AIM Software Status

advertisement
AIM Program Software
Status
AIM Program Software
Includes:
AIM I
• AIM II
• AIM Learning Object Module
• Content Planning Module
•
AIM Training
Traditional “Buttonology” Courses
• AIM I
• 2 FY 15 convenings, 1 on each coast
• AIM II
• 6 convenings
• CPM/LO Module
• 16 convenings
E2E Training
Taught or expected to be taught at every
learning center or fleet concentration area
• Approximately 50% of the convenings in the
Hampton Roads area
• Distance Learning version of current E2E ILT
course planned for facilitated asynchronous
delivery via NETC N7 Sakai instance
•
E2E Training
Training in support of the NETC E2E Process
• NAVEDTRAs
• NETC End-to-End Process SOP
• Three new topics in design:
•
BCA – FEA in govt review
•
R3 (Reuse, Repurpose, Reference) – integrated
into the DL Videos, retrofitting into ILT course
•
Reengineering – in JDTA currently
AIM Program Updates
AIM Update
December 2014
Fixed summary display in the CMS
• Fixed issues with CMS Events for non-CCMM
site
• Added support for multiple Volumes in LP
•
•
Added support for adding distribution
statements to the cover page of the TPP,
TCCD, LP, TG
AIM Update
December 2014
(contd)
LP Preview automatically turns to PDF if over
2500 pages
• Changed the terminology from IMI
(Interactive Media Instruction) to IMM
(Instructional Media Material)
• Added "Save Source File As..." and a "Save
As..." menu items to the Graphics module
•
AIM Update
December 2014
(contd)
Changed PC Simulation support in the Site
RRL, moving it from a separate category to
be a subset of IMM.
• Increased the field size for number and
supplier fields.
• Fixed issue when printing the TG and the
S/HAN contains section breaks
•
AIM Update
December 2014
(contd)
•
•
•
When editing sheet content, software
should no longer hang if trying to edit a
document that is blocked by Word 2010's
security settings.
Updated TPP functionality based on
feedback from TPP Working Group
Expanded performance assessment support
CPM Update
2nd QTR FY15
TPP updates from TPP Working
Group
• OCCSTD import into JDTA
• Expanded Field Level Help in CPM
• Expanded PC Simulation in RRL
•
CPM Update
2nd QTR FY15
(contd)
Multicenter Roles for CPM users
• Remedy printing, data import, and
JDTA copy issues in CPM
• Correct Lesson length
• Change IMI to IMM
•
Future AIM / CPM Updates
Improved Lesson Plan formatting
• Versioning –
•
•
Create new versions of only those Modules/Lessons/Sections that actually need to be
modified. Remaining content stays at its current approved version
Course Master Schedule fixes
• Front End Analysis (FEA)
• Table of Specifications (TOS)
•
Future AIM / CPM Updates
(contd)
•
•
•
•
•
Track Access/Changes to data in
AIM I/AIM II/LO Module
Data Retention of CPM Data
Versioning Resources / Data /
KSATRs
Portion Marking
OCCSTD Versioning
LO Module Integration into
CPM – ‘Webification’
•
Long-term NETC plan is to
integrate LO Module functions
into CPM as a fully web-based
application
Phase 1
•
Core of LO Module creation in CPM
‒
delivered and accepted by govt Jan 14
Phase 2
•
Significant improvements in importing
LO Module files, “filled in holes” from
Phase 1
‒
Approved FEB 15
Future Development
•
•
Phase 3 (100% of desktop client
functionality and operational replacement
for LO Module desktop client): unfunded
Schedule and required funding are TBD
based on several factors, including:
‒
ECP to capture functional and technical design, scope
cost, and determine schedule – especially editor and
printing issues
‒
freeze of desktop client enhancements that will need
to be incorporated into the Phase 3 version of
webified LO Module
Issues
Replace current Word editor for TG sheets
with web-based editor and migrate existing
Word-based TG Sheets into new editor
• Identify, test, and implement new print
engine
• Work with NETC N6 to scope server
requirements and network bandwidth to
support far greater user and data load on
CPM than current Plan, Analyze, and Design
phases of ISD process
•
Next Steps
•
•
•
Start work by ‘Webification’ Working Group
chartered by NETC N74 in Dec 14
‒
Define functional requirements for the ECP analysis,
functional/technical design, costing, and schedule
‒
Begin analysis and design of NETC IT architecture to support
implementation of integrated Web-based CPM/LO Module –
especially new SSC NOLA configuration
N7/FRB/CCB determine when to freeze
enhancements to desktop client LO Module
Task/fund ECP for Phase 3 ‘webification’
AIM Support
Currently handled by NAWCTSD,
with contractor support
• Planning for eventual transition to
REMEDY, with appropriate planning
and implementation
•