Accelerating solutions for highway safety, renewal, reliability, and capacity AASHTO Design Subcommittee Albuquerque, NM July 17, 2008 HALLMARKS • Short-term • Results-oriented • Non-traditional areas • Quantum leaps, major advances • Inter-related projects • Emphasis on openness FOUR FOCUS AREAS Safety Safe Highways Capacity Better Transport Decisions Great Custome r Service Reliable Travel Time Reliability Rapid Renewal and Lasting Facilities Renewal SHRP 2 Capacity Research Integrate mobility, economic, environmental, and community needs into the planning and design of new highway capacity $18 million 8 Projects Decision Points and Decision Makers Long-Range Planning Corridor Planning Environmental Review Design Permitting MPOs DOTs Pricing Effects of Congestion Models and Assignments FHWA Performance Measures Effects of Road Management Habitats & Wetlands Citizens Advocacy Effects of Technology Planning and NEPA Economic Impact and Land Use Resource Agencies Elected Officials Highlights-Capacity • Travel Demand Model Partnerships (C10): States/MPOs can partner with bidders • Workshops on Key Decision Points (C01): need folks from “the trenches” • Web-based Performance Measures (C02): project finishes in a month • Case studies on economic impacts of highway expansion (C03): suggestions needed for cases • Contributions of operations, technology, design (C05): need data sources on arterial flow SHRP 2 Safety Research Understanding Driving Behavior $43.2 Million 11 Projects 2 Safety Research Tracks Data Collection 2500+ Drivers Traffic Roadway Conditions Traffic Controls Weather Distractions In-Vehicle Study Data Analysis Countermeasures Data Collection Data Analysis Vehicles at Intersections Site-Based Study Highlights-Safety • Finalize sample design: driver and vehicles factors (S05) • Selection of sites for field study (S07) – – – – Urban, rural, suburban Weather, topography, design factors Other data sources Qualified contractors • Rodeo to test roadside/roadway data collection capabilities (S03/S04) SHRP 2 Reliability Research reduce congestion through incident reduction, management, response, and mitigation $18 million 12 projects Reliability Performance Measures • Travel Time Variability • Travel time index: Average travel time/free-flow travel time • Planning time index: 95th percentile travel time index • Buffer time: time added to trip to arrive within a window with acceptable probability • Buffer index: (mean – 95 percentile)/mean Traffic Math 101 75 vs. 90 Minutes Clearance Time: Explaining the Value of 15 Minutes Saved • Example: – – – – – – I-5 northbound, Fife vicinity Average 8% trucks Two (of four) lanes blocked 6:00 a.m., typical Wednesday $14 - $18/hour Auto Delay Cost $56/hour Truck Delay Cost • Cost savings of clearing 15 minutes faster = $146,000 Source: WSDOT Highlights — Reliability • Project L06 (PB Consult) – Workshop on Institutional Barriers to NonRecurring Congestion Management Strategies • Project L03 (Cambridge Systematics) – Potential Performance Measures and Mitigation Strategies for Evaluation • L01 (Midwest Research Institute) – Identification of Case Studies of Successful Integration of N-RC Operations Business Processes SHRP 2 Renewal Research Get in, Get out, Stay out $28.9 million 14 Tracks 3 Strategic Objectives with 5 Integrated Research Tracks for Successful Highway Renewal Rapid Approaches Successful Renewal Long-Lived Facilities Minimal Disruption Integrated approach Technology Project Delivery Successful Renewal Integrated Tactic 1 R06. High-Speed NDT Enable Performance-Based Renewal • Rapid Approach • Minimum Disruption • Long Life R07. Performance Specs Incentive Specs Warranties R09. Risk Manual for Renewal Contracts Integrated Tactic 2 R16: Railroad-DOT Mitigation Strategies R01: Locating & Characterizing Utilities R15: Integrating Utility and Transp. Agency Priorities R11: Approaches at Corridor/Network Level Facilitate Project Start-up • Minimum Disruption • Rapid Approach R09: Risk Manual for Rapid Renewal Contracts R06: High-Speed NDT R04: Innovative Bridge Designs Integrated Tactic 3 R23. Using Existing In-place Pavement R04. Innovative Bridge Designs R02. Geotechnical Solutions Accelerate Construction R05. Modular Pavement • Rapid Approach • Minimum Disruption R06. High-Speed NDT R10. Innovative Project Management R03. Reducing Personnel Fatigue Integrated Tactic 4 R23. Using Existing In-place Pavement R21. Composite Systems Reduce Maintenance Frequency • Minimum Disruption • Extends Life R02. Geotechnical Solutions R19. Durable Bridge Systems R26. Preservation Approaches R06. High-Speed NDT Integrated Tactic 5 Facilitate Responsive Contracting • Rapid Approach • Minimum Disruption • Long Life R07. Performance Specs Incentive Spec Warranties R09. Risk Manual for Renewal Contracts R10. Innovative Project Management R03. Reducing Personnel Fatigue R04. Innovative Bridge Designs Highlights - Renewal • Preliminary results: – Approaches for mitigating impacts of utility relocation (R15) – Locating underground utilities (R01) – Non-destructive testing (R06) • Refined research plans for follow on detailed development project SHRP 2 Research Related to Design • Primarily in 2 focus areas – Renewal – Reliability • Deliverables – Design Guidelines – Procedures – Other tools (data gathering, etc) – Training programs – Design specifications (bridges) Design Guidelines L07 Evaluation of Costs and Effectiveness of Highway Design Features to Improve Travel Time Reliability $2.5 M Identify state of reliabilityrelated design practice. Develop guide book and dissemination plan R02 Geotechnical Solutions for Soil Improvements, Rapid Embankment Construction and Stabilization of the Pavement Working Platform $3.0M Develop design guidelines for mechanical and chemical treatment of base, sub-base and subgrade layers R23 Using Existing Pavement in Place and Achieving Long Life $1.0 M Develop design guidelines and criteria for the use of various options State DOT help needed (R23) 1. Guideline development (4 DOTs min) 2. Workshops planned for 2009 and 2010 Design Procedures R05 Modular Pavement Technology $1.0 M R21 Composite Pavement Systems $4M Feasibility study of potential uses. Develop generic Modular Pavement Design Procedures Procedures for development of composite pavement systems. Development of design manuals Data gathering and such R01 Encouraging Innovation in Locating and Characterizing Underground Utilities $300K ($5M) Report documenting current techniques and practices, software toolbox, R&D plan Future SHRP2 Projects R06-A NDT to Identity Bridge Deck Deterioration RFP advertisement July 29 R06-D NDT to identify Delaminations between HMA Layers RFP advertisement July 29 R06-E Development of Continuous Deflection Sensors RFP advertisement July 29 R15-B Utility Conflict Identification and Solutions RFP advertisement July 29 Training Programs R15-A Model Curricula and Certification Programs for Utility Relocation RFP advertisement July 29 Design Specifications R04 Innovative Bridge Designs for Rapid Renewal $2.0 M R19-A & B Bridges for Service Life beyond 100 years $2M + $1M New methods for accelerated bridge design and construction. AASHTO-formatted LRFD design specifications AASHTO-formatted LRFD design specifications R06. Plan for Developing High-Speed NDT Procedures for Design Evaluation and Construction Inspection RFPs to be released on July 29 R06-A: NDT to identify concrete bridge decks deterioration R06-B: Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction Materials R06-C: Using Infrared and High Speed Ground Penetrating Radar for Uniformity measurement on New HMA Layers R06-D: NDT to identify Delimitations between HMA Layers R06-E: Development of Continuous Deflection Sensors R06-F: Real-Time smoothness measurements of PCC Pavements During Constructions R15. Strategies for Integrating Utility and Transportation Agency Priorities in Renewal Projects RFPs to be released on July 29 R15-A: Model Curriculum and Certification Programs in Utility Relocation Engineering R15-B: Utility Conflict Identification and Solutions Thank you for listening! http://www.trb.org/shrp2/