NDIA PMSC Guides Update Working Group 26 August 2010 Gay Infanti Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . Guide Update Process/Timeline • Survey conducted in Spring 2009 indicated PMSC Guides require update; in future, guides will be reviewed/maintained on a regular cycle • PMSC decision to tackle IBR guide first • PMSC Guides Update Team established; government and additional industry participation added in November • First draft revised IBR Guide released for public comment in early October; feedback adjudication began in early November; joint team reached agreement on main body of guide • Significant update to Pre-Award IBR section in December • Second draft release in January. Comments addressed and incorporate; revised draft distributed on 4/14/10 • Formal PMSC membership voted to approve IBR Guide as working draft, for 2-month use/comment period prior to final publication • IBR Guide, Revision 1, dated 9/1/2010, approved for publication on 25 August 2010 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . Guide Update Process/Timeline (continued) • Surveillance Guide team formed and update begun in April • Draft Surveillance Guide, Revision 1 (7/28/10) distributed to PMSC members review/comment on 3 August 2010 • Final revision targeted for completion by 1 October • Vote to approve for publication tentatively scheduled for November 10th Acceptance Guide update started; completion date is TBD Application Guide update started; lead is TBD Intent Guide updated last Spring to incorporate corrections and align with EIA 748-B • • • – Currently awaiting feedback from DCMA’s EVMC – Collecting recommendations from other sources, e.g., the Scheduling WG – Will likely recommend an out-of-cycle revision to the Intent Guide for PMSC Board and PMSC membership concurrence Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 3 Guides Update Project Organization Guides Update Steering Group Gay Infanti – Lead Joan Ugljesa Randy Steeno Surveillance Guide Dave Roberts Lead Acceptance Guide Buddy Everage Lead IBR Guide Dave Roberts Lead Application Guide Lead - TBD Intent Guide Lead - TBD Individual Guide Update Team Participants Shown on Subsequent Slides Team Members Invited to Support All Guide Updates as Applicable to Their Subject Matter Expertise Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 4 IBR Guide Update Team Industry Participants Government Participants • Matt Pflieger - Battelle • Fred Meyer – Air Force • Marty Doucette – Pilgrim Companions • Bob Loop - Air Force • Bill Mendelsohn - ITT • Keith Samuels – Army • Scott Gring - Lockheed • Mia Lasat – Army • Mitzi Shepard - Lockheed • Jesse Stewart – DAU • Ruth Taylor – Lockheed • Robert Pratt – DAU • Dave Roberts – Navigant ( IBR Guide Lead) • Roberta Tomasini - DAU • Dennis Chapman – DCMA EVMC • Brian Kong – DOE • Matt Gonzales – JPL • Ken Poole – NASA • Beau Willis – Navy • Anita Cukr – Navy • Ted Rogers – NAVAIR • Annette Junek - NAVAIR • David Driver – Navy • Aaron Risdal – Navy • Lt Col David Arrieta – OSD • Todd Schulzetenberg - Raytheon • Ed Silva - Raytheon • Dale Gillam – SAIC • Jim Brasell – Unisys • Pam Brooker – Battelle • Pete Wynne – Lockheed • Gay Infanti – NGC (Guides Update Lead) • Evelyn Neely – Raytheon • Frank Malsbury – Raytheon • Richard Childress – Unisys Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 5 IBR Guide Status • Working draft of IBR Guide unanimously approved in May for publication on NDIA PMSC website as a working draft for use and comment Formal comments were requested during a two-month period ending 15 July 2010 33 formal comments and recommendations were received from PMSC member companies and government agencies • • – All were adjudicated, documented along with the rationale for acceptance or rejection (23 accepted in whole or in-part;10 rejected), and ratified by the PMSC Board – A documented Summary and Disposition of Comments was distributed with the final revision of the document to the PMSC membership and individually included in formal responses sent by PMSC to the companies and agencies to acknowledge and thank them for their comments • Yesterday, the final revision was approved for publication on the NDIA PMSC website effective 9/1/10 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 6 Summary of IBR Guide Changes • Established new standardized format/style for this guide; plan to • • • • • use on all PMSC guides Improved applicability and use for non-DOD agencies and for inhouse IBRs Improved consistency of the IBR process across all stakeholders Added content to address both types of IBRs, pre- and post-award Increased content and focus on risk/opportunity assessment and management Included CAM/PM/IPT risk discussion objectives for each of the following risk areas: technical, cost, schedule, resources & management Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 7 Summary of IBR Guide Changes • Added recommended content for IBR Preparation – Objectives, entrance/exit criteria – Training – Data requests • Included typical IBR execution agenda • Clarified that IBR is not an EVMS review – EVMS should be reviewed in connection with management system risk only – EVMS risk should be assessed by checking its status via coordination with applicable CFA responsible for EVMS surveillance • Additional material/guidance added regarding pre-award IBR – Acquisition planning guidance to identify when pre-award IBRs should be considered – Mechanisms for applying and funding pre-award IBR requirements – Key process differences associated with timing of pre-award IBRs, e.g., availability and maturity of data available prior to contract award Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 8 Surveillance Guide Update Team Industry Participants • Dave Roberts – Navigant Consulting (Team Lead) Government Participants • Brian Kong – DOE • Jim Fountain – DOE • Laura Ayres, Price Waterhouse Coopers • Tom Bruder - DOE • Pam Brooker – Battelle • Aaron Risdal – Navy • Bill Mendelsohn - ITT • Scott Gring – Lockheed Martin • Lucy Haines – Lockheed Martin • Mitzi Shepard – Lockheed Martin • Pete Wynne – Lockheed Martin • Marty Doucette – Pilgrim Companions • Mike O’Neill- Raytheon • Andrew Dorsey – Orbital Sciences • Amy Martz – Raytheon • Chris Nicholson, Northrop Grumman • Gay Infanti, Northrop Grumman (Guides Update lead) Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 9 Surveillance Guide Status • Draft revision distributed to PMSC members for review and comment on August 3rd Comments requested by 1 September 2010 Submit comments to: • • – Dave Roberts at David.Roberts@navigantconsulting.com – Gay Infanti at gay.infanti@ngc.com • All comments are welcome but preferred approaches, which facilitate consolidation and review by the team, are: – Mark-ups of the draft document using M/S Word‘s Track Changes menu command, or – Inserted comments using M/S Word’s Insert Comments menu command • Alternatively, you may submit comments via email referencing the sections and paragraphs to which they refer Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 10 Summary of Surveillance Guide Changes • Objective - Update Surveillance guide based on: – – – – • Changes in EIA 748-B Latest government guidance/policy Survey results Lessons learned and best practices Increased focus on perceived gaps in earlier version: – – – – – – – Applicability of the PMSC Surveillance Guide (vs. the SSOM) Risk and opportunity management Schedules Subcontractor surveillance Data anomaly prevention Accuracy/integrity of management report Collection, tracking and use of surveillance results for subsequent year surveillance planning and system-level process improvements • Replaced most of Section 6.3, deemed too detailed and overly-prescriptive with more generic guidance on collection/use of data and metrics • Reformatted and modified terminology/definitions consistent with IBR Guide Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 11 Next Steps • Surveillance Guide – Receive, disposition, and incorporate comments received by 9/1/2010 – Publish final revision by 1 October; distribute to PMSC membership for review – Hold formal vote to approve for publication (tentatively scheduled for November) • Acceptance Guide – Buddy Everage leading this team – Tentatively planning a reciprocity workshop for the fall IPM Conference – Currently accepting members; if interested, please notify Buddy (beverage@mcri.com) or Gay • Application Guide – Starting point will be the version of the Acceptance Guide containing the RM/EVM Integration Guidance recommended by the original PMSC Risk Management WG – Currently seeking team lead and members – Targeting year-end for completion of first draft for review/comment • Intent Guide –further revision prior to May 2012 is still TBD Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved. . 12