Cost Total cost is up to $8,645,000 $500,000 from Capital Reserve Fund $8.145 million bond for the balance. Cost Breakdown $822,256 Building Renovations $1,411,162 $4,053,208 $2,368,757 In-Kind Track and Field Replacement Add Geo-Turf Synthetic Field Add Regulation Track Declining Debt Level Two Bonds Currently Outstanding 1995: $3.972 Million with Last Payment in 2014 Current Annual Net Debt Service of $226,000 2003: $9.925 Million with Last Payment in 2017 Current Annual Net Debt Service of $543,456 Total Annual Net Debt Service $769,456 $8.165 Million in New Debt First Year Net Debt Service (2015/16) of $156,000 Subsequent Annual Net Debt Service $490,000 Tax Impact Annual tax over 15-year life of bond for average assessed house $16 $27 $45 Building Renovations $78 In-Kind Track and Field Replacement Add Geo-Turf Synthetic Field Add Regulation Track Hillside Elementary Roof Replacement on the K-2 wing of the building 36 Univents to improve air quality and heating in classrooms Classroom and Fire Doors to meet current safety standards Floors of the All Purpose Room (large gym) and the lower wing Exterior Masonry – repointing of brick work Electrical Upgrade Ceiling and Wall finishes Farragut Middle School Roof Replacement on the Middle School Auditorium Exterior Masonry – repointing of brick work and parapets Electrical Upgrade Boiler Burner – Replacement of 50-year old equipment Hastings High School Roof Replacement on the Cochran Gym Renovation of the High School Auditorium including Seating, Lighting and Sound Systems, Flooring, Curtains, Rigging, and Stage Resurfacing Interior Ceiling and Wall finishes Reynolds Field Install a Regulation 400-meter track Install a Geo-turf synthetic field Install a sidewalk on Chauncey Lane Replace bleachers in similar style Add 15-foot lights around track – NO stadium lighting Refinish all tennis courts (one being relocated) Relocate playground to grassy area south of tennis courts Beginning and End of Season Upper Burke Field Bleacher Replacement What Kind of Lights? Maintenance Cost Comparison Natural Weekly Mowing and Sweeping $1,400 General Maintenance, Lining, Set-up, etc. $7,800 Aeration 6x Year $1,270 Natural turf renovation (biennial) $3,100 Geo-turf $5,200 Routine Irrigation, Inspection, Repairs $800 $500 Irrigation water $6,000 $2,000 $3,500 Infill Replacement Allowance Total $20,370 $11,200 15-Year Cost Comparison Grass Installation Costs Geo-turf $520,300 $1,706,100 $26,690 $79,298 5 8 Annualized Cost of Resurface $36,000 $61,875 Annual Maintenance $20,370 $11,200 15-Year Annualized Cost $60,024 $87,702 Annual Depreciation of Install Expected Life Span Annual Difference $27,679 15-Year Cost Comparison Natural Installation Costs Annual Depreciation of Install Geo-turf Sand-Based $520,300 $1,706,100 $1,100,000 $26,690 $79,298 $53,376 Expected Life Span 5 Annualized Cost of Resurface $36,000 $61,875 $36,000 Annual Maintenance $20,370 $11,200 $45,000 15-Year Annualized Cost $60,024 $87,702 $105,884 Annual Difference to Natural Grass 8 $27,679 $45,772