Project Management Self-Discovery Programme 6 Zones in Land Transport Gallery Programme Encompasses Ice Breaker Journey Self - Discovery Challenge Theatre Vision Ice Breaker : Work Breakdown Structure Chart: Answer Cards: 1.0 MRT LINE Engineering Design Report Compilation 1.1 1.2 ? Engineering & Design 1.1.1 Post Construction Survey 1.1.2 ? 1.2.1 Gather Local Construction Safety Regulation Safety Certification Self – Discovery Programme Picture Search Short Answered Question (SAQ) Project Life Cycle Phases Crossword Puzzle Next… Picture Search Picture Description Advanced Wireless payment service on-board taxis Back Short-Answer Question What does LTA stand for? Hints: Answer: Land Transport Authority BACK Project Life Cycle Phases Project Life Cycle phases Initiation Planning Answers Answer card: ? Opened to the public on 29 June The final construction cost for the project, 2012. not including the price of the land but including an access road, drainage works, and soil improvement, was within a $1.035 billion Aims to showcase the best allocated budget. Execution Construction begin on access road , drainage works, and soil improvement. Monitoring and control Maintenance / Improvement on the work condition. Closing ? ? Back of tropical horticulture garden artistry. and Crossword Puzzle P R O J E C T R O D U C T 1. ______Management is the application of knowledge, tools, skills, and techniques to project activities in order to meet or exceed stakeholder needs and project expectations. 2. _______ life cycle describes the stages a product goes through from when it was first thought of until it final removed from the market. BACK LET THE GAME BEGIN!