Project Management
Self-Discovery Programme
6 Zones in Land Transport Gallery
Programme Encompasses
 Ice
Breaker
 Journey
 Self - Discovery
 Challenge Theatre
 Vision
Ice Breaker : Work Breakdown Structure
Chart:
Answer
Cards:
1.0
MRT LINE
Engineering Design
Report Compilation
1.1
1.2
?
Engineering &
Design
1.1.1
Post
Construction
Survey
1.1.2
?
1.2.1
Gather Local
Construction Safety
Regulation
Safety Certification
Self – Discovery Programme




Picture Search
Short Answered Question (SAQ)
Project Life Cycle Phases
Crossword Puzzle
Next…
Picture Search
Picture
Description
Advanced Wireless payment
service on-board taxis
Back
Short-Answer Question
What does LTA stand for?
Hints:
Answer: Land Transport Authority
BACK
Project Life Cycle Phases
Project
Life Cycle
phases
Initiation
Planning
Answers
Answer card:
?
Opened to the public on 29 June
The final construction cost for the project,
2012.
not including the price of the land but
including an access road, drainage works, and
soil improvement, was within a $1.035 billion
Aims to showcase the best
allocated budget.
Execution
Construction begin on access road , drainage
works, and soil improvement.
Monitoring
and control
Maintenance / Improvement on the work
condition.
Closing
?
?
Back
of tropical horticulture
garden artistry.
and
Crossword Puzzle
P
R O
J
E
C
T
R
O
D
U
C
T
1. ______Management is the application of knowledge, tools, skills, and
techniques to project activities in order to meet or exceed stakeholder needs
and project expectations.
2. _______ life cycle describes the stages a product goes through from when it
was first thought of until it final removed from the market.
BACK
LET THE
GAME
BEGIN!