ESE Departmental Tasks Andrew Will Evan Kristen Alex Shauna Joe Saroj Sam, Jessi Jessi Cammi Andrew Seas website comparison. Upgrade all flowcharts to Visio. – start with Math/EE and Math/SSE Undergrad FAQ Gk12 site 4/27/10: Create sample program for Double Major ME/SSE per 4/23 email from Hiro Done Look at what Infrared sensors are available and think of how they can be used for UGR Robotic Sensing projects Reflections by students from Technion Feitek Technion Reflections/Reports to ese.wustl.edu Help Dr. Katz pack boxes Add casters to robot Help Will fix Power Supply current limit Faitek Run Action Items list from meeting 6/15/10: Convert ESE435 manual to Word Compare old site (http://ese-old.wustl.edu/) to new site for missing content and layout ideas Review new site for readability/layout/content improvements Right angle microwave circuit CMS system for UGR reports o MediaWiki? Fix Sidebar – make Side Bar and Toolbox only available when logged in. Play local videos Permissions to edit? Can anyone become an editor w/o authorization? Templates – create a template that includes the custom navigation bar to start with at the beginning of the semester. Figure out how to make a simple photo gallery in the wiki 5/10/10: Convert to HTML: http://ese.wustl.edu/ContentFiles/AboutTheDepartment/DepartmentResources/Bio%20for %20Preston%20M%20Green.pdf 3/2/10: Convert to html tables: http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/EE_SampleProgram.pdf *http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_SampleProgram.pdf *(move to its own page) http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/BS_EE_BME_SampleProgram.p df *(move to its own page) http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/BSASEE_BME_SampleProgram. pdf *(move to its own page) http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_BME_SampleProgram.pdf *(move to its own page) http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/BSAS_SSE_BME_SampleProgra m.pdf http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/EE_CoE_SampleProgram.pdf http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/EE_CS_SampleProgram.pdf http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_FinanceSampleProgram.pd f http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/EE_PreMed_SampleProgram.p df http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_PreMed_SampleProgram.p df http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/Undergraduate%20Funding.pdf http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/Co-Op.pdf Resize flowcharts Mediawiki Skin 3/2/10: Convert to html: http://ese.wustl.edu/ContentFiles/AboutTheDepartment/Seminars/seminars.pdf Create photo gallery for UGR Fix robot traction issue Look at other comparable University's web pages for content/ideas to improve our site5/6/10: Convert to HTML: http://ese.wustl.edu/ContentFiles/Research/UndergraduateResearch/UGR%20Phot o%20Gallery/UGR%20Photo%20Gallery.pdf Flowcharts i. BSAS/CS ii. BSAS/CoE Talk with Pat Harkins about mounting motor on dynamo – get a coupling New Motor from Carter Remove Fluke multimeter panels and have them machined Measure the size of 115 Bryan and the size of one station in 14 Urbauer and create schematics like the ones you made for the Control Systems Lab still in 113 Cupples 2. Alex Done Cancelled - Bode Plots in Bryan 306 o Use MAX to make sure 6025E PCI card is dev1 under DAQmx – there might be a driver issue here. o Modify C:\Documents and Settings\All Users\Documents\National Instruments\NI ELVISmx Source Code\Bode.llb to work on with the PCI card. o Get a SCB-100 and add wire-BNC adapters to AO-0 and AI-0 and AI-1 o Snake the SCSI-II-100 cable through the mouse hole on station 1 Broken equipment in Urb115 Fix temp probe Repair 0.01 ohm current shunt Test batteries in current meters Replace fuses on the left fluke at Bry30614 and Bry30613 Put away stuff on Bryan 308 desk Test Equipment in Bryan Urb 115 Fix In. Amp. ESE331 board Bad torque gauge – temp fixed – waiting for dial from mfg. Spec An in 308 – broken Intensity knob Build ribbon cables for sbRIO to Pre-Amp connection. ESE331 uWave o 3 cables for DPST uWave switch Repair Spec. Analyzers - this looks like a mechanical problem Evan Done 3/2/10: Convert http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/StudyAbroadStudentsComments.pdf to html and add 3 additional testimonials: (OriginalFiles/StudyAbroad_030210/AllisonDeal_StudyAbroad.docx OriginalFiles/StudyAbroad_030210/AllisonDeal_RhyanJohnson_DSCN0495a.jpg OriginalFiles/StudyAbroad_030210/ChelseaRoberts_Study%20Abroad%20Website.docx OriginalFiles/StudyAbroad_030210/ChelseaRoberts_IMG_3659.jpg http://ese.wustl.edu/ContentFiles/AboutTheDepartment/DepartmentResources/ESEDepart mentWebSiteTasks/OriginalFiles/StudyAbroad_030210/JessicaStigile_Study Abroad Comments.docxOriginalFiles/StudyAbroad_030210/JessicaStigile_Study%20Abroad%20Com ments.docx OriginalFiles/StudyAbroad_030210/Jessica_JenAtNeuschwansteinCastle.jpg 3/2/10: Convert http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/Undergraduate%20Summer%20Resear ch.pdf to html and add: OriginalFiles/SummerResarch_030210/MichaelSteinbock_SummerResearch.docx OriginalFiles/SummerResarch_030210/MichaelSteinbock_IMG_2659.jpg Kristen Done (or not): 4/27/10: Create flowchart for Double Major for ME/SSE 3/2/10: Convert to images viewable inside the Content Editor framework o http://ese.wustl.edu/undergraduateprograms/Pages/bs-in-ee.aspx (already embedded) o http://ese.wustl.edu/undergraduateprograms/Pages/bs-in-sse.aspx (at bottom) o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/BSEE_BMEFlowchart.gif o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/BSASEE_BME_FlowChart.jp g o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_BME_Flowchart.jpg o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/BSAS_SSE_BME_Flowchart. jpg o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/EE_CoE_FlowChart.jpg o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/EE_CS_Flowchart.jpg o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/ProcessControlFowchart.gif o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_Finance_Flowchart.jpg o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/EE_PreMed_FlowChart.jpg o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_Premed_Flowchart.jpg o http://ese.wustl.edu/ContentFiles/UndergraduatePrograms/SSE_SecondMajor.jpg Will Limit switches in Bryan 202 230 Inventory including Rollerbot Cut wires for ESE230 Spray contact cleaner on all rheostats (for 1/23) Replace SCR in load box for non-linear load – waiting for parts (for 1/23) Mount all DMMs with Hinges to Bry306-work with Pat to fab a plate. Configure new robot for Robotic Sensing Training – motor bad? Front wheel on some of the robot on new robot – check the other robots. Configure wireless on new robot Clean up Bryan 308/306/316 Finish test of Bry306/Urb 115 equipment High current output stage for function generators – TI OPA 548 with 1 MHz GBW – waiting on parts and board Count scope probe caps and ground leads and reorder (Bryan 306 and Urb. 115) sent ed report Cable hangars – sent ed link Order current shunts – sent ed link Done: Fix Torque gauge – parts on order – torque gauge is missing – maybe Alex USRP with Paul Min and Bob Morley o Directional Antenna o Radar example Barry’s videos Cabling for DPST uwave switches – waiting for 2nd switch Convert VHS to DVD for barry Order 10 more temp probe stands – sent ed link - ordered Add 9M resistor to ESE435 – see drawing Fix 2 instrumentation amps for ese331 Fix solar cell #1 Replace old narrow body SMA connectors with wide body ones Storage bins 39 drawer of 1: x 3: x 6: Angle for ½ bracket in Bryan 306 Check Firmware version on the Agilent scopes against current version – urb. 115 and bryan 306 Test equipment in Bryan 316/306 and Urb. 115 Anechoic chamber Wireless vs. Ethernet tests on sbRIO robots Check inventory for Drill paint rollers, other rollerbot parts Fix speaker on desk in bry308 Test AA batteries on desk in bry308 – toss bad ones, put good ones in AA battery drawer Test bulbs Fix/Test Instrumentation Amps from ESE331 Clean up Bryan 306 Tighten set screw on P/S in Urb. 115 3 bad motors in Bryan 306 Repair Thermoelectric fixtures (replace FETs) – IRFP640 – waiting to test ESE331 o Matlab calculations for Barry Metal shields for robots Reconfigure RMA robots – test motors JEE Schhep Under cabinet wiring in Bryan 316 Fix 2 solar cells for Tuesday, 2/1 Missing 3 Fluke Handhelds Test Equipment in Bryan 306/316/ Urb 115 Transcribe Videos Roller Bot parts inventory – almost done. 1 of the robots are missing the AIGnd connection. Caster wheel for robot Secure DMMs in Bryan 306 Port PSpice tutorials to Cadence. Cut more 5” wires for ESE230 Clean up 308 Fix 2 decade boxes in Bryan 308 Organize ESE230 equipment with labels using lab manual Fix 2 47 mH inductors Mount brackets on antennas Reset current limit to 400 mA on power supplies in Bryan 306 Current limit on right side not working on p/s ESE331 o Clear a shelf in Bryan 308 for ESE331 uWave stuff. o Build hybrid and right angle circuits o Drill 6 boards and Plexiglas - Assemble o Mount 5 SMA connectors on each board o Swap Bryan 306 HP DMMs with Fluke DMMs in Urb. 115 and mount all DMMs to rack Current Limit on Power Supplies in Bryan 306 Clean up computer cabinets so that wiring is neat and doors will always close. Test Spec. An in Bry308 Bry306 replacements/Feitek run Fix resistor for ESE230 – just 1 left Benchmark LabVIEW 2009 Unwind inductors for ESE230 Repair 4 bad solar cells Troubleshoot Wireless Re-Organize cables in Bryan 306/316. Wind solder into small containers Cut breadboards into 3 and drill on CNC for ESE230 robots Repair Wattmeter Fix Temp Probes (4) – calibrating 4/8/10 Cable up sbRIO robots for wireless and uPhone preamp Noisy scope on station Bry306-1 6 channel 2 – can you check it out? Might be a probe – come get me if you need help. Empty Bryan 105,115,311 Sam, Jessi Code: o Current o Pending o Not feasible o No formatting – waiting for faculty input FlowCharts: o BSASEE/BSME – waiting for comments from Hiro – 8/12 o BSEE/ME from Eitan – Hiro made changes and added the colors o BSEE/BME – 4 year program – flowchart/spreadsheet Replace or keep 5 year program Waiting for Hiro approval Waiting for Spreadsheet o EE BSSSE/BSAS EE BSEE/BSAS SSE – incorporate Hiro’s 8/15 comments o Math BA Applied Math with second degree in EE – waiting for program – needs 150 credits so unlikely BA Applied Math with second degree in SSE – waiting for program – needs 150 credits so unlikely BSSSE with second major in Applied Math – waiting for program o Add the new requirement to all flowcharts: E60 4501 – Engineering Ethics and Sustainability will be required for the BSEE and BSSSE starting now. Hence, you need to revise every page where either one is featured. Port all old flowcharts to new format Change “SS or TH Requirements” to “H and SS Requirements” on all flowcharts Done o BSASEE/BME o BA Applied Math with second major in Electrical Science o Changes to BSEE/BSSSE from Hiro 7/27 o SSE/BME o BSSSE/BSChemE revisions from Hiro – 7/15 o Shauna Post UGR reports – see old email for details Done BSAS (SSE) revision Minor in SSE Fix Zaborsky Lecture series o Separate page for each lecturer o Link to separate page with on Zaborsky page with Name and Year and affiliation Generate slide for signage for ESE488 Generate slide for signage for Alex and EvanAdd HomeFlash/Signage for all UGR projects Add HomeFlash/Signage/NewsItems for Michael, Alex and Andrew Hoover quote to Signage/HomeFlash Fix up Internation Experience slideshows Convert http://ese.wustl.edu/undergraduateprograms/Pages/BSinEEwithSecondMajorinAppliedMath.aspx to a HTML table. Merge 2 slideshows for International Experience and UGR Check for formatting errors using google Staff Page Compare ESE web site with other web sties More slideshows 3 UGR videos-Andrew, Evan, Rafael and Zach Subtitles Post to Esesignage1Hasting exams Create animated gif for Undergraduate Programs and Undergraduate Research. Copy 10 good photos of undergraduates from the ESE Photo Library to v:\UndergraduatePrograms\UndergraduateProgramsSlideshow. You can find all of our photos at: http://ese.wustl.edu/~ed/ESEPhotos Crop all of these photos to 4”x4” at 75 dpi (see section 7 of tutorial) Create an animated gif of these 10 photos (see section 8 of tutorial) Change the link on http://ese.wustl.edu/undergraduateprograms/Pages/default.aspx to point to this image. Repeat with 10 UGR photos for the photo on http://ese.wustl.edu/Research/Pages/undergraduate-research.aspx Web doc for B.S./M.S. program for M. Eng. SP21010 UGR/Senior Design posting Jessi Done o BSSSE/ChemE changes o Biology: **BA in Biology with second major in Systems Science – almost done o Physics **BA in Physics with second major in Electrical Science* - almost done o BSEE/BSCoE changes o BSEE/Applied Math changes o BSEE/BSCS changes – see recent changes from Hiro. o BSEE changes – flowchart and spreadsheet o Changes to BSSSE flowchart and Spreadsheet o Changes to 2nd Major in SS – done, needs to be posted o Biology BSSSE with Emphasis in Biological Systems EE BSEE/BSSSE (in 4 years) Math BSEE – 2nd Major Math, B.A. Math with 2nd Major in Systems Science – flowchart and spreadsheet. BSEE – PreMed o Rejects o Biology ***BA in Biology with second major in Electrical Science* ***BSSSE with Double Major in Biology ***BSEE with Double Major in Biology *Waiting for faculty input **Top Priority ***Hiro said we might not need these. Done Joe Fix motors for ESE230 Test bulbs Done Switch out scope 2 – send out for repair Saroj Done Re-drill speaker chassis for ESE230 for easy vertical dual banana plug in Drill out all paint rollers – use wooden jig and sample roller Check motors for ESE230 Fix/Test light bulbs on desk in bry308 Cammi Add disclaimer to all flowcharts. Updated to Fall 2012 requirements. We make every effort to make sure these sample programs are correct but you should always verify that all requirements are met with your academic advisor. SS/Business (Danielle Hoover) SS/Entrepreneurship (?) SSE/Applied Math (Sylvia Wang) Done Jpgs look grainy out of Visio BSME/BSAS(SSE)