QUALITY MANUAL (Version 1 – Printed on 12 March 2016) Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL Table of Contents 1. INTRODUCTION ........................................................................................................ 1 2. THE ISSUE STATUS .................................................................................................... 2 3. OVERVIEW OF FRANKI FOUNDATIONS UK LTD ........................................................... 3 4. THE QUALITY POLICY................................................................................................. 4 5. THE SCOPE OF REGISTRATION ................................................................................... 5 6. OUR QUALITY OBJECTIVES ........................................................................................ 6 7. MANAGEMENT RESPONSIBILITY................................................................................ 7 8. RESOURCES .............................................................................................................. 8 8.1 Human Resources............................................................................................ 8 8.2 Infrastructure .................................................................................................. 8 8.3 Document Control and Control of Records ....................................................... 9 8.4 IT System ........................................................................................................ 9 9. OPERATIONAL PROCESSES (PRODUCT REALISATION) ............................................... 10 9.1 Enquiry to Tender and Contract Process ......................................................... 11 9.2 Contract Design, Build and Completion Process .............................................. 12 9.3 Purchasing Process ........................................................................................ 13 9.4 Corrective/Preventative Action – Control of Non Conforming Product ............ 14 9.5 Complaint Management ................................................................................ 14 10. MEASUREMENT, ANALYSIS AND IMPROVEMENT ..................................................... 15 10.1 Client Satisfaction ......................................................................................... 15 10.2 Internal Audits .............................................................................................. 16 10.3 Example Audit Report ................................................................................... 17 12. APPENDIX 1 – ORGANISATION CHART ..................................................................... 18 GECCO2 VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 1. INTRODUCTION This document is the Quality Manual (QM) of Franki Foundations UK Ltd. It is the property of Franki Foundations UK Ltd and is a controlled document. The purpose of the QM is to provide an overview of Franki Foundations UK Ltd, the activities it carries out and the quality standards of operation it conforms to. It carries information about where procedures information is located and the detailed information on Documentation Requirements for essential procedures e.g. document control, control of records, control of non-conforming product; internal audit and corrective/preventative action. Page 1 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 2. THE ISSUE STATUS The issue status is indicated by the version number in the footer of this document. It identifies the issue status of this Quality Manual. When any part of this Quality Manual is amended, a record is made in the Amendment Log shown below. The Quality Manual can be fully revised and re-issued at the discretion of the Management Team. Please note that our policy for the Control of Records means that this Quality Manual is only valid on day of printing. Issue 1 Amendment & Date Initials Page 2 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 3. OVERVIEW OF FRANKI FOUNDATIONS UK LTD Franki Foundations UK Ltd is a UK based operation, drawing on local expertise and resources and offering a wide spectrum of foundation solutions. Our management structure is supported by Designers, Estimators, Site Crew and Administrators, capable of completing demanding and innovative projects. We are in a unique position with partner organisations to offer a complete foundation solution in one package. From high profile projects to smaller private commissions, from industrial and commercial contracts to social housing projects, we apply our expertise to address the unique challenges of each individual project. Our strong commercial performance is based on: Ability to deliver on or ahead of schedule and budget. Commitment to ongoing research and development. Commitment to staff development. From the crucial, early project design and planning stages to final formal feedback from our clients, we work to understand your needs and continually seek to improve our service. Through our approach, we make the most of resources and our clients save cost. For more information about Franki Foundations UK Ltd please visit www.frankifoundationsuk.co.uk Page 3 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 4. THE QUALITY POLICY It is the policy of the company to maintain a quality system designed to meet the requirements of EN ISO 9001:2008 in pursuit of its primary objectives. The company’s Quality Assurance Manual defines our quality objectives and key procedures. Customer service is an essential part of the quality process and to ensure this is fulfilled, all employees receive training to ensure awareness and understanding of quality and its impact on customer service. To ensure the company maintains its awareness for continuous improvement, the quality system is regularly reviewed and is subject to annual audit. The requirements of the company’s quality system are mandatory and all company personnel have a responsibility and obligation to it. Craig Macklin Managing Director Page 4 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 5. THE SCOPE OF REGISTRATION THE DESIGN, CONSTRUCTION AND ASSOCIATED IN PROCESS TESTING OF FOUNDATION SYSTEMS FOR COMMERCIAL AND DOMESTIC APPLICATIONS. EXCLUSIONS THERE ARE NO EXCLUSIONS. Page 5 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 6. OUR QUALITY OBJECTIVES We aim to provide a professional and ethical service to our clients. In order to demonstrate our intentions, we have identified the following Quality Objectives: To maintain an effective Quality Assurance System complying with BS EN ISO9001:2008. To be our client’s preferred choice. To be a positive force in the industry, always striving to exceed the customers’ expectations and go the extra mile. To achieve and maintain a level of quality which enhances the Company’s reputation with customers. To ensure compliance with relevant statutory and safety requirements. To endeavour, at all times, to maximise customer satisfaction with the services provided by Franki Foundations UK Ltd. To minimise the environmental impact of what we do. Page 6 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 7. MANAGEMENT RESPONSIBILITY The management structure of Franki Foundations UK Ltd is shown as an organisation chart (see Appendix 1) the chart shows functional relationships and responsibilities. Management ensures: That the ongoing activities of Franki Foundations UK Ltd are reviewed regularly and that any required corrective action is adequately implemented and reviewed to establish an effective preventative process. That employees have the necessary training and equipment to effectively carry out the work. That internal audits are conducted regularly to review progress and assist in the improvement of processes & procedures. Weekly operations meetings are held which feed into our monthly management meeting. Minutes are taken and circulated. Typical agenda items for the monthly management meeting include: Business Development Finance Projects Human Resources and Sub-Contractors Suppliers Quality, Health Safety and Environmental We have a designated Management Representative who is responsible for the maintenance, measurement and review of our Quality Management System who is ????. Management is committed to providing high quality service to both internal and external customers and has a shared responsibility for the control of non-conforming products and corrective/preventative actions. 8. RESOURCES 8.1 HUMAN RESOURCES The deployment of our human resources is managed centrally by our directors. All employees have the necessary training needed to meet their job requirements. This training includes but is not limited to: Health and Safety CPD is undertaken on the job as one to one training and also by individuals as part of the requirement of their respective professional bodies Annual reviews are undertaken which identify individual training requirements. These requirements are entered into a training log. All employees have employment contracts and along with these, copies of any qualifications, professional memberships and CV’s are held in individual personnel files. Page 7 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL Contractors We only use the services of contractors with proven performance and reputation. Prior to the appointment of contractors for a project we ensure that they have the relevant valid construction industry tickets. 8.2 INFRASTRUCTURE All of our administration is conducted at our Head Office in Curdridge. This includes: Client Contract records Project Records Personnel records 8.3 DOCUMENT CONTROL AND CONTROL OF RECORDS All client related documents are identified by a sequential numbering system, in this respect, for projects in their enquiry stage we use an ‘E’ followed by an enquiry number, followed by the year. For example E/001/08 using series of indexed ‘green’ folders. When an enquiry turns into a contract, a similar ‘C’ numbering system is used, for example, C/001/08 using a series of indexed ‘orange’ folders. Our enquiries and contracts are also managed electronically using our ???? contract management software. We also have records for personnel, purchases orders, plans, drawings, plans etc. Our product realisation processes in section 9 are designed to manage and control all stages of our document receipts and production by relating to our extensive procedures. 8.4 IT SYSTEMS Our IT systems are backed up daily to a remote server. Page 8 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 9. OPERATIONAL PROCESSES (PRODUCT REALISATION) Franki Foundations UK Ltd is responsible for both the planning and delivery of its services and has comprehensive processes and procedures in place to achieve this. Our Enquiry to Tender and Contract Process is shown in the chart in Section 9.1 and our Contract Design, Build and Completion Process is shown in the chart in Section 9.2 overleaf. These process charts relate to other comprehensive processes and procedures that we undertake. Page 9 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 9.1 ENQUIRY TO TENDER AND CONTRACT PROCESS ENQUIRY & Book in onto ???? as an enquiry ‘E:’ Number Enquiry ( TENDER STAGE Score & Prioritise Enquiry N Send decline letter stating reason >55% Y Check & Ensure all documents & are updated / revised as appropriate Then Grade as A,B,C or D Printed & placed in ‘green’ file broken down into 9 sections Design Mods To Technical Dept to produce technical design Check ‘back to back’ agreements & T&C’s To Estimating Dept to produce final bid document To Technical Design Procedures in accordance with industry design software & codes) To Project Bid Management Process / Procedure Formal Enquiries sent to approved suppliers Logged onto ???? & Assigned an ‘owner’ Review of timescales, costs, options etc. Full tender sent to client by email & hardcopy posted Tender clarification meeting N Investigate why + update ???? Tender Won Y CONTRACT STAGE All papers transfer from green to orange files and sequential ‘C’ number Assigned Contract handover meeting from tender team to contracts team To 9.2 Page 10 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) .Appoint contracts and commercial managers FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 9.2 CONTRACT DESIGN, BUILD AND COMPLETION PROCESS From 9.1 Y External Contract Teams? Contract Design Process (e.g Steel, concrete, Contract Design ‘Owner’ Assigned construction, slab, testing, engineering) Contract Design produced / revised & signed off Checked by competent person Contract Manager Project Plan, Risk Assessments, COSHH, Quality Plan Issued for comments to client by hardcopy / email Y Any changes? N Confirm cost & T&Cs with Suppliers Send letters of intent to agreed ‘back to back’ pricing, delivery program & start dates Project Management Plan (PMP) & design approved by client N Installation in accordance with design? Y Mobilise site & site induction & appoint GECCO2 site team Build to contract design in accordance with PMP CM & QS produce application for work carried out & client agreement for payment under T&Cs & issue Stage Invoice(s) Project Closure Meeting &Final Sign Off Final Application agreed & Final invoice issued Internal Closure meeting to discuss feedback and contract summary Page 11 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) Various testing as work progresses in accordance with PMP and client sign off Satisfaction Feedback questionnaire completed and signed by client site representative FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 9.3 PURCHASING PROCESS All main purchases are made under strict control by our Head Office in Curdridge from our approved list of suppliers. Purchases are verified as being up to standard by purchasing from approved recognised sources. Our core purchases are hire of construction equipment, construction materials and skilled labour and subcontractors. 9.3.1 Purchase Policy for Hire of Equipment Where our project plan requires the hire of construction equipment, we first ensure that we obtain the best price and that equipment is fit for purpose, has a safety inspection certificate and that the operator has the correct construction industry ticket. Where the equipment is used for testing, we ensure that we have copies of the relevant valid calibration certificates. We then specify delivery details such as date required on site. On completion of the hire requirement, our respective site foreman is responsible for giving the ‘off hire’ notice to the supplier as indicated in the Project Management Plan. 9.3.2 Materials Supply Received Verification Our materials verification is based on purchasing from recognised sources and in the case of chemicals from responsible sources. Our site foreman or nominated person is responsible for checking the material certificates and for signing the delivery note. Should there be a problem with materials this is sorted out over the telephone and an action agreed regarding the materials with the supplier. 9.3.3 Skilled Labour and Sub Contractors We select our skilled labour and sub contractors based on their expertise and quality of their work. Each sub contractor is formally engaged by letter and is provided with a documented specification of the work they are required to do. Details of our subcontractors are also held in personnel and contract files. Our site foreman is responsible for verifying out subcontractors timesheets weekly. 9.3.4 Purchasing Reconciliation All delivery notes and timesheets are collated by the respective site foreman and sent to Head Office once a week where they are checked and reconciled with the respective orders by our quantity surveyor or accounts manager. 9.4 CORRECTIVE/PREVENTATIVE ACTION – CONTROL OF NON CONFORMING PRODUCT Our comprehensive operational processes as described in 9.1 above have been designed to incorporate Corrective and Preventative Actions and Control of Non Conforming Products and Services. 9.5 COMPLAINT MANAGEMENT As part of our ongoing commitment to delivering quality services, we have a policy of dealing with all complaints to the satisfaction of our customers. Disputes dealt with through our comprehensive dispute procedures which is part of our operational processes described in 9.1 above. All complaints will be reviewed by the Management Team of Franki Foundations UK Ltd. Complaints in relation to quality of work Active feedback is invited in relation to all aspects of the work. Where there is genuine grievance a formal complaint will be logged, investigated and an assessment made of whether there is a basis for accepting the complaint following our comprehensive dispute, complaint and claim procedures. If accepted there will be a summary report of why the fault has occurred and specific corrective action in relation to the work in question. If the complaint highlights a systematic failing standard procedures will be adjusted accordingly. Complaints in relation to personnel Page 12 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL It is expected that employees of Franki Foundations UK Ltd will provide assistance to customers in a professional, polite and helpful manner. If a complaint is received in relation to how a customer enquiry or contact has been dealt with these will also be subject to logging and investigation. Where appropriate further training or disciplinary measures may be taken. Page 13 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 10. MEASUREMENT, ANALYSIS AND IMPROVEMENT 10.1 CLIENT SATISFACTION We believe that client satisfaction is an effective way of measuring the performance of Franki Foundations UK Ltd. To do this we maintain close contact with our clients and actively involve them in our planning and delivery processes. At the end of each project we ensure that a client satisfaction is completed and we hold an internal project closure meeting to review how each respective project has been executed. We also use the continuous improvement model shown below and incorporate customer feedback and Management Review. Page 14 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 10.2 INTERNAL AUDITS Internal audits are carried out regularly as part of our Quality System. We also audit our business processes and the findings of these audits are reported in our periodic management meetings. The internal audit process is as follows:INTERNAL AUDIT SUBJECT IDENTIFIED Documentation/personnel to be audited is specified on the Internal Audit Report The audit is conducted and closed if no actions are required – A report is produced If any action is required-a re-audit is done to check that the action was effective The audit report is then completed and Management agrees the audit schedule on each audit is reviewed with our ISO9001:2008 signedand by feedback the Internal Auditor accrediting body, the British Accreditation Bureau, as part of our annual audits. INTERNAL AUDIT REPORTS ARE REVIEWED BY MANAGEMENT Page 15 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 10.3 EXAMPLE AUDIT REPORT Version 1 05/07/2014 INTERNAL AUDIT REPORT Date: / / Open Audit: Closed Area or Procedure to be Audited: ......................................................................................... Auditor: ................................................................................................................................... Documentation Reference:.................................................................................................... Departmental personnel: ....................................................................................................... PART A: OBSERVATIONS ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ PART B: ANY DISCREPANCY IDENTIFIED ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ PART C: PROPOSED CORRECTIVE ACTION ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ ................................................................................................................................................ To be completed: / / CORRECTIVE ACTION VERIFIED AS EFFECTIVE: Yes SIGNED (AUDITOR): ...............................................DATE COMPLETED: Page 16 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) No / / FRANKI FOUNDATIONS UK LTD QUALITY MANUAL 11. APPENDIX 1 – ORGANISATION CHART Board of Directors Craig Macklin Business Development Operations Commercial Estimators Admin /Accounts Technical Management Marketing Quantity Surveyors Site Operations Works Manager & Supervisors Design Consultants Foremen Site Operatives Contract Management Contracts Managers Contracts Engineers Page 17 of 18 Franki Foundations UK Ltd VERSION 1 (12/03/2016) HSE, QA, HR