Facilities and Services ECU Sport and Fitness Open, Close and Supervision Checklist - Mt Lawley Staff will be responsible as a team to ensure the following is actioned: Use safe manual handling techniques when performing the following duties Are always vigilant on shift in identifying and immediately making safe the facility Check and identify the emergency plans are accessible in your work area To report immediately to your supervisor, including but not limited to trip hazards, EXIT signs not being illuminated, flickering lights or out of order equipment Ensure any out of order equipment will be signed and wrapped in hazard tape so it is clear to all users that the equipment is out of order. Items in bold are specific for gym instructors. In the event a reception person is running late this document can be referenced by gym staff and found at reception in the ‘Communication File’ in the reference section. Open Process 1. Swipe your access card on panel near security phone at main entrance. 2. Deactivate alarm (if not already done by security or cleaners). 3. Swipe access card to enter reception office. 4. Turn on relevant lights for the centre in accordance with panel directions at reception. 5. (Gym) turn on lights for the gym, (switches located in reception) turn on TV’s and electronic exercise equipment. Ensure one screen displays media slides. 6. (Gym) open Fitness Studio . Check music is audible in the centre. 7. (Gym) dust and wipe down treadmill runners and displays. 8. Ensure alert/evac controller is switched to auto. 9. Check that the change room lights are on (if not already done by cleaners). 10. 5.30am or earlier open, will need to turn air-conditioning manually. 11. Turn on and log onto computer as required. 12. EFTPOS Machine: Press settlement – print outs go in centre Administrator’s in-tray. NOTE: If computer or Flex does not open correctly, do a complete shutdown of the computer and try again. Double check all cables are plugged in at the wall and back of computer. Check the receipt printer has paper in it and is switched on as till draw will not open if printer is switched off. 13. Collect lift keys and car park gate remote from key locker in office. Turn lift fan to ON and door hold to OFF. Take the lift to the basement car park and turn lift security switch to OFF once you are outside the lift. Use remote to open car park gates and open dividing door in the stairwell opposite the lift. 14. Follow Till Check List. 15. Check the phone for messages. If messages have been left, press voice mail and follow the prompts to check messages. Check phone list at reception for most recent code as it automatically changes). 16. Turn lift ‘Door hold’ to OFF 1-2 min before opening time. Open, Close, Supervision Checklist ML All printed copies are uncontrolled. Page 1 of 2 As at May 2015 Issue 2 17. Fill water for bands for Tone & Shape Studio. Cleaning duties – ensure all items are done in accordance with the appraisal/program diary responsibilities list. 18. (Gym & Reception) Read all memos in Communication file and all staff to check your work email within the first hour of your shift. Close Process Items 1 to 3 to be completed Monday to Thursday before reception person leaves unless class still running. 1. Fitness Studio / MPR / Fitness Area Lobby / Classroom / Kitchen 2. All windows locked, turn off lights in each area MPR fire exit door locked - push to check Turn off treadmills, air-conditioning and fans in fitness studio Wash, dry and put away dishes, and wipe down kitchen benches All doors locked including double doors to lobby MLSHS areas / Crèche Glass door to MLSHS locked - push to check Emergency exit door near MLSHS male change rooms locked MLSHS Phys Ed office door locked MLSHS tea preparation room external door near Crèche area is locked Cleaner’s room locked Crèche external door to play area locked Crèche exit door locked, lights off 3. Change rooms - Fire exit door in ECU male change room locked, lights off 4. Indoor Courts 5. Gym / Reception 6. Check storeroom cleanliness & report any incorrect storage of equipment in communication file Put away any equipment left on courts, collect rubbish and collect lost property Roller door in storeroom shut/locked, storeroom door shut Fire exit doors x 2 - push to check, lights off - switches in reception Empty wristband water and dry wrist bands Clean entrance door windows, tidy and wipe desks File diary sheets for that day Stock fridge Appraisal room cabinet to be locked, lights off Windows locked, TV’s and cardio equipment turned off Settlements and banking, as per till guideline document. Lock safe doors and safe cupboard doors, Shut down computers – reception and back office Lift lock switched to fan ‘off’ and door hold ‘on’ with door open Shut centre manager door and lock office door, Reception door locked Lights off except one set left on in reception Car park Fire exit doors shut x 3 Gates shut Lift lock switched to security ‘on’ Open, Close, Supervision Checklist ML All printed copies are uncontrolled. Page 2 of 2 As at May 2015 Issue 2