Central State University Qualification Presentation February 2010 ooster • Connecticut College • Cornell University • Dartmouth College • Davidson College • Drew University • Drexel University • Duke University • Duquesne University • East Stro University • Northwestern University • Nova Southeastern University • Oregon Institute of Technology • Oregon State University • Pace university • Pacific Lutheran University • y of Massachusetts Amherst • University of Massachusetts Boston • University of Massachusetts Dartmouth • University of Massachusetts Lowell • University of Michigan • Unive We are a membership based organization 95%+ annual retention rate of member campuses • 260+ member campuses • 96 public and 129 private institutions 0 1-5 • 6-11 © Sightlines 2010 Developed a useful tool based on: Common vocabulary Consistent analytical methodology Credibility through benchmarking 12-17 18-23 24-above 2 Data pieces that need to be reviewed © Sightlines 2010 • Review building inventory and GSF figures • Verify operating budget costs and actual costs • Review maintenance, custodial, and grounds staffing • Discuss energy cost and consumption • Verify capital investment totals • Discuss service process 3 A vocabulary for measurement The Return on Physical Assets – ROPASM © Sightlines 2010 Sightlines Terms The annual investment needed to insure buildings will properly perform and reach their useful life “Keep-Up Costs” The accumulated backlog of repair and modernization needs and the definition of resource capacity to correct them. “Catch-Up Costs” Asset Value Change The effectiveness of the facilities operating budget, staffing, supervision, and energy management The measure of service process, the maintenance quality of space and systems, and the customers opinion of service delivery Operations Success 4 Verifying space – total space 33 Buildings – 1,136,729 GSF © Sightlines Sightlines2010 2010 FY09 Breakdown of Space Descriptive text goes here 6% State Supported 32% Auxiliaries 62% Mixed Category GSF picked up State Supported 764,039 Maintained 764,039 Cleaned 749,173 Capital(AS/AR) 718,105 5 Building inventory – academic/admin Please verify building specifications © Sightlines 2010 Count Building GSF Sightlines Function Tech. Rating Constr. Year Brown-Henderson Building 1 90,586 Academic 3 1981 CENS I 1 61,000 Academic 5 2006 Cosby Hall 1 19,500 Academic 3 1958 Jenkins Building 1 51,258 Academic 4 1972 McLin Water Resource Ctr 1 45,000 Academic 4 1994 New Banneker Building 0 51,120 Academic 3 1967 Old Banneker Building 1 26,146 Academic 3 1948 Robeson Arts Center 1 85,268 Academic 3 1978 Smith Building 1 45,163 Academic 3 1969 Stokes Center on Aging 0 10,000 Academic 2 2000 Wesley Hall 1 38,862 Academic 3 1967 Administration Building 1 42,923 Administrative 3 1958 Student Health Center 1 12,000 Medical 3 1978 3.23 Average Age of 34 Years Building Name Totals • State supported E&G space only 578,826 594,580 GSF Majority Academic 6 Building inventory - Others Please verify building specifications © Sightlines 2010 Count Building GSF Sightlines Function Tech. Rating Constr. Year Beacom Gymnasium (E&G) 1 45,934 Athletic 3 1961 Walker Gymnasium 1 32,290 Athletic 4 1975 President's Residence (Robinson House) 1 4,779 House 1 1981 Facilities Building 1 14,520 Support 3 1974 Galloway Alumni Tower 1 2,900 Support 2 1978 Power Plant 1 14,337 Support 2 1926 Simpson Hall (E&G) 1 16,405 Support 3 1974 Ward University Center 1 53,519 Support 3 1964 Water Treatment Plant 1 529 Support 1 1962 Totals 9 185,213 GSF Majority Support 2.44 Average Age of 43 Years Building Name Students FTEs Faculty FTEs Staff FTEs Maintained GSF FY2005 FY2006 FY2007 FY2008 FY2009 1,475 1,666 1,922 2,055 2,287 91 96 109 114 138 265 267 263 278 318 764,039 764,039 764,039 764,039 764,039 • State supported E&G space only 7 Campus profile 20 buildings, 776,564 GSF and a tech rating of 3.26 © Sightlines 2010 FY09 Renovation Age Profile 100% 90% 80% % of Total GSF 70% 60% 50% 40% 74% 30% 20% 10% 0% 9% 0 - 10 • Acquired 61,000 GSF for CENS I in FY2007 6% 10-25 11% 25-50 50+ 8 Maintenance staffing Verify % break-outs of staffing duties Maintenance Lead worker Larry Jordon © Sightlines 2010 Trades (13) Mechanical (3 FTE): 100% Supervision •HVAC – 2 FTE •Electrical – 1 FTE Structural (4 FTE): •Painting – 1 FTE •Plumbing – 1 FTE •Carpentry – 1 FTE •Locksmith – 1 FTE Maintenance Repair (6 FTE): 9 Maintenance staffing FY05-FY09 Verify removed workers © Sightlines 2010 Year Change Name Position FY2009 Removed Stephen Johnson Maintenance Repair FY2009 Removed Lowell Hartman Maintenance Repair FY2008 Removed James Brown Maintenance Repair FY2008 Removed Norman Symonds Painter FY2008 Add Willie Arnold Maintenance Repair FY2008 Add Edward Henry Maintenance Repair FY2006 Removed Casey Ferguson Carpenter 10 Maintenance staffing FY05-FY09 Verify removed workers in FY06 and FY09 FY07 FY08 FY09 FY05 0.6 FY06 0.6 FY07 0.6 FY08 0.6 FY09 0.6 1 2 2 1 1 Mechanical Electrical 0.6 0.6 0.6 0.6 0.6 Electrical HVAC 1.0 1 1.0 1 1.0 1 1.0 1 1.0 1 HVAC Plumbing 0.5 2 0.5 2 0.5 2 0.5 2 0.5 2 Supervisors General Trades Trades General Trades Trades Mechanical Structural Structural General General Plumbing Subtotal Mech. Trades 2.0 1 2.0 1 2.0 1 2.0 1 2.0 1 Subtotal Mech. Trades 4.0 4.0 4.0 4.0 4.0 Carpentry 1.2 0.5 0.5 0.5 0.5 Carpentry Painting 1.8 2 1.8 1 1.8 1 0.8 1 0.8 1 Painting Locksmith 0.6 2 0.6 2 0.6 2 0.6 1 0.6 1 Locksmith Subtotal Struct. Trades 3.9 1 2.9 1 2.9 1 1.9 1 1.9 1 Subtotal Struct. Trades Maintenance Repair 5.0 3.8 4.0 3.8 4.0 3.8 3.0 3.0 3.0 2.3 Maintenance Subtotal General Repair Trades 3.8 7 3.8 7 3.8 7 3.0 8 2.3 7 Total Building Subtotal Trades General Trades 7.0 9.3 7.0 8.6 7.0 8.6 8.0 6.9 7.0 6.2 16.0 15.0 15.0 15.0 14.0 Total Building Trades Total Maint. Staffing vs. E&G 18 16 14 12 10 8 6 4 2 0 FTE Count Maintenance Staff Headcount FY05 FY06 Supervisors © Sightlines 2010 FY2005 FY2006 FY2007 Total Maint. Staffing FY2008 FY2009 E&G Maint. Staffing 11 Maintenance staffing FY05-FY09 Verify removed workers in FY06 and FY09 © Sightlines 2010 Maintenance E&G Dedicated FTEs FY05 FY06 FY07 FY08 FY09 General Trades 0.6 1.0 1.0 0.6 0.6 Electrical 0.6 0.6 0.6 0.6 0.6 HVAC 1.0 1.0 1.0 1.0 1.0 Trades Mechanical Plumbing 0.5 0.5 0.5 0.5 0.5 2.0 2.0 2.0 2.0 2.0 Carpentry 1.2 0.5 0.5 0.5 0.5 Painting 1.8 1.8 1.8 0.8 0.8 Subtotal Mech. Trades Structural Locksmith Subtotal Struct. Trades 0.6 0.6 0.6 0.6 0.6 3.5 2.9 2.9 1.9 1.9 Total Maint. Staffing vs. E&G 18 16 14 12 10 8 6 4 2 0 FTE Count Supervisors FY2005 General Maintenance Repair Subtotal General Trades Total Building Trades 3.8 3.8 3.8 3.0 2.3 3.8 3.8 3.8 3.0 2.3 9.3 8.6 8.6 6.9 6.2 FY2006 FY2007 Total Maint. Staffing FY2008 FY2009 E&G Maint. Staffing 12 Work orders Making the split between E&G and AUX © Sightlines 2010 13 Maintenance split by Work Orders FY09 Staffing List Last Name First Name © Sightlines 2010 Classification Building E&G AUX Beatty James Carpenter 2 Split by Work Order Hours 50% 50% Tebbe Gary Electrician 2 Split by Work Order Hours 60% 40% Arnold Willie Maint. Repair. 2 Foundation 1&2/Green/Anderson Berrien Rex Maint. Repair Worker 3 Split by Work Order Hours Henry Edward Maint. Repair. 3 Foundation 1&2/Green/Anderson Taylor Douglas Maint. Repair. 3 Split by Work Order Hours 30% 70% VACANT 100% 10% 90% 100% Maint. Repair. 3 Washington Kevin Maintenance Repair III Split by Work Order Hours 35% 65% Wilson Marvin Maint. Repair. 3 Split by Work Order Hours 30% 70% Curtice Christopher Heating, Vent., Air Cond. Tech Split by Work Order Hours 60% 40% Johnson John HVAC Repair Worker Split by Work Order Hours 35% 65% Harris Jeffrey Locksmith 2 Split by Work Order Hours 60% 40% Shuttleworth Tracy Painter 2 Split by Work Order Hours 80% 20% Williamson Roger Plumber 2 Split by Work Order Hours 45% 55% Jordan Larry Trades Supervisor Split by Work Order Hours 60% 40% Percent Split 58% E&G 42% AUX 14 Maintenance staffing FY05-FY09 Verify reduced mechanical tradesman in FY08 © Sightlines 2010 FY09 Database Average Staffing (GSF/FTE) Supervision (FTE/Super) 82,510 11.4 Database Average 15 Custodial Staffing Verify % break-outs of staffing duties © Sightlines 2010 Interim Supervisor Custodial Lead workers Ops & Maintenance Alan Davis (E&G) Alan Lassiter Djuna Washington (AUX) 40% E&G Custodial Supervisor Custodians (25) E & G: 40% Supervision • 100% E&G 18 FTEs • Donnetta Porter (90%) Split: 30% Auxiliary Custodial Supervisor 30% Grounds Supervisor 60% Trades •William Riggins (33% E&G) Auxiliary: •Alan Davis •Adrian Gaines •Kevin Hatfield •Ray Marone •Breyon Miller 16 Custodial staffing FY05-FY09 Verify reduced supervision in FY08 © Sightlines 2010 Addition Removal Net FY2009 2 3 -1 FY2008 7 5 +2 FY2007 1 4 -3 FY2006 5 3 +2 Total Custodial Staffing vs. E&G 25 FTE Count Year 30 20 15 10 5 0 FY2005 FY2006 FY2007 Total Custodial Staffing FY2008 FY2009 E&G Custodial Staffing Custodial Headcounts Supervisors FY2005 FY2006 FY2007 FY2008 FY2009 2 2 2 2 2 24 26 23 25 24 Trades 17 Custodial split by building © Sightlines 2010 Last Name First Name Classification Building Aikens Baker Collins Cook Crockett Davenport Davis Foster Deborah Lou Ann Paulette Bonnie Judith Gail Alan Erica Cord./Household Accts. Custodial Worker Custodial Worker Custodial Worker Custodial Worker Custodial Worker Custodial Lead Worker Custodial Worker Robinson House Gaines Adrian Custodial Worker Green Garrett Hatfield Jamason Joe Kevin Tracy Custodial Worker Custodial Worker Custodial Worker Mercer/Williamson (July 2009) Lassiter Alan Interim Superv Ops & Maint. 70% Custodial split by GSF Lindsay Sheryl Custodial Worker Marone Raymond Custodial Worker McGee Miller Nooks O'Rourke Perdue Pitts Porter Quick Riggins Robbins Tolbert Shelia Breyon Patricia Ernest Larry Anita Donetta Richard William Elizabeth Broderick Custodial Worker Custodial Worker Custodial Worker Custodial Worker Custodial Worker Custodian Storekeeper II Custodial Worker Custodial Worker Custodial Worker Custodial Worker VACANT Lassiter, A Custodial Lead Worker Washington Djuna Acting Lead Worker E&G AUX 100% 100% 100% 100% 100% 100% Foundation II 100% 100% 100% 100% 100% 100% 40% 30% 100% Anderson Hall Percent Split 70% E&G 30% AUX 100% 100% Hunter/ Williamson Foundation (July 2009) 10% of time for inventory McPher/Beac/Walker Foundation II 100% 100% 100% 100% 100% 90% 100% 33% 100% 100% 67% 100% 18 Custodial staffing FY05-FY09 Verify reduced supervision in FY08 © Sightlines 2010 Custodial E&G Dedicated FTEs Supervisors FY2005 FY2006 FY2007 FY2008 FY2009 0.6 0.6 0.6 0.4 0.4 18.6 19.6 17.6 19.3 17.2 Trades FY09 Database Average Staffing (GSF/FTE) Supervision (FTE/Super) 33,555 18.1 Database Average 19 Grounds staffing Verify % break-outs of staffing duties Interim Supervisor Ops & Maintenance Alan Lassiter © Sightlines 2010 Grounds Lead workers Joseph Anderson 30% Custodial Supervisor 50% Supervision 30% Grounds Supervisor 50% Trades Grounds Workers (8) All Included: • Calvin Hudson • Daryl Hughlett • Dean Rohlfing • Gerald Ingram • Rickie Thompson • Steve Burnett • Steven Victoria • Wilfred Jones 40% Excluded Custodial Supervisor 20 Grounds staffing FY05-FY09 Verify reduced supervision in FY07 © Sightlines 2010 Year Change Name Position FY2009 Promotion Samuel Ragland Support Svs Coordinator FY2009 Promotion Alan Lassiter Interim Ops & Maint. Super FY2009 Add Dean Rohlfing Groundskeeper 1 FY2009 Remove Stacy Harris Groundskeeper 1 FY2008 Promotion Joseph Anderson Machine Operator Lead FY2008 Add Rickie Thompson Groundskeeper 1 FY2008 Add Steve Burnett Groundskeeper 1 FY2007 Add Gerald Ingram Groundskeeper 1 FY2006 Remove Cynthia Grundy Groundskeeper 1 FY2006 Remove Mark Porter Groundskeeper 1 FY2006 Add Stacy Harris Groundskeeper 1 Grounds Staffing Headcounts Supervisors FY2005 FY2006 FY2007 FY2008 FY2009 1 2 2 2 2 8.0 6.0 6.0 8.0 8.0 Trades 21 Grounds staffing FY05-FY09 Who supervised grounds staff in FY07? © Sightlines 2010 E&G Dedicated FTEs Supervisors FY2005 FY2006 FY2007 FY2008 FY2009 0.5 0.8 0.8 0.8 0.8 8.5 6.5 6.5 8.5 8.5 Trades FY09 Database Average Database Average Staffing (Acres/FTE) 30.8 Supervision (FTE/Super) 12.2 22 Total operating budget Verify budget trends and roll-ups Original Budget ROPA Block People People Total Expenses Expenses Total Utilities Utilities Total Grand Total Object/ Line Name ADMINISTRATIVE SALARIES BENEFITS CLASSIFIED SALARIES OVERTIME WAGES PART TIME WAGES RETIREMENT BENEFITS STUDENT WAGES - NON CWS SUPPLEMENTAL SALARIES & WAGES CAPITAL PURCHASES COMMUNICATIONS EMPLOYER PORTION FICA INFORMATION AND COMMUNICATIONS MAILING EXPENSE MAINTENANCE & REPAIRS MAINTENANCE & REPAIRS CONTRACTS MISCELLANEOUS EXPENSE PRINTING AND COPYING EXPENSE PURCHASED SERVICES SEMINAR FEES SUPPLIES TRAINING TRAVEL & ENTERTAINMENT UTILITIES © Sightlines 2010 Fiscal Year 2005 385,681 647,068 1,359,593 70,060 6,200 1,633 2,470,235 40,899 2006 386,279 620,863 1,327,520 61,820 2007 279,747 596,231 1,361,256 17,300 21,507 27,372 2,423,854 2,276,042 200 28,848 32,130 512 4,000 322,143 220,641 97 32,982 59,170 3,366 5,560 362,483 1,280 161,726 565 786,117 1,469,868 1,469,868 4,726,220 315 626,979 3,336,238 3,336,238 6,387,071 2008 212,207 625,110 1,420,020 62,300 - 2009 215,698 720,384 1,426,672 37,300 23,734 21,507 960 2,341,143 10,550 2,914 2,424,748 58,105 2,973 225 108 40,438 26,586 123 5,109 429,424 56 86,608 19,104 112 3,315 533,476 223,869 595 510 740,452 2,549,241 2,549,241 5,630,836 331,557 150 528 1,035,983 2,575,014 2,575,014 6,035,745 191 22,240 60,744 14,730 8,835 417,272 210,833 598,666 2,016,241 2,016,241 4,890,949 23 Facilities department splits © Sightlines 2010 Account CUSTODIAL FACILITIES - ROBINSON HOUSE FACILITIES MANAGEMENT GROUNDS % E&G % Aux Major Factors 70% 30% Custodial Workers Presidents House 100% 88% 12% Work Orders 100% MAINTENANCE 58% 42% Work Orders POWER PLANT 70% 30% GSF UTILITIES MAINTENANCE 70% 30% GSF WATER DEPARTMENT 70% 30% GSF All Accounts 78% 22% 24 E&G operating budget Verify budget trends and roll-ups Budget ROPA Block People People Total Expenses Expenses Total Utilities Utilities Total Grand Total Object/ Line Name ADMINISTRATIVE SALARIES BENEFITS CLASSIFIED SALARIES OVERTIME WAGES PART TIME WAGES RETIREMENT BENEFITS STUDENT WAGES - NON CWS SUPPLEMENTAL SALARIES & WAGES CAPITAL PURCHASES COMMUNICATIONS EMPLOYER PORTION FICA INFORMATION AND COMMUNICATIONS MAILING EXPENSE MAINTENANCE & REPAIRS MAINTENANCE & REPAIRS CONTRACTS MISCELLANEOUS EXPENSE PRINTING AND COPYING EXPENSE PURCHASED SERVICES SEMINAR FEES SUPPLIES TRAINING TRAVEL & ENTERTAINMENT UTILITIES © Sightlines 2010 Fiscal Year 2005 226,716 443,861 968,887 48,758 3,596 1,032 1,692,851 23,721 2006 227,144 425,172 945,890 43,856 2007 182,743 413,905 953,222 14,630 15,055 17,496 1,659,558 1,579,556 128 19,966 22,797 297 2,320 206,507 149,760 57 22,782 41,539 2,156 3,246 234,174 742 111,531 328 502,876 1,469,868 1,469,868 3,665,595 183 416,410 3,336,238 3,336,238 5,412,206 2008 126,675 430,940 994,832 44,767 - 2009 128,747 495,682 1,003,320 26,230 16,614 13,875 557 1,611,089 8,618 1,690 1,671,149 36,511 1,724 131 64 26,711 16,835 86 2,963 272,919 33 55,757 13,541 78 1,923 351,646 150,526 411 357 481,310 2,549,241 2,549,241 4,641,641 230,970 105 501 692,790 2,575,014 2,575,014 4,938,953 113 14,411 39,853 8,987 5,126 260,577 141,771 393,786 2,016,241 2,016,241 3,989,583 25 Annual daily service costs © Sightlines 2010 Total Facilities Operating Budget $7 $6 Operating $/GSF $5 $4 $3 $2 $1 $0 FY2005 FY2006 FY2007 Daily Service Budget • PM Split based upon dedicated maintenance W.O. hours FY2008 PM FY2009 Utilities 26 Annual daily service costs Similar operating costs as total campus © Sightlines 2010 E&G Facilities Operating Budget $7 $6 Operating $/GSF $5 $4 $3 $2 $1 $0 FY2005 FY2006 FY2007 Daily Service Budget • PM Split based upon dedicated maintenance W.O. hours FY2008 PM FY2009 Utilities 27 Planning maintenance funding Service contracts, how should this be split? Vendor Type ADT Alarm Protec II Alarm Siemens Alarm Schindler Elevator Thyssenkrupp Elevator FY2005 20,841 © Sightlines 2010 FY2006 FY2007 FY2008 FY2009 18,225 16,890 22,540 16,420 2,580 1,160 2,050 990 2,546 3,149 3,936 15,579 20,054 49,849 60,730 35,537 66,716 12,096 350 39,330 10,475 27,021 - - - - SimplexGrinnell Fire Alarm Megacity Fire Ext - - - 3,074 14,013 Belmont Water - - 599 3,701 5,373 Miami Products Water 2,808 6,816 5,158 2,145 3,841 4,801 5,514 5,142 78,189 95,341 68,081 129,998 140,440 Preventative Maintenance Systematic inspection, detection, correction, and prevention of emergent failures, before they become actual or major failures. 28 Trades material dollars Should we also be including supply line 72100? © Sightlines 2010 Total Maintenance Material Dollars $70,000 E&G Maintenance Material Dollars $70,000 $65,339 $60,000 $60,000 $50,000 $50,000 $40,000 $30,473 $30,000 $40,000 $29,000 $29,000 $20,442 $30,000 $20,000 $20,000 $10,000 $10,000 $- $38,006 $17,674 $16,820 $16,820 FY2007 FY2008 FY2009 $12,058 $FY2005 FY2006 FY2007 FY2008 FY2009 FY2005 Maintenance Material Dollars $65,339 $20,442 $30,473 $29,000 Maintenance Material Dollars: • Yearly Average of $20,300 FY2006 Maintenance Material Dollars $29,000 $38,006 $12,058 $17,674 $16,820 $16,820 58% of supplies line 71800 for Maintenance Accounts & 100% Robinson House 29 Trades material dollars Please verify split © Sightlines 2010 Total Custodial Material Dollars $70,000 $61,807 $60,000 $50,000 E&G Custodial Material Dollars $48,682 $60,000 $49,692 $50,000 $43,680 $40,000 $70,000 $35,848 $40,000 $31,371 $30,000 $30,000 $20,000 $20,000 $10,000 $10,000 $- $25,334 $28,235 $28,821 FY2007 FY2008 $18,195 $FY2005 FY2006 FY2007 FY2008 FY2009 FY2005 FY2006 Custodial Material Dollars Custodial Material Dollars $43,680 $31,371 $48,682 Custodial Material Dollars: • Yearly Average of $27,300 $49,692 FY2009 $61,807 $25,334 $18,195 $28,235 $28,821 $35,848 70% of supplies line 71800 for the Custodial Account 30 Trades material dollars Should material dollars be taken from the operating budget? © Sightlines 2010 Grounds Material Dollars $35,000 $30,000 $32,933 $27,355 $25,000 $18,055 $20,000 $15,000 $9,258 $10,000 $10,358 $5,000 $FY2005 FY2006 FY2007 FY2008 FY2009 Grounds Material Dollars Grounds Material Dollars: $27,355 • Yearly Average of $19,600 100% of supplies line 71800 for the Grounds Account $9,258 $10,358 $18,055 $32,933 31 Fossil cost and consumption Increased costs are tempered by reduced consumption © Sightlines 2010 32 Electric cost and consumption Increased costs are tempered by reduced consumption © Sightlines 2010 33 Campus inspection Identifying areas for improvement © Sightlines 2010 5 Inspection Score 4 3 2 1 0 Grounds Exterior Mechanical Systems General Repair/ Impression Cleanliness 34 Service process scoring © Sightlines 2010 35 Service process scoring (cont…) © Sightlines 2010 36 Capital projects Basic renovations Fiscal Year Building Name © Sightlines 2010 Project Name 2006 Paul Robeson Performing Arts Ctr Exhaust Fan 2006 2006 2006 2006 2006 2006 2006 2006 2006 McPherson Memorial Stadium Campus Campus Charles H. Wesley Hall McPherson Memorial Stadium McPherson Memorial Stadium Campus Campus Charles H. Wesley Hall Pipes Backflow Upgrades Backwash Pump Exhaust Fan Bleachers Windows Tornado Siren Electric Meter Relocation Exterior Lighting 2006 2006 2007 2008 2008 2008 2008 2008 2008 2008 2008 2008 Hallie Q. Brown-Henderson Bldg Charles H. Wesley Hall CENS II Jenkins Building Anderson Hall Charles H. Wesley Hall Paul Robeson Performing Arts Ctr Campus Lionel H. Newsom Admin Bldg Walker Gymnasium Charles H. Wesley Hall Paul Robeson Performing Arts Ctr Floor Renovation Auditorium Renovation New Space Mold Remediation Elevator Recall Elevator Recall Elevator Recall Public Water System Reno Emergency Generator Lucas Natatorium Doors Reno Roof Renovation Stage Renovation Actual Spent $30,000 $75,000 $20,000 $20,000 $22,000 $250,000 $62,000 $67,000 $70,000 $20,000 Package Building Systems Building Systems Utility Infrastructure Utility Infrastructure Building Systems Space Renewal Envelope Safety/Code Utility Infrastructure Grounds Infrastructure $85,000 Space Renewal $140,000 Space Renewal $3,420,833 New Space $1,200,000 Safety/Code $47,667 Building Systems $47,667 Building Systems $47,667 Building Systems $80,000 Utility Infrastructure $123,000 Utility Infrastructure $46,000 Space Renewal $154,000 Envelope $90,000 Space Renewal E&G 100% 70% 70% 100% 70% 70% 100% 100% 30% 30% 100% 100% 100% 100% 70% 100% 90% 100% 100% Smart Classroom Renovation $168,000 Space Renewal 100% 2008 2008 2008 2008 2009 Smart Classroom Renovation Steam Trap Renovation Flooring and Painting New Space New Space $72,000 Non-Facilities $9,000 Building Systems $124,000 Space Renewal $3,420,833 New Space $3,420,833 New Space 100% 100% 100% 100% 100% • Are we missing any other capital investment? 100% 30% 30% 100% 100% 100% 100% 2008 New Banneker Science Building New Banneker Science Building Cosby Hall Charles H. Wesley Hall CENS II CENS II AUX 30% 10% 37 Total project spending from FY05-FY09 Verify average spending of $0.85/GSF © Sightlines 2010 FY06 Projects Include: (1) McPherson Stadium pipes, bleachers and windows; (2) Campus backflow upgrades, siren, electric meter relocation FY08 Projects Include: Elevator recall, Admin Building generator, Smart Classroom Renovation 38 Next steps… © Sightlines 2010 • Make any changes from today’s discussion (Sightlines) • Discuss this year’s Customer Satisfaction Survey (Clinton) • Review capital project breakouts (Rick) • Confirm dates & plans for future presentations (Clinton & Curtis) Questions & Discussion… 39 39