Subcontracting with Third Party Order and MRP Area SAP Best Practices for Automotive Package (Japan) SAP Best Practices Scenario Overview – 1 Purpose and Benefits: Purpose The business scenario deals with a sub-component procured from a third party vendor, which delivers not to the Supplier, but to the subcontractor for further assembly. Material requirements planning at the plant level (MRP area: plant) and separate material requirements planning for subcontracting at the vendor's subcontractor level (MRP area: subcontractor) Benefits In third-party procurement with subcontractor as ship-to party, the Tier-2Supplier delivers the sub-component directly to subcontractor. Thus it reduces the stock level on Tier-1 supplier side and shortens the complete components delivery time. Material Requirements Planning runs separately at MRP Area level, which enhances transparency within a plant and provides a greater degree of differentiation in material requirements planning. With special procurement key ‘stock transfer from plant to MRP area’, the system automatically generates a stock transfer reservation from plant MRP area to Subcontracting MRP area, which supports the subsequent logistics processing. OEM receives the invoice automatically from supplier via EDI IDoc. Scenario Overview – 2 SAP Applications Required: Enhancement Package 4 for SAP ERP 6.0 Company Roles Involved in Process Flows: OEM Client: Strategic Planner Warehouse Clerk Purchaser Production Planner IT Administrator (Professional User) Accounts Payable Manager Supplier Client: IT Administrator (Professional User) Sales Administrator Purchaser Production Planner Shop Floor Specialist Warehouse Clerk Billing Administrator Scenario Overview – 2 Key Process Flows Covered: OEM Process: Maintaining Planned Independent Requirement OEM Process: Material Requirements Planning (MRP) at the Customer (OEM) OEM Process: Creating Forecast Delivery Schedules / JIT Delivery Schedules OEM Process: Message Outputting for Forecast Delivery Schedules Supplier Process: Process Forecast Delivery Schedule for Scheduling Agreement Supplier Process: Material Requirements Planning at Plant Level Supplier Process: Creating Forecast Delivery Schedules for Subcontractors A-V6003 and A-V6004 and the Component Supplier A-V6005 Supplier Process: Creating a Forecast Delivery Schedule for the Third-Party Order Vendor Supplier Process: Posting Goods Receipt (from third-party vendor) Supplier Process: Building Stock through Backflushing from Production - A-60-1120_SUP Supplier Process: Generating the Delivery of Provided Material Supplier Process: Goods Issue Posting for the Provided Material (with SD Delivery) Supplier Process: Posting Goods Receipt for Subcontracted Material (Goods Receipt including A-601100_SUP & A-60-1200_SUP) Supplier Process: Posting Goods Receipt for Purchased Material (A-60-1300-SUP) Supplier Process: Backflushing in Production Supplier Process: Generating Delivery OEM Process: Goods Receipt Posting Supplier Process: Processing and Output Billing Due List OEM Process: Invoice Receipt Scenario Overview – 3 Detailed Process Description : Subcontracting with Third Party Order and MRP Area The OEM plans its material requirements, runs an MRP and creates forecast and JIT delivery schedules which are transmitted to the Supplier (Tier 1). The Tier-1-Supplier has to assemble the ordered material. Therefore the Supplier plans its material requirements first. The resulting delivery schedules are transmitted to the Tier-2-Supplier, third-party vendor, and subcontractor. The ordered sub-component from the third-party is delivered to the Subcontractor1. The Subcontractor assembles the sub-component and delivers the resulting component to the Tier-1-Supplier. The Tier-1-Supplier performs further assembly and delivers the final product to the OEM. Process Flow Diagram Subcontracting with Third Party Order and MRP Area OEM Client / Plant 1000 Supplier Client / Plant 1000 Planned Independent requirement Material Requirement Planning Run DELFOR Create Forecast / JIT Delivery Schedule Forecast Delivery Schedule / JIT Delivery Schedule DELJIT Material Requirement Planning run Forecast Delivery Schedule to subcontractor for A-60_1100_SUP Forecast Delivery Schedule to subcontractor for A-60_1200_SUP Forecast Delivery Schedule to supplier for A-60-1300_SUP Material Requirement Planning run in subcontract Area for A-60_1100_SUP Forecast Delivery Schedule to third party vendor for component A-601110_SUP Goods Receipt of A-60-1110_SUP to subcontract stock Backflush to receive A-60-1120_SUP Deliver A-60-1120_SUP to subcontractor Goods Receipt for A-60-1100_SUP, A-60-1200_SUP, A-60-1300_SUP Backflush of assembly A-60-1000_SUP DESADV Inbound Delivery Outbound Delivery & Goods Issue Goods Receipt Invoice INVOIC Billing Relationship Diagram Subcontracting with Third Party Order and MRP Area Forecast / JIT Del.Schedule Assembled console Delivery of A-60-1000_SUP OEM Supplier (1st Tier) A-V6001 Supplier (2nd Tier) A-V6005 Delivery of A-60-1110_SUP Schedule Agreement 5600006003 Third-party order vendor A-V6002 Schedule Agreement 5600006001 Subcontractor A-V6003 Schedule Agreement 5600006004 Subcontractor A-V6004 Schedule Agreement 5600006005 Master Data Subcontracting with Third Party Order and MRP Area OEM Client / Plant 1000 Supplier Client / Plant 1000 A-60-1000_OEM Console Model A-60-1000_SUP Console Model A-60-1100_SUP Extension incl. painted component A-60-1110_SUP Soda can holder A-60-1120_SUP Extension incl. soda can cover A-60-1200_SUP Ashtray A-60-1300_SUP Inside armrest A-60-1210_SUP Ashtray cover) A-60-1220_SUP Ashtray lower part A-60-1121_SUP Pellets Finished Product, Material Type = FERT Semi-finished Product, material type = HALB Raw Material, material type = ROH Legend <Function> Symbol Description Usage Comments Band: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an organization unit or group, rather than a specific role. Role band contains tasks common to that role. Symbol Diagram Connection The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario. Hardcopy / Document External to SAP External Events: Contains events that start or end the scenario, or influence the course of events in the scenario. Business Activity / Event Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario. Flow line (dashed): Line indicates flow to infrequentlyused or conditional tasks in a scenario. Line can also lead to documents involved in the process flow. Connects two tasks in a scenario process or a non-step event Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario Does not correspond to a task step in the document Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario Corresponds to a task step in the document SubProcess Reference Proces s Decisio n Usage Comments To next / From last Diagram: Leads to the next / previous page of the Diagram Flow chart continues on the next / previous page Hardcopy / Document: Identifies a printed document, report, or form Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Financial Actuals: Indicates a financial posting document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Budget Planning: Indicates a budget planning document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Manual Process: Covers a task that is manually done Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow. Existing Version / Data: This block covers data that feeds in from an external process Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines System Pass / Fail Decision: This block covers an automatic decision made by the software Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed. Financial Actuals Budget Planning Manual Proces s Unit Process Process Reference Description Process Reference: If the scenario references another scenario in total, put the scenario number and name here. Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond. Corresponds to a task step in the document Corresponds to a task step in the document Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution Existing Version / Data System Pass/F ail Decisio n