LED Retrofit Capabilities at MSU (Revisited) SPARTA | Fall 2014 SPARTA | Fall 2014 2 SPARTA | Fall 2014 3 SPARTA | Fall 2014 Current Lamp: F32T8 Calculate CCT (Measured) Declare CCT (Manufacturer) • CCT: 4100K • CRI Average: 65 • CCT: 2800K 1 1 0.9 0.9 0.8 0.8 Normalized Spectra Intensity Normalized Spectra Intensity • CRI Average: 86 0.7 0.6 0.5 0.4 0.3 0.2 0.6 0.5 0.4 0.3 0.2 CCT Ref Black Body Test Spectrum 0.1 0 350 0.7 400 450 500 550 600 650 Wavelength (nm) 700 750 800 CCT Ref Black Body Test Spectrum 0.1 850 0 350 400 450 500 550 600 650 Wavelength (nm) 700 750 800 850 4 SPARTA | Fall 2014 Proposed Lamp: CREE LED Calculate CCT (Measured) Declare CCT (Manufacturer) • CCT: 4000K • CRI Average: 84 • CRI Average: 80 1 1 0.9 0.9 0.8 0.8 Normalized Spectra Intensity Normalized Spectra Intensity • CCT: 3400K 0.7 0.6 0.5 0.4 0.3 0.2 0.6 0.5 0.4 0.3 0.2 CCT Ref Black Body Test Spectrum 0.1 0 350 0.7 400 450 500 550 600 650 Wavelength (nm) 700 750 800 CCT Ref Black Body Test Spectrum 0.1 850 0 350 400 450 500 550 600 650 Wavelength (nm) 700 750 800 850 5 SPARTA | Fall 2014 Fixture Comparison From 3 fluorescent bulbs to 2 LED bulbs Equivalent lighting lux F32T8 (104W Measured) Fl. LED 6 SPARTA | Fall 2014 Color Comparison F32T8 CREE LED UR 2-48 7 SPARTA | Fall 2014 General Characteristic and CCT & CRI Comparison Lifetime (hours) Warranty (years) Replacement (years) Capital Cost/Fixture F32T8 UR 2-48 24,000 2.5-3 4 $6.51 50,000 7 10 $90-$140 Measure Spectra to Calculate CCT and CRI CCT CRI F32T8 2800K 86 UR 2-48 3400K 84 Declare CCT to Calculate CRI F32T8 4100K 65 UR 2-48 4000K 80 Manufacturer Specs F32T8 4100K 78 UR 2-48 4000k 80 Note: The CRI determines how close the bulb is to the CCT 8 SPARTA | Fall 2014 Feasibility Per Fixture Comparison Annual Energy Use (kWh) Annual Energy Cost ($/year/fixture) Installation Labor Rate Per Fixture Replacement (years) F32T8 UR 2-48 644 286 104 46 $2.30 4 $4.60 10 9 SPARTA | Fall 2014 Psychology Bldg. Lighting Study Goal: • • To develop a case study that demonstrates where, and in what use cases, LED System retrofits make the strongest impact in campus buildings Use load data and other project information gathered to develop an LED Investment Sensitivity Study with 10 SPARTA | Fall 2014 Psychology Bldg. Lighting Study Project Scope: • Currently monitoring 1st and 2nd floor hallway lighting for baseline load • Retrofit 91 hallway fixtures with UR 2-48-48-45L-40K-S-FD kits at lowest quoted price • Monitor post installation load to display impact Installation Expenses Materials UR 2-48-48-45L-40K-S-FD CREE LED (Shipping Not Included) Unit Cost/Unit Vol. fixture $90.12 91 $8,200.92 $23.96 91 $2,180.36 14.8% - $322.69 - - $10,703.97 Labor Expense Installer/Electrician fixed hourly % direct Installation Overhead installation Total - Total Expense 11 SPARTA | Fall 2014 LED Investment Sensitivity Study Sensitivity Analysis: • The study of how different sources of uncertainty in key inputs can lead to unexpected output values in a model or system. • Our model uses: 1. Discounted Cash Flow (DCF) model pre-vetted by the DOE EERE to asses the expected return of energy efficiency upgrades 2. AIC/BIC to measure goodness of fit for input variable distributions 3. Monte Carlo to run controlled simulations – iterations = 10,000 randomized samples/sim Application to LED Investments: • Asses stress viability of LED retrofit investments in campus buildings across Key Simulation Inputs using the Psychology Building Lighting Study scenario 12 SPARTA | Fall 2014 LED Investment Sensitivity Study Key Simulation Inputs: • • • • • • Installation Labor Time (mins) UR 2-48 Pricing (USD) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) Outputs Tested: • Lifetime (10yr) Net Present Value (NPV, USD) • Payback Time (PBT, yrs) Baseline Model: • Establishes NPV and PBT outputs in the Discounted Cash Flow (DCF) model using a set of verified baseline inputs • Used to benchmark simulations against 13 SPARTA | Fall 2014 LED Investment Sensitivity Study Baseline Model: • Each Input value has a part in developing the baseline DCF model’s intermediate outputs, PBT and NPV Key Simulation Inputs for Baseline Model Installation Labor Time (mins) UR 2-48 Pricing (USD) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) LED System Performance Gains: • Expected Returns are provided by finding the load reduction between current system and the CREE LED Retrofit at Psychology Bldg. 60 $90.12 1.44% 1.74% 3.50% 100% Baseline Model Installation Expenses Total Direct Cost Total Indirect Cost % of Direct Costs Sales Tax Applies Total Installed Cost $10,381 $323 100% $11,327 Baseline Model LED System Performance Gains Degradation (%/year) Expected Returns (kW) First Year Annual Savings (kWh) 1.00% 5.28 46,262 14 SPARTA | Fall 2014 LED Investment Sensitivity Study Baseline Model Cumulative Payback Cash Flow Intermediate Outputs for Baseline Model Effective Tax Rate 0.00% Credit Basis - Fed $11,326.85 30 Credit Basis - State $11,326.85 20 Nominal Discount Rate 5.30% First Costs $11,326.85 Adjusted Installed Costs $11,326.85 NPV(Nominal,Costflow)) $0.00 NPV(Nominal,Output)) 10 0 -10 338,066.30 NPV(Real,Output)) 368,928.11 Payback Time (yrs) 2.94 -20 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 15 Thousands USD 40 SPARTA | Fall 2014 LED Investment Sensitivity Study Simulation Process: • Gather Data Sets for Simulation Inputs • Perform Distribution fits on Simulation Inputs • Assess distribution fits using Akaike Information Criterion and Bayesian Information Criterion • Select Best Fitting Distribution for each Simulation Input • Parameterize the Simulation • Perform simulation runs on each individual input using Monte Carlo analysis methodologies over an iteration range of 10,000 randomized samples/sim Snap-shot of a simulation run in the DCF model (The ‘Time Fixtures are on’ Input is currently running in this shot) 16 SPARTA | Fall 2014 LED Investment Sensitivity Study Used to: • Assess variation in Outputs • Assess overall model sensitivity • Assess investment viability given a significant degree of simulated uncertainty in the inputs Simulation Input Reference Table Percentile Installation Labor Time (mins) UR 2-48 Pricing (USD) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) 1% 0.6 $90.19 -3.4% -14.0% 2.7% 11.7% 5% 3.7 $90.44 -2.4% -8.4% 3.1% 18.0% 15% 11.1 $91.12 -1.5% -2.7% 3.8% 27.9% 25% 18.9 $91.92 -1.0% -0.5% 4.5% 35.6% 35% 27.0 $92.86 -0.6% 0.7% 5.2% 42.4% 45% 35.5 $94.00 -0.2% 1.8% 5.9% 48.2% 50% 40.1 $94.77 0.0% 2.3% 6.3% 51.1% 65% 55.4 $97.48 0.5% 3.8% 7.5% 59.6% 75% 60 $100.31 1.0% 5.1% 8.5% 66.4% 85% 60 $105.11 1.5% 7.2% 10.0% 74.3% 95% 60 $117.21 2.3% 12.7% 12.4% 87.2% 99% 60 $141.31 3.4% 18.4% 15.3% 96.2% Note: Simulation Input percentiles are to be paired with the Output percentiles and Spider Plots 17 SPARTA | Fall 2014 LED Investment Sensitivity Study Payback Time Output - Payback Time (yrs) Percentile Baseline Installation Labor UR 2-48 Time (mins) Pricing (USD) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) 1% 2.94 2.26 2.94 2.89 2.94 2.94 10 5% 2.94 2.30 2.95 2.91 2.94 2.94 10 15% 2.94 2.34 2.96 2.94 2.94 2.94 10 25% 2.94 2.47 2.98 2.95 2.94 2.94 8.17 35% 2.94 2.56 3.01 2.96 2.94 2.94 6.88 45% 2.94 2.66 3.03 2.97 2.94 2.94 5.71 50% 2.94 2.71 3.05 2.98 2.94 2.94 5.42 65% 2.94 2.89 3.12 3.00 2.94 2.94 4.91 75% 2.94 2.94 3.19 3.01 2.94 2.94 4.41 85% 2.94 2.94 3.31 3.03 2.94 2.94 3.94 95% 2.94 2.94 3.61 3.06 2.94 2.94 3.37 99% 2.94 2.94 4.21 3.09 2.94 2.94 3.05 Note: Simulation Input percentiles are to be paired with the Output percentiles and Spider Plots 18 SPARTA | Fall 2014 LED Investment Sensitivity Study Spider Plot for Payback Time (yrs) Baseline Installation Labor Time (mins) UR2 Pricing (usd) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) 12.00 10.00 PBT (yrs) 8.00 6.00 4.00 2.00 Percentile 0.00 1% 5% 15% 25% 35% 45% 50% 65% 75% 85% 95% 99% Baseline 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 Installation Labor Time (mins) 2.26 2.30 2.34 2.47 2.56 2.66 2.71 2.89 2.94 2.94 2.94 2.94 UR2 Pricing (usd) 2.94 2.95 2.96 2.98 3.01 3.03 3.05 3.12 3.19 3.31 3.61 4.21 Annual Utility Rate Escalation (Average, %) 2.89 2.91 2.94 2.95 2.96 2.97 2.98 3.00 3.01 3.03 3.06 3.09 Inflation Rate (Average, %) 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 Real Discount Rate (%) 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 10 10 10 8.17 6.88 5.71 5.42 4.91 4.41 3.94 3.37 3.05 Time Fixtures are on (Average, %) 19 SPARTA | Fall 2014 LED Investment Sensitivity Study Net Present Value Output - Lifetime NPV(USD) Percentile Baseline Installation Labor Time (mins) UR 2-48 Pricing (USD) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) 1% $18,406 $18,406 $13,468 $13,246 $67,548 $19,585 -$7,853 5% $18,406 $18,406 $15,793 $14,202 $41,888 $19,042 -$5,966 15% $18,406 $18,406 $16,960 $15,090 $26,355 $17,931 -$3,034 25% $18,406 $18,406 $17,424 $15,630 $22,086 $16,981 -$753 35% $18,406 $18,606 $17,697 $16,105 $19,956 $16,036 $1,269 45% $18,406 $19,079 $17,888 $16,518 $17,632 $14,699 $3,005 50% $18,406 $19,281 $17,958 $16,722 $16,959 $14,224 $3,866 65% $18,406 $19,856 $18,142 $17,316 $15,561 $13,291 $6,391 75% $18,406 $20,211 $18,233 $17,824 $13,938 $12,200 $8,411 85% $18,406 $20,553 $18,310 $18,448 $11,644 $10,824 $10,776 95% $18,406 $20,879 $18,375 $19,484 $7,043 $8,731 $14,590 99% $18,406 $21,012 $18,399 $20,828 $3,682 $6,595 $17,285 Note: Simulation Input percentiles are to be paired with the Output percentiles and Spider Plots 20 SPARTA | Fall 2014 LED Investment Sensitivity Study Spider Plot for NPV (USD) Baseline Installation Labor Time (mins) UR2 Pricing (usd) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) $80,000 $70,000 $60,000 $50,000 Lifetime NPV (USD) $40,000 $30,000 $20,000 $10,000 $0 Percentile -$10,000 -$20,000 1% 5% 15% 25% 35% 45% 50% 65% 75% 85% 95% 99% Baseline $18,406 $18,406 $18,406 $18,406 $18,406 $18,406 $18,406 $18,406 $18,406 $18,406 $18,406 $18,406 Installation Labor Time (mins) $18,406 $18,406 $18,406 $18,406 $18,606 $19,079 $19,281 $19,856 $20,211 $20,553 $20,879 $21,012 UR2 Pricing (usd) $13,468 $15,793 $16,960 $17,424 $17,697 $17,888 $17,958 $18,142 $18,233 $18,310 $18,375 $18,399 Annual Utility Rate Escalation (Average, %) $13,246 $14,202 $15,090 $15,630 $16,105 $16,518 $16,722 $17,316 $17,824 $18,448 $19,484 $20,828 Inflation Rate (Average, %) $67,548 $41,888 $26,355 $22,086 $19,956 $17,632 $16,959 $15,561 $13,938 $11,644 $7,043 $3,682 Real Discount Rate (%) $19,585 $19,042 $17,931 $16,981 $16,036 $14,699 $14,224 $13,291 $12,200 $10,824 $8,731 $6,595 Time Fixtures are on (Average, %) -$7,853 -$5,966 -$3,034 -$753 $1,269 $3,005 $3,866 $6,391 $8,411 $10,776 $14,590 $17,285 21 SPARTA | Fall 2014 LED Investment Sensitivity Study What does all of this mean: • For Payback Time (PBT): • Despite a large range of variation in Simulation Inputs there is little deviation away from the Baseline Model Outputs - when excluding ‘Time Fixtures are on’ Range of Simulation Inputs (MAX–MIN) Installation Labor Time (mins) UR 2-48 Pricing (USD) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) 59 $51.12 7% 32% 13% 85% Average Deviation from Baseline (%) - PBT • This tells us that with even rather extreme Installation Labor Time (mins) -9% amounts of uncertainty over vital Model Inputs UR 2-48 Pricing (USD) 9% the Investment in LED systems remains at most, 1% an on Average 9% above our Baseline Model’s PBT Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) 0% of 2.94yrs or otherwise 3.20yrs - when excluding ‘Time Fixtures are on’ Real Discount Rate (%) Time Fixtures are on (Average, %) 0% 115% 22 SPARTA | Fall 2014 LED Investment Sensitivity Study Payback Time Output Deviations - from Baseline Model to Simulation (%) -9% 300% 130% Avg. Deviaton from Baseline, Time Fixtures are on 115% Deviation from Baseline /percentile (%) 250% 110% Avg. Deviaton from Baseline,Annual Utility Rate Escalation 1% 200% 90% 150% 70% Avg. Deviaton from Baseline, Real Discount Rate 0% 100% 50% 50% 30% Percentile 0% 10% 1% 5% 15% 25% 35% 45% 50% Avg. Deviaton from Baseline, UR 2-48 Pricing 9% -50% 65% 75% 85% 95% 99% Avg. Deviaton from Baseline, Inflation Rate 0% Installation Labor Time (mins) UR2 Pricing (usd) Annual Utility Rate Escalation (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) Baseline Inflation Rate (Average, %) -10% 23 Average Deviation from Baseline (%) Avg. Deviaton from Baseline, Installation Labor Time SPARTA | Fall 2014 LED Investment Sensitivity Study What does all of this mean: • For Net Present Value (NPV): • Range of Simulation Inputs (MAX–MIN) Installation Labor Time (mins) UR 2-48 Pricing (USD) Annual Utility Rate Escalation (Average, %) Like the PBT outputs - a large range of variation Inflation Rate (Average, %) in Simulation Inputs seems to show little in terms Real Discount Rate (%) of deviations away from the Baseline Model Time Fixtures are on (Average, %) Outputs - when excluding ‘Time Fixtures are on’ • Again, this tells us that with even rather extreme amounts of uncertainty over vital Model Inputs the Investment in LED systems remains, on Average, 2.4% below our Baseline Model’s Lifetime NPV of $18,406 at $17,960 - when excluding ‘Time Fixtures are on’ 59 $51.12 7% 32% 13% 85% Average Deviation from Baseline (%) - NPV Installation Labor Time (mins) UR 2-48 Pricing (USD) Annual Utility Rate Escalation (Average, %) Inflation Rate (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) 6% -6% -9% 20% -23% -78% 24 SPARTA | Fall 2014 LED Investment Sensitivity Study NPV Output Deviations - from Baseline Model to Simulation (%) 250% Avg. Deviaton from Baseline, Installation Labor Time 6% Deviation from Baseline /percentile (%) 200% 40% Avg. Deviaton from Baseline, Inflation Rate 20% Avg. Deviaton from Baseline, UR 2-48 Pricing -6% 20% 0% 150% Avg. Deviaton from Baseline, Real Discount Rate -23% 100% Avg. Deviaton from Baseline,Annual Utility Rate Escalation -9% 50% -20% -40% 0% 1% 5% 15% 25% 35% 45% 50% 65% 75% 85% 95% 99% -50% -60% -100% Percentile -80% Avg. Deviaton from Baseline, Time Fixtures are on -78% -150% -200% -100% Installation Labor Time (mins) UR2 Pricing (usd) Annual Utility Rate Escalation (Average, %) Real Discount Rate (%) Time Fixtures are on (Average, %) Baseline Inflation Rate (Average, %) 25 Average Deviation from Baseline (%) 300% SPARTA | Fall 2014 LED Investment Sensitivity Study Psychology Bldg. Lighting Study: • Monitoring 1st and 2nd floor hallway lighting for baseline load at 5min logging increments • Lights in the hallway have been on 100% of the time 350 350 300 300 250 250 200 200 150 150 100 100 50 50 0 0 1 433 865 1297 1729 2161 2593 3025 3457 3889 4321 4753 5185 5617 6049 6481 6913 7345 7777 8209 8641 9073 9505 9937 10369 10801 11233 11665 12097 12529 12961 13393 Second Floor Monitored Lights 1 513 1025 1537 2049 2561 3073 3585 4097 4609 5121 5633 6145 6657 7169 7681 8193 8705 9217 9729 10241 10753 11265 11777 12289 12801 13313 Energy Consumption (Wh/min) First Floor Monitored Lights Minutes 26 SPARTA | Fall 2014 LED Investment Sensitivity Study Significant Findings (Holding all other inputs constant at Baseline): Avg. Energy Use Reduction of 55% per Fixture over Fluorescent Tubes Use ≥ 51% ON PBT≤ 5yrs Use ≥ 90% ON PBT≤ 3.5yrs 27 SPARTA | Fall 2014 LED Investment Sensitivity Study Significant Findings (Holding all other inputs constant at Baseline): Time Fixtures are on (Average, %) PBT (yrs) 48.2% 51.1% 59.6% 66.4% 74.3% 87.2% 96.2% 5.71 5.42 4.91 4.41 3.94 3.37 3.05 28 SPARTA | Fall 2014 LED Investment Sensitivity Study Significant Findings (Holding all other inputs constant at Baseline): Avg. Energy Use Reduction of 55% per Fixture over Fluorescent Tubes Use ≥ 51% ON NPV > $42/fixture Use ≥ 90% ON NPV > $169/fixture 29 SPARTA | Fall 2014 LED Investment Sensitivity Study Significant Findings (Holding all inputs constant at Baseline): Time Fixtures are on (Average, %) Per-Fixture Lifetime NPV (USD) 48.20% 51.10% 59.60% 66.40% 74.30% 87.20% 96.20% $33.02 $42.48 $70.23 $92.43 $118.42 $160.33 $189.95 30