fax message - Chinabidding.org

advertisement
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Municipal real estate construction
(20110606-20110610)
Project Name: Tianji Coal Chemical Industry Group Co., Ltd. Innovative capacity-building
projects ..........................................................................................................................19
Project Name: Huai County Jin Runhua House a -10 #, 11 #, 29 #, 30 # project ...............20
Project Name: Hunan hole Economic Development Zone General Services Building Projects
Ltd .................................................................................................................................20
Project Name: Excelle 名邸 House Area ............................................................................21
Project Name: Hubei steel three new community projects Heroes ......................................22
Project Name: Hohhot Prime Square commercial district project ........................................22
Project Name: Heilongjiang Province, Xiyuan shed reconstruction projects, Springfield Park,
A1-A17, A31-A42, B1-B10 Project ....................................................................................23
Project Name: Hebei Province, the project Longwan happy home ......................................24
Project Name: High Village 25 #, 29 #, 30 # residential building projects ..........................24
Project Name: Fuzhou expansion Taijiang Sixth Central Primary School, Fuzhou fourteenth
Extension School .............................................................................................................25
Project Name: Shanxi Xinghua Group Co., Ltd. Innovation Fen Project ...............................26
Project Name: Tanghe East Coast, the second phase commercial and residential district .....27
Project Name: Huizhou City, Metro municipal level infrastructure projects ..........................27
Project Name: Guangdong eighty-nine secondary school expansion, the overall
transformation of the campus -Administration Building Project ...........................................28
Project Name: Construction of family residence residential projects ....................................29
Project Name: Dongyang Industrial Agglomeration Mianchi County Business Service Center
Project ...........................................................................................................................30
Project Name: Shunyi District, secondary school renovation projects along the river ...........30
Project Name: First World Plaza Baoding new building decoration projects .........................31
Project Name: 2011 Longjiang Forestry Management and shantytowns, E James River Forest
Lot -home 6,7,8,9,10,11,12 Jian Building, and Chien area, Building 1, Jian residential home
staff , reception area, Building 1, Building 4, Chung Hsing North district project ..................32
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: 2011 Longjiang Forestry Management and shantytowns, James River Forest
Lot D2 -Harmony Area B, M, N, Q, P, O Building Project ....................................................32
Project Name: 2011 Longjiang Forestry Management and shantytowns, Section of James
River Forest D1 -C, 1,2,3,4,5 Building a harmonious community project .............................33
Project Name: 2011 Longjiang Forestry Management and shantytowns, James River Forest C
Lot -Sunshine Garden Building B, 7,8,9,10,11,12 Project ...................................................34
Project Name: 2011 Longjiang Forestry Management and shantytowns, Lot A1 James River
Forest -1-6, Building B, Sunshine Garden Project ..............................................................34
Project Name: Xianghe -R & F Metro Phase II Project .......................................................35
Project Name: Xianghe -R & F Metro a construction project ...............................................36
Project Name: Riverfront source area -B area Residential Building......................................36
Project Name: Sandstone eco-tourism projects in Inner Mongolia Center for Science in
Construction Engineering .................................................................................................37
Project Name: Spring Area Project Luohe Lijiang ...............................................................38
Project Name: Lujiang County New Radio and Television Radio and Television Center Project
......................................................................................................................................38
Project Name: Lotus Engineering Block F East Area ...........................................................39
Project Name: Jilin People's Hospital Phase II ...................................................................40
Project Name: Hunan You County invest in home city - repurchase -BT project ..................40
Project Name: production of Yueyang Power Administration Building Installation Engineering
......................................................................................................................................41
Project Name: Heilongjiang Province, eight hundred fifty-six farm cultural information center,
archives and exhibition project .........................................................................................42
Project Name: Shanghai Institute of Nuclear Engineering Nuclear Power R & D center -Phase
III project .......................................................................................................................43
Project Name: Puyang City Eye Hospital and outpatient comprehensive construction program
relocation building project ...............................................................................................44
Project Name: 2011 Longjiang Forestry Management and shantytowns, Eleventh District, the
northern Forestry Project .................................................................................................45
Project Name: 2011 Longjiang Forestry Management and shantytowns, through North West
Community Forestry Project ten districts...........................................................................45
Project Name: 2011 Longjiang Forestry Management and shantytowns, the northern North
Community Forestry Project Twelve .................................................................................46
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: National Secondary Schools Ziyun County building project ...........................47
Project Name: Yueyang City fifteenth school track and field, flag-raising square, gate project
......................................................................................................................................47
Project Name: Yantai special equipment safety testing of base construction projects ..........48
Project Name: Yakeshi City Palace Hotel construction project ............................................49
Project Name: Xuancheng Secondary 1 # -6 # new campus student housing project ..........49
Project Name: Yunlong Town Project Packaging ...............................................................50
Project Name: Dandong City in 2011 to move back to a Wantong coking project ................51
Project Name: detachment of armed police Daxinganling new barracks project area ...........51
Project Name: Chen Ming Motors headquarters in Hong Kong New Town Phase II # 1 .......52
Project Name: Tujia Autonomous County Public Security Bureau, the business technology
space project -main project project ..................................................................................53
Project Name: Changji centralized building the organs of employee housing units in three
projects -A zone project ..................................................................................................53
Project Name: Beijing business building projects ...............................................................54
Project Name: 2011 Longjiang Forestry Management and shantytowns, Section of James
River Forest F -Sunny Garden A, L, M, N, Building, B District, 13,14,15,16,17,18,19, Building
20 Project .......................................................................................................................55
Project Name: 2011 Longjiang Forestry Management and shantytowns, James River Forest
Lot B -Harmony Area A, E, F, G, H Building, B District, I, J, K, L, R, S Building Project .........55
Project Name: 2011 Longjiang Forestry Management and shantytowns, Lot A2 James River
Forest -A sunny garden area A, B, C, D, E, F, G, H Dong, red gold district seat, red cell Ginza
Project ...........................................................................................................................56
Project Name: King County commercial and residential projects in Kingston Agile ...............57
Project Name: million and the county district a project ......................................................57
Project Name: Shandong tobacco culture pension base a project .......................................58
Project Name: Qujing City Fuyuan county sports center project -update .............................59
Project Name: Marriott International, a building and underground garage project 17,20,24 .59
Project Name: Marriott International, a building and underground garage project 2,3,7,11 ..60
Project Name: Marriott International, a building and underground garage project
1,5,6,9,10,13 ..................................................................................................................61
Project Name: Heilongjiang Province, eight hundred fifty-six Farm Gymnasium ...................61
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hebei Science and Technology Industrial Park of modern agricultural
equipment, the joint plant five to six steel works...............................................................62
Project Name: 2011 Longjiang Forestry Management and shantytowns, through the North
East Community Forest project ten ..................................................................................63
Project Name: 2011 Longjiang Forestry Management and shantytowns, the northern South
Community Forestry Project Twelve .................................................................................63
Project Name: Honghuagang District People's Hospital Medical Building for Construction
Projects ..........................................................................................................................64
Project Name: Bauhinia Garden Residential Project ...........................................................65
Project Name: Zhuhai City high school campuses Culture Park Project ...............................65
Project Name: the central grain Tangyuan New Building Depot, the subsidiary buildings and
supporting projects .........................................................................................................67
Project Name: First Zhangjiachuan Hui Autonomous County People's Hospital Building Project
......................................................................................................................................68
Project Name: Public Security Bureau business houses Shinshu Engineering .......................69
Project Name: Xinjiang University, Main Campus Building 1, high-rise residential projects ...69
Project Name: Five thousand Chinese Museum Project ......................................................70
Project Name: Technology Venture Capital Co., Ltd. Wujiang research building, biopharmaceutical R & D building and garden apartment project talent ..................................70
Project Name: Village Harmony community Wen'an Han 1 #, 2 # Building Project ..............71
Project Name: Wen'an large new residential zhaocun 2 # Building Yongfu Park District
projects ..........................................................................................................................72
Project Name: Ya Ju County District Court million 4 # -9 # F Project .................................72
Project Name: Xinjiang Hotan Prefecture Technical School staff raised high-rise residential
building projects .............................................................................................................73
Project Name: Luohu District, Shenzhen, Guangdong, People's Primary School renovation and
expansion project............................................................................................................73
Project Name: Tieling Municipal Intermediate People's Court Trial Project ..........................74
Project Name: Gree Coast S2 block a 17 # -22 # Building Installation Engineering .............75
Project Name: First Middle School expansion project Jianou ..............................................75
Project Name: China Medical University Hospital, the New Fourth Ward Building Project .....76
Project Name: Taian City, Pinghu One day number one residential building and underground
garage project .................................................................. Error! Bookmark not defined.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Fuk Road home district projects .................................................................77
Project Name: Honghuagang District People's Hospital Medical Building for Construction
Projects ..........................................................................................................................78
Project Name: Sichuan disaster Judicial Police Vocational College canteen new construction
projects, student housing complex building ........................ Error! Bookmark not defined.
Project Name: Wu Zhi Senior Services Center Project ........................................................79
Project Name: Oasis Shenhua Baotou Railway Corporation currents block diagram and
integrated planning and design projects ...........................................................................80
Project Name: Gong Fu Wang Wen'an prosperous farmers shop floor apartment project # 1
......................................................................................................................................81
Project Name: Shanxi Taihang. Scenic Watertown Yu Fung # 1 Residential District Court
building and underground garage project .........................................................................82
Project Name: Gree Electric Appliance -Zhengzhou Co., Ltd., Zhengzhou Gree Air Conditioner
Storehouse Project ..........................................................................................................83
Project Name: Jieyang City, Guangdong Province People's Hospital of benefits to the county
hospital new building project ...........................................................................................83
Project Name: Ordos Civil Aviation Building Project ...........................................................84
Project Name: Ding Xiang family of civil engineering projects ............................................85
Project Name: German source Cannes -for the benefit of Hill House Area ...........................86
Project Name: Urban North is still a project ......................................................................86
Project Name: Chengdu Run into the United States Coast Investment Co., Ltd. of England
Project ...........................................................................................................................87
Project Name: Shen Yuan Industrial Development Co., Ltd. Changle Imperial Court Name
County Project ................................................................................................................88
Project Name: Construction of gold ditch shantytowns ......................................................88
Project Name: Qin Peninsula C1-1 project ........................................................................89
Project Name: agricultural -logistics and distribution center project ....................................90
Project Name: Qinhuangdao City International Hardware & Electrical projects ....................90
Project Name: Andong Town, outside the mouth of an apartment project Hongxing ...........91
Project Name: Southview World apartment project ...........................................................92
Project Name: Industrial Cloth Factory block housing project land acquisition and
resettlement ...................................................................................................................92
Project Name: Real Estate Development Co., Ltd. Shengda Bazhou Huayuan Area Project ...93
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Quanzhou expressway traffic police working space and ancillary works ........94
Project Name: Construction QIDINGSHAN Huiqian Lou -a project ......................................94
Project Name: Nantong Long Star Properties Ltd. is still in the city million residential project
......................................................................................................................................95
Project Name: Real Estate Development Co., Ltd. Nantong Jinchang Marriott International
Building and an underground garage 2,3,7,11 ..................................................................96
Project Name: Natural Ecological Park Chu-yu Village Project.............................................97
Project Name: Qinhuangdao Hing Enterprise Co., Ltd. construction warehouse expansion
project, 1-3 ....................................................................................................................97
Project Name: Huanghua Downtown Real Estate Development Co., Ltd. New East Beiyuan
residential projects ..........................................................................................................98
Project Name: Lot 11-3 overhead of office space project ...................................................99
Project Name: Beijing Chaoyang Hospital expansion project of peace -update ....................99
Project Name: Anyue towns Train to Train Your Dragon Road, town road reconstruction
works ........................................................................................................................... 100
Project Name: Red Road Anyue Lee County road reconstruction works to yuanba ......... Error!
Bookmark not defined.
Project Name: Handan City Psychiatric Hospital New Ward Building Project -updated .... Error!
Bookmark not defined.
Project Name: Haig Wireless Technology Building Project ................................................ 102
Project Name: Fujian office building societies and institutions directly under the base of the
business space project .................................................................................................. 103
Project Name: Anshun City People's Hospital relocation project ........................................ 104
Project Name: Luyuan District, Changchun City Drainage Improvement Project ............ Error!
Bookmark not defined.
Project Name: Shenyang Agricultural University Campus Infrastructure Project Phase I ..... 105
Project Name: Chongqing City hospital for Chinese medicine project Nanchuan District ..... 106
Project Name: county used industrial clustering testing centers for biotech projects .......... 107
Project Name: Fenghuang County High School Relocation Project .................................... 107
Project Name: East Century City 16 #, 17 #, 18 #, 22 #, 23 #, 24 # Building Project ...... 108
Project Name: Workshop # 1 office building and plant engineering .................................. 109
Project Name: Reconstruction of Shanxi Academy of Agricultural Sciences research and
innovation base demolition projects ............................................................................... 110
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Jize navigation center of agricultural eco-tourism eco-tourism center of the
new agricultural projects ............................................................................................... 111
Project Name: Town Center Banbi Xinglong County Commercial Street Construction Project
.................................................................................................................................... 111
Project Name: Shanxi in North China Electrical and Mechanical School New Building Project
.................................................................................................................................... 112
Project Name: Seda in the possession of hospital building projects .................................. 113
Project Name: Flower planting demonstration zone expansion project .............................. 113
Project Name: Qinglong County War History and Culture Square underground car park
project ......................................................................................................................... 114
Project Name: General setting for Power Production Comprehensive Building Project ........ 115
Project Name: Pingyang gathering point MASS rural housing projects .............................. 115
Project Name: Community Phase III Pingliang Huadian 10 #, 11 #, 12 #, 15 #, 17 #, 18 #
residential building projects ........................................................................................... 116
Project Name: Water Garden Ningyang Li underground garage project ............................ 117
Project Name: Ning Wai, Xinhua Town Office Building Project .......................................... 117
Project Name: State Road 121, Nanjing housing renovation project ................................. 118
Project Name: Real Estate Development Co., Ltd. Nantong Jinchang Marriott International
Building and an underground garage 17,20,24 ................................................................ 119
Project Name: Downtown Walk Manor House project ...................................................... 119
Project Name: Tangshan Guye Hong residential projects into their homes ........................ 120
Project Name: Real Estate Development Co., Ltd. Nantong Jinchang Marriott International
Building and an underground garage 1,5,6,9,10,13 ......................................................... 120
Project Name: Ocean Star Project of Zhengzhou City ...................................................... 121
Project Name: Huozhou Coal Group Co., Ltd. Luliangshan coal coal coal washing plant roads
and bridges .................................................................................................................. 122
Project Name: Fengtai Technology Gymnasium ............................................................... 123
Project Name: Salt Lake County highway projects in 2011 ............................................... 124
Project Name: Shanghai International Financial Center Project ........... Error! Bookmark not
defined.
Project Name: Shanghai Jinshan Industrial Zone, Industrial Park of the project life of service
.................................................................................................................................... 126
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Silver Road near resettlement supporting commercial supporting municipal
road - planning all the way -Silver Road ~ China Exhibition Road Project .......................... 127
Project Name: Cultural Plaza project in Fujian ................................................................. 128
Project Name: Naiman Dongming middle school project .................................................. 129
Project Name: Minhou County Central Primary School Teaching Building mussels kindergarten
teaching building construction........................................................................................ 129
Project Name: Wuxi Taihu Lake City supporting the placement of water environment
improvement project ..................................................................................................... 130
Project Name: Mianyang City Investment Holding -Group Co., Ltd. Ka commercial and
residential district projects to Prime Terrace ................................................................... 131
Project Name: Luohe Water Sports Centre surf entertainment projects ............................. 131
Project Name: Longyan Teachers Preparatory School New Campus Phase II Building and the
No. 1 Teaching Building Project ..................................................................................... 132
Project Name: Liaoning New Star Powertrain Limited plant construction project -Phase I 1 #
joint plant and ancillary projects .................................................................................... 133
Project Name: Stone Village green Whitehead Lanzhou overall planning of construction
projects ........................................................................................................................ 134
Project Name: Kun Heng Jinbi District Court Building Project # 1 ..................................... 134
Project Name: Kaili City, one of the main entrance to the Kamba Reservoir laugh campus
construction projects for urban trunk road ...................................................................... 135
Project Name: Junan Dragon Royal Garden Residential Project Phase II ........................... 136
Project Name: Jinzhou Railway 80 ShangXi Hailu Nan transformation 2 # F, 5 # Building
Construction Project ...................................................................................................... 137
Project Name: Redstar International Home Plaza ............................................................ 137
Project Name: Longjing City Public Security Bureau Detention Center construction project 138
Project Name: Jinzhou Railway 80 ShangXi Hailu Nan transformation 1 # F, 6 # Building
Construction Project ...................................................................................................... 139
Project Name: Changjiang North Street, Yuhong District, road works -road drainage works
.................................................................................................................................... 139
Project Name: Anlong County People's Hospital outpatient and emergency complex building
projects, medical technology building, hospital construction and installation, living rooms . 140
Project Name: Su bend 41,42 Neighbourhood Project ..................................................... 141
Project Name: Shanghai Jiading Ju block of residential and commercial projects garden .... 142
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Zhaoxian weak school renovation project -Secondary School Section of Nanbo
town homes project ...................................................................................................... 143
Project Name: Mining Limited Zhaotong Chihong Base Project Office ............................... 143
Project Name: Welcome Yanjiao North Community Health Center Project ......................... 144
Project Name: Area A, Xing Sheng Yuan Project ............................................................. 145
Project Name: Wuzhou City School District Tengxian People's Hospital patient building of new
projects -update ........................................................................................................... 145
Project Name: Yichang Municipal Construction Committee Housing and Urban Park Project in
Yichang City Vocational Education .................................................................................. 146
Project Name: Xixia Green Energy preservation projects .................................................. 147
Project Name: Shijiazhuang Airport Industrial Park off Southwest Area Road Network Project
Area ............................................................................................................................. 148
Project Name: John City Fourth People's Hospital Building Project .................................... 149
Project Name: Xi'an Xianyang Qindu District AC and DC EHV dry casing Industrialization
Project -update ................................................................. Error! Bookmark not defined.
Project Name: the founding of the Second District Park -Golden Age limit housing projects
.................................................................................................................................... 150
Project Name: founding a new city area -Triumph Square price of commercial housing
projects ........................................................................................................................ 151
Project Name: Anshan Dade residential construction projects Regalia ............................... 151
Project Name: Henan water legislation Mountain million DH-2009-568-2 block of residential
construction projects ..................................................................................................... 152
Project Name: Poly Quartet and construction project ....................................................... 153
Project Name: Zhou, Xiaolin Town residential project relocation ....................................... 153
Project Name: Wuhan Real Estate Development and Investment Group Co., Ltd. 60 after the
lake complex projects Articles ........................................................................................ 154
Project Name: Yu Cheng-hung out -2010 108 block the project ....................................... 155
Project Name: Quanzhou Licheng Edward Lane Area Improvement Project ...................... 156
Project Name: Golden Resources • Napa Valley Project ................................................... 156
Project Name: Yan Hing Door North village reconstruction -near International Park City
project ......................................................................................................................... 157
Project Name: High Mountain and Flowing • Singapore dollar construction projects Legend
.................................................................................................................................... 158
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: great affordable housing project Jiayuan .................................................. 158
Project Name: Miss Hong Kong • Gold Coast -a Leiden town project ................................ 159
Project Name: Chen Wei Real Estate Development Co., Ltd. Hebei New Peace House Garden
Project ......................................................................................................................... 160
Project Name: the third phase of residential areas are gardens ........................................ 161
Project Name: Handan City Real Estate Development Co., Ltd. New Fu On Phase II project
area ............................................................................................................................. 162
Project Name: Qinhuangdao large automobile trade center project car sales service ......... 162
Project Name: Joint Industry Group Co., Ltd. Zhuozhou Building Project .......................... 163
Project Name: Residential Construction Project ............................................................... 164
Project Name: Chongqing Qianjiang District, the garden center project passenger and freight
transport services ......................................................................................................... 164
Project Name: Zhaoxian weak school renovation project -Secondary School Section of the
former chapters and Rural Project .................................................................................. 165
Project Name: First Middle School of Shiping County Building Project -updated ................. 166
Project Name: Chenghai Power Supply Bureau Building Project Scheduling ....................... 167
Project Name: International garden of Agile projects ....................................................... 168
Project Name: New Vista II project 枫景 ........................................................................ 168
Project Name: Hengshui Yi Xing Fu River Real Estate Development Co., Ltd. New East Garden
Project ......................................................................................................................... 169
Project Name: Yue Heng. Yuet four projects the world .................................................... 170
Project Name: Silver Beach million construction project Springs II ................................... 171
Project Name: Standard plant construction project .......................................................... 171
Project Name: Hengda Jinbi high-rise residential construction projects the world -C .......... 172
Project Name: Hengda Jinbi high-rise residential construction projects the world -B .......... 173
Project Name: Hengda Jinbi high-rise residential construction projects the world -A .......... 174
Project Name: Fu Jen Catholic Fu Jen Pharmaceutical Group Pharmaceutical Group Co., Ltd.
headquarters building projects ....................................................................................... 174
Project Name: Fu Jen Catholic Fu Jen Biotechnology Pharmaceutical Group Co., Ltd. Garden
Project ......................................................................................................................... 175
Project Name: Two Rivers Area of Chongqing Hi-Tech Industrial Park, land and water from
the source of public rental Xiangmu Area ....................................................................... 176
Project Name: Neighborhood Center affordable housing construction projects .................. 177
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: composite Xiangmu ................................................................................. 177
Project Name: Longhai Kok Weng Kok Road Town, United States -Jinjiang Road to Haicang
community road works .................................................................................................. 179
Project Name: Gulin Gulin Town Law Ping Road Improvement Project . Error! Bookmark not
defined.
Project Name: Pingyao County People's Hospital inpatient expansion building project ....... 180
Project Name: open up the road the rain four sewage pumping station project ................. 181
Project Name: Tianjin Binhai New District, Central Business District, the Twin Towers, North
Tower Xiangmu............................................................................................................. 182
Project Name: Tianjin, Shenzhen Investment Shopping Center -Phase I project ................ 183
Project Name: Xi'an Jiaotong University School of Medicine, First Affiliated Hospital of
research and teaching building project ........................................................................... 184
Project Name: Shaanxi Hotel Expansion Project .............................................................. 185
Project Name: Kai Tak Ming Yuan Project ....................................................................... 186
Project Name: Tianhong Real Estate Development Co., Ltd. Hengshui still have projects
Tianhong ...................................................................................................................... 187
Project Name: Dongping Town, Foshan City Business Center project ................................ 187
Project Name: Wuhan City invest in future technologies Ltd a construction project starting
area ............................................................................................................................. 188
Project Name: Chongqing New Real Estate Development Co., Ltd. Two Rivers Two Rivers
Chongqing International Cloud Computing Center -Phase I project ................................... 189
Project Name: Dalian Changxing Island Harbor Industrial Zone West municipal infrastructure
facilities petrochemical project -Phase II......................................................................... 190
Project Name: State oil storage depot Nanjing airport expansion project .......................... 191
Project Name: Heilongjiang Agricultural airport project red border farms .... Error! Bookmark
not defined.
Project Name: Zaozhuang Public Transit Transfer Station Project and the end of the first BRT
.................................................................................................................................... 193
Project Name: Shizuishan City Bus Terminal project Dawukou ......................................... 194
Project Name: Secondary V second stage Puning ............................................................ 194
Project Name: Inner Mongolia Medical College Hospital Building renovation and expansion
project for outpatient and inpatient ................................................................................ 195
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Inner Mongolia Science and Technology Innovation Park Service construction
projects ........................................................................................................................ 196
Project Name: Inner Mongolia Autonomous Region Committee of democratic authority office
project ......................................................................................................................... 197
Project Name: Mancheng Experimental High School classroom building, laboratory building
and the comprehensive building ..................................................................................... 197
Project Name: Construction of the terminal project in Zaozhuang .................................... 198
Project Name: Marcy Road -Manan Road to West Point Road New Construction ............... 199
Project Name: Pedestrian Street Jishan characteristics - Fairview world projects ............... 199
Project Name: Handan Yee Endowment Project Rehabilitation Centre .............................. 200
Project Name: Kunming Jinning County Street High School Standard School moved to New
Project -updated ........................................................................................................... 201
Project Name: Al Tang Yijinhuoluo County town of Outer Ring Road hot seat auxiliary Line
.................................................................................................................................... 202
Project Name: Wah Wah County Hospital and County Hospital of People's relocation project
.................................................................................................................................... 203
Project Name: Protection of Jiamusi City Centre Rangers minor relief stations project ....... 204
Project Name: Longquan City, Hyundai Motor Service Center -4S stores Construction ....... 204
Project Name: Tianhong Real Estate Development Co., Ltd. Hengshui still have projects
Tianhong ...................................................................................................................... 205
Project Name: Hebei Province, three in Kowloon Garden Residential Quarter, 53 #, 57 #, 58
#, 61 #, 64 #, 78 # residential building, 77 # Building Project ........................................ 206
Project Name: Guangdong Shantou CITIC Pu River Beach Resort holiday apartment project
dragon ......................................................................................................................... 207
Project Name: old City inpatient psychiatric hospital building project ................................ 207
Project Name: Sunshine House project in Ordos ............................................................. 208
Project Name: Dong Yue Garden Project ........................................................................ 209
Project Name: Badong County Detention Center, the Public Security Bureau detention center
construction project in Badong County ........................................................................... 209
Project Name: Internal Medicine Hospital of Chongqing City Building Project -update ........ 210
Project Name: Chongqing Green Island Public Service District Building 2 project ............... 211
Project Name: Jiangyin Jin Meilin Properties Limited real estate project ............................ 212
Project Name: Transport Group Co., Ltd. Handan standardized vegetable market project .. 212
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Xuzhou City East Middle School Project -updated ...................................... 213
Project Name: County # 106, Grand International Hot Springs apartment project health ... 214
Project Name: Xiong County Grand International Hot Springs 105 #, 107 #, health apartment
project ............................................................................. Error! Bookmark not defined.
Project Name: Ying Town, Xinxiang County, seven miles of industrial agglomerations
standard plant project ....................................................... Error! Bookmark not defined.
Project Name: Xiamen Municipal Construction and Development Corporation Xiang'an East
Metro Phase II Project ................................................................................................... 216
Project Name: Vocational and Technical College Technology Building Luliang construction
projects ........................................................................................................................ 217
Project Name: Economic and Trade Co., Ltd. Xingtai Xingtai Yuen Shing Hing of frozen fruit
and vegetable processing project ................................................................................... 218
Project Name: Guizhou Province in the first place • Real Estate Development Co., Ltd. The
first phase of the project Lan County .............................................................................. 218
Project Name: Guangxi Museum of Natural Resource Project ........................................... 219
Project Name: Fengyang County road projects in the capital of South .............................. 220
Project Name: Fenghuang County High School Relocation Project .................................... 220
Project Name: Phoenix City Qingchengzi Accord Town Court, the state-owned mining shanty
town, the gardener building projects .............................................................................. 221
Project Name: Feng Ning Tianze Garden -personnel home community project .................. 222
Project Name: Ordos Kang Bashi New Fourth Middle School Project ................................. 222
Project Name: Ordos Kang Bashi District VI Secondary School Project .............................. 223
Project Name: School Sixth New Kang Bashi Ordos Project .............................................. 224
Project Name: Dongsheng District of Erdos Xin Yi Garden Phase II project housing project
intelligence ................................................................................................................... 224
Project Name: Hengtai Trade City B, 1 #, 2 # Building Project ........................................ 225
Project Name: Dalian Airport Expansion Project ATC Engineering ........ Error! Bookmark not
defined.
Project Name: North Mountain Area Zhungeer Xue bay three municipal road and pipe
network construction ..................................................................................................... 227
Project Name: the city is the county building in Seoul Style Centre, the National Fitness
building project ............................................................................................................. 227
Project Name: Friendship century gardens Linxia City Residential Phase ........................... 228
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: mechanical and electrical products logistics functional area standard factory
construction project ...................................................................................................... 229
Project Name: Kunming Wuhua three squadrons fire brigade and fire station construction
project -updated ........................................................................................................... 230
Project Name: North Morning Garden District, the second phase of public rental housing
projects ........................................................................................................................ 231
Project Name: Lu Shun Trading Company Pingdingshan Storage Project .......................... 231
Project Name: Qinyang City People's Hospital ward building new projects in different places
.................................................................................................................................... 232
Project Name: Jiangyin City new secondary school projects . Error! Bookmark not defined.
Project Name: Meyer Real Estate Development Co., Ltd. Jiangsu International City Project 233
Project Name: Jizhou City in the capital of 1 #, 2 #, 3 #, 5 #, 7 # residential buildings and
commercial outlets along the street project .................................................................... 234
Project Name: Meilong Garden South Garden Real Estate Development Project ................ 235
Project Name: Municipal Water Sports Centre Jizhou base project -clean water Bay Hotel
interior decoration project ............................................................................................. 236
Project Name: Comprehensive Building Hulunbeier Power Administration and Training Centre
Production Engineering.................................................................................................. 237
Project Name: Red Mile Island Chinese Medicine Hospital Relocation Project .................... 237
Project Name: Hebei Xin Bridge Park Community Real Estate Baixiang Phase ................... 238
Project Name: Hebei Province, Beijing, Shanghai R & D energy-saving lamps integrated plant
engineering .................................................................................................................. 239
Project Name: Hebei Hengshui Laobaigan Wine Company Limited General Office Building . 239
Project Name: Guiyang Huaxi Rural Cooperative Bank office building project .................... 240
Project Name: Real Estate Development Co., Ltd of Zhangjiakou City, New Sanyo Town,
Taiwan Taiwan Mall Project II ........................................................................................ 241
Project Name: Municipal Water Sports Centre Jizhou base project -clean water Bay Hotel
secondary structure and exterior decoration projects....................................................... 241
Project Name: Heilongjiang Provincial Vocational Education Center School Building Project 242
Project Name: long-Fu Fengzhen City area residential buildings, shopping malls project .... 243
Project Name: International School project in Dehong Mans ............................................ 244
Project Name: North Peak Xing Xia U.S. Area Project ...................................................... 244
Project Name: Wanquan Jiayuan Residential Residential Building B, Phase II .................... 245
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Right Banner header ditch soil relocation of the door central school new
project -update ............................................................................................................. 246
Project Name: Town of the original County Kangrui Jia Garden residential district 4, 5,
Residential Building ....................................................................................................... 247
Project Name: Transport Group Co., Ltd. Handan million new joint storage project ........... 247
Project Name: Zhangzhou Teachers College graduate student housing project ................. 248
Project Name: Technology Square project in Yantai Hi-tech Zone .................................... 249
Project Name: China People's Insurance Company in Tangshan City, the new branch office
building project ............................................................................................................. 249
Project Name: Economic and Trade Co., Ltd. Cizhou Cixian Zhongcheng Cultural Tourism
Development Company Cizhou cultural and creative industry park projects....................... 250
Project Name: Vanguard Trading Company Ningjin County Phoenix good commercial center
construction project ...................................................................................................... 251
Project Name: Golden Age style Jinhui Xiaoyi City construction projects of residential A zone
.................................................................................................................................... 251
Project Name: Tibetan Nagqu County People's Court Nagqu construction business premises
.................................................................................................................................... 252
Project Name: Tibet Doilungdêgên County Health Center Construction ............................. 253
Project Name: Hebei Province, three in Kowloon Garden Residential Quarter, 50 #, 54 #, 60
#, 62 #, 63 # residential building projects ..................................................................... 253
Project Name: Wuhan Optical Valley biomedical industry park of public rental housing and
supporting facilities construction projects ....................................................................... 254
Project Name: Pine Valley Construction Project Utopia group B ........................................ 255
Project Name: Hebei Province, Beijing, Shanghai R & D energy-saving lamps integrated plant
project ............................................................................. Error! Bookmark not defined.
Project Name: Taiyuan Central Hospital Building Construction Logistics ............................ 256
Project Name: Xianfeng power company electrical power management works .................. 257
Project Name: Vocational and Technical College Luliang houses the administrative operations
of construction projects ................................................................................................. 257
Project Name: Welfare and the county social welfare centers and canteens project ........... 258
Project Name: Town, Yuhang District, Hangzhou Qiaosi social harmony and economic
integration Village 1 # 2 # standard factory project workshop ......................................... 259
Project Name: Hainan Nan Bright light • High Estates Limited South West Bay ................. 259
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Guangzhou-Zhuhai municipal urban rail station supporting projects
Tangjiawan ................................................................................................................... 260
Project Name: Xingtai Xingtai Xing Xing Industry Logistics Co., Ltd. through the cold chain
logistics industry ........................................................................................................... 261
Project Name: Building project in Ganzhou City Design.................................................... 262
Project Name: Gansu Bi Hui Heights residential building 9 #, 11 # Building Project ........... 262
Project Name: Fushun City Hotel demolition project ........................................................ 263
Project Name: Phoenix Hill -Yantai Laishan Miaohou transformation of old village project -C
Zone ............................................................................................................................ 264
Project Name: Ordos Kang Bashi District Social Welfare Centre Project ............................ 264
Project Name: First Hospital of Qiqihar City, South Campus project -update ..................... 265
Project Name: Chen Dongshan County, West Line -County Road X541 Western Po to the
house before the road reconstruction project -update ..................................................... 267
Project Name: Neiqiu County Thermal Limited use of industrial waste heat heating project
implementation ............................................................................................................. 267
Project Name: Guiyang Huaxi Medical College New Campus Construction Project .............. 268
Project Name: East County East County Department of Education School Construction Project
In the third experiment ................................................................................................. 269
Project Name: Danyang Economic Development Zone, Central Primary school buildings,
sports, arts building projects .......................................................................................... 270
Project Name: Integrity Group, Chengdu hotel project .................................................... 270
Project Name: Qinghe County Qing City Investment Co., Ltd. Celestica International Hotel
Project ......................................................................................................................... 271
Project Name: Chengdu Shuangliu International Airport Company Limited and sports
activities center project staff .......................................................................................... 272
Project Name: Construction of Daqing City, Dongcheng heat ........................................... 273
Project Name: Nanning Economic and Technological Development Zone, standard factory
construction project ...................................................................................................... 274
Project Name: Kunming, the main drainage network improvement project west of films outside the Second Ring Road, Xishan District, sub-items ................................................ 275
Project Name: Long Industrial Park northeast of cultural tourism service center Reception
Center and Park Project ................................................................................................. 276
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Singapore • Nanjing, the promoter region of the island ecological technology
infrastructure works for the Southern District .................................................................. 276
Project Name: Singapore • Nanjing, the promoter region of the North Island, ecological
science and technology infrastructure projects ................................................................ 277
Project Name: Lijiangxintuanheigu Area -University District, Lijiang, Yunnan Province urban
infrastructure construction projects ................................................................................ 278
Project Name: Real Estate Development Co., Ltd. Hebei Xu Yao Xu Jing-Hua Fucheng new
community shopping center construction projects are ..................................................... 279
Project Name: Road Jinniu into irrigation on both sides of the market town of 500 meters and
Dobashi Area Reconstruction of infrastructure and public construction projects ................. 280
Project Name: Haidian District, Xishan Scenic Area west quay construction projects of tourist
facilities ............................................................................ Error! Bookmark not defined.
Project Name: Long Industrial Park northeast of cultural tourism service center Reception
Center and Park Project ................................................................................................. 282
Project Name: Poly Tsinghua Yiyuan a project ................................................................ 282
Project Name: Anhui New Area Phase I -7 #, 19 #, 21 #, 23 # -26 # F project ................ 283
Project Name: First Affiliated Hospital of Anhui Medical University Hospital Medical Complex
Building High-tech projects ............................................................................................ 284
Project Name: Wenling City Second People's Hospital Expansion Project Phase II ............. 284
Project Name: Junlian Takenori to Artemisia dam concrete road reconstruction works through
village .......................................................................................................................... 285
Project Name: Fuqing City car-only lanes -Fook people Strip - Tiger Creek road works ...... 286
Project Name: Dezhou Thermal Control Center office building project company ................ 287
Project Name: Danzhou Johnsy personnel office building labor market ............................. 287
Project Name: Chengdu Construction Investment Co., Ltd. Xingcheng Xindu District North
Extension Area new homes and ternary phase C, new home construction......................... 288
Project Name: Thermal Co., Ltd. Datang Jiaozhou Jiaozhou Bay Industrial Area construction
projects central heating ................................................................................................. 289
Project Name: Heilongjiang Provincial Cancer Hospital New Outpatient Building Project .... 290
Project Name: Real Estate Co., Ltd. Chengdu and letter shantytowns project Guangyuan .. 291
Project Name: Zhengzhou Luyuan Landscape Ecological Agriculture Development Co., Ltd.
Zhengzhou Luyuan landscape construction projects Spa Resort ....................................... 292
Project Name: Guangdong Avenue Chemical Co., Ltd. R & D Center Construction Project .. 292
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Second Hospital of Ningbo City, the original hospital building renovation
project ......................................................................................................................... 293
Project Name: Henan medicine herbs healthy Relocation Project Co., Ltd. .. Error! Bookmark
not defined.
Progress stage: the record ................................................. Error! Bookmark not defined.
Project Name: Albert City Xiapu Oriental Plaza ................................................................ 294
Project Name: New Materials Co., Ltd. Baoding Baoding Wing Wing furniture furniture
industrial park project ................................................................................................... 295
Project Name: brick village Liyuan Town, Tongzhou District, residential projects ............... 296
Project Name: Village of Chengguan district offices to move back to Ma resettlement housing
project ......................................................................................................................... 297
Project Name: Beijing Jia Wang Xin Zhuang Town Pinggu District east of the Village
Residential Project ........................................................................................................ 298
Project Name: West Da Wang Road, policy-housing project ............................................. 299
Project Name: Daxian I, North-South trunk road works in South Extension ....................... 300
Project Name: Weining Forced Labor Camp in Benxi City, the overall drug removal and
isolation of the guard force, social assistance and education buildings, workhouse building
projects ........................................................................................................................ 301
Project Name: North Town Municipal People's Procuratorate and expertise in handling cases
space projects .............................................................................................................. 301
Project Name: Beijing Hyundai Volkswagen 4S shop projects ........................................... 302
Project Name: Jieyang City, Guangdong Province People's Hospital of benefits to the county
hospital new building project ......................................................................................... 303
Project Name: Reconstruction Project of Baoshan District Detention................................. 303
Project Name: Bo Feng - Purple 11 # commercial and residential project domain ............. 304
Project Name: Anshan City Commercial Street, Building 1, South Korea Reconstruction
Project ......................................................................................................................... 305
Project Name: Sui River in Anhui Province, Third District a project ................................... 305
Project Name: Highway 113 lines Nim village temple floor Xinxing county section of a major
repair works to ............................................................................................................. 306
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Tianji Coal Chemical Industry Group Co., Ltd. Innovative capacity-building projects
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Lucheng, Tianji Coal Chemical Industry Group Co., Ltd. Innovative capacitybuilding projects, project construction content: 1, the system of basic theoretical research, analysis of raw
phosphate rock composition change, to determine the concentration of low grade phosphate rock
production of high nitrate fertilizer bottleneck for the development of new technology to provide a
theoretical basis for further formation of our country, the efficient use of low grade phosphate rock, the
theoretical system; 2, the establishment of a low grade phosphate rock efficient use of laboratory, focusing
on low-grade phosphate rock in acid insoluble content and high, from the mechanical separation and
chemical flocculation separation of research and experimental work to start to develop to remove insoluble
matter such as efficient utilization of low grade phosphate rock resources, process route; 3, the construction
of a pilot test area -two in the trial device, in the laboratory and test results, based on the technology to
expand testing, laying process for the industrial production technology, equipment and other infrastructure
equipment and production management, to enhance the efficient use of low-grade phosphate level and
innovation capability.
The total investment is about 50 million yuan, mainly to purchase equipment development and test
equipment costs. Full cost of the project by the enterprise itself.
Owner:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: Huai County Jin Runhua House a -10 #, 11 #, 29 #, 30 # project
Progress stage: construction preparation
Construction period: June 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Huai County, with a total construction area of .35517.95 square meters, including 10
#, 11 # Building gross floor area of 26,254.52 square meters, wall structure, 16 floors; 29 #, 30 # F are the
total construction area of 9263.43 square meters , wall structure, six floor building area of 4092.5 square
meters, respectively, 5170.93 square meters.
The total investment is about 26 million yuan.
Owner:*******
Contact:*******
Tel:*******
Project Name: Hunan hole Economic Development Zone General Services Building Projects Ltd
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Economic Development Zone project is located in the hole, ten floor frame structure, construction area
of 11,727 square meters. Where: Underground floor -floor area of 2723 square meters, ten ground floor floor area of 9004 square meters.
The total investment is about 18 million yuan. Source: self.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact person: Mr. Shu Yin
Tel:*******
Project Name: Excelle 名邸 House Area
Progress stage: construction design
Construction period: July 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
South King County Shiqiao Village project is located in Hebei Province, the new sub-unit residential
building 23 units and clubhouse facilities, the total floor area of 285,602.41 square meters.
The total investment is about 497.6 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hubei steel three new community projects Heroes
Progress stage: construction preparation
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
East Lake Development Zone project is located in Hubei, 1-5 Building, basement: Building Area: 59,180
square meters. -9 Building: Building Area: 37,440 square meters.
The total investment is about 190 million yuan.
Construction unit:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Hohhot Prime Square commercial district project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Hohhot, Jinqiao Road, Jinqiao Development Zone Saihan District, east of East Street
north of the century, with a total construction area of 92,200 square meters. On the ground 74,200 square
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
meters -including: 28,000 square meters of residential, commercial and office 46,200 m2, G 18,000 square
meters, the structure of frame-wall.
The total investment is not detailed. Source: self-financing.
Owner:*******
Postal address:*******
Post Code:*******
Tel:*******
Project Name: Heilongjiang Province, Xiyuan shed reconstruction projects, Springfield Park, A1-A17,
A31-A42, B1-B10 Project
Progress stage: construction preparation
Construction period: June 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located east of refractories plant in Heilongjiang, Cardiovascular Hospital, west of the land
south of the Western Hills, Hailin north of the road, construction area: about 20 million square meters.
The total investment is about 350 million yuan. Construction funds from the self.
Construction unit:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hebei Province, the project Longwan happy home
Progress stage: construction preparation
Construction period: July 2011 -2012 in August
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Xiong County Project is located in the town of Road Works Longwan four villages, happy homes
Longwan 1 #, 2 #, 3 #, 4 # residential building projects, total building area of 17,710.04 square meters including a # floor area of 4427.51 square meters of residential building; 2 # residential floor building area
of 4427.51 square meters; 3 # residential building construction area of 4427.51 square meters; 4 #
residential building construction area of 4427.51 square meters structure type of masonry structure, 7 floors
above ground floors. Way for the project contract labor and materials. Bay happy home 5 #, 6 #, 7 #, 8 #
residential building projects, total construction area of 13788.88 square meters -of which 5 # 4302.26
square meters floor area of residential building; 6 # floor area of 2592.18 square meters of residential
building; 7 # Residential Building construction area of 2592.18 square meters; 8 # floor area of 4302.26
square meters of residential floor structure type masonry structure, layers 7 for the ground floor. Way for
the project contract labor and materials.
The total investment is about 25 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: High Village 25 #, 29 #, 30 # residential building projects
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: July 2011 In July -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Zhangdian Fu Town, Village planning area, a total of 3 buildings, each building
3809 square meters, total area: 11427 m2.
The total investment is not detailed. Construction funds for the self-financing.
Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Fuzhou expansion Taijiang Sixth Central Primary School, Fuzhou fourteenth Extension
School
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Yi Island project is located in Taijiang Lane 46, won the championship Taijiang Sixth Central Primary
School campus, to open Chi Road 4 Taijiang fourteenth secondary school in Fuzhou, Fuzhou, Taiwan,
Jiang Sixth Central Primary School extension, the new school building area of 4530 square meters. Fu
fourteenth school expansion project, building area of 17,060 square meters -including the original floor
area of 3560 square meters, the new building area of 13,500 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 44.82 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Shanxi Xinghua Group Co., Ltd. Innovation Fen Project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: Chinese herbal medicine percolation extraction equipment, ultra-high performance liquid
chromatography-mass spectrometry, etc. -for reference only
Project:
The project is located in Shanxi Fenyang Heng Fa Chuen, Heng Fa Chuen Fenjiu Group Co., Ltd. Shanxi
innovative capacity-building projects, project construction content: 1, increase research and development of
advanced equipment, including LC-MS, multi-functional fluorescence spectroscopy system, sniffing device,
atomic absorption spectrophotometer, percolation extraction equipment, supercritical fluid extraction
devices. 2, the construction of the pilot study and application base, combined with the Shanxi Fen Wine
Factory Co., Ltd. Heng Fa Chuen health wine production base construction project, the implementation of
the construction of Wine Institute of Health, traditional Chinese medicine extraction center and aging base
and other related hardware.
2500,52 million total investment, all raised by the enterprise solution. Project resources are mainly for
the purchase of Chinese herbal medicine percolation extraction equipment, ultra-high performance liquid
chromatography-mass spectrometry and other equipment.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal address:*******
Post Code:*******
Tel :*******
Fax :*******
Project Name: Tanghe East Coast, the second phase commercial and residential district
Stages of progress: preliminary design
Construction period: August 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Qinhuangdao City, Hebei Province, Hebei Street, north of the harbor area, the
West Harbour Road, east of new commodity housing 123,050 square meters -ground floor, underground
construction area of 35,050 square meters, of which 20,972 square meters underground garage, 7289 square
meters ground floor commercial, underground bike library and equipment space 6789 square meters.
The total investment is 516.69 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Huizhou City, Metro municipal level infrastructure projects
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference
Project:
Huizhou City, three projects are located in the northern end of Town, Huizhou City Metro road system in
the form of vocational grid, the project includes the One Road and east-west road II; north-south Route
Road, Four Road and Hui South Boulevard, which benefits the Southern Boulevard, the road widening and
transformation of municipal services. One way length of 1661.6m, road width of 36m, urban trunk road
grade; II road length 1839m, the road width of 18m, the city slip road level; III Road Length 301.9m, road
width 36m, road rating for the city main road; IV Road length of 412.2m, the road width 32m, road class
for the urban sub-trunk. Hui South Road, the city trunk road, a length of 3298.6m -including extension of
first Medical School South Entrance. Bridge type design with the terrain as follows: II cross the road in Big
railway overpass design; One road beneath the railway embankment in Big, established a double-hole
channel culvert; Hui South Road, One Road and Fu Yong intersection Changling Three bridges across the
creek at the set. Drainage works with Rain, sewage diversion system, the drainage system. Projects include
roads, bridges, drainage, access, lighting, green, transportation facilities, municipal facilities projects, all
road construction by city road standards.
The total investment is about 330 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Guangdong eighty-nine secondary school expansion, the overall transformation of the
campus -Administration Building Project
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Tianhe District, Guangzhou Dragon Cave, size of the project: The overall
transformation of an area of 49,013 square meters.
The total investment is about 2,000 yuan. Sources of funding: funding.
Owner:*******
Postal Address:*******
Contact:*******
Project Name: Construction of family residence residential projects
Progress stage: construction started in
Construction period: May 2011 -2013 in June
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of South Street, Baoding building, total construction area of 13,147 square
meters, of which: residential 6,790 square meters, 底商 4668 square meters, ground 1689 square meters.
The total investment is about 25 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: Dongyang Industrial Agglomeration Mianchi County Business Service Center Project
Progress stage: the record
Construction period: August 2011-August 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located Mianchi County industrial clustering, concentration area Mianchi County Business
Service Center Dongyang projects with a total land area of 15 hectares, construction area of 22 square
meters, including trade, restaurants, hotels, business offices, integrated services and information technology
as one of modern commerce service platform construction, the main function is to provide services to the
development of industrial clustering.
The total investment is about 455,564,000 yuan, of which 4,000 million raised by the enterprise,
domestic bank loans to 50 million yuan, other funds 365,564,000 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Shunyi District, secondary school renovation projects along the river
Stages of progress: survey and design
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Shunyi, floor area -square meters 14000 building height -m 24.
The total investment is about 64.46 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: First World Plaza Baoding new building decoration projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Baoding National High-tech Zone, Chaoyang North Street, No. 799, construction
area of 67,000 square meters.
The total investment is not detailed. Source: self.
Owner:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: 2011 Longjiang Forestry Management and shantytowns, E James River Forest Lot -home
6,7,8,9,10,11,12 Jian Building, and Chien area, Building 1, Jian residential home staff , reception area,
Building 1, Building 4, Chung Hsing North district project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
44,326.35 square meters.
The total investment is about 44,326,000 yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, James River Forest Lot D2 Harmony Area B, M, N, Q, P, O Building Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
23,887.45 square meters.
The total investment is about 23,887,000 yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, Section of James River Forest D1 C, 1,2,3,4,5 Building a harmonious community project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
28,006.28 square meters.
The total investment is about 28 million yuan. Construction funds from the central budget for investment,
the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, James River Forest C Lot Sunshine Garden Building B, 7,8,9,10,11,12 Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
37,338.18 square meters.
The total investment is about 37,338,000 yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, Lot A1 James River Forest -1-6,
Building B, Sunshine Garden Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
36,122.24 square meters.
The total investment is about 36,122,000 yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Xianghe -R & F Metro Phase II Project
Progress stage: construction design
Construction period: July 2011 In January -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Jiang Xin Tunfu power project planning area is located on the 7th Street North, the new residential
buildings 5. The total construction area of 99,750 square meters.
The total investment is about 301 million yuan.
Owner:*******
Post code: 065400
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Xianghe -R & F Metro a construction project
Progress stage: construction design
Construction period: July 2011 In January -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Jiang Xin Tunfu power project is located in planning area 7 Street North, the new residential buildings 5.
The total construction area of 99,811 square meters.
The total investment is 303.53 million yuan.
Owner:*******
Post code: 065400
Contact:*******
Tel :*******
Project Name: Riverfront source area -B area Residential Building
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Qinyuan project is located in Shanxi Province People's Road East, the construction scale of 26,437
square meters, brick, frame structure, six, ten layer.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 51,154,000 yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Sandstone eco-tourism projects in Inner Mongolia Center for Science in Construction
Engineering
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Zhungeer Warm Water, with a total construction area of 5062.06 square meters, of
which the ground floor area of 4161.86 square meters, construction area of 900.22 square meters
underground, above ground construction for the two-story main building with a height of 15m, the tower
height of 42m.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact person: Chen Ping
Tel:*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Spring Area Project Luohe Lijiang
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Henan Province, Lijiang River Road and Hengshan Road Luohe City, southeast of
the intersection, a total of 19, all of six brick structure, with a total construction area of 51,558 square
meters.
The total investment is about 30 million yuan.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Lujiang County New Radio and Television Radio and Television Center Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located east of Chaohu City, New Lujiang county, ten level plus the negative layer, with a
total area of about 12,000 square meters, the framework structure.
The total investment is about 30 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Lotus Engineering Block F East Area
Stages of progress: survey and design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Longyan City, Fujian Dongshan Road area west of Romania, north of Lin Road,
Longyan City, Block F Lin Dong New Area, a total construction area of about 231,448 square meters,
planned land area of about 64,480 square meters, the exploration hole of about 10,800 m total depth, The
first bid of about 5400 m depth of exploration holes, hole depth exploration of the second section about
5400 meters.
The total investment is unknown.
Owner:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Fax :*******
Project Name: Jilin People's Hospital Phase II
Progress stage: Design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
The project is located 36 Zhongxing Street, Jilin City, construction scale of about 55,000 m2, 15 storey
frame structure.
The total investment is about 100 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Hunan You County invest in home city - repurchase -BT project
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
The project is located Youxian Chengguan Town, You County, home design construction projects the
city a total construction area of about 71,500 square meters, covers an area of 75,371 square meters -about
113 acres, the maximum number of layers 4 layers, of which 5,000 square meters of outdoor parking.
The total investment is about 100 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: production of Yueyang Power Administration Building Installation Engineering
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located north of Hunan Yueyang Road, northwest corner of the junction with the character
avenues, adjacent to the West and the Yueyang Municipal People's Congress, construction area of about
24,000 square meters; main part of which about 19,000 square meters, the Annex portion of about 3,000
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
square meters in the basement of about 1,800 square meters; the main building 21 floor building floors including basement, with a total height of 78.0 meters. Annex building layers of 3 layers, with a total height
of 13.6 meters.
The total investment is about 40 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Heilongjiang Province, eight hundred fifty-six farm cultural information center, archives and
exhibition project
Progress stage: construction preparation
Construction period: June 2011 -2012 in October
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Hulin City in Heilongjiang Province, the project eight hundred fifty-six farms, construction area of
10612.26 square meters.
The total investment is about 25 million yuan.
Construction unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel:*******
Project Name: Shanghai Institute of Nuclear Engineering Nuclear Power R & D center -Phase III project
Stages of progress: preliminary design
Construction period: 2011 -2013
Major equipment: steel, building materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, management pieces of pipe, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinets -for reference
Project:
Project is located in Shanghai, Hong Cao Road 29, Shanghai Nuclear Engineering Research and Design
using the original base, the expansion of nuclear power R & D Building, R & D building, that building two
high-rise building with podium connecting the body, the base area of 22000m2, total construction area of
56201 m2, including the ground floor area 41634 m2, ground floor area of 14567 m2, 2 floors underground,
15 floors, including international cooperation and exchange center, nuclear power technology research
centers, and staff activities and dining center and the necessary logistical support facilities building.
The total investment is 497.04 million yuan.
Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Design:*******
Postal Address:*******
Tel :*******
Fax :*******
Project Name: Puyang City Eye Hospital and outpatient comprehensive construction program relocation
building project
Stages of progress: preliminary design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic displays, air-conditioning system. For reference
Project:
Project is located in the western part of Huanghe Road, Puyang City, kun wu Road West, about 30 000
M2, structural framework, multi-layer or high.
The total investment is about 58.86 million yuan, the government invested 3.04 million yuan, raised
55.82 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design by: China International Engineering Corporation Meta
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Postal Address:*******
Project Leader: Walter
Tel :*******
Fax :*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, Eleventh District, the northern
Forestry Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located: Forestry Bureau in Heilongjiang Province, the northern site, building area of
58,800 square meters.
The total investment is about 52.92 million yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, through North West Community
Forestry Project ten districts
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the northern Heilongjiang Province Forestry Bureau site, building area of 51,600
square meters.
The total investment is about 46.44 million yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, the northern North Community
Forestry Project Twelve
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the northern Heilongjiang Province Forestry Bureau site, building area of 37,400
square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 33.66 million yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: National Secondary Schools Ziyun County building project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Ziyun County project is located within the national secondary schools, building area of about 8933
square meters.
The total investment is 9,000,000 yuan.
Owner:*******
Contact:*******
Tel :*******
Project Name: Yueyang City fifteenth school track and field, flag-raising square, gate project
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Yueyang Economic and Technological Development Zone Baishi Ridge Road, the
project includes track and field, flag-raising square, gates and other projects.
The total investment is about 13 million yuan. Source: The enterprise itself.
Construction Unit:*******
Contact person: Zhao
Tel:*******
Project Name: Yantai special equipment safety testing of base construction projects
Progress stage: construction preparation
Construction period: May 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Intel project is located in Fushan District, Yantai City Road 11, Project scale: about 19,000 square meters.
The total investment is about 40 million yuan. Construction financing: self.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Yakeshi City Palace Hotel construction project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located north of the original Yakeshi Forestry Industrial Avenue joint factory floor,
construction area of 32,659 square meters, six. Construction of basement, primarily for the car park, bath
center, equipment rooms, power distribution room; ground five, to build a comprehensive service area,
conference rooms, reception room, entertainment room, deluxe rooms and so on.
The total investment is about 80 million yuan. Source: The enterprise itself.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Xuancheng Secondary 1 # -6 # new campus student housing project
Progress stage: construction started in
Construction period: May 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located north of Sun City Water Yangjiang Road, King Pavilion Shannan foothills,
building layers of 5 layer structure for the frame structure, construction area of 27890.4 square meters.
The total investment is about 37 million yuan. Construction funds for the financial allocations and self.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Yunlong Town Project Packaging
Progress stage: under construction
Construction period: May 2011-May 2014
Major equipment: Indian railways, printing machinery, canning machinery cut iron machines, presses, over
the line machine, printing machine, micro slot machines, automatic pasting machine -for reference only
Project:
Xinyang Yangshan project is located in New District, Xinyang City Yunlong Investment Co., Ltd.
Yunlong packaging, the project covers an area of 137 acres, the new packaging line 98, an annual output of
iron, wood, paper and other packaging materials 1800000 -sets; product process: R & D - Design - Printing
- manufacture; buy Indian Railway system, printing machine 4 -sets, can manufacturing machinery cut iron
machines, presses, over the line machine, printing machine, micro slot machines, automatic wall paper
machine 130 pieces -sets.
The total investment is about 320 million yuan, of which 90 million yuan raised by the enterprise,
domestic bank loan 40 million yuan other funds 190,000,000 yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Dandong City in 2011 to move back to a Wantong coking project
Progress stage: construction preparation
Construction period: May 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Sidaogou station project is located, with a total construction area of about 119,500 square meters. A total
of 14; bidding range is 14 Huiqian Lou -1-14 #: 11.95 million square meters.
The total investment is about 240 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: detachment of armed police Daxinganling new barracks project area
Progress stage: construction preparation
Construction period: June 2011 In June -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Aga road project is located west exit Jiagedaqi area, size of the project: 14665.26m2.
The total investment is about 49 million yuan. Construction funds from the self.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Chen Ming Motors headquarters in Hong Kong New Town Phase II # 1
Progress stage: construction preparation
Construction period: May 2011 -2012 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Century Plaza District, Chengdu, Sichuan stone street, size of the project:
approximately 25,000.00 square meters.
The total investment is about 25 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Fax :*******
Project Name: Tujia Autonomous County Public Security Bureau, the business technology space project main project project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Boat Town of Linjun Road 181, total construction area of 8360.54 square meters.
One business area of 7861.64 square meters building space technology, ten-storey frame structure +
overhead layer; canteen construction area of 499.54 square meters, two-story frame structure.
The total investment is about 11.52 million yuan. Construction funding: the central budget for
investment and local investment.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Changji centralized building the organs of employee housing units in three projects -A zone
project
Progress stage: construction preparation
Construction period: June 2011 In June -2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Changji City District No. 53 Henan Road Tuen Mun, the first building area of
47,846 square meters Lot, building area of 49,616 square meters second mark. The third area of 42,916
square meters construction tenders and related works.
The total investment is not detailed.
Owner:*******
Contact:*******
Tel:*******
Project Name: Beijing business building projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Yanqing County, 65 East Main Street, canopy height -m 20 floor area -square meters
6034.97.
The total investment is about 32.91 million yuan.
Construction:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, Section of James River Forest F Sunny Garden A, L, M, N, Building, B District, 13,14,15,16,17,18,19, Building 20 Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
37,357.9 square meters.
The total investment is about 37,358,000 yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, James River Forest Lot B Harmony Area A, E, F, G, H Building, B District, I, J, K, L, R, S Building Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
56,458.2 square meters.
The total investment is about 56,458,000 yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, Lot A2 James River Forest -A
sunny garden area A, B, C, D, E, F, G, H Dong, red gold district seat, red cell Ginza Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in James River Forestry Bureau in Heilongjiang Province, site, building area of
51,834.08 square meters.
The total investment is about 51,834,000 yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: King County commercial and residential projects in Kingston Agile
Progress stage: construction design
Construction period: June 2011 -2012 in March
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Hebei Province Jing County Kingston Avenue North, Ouyaluxi, new
commercial and residential 1 3 +2 level, the total construction area of 7536 square meters.
The total investment is about 13.2 million yuan.
Owner:*******
Postal Address:*******
Contact Person:*******
Tel :*******
Project Name: million and the county district a project
Stages of progress: preliminary design
Construction period: September 2011 -2013 in March
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project located in Qinhuangdao City, Wenchang Road, south of the harbor area, three-way east of the
Wei, Wei-four west of the Tian Shan to the north of the new 78,975 square meters of ordinary commercial
residential, commercial 1,900 square meters, convenience market, 1,200 square meters, underground space
4730 square meters, underground garage, 12,360 square meters, the largest single set of house area 117.76
m2.
The total investment is 390.05 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Shandong tobacco culture pension base a project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Lake project is located in Laiwu City Xueye the east coast of the total building area of 55,018.58 square
meters.
The total investment is about 55 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Qujing City Fuyuan county sports center project -update
Progress stage: construction preparation
Construction period: May 2011 -2012 in May
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
The project is located in Fuyuan County, Yunnan Qujing city north of the old city, a comprehensive
development, covers an area of 108,000 square meters, total construction area of approximately 25,000
square meters, including a stadium, a gymnasium, a swimming pool.
The total investment is about 50 million yuan.
Owner:*******
Postal Address:*******
Tel:*******
Fax :*******
Project Name: Marriott International, a building and underground garage project 17,20,24
Progress stage: construction preparation
Construction period: 2011 -2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the county, Jiangsu Hai Road and Wing Road Interchange Pingqiao the northeast,
17,20,24 building and underground garage construction, installation construction area of 18668.15 square
meters.
The total investment is about 28 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Marriott International, a building and underground garage project 2,3,7,11
Progress stage: construction preparation
Construction period: June 2011 -2013 in January
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the county, Jiangsu Hai Road and Wing Road Interchange Pingqiao the northeast,
2,3,7,11 Building underground garage floor area of 77,519.18 square meters.
The total investment is about 130 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Marriott International, a building and underground garage project 1,5,6,9,10,13
Progress stage: construction preparation
Construction period: June 2011 -2013 in January
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the county, Jiangsu Hai Road and Wing Road Interchange Pingqiao the northeast,
1,5,6,9,10,13 building and underground garage construction, installation construction area of 51888.70
square meters.
The total investment is about 97 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Heilongjiang Province, eight hundred fifty-six Farm Gymnasium
Progress stage: construction preparation
Construction period: June 2011 -2012 in October
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Hulin City in Heilongjiang Province, the project eight hundred fifty-six farms, construction area of
14,040 square meters.
The total investment is about 50 million yuan.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Hebei Science and Technology Industrial Park of modern agricultural equipment, the joint
plant five to six steel works
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage power distribution equipment, steel structure. -For
reference
Project:
The project is located south side of Laishui Wing, the Joint workshop building area of 17,760 square
meters five; combined floor area of 9984 square meters factory six.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is unknown.
Owner:*******
Contact:*******
Tel :*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, through the North East Community
Forest project ten
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the northern Heilongjiang Province Forestry Bureau site, building area of 52,800
square meters.
The total investment is about 47.52 million yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: 2011 Longjiang Forestry Management and shantytowns, the northern South Community
Forestry Project Twelve
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the northern Heilongjiang Province Forestry Bureau site, building area of 59,400
square meters.
The total investment is about 53.46 million yuan. Construction funds from the central budget for
investment, the provincial infrastructure, enterprises and trade unions raised.
Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Honghuagang District People's Hospital Medical Building for Construction Projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
The project is located in Guizhou Changzheng Road Honghuagang District, Medical Technology
Building 8482 square meters, the field level and the operating room and distribution facilities.
The total investment is about 20 million yuan. Sources of funding and implementation: Central subsidy,
district financial support solution.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Bauhinia Garden Residential Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of the district government, the first southern primary, project size: 40,507
square meters.
The total investment is about 79 million yuan. Source: self.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Zhuhai City high school campuses Culture Park Project
Stages of progress: survey and design
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Zhuhai City, Guangdong Village Garden District, north side, a total of
approximately 14,369 square meters floor area -including floor area of 2341 square meters of overhead,
which ordinary classroom construction area of about 3350 square meters, construction area of about 3127
classrooms square meters, construction of public classrooms area of about 4131 square meters, office space
construction area of about 1316 square meters of living space construction services, an area of about 2083
square meters, the other of about 361 square meters building area.
The total investment is about 54.85 million yuan. Funding budget -fiscal 100.00% availability of funds.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: the central grain Tangyuan New Building Depot, the subsidiary buildings and supporting
projects
Progress stage: construction preparation
Construction period: May 2011 -2011 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Tangyuan Depot project is located within the central grain reserves, the central grain reserves Tangyuan
New Building Depot, the subsidiary buildings and construction of projects.
The total investment is about 26 million yuan. Sources of funding and implementation: the central
investment and self.
Construction units:*******
Contact:*******
Tel:*******
Project Title: Investment and Development Co., Ltd. Zhangjiagang City of East Lake Garden resettlement
houses 1 # - 22 # of residential, underground garage project
Progress stage: construction design
Construction period: June 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The project is located in Zhangjiagang City, Jiangsu Province, East Lake Garden resettlement houses 1 #
- 22 # of residential, underground garage A, B, total construction area of 18 square meters, 12 floors of
Frame.
The total investment is about 360 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: First Zhangjiachuan Hui Autonomous County People's Hospital Building Project
Progress stage: construction started in
Construction period: May 2011 -2012 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
The first project is located in Zhangjiachuan Hui Autonomous County People's Hospital, the construction
scale: 13735.85m2, frame structure, -9, ground floor, ground level 1.
The total investment is about 29,058,600 yuan. Source: The central budget for investment 27 million
yuan, raised 2,058,600 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Public Security Bureau business houses Shinshu Engineering
Stages of progress: preliminary design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in downtown Jiangxi Jilin Rd Shangrao south east of Guangdong International Trust
and East, building area: about 2 million square meters.
The total investment is about 6500 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Xinjiang University, Main Campus Building 1, high-rise residential projects
Progress stage: construction preparation
Construction period: June 2011 -2013 in August
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located 14 Shengli Road, Urumqi, engineering modeling: 32,120.13 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 49 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Five thousand Chinese Museum Project
Progress stage: construction preparation
Construction period: May 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located north of Bath Street, Mount Tam, the four-way west, with a total construction area
of 39854.56 square meters, the base layer 1, layer 3 floors above ground, frame-wall structure.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Technology Venture Capital Co., Ltd. Wujiang research building, bio-pharmaceutical R & D
building and garden apartment project talent
Stages of progress: preliminary design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Wujiang Economic Development Zone in Jiangsu project, project size: 98,000 square meters.
The total investment is about about 400 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Village Harmony community Wen'an Han 1 #, 2 # Building Project
Progress stage: construction preparation
Construction period: June 2011 In June -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located ANALYSIS, construction area of 12700.98 square meters.
The total investment is about 10.16 million yuan.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Wen'an large new residential zhaocun 2 # Building Yongfu Park District projects
Progress stage: construction preparation
Construction period: May 2011 -2012 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
ANALYSIS Zhaocun project is located in a large building area of 5265 square meters.
The total investment is not detailed.
Owner:*******
Postal Address:*******
Contact Person:*******
Tel:*******
Project Name: Ya Ju County District Court million 4 # -9 # F Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Million project is located in the county Kong Commercial Street North home town, building area of
34,463.6 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 33 million yuan.
Construction Unit:*******
Contact:*******
Tel:*******
Project Name: Xinjiang Hotan Prefecture Technical School staff raised high-rise residential building
projects
Progress stage: construction preparation
Construction period: June 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located 222 North Road, Urumqi, Hotan city, building area -sq m: 30908.74.
The total investment is about 50 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Luohu District, Shenzhen, Guangdong, People's Primary School renovation and expansion
project
Progress stage: construction design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: September 2011 -2012 in June
Major equipment: light fixtures, low voltage electrical appliances, power distribution, instrumentation,
weak systems, wire and cable, ventilation, fire control facilities, fire hydrants, fire extinguishers. -For
reference
Project:
Project is located in Luohu District, Shenzhen, Guangdong Road, the construction of a primary school,
with a total floor area of approximately 8,000 square meters, including: teaching, canteen, playground.
The total investment is about 13 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Tieling Municipal Intermediate People's Court Trial Project
Progress stage: construction preparation
Construction period: June 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Hengshan Road, New City project is located in Tieling east, the Yangtze River Road North, Huashan
Road West, with a total construction area of 29,368 square meters Structure: Frame structure.
The total investment is about 39 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Gree Coast S2 block a 17 # -22 # Building Installation Engineering
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the southern section of Zhuhai, Guangdong couple Tangjiawan North Reclamation
Area, Gree Coast S2 block a floor, 17 # -22 # Jian project cost about 1.6 billion, construction scale of about
67,000 square meters, of which part of the construction area of 43297.44 ground square meters, six 11story high-rise, a layer of the basement.
The total investment is about 160 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: First Middle School expansion project Jianou
Stages of progress: survey and design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the suburbs north of the school field in Fujian Jianou Hill, 6th floor student housing,
student dining hall 2 layer, a single 5-story apartment teachers, Arts Building 4th floor, building 5, the
upper layer -ground floor, Library 3rd floor, Teaching Building, 4th floor, 5th floor laboratory building,
gymnasium and ancillary Level 1 slope.
The total investment is about 133.5 million yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: China Medical University Hospital, the New Fourth Ward Building Project
Progress stage: project
Construction period: October 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display boards, etc. -for reference
only
Project:
The project is located Huanggu Chongshan Road District No. 4 -Fourth Affiliated Hospital of China
Medical University Hospital Chongshan Branch, with a total construction area of 64,392.37 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is not detailed, self-financing.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Progress stage: construction started in
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Park project is located in the southeast of Pinghu days, construction scale: the ground 40734.55m2;,
underground 23511.35m2;, a total of nine monomers -including 3 #, 4 #, 9 #, 10 #, 12 #, 13 #, 14 #, 15 #,
16 # residential building and garage # 1 # -3 4-18th floor, wall structure.
The total investment is about 90 million yuan. Construction funds for the self.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Fuk Road home district projects
Progress stage: construction preparation
Construction period: June 2011 -2012 in October
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Laishan Phoenix Project in Shandong Province Road east of East Avenue south of Hong Kong,
construction scale of about 93,286.51 square meters.
The total investment is about 120 million yuan.
Construction unit:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Honghuagang District People's Hospital Medical Building for Construction Projects
Progress in stages: approval for the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display boards, etc. -for reference
only
Project:
The project is located Honghuagang District, covering over 30,000 square meters, construction of
Building 8482 m2 medical technology -including the underground garage area of 1649 square meters,
corridor, Guo Jielou area of 488 square meters, field level and the operating room, distribution facilities,
the preparation of 400 beds.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 100 million yuan, the central investment grants, district financial support
solution.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of Sichuan Judicial Police Vocational College campus, the construction scale:
about 11,000 square meters.
The total investment is about 22 million yuan. Construction funds from the central fund and selfreconstruction.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Wu Zhi Senior Services Center Project
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: August 2011-August 2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation facilities -for reference only
Project:
Project is located in the eastern section of the north side of First Street, Chaoyang Wuzhi County, Wu
Zhi Senior Services Center project, which covers an area of 55 mu, total construction area of 30,000 square
meters, the main construction contents include: recreational activities room, library, TV room, Office,
calligraphy room, gym, clinic, conference rooms, restaurant, kitchen, staff quarters, equipped with 350 beds.
The total investment is about 35 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Oasis Shenhua Baotou Railway Corporation currents block diagram and integrated planning
and design projects
Stages of progress: preliminary design
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project in Inner Mongolia, the project is divided into a tenders, including two plots. Block A: Current
plans by 20,000 square meters of land planning and design controls the recent meeting of 150 people at
offices, living rooms, to meet long-term by about 300 office and living space, considering the Hailiutu
branch, focus on maintenance branch office space, conference space -multi-frame structure, traffic control
space, power scheduling space, audio-visual training buildings, staff apartments -multi-storey brick
structure, apartment-style standard room, dining, cultural activities, fitness with room and so on. Block II:
20,000 square meters by the control header block planning and design, the recent meeting of 150 people at
offices, living rooms, to meet long-term by about 300 office and living space, considering the concentration
of branch office space -in the high-level framework structure, the information display center double space,
audio-visual meeting space, staff apartments -in the top frame or brick structures, mainly standard room
apartment, a small one bedroom, dining, cultural activities such as fitness space.
The total investment is not detailed.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Gong Fu Wang Wen'an prosperous farmers shop floor apartment project # 1
Progress stage: construction preparation
Construction period: May 2011 -2012 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located ANALYSIS, construction area of 6682 square meters.
The total investment is not detailed.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Shanxi Taihang. Scenic Watertown Yu Fung # 1 Residential District Court building and
underground garage project
Progress stage: construction started in
Construction period: April 2011 -2012 in July
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located east of Linfen City, East Riverfront, West Zhaocun west, the total construction
area of 23,209 square meters, of which: 1 # floor area of 10,758 square meters of residential and public
construction area of 2391 square meters, the basement area of 2015 square meters; underground garage
floor area of 8045 ㎡. House # 1 two-story, twenty-ground layer. Basement for equipment, underground
civil air defense layers to the second floor. Total building height of 63.9m, including: one-storey 4.45m, the
second floor storey 5m, three to twenty layers high are 3m;-storey underground garage is 5.4m. 1 # F, the
main building structure supported on frame shear wall structure, podium for the frame structure,
underground garage for the framework of the concrete structure. Architectural design life of 50 years,
seismic intensity of 8 degrees, fire resistance level.
The total investment is about 47,425,600 yuan.
Construction Unit:*******
Postal address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Fax :*******
Project Name: Gree Electric Appliance -Zhengzhou Co., Ltd., Zhengzhou Gree Air Conditioner Storehouse
Project
Progress stage: under construction
Construction period: May 2011 to February 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation facilities -for reference only
Project:
Project is located in the South West Street, Zhengzhou High-tech Zone micrantha be River Road East,
Gree Electric Appliance -Zhengzhou Co., Ltd., Zhengzhou Gree Air Conditioner Storehouse project covers
200 mu, building area of 174,000 square meters, the main building two finished products, finished product
warehouse 64,000 square meters 1, 2, 11 million square meters finished products, after the completion of
home air conditioners is mainly used for supporting the production of finished products warehouse, storage,
39 million home air conditioning units -sets,
The total investment is about 246 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Phone: 18926932654 13702760242 0371-55590000
Project Name: Jieyang City, Guangdong Province People's Hospital of benefits to the county hospital new
building project
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display -for reference
Project:
Project is located in town Hui Hui Hui Lai County Road No. 230, removal of the original hospital
building, build a new hospital building at the site a total of 15 floors with a total construction area of about
22,500 square meters, the area to 1,500 square meters, set the bed 600.
The total investment is unknown.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Ordos Civil Aviation Building Project
Progress stage: Design
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
The project is located in the Ordos civil aviation, the project site is rectangular in shape, about 88 meters
north-south, east to west about 132 meters, with a total land area of 1.17 hectares. Railway Civil Aviation
Building, set in the block center, the main building for the L-type, construction area of about 5 million
square meters, with the podium together form a rectangular surface area form. Thirteen of the design on the
ground, underground layers.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Ding Xiang family of civil engineering projects
Progress stage: construction preparation
Construction period: June 2011 In June -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Shenyang, the scale of construction of 6,500 square meters.
The total investment is unknown.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: German source Cannes -for the benefit of Hill House Area
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Changde, Hunan Economic and Technological Development Zone Administrative
De Lunan north side, German Hill Road, east of the railway line west of the land, the project covers an area
of 44.83 mu, total construction area of about 65,696 square meters.
The total investment is about 180 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Urban North is still a project
Progress stage: construction preparation
Construction period: June 2011 In June -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located, Huanggu District, project size of about 36,904 square meters.
The total investment is unknown.
Construction Unit:*******
Post Code:*******
Contact Person:*******
Tel :*******
Project Name: Chengdu Run into the United States Coast Investment Co., Ltd. of England Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Chengdu, Sichuan Huayang Town, the project covers an area of 33875.89m2,
floor area ratio of 4.0, with a total construction area of 197966.28m2; including the basement area of
57831.00m2, total floor area of floor area ratio 135472.74m2, residential construction area 128567.8m2, a
total of 1254 .
The total investment is unknown.
Construction Unit:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: Shen Yuan Industrial Development Co., Ltd. Changle Imperial Court Name County Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Changle City, Fujian Air city streets Longmen Village, for a total capacity of an area
of 292,521.60 square meters, with a total land area of 107,552 square meters.
The total investment is 109.81 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Construction of gold ditch shantytowns
Progress stage: construction preparation
Construction period: June 2011 -2011 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Benxi City, Liaoning Province, Fu Jin Ping mountain gully, with a total building
size of approximately 71,729.95 square meters, brick layer 6.
The total investment is about 75 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Qin Peninsula C1-1 project
Progress stage: Design
Construction period: October 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project located in Qinhuangdao harbor area owned by mentioning Walled City 04-03, the new ordinary
commercial housing, including the ground area of 62,208 square meters, ground floor area of 31,890 square
meters, the largest single set of house area 137.16 m2.
The total investment is 295.71 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: agricultural -logistics and distribution center project
Progress stage: construction design
Construction period: July 2011 In January -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, forklifts,
electrical installations, lighting, ventilation. -For reference
Project:
Hiraizumi Town project is located in the Sam Ka Tsuen Pingquan County, built 2000 square meters of
agricultural storage library, exhibition hall, office and other space 1,000 square meters. An area of 13,333
square meters, total construction area of 3,000 square meters.
The total investment is about 5.22 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Qinhuangdao City International Hardware & Electrical projects
Progress stage: Design
Construction period: October 2011 In October -2014
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located north of Qinhuangdao harbor area, North Ring Road, North Ring Road 40, west of
Yiwu Commodity City, shopping malls of 100,000 square meters, independent shops 29,000 square meters,
warehouse of 2000 square meters, ancillary support building 2,400 square meters.
The total investment is about 600 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Andong Town, outside the mouth of an apartment project Hongxing
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Zhejiang Hongxing Village, Andong Town, with a total floor area of 10,216.7
square meters, a total of 4, 1 # F, 2 # Building the framework of 4 layers, 3 # F, 4 #, 5-story building as a
framework.
The total investment is 1200 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Fax :*******
Project Name: Southview World apartment project
Progress stage: the record
Construction period :2011-11 to 2013-12
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located north of Park Road, flat water, road, west of Southview world apartment project,
the new residential and commercial buildings, the total area of 13,162 square meters parcel, of which an
area of 10,215 square meters were sold, with a total construction area of 33,600 square meters. Commercial
buildings where the floor area of 8429 square meters, the floor area of 20,173 square meters of residential,
ground 4998 square meters. 40% building density, plot ratio of 2.8, 25.01% green space ratio, building
height control in the 100 meters.
The total investment is about 145 million yuan, including fixed assets investment: 136.5 million yuan Civil 12000; equipment 600; installation of 150; construction other costs 600; reserve fund of 300,
construction of 2.5 million yuan of interest, working capital 6,000,000 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Industrial Cloth Factory block housing project land acquisition and resettlement
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Nanchang District, Wuxi City, South Lake Avenue, west of the village area east of
Lo, Lucun River north, Jincheng Road, south. Construction project covers an area of 97084m2, total
construction area of 359650m2 -residential construction area of 260070m2, public facilities construction
area of 27980m2, underground construction area 71600m2, volume rate of 2.97, the total number of 2772.
Resident gas by pipeline natural gas, sewage centralized treatment of sewage pipe network access, unified
garbage removal and transportation.
The total investment is about 750 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Real Estate Development Co., Ltd. Shengda Bazhou Huayuan Area Project
Progress stage: construction preparation
Construction period: June 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located east of Bazhou Yi Jin Road, Tianjin Paul south, Xinghua Road west, covers an
area of 57.357 acres, with a total construction area of 135,700 square meters, including: ground floor area
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
of 117,000 square meters, construction area of 18,700 square meters underground . After the completion of
a capacity of 780 Guests.
The total investment is 382.59 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Quanzhou expressway traffic police working space and ancillary works
Progress stage: construction started in
Construction period: May 2011 -2012 in February
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Quanzhou, Fujian, construction area of 3982.86 square meters.
The total investment is about 10 million yuan.
Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Construction QIDINGSHAN Huiqian Lou -a project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located seven-sea mountain village streets, construction area of about 50,000 square
meters, a total of 9 buildings housing the monomer up to 14 layers.
The total investment is about 110 million yuan. Source: self.
Owner:*******
Contact:*******
Tel:*******
Project Name: Nantong Long Star Properties Ltd. is still in the city million residential project
Stages of progress: preliminary design
Construction period: June 2011 In June -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Nantong, Jiangsu Road, north of the Yellow Sea Hai'an, Dam Road in the east,
the construction of several blocks of residential buildings, covers an area of 59,808 square meters, total
construction area of about 195,037 square meters.
The total investment is about 250 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal Address:*******
Contact person: Mr. Ding Xiaojun -Engineering Department
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design by: Shanghai Science Department of Architectural Design Co., Ltd.
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Real Estate Development Co., Ltd. Nantong Jinchang Marriott International Building and an
underground garage 2,3,7,11
Progress stage: construction preparation
Construction period: June 2011 -2013 in January
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the county, Jiangsu Hai Road and Wing Road Interchange Pingqiao the northeast,
2,3,7,11 Building underground garage floor area: 77,519.18 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 130 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Natural Ecological Park Chu-yu Village Project
Progress stage: construction started in
Construction period: May 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Xinglong County, Hebei Province, Chengde City, Town of Chu Yu Ping Village, the
total land area of 19,337.06 square meters, total construction area of 35,000 square meters, was built 11
residential buildings.
The total investment is about 49.68 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Qinhuangdao Hing Enterprise Co., Ltd. construction warehouse expansion project, 1-3
Progress stage: construction preparation
Construction period: June 2011 -2011 in December
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
North Ring Road project is located north of Qinhuangdao City, Qinhuangdao City, Hing Enterprise Co.,
Ltd. hospital construction projects, the new single warehouse 5508 square meters 1-2 # 3 # Three
warehouse 4109 square meters.
The total investment is about 600 million.
Construction Unit:*******
Postal Address:*******
Contact:*******
Project Name: Huanghua Downtown Real Estate Development Co., Ltd. New East Beiyuan residential
projects
Progress stage: construction design
Construction period: June 2011 -2012 in August
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Xinhai Road North, East Street East, two layers of 5 +1 +1 multi-storey residential
buildings, an area of 3825 square meters.
The total investment is about 19.2 million yuan.
Owner:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Project Name: Lot 11-3 overhead of office space project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Changning District, Shanghai General Association Road, north of Suzhou Creek,
west of the south of Chu Bang, Fuquan Road, east of the block. Base total land area of 66,661 square
meters. 6 floors and 2 underground floors, there are nine buildings were designed; total floor area of about
192,944 square meters, which included an area of 120,656 square meters floor area ratio, floor area of
approximately 70,274 square meters underground. Building floor area ratio of 1.81; building density of
35%; greening rate of 35%; building is 6 floors, 2 underground floor of the multi-local buildings.
Maximum height of 24 meters construction planning.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Beijing Chaoyang Hospital expansion project of peace -update
Progress in stages: approval for the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in Chaoyang District, Beijing Lai Guang Ying Dong Ma battalion south, with a total
construction area of 11,370 square meters -including the retention of the original door emergency building
2405 square meters, the expansion of the total construction area of 8965 square meters, of which the ground
floor area of 5225 square meters, construction area of 3,740 square meters underground. The contents of
construction, Chaoyang District, Ward Building and the old integrated medical technology building.
The total investment is about 80.31 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Anyue towns Train to Train Your Dragon Road, town road reconstruction works
Progress in stages: approval for the record
Construction period: September 2011 -2012 years
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
How to Train Your Dragon Town project is located, for the child to Train Your Dragon road
reconstruction project.
The total investment is about about 15.15 million yuan, the local self-financing.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Progress in stages: approval for the record
Construction period: September 2011 -2012 years
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
The project is located yuan Nanba, for Lee to yuanba road reconstruction project.
The total investment is about about 12.1 million yuan, the local self-financing.
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Stages of progress: preliminary design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in Handan City hospital psychiatric hospital, nine new ground, ground floor, building a
room frame structure, construction area of 12,000 square meters.
The total investment is about 30 million yuan, sources of funding: Central special funds and local
matching funds.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Design:*******
Tel :*******
Project Name: Haig Wireless Technology Building Project
Progress stage: construction started in
Construction period: April 2011 -2013 in June
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Guangzhou City, Guangdong Province, south of Cheung three-way zone south of
science, an area of 3014 square meters, total construction area of 10,549 square meters. The main building
has a wireless technology building.
The total investment is about 100 million yuan.
Construction:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Fujian office building societies and institutions directly under the base of the business space
project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Fuzhou, southeast Cangshan Jinshan Sports Center, construction area of about
30,000 square meters.
The total investment is about 75 million yuan.
Construction units:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: Anshun City People's Hospital relocation project
Progress in stages: approval for the record
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display boards, etc. -for reference
only
Project:
The project is located east of Xi Xiuqu Anshun City, New District, Village, an area of about 421012M2,
total construction area of 150620m2, about 1,680 new beds, completed the top three hospitals meet
standards.
The total investment is about 540 million yuan, self.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: pipes, valves, instruments, excavators, bulldozers, rollers, tamping machine, stirring hug,
pavers, lighting, pipe network -for reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Lvyuan project is located in Changchun City, the project access the new content for the western closure
of the sewage treatment plant effluent and its branch trunk pipeline project. The new sewage works dry,
branch pipeline total length of 6926km.
The total investment is about 72,446,300 yuan. Of which: the first part of the costs -cost is: 38,546,100
yuan, the second part of the construction of other costs: 23,790,500 yuan, the basic reserve fund is
6,233,700 yuan, building an interest rate of 3.876 million yuan of loans.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: Shenyang Agricultural University Campus Infrastructure Project Phase I
Progress stage: the record
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Tanglin Road, Shen He District, No. 120 -Shenyang Agricultural University hospital,
building area of 143,000 square meters.
The total investment is about 500 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Chongqing City hospital for Chinese medicine project Nanchuan District
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display -for reference
Project:
Nanchuan Metro project is located in the long-term 5, the construction standards for Chinese medicine
hospitals Nanchuan secondary level hospitals, 499 hospital beds, outpatient day of 2000, every bed is 141.6
square meters floor area, each land area of 64.1 square bed meters. Planning area is 42973m2. Hospital, the
main equipment to be configured: γ knife -Ⅱ type, 1, linear accelerator -Ⅱ type, 1, CT machine -Ⅲ type, 1,
X-ray machine -Ⅲ class, 8, nuclear magnetic resonance machine. The hospital also intends to set the
Department of Nuclear Medicine, the use of 131I, 125I radioisotopes.
The total investment is 145,902,100 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: county used industrial clustering testing centers for biotech projects
Progress stage: under construction
Construction period: May 2011-May 2012
Main equipment: analytical balance, vacuum oven, vacuum pumps, water-soluble pot temperature, gas
chromatography, freezers, the Reader, amino acid analyzer, set of nitrogen analyzer, fat analyzer,
microscopes, liquid chromatography, high pressure digestion, refrigerator, biological safety cabinets, etc. for reference only
Project:
The project is located Queshan industrial concentration areas, county used industrial clustering testing
centers for biotechnology, the project covers an area of 16,800 square meters, the new R & D Center
Building a test of 3,000 square meters, central park road, water supply and drainage, electric power
facilities, Green, fences, gates and so on. Purchase of major equipment to be analytical balance, vacuum
oven, vacuum pump, constant temperature water-soluble pot, gas chromatography, freezers, the Reader,
amino acid analyzer, fixed nitrogen analyzer, fat analyzer, microscopes, liquid chromatography, high
pressure digestion device, refrigerators, biological safety cabinets and other 107 sets.
The total investment is about 23 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Fenghuang County High School Relocation Project
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Fenghuang County in Hunan River Road embankment Tuojiang Town, with a
total construction area of 36417.17 square meters, total investment of 47,647,000 yuan, a total of five,
which gives an experimental building 9530.35 square meters, five-story, hand-dug pile; teaching building
7361.16 m, five layer, independent column; 1 # dormitory 6573.90 square meters, the ground seven, ground
floor, hand-dug pile; 2 # dormitory 7935.58 square meters, seven, strip foundation; canteen 5016.48 square
meters, four, independent column.
The total investment is about 47,647,000 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: East Century City 16 #, 17 #, 18 #, 22 #, 23 #, 24 # Building Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in the Kyushu District, Hebi City, Henan Qibin Songshan Road and intersection,
building scale 33628.8m2, 11 layer frame structure.
The total investment is about 20 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Workshop # 1 office building and plant engineering
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage power distribution equipment, steel structure. -For
reference
Project:
Project is located in Yantai City, Shandong Province High-tech Zone, with a total construction area of
about 13,000 square meters, including: shop office building area of 8820.07 square meters, ten ground floor,
ground floor, building height 41.2m. Second floor of the north channel, construction area of 788.54 square
meters, building a high degree of 9m, the maximum span of 18.3m, the structure type framework. 1 # plant
construction area of 4383 square meters, the height of 11.4m, the maximum span of 18m, two-story
structure in the form of steel.
The total investment is about 14 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Reconstruction of Shanxi Academy of Agricultural Sciences research and innovation base
demolition projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Taiyuan of Shanxi Province Academy of Agricultural Sciences of the original
Big Wu Xiaodian farms, a bid of: Agriculture Technology and conference center, an area of 22600.9 square
meters, floor 10 floors, height of 45 meters, the wall structure; two tenders: Biotechnology Dryland
Agriculture Research Center, Research Center, Center for Experimental Research / Plant Protection
Research Center of Resources and Environment Research Center, 10541.1/10237.4 square meters floor area,
number of layers 5 layers, height 23.55/24 meters, wall structure,; three tenders: Exhibition Centre of Crop
Science Research Center / Agricultural Research Center of Modern Information Institute, an area of
9799.2/7573.7 m, height 23.55/23.55 m, layers 5 layers, frame structure.
The total investment is about 154 million yuan. Source: The compensation for demolition.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Jize navigation center of agricultural eco-tourism eco-tourism center of the new agricultural
projects
Progress stage: construction started in
Construction period: May 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located north of the North Jize placement Village, Spa reception center, expert technical
service building, conference center investment, intelligent greenhouse, and other places do floor and
ancillary buildings. The total area of about 345 mu, total construction area of 159,676 square meters. One
area of 150,631 square meters of floor; underground area of 9045 square meters.
The total investment is about 1.1558 billion yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Town Center Banbi Xinglong County Commercial Street Construction Project
Progress stage: construction design
Construction period: July 2011 -2013 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Xinglong County Banbi Town Banbi village, construction of 6 storey residential
building 9 +1; commercial buildings, Building 11, Level 2, 3 layers 2, 4 layer 2; single-family residential 2
layer 4; office space, layer 3 1, 4 layers 1. All buildings arranged along both sides of the street. The planned
land area of 41,120 square meters, total construction area of 61,835 square meters, of which ordinary
residential area of 12,320 square meters, single-family residential area of 1,800 square meters, business
area of 42,565 square meters, an area of 5150 square meters of office space.
The total investment is 154.87 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Shanxi in North China Electrical and Mechanical School New Building Project
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Yangtze River Region in North China Electrical and Mechanical School No. 77,
Lane campus, type of structure as a framework, the construction scale of 8500m2.
The total investment is about 10 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Contact person: Zhang Zhong Bin
Tel:*******
Project Name: Seda in the possession of hospital building projects
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in the eastern section of the Sichuan Seda No. 20 Jiefang Road, the new hospital,
preparation rooms 2799.10 square meters, 1,100 square Reconstruction clinic.
The total investment is about 10 million yuan. Construction funds from the central budget funds, the
project is 100% funded ratio.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Flower planting demonstration zone expansion project
Progress stage: construction started in
Construction period: May 2011 -2013 in May
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Flat Springs project is located in Hong shizhangzi Pingquan County Village, built 60 flower greenhouses,
tanks, Block 2, the main water pipeline laying 2800 meters, 10 km overhead line, built 300 square meters
of office and other buildings. An area of 380 acres, 60 flower greenhouses, cultivating lilies 720,000.
The total investment is about 10.6 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Qinglong County War History and Culture Square underground car park project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Qinglong County, North Ring Road project in Guizhou original north gate stations, construction scale:
about 3644 square meters, the height of 6.00 meters.
The total investment is about about 11,779,000 yuan.
Owner:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Project Name: General setting for Power Production Comprehensive Building Project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Puding County, a total construction area of about 8,000 square meters.
The total investment is not detailed.
Owner:*******
Postal address:*******
Post Code:*******
Contact person: Yang Jian
Tel :*******
Project Name: Pingyang gathering point MASS rural housing projects
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Pingyang County, Zhejiang Province for the first three farms area, building area:
19,564 square meters.
The total investment is about 20.2 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Community Phase III Pingliang Huadian 10 #, 11 #, 12 #, 15 #, 17 #, 18 # residential
building projects
Progress stage: construction preparation
Construction period: June 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Pingliang, tenders by: First Lot: 10 #, 11 # residential building, building area of
13,781.08 square meters, the underground floor, ground floor fourth place the whole wall structure; the
second section : 12 #, 15 # residential building, building area of 10,586.64 square meters, the underground
floor, ground the whole place second layer wall structure, and the third tenders: 17 #, 18 # residential
building, building area of 13,781.08 square meters , the whole place for the fourth layer wall structure.
The total investment is about 48 million yuan. Source of funds raised to 100% of the units.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Water Garden Ningyang Li underground garage project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Ningyang Avenue and the northwest corner of apricot Post Road intersection, as
the basement of the building, the height of 3.90 meters, construction area of 5572.96 square meters, the
framework structure.
The total investment is about 10 million yuan. Construction funds for the self-financing.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Ning Wai, Xinhua Town Office Building Project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Ning Wai project is located in the town of Xinhua Village, with a total floor area of approximately
66,000 square meters.
The total investment is about 110 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: State Road 121, Nanjing housing renovation project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in State Road 121, Nanjing, construction area 13528.33m2.
The total investment is about 44,132,000 yuan.
Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Real Estate Development Co., Ltd. Nantong Jinchang Marriott International Building and an
underground garage 17,20,24
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the county, Jiangsu Hai Road and Wing Road Interchange Pingqiao the northeast,
17,20,24 building and underground garage construction, installation floor area: 18,668.15 square meters.
The total investment is about 28 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Downtown Walk Manor House project
Progress stage: construction design
Construction period: June 2011 -2012 in September
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Xinhai Road North, west of the EPA, the total area of 7784 square meters, two
partial three-block buildings.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 64 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Tangshan Guye Hong residential projects into their homes
Progress stage: construction design
Construction period: July 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Guye District, the project is located south of Donlin Road Tang Zhuang Zhenxing Road, east of a 6 layer,
a layer of 6 to 11 frame wall structure for residential and some commercial and ancillary facilities. The total
area of 8146 square meters, total construction area of 20,620 square meters, ground floor area of 18,355
square meters, ground floor area of 2265 square meters, greening rate of 35%, FAR 2.24.
The total investment is about 50.83 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Real Estate Development Co., Ltd. Nantong Jinchang Marriott International Building and an
underground garage 1,5,6,9,10,13
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: June 2011 -2013 in August
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the county, Jiangsu Hai Road and Wing Road Interchange Pingqiao the northeast,
1,5,6,9,10,13 building and underground garage construction, installation floor area: 51,888.70 square
meters.
The total investment is about 97 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Ocean Star Project of Zhengzhou City
Progress stage: the record
Construction period: October 2012 In September -2015
Main equipment: large snow machine, water treatment facilities, refrigeration systems, five-star cinema
equipment and other facilities, catering equipment, etc. -for reference only
Project:
Project is located in the country, Wenhua Road, Zhengzhou City-based road intersection 200 meters west
of Zhengzhou City Ocean Star Project, the project covers an area of 47 mu, building area of 116,200 square
meters, main construction contents are: ice water world of 18,000 square meters, digital Cinema of 10,000
square meters, 18,000 square meters shopping center, underwater restaurant 5,000 square meters, 28,000
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
square meters of rainforest apartments, real base of 15,200 square meters animation, water Auditorium of
12,000 square meters, and other supporting 10,000 square meters. The main equipments are large snow
machine, water treatment facilities, refrigeration system, the five-star cinema equipment and other facilities,
catering and other ancillary equipment.
The total investment is about 1.5 billion yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Huozhou Coal Group Co., Ltd. Luliangshan coal coal coal washing plant roads and bridges
Stages of progress: preliminary design
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
Project is located in Fangshan County in Shanxi Luliang Dawu town, highway and bridge construction
projects coal washery coal.
The total investment is not detailed.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Fengtai Technology Gymnasium
Stages of progress: preliminary design
Construction period: 2011 -2012
Major equipment: steel, building materials, wall decoration materials, glass doors and windows, sanitary
ware, elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, management pieces of pipe, water supply
equipment, outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable,
weak systems, lightning protection systems, low-voltage distribution cabinets -for reference
Project:
Project is located in Fengtai District, Beijing West Fourth Ring Road 55, total building area of about
12,530 square meters. 4137 square meters above ground stadium building car models and model aircraft to
match the content area; the main stadium of 3,500 square meters underground, building content for the seadie game area; North ancillary space 3150 square meters, construction, sale of the contents of the model
rooms, clubs, R & D and office space; South ancillary space 1743 square meters, building content for
multi-function space and training room.
The total investment is about 84.79 million yuan, funds have been implemented.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Salt Lake County highway projects in 2011
Stages of progress: survey and design
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Salt Lake County, including three parts: 1. Yanchi County Rural Road Improvement
Project in 2011; 2. Yanchi County Highway 304, crossing the county road works section of cable; 3.
Yanchi Immigrant Village road works.
The total investment is not detailed.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Project: Pando States
Tel :*******
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Pudong New Area, east Yang Gao Road, south Zhangjiabang river, west Chuk Yuen
Road, with a total land area of 55,287 square meters, the project for the three high-rise towers and
connected to the overall composition of the buildings basement . High-rise towers, each on the Shanghai
Stock Exchange, the China Financial Futures Exchange and China Securities Depository and Clearing
Limited, the main purpose is to write office; piece construction including the central sunken plaza financial
theater, restaurant, fitness area and other supporting facilities. Besides building also includes a substation
and other public works.
The total investment is unknown.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax:*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Shanghai Jinshan Industrial Zone, Industrial Park of the project life of service
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Shanghai Jinshan Industrial Zone project is located in the region life support -project base east of process
water to Hong Kong, south Lin Hui Road, Exhibition Road, west of Golden, Hsiu Road north to Greenland,
the project construction of apartment accommodation -12 8 layers floor, 14 floors and supporting space 18,
etc., with a total floor area of 164,117.47 square meters.
The total investment is about 500 million yuan.
Construction:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Silver Road near resettlement supporting commercial supporting municipal road - planning
all the way -Silver Road ~ China Exhibition Road Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference
Project:
Project is located in Xuhui District of Shanghai, planning all the way -Silver Road ~ China Exhibition
Road is a north-south road, south from Silver Road, Exhibition Road, north to China. Within the region
north side of Hua Jing Road, south side of a double road. West, Long Wu Road, east of the Huangpu River.
Planning for the city level all the way slip road planning, planning red 24.0m, total length of about 650m,
driving speed 30km / h, the total project investment of 52,639,500 yuan. The works will include roads,
storm water and other public facilities, the project of a new bridge Chunshen Hong Kong.
The total investment is unknown.
Construction:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Cultural Plaza project in Fujian
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located south of Fuzhou Road, Huangpu District, Shanghai, the core block, the base block
from the 099-01 and 090-01 ,095-02 block block composition. The total land area of 21,799.3 square
meters, total construction area of 167,889.8 square meters, including the total ground floor area of 95,838.9
square meters, connected part of the total area of 3061.8 square meters, total building area FAR 87196 m²,
ground floor area of 68,989.1 square meters, some shopping malls Prizes will be awarded catering, floor
area ratio 4.0.
The total investment is unknown.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Project Name: Naiman Dongming middle school project
Progress stage: construction preparation
Construction period: May 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located east of Town, Naiman Banner, the southern end of East Mountain Road Road East,
the project construction area of 6147 square meters, the framework structure.
The total investment is about 9.5 million yuan. Funding from the National School Safety construction
projects funds.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Minhou County Central Primary School Teaching Building mussels kindergarten teaching
building construction
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Fuzhou City, Fujian Minhou Green Town Green garden outside the 60 bridge,
mussels Minhou County Central Primary School Teaching Building, nursery school building construction
project planning and land acquisition of about 13,218 square meters, the center total construction area of
primary teaching building of about 3500 square meters, the kindergarten classroom building of
approximately 2,520 square meters of total floor area.
The total investment is 9,000,000 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Wuxi Taihu Lake City supporting the placement of water environment improvement project
Progress stage: feasibility study being prepared
Construction period: 2011 -2012
Major equipment: bulldozers, compactors, cranes, hoist, gates, controlled digging machine -for reference
only
Project:
Project is located in Wuxi City, Jiangsu Province, the project by the Water Pollution Control in Taihu
Lake in Wuxi City Commission Office of investment and construction, the project covers an area of 6711
mu, total construction area of about 500 million square meters.
The total investment is about 18.95 billion yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Mianyang City Investment Holding -Group Co., Ltd. Ka commercial and residential district
projects to Prime Terrace
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Mianyang City, Backstreet Shunhe Fucheng District, total construction area of
46833.35 square meters, including three shopping podium and basement floor building area of 18,784.89
square meters, Block A 31-story main building, building area of 18,365.94 square meters, the main
building B , 24th floor, building area of 9682.52 square meters.
The total investment is about more than 2000 million.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Luohe Water Sports Centre surf entertainment projects
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Luohe City Sports Center project is located in the hospital, covering 18,578 square meters, construction
area of 2775 square meters, an area of 3940 square meters swimming pool, swimming pools are open-air
swimming pool. Where: changing floor 2775 meters, 3200 meters surfing pool, children's pool 740 square
meters.
The total invested 800 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Longyan Teachers Preparatory School New Campus Phase II Building and the No. 1
Teaching Building Project
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Longyan City, Fujian Nan Luo District Shuangquan Road 85, across the school to
post the new campus, with a total construction area of about 8647 square meters, the framework 7 layers,
basement, building area of about 5758 square meters, Building with the No. 1 Teaching Building Corridor
construction area of about 120 square meters, the framework of the 4th floor, building area of 2326 square
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
meters, Academic Building No. 1 and 2 Teaching Building corridor about 398 square meters floor area,
reception room and control room building area of about 45 square meters.
The total investment is about 14 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Liaoning New Star Powertrain Limited plant construction project -Phase I 1 # joint plant and
ancillary projects
Progress stage: construction started in
Construction period: May 2011 -2011 in October
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage power distribution equipment, steel structure. -For
reference
Project:
Project is located in Fushun Economic Development Zone, size of the project: 1 # joint plant and
ancillary works, construction area: 25,000 square meters, of which 17,000 square meters steel sub office
building of 8,000 square meters.
The total investment is about 50 million yuan. Source: self.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Stone Village green Whitehead Lanzhou overall planning of construction projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Lanzhou City Green Whitehead, size of the project: two-story frame structure, with
a total construction area of 72,127 square meters.
The total investment is about 17 million yuan. Source: self.
Construction unit:*******
Postal address:*******
Zip Code:*******
Contact:*******
Tel:*******
Project Name: Kun Heng Jinbi District Court Building Project # 1
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Han River Road and the project is located in the southeast corner of intersection Li Road, ground floor,
ten ground floor, with a total construction area of 10,191 square meters, including building area of 8589 1 #
F ㎡, building area of 1602 square meters underground garage, both the framework structure.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Kaili City, one of the main entrance to the Kamba Reservoir laugh campus construction
projects for urban trunk road
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference
Project:
The project is located in Guizhou, Kaili City, a hearty main entrance to campus Kham reservoirs, roads,
total length of 2,200 meters, 36 meters wide roads, roadway width of 25 meters, 4 meters wide sidewalk ×
2, green bandwidth of more than 3 meters, the roadway area 55,000 square meters, the sidewalk area of
17,600 square meters, green belt area of 06,600 square meters.
The total investment is about 100 million yuan. Source: City Finance.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Junan Dragon Royal Garden Residential Project Phase II
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of the northern section of Long Hill Road, with a total floor area: 26,762.26
square meters, 10 residential buildings #, 5 +2 layers, frame structure, construction area of 3915.28 square
meters; 11 # residential building, 5 +2 layer, framework, architecture area of 4866.27 square meters; 12 #
residential building, 5 +2 layers, frame structure, construction area of 4079.53 square meters; 13 #
residential building, 5 +2 layers, frame structure, construction area of 5026.44 square meters; 15 #
residential buildings, 11 + Layer 1, frame structure, construction area of 6633.36 square meters;
commercial and residential street, 5 -2 +3 layer, the frame structure, commercial building area of 1222.7,
residential construction area of 1018.68 square meters.
The total investment is about 10 million yuan. Source: self.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Jinzhou Railway 80 ShangXi Hailu Nan transformation 2 # F, 5 # Building Construction
Project
Progress stage: construction started in
Construction period: May 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Jinzhou City, south of Shanghai, Yichang Road, north of Zhengzhou Street, east
of wealth Street, west of Building 2, floor area of approximately 14,090 square meters, twenty-six; 5
Building floor area of approximately 14,090 square meters, twenty six.
The total investment is about 30 million yuan. Source of funds for the construction of self.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Redstar International Home Plaza
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Hongqiao Town, Minhang District, Shanghai, Jinhui Road, west of Pioneer Road,
south of the city green belt north of the block Wuzhong, the total land area 24137.6m ², total height 30.3 m
building is divided into six ground and underground two-story, building on the ground fixed shops,
underground construction for the underground parking garage. Project a total of 1,003 motor vehicle
parking spaces, including 3 parking spaces on the ground, 1,000 underground parking spaces. The total
construction area of 99963.5 m², green land rate of 20%.
The total investment is unknown.
Construction:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Longjing City Public Security Bureau Detention Center construction project
Progress stage: construction preparation
Construction period: June 2011 -2012 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, barricades machine. -For reference
Project:
The project is located west of Longjing City Detention Center, project size: 7,000 square meters.
The total investment is about 13 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Jinzhou Railway 80 ShangXi Hailu Nan transformation 1 # F, 6 # Building Construction
Project
Progress stage: construction started in
Construction period: May 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Jinzhou City, south of Shanghai, Yichang Road, north of Zhengzhou Street, east
of wealth Street, west of Building 1, floor area of approximately 15,682 square meters, the twenty-eighth
floor; 6 building floor area of approximately 14,622 square meters, twenty eighth floor.
The total investment is about 30 million yuan. Source of funds for the construction of self.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Changjiang North Street, Yuhong District, road works -road drainage works
Stages of progress: engineering design
Construction period: June 23, 2011 -2011 years
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
The project is located, Yuhong District, Shenyang City, the construction of the Yangtze North Street
road drainage works.
The total investment is about about 25.25 million yuan, the government investment.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Design:*******
Postal Address:*******
Tel :*******
Fax :*******
Project Name: Anlong County People's Hospital outpatient and emergency complex building projects,
medical technology building, hospital construction and installation, living rooms
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located in Anlong county in Guizhou Wong, Xicheng District, Village, a new five-door
emergency building, building area of 5562.7 square meters, the frame structure; five medical technology
building, an area of 4056 square meters frame structure; three hospital living space, an area of 1507 square
meters.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Su bend 41,42 Neighbourhood Project
Progress stage: project
Construction period: 2011 -2016
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located southeast of Zhabei District, Suzhou River North. 41 neighborhood range: Qufu
Road to the north, south North Suzhou Road, west of Gansu Road, North East arrived in Zhejiang. Base
covers an area 14995.7m ², total construction area of 92720m ², including the total ground floor area of
62082m ², 7-19 from the three layers of high-level commercial office building complex, a 5-story building
and two multi-storey commercial office 3 story commercial building components to retain building
renovation, along part of the municipal roads and internal roads to set 1 layer 3 layers of commercial
podium; underground construction area of 30638m ². Consolidated volume rate of 4.14. 42 neighborhood
range: Qufu Road to the north, south Suzhou Road North, west of Man On Road, East arrived in Gansu
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Road. Base covers an area 20423.4m ², total construction area of 131739.5m ², including the total ground
floor area 87089.5m ², the one 18-storey high-rise commercial office building complex, a 9 story high-rise
commercial office building complex, a 4 layers of historic waterfront -transformation of business, and 6story buildings to retain some transformation of commercial building construction components, and has
played a small view rooms, artist studios and other functional areas; underground construction area of
44650m ². Consolidated volume rate of 3.75.
The total investment is about 3,037,130,000 yuan.
Owner:*******
Postal address:*******
Post Code :021 -200,085
Contact:*******
Tel :*******
Project Name: Shanghai Jiading Ju block of residential and commercial projects garden
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Jiading District of Shanghai large residential community east of North Base
Huocheng Road, Anping Road, south of the block, the first Lane East Linan, Yu Road south to the north,
west Huocheng Road, Ping Cheng Road to the north. The planned land area of 77,180.2 square meters,
total construction area of 211,519 square meters land, the ground floor area of 154,360 square meters total
capacity, capacity building, excluding the floor area of 5728 square meters, construction area of 51,431
square meters underground; the total number of 1725, The main types of 11,15,18 layer building high-rise
residential, and two underground parking, a community service center and supporting business.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is unknown.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Zhaoxian weak school renovation project -Secondary School Section of Nanbo town homes
project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Shijiazhuang City, Hebei Province, town homes Zhaoxian Nanbo secondary hospital,
the construction of the school gates and duty room, wrought iron fence 230 meters, two toilets, courtyard
hardening 9233.7 square meters, built a reviewing stand.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Mining Limited Zhaotong Chihong Base Project Office
Progress stage: Design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Yunnan Province, the Office of Zhaoyang District Taoyuan Pacific community,
building area of about 19500 square meters.
The total investment is about 99,681,700 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Welcome Yanjiao North Community Health Center Project
Progress stage: construction preparation
Construction period: June 2011 -2011 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in Hebei Province, Yan Ling Road, afford to 8, the works include a health service
centers: frame structure, construction area of 3047.94 square meters, 5 floors, local 6 layers; outside and
ancillary works: sewage treatment pond, pumping stations , heat transfer stations, hardening, water, fire
protection, heating, electrical and demolition works; supplementary works: civil engineering, heating, water
supply and outdoor transformer works.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 12.49 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Area A, Xing Sheng Yuan Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Inner Mongolia, Genghis Khan Road, east of Zalantun City, Lixin Street, south side,
with a total floor area of approximately 59,569.82 square meters.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Wuzhou City School District Tengxian People's Hospital patient building of new projects update
Progress stage: construction design
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: July 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
The project is located east of Guangxi Wuzhou Tengxian Dongsheng Village, with sub-county Bay, the
construction of a 19-storey residential building, with 600 beds, with a total construction area of 34,000
square meters.
The total investment is about 50 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Contact:*******
Tel :*******
Project Name: Yichang Municipal Construction Committee Housing and Urban Park Project in Yichang
City Vocational Education
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Yiling District Yichang City, Hubei Province, Longquan Town Station Village, a
total area of 1966 mu, scale of 3.3 million people. Higher Vocational Education Garden financial,
vocational and craft education in one, there is a vocational college, two vocational schools, a technical
school. Are the Three Gorges Tourism Vocational and Technical College, Yichang City Three Gorges
secondary schools, electrical and mechanical engineering schools in Yichang City, Hubei Three Gorges
advanced technical schools. Yichang City, the project retained the building facilities, mechanical and
electrical engineering school, and moved to the other three schools vocational Park. The main teaching
building construction, training buildings, student dormitories, student cafeteria, teacher offices, libraries,
administrative offices, gymnasium, business service center, student activity centers, hotels, standard track
and field, park and municipal roads and other related pipe facilities.
The total investment is about 1,378,959,100 yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Xixia Green Energy preservation projects
Progress stage: under construction
Construction period: May 2011-May 2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Xixia County Town project is located in Huangshi Village of Wuli Liu camp after the group, Xixia
Green Energy preservation projects, the project plans to build an area of 200 square meters of office
building -brick layer 3, 120 tons of cold storage Block 5 -covers an area of 1,000 square meters, the
election results Workshop Block 2 -area of 1000 square meters, a packaging plant -an area of 500 square
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
meters, Storage Workshop Block 2 -area of 1000 square meters , as well as water, electricity, green, and
other supporting facilities.
The total investment is 1200 million.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Shijiazhuang Airport Industrial Park off Southwest Area Road Network Project Area
Progress stage: has the record
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
Airport Industrial Park project is located in Shijiazhuang, the construction of the initial area of Southwest
Area Road Network project.
The total investment is about about 2.7 billion.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: John City Fourth People's Hospital Building Project
Progress stage: project
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
The project is located Yongzhou 13 Renmin Road, Lingling District, total construction area of about
16,500 square meters, the structure in the form of frame structure, building layers of 6 + 1 layer.
The total investment is about about 32 million yuan, the central special funds and self-financing.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Progress stage: Design
Construction period: December 2011 In December -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Qindu District, Xianyang power industry base, a comprehensive development with
a total construction area of about 30,000 square meters, including: a six-storey office building, plant,
workshop.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 50 million yuan.
Construction Unit:*******
Postal address:*******
Contact:*******
Tel:*******
Project Name: the founding of the Second District Park -Golden Age limit housing projects
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
MTR Eastern Mountain project is located in Anshan City, South Street West, Ping Street South. Project
planning area is 20725.81m2, total construction area of 116084m2, including residential construction area
94560m2, building area of public and commercial networks and construction of 11344m2, the basement
floor area of 10180m2. The overall project proposed 7 -1 32 storey residential building, including
temporary housing Hill Street side of the ceiling set three commercial networks, while Hill Street side of
the podium has a 3-layer, the overall residential building at Hill Street South connection, operation of the
podium as the commercial networks, two stations four rooms, toilets and other uses.
The total investment is 292.35 million yuan.
Construction unit:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: founding a new city area -Triumph Square price of commercial housing projects
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Anshan City, MTR Eastern South West Jianguo Road, Sheng Shi South trade.
Project covers 28420.18m2, total construction area of 226313m2, residential construction area of
131678m2, public building construction area of 55700m2.
The total investment is 593.57 million yuan.
Construction unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Anshan Dade residential construction projects Regalia
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Anshan City, South East MTR Eastern Health -formerly the city block technical
schools, the project built 11 -3 ~ 33 storey residential building, East side of the two adjacent fitness for the
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
end of the second floor shops, the rest are residential buildings The total construction area of 119,980.95
square meters, of which 115,683.15 square meters of residential, public building 4297.80 m
The total investment is about 500 million yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Henan water legislation Mountain million DH-2009-568-2 block of residential construction
projects
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Million project is located in Anshan City Mountain Water Henan. The project covers an area of
52341.83m2, total construction area of 148411.43m2, residential construction area 133974.7m2, public
building construction area 10783.1m2, the proposed 14 high-rise residential buildings.
The total investment is about 3.2 billion.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Poly Quartet and construction project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Anshan City, Taiwan Road, West District, Quartet No. 13, the project covers an area
of 59087.06m2, total construction area of 172702m2, residential construction area of 166428m2, public
building construction area of 6274m2.
The total investment is about 560 million yuan.
Construction unit:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Zhou, Xiaolin Town residential project relocation
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Kunshan City, Suzhou City, Jiangsu Province, Zhou Xiao Lin Lunan side of town,
Suntory road on both sides, the project covers an area of 138,333.28 square meters, total construction area
of 341,581.06 square meters, the building density of 18.0%, 30.4% green space ratio.
The total investment is about 1.1 billion yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Wuhan Real Estate Development and Investment Group Co., Ltd. 60 after the lake complex
projects Articles
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Wuhan Yonghong Village, Tahu after the riverbank area, the planned total land area
of 218670m2, total planned construction area -the ground 608395m2, the main building of residential,
commercial and supporting facilities, the average floor area ratio 2.78, 23% building density, green rate of
31%, the total number of about 3136 residential.
The total investment is unknown.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Tel :*******
Project Name: Yu Cheng-hung out -2010 108 block the project
Progress stage: the record
Construction period :2012-1 to 2016-1
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located east abundance of Hong Kong; Sha Road south to the north; west Lotus Road;
north to-day Holland Road, Yu Cheng-hung out -2010 108 Block project, which plans to build housing,
with a total construction area of 320,000 square meters, including the ground floor area of 24 square meters,
construction area of 80,000 square meters underground. The total land area of 109,106 square meters about 163.66 acres, the volume rate of 2.2. Land transfer contract number: 3301102011A21052. Specific
views on issues approved by planning to implement.
The total investment is about 1.8319 billion yuan, including fixed assets investment: 1,820,540,000 yuan
-Civil 67400; equipment 10700; installation of 7100; other expenses 94,800 construction; reserve fund
2054, interest of construction period 11,360,000 yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Quanzhou Licheng Edward Lane Area Improvement Project
Progress stage: Design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located north of Quanzhou, Fujian playing tin Street, south of Edward Lane, the total land
of about 49.6 acres.
The total investment is about 483 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Golden Resources • Napa Valley Project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The project is located Chanba, Chan east west road, south-meter Qin Road, north of basaltic road. Highrise residential, commercial service facilities supporting the construction of a total of 50 residential building
construction, as well as a cultural activity center, a comprehensive commercial, health stations 1, 1 toilet,
bank, savings bank, telecommunications, postal services are 1 each, and the supporting public facilities and
other facilities. The total area of 20.66ha, total construction area of 703196m2, including the total ground
floor area of 578351m2, the total ground floor area of 124845m2, greening rate of 30%, 4284 households is
expected to live, the resident population of about 13,709 people.
The total investment is about 1.72 billion.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Yan Hing Door North village reconstruction -near International Park City project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of Xian Ying Road West, west of Park Road South, composed by the nine
plots. The total land area of project planning 18.754Ha, total construction area of 1060452m2, planning and
construction of 31 residential buildings, while supporting the construction of the appropriate public
facilities -primary school, shops, property, etc., and other ancillary works facilities -underground parking,
green space focus, etc. .
The total investment is about 2.5 billion yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: High Mountain and Flowing • Singapore dollar construction projects Legend
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of East Second Ring Road in Xi'an, north of North Road and Jianguo Hotel
generosity Zhuang -modified five-star across the south South and generosity village across the wall of Xi'an
University of Technology, the families of area west of Xi'an Engineering University, East Pro East Second
Ring Road, Xi'an University of Engineering and across campus. The total land area of 61415.8m2, total
construction area of the ground 414858.1m2, total construction area of underground 70061.41m2, total
construction area of 484919.51m2, green land rate of 35.7%, is expected to live 4,279 households,
population of 14,860 people.
The total investment is about 1.3 billion.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: great affordable housing project Jiayuan
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: project
Construction period: May 2012 -2017 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of East Road, Yanta District Zhangba, South Third Ring Road, north west of
Meridian Road, west to the planning of every 20 meters wide is the demolition of North Shen Kiu, North
every 20 meters wide for the planning of open space, south every 25 meters wide in the planning of
housing. Planned land area of 42,941.03 square meters, total building area of 246,425.00 square meters, the
project plans to build 10 high-rise residential buildings -32F, 33 F and 18F, while supporting the
construction of the appropriate public facilities -commercial, property, kindergartens, etc., and other
ancillary works facilities -underground parking, central green space, etc., the total number of 1940, housing
a population of about 6790 people.
The total investment is about 950 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Miss Hong Kong • Gold Coast -a Leiden town project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Project is located in Shaanxi Province, Xi'an International Port District, the northwest corner of Apricot
Interchange, east of Welcome Road, south of North Third Ring Road, west of Riverside Road, north of
planning road. The planned land area of 67517m2, total construction area of 225722m2, including
residential buildings, clubs, commercial, parking and other ancillary facilities, built after 1084 the total
number of living, housing a population of about 3443 people.
The total investment is about 800 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Chen Wei Real Estate Development Co., Ltd. Hebei New Peace House Garden Project
Progress stage: construction preparation
Construction period: June 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in No. 488, Heping Road, Handan City, a 29 storey residential building, property,
commercial outlets, basement, garage and other ancillary buildings. The total area of about 12.6 acres, with
a total construction area of 29,697 square meters. One area of 22,420 square meters of residential and
public construction area of 2777 square meters; underground area of 4,500 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 109 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: the third phase of residential areas are gardens
Progress stage: construction preparation
Construction period: June 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located north of Waterworks Road, Handan City, Nagisa River Road, south of West Main
Street east of the mausoleum, Dongsheng Street, west of a 33 storey residential building, 25 storey
residential building one, a 11 storey residential building, commercial store, basement, garage and other
ancillary buildings. The total area of about 97.96 acres, with a total construction area of 275,090 square
meters -ground. Three of which covers an area of about 20.15 acres and a building area of 93,931 square
meters, including the residential area of 58,820 square meters, an area of 4040 square meters of public
buildings, underground area of 31071 square meters.
The total investment is 244.36 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Handan City Real Estate Development Co., Ltd. New Fu On Phase II project area
Progress stage: construction design
Construction period: July 2011 -2014 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the alley north of the river, City Street, east of Hill Street, west of the earth, a 33
storey residential building, two 25-storey residential building, property, commercial outlets, basement,
garage and other ancillary buildings. The total area of 43.77 mu, total construction area of 141,767 square
meters -ground. Which covers an area of 14.97 acres of Phase II, construction area of 93,573 square meters,
including residential 58,765 square meters.
The total investment is 222.41 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Qinhuangdao large automobile trade center project car sales service
Progress stage: construction preparation
Construction period: July 2011 In June -2013
Major equipment: hydraulic steel stamping production line, processing center, coating production lines,
testing equipment, transmission belt. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in the Bohai Sea, Qinhuangdao Economic and Technological Development Zone, north
of West Road, in the existing building within the site 24 car showroom and office areas, maintenance shop,
with a total construction area of 115,650 square meters. Of which: exhibition area of 10,800 square meters,
office area 20,160 square meters, maintenance workshop 66,240 square meters, Building a building area of
18,450 square meters; annual sales of 25,600 cars, 40,000 in vehicle maintenance.
The total investment is 355.92 million yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Joint Industry Group Co., Ltd. Zhuozhou Building Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Fan Yang Road, north of Zhuozhou City, Hebei Province, total construction area
of 87693.1 square meters, of which the basement floor area of 12,049.8 square meters.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: Residential Construction Project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Changchun High-tech Industrial Development Zone expansion area, the project
north of the B Rd, east of the park for the rich and powerful, super street west to the south as a Road.
Projects are all around the open space, construction of the project area a total of 91 residential buildings in
the form of high-density houses.
The total investment is unknown.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Chongqing Qianjiang District, the garden center project passenger and freight transport
services
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located west of the city of Chongqing Qianjiang District Lingyun gas station next to the
street, including the garden of the new passenger and cargo transportation service center, the total
construction area of approximately 10,374.98 square meters.
The total investment is about 20 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Zhaoxian weak school renovation project -Secondary School Section of the former chapters
and Rural Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Shijiazhuang City, Hebei Province, Zhao County Chapter rural secondary schools
before the big hospital, the construction of the school gates and duty room, wrought iron fence 160 meters,
500 meters of a cafeteria, a 300 square meters bathroom, boiler room, a small pump each one. Hardening of
5784.7 square meters courtyard, flat playground 11,950 square meters, built a reviewing stand.
The total investment is unknown.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: First Middle School of Shiping County Building Project -updated
Progress stage: construction started in
Construction period: April 2011 -2012 in January
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Hani and Yi Autonomous Prefecture differences in Shiping County Longzhen 珠泉
Street -a stone screen in the campus, the construction of a comprehensive four-part five-storey building,
total construction area of 6,700 square meters, including : classrooms, offices. 5360 square meters education and research facilities, 1340 square meters -office.
The total investment is about 10 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Designer:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Chenghai Power Supply Bureau Building Project Scheduling
Stages of progress: survey and design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Chenghai Yuting Road and the southwest corner of Ningchuan Road junction block,
the scale of construction of 23,000 square meters.
The total investment is about 99.96 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: International garden of Agile projects
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Chang'an District, Xi'an Mao Guo Du Bo Village west of the town, the project
covers an area of 158211m2, total construction area of about 448281m2, project planning and the total
number of 3537, the total number of 10,593 living people, 147 parking spaces located on the ground,
underground parking spaces 1784 .
The total investment is about 3.1 billion.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: New Vista II project 枫景
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction design
Construction period: July 2011 -2014 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located east of the bright street, west of King Ming Street, Lei Wing Road, south of
Orchard Road, north of 18 five storey residential building, commercial outlets, basement, garage and other
ancillary buildings. The total area of 6602 mu, total construction area of 132,391 square meters -ground.
Phase One covers about 32 acres and a building area of 78,884 square meters, including the residential area
of 56,457 square meters, an area of 7423 square meters of public buildings; ground floor area of 15004
square meters.
The total investment is 216.19 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Hengshui Yi Xing Fu River Real Estate Development Co., Ltd. New East Garden Project
Progress stage: construction started in
Construction period: May 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Hengshui City, north of the south outer ring, Fuming Street, east of the new
residential building brick layer 7 6 +1, 3 high-rise shear wall, the total construction area of 80,400 square
meters.
The total investment is about 68.34 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Yue Heng. Yuet four projects the world
Progress stage: construction preparation
Construction period: June 2011 -2014 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in a cotton Handan Road, north of Green Street to the east of 18-storey residential
building four, a 16 storey residential building, property, community service, basement, garage and other
ancillary buildings. The total area of about 128.39 acres, with a total construction area of 310,659 square
meters -ground. Four of them covering about 39.1 acres and a building area of 99,925 square meters.
79,993 square meters of residential, public building area of 2,500 square meters, underground area of
17,432 square meters.
The total investment is 188.25 million yuan.
Construction Unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel :*******
Project Name: Silver Beach million construction project Springs II
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Beihai City, Guangxi Zhuang Autonomous Region Ⅱ Modern Industrial City,
Development Zone, north of the Gold Coast Road, Canton Road, west of the planned total land area
142690.13m2, total construction area of 277967.55m2, greening rate of 34%, floor area ratio of 1.8, the
total household Number 2834, 1570 motor vehicle parking spaces. Xiangmu total of the two components,
one of the middle period from 34 residential buildings and central business district composed of two in the
31 high-rise residential buildings and kindergartens and other facilities component.
The total investment is about 800 million yuan.
Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Standard plant construction project
Progress stage: the record
Construction period :2011-10 to 2013-10
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Town water plant project is located in C15 standard block, standard factory construction project, the new
standard factory buildings with a total land area of 6627 square meters, total construction area of 13,200
square meters, including workshop building area of about 10,800 square meters, office building area of
2,400 square meters . After being put into an annual output of 3.8 million belt, the new output value of 41
million yuan.
The total investment is about 21.87 million yuan, including fixed assets investment: 21.87 million yuan Civil 2087; equipment 80; installation of 10; construction of 10 other charges;.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Hengda Jinbi high-rise residential construction projects the world -C
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Welcome Boulevard project is located in the south of Ukraine five road -Urumqi City - Wujiaqu City
Highway east of Baghdad Green Lake Northwest, sub A, B, C three block building, which was built for the
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
public land area C , the total floor area of 336,466.9 square meters building, including hotels, convention
and exhibition, entertainment, health centers, restaurants, business center, children's play center.
The total investment is about 2.06 billion yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Hengda Jinbi high-rise residential construction projects the world -B
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Welcome Boulevard project is located in the south of Ukraine five road -Urumqi City - Wujiaqu City
Highway east of Baghdad Green Lake Northwest, sub A, B, C three block construction, B are connected
row of building blocks residential areas, the total ground floor area of 119,018.8 square meters, a total of
145 with row of buildings.
The total investment is about 778 million.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hengda Jinbi high-rise residential construction projects the world -A
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Welcome Boulevard project is located in the south of Ukraine five road -Urumqi City - Wujiaqu City
Highway east of Baghdad Green Lake Northwest, sub A, B, C three block construction, A high-rise
residential blocks are , the total floor area of 830,940 square meters building, a total of 62 high-rise
residential buildings -1-62.
The total investment is about 3.006 billion yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Fu Jen Catholic Fu Jen Pharmaceutical Group Pharmaceutical Group Co., Ltd. headquarters
building projects
Progress stage: the record
Construction period: September 2011-September 2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Zheng open road project is located in the south east Longyang, honest and road west, Wen Hua Road,
north side, Fu Jen Catholic Fu Jen Pharmaceutical Group Pharmaceutical Group Co., Ltd. headquarters
building projects, project planning and construction land area of 103.84 acres -69,226.5 square meters,
construction area of 229,549 square meters, green area of 21,114 square meters, greening rate of 30.5%,
FAR 3.32, of which 117,632 square meters office building, 8409 square meters pharmacy service center,
comprehensive business building 21,628 square meters, office 79,830 square meters, clearing 2,050 square
meters. Project uses a new office and business concepts to create a set of the headquarters office, pharmacy
business contacts, business meetings, financial services, product exhibitions, and other offices as an
integrated group of commercial projects.
The total investment is 933.56 million yuan, of which 568.05 million yuan raised by the enterprise,
domestic bank loans to 365.51 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Fu Jen Catholic Fu Jen Biotechnology Pharmaceutical Group Co., Ltd. Garden Project
Progress stage: the record
Construction period: June 2011-December 2014
Major equipment: fermentation tank \ blender -for reference
Project:
Project is located in Zhengzhou City, the south side of Central Avenue Industrial Park Zhongmu, future
road east of Fu Jen Catholic Fu Jen Catholic Biotechnology Pharmaceutical Group Co., Ltd. Garden Project,
the project covers an area of 276 acres -183,792 m2, construction area of 204,222 square meters, green area
of 36,758 square meters, greening rate of 20%, floor area ratio 1.21, of which 68,848 square meters
workshop, office and living space 51,516 square meters service, quality, R & D and pilot floor 61,740
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
square meters, warehouse of 18,000 square meters, cold storage and wastewater treatment facilities and
other space 4118 square meters. Technology and major equipment: The project adopts advanced
fermentation and purification technology, using advanced fermentation tanks, the use of adjustable power
and speed, combined with the new blender, improve production efficiency.
The total investment is about 799,103,800 yuan, including 499.1037 million yuan raised by the
enterprise, domestic bank loans to 300 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Two Rivers Area of Chongqing Hi-Tech Industrial Park, land and water from the source of
public rental Xiangmu Area
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Beibei District, Chongqing Fuxing Town, an area of about 617,000 m2.
Rehabilitation of the land north of town, east of Yue Fu Road. The total construction area of about 617,000
m2, including residential building and supporting facilities.
The total investment is about 1.54 billion.
Owner:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Project Name: Neighborhood Center affordable housing construction projects
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Wuhan City mayor Feng Changfeng Qiaokou four groups, the total land area
51370.97m2, building area of 127475m2 -excluding basement, the main building of residential buildings,
commercial and ground, underground parking and other facilities.
The total investment is about 110 million yuan.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: composite Xiangmu
Progress stage: the record
Construction period :2011-February 07 -2012-12
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Yi Cui Road project is located in Guangzhou City, 33 commercial and residential, Guangzhou Yi Cui
Road 33 commercial and residential, construction scale 3375.31 square meters, has a seven-story main
building -part 5 level, above the first floor commercial residential, accounting for area of 2256.0 square
meters.
The total investment is about 3.672 million yuan.
Construction:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Title: Marketing and sales service network construction projects
Progress stage: the record
Construction period :2012-06 -2014-05 months
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located in Guangzhou Science City High-tech Industrial Development Zone, Rd 3, south
of the cloud, marketing and sales and service network construction, the construction scale of 640.00 square
meters, the main building re-planning of existing plant covers an area of 300.0 square meters
The total investment is about 15.95 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Longhai Kok Weng Kok Road Town, United States -Jinjiang Road to Haicang community
road works
Progress in stages: approval for the record
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, safety facilities, high-speed control, high-speed electrical and
mechanical, security facilities, elevator, boring machine, tunnel boring machines, drilling rig, mud
circulation reserve cans. -For reference
Project:
Project is located in the town of Longhai jiaomei administrative regions, road length of 5,615.297 m,
road red line width of 40 meters and 60 meters, the road grade II level for the urban main road, the design
speed of 40 km / h and 60 km / h .
The total investment is about 325,204,500 yuan, self-financing.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Stages of progress: The project proposal
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
Project is located in Gulin Gulin town, road by the old chain bridge-building laboratories to 7 km
mileage, technical grade four, the design speed of 20 km / h, subgrade width of 5.5 meters, design load
criteria: Road - Ⅱ grade.
The total investment is not detailed.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Pingyao County People's Hospital inpatient expansion building project
Progress in stages: approval for the record
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
The project is located 53 Shuguang Road, Pingyao County, construction area of 13,000 square meters.
The total investment is not detailed, and self-government funding.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: open up the road the rain four sewage pumping station project
Stages of progress: environmental impact assessment
Construction period: August 2011 -2012 in April
Major equipment: water monitoring equipment, testing equipment, analytical instruments, tires hanging,
crane, forklift, forklifts, power distribution facilities, hoist, pumps, valves, turbines, pipes, sludge thickener,
smoking mud, mixed mixer, cranes -for reference
Project:
Project is located in the Yangtze River Road and open up the northeast corner of the intersection of four
roads, south of the Yangtze River Road, west side of the road is wide open four, north of the Nankai
District Planning Board and the residents of Chung Yu F 2 # West, east of the West 1, Chung Yu #
residential buildings. Project covers an area of 3244 m2. Construction area of 636 m2. The project mainly
includes the new rain, a Combined Sewage pump station, storm water pumping station design flow of
8.0m3 / s, a sewage pumping station design flow 1.5m3 / s, including: intake wells, grill well, set pool, a
pool, a gate wells; new subsidiary of a two-story buildings, one for the rain, sewage pumping station high
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
and low voltage power distribution room, duty room; two for the sewer maintenance team; of rain, sewage
pumping stations into , the water pipes to be transformed.
The total investment is about 52,306,000 yuan, of which World Bank loans 42.168 million yuan,
10,138,000 yuan of local matching funds.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Tianjin Binhai New District, Central Business District, the Twin Towers, North Tower
Xiangmu
Stages of progress: environmental impact assessment
Construction period: 2011 -2013 also on January 8
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located in Tianjin Hi-tech Zone software and service outsourcing bases in the central
business district integrated support area, block east Haitai North Avenue, west to a / III boundary, north to
the three boundaries, south to Avenue Haitai things, the total covers an area of 183,782.7 square meters.
Total building area of 133161m2, 43-story main building on the ground, underground 3 floors, high
222.55m a grade A office space, ground floor area of about 76620m2, 3 basements -and a mezzanine floor
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
and the Central Business District Phase II with Full Basement as one of the underground construction area
is about 56541 m2.
The total investment is about 1.5 billion.
Designer:*******
Postal Address:*******
Project Name: Tianjin, Shenzhen Investment Shopping Center -Phase I project
Stages of progress: environmental impact assessment
Construction period: August 2011 In August -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Xiqing District, land west, north and south of the city roads, respectively, Friendship
Road Pro, pear dual highway, the public and Road, the east is open space. The total land area of 104929m2,
including a land area of 75338 m2, the second phase land area of 29591m2. The project mainly for the
underground floor, ground four of the commercial complex one, total building area of 161934m2. One
ground floor area 125758m2, underground 36176m2. Planning as JUSCOGMS supermarkets, business,
cinema with the completion of the project, the full year of operation, staff Dingyuan about 200 people,
traffic is expected in the 1.5-2 million / d.
The total investment is about 600 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Xi'an Jiaotong University School of Medicine, First Affiliated Hospital of research and
teaching building project
Stages of progress: environmental impact assessment -filed
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display -for reference
Project:
Project is located in Xi'an Jiaotong University, First Affiliated Hospital of Medical College Hospital
District, the northeast, the main construction contents are: research and teaching building of total floor area:
26,968.2 square meters, designed a room of 500 Congress, 120 medium-sized conference room 5, 10 - 17
of 20 meeting rooms, 19 classrooms, offices 6. Simulated operating room, laboratory, multimedia
classrooms and other training-related endoscopy space, 253 residential students. We have the 2,000 people
at a time for restaurant workers, and 73 underground parking garage.
The total investment is unknown.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Shaanxi Hotel Expansion Project
Progress stage: start construction in -EIA at the same time
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located Zhangba Road Yanta District No. 1, expansion of eighth building, conference
center and auxiliary works. Shaanxi Hotel eighth building, conference center and auxiliary total
construction area of 165,000 square meters, with a total estimated investment of 1.8 billion. Where: eighth
floor area of Building 9 million square meters, the building 17 floors above ground and underground 1
layer of the framework of the wall structure, building height of 70.50 m, estimated 9.8 billion investment, a
total of 728 rooms, which can meet the 1100 occupancy; Convention Center construction area of 65,000
square meters, the building is 4 floors, 1 underground level of the framework of the wall structure, building
height of 33.8 meters, estimated investment of 630 million yuan; Soap Creek drainage within Shaanxi
Hotel section of diversion, diversion length of 1.24 km, 045 million yuan investment estimates; auxiliary
engineering, investment estimated 145 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 1.8 billion.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Kai Tak Ming Yuan Project
Progress stage: under construction
Construction period :2011-5 to the 2014-11
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Riverside project is located in a large sand blocks -block east vertical way, all the way across the south,
west to the first bridge after the sand ramp, north to Riverside Road, Kai Tak gardens projects with a total
land area of 38,692.94 square meters, total construction area of 73070.35 square meters, of which an area
of 72,230.05 square meters of residential, commercial buildings and other premises 843.3 square meters,
the project construction funds raised by the enterprise solution.
The total investment is about 370 million yuan, including fixed assets investment: 350 million yuan Civil 14000; equipment, 2000; installation of 1000; 17,000 other costs project construction; reserve fund
1000, working capital 20 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Tianhong Real Estate Development Co., Ltd. Hengshui still have projects Tianhong
Progress stage: construction preparation
Construction period: July 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Hengshui City, Daqing Road, Yung Flower Street and the intersection of 6 +1 new
brick building 12 storey residential high-rise frame structure 17, supporting the construction of the
underground garage of a frame structure, the total construction area of 268,315 square meters.
The total investment is about 700 million yuan.
Owner:*******
Postal Address:*******
Contact person: Liu Zhiyong
Tel :*******
Project Name: Dongping Town, Foshan City Business Center project
Stages of progress: preliminary design
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Project is located in Foshan City, Guangdong Province, the core area of Dongping Town, South Avenue,
east of Rainbow Road, south of South Road, west of the text, and a road north of the margin area. The total
land area of the project planning is about 44hm2, including the net site area of about 36.9hm2, plans to
build a total construction area of approximately 495,000 square meters. This project is a municipal business
office, social services and other functions as one large building complex, construction features include
business services center, business office, senior business center, conference center, business hotel,
information services, business services, underground parking and public facilities.
The total investment is unknown.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Wuhan City invest in future technologies Ltd a construction project starting area
Progress stage: the record
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Project is located in East Lake National Innovation Model Han East, south of the High Road, east to
Outer Ring Expressway, north side close to the natural Jiufeng National Forest Park and Longshan
Mountain Reservoir. The total land area of project planning 400900m2, total construction area of
598705m2, on the ground floor area of 456042m2, underground construction area 142663m2. The main
construction contents are: Exhibition Center, R & D area, incubator, cultural industries, residential areas,
commercial areas and underground parking and other ancillary commercial projects, floor area ratio of 1.14,
greening rate of 23%.
The total investment is about 2.2 billion.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Chongqing New Real Estate Development Co., Ltd. Two Rivers Two Rivers Chongqing
International Cloud Computing Center -Phase I project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
New project land and water of two rivers in Chongqing Area, covering about 255795m2, the proposed
construction area of 379,548 square meters total, of which 306,477 square meters on the ground, including
the business office, commercial zone and five-star hotel, expert service center, exhibition halls, Cloud
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Computing Center; ground floor area of 73,071 square meters, including underground parking garage and
equipment room and so on.
The total investment is about 3.79 billion.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Dalian Changxing Island Harbor Industrial Zone West municipal infrastructure facilities
petrochemical project -Phase II
Stages of progress: environmental impact assessment
Construction period: In September 2011 -2012
Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference
Project:
The project is located West of Dalian Changxing Island Harbor Industrial Zone is located in Changxing
Petrochemical west, south west from the coastal road north of the public port to the north coast, east
industrial zone 1 # Road, west coast before Ma shallow land reclamation line. The project includes the
petrochemical Road -K0 +54.733 ~ K7 +066.276,7016.6 m and the industrial zone 1 # road extension line K0 +050 ~ K4 +090.352,4040.4 m, for the city main road, planning red line 48m, calculate traffic speed of
60km / h. And the corresponding ancillary works including bridges, drainage works, water -including
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
reclaimed water projects, lighting projects, pipeline integrated engineering, traffic engineering, road
greening works.
The total investment is about 1,050,629,400 yuan -total project investment is 404.8672 million yuan, of
which 256,960,400 yuan Ken fee.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: State oil storage depot Nanjing airport expansion project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: steel, tank, tank, pumps, valves, flow transmission, mass flow meter, level indicator, fire
facilities, a positive crane, gantry crane, tractor, crane tires, containers, loading and unloading bridge. -For
reference
Project:
Project is located in Nanjing Lukou International Airport, expansion of 5 * 10000m3 storage tanks, tank
fabrication and installation, and the supporting pipelines and self-control and so on.
The total investment is about about 58,609,600 yuan, self.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Post Code:*******
Contact:*******
Tel :*******
Progress stage: construction preparation
Construction period: July 1, 2011 -2011 on September 20
Major equipment: navigation lamps, power distribution systems, communications equipment, weather radar,
navigation systems, energy center, automatic observation system, non-voice systems, boarding bridges,
baggage sorting machine, flight displays, airport vehicles, baggage transfer vehicles , aircraft tractors,
platform lift trucks, power trucks, air vehicles, de-icing trucks, passenger lift trucks, sewage trucks,
catering vehicles, refrigerated food trucks, submersible pumps, cranes, air traffic control, very high
frequency, control, secondary radar, logo, brand, light boxes, tractors, baggage tractors -large, medium and
small aircraft, tractors, passenger elevator cars, baggage handling -delivery trucks, food trucks, garbage
trucks, garbage trucks environmentally friendly aircraft, ferry vehicles, aircraft, food trucks, aircraft
passenger elevator cars, aircraft belt car, airport emergency patrol vehicles, aircraft washing vehicles,
aviation equipment. -For reference
Project:
Project Red frontier farm in Heilongjiang Province to build concrete runway of 500 meters, the runway
safety Road works 50 meters across, the runway safety Road works on both sides of 600 meters, 30 square
meters of underground oil and ancillary refueling library facilities, materials library 50 square meters,
playing electromechanical wells and 1, 2 with drug pool, 1575 m2 apron, terminal and office of 144 square
meters.
The total investment is 7,000,000 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Project Name: Zaozhuang Public Transit Transfer Station Project and the end of the first BRT
Progress in stages: approval for the record
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, inspection ticket systems, electronic 屛, cranes, etc. -for reference only
Project:
Road project is located in Zaozhuang City, south of the bright, Dongsheng Road, east of the north side of
Changsheng Road; project land area of 60,491 square meters, total construction area of about 14,385 square
meters, of which the station house is 4765 square meters, 7720 meters consolidated dispatch center, repair
shop 1200 square meters, gas stations, room 700 ㎡; 16.1% building density, plot ratio of 0.24, bus parking
spaces: the grid 28, parking area 160. Architectural design of the project has been completed and approved.
The total investment is about about 4 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Shizuishan City Bus Terminal project Dawukou
Progress stage: has the record
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, inspection ticket systems, electronic 屛, cranes, etc. -for reference only
Project:
The project is located in Dawukou District IV Yeo Road and Industrial Park Road intersection northwest
side of the land area of 80,569 square meters, total construction area of 20,000 square meters, including: ①,
planning station house building area of 3,500 square meters -1400 square waiting hall meters, including the
VIP passenger waiting room of 200 square meters, traffic by 12,000 visitors / day dollars. ②, office space:
3,000 square meters building area, including bus terminal, bus terminals and transportation companies
office space agencies. ③, other space: 4,000 square meters of office independently; construction of
commercial buildings with 10,000 square meters.
The total investment is not detailed.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Secondary V second stage Puning
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Guangdong Province, Hong Yang Zhen Ming Puning Village, the proposed dining
room, outdoor playground, school, outdoor road and drainage and other ancillary works, including three
dining frame structure, construction area of 7056.19 square meters.
The total investment is 1732.306943 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Inner Mongolia Medical College Hospital Building renovation and expansion project for
outpatient and inpatient
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: water supply and drainage facilities, electrical facilities, lighting, ventilation, elevators,
medical equipment, electronic display. -For reference
Project:
Muslims in the project is located in Hohhot, Inner Mongolia Medical College, 1 North Street, Xinhua
channel campus, with a total construction area of about 14.5 million square meters, 1,120 beds,
construction, outpatient and emergency and inpatient departments, the Department of medical technology,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
logistics and underground parking , according to floor space, the proposed 23-25 layers -including the
ground three.
The total investment is about 3 billion.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Inner Mongolia Science and Technology Innovation Park Service construction projects
Progress stage: construction preparation
Construction period: May 2011 -2012 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Ruyi Development Zone project is located in Hohhot, the project construction area of 108,160 square
meters, 17 floors on the ground and 2 underground floors, concrete frame - shear wall structure.
The total investment is about 290 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Inner Mongolia Autonomous Region Committee of democratic authority office project
Progress stage: construction design
Construction period: July 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
New city project is located in Hohhot, Inner Mongolia Genghis Khan Avenue, south west of Overseas
Chinese Village, north of the original building materials warehouse, home to the New World to build an
office building, with single-layer high in the underground garage, with a total floor area of approximately
20,000 square meters.
The total investment is about about 1 million.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact person: Shi Qing Yuan
Tel:*******
Project Name: Mancheng Experimental High School classroom building, laboratory building and the
comprehensive building
Progress stage: construction preparation
Construction period: July 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located west of Vocational Education Center Mancheng County, Hebei Province, which
borders the south and south outer ring, four -on the ground five three, six one floor, frame structure, with a
total construction area of 24,800 square meters.
The total investment is about 29.5 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Construction of the terminal project in Zaozhuang
Progress in stages: approval for the record
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, inspection ticket systems, electronic 屛, cranes, etc. -for reference only
Project:
The project is located in Zaozhuang City, Shandong Province, Guangming Road, East District, the first
south eastern ring road west, prosperity Road north, the planned total land area: 125,883.4 square meters about 188.83 acres, total floor area of about 76,656 square meters.
The total investment is about about 5 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Fax :*******
Project Name: Marcy Road -Manan Road to West Point Road New Construction
Progress in stages: approval for the record
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, explosion-proof blankets, non-magnetic probe, inspection wells, EOD tools vest, police
equipment, mount, intelligent transportation, electronic police, capture systems, radar guns, green facilities,
fire facilities, lighting, drainage facilities, safety facilities, high-speed control, high-speed electrical and
mechanical, security facilities, elevator, boring machine, tunnel boring machines, drilling rig, mud
circulation reserve cans. -For reference
Project:
Project is located in Tianyuan District, Zhuzhou City Industrial Park, Malaysia, total length of about
1.1km, road width is 36m, according to urban trunk road design.
The total investment is about 3000 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Pedestrian Street Jishan characteristics - Fairview world projects
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: 2011 -2014
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Ring Road project is located south of Qin River Street north of North Avenue west of Handan Iron
Mountain, east of New Street Bath, 34 storey residential building 3. Two 28-story residential building,
property, community services, shopping outlets, basement, garage and other ancillary buildings. An area of
about 32.36 acres, with a total construction area of 100,460 square meters, including 78,714 square meters
of residential area, commercial area of 10442 square meters and public building; ground area of 11,304
square meters.
The total investment is 351.41 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Handan Yee Endowment Project Rehabilitation Centre
Progress stage: construction design
Construction period: July 2011 -2014 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Yongnian County, east of China Street, south water plant -in North Avenue and the
southeast corner of Ming Shan Road intersection, 28 layer -apartments integrated office 2, multi-layer
Integrated Services Building 6, guard, underground garage and other ancillary buildings. The total area of
about 200 mu, total construction area of 295,718 square meters. One area of 289,958 square meters of floor;
underground area of 5760 square meters.
The total investment is 613.02 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Kunming Jinning County Street High School Standard School moved to New Project updated
Progress stage: construction started in
Construction period: May 2011 -2013 in February
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Kunming, Yunnan shame Jinning County Xinjie three villages and Jia-Pa, an
educational development, with a total floor area of approximately 11,770 square meters, including: a fourstorey office building, two storey classroom building, two three-story student dormitory, a two-storey
dining hall.
The total investment is about 20 million yuan.
Owner:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact person: Li Yan Xing Electrical Engineer
Tel :*******
Project Name: Al Tang Yijinhuoluo County town of Outer Ring Road hot seat auxiliary Line
Progress in stages: approval for the record
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
The project is located Yijinhuoluo County town of Al-Tang hot seats, including high-speed east of Mao,
Antony line north, across Ada Gong Road. Route length of approximately 7.7km, line width of 50m, eightlane two-way Drive-scale, urban trunk road grade I level.
The total investment is not set, the government investment.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Wah Wah County Hospital and County Hospital of People's relocation project
Stages of progress: The project proposal
Construction period: June 2011 In June -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
The project is located in Yuxi, Yunnan Road, Nanjing State Town Transit Pass Village junction, a
medical development, covering about 43,956 square meters, including: Medical Building for outpatient and
inpatient departments, offices, underground car park.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 50 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Protection of Jiamusi City Centre Rangers minor relief stations project
Progress stage: construction preparation
Construction period: June 2011 -2011 in September
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Chang'an Road, No. 646, with a total construction area of 8836 square meters, of
which: Relief Protection Center 6483 m2, five-story frame structure, garage, 2352 square meters, a layer of
brick-concrete structure.
The total investment is about 20 million yuan. Source of funds for construction investment in gold.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Longquan City, Hyundai Motor Service Center -4S stores Construction
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period :2011-9 to the 2012-12
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Industrial Park project is located in Longquan City, Kwong Yuen Street, north of the sewage treatment
plant west of the block, Longquan City, Hyundai Motor Service Center -4S stores construction project,
with a total land area of 6,000 square meters, construction area of 2690 square meters, total construction
area of 5,380 square meters . Building scale is selling cars 900, used car trade 1500, while 4,000 cars after
services.
The total investment is about 20.85 million yuan, including fixed assets investment: 17.85 million yuan civil 787; equipment 496; installation of 22; 395 other costs project construction; reserve fund of 85, 300
million working capital.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Tianhong Real Estate Development Co., Ltd. Hengshui still have projects Tianhong
Progress stage: construction started in
Construction period: May 2011 -2013 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Hengshui City, Daqing Road, Yung Flower Street and the intersection, the new twostory commercial street stores, the total construction area of 22,149 square meters.
The total investment is about 75.5 million yuan.
Owner:*******
Postal Address:*******
Contact person: Liu Zhiyong
Tel :*******
Project Name: Hebei Province, three in Kowloon Garden Residential Quarter, 53 #, 57 #, 58 #, 61 #, 64 #,
78 # residential building, 77 # Building Project
Progress stage: construction preparation
Construction period: August 2011 -2012 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Xuanhua District of Zhangjiakou City project is located in Dongsheng Road north, the west side of
Chang'an Road, with a total construction area of 37261.87 square meters, including the basement -storage
area of 3747.27 square meters, the balcony area of 977.91 square meters.
The total investment is about 36 million yuan. Source: self.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Guangdong Shantou CITIC Pu River Beach Resort holiday apartment project dragon
Progress stage: construction started in
Construction period: May 2011 -2012 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Shantou, Guangdong CITIC Longhu Pu River Beach Resort, on the construction of
66 holiday apartments and a clubhouse, each with 2 to 3 layers, with a total construction area of 39318.36
square meters.
The total investment is 100,548,700 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: old City inpatient psychiatric hospital building project
Progress stage: construction started in
Construction period: March 2011 -2011 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Hani and Yi Autonomous Prefecture old city building, 35 East Road, the
construction of a five-storey hospital building, providing 200 beds, covers an area of 7,637 square meters,
total construction area of 5,968 square meters .
The total investment is about 10 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Sunshine House project in Ordos
Progress stage: construction design
Construction period: May 2011 -2012 in December
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Project is located in Erdos City, Inner Mongolia, Kang Bashi District, with a total land area of 4.3594
hectares with a total construction area of about 60,000 square meters, building height not less than 60m,
building density ≤ 25%, afforestation rate of ≥ 25%, motor vehicles per hundred square meters of
construction area not less than 0.8 parking spaces.
The total investment is about 50 million yuan.
Owner:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Fax :*******
Project Name: Dong Yue Garden Project
Stages of progress: survey and design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Longyan City, Fujian, eastern ring road east of the new Law District -Unicorn
cement a, the planned land area of approximately 44,714.7 square meters, total construction area of about
196,501 square meters -of which approximately 156,501 square meters on the ground, underground 40000
square meters.
The total investment is 572.66 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Badong County Detention Center, the Public Security Bureau detention center construction
project in Badong County
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, barricades machine. -For reference
Project:
Shennongxi project area is located in Badong County in Hubei Province, with a total floor area of
11,757.72 square meters.
The total investment is about 29.84 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Internal Medicine Hospital of Chongqing City Building Project -update
Progress stage: construction design
Construction period: September 2011 In December -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in Fengshan district Dianjiang County of Chongqing, the construction of a 17-storey
medical building, with a three-storey basement, with a total construction area of 32,000 square meters.
The total investment is about 60 million yuan.
Owner:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Chongqing Green Island Public Service District Building 2 project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
New projects are located in the core area of Chongqing Green Island, on the ground floor, underground
parking, air defense, and emergency facilities, total construction area of 45100.27 square meters, ground
floor building area of 31,330.27 square meters 9 and 2 underground floors building area of 13920 square
meters.
The total investment is about 80 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Jiangyin Jin Meilin Properties Limited real estate project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Changzhou City, Jiangsu Province, east sector, Qi road south west of Hengtong
Textile Co., Ltd., the total land area of 97,551 square meters. The total floor area of approximately
175,591.8 square meters.
The total investment is about 6 billion.
Construction:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Transport Group Co., Ltd. Handan standardized vegetable market project
Progress stage: construction started in
Construction period: May 2011 -2012 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project forward Avenue North in the urban areas -forward Avenue west, Ridge Road, east of the south
planning, a multi-standard markets, office space and other supporting buildings. Covering about 14 acres
and a building area of 7415 square meters.
The total invested 800 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Xuzhou City East Middle School Project -updated
Progress stage: construction started in
Construction period: April 2011 -2012 in March
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Xuzhou, Jiangsu Province Economic Development Zone, a high-to six-story
development of education, with a total construction area of about 34,000 square meters, including: teaching
buildings, laboratory buildings, office buildings, canteens, dormitories, playground, school hall.
The total investment is about 50 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Design unit: Jiangsu Sheng Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design unit: Jiangsu Sheng Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design unit: Jiangsu Sheng Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design unit: Jiangsu Sheng Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: County # 106, Grand International Hot Springs apartment project health
Progress stage: construction preparation
Construction period: May 2011 -2012 in September
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Xiong County, Hebei County Xiong Zhou Road, east of the west of Tai Road, Hou
Street, north of the twin building area of 12,269.79 square meters.
The total investment is about 15 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Progress stage: construction preparation
Construction period: May 2011 -2012 in September
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Xiong County, Hebei County Xiong Zhou Road, east of Tai Road, west of the
double-Hou Avenue north of 105 # health area of 12,616.32 square meters apartment building, structure,
type of wall structure, floor 12 floors above ground and underground Layer 1; 107 # floor area of 12,616.32
square meters apartment health, structure, type of wall structure, floor 12 floors above ground and 1
underground floor, total floor area of 25,232.64 square meters.
The total investment is about 30 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage power distribution equipment, steel structure. -For
reference
Project:
Project is located in Xinxiang, Henan Province, Xinxiang County, seven miles 营镇 industry clusters,
with a total construction area of 6774.50 square meters, the base area of 6335.57 square meters.
The total investment is unknown.
Owner:*******
Postal Address:*******
Tel:*******
Project Name: Xiamen Municipal Construction and Development Corporation Xiang'an East Metro Phase
II Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Xiamen, Fujian Xiang'an TOWN, the project consists of six, 1 # ~ 6 # F, structure
types: frame-wall structure. 1-1 # 1-1-2 # 3 # 4 # 1-1-1-6 # 5 # 18 story residential building on the ground
floor, ground level basement for the; the outdoor part of the construction above ground level height of
about 51.800m.
The total investment is about 250 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Vocational and Technical College Technology Building Luliang construction projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of Lake Road, South Road, north of planning, South View Avenue, south side
of the scale of construction 9298.2m2.
The total investment is about 20.45 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Economic and Trade Co., Ltd. Xingtai Xingtai Yuen Shing Hing of frozen fruit and
vegetable processing project
Progress stage: construction design
Construction period: June 2011 -2012 in January
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Yan Jia Zhunzhen project is located in Xingtai County, 107 North State Road section of the north side of
the king, the project covers an area of 5.25 mu, total construction area of 3425 square meters, including
cold storage 2,250 square meters, warehouse of 300 square meters, 300 square meters processing workshop
cleaning, office life of 500 square meters, door post and auxiliary buildings of 90 square meters. Fresh
Fruits and Vegetables designed scale of 1,000 tons, frozen 500 tons.
The total investment is about 10.02 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Guizhou Province in the first place • Real Estate Development Co., Ltd. The first phase of
the project Lan County
Progress stage: construction design
Construction period: 2011 -2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Orange Mountain, Xingyi City, Guizhou, Office of Civil Aviation Boulevard Street Osmanthus Hotel opposite, with a total land area of 300 acres, the first to project a • Lan County land area
of about 5 million square meters. Volume rate of 1.18, green rate> 40%. Ground floor area of about 70,000
square meters, housing about 272 households.
The total investment is not detailed. Sources of funding and implementation of the project: self-financing.
Construction unit:*******
Contact:*******
Tel :*******
Project Name: Guangxi Museum of Natural Resource Project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Nanning City, Feng Ling Road, with a total land area of 12,601.94 square meters collectively 18.9029 acres, total construction area of about 9500m2.
The total investment is about 90 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: Fengyang County road projects in the capital of South
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference
Project:
Project is located Yufeng Yang County, road length of 4530.17 meters, road red line width of 50 m and a
design width of 60 meters.
The total investment is about 7,500 yuan. Source: The Government's financial capital.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Fenghuang County High School Relocation Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The project is located in Fenghuang County in Hunan River Road embankment Tuojiang Town, with a
total construction area of 36417.17 square meters, total investment of 47,647,000 yuan, a total of five,
which gives an experimental building 9530.35 square meters, five-story, hand-dug pile; teaching building
7361.16 m, five layer, independent column; 1 # dormitory 6573.90 square meters, the ground seven, ground
floor, hand-dug pile; 2 # dormitory 7935.58 square meters, seven, strip foundation; canteen 5016.48 square
meters, four, independent column.
The total investment is about 47,647,000 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Phoenix City Qingchengzi Accord Town Court, the state-owned mining shanty town, the
gardener building projects
Progress stage: construction started in
Construction period: May 2011 -2011 in September
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the town of Phoenix City Qingchengzi, the first tenders: Phoenix City Qingchengzi
Town Court, the state-owned mining shanty town Accord Building A, # 1-6, Building Area: 19,348 square
meters, the framework of six. The second section: Phoenix City Qingchengzi Town Court, the state-owned
mining shanty town Accord 1,2 B, F #, C #, District D, 1,2 F, Building Area: 19,245 square meters, the
framework of six. Third tenders: Phoenix City Qingchengzi Town House, the state-owned mining shanty
town gardener 1,2 # F, Building Area: 14,684 square meters, the framework of six. Total construction area
of 53,277 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 50 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Feng Ning Tianze Garden -personnel home community project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the town of Fengning Autonomous County Court, Zhen Feng Road West, 1 #: 7200
square meters, brick-concrete structure 6 layers; 2 #, 3 #: 5750 square meters, brick layer 6.
The total investment is about 13 million yuan. Sources of funding and total investment: self.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Ordos Kang Bashi New Fourth Middle School Project
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Erdos City, Kang Bashi District, total construction area of 31847.77m2, including:
ground 29352.21m2, underground 2495.56m2.
The total investment is about 2,000 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Ordos Kang Bashi District VI Secondary School Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Erdos City, Kang Bashi District, total construction area of 31088m2, of which the
ground 29492m2, underground 1596m2.
The total investment is about 100 million yuan. Sources: government funds.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: School Sixth New Kang Bashi Ordos Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Erdos City, Kang Bashi District, total construction area of 28590 m2, in which the
ground 24130 m2, ground 4460 m2.
The total investment is about 2,000 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Dongsheng District of Erdos Xin Yi Garden Phase II project housing project intelligence
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Dongsheng District of Erdos City project is located, the total floor area of approximately 56,000 square
meters of intelligent engineering.
The total investment is not detailed. Sources: government funds.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Hengtai Trade City B, 1 #, 2 # Building Project
Progress stage: construction started in
Construction period: April 2011 -2011 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Inner Mongolia, Manchuria City Zhalai Knoll District, the new two six-story
residential complex building, floor and part of the second floor for commercial space, others are residential,
with a total floor area of 16,124.98 square meters.
The total investment is unknown.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Progress stage: has the record
Construction period: 2011 -2012
Major equipment: single radar head, air traffic control equipment, integrated display system, the batteryline detection system, power supply, lightning protection grounding, fire, equipment such as cable. -For
reference
Project:
The project is located in Dalian Airport, the new air traffic control business space 2490 square meters,
and the scene of a surveillance radar, supporting construction of water supply and drainage, electricity,
roads and other ancillary facilities.
Not available total investment, civil aviation development funds.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: North Mountain Area Zhungeer Xue bay three municipal road and pipe network
construction
Progress stage: has the record
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
The project is located Zhungeer Xue bay, the road length of 5545.2 meters.
The total investment is not detailed.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: the city is the county building in Seoul Style Centre, the National Fitness building project
Progress stage: construction preparation
Construction period: June 2011 In June -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Hebei Province, the city is the county site of the original stadium, two -on the floor
five, six a partial, on the ground four a framework, masonry structure; total construction area of 9331.89
square meters.
The total investment is unknown.
Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Friendship century gardens Linxia City Residential Phase
Progress stage: construction started in
Construction period: March 2011 -2013 in June
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of Hui Bin Road, the construction of three 33-storey commercial and
residential, each with a two-storey basement with a total construction area of 79,448 square meters.
The total investment is about 80 million yuan.
Construction Unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Construction unit:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: mechanical and electrical products logistics functional area standard factory construction
project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
systems, lightning protection systems, low voltage power distribution equipment, steel structure. -For
reference
Project:
Project is located in Kunming Export Processing Zone A4-2-1, A4-2-2 block, the total area of 79,428.66
square meters, construction area of about 154,229.72 square meters.
The total investment is about 3 billion.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Kunming Wuhua three squadrons fire brigade and fire station construction project -updated
Stages of progress: preliminary design
Construction period: September 2011 -2012 in June
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Ring Road project is located in Kunming, Yunnan, Wuhua black forest shop street self-defense, the
Office of Community Residents Unit of the sea sources, a comprehensive development, with a total floor
area of approximately 6,366 square meters, including: business office space, training ground.
The total investment is about 20 million yuan.
Owner:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel :*******
Project Name: North Morning Garden District, the second phase of public rental housing projects
Progress stage: the record
Construction period: July 2011 In October -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Hebi City Development Project is located north of Wei River Road, Penglai Road, west side, the North
Garden area the morning, the second phase of public rental housing projects, North Morningside Garden
district 14 #, 15 #, 22 # Building, with a total land area of aboutConstruction of public rental housing, 300
units, each about 60 square meters, building height of 22 meters, a total of six, 26.39% building density,
plot ratio 1.5, 35% green, because the area near the industrial park north of the city e good rental market is
expected to .
The total investment is about 22.5 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Lu Shun Trading Company Pingdingshan Storage Project
Progress stage: the record
Construction period: May 2011 -2011 in December
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: 1.5 to 3 tons of gasoline and diesel forklifts and dry rechargeable battery forklift, flatbed
truck push, push hydraulic car and take a car, computer, platform balances, etc. -for reference only
Project:
Project is located in the western part of Pingdingshan Ping Road northbound, Pingdingshan Lu Shun
Trading Company warehouse construction project, the project covers an area of 15 mu, building area of
10,600 square meters. Construction of large libraries, small libraries, working library, the dispatch center,
testing room and ancillary rooms, facilities. Process: acceptance of procurement → → storage → sales.
Major equipment from 1.5 to 3 tons of gasoline and diesel forklifts and dry rechargeable battery forklift,
flatbed truck push, push hydraulic car and take a car, computer, platform balances and so on. Projects to
warehouse leases, operating mainly agricultural products, can be arranged after the completion of nearly 30
jobs.
The total investment is about 18 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Qinyang City People's Hospital ward building new projects in different places
Progress in stages: approval for the record
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Wye House project is located in West Qinyang habitable Road intersection with the southeast corner of 1
floor underground 15 floors, frame structure, construction area of 50,000 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is not detailed.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Progress stage: construction design
Construction period: July 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Wuxi, Jiangsu Jiangyin Flower Road South, North Tide Road West, a high-to
five-story development of education, covering about 70,555 square meters, total construction area of about
40,000 square meters, with single basement including: teaching buildings, office buildings, sports, arts hall,
student hostels.
The total investment is about 85 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Meyer Real Estate Development Co., Ltd. Jiangsu International City Project
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Danyang City, Jiangsu Province Road Development Zone, Yuquan Road and the
junction of the total residential floor area: 125,000 m2 -min two tenders, in which the ground floor area of
104,300 m2, ground floor area of 20,800 m2 -excluding pile based engineering; frame structure, five 18storey, two 26-storey; field leveled the area has been completed.
The total investment is not detailed.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Jizhou City in the capital of 1 #, 2 #, 3 #, 5 #, 7 # residential buildings and commercial
outlets along the street project
Progress stage: construction preparation
Construction period: June 2011 -2012 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located Arable Road and Hing Wah Street, the letter are the intersection, with a total
construction area of 74861.3 square meters, are the wall structure, in which a # floor building area:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
13,315.53 square meters, underground 1 layer, ground layer 21/23, Main Podium Level 2; 2 # Building
floor area: 13,263.89 square meters, underground 1 layer, ground layer 23/25, 2 main podium on the
ground floor; 3 # Building floor area: 13,924.55 square meters, underground 1 layer, ground layer 23/25
The main building 2 layer skirt on the ground; 5 # Building floor area: 14,997.82 square meters,
underground 1 layer, ground layer 25/27, 2 main podium on the ground floor; 7 # Building floor area:
19,359.51 square meters, underground 1 layer, ground layer 27 The main building 2 layer skirt on the
ground; independent business on the ground floors, floor area of 963.4 square meters.
The total investment is about 144 million. Construction financing: self.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Meilong Garden South Garden Real Estate Development Project
Progress stage: the record
Construction period :2011-7 to the 2013-7
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Xiao-Mei Town villa project is located in the north block Shu Hing, Meilong Garden Nanyuan real estate
development projects, in obtaining land use right Xiao Shu Shu Mei Hing town north of block -state-owned
land Contract Number: 3305232010A21414 implementation of the Garden Meilong Nanyuan real estate
development projects, mainly the construction of commercial, residential buildings, and supporting the road
and greening projects. The total building area of 17,806.5 square meters, with a total land area of 12,835.3
square meters, of which the road with a sign area of 964.01 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 68 million yuan, including fixed assets investment: 61 million yuan -Civil
3200; equipment 500; installation of 300; other costs construction 1800; reserve fund of 300, interest of
construction period 200 million, 500 million working capital.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Municipal Water Sports Centre Jizhou base project -clean water Bay Hotel interior
decoration project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of Jizhou City, North Port market, the construction scale: 21,000 square
meters.
The total investment is about 40 million yuan. Construction financing: self.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Comprehensive Building Hulunbeier Power Administration and Training Centre Production
Engineering
Progress stage: construction preparation
Construction period: May 2011 -2012 in July
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
New project in Inner Mongolia Hulunbeir Hulunbeier Road, east of the Kowloon Street north of
planning, planning eight west, producing comprehensive building of 36,000 square meters, the training
center of 3,900 square meters.
The total investment is about 100 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Red Mile Island Chinese Medicine Hospital Relocation Project
Progress stage: construction design
Construction period: July 2011 In June -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Hani and Yi Autonomous Prefecture Mile north of the village grain Mi Yang Zhen
Wong, a medical development, with a total floor area of approximately 13,240 square meters, including:
outpatient and emergency department, inpatient, medical technology Building.
The total investment is about 15 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Hebei Xin Bridge Park Community Real Estate Baixiang Phase
Progress stage: construction preparation
Construction period: May 2011 -2012 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of the Yangtze River Road, Hebei Wuqiao County -formerly Mega Flour
hospital, a new residential building, building area of 5,200 square meters.
The total investment is about 10 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hebei Province, Beijing, Shanghai R & D energy-saving lamps integrated plant engineering
Progress stage: construction preparation
Construction period: June 2011 In June -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage power distribution equipment, steel structure. -For
reference
Project:
King Sau Street project is located west of Baoding, south of entrepreneurship, with a total construction
area of 21,089 square meters, 4 floors, basement, frame structure.
The total investment is about 30 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Hebei Hengshui Laobaigan Wine Company Limited General Office Building
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Hengshui City Economic Development Zone, Zhenhua Road, west of the
northbound; New Rd north, with a total construction area of 17513.25m2, on the ground 12 floors, 1
basement, frame shear wall structure.
The total investment is unknown.
Owner:*******
Postal address:*******
Contact:*******
Tel :*******
Project Name: Guiyang Huaxi Rural Cooperative Bank office building project
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Huaxi District, Guiyang Office of the cloud of your building the village, the
construction of a 11-storey office building, with a three-storey basement, with a total construction area of
45,000 square meters.
The total investment is about 50 million yuan.
Construction Unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel:*******
Project Name: Real Estate Development Co., Ltd of Zhangjiakou City, New Sanyo Town, Taiwan Taiwan
Mall Project II
Progress stage: construction started in
Construction period: May 2011 -2013 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Hebei Province, south of Zhangbei two sets of the town of credit unions, commercial
and residential building nine new brick structure, with a total floor area of 11,178.8 square meters,
including building area of 3125 square meters of residential and commercial building area of 8053.8 square
meters, supporting construction of water , electricity, heating, drainage and other green road and hospital
projects sclerosis.
The total investment is about 28.87 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Municipal Water Sports Centre Jizhou base project -clean water Bay Hotel secondary
structure and exterior decoration projects
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of Jizhou City, North Port market, the construction scale: 21,000 square
meters.
The total investment is about 30 million yuan. Construction financing: self.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Heilongjiang Provincial Vocational Education Center School Building Project
Progress stage: construction started in
Construction period: May 2011 -2011 in September
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Castle Peak Road, East Wudalianchi City, five Thistle Street South, Building 1,
Base: 2282.66 square meters, 2 base floor: 1956.16 square meters, the school building: 4,839.28 square
meters, the training building: 4,009.50 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 24.32 million yuan. Construction funds from the government investment.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: long-Fu Fengzhen City area residential buildings, shopping malls project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Project in Inner Mongolia Meteorological Bureau Fengzhen City Xinfeng Street, South Fujian district
hospital for a long time, building area of approximately 49,601 square meters and ancillary projects. 36 #
floor area of 8134 square meters building, 37 # Building construction area of 7492 square meters, 39 #
floor area of 11,174 square meters building, 38 # Building construction area of 6627 square meters, 40 #
building area of 11,174 square meters building, 41 # Building construction area of 5,000 square meters of
Jian construction.
The total investment is about 40 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: International School project in Dehong Mans
Progress stage: construction preparation
Construction period: July 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Yunnan Province Luxi City Dehong Autonomous Prefecture Sports Center,
west side, when the road width, north of 320 national highway, an educational development, covering about
130,400 square meters, total construction area of approximately 72, 000 square meters, including: a
teaching building, a library and administrative offices, a laboratory building, two student dormitory, a
student activity center, a student canteen.
The total investment is about 80 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: North Peak Xing Xia U.S. Area Project
Progress stage: Design
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Quanzhou, Fujian Feng Xia U.S. Northern Area, the project total approximately
307.6 acres of land.
The total investment is about 800 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Wanquan Jiayuan Residential Residential Building B, Phase II
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Inner Mongolia Baotou Rare Earth High-tech Zone off Avenue south of
Riverside District, Chaoyang Road, west of the total area of 106,830 square meters. Residential
construction area of 86,000 square meters -including the 11-story low-rent housing 23,127.5 square meters,
6th floor brick residential 62,872.5 square meters, public buildings construction area of 20,830 square
meters.
The total investment is about about 1 million.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Right Banner header ditch soil relocation of the door central school new project -update
Progress stage: construction preparation
Construction period: June 2011 In June -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Baotou, Inner Mongolia soil Right Banner Sala Qi State Road 110, New Town,
north east of the village fire panel, the highway connecting the western line, an educational development,
with a total floor area of approximately 18,000 square meters, including: teaching complex , dormitory,
dining hall.
The total investment is about 22 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Town of the original County Kangrui Jia Garden residential district 4, 5, Residential
Building
Progress stage: construction started in
Construction period: May 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the former county town of West Gansu 3, two six-story brick building area of
10,646.76 square meters.
The total investment is about 11 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Transport Group Co., Ltd. Handan million new joint storage project
Progress stage: construction design
Construction period: July 2011 In July -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Renaissance Zone project is located in Handan forward Avenue west, Ridge Road, east of the south
planning, a 4 floors have warehouse, office space, parking and other ancillary facilities, with a total
construction area of 21,904 square meters.
The total investment is about 92 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Zhangzhou Teachers College graduate student housing project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Zhangzhou, Fujian Normal University campus, this project is second-class high-rise
residential buildings, 11 floors high, total building height of 34.8 meters, outdoor fire water for the 25S / L,
one for the parking garage and ancillary buildings, two to Ten floor for the apartment. The total
construction area of about 6,000 square meters.
The total investment is about 17.88 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Fax :*******
Project Name: Technology Square project in Yantai Hi-tech Zone
Progress stage: construction design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Venture Building Project is located in the south, with a total land area of 59,000 square meters, total
construction area of 74211.8 square meters, of which ground floor area of 8435.8 square meters,
construction area of 65,776 square meters underground. 2 underground floors, ground floor, the square
building.
The total investment is about 200 million.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: China People's Insurance Company in Tangshan City, the new branch office building project
Progress stage: construction design
Construction period: July 2011 In October -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Tangshan City, 60 West Road, the main building of office space, including ground
floor area of 4554 square meters, construction area of 1,735 square meters underground. Covers an area of
3175 square meters, total construction area of 6289 square meters.
The total investment is about 16 million yuan.
Construction:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Economic and Trade Co., Ltd. Cizhou Cixian Zhongcheng Cultural Tourism Development
Company Cizhou cultural and creative industry park projects
Progress stage: construction started in
Construction period: May 2011 -2014 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located 3 km northwest of Cixian county may overflow Spring Lake at the east side of the
lake eight functional areas and other projects, covering about 300 acres, with a total construction area of
48,571 square meters.
The total investment is about 1.1002 billion yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Vanguard Trading Company Ningjin County Phoenix good commercial center construction
project
Progress stage: construction design
Construction period: July 2011 -2013 in February
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
West Tian project is located in Ningjin County 7, the new shopping malls, pedestrian street shops,
shopping malls office, warehouse, parking and ancillary buildings and facilities 98,000 square meters.
The total investment is about 267 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Golden Age style Jinhui Xiaoyi City construction projects of residential A zone
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of Shanxi Zhenxing Street, New Village, north of the village, the
construction scale 42000m2.
The total investment is about 86 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Tibetan Nagqu County People's Court Nagqu construction business premises
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project area is located in Naqu Nagqu County People's Court trial of business houses and ancillary
facilities, building area of 6987.62 square meters, the base area of 1446.15 square meters, the framework
structure.
The total investment is about 10 million yuan.
Owner:*******
Postal address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Tibet Doilungdêgên County Health Center Construction
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in Lhasa, Tibet Autonomous Region Doilungdeqen County, the construction scale of
5413.76 square meters. The project is divided into three tenders: the first out-patient medical technology
Building Lot 2,850.56 square meters; the second section integrated ward, corridor, mortuary, engine room,
canteen and hostels, guard duty room, central vacuum and central oxygen chamber -civil engineering Total
2563.11 square meters; the third Section of the overall outdoor roads, drainage, lighting, fences, gates and
all the contents of green and other design drawings.
The total investment is unknown.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Hebei Province, three in Kowloon Garden Residential Quarter, 50 #, 54 #, 60 #, 62 #, 63 #
residential building projects
Progress stage: construction preparation
Construction period: August 2011 -2012 in October
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Xuanhua District of Zhangjiakou City project is located in Dongsheng Road north, the west side of
Chang'an Road, with a total construction area of 23467.14 square meters, including the basement -storage
area of 3290.17 square meters, the balcony area of 568.49 square meters.
The total investment is about 22.08 million yuan. Source: self.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Wuhan Optical Valley biomedical industry park of public rental housing and supporting
facilities construction projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located north pier of God Road, south of High Road, west of Coral Road, east of Long Hill
Road, with a total floor area of 20,356.9 square meters, of which: C1 Building floor area of 16,087.4 square
meters, ground floor area of 2312 square meters, Building an area of 1957.5 square meters C2, C3-C9
Building: The total construction area of 33744.7 square meters, of which: C3 Building floor area of
4891.75 square meters, ground floor area of 6195.2 square meters, C4 Building 4,670.45 m2, C5 Building
3,901.47 m2, C6 Building 3,901.47 m2, C7 building floor area of 3534.57 square meters, ground floor area
of 2533.4 square meters, C8, Building 3,503.78 m2, C9 building 612.61 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 85 million yuan.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Pine Valley Construction Project Utopia group B
Progress stage: construction preparation
Construction period: May 2011 -2011 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of Changchun Road B, West Ring Road, west of the total building area of
70,086.14 square meters.
The total investment is 167.02 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Construction period: June 2011 In June -2012
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage power distribution equipment, steel structure. -For
reference
Project:
Project is located in Baoding King Sau Street, west of the south building area of business and number of
layers: The total construction area of 21,089 square meters, 4 floors, basement, structure types: frame
structure.
The total investment is about 30 million yuan. Building self-funding.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Taiyuan Central Hospital Building Construction Logistics
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in East Jiefang Road, Taiyuan, Shanxi Province No. 1, Lane three, construction area of
6225 square meters, five-story steel structure.
The total investment is about 16 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Xianfeng power company electrical power management works
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Xianfeng Dam project is located in New City in Hubei Province -behind County District Disaster Relief
Reserve Center, the framework of thirteen floor, basement, building area of 11,000 square meters.
The total investment is about 25 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Vocational and Technical College Luliang houses the administrative operations of
construction projects
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of Lake Road, South Road, north of planning, South View Avenue, south side
of the scale of construction 14553.28m2.
The total investment is about 32.01 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Welfare and the county social welfare centers and canteens project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located and the county hospital south of glory, the framework of three floors with an area
of about 5780m2.
The total investment is about about 800 million. Source: Financial supply.
Construction unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Town, Yuhang District, Hangzhou Qiaosi social harmony and economic integration Village
1 # 2 # standard factory project workshop
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Yuhang District of Hangzhou City, Zhejiang Province town of Harmony Village
Qiaosi joint economic community, building area 18300.91m2.
The total investment is about 11.5 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Hainan Nan Bright light • High Estates Limited South West Bay
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of Binhai Road, Haikou, Hainan, No. 163, covers an area of 110,644 square
meters. Construction scale is 56 2-5 layers, basement 1 -1 basement, with a total construction area of about
99,991 square meters -of which the floor area of 55,212 square meters, ground floor area of 44,779 square
meters, engineering & installation cost is 202,574,257.12 yuan.
The total investment is 202.57 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Guangzhou-Zhuhai municipal urban rail station supporting projects Tangjiawan
Stages of progress: survey and design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, etc. -for reference only
Project:
The project is located east of Jinfeng Road, Zhuhai City Tang, Jin Tang Road, south of the southeast to
the phase with the Lakewood golf course, bus terminal building area of about 9,000 square meters; taxi 30
temporary parking spaces, station area of 2,500 square meters ; public parking -owned vehicles market area
of 27,500 square meters, 770 parking spaces; bus parking lot area of 10,000 square meters, 24 parking
spaces; non-motor vehicle parking spaces 400; bicycle parking spots 10. Central Station Road and Station
Road, Station Road, Central, full 503M, wide-18M; Station Road full 268M, wide 13.5M; cross Jinfeng
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Road bridge, size 25M × 18M; two-story service building, building area of about 2000 square meters. In
addition, the region also includes the field of green landscape, lighting, safety supervision facilities.
The total investment is about 48.63 million yuan.
Owner:*******
Post Code:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Xingtai Xingtai Xing Xing Industry Logistics Co., Ltd. through the cold chain logistics
industry
Progress stage: construction started in
Construction period: April 2011 -2014 in June
Major equipment: installation of refrigeration, handling, transportation and other equipment 3372 sets. -For
reference
Project:
I wish the project is located in Xingtai County home towns Wang Tuncun East, the project covers an
area of 20 hectares, to build a comprehensive logistics, Tower 2, large cold storage 5, three large
warehouses, large agricultural fair Block 1, a large parking lot 3, and supporting facilities. Reserves of
80,000 tons of agricultural products, the annual throughput of 240 million tons.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 1,107,270,000 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Building project in Ganzhou City Design
Progress stage: construction preparation
Construction period: June 2011 -2012 in April
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Ganzhou City of Jiangxi Chapter south of River Road, New City and
rejuvenating G1 block, a total construction area of about 16,000 square meters, ground floor, the groundfifth floor -where the second floor podium.
The total investment is about 25 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Project Name: Gansu Bi Hui Heights residential building 9 #, 11 # Building Project
Progress stage: construction started in
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: April 2011 In April -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Xifeng Anding Dong Road, 400, 9 #, 11 # residential buildings, two sixteen frame
structure, construction area of 14257.98 square meters.
The total investment is about 24 million yuan. Source: selfConstruction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Fushun City Hotel demolition project
Progress stage: construction preparation
Construction period: May 2011 -2011 in June
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Ask the project area is located in Fushun City, the demolition area: 20,719 square meters.
The total investment is not detailed. Source: top-work material.
Construction unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel:*******
Project Name: Phoenix Hill -Yantai Laishan Miaohou transformation of old village project -C Zone
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Laishan Miaohou Village project is located in the northern part of the total floor area of approximately
205,000 square meters building structure as a framework knot.
The total investment is about 205 million yuan. Source: self-financing
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Project Name: Ordos Kang Bashi District Social Welfare Centre Project
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Erdos City, Kang Bashi District, total construction area of about 33896m2.
The total investment is about 100 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: First Hospital of Qiqihar City, South Campus project -update
Stages of progress: engineering design
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in Qiqihar City, Heilongjiang Province, with a total construction area of 210,000
square meters.
The total investment is about 9.8 billion.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Design by: Shanghai Institute of Architectural Design Co., Ltd.
Postal Address:*******
Contact:*******
Phone :*******
Fax :*******
Design by: Shanghai Institute of Architectural Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design by: Shanghai Institute of Architectural Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design by: Shanghai Institute of Architectural Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design by: Shanghai Institute of Architectural Design Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Chen Dongshan County, West Line -County Road X541 Western Po to the house before the
road reconstruction project -update
Progress stage: feasibility study being prepared
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, security facilities. -For
reference
Project:
Project is located in Zhangzhou City, Fujian Dongshan County, the proposed standards by secondary
roads -main roads and city-level function Ⅱ, total length of 16.44 km, by 50 meters wide control
embankment, road width of 22.5 meters, two-way 6 lanes, asphalt concrete pavement.
The total investment is about 227 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Project Manager: Sun family
Tel :*******
Fax :*******
Project Name: Neiqiu County Thermal Limited use of industrial waste heat heating project implementation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction started in
Construction period: May 2011 -2012 in December
Major equipment: pipes, valves, automatic control systems, instrumentation, boilers, meters, coolers,
chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels. -For reference
Project:
The project is located within the hill county area, construction area of 12,000 square meters, the first stop
of a base building heating facilities, pipeline 25km, modified pump station 36, the new pump station 24.
Heating area of 400 square meters.
The total investment is 378.97 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Guiyang Huaxi Medical College New Campus Construction Project
Progress stage: construction started in
Construction period: April 30, 2011 -2013 years
Major equipment: building materials, wall decoration materials, glass doors and windows, sanitary ware,
elevators, cranes, waterproof anti-corrosion materials, paint, valve components, ceramic products,
instruments, water supply and drainage systems, fire systems, pipe fittings, water supply equipment,
outdoor drainage, building electrical, lighting, low voltage electrical appliances, wire and cable, weak
systems, lightning protection systems, low voltage distribution cabinet. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Huaxi District, Guiyang City, the party gathering area Wuxiang a university west of
the land, land planning and construction of more than 1,500 acres, at present, the project leveling
Construction has already started. Project implemented in three phases.
The total investment is about 1.5 billion.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: East County East County Department of Education School Construction Project In the third
experiment
Progress stage: construction started in
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in East County, a bid of: construction area is about 5057 square meters, the frame
structure, four, two tenders: construction area is about 6271 square meters frame structure, four, three
tenders: construction area is about 1661 square meters, the frame structure, three.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is not detailed.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Danyang Economic Development Zone, Central Primary school buildings, sports, arts
building projects
Progress stage: construction preparation
Construction period: June 2011 -2012 in January
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Danyang Economic Development Zone, construction area of about 13,655 square
meters, of which the ground floor area of about 11,355 square meters, underground garage floor area of
approximately 2,300 square meters.
The total investment is about 3000 yuan. Projects to be financed from government grants, has been
implemented.
Owner:*******
Contact:*******
Tel:*******
Project Name: Integrity Group, Chengdu hotel project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Jinjiang River in Chengdu, Sichuan Road Area To the people, north of Jinjiang, East
China To the south, planning and construction of net land area of 4616.9 square meters, total building area
of 28,313.98 square meters, floor area ratio recorded in the construction area of 17204.33 square meters,
ground floor area of 11,103.04 square meters. Volume rate of 3.73.
The total investment is not detailed.
Owner:*******
Contact:*******
Tel :*******
Owner:*******
Contact:*******
Tel :*******
Project Name: Qinghe County Qing City Investment Co., Ltd. Celestica International Hotel Project
Progress stage: construction design
Construction period: July 2011 -2014 in May
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The project is located west of Taihang Road, Qinghe County, south side of the Xiangjiang River Street,
Minshan Road, east of building 1 basement floor 17 floors building a high-rise building, 4th floor podium,
an area of 31,663.87 square meters, total construction area of 35,000 square meters.
The total investment is about 200 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Chengdu Shuangliu International Airport Company Limited and sports activities center
project staff
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located in Chengdu, Sichuan Shuangliu International Airport, construction scale of about
11059m2.
The total investment is not detailed.
Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Construction of Daqing City, Dongcheng heat
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: pipes, valves, automatic control systems, instruments, boiler, meters. -For reference
Project:
Project is located in Daqing City Longfeng District, the site located south of dragon and phoenix power
plant, refinery west of dragon and phoenix, the project covers an area of 4.12 hectares, construction area of
30,000 square meters. 6 sets of heat build scale 70MW chain grate boiler, heating network maximum
diameter DN1000, heating radius of 9160 meters, heating area of 800 square meters. Construction of a
scale of 4 70 MW hot water boiler, heating area of 3,560,000 square meters, the second phase construction
of 2 sets of 70MW hot water boiler, fuel type II bituminous coal used, the amount of 25 million tons of coal.
Dragon and phoenix power plant has been built using the original heating pipe network and 28 heat
exchange stations, and new heat exchange station 5, the new heating pipeline DN700 5200 meters.
The total investment is 295.76 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Design unit: Heilongjiang Provincial Environmental Protection Science Research Institute -EIA agencies
Mailing address: Harbin Taiping South Road, 356 directly
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Nanning Economic and Technological Development Zone, standard factory construction
project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Nanning Economic and Technological Development Zone, the project includes
construction of three blocks, one block as one in five road extension line south, then cross-Li Road, west
side of the block, the block in the planning of the State Second Avenue South, Kai side, the planned crossHepu Road, east block, three plots in the planning Kay Road south of the country, planning the Golden Rd
east of the west side of Qinzhou Road, planning, planning of the kaolinite Road north cross plots. The total
land area: 366000m2 -of which: land one occupies 10000m2; Block II area of 38000m2; Block III area
318000m2, total construction area: 531080 m2 -of which: land of a construction area of 20680m2; Block II
building area of 79680m2; land area of the three buildings 430720m2.
The total investment is 654,456,700 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Kunming, the main drainage network improvement project west of films -outside the Second
Ring Road, Xishan District, sub-items
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: grill, pumps, pipes, valves, automatic control systems, submersible pumps, cranes,
lightning protection and grounding -reference only
Project:
The project is located south of Kunming, the main chip outside the Second Ring Road, Xishan District,
bounded east by the Funan River, south of Kwong Fuk Road, west Xibahe, North to South Second Ring.
The transformation of villages in the project area with film, municipal road construction and sewage
diversion simultaneous implementation rain garden, will address the municipal pipe network is imperfect
and incomplete rain caused sewage diversion indiscriminate discharge of sewage, urban sewage treatment
plant effluent into the rainy season plant density is low and some chip area flooding low-lying areas of the
problem. The project scope of services for the south in the Second Ring Road, Kunming, Xishan District,
outside the total area is 17.82km2. 2015 projects were built within the rain and sewage pipe network a total
of 91.41km.
The total investment is about 483,691,800 yuan -including project cost 328,186,500 yuan, 55,986,300
yuan construction of other costs, the basic reserve fund of 30,733,800 yuan, construction 73.074 million
yuan of loan interest.
Owner:*******
Post Code:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Fax :*******
Project Name: Long Industrial Park northeast of cultural tourism service center Reception Center and Park
Project
Progress stage: construction design
Construction period: May 2011 -2012 in July
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the heart of Changchun High-tech Zone, the park covers an area of 3,000 square
meters reception center; Park Service covers an area of 3,000 square meters.
The total investment is about 60 million yuan. Construction funds from the self.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Singapore • Nanjing, the promoter region of the island ecological technology infrastructure
works for the Southern District
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located Jiangxinzhou Jianye District, Nanjing, the implementation of an area of about
2,100 acres. Main construction contents are road works, pipe network engineering, bridge engineering,
environment and sanitation, landscaping projects.
The total investment is about 2.2 billion.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Singapore • Nanjing, the promoter region of the North Island, ecological science and
technology infrastructure projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference
Project:
Project is located in the Chau Thai Jiangxinzhou Yongding village and village, north to the Island
Village Planning Thai roads, east Jiajiang Dyke, south to latitude seven river tunnel passing through the
green belt north, west to the river river bank, the implementation of an area of about 1,400 acres. Main
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
construction contents are road works, pipe network engineering, bridge engineering, environment and
sanitation, landscaping projects.
The total investment is about 1.8 billion.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Lijiangxintuanheigu Area -University District, Lijiang, Yunnan Province urban
infrastructure construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, excavators, rollers, tamping machine, stirring hug, paver, hoist,
boring machine, tunnel boring machines, drilling rig, mud circulation reserve tank -for reference
Project:
Project is located in the region of Yunnan Province Area Planning Group, the new Area roads, parks,
public parking, landscaping, flood control, drainage, gas, electricity and sanitation municipal
telecommunications infrastructure. 1,836,885.00 square meters in which new urban roads; flood control
ditch 113,800.00 square meters; public toilets 4050.00 square meters -27; Gas Regulator Station 200.00 -2;
refuse transfer station 1200.00 square meters -6; 10KV switching station 3900.00 square meters -39 ; to the
water network 59645.00m; drainage 59645.00m; green 2,692,997.00 square meters, and other ancillary
projects.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 2,272,104,800 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Real Estate Development Co., Ltd. Hebei Xu Yao Xu Jing-Hua Fucheng new community
shopping center construction projects are
Progress stage: construction preparation
Construction period: June 2011 -2012 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of Hebei Zhongxing Fucheng County Dongan Avenue to the east of the new
five-story frame structure on the ground shopping center, underground floor, total building area of
19,098.52 square meters.
The total investment is about 25.59 million yuan.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Project Name: Road Jinniu into irrigation on both sides of the market town of 500 meters and Dobashi Area
Reconstruction of infrastructure and public construction projects
Stages of progress: environmental impact assessment
Construction period: September 2011 -2013 in August
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located outside the Third Ring Road west Jinniu, into irrigation within 500 meters of road
on both sides of GSK Winery and Stone Town and Area sector Pi County Area -500 meters north to the
control line, east to West Railway Link , West, Central and Western planning road south Hi-Tech. The
main construction content and scale, including municipal roads -including roads, sewer, lighting, electricity,
communications, transportation, greening works on both sides of the road, farmers market, community
service centers, kindergartens, schools and other public construction projects. Total length of 6519 meters
the road, public construction area is about 30974m2, total land area of about 471 acres.
The total investment is about 486 million.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Su Jia Tuo Town, Haidian District, planned total land area of 289,663 square meters,
of which the total area of 230,776 square meters of construction land, collect the urban public land area of
58,887 square meters, of which 30,432 square meters land area of the road collected, green land area of
28,455 square meters collected. The total building size of 239,237 square meters, which control the size of
the ground building 161,543 square meters, the scale of 77,694 square meters underground construction;
green was 50%.
The total investment is about 1,768,794,000 yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Long Industrial Park northeast of cultural tourism service center Reception Center and Park
Project
Progress stage: construction design
Construction period: May 2011 -2012 in July
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in the heart of Changchun High-tech Zone, the park covers an area of 3,000 square
meters reception center; Park Service covers an area of 3,000 square meters
The total investment is about 60 million yuan. Construction funds from the self.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Poly Tsinghua Yiyuan a project
Progress stage: construction preparation
Construction period: May 2011 -2012 in November
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Nangang District, Harbin Engineering circuit and self-Hing Street Interchange
Construction scale: Total 199666.54m2;;, shear wall structure / 1 ~ 33 layers on the ground and 2
underground floors.
The total investment is about 400 million yuan. Construction funds from the self.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Anhui New Area Phase I -7 #, 19 #, 21 #, 23 # -26 # F project
Progress stage: construction preparation
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located west of South Lake Road, Huaibei City, Huan Tan Road north, with a total floor
area of approximately 25,676.15 square meters, 7 # Building frame structure, the ground layer 2, the others
are brick, 6 floors.
The total investment is about about 24,141,400 yuan. Source: Government investment and self.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: First Affiliated Hospital of Anhui Medical University Hospital Medical Complex Building
High-tech projects
Progress stage: has the record
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Project is located in Hefei, the proposed new building medical complex building, the number of beds to
2,000. Construction area of about 150,000 square meters.
The total investment is about 45,000 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Wenling City Second People's Hospital Expansion Project Phase II
Progress in stages: approval for the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Xinhe Town, Wenling City, members of the public road north, the land area of about
34,589 square meters, total construction area of 36,511 square meters, including the cancer ward, science
and technology building, emergency buildings, living space and facilities necessary to add 400 beds.
The total investment is about 1.4 billion.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Junlian Takenori to Artemisia dam concrete road reconstruction works through village
Progress stage: project
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
The project is located Junlian Moral Township, Artemisia Nanba, construction, conversion works cement
road through town.
The total investment is not detailed.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Fuqing City car-only lanes -Fook people Strip - Tiger Creek road works
Stages of progress: preliminary design
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
The project is located north of the main city of Fuqing City, the starting point is located in Fuqing City,
Fujian government Avenue, located in Fuqing City, Fujian people end road, the road 2 km in length, width
about 55 meters, the road grade urban expressway, the main road design speed of 80 km / h, Des Voeux
Road design speed of 40 km / hour.
The total investment is about 66,120,754 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Designer:*******
Postal address:*******
Post Code:*******
Project Leader: Xie Shangying
Tel :*******
Fax :*******
Project Name: Dezhou Thermal Control Center office building project company
Progress stage: construction preparation
Construction period: June 2011 -2012 in January
Major equipment: pipes, valves, automatic control systems, instrumentation, boilers, meters, coolers,
chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels, heat-conducting oil
furnace, steel-plastic composite pipe -for reference
Project:
Project is located in Shandong, building area of 10,000 square meters, 8 layer frame structure.
The total investment is about 10 million yuan. Self-financing.
Owner:*******
Contact:*******
Tel :*******
Project Name: Danzhou Johnsy personnel office building labor market
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Station commercial and residential projects are located in Hainan Danzhou integrated logistics block
0504 block, 1, 8 layers, frame structure, with a total floor area: 5,616.37 square meters. Danzhou station
building located at Block 0504 integrated logistics commercial and residential land.
The total investment is not detailed.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Chengdu Construction Investment Co., Ltd. Xingcheng Xindu District North Extension Area
new homes and ternary phase C, new home construction
Stages of progress: survey and design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Dafeng Street Chengdu, Sichuan, C, new homes new homes northern extension of
the proposed project area of about 90,511 square meters, three quarters the proposed second phase of new
home construction area of about 66,649 square meters.
The total investment is not detailed. Construction funds from the company self-financing, the project is
100% funded ratio.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Thermal Co., Ltd. Datang Jiaozhou Jiaozhou Bay Industrial Area construction projects
central heating
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: pipes, valves, automatic control systems, instrumentation, boilers, meters, coolers,
chillers, fire fighting facilities, water supply and drainage facilities, pressure vessels -for reference
Project:
The project is located in Jiaozhou Bay, Jiaozhou, within the industrial base, the heat source plant in
Circle, east of planning within the block north of North Road, Kowloon, with a total area of 106,000 square
meters, planned to build a 3 × 75t / h steam boiler layer burning chain and related heat pipe network. New
heat source plant covers an area of 106,000 m2, total construction area of 21948m2, built structures,
including the main boiler room Block 1, dry coal shed, ash libraries, Java positions, fan room,
desulphurization towers, air stations and other complex building. New heat boiler to be installed plants 75t /
h steam boiler 3 sets of chains, bag filter design uses, lime - gypsum desulfurization. Heat pipe network
built about 114.72km, including the steam pipe network 6.8km, hot water pipe network 107.92km. In
principle, using buried pipe laying methods, the case of rivers, roads and railways, and other special
combination of site conditions or by other means of laying overhead.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 851,138,300 yuan -52.77 million yuan investment in environmental
protection.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Heilongjiang Provincial Cancer Hospital New Outpatient Building Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display -for reference
Project:
Project is located in Ping Ha Road, Nangang District, Harbin No. 150, Heilongjiang Provincial Tumor
Hospital, the hospital, with a total construction area of 103526m2. Building the new outpatient building
area 103,526 square meters, including: underground construction area of 19,602 square meters, ground
floor area of 83,924 square meters. At reception door -emergency patient volume of 2,000 passengers / day.
The total investment is 687,965,000 yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Design unit: Heilongjiang Provincial Environmental Protection Science Research Institute -EIA agencies
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Real Estate Co., Ltd. Chengdu and letter shantytowns project Guangyuan
Stages of progress: survey and design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Guangyuan City, Sichuan, rock house solutions, project profiles: municipal road 25
meters wide, length 1135 m, 195 m length of municipal tunnel, 19 meters wide, triangular-based
resettlement housing plots, the land area of about 50 acres, the terrain height difference of about 35 meters.
The total investment is not detailed.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Zhengzhou Luyuan Landscape Ecological Agriculture Development Co., Ltd. Zhengzhou
Luyuan landscape construction projects Spa Resort
Progress stage: the record
Construction period: May 2011 -2013 in April
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Fung Lok Wai economic zone project is located east of the farm, north of Yellow River, Zhengzhou
Luyuan Landscape Ecological Agriculture Development Co., Ltd. Zhengzhou Luyuan spa resort landscape
construction projects with a total area of 1,800 acres, including a land area of 1492 acres water area of 308
acres. The park is divided into three centers and seven experience area, namely: Spa fitness center, business
conference reception center, water seasons ecological food center; lakeside recreation area, fruit picking
areas, industrial areas and the Central Plains Experience Hall of Fame, the Central Plains of ancient
residential areas, factories soilless culture tourism, leisure residential areas and water recreation areas.
Meanwhile, road construction 39,360 square meters, 22,907 square meters square hardened building
parking lot of 36,000 square meters, green area of 337,169 square meters.
The total investment is 259.89 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Guangdong Avenue Chemical Co., Ltd. R & D Center Construction Project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: the record
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Deqing County, Zhaoqing City, fine chemical industry base in Guangdong Avenue
Chemical Co., Ltd. R & D center construction project, the center is mainly engaged in various types of
chemical products, synthetic resins and related research and development services, such as acrylic resin,
acrylic paint. The total area of about 720m2, total construction area of about 3600m2, main construction
contents are research laboratories and facilities.
The total investment is about 30 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Second Hospital of Ningbo City, the original hospital building renovation project
Stages of progress: preliminary design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The second project is located in Ningbo City Hospital building, transformation of the total area of about
26,228 square meters -excluding the basement section.
The total investment is about 1500 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Construction period: June 2011 -2013 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
The project is located Yu City North, medicine Medicine Co., Ltd. Henan healthy Relocation Project, the
new medical logistics warehouse, sales and office buildings, staff quarters and other facilities, building area
of 220,000 square meters planned. After completion, the annual pharmaceutical sales of 2.8 billion.
The total investment is about 330 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Albert City Xiapu Oriental Plaza
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Fujian Province, Ningde City urban core areas Xiapu County, north of Funing
Avenue and Town Square, south of South Road, east of Imperial hotel site, west of Commercial Street site
in Kowloon. The total land area of 26,666.7 square meters. 3.99 floor area ratio, ground floor area ratio of
0.5. The total ground floor area of 106,326.8 square meters. Ground floor area of 43,800 square meters.
Located in the block west of downtown, facing the direction of the old city; house has four Cored,
including two located in the east, and with the independent synthesis of commercial district around the
podium; the other two in the northwest side, for Town Square.
The total investment is about 2.5 billion.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: New Materials Co., Ltd. Baoding Baoding Wing Wing furniture furniture industrial park
project
Progress stage: construction preparation
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: May 2011 -2012 in November
Major equipment: double-sided pressure planing machine, horizontal belt sander, woodworking planer,
comb docking machine, pneumatic cut materials and other equipment. -For reference
Project:
An item in the new county of Hebei Province Western ecological industrial park, building factories,
exhibition halls, dormitory and related ancillary facilities. Project covers an area of 120 acres, with an
annual output 160,000 sets of furniture -pieces.
The total investment is about 375 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: brick village Liyuan Town, Tongzhou District, residential projects
Progress stage: the construction preparation -EIA at the same time
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Liyuan Town, Tongzhou District, Beijing brick village, state, district brick village
Liyuan Town, Tongzhou District, residential projects are located in the town of brick village Liyuan, Tong
Zhi Yuan in Beijing, China Real Estate Development Co., Ltd. is responsible for building, four areas are:
east jade river; west Dobashi Road; south Jiukeshu East; Dobashi in the Street to the north. Project
construction area 129029m2, collected road land area 56346 m2, collected green area 31353 m2, ground
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
floor plan scale 312104 m2 -including child care, including: general commercial housing 130984 m2,
directed placement of housing 87878 m2, price commodity housing 70000 m2, facilities 19882 m2,
childcare land 3360 m2.
The total investment is about 3,193,620,000 yuan.
Construction Company: Beijing Xin Tong Zhi Yuan Real Estate Development Co.
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Village of Chengguan district offices to move back to Ma resettlement housing project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in Fangshan District of Beijing Office of horse Chengguan the Village streets, land use
planning four areas: Road industrial area east and south latitude Quad planning, planning by Road west,
north to the planning Weier. The total land area of 65793.10 m2, of which construction land 30152.72 m2,
collected road 22065.17 m2, collected green 13575m2. The total construction area of 102920m2, including
the ground floor area is 75382m2, underground construction area 27538m2. A total of five residential
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
buildings and construction of supporting public service facilities, ground floor building 12 to 15 storeys,
floor area ratio of 2.5.
The total investment is 341,631,300 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Beijing Jia Wang Xin Zhuang Town Pinggu District east of the Village Residential Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in the town of Pinggu District, Wang Xin Zhuang Jia the Village, with a total building
floor area 70041m2, need to synchronize the implementation of urban public land area of 12,254 square
meters. Ground floor area of 112,066 square meters, construction area of 60,340 square meters
underground. Ground floor area, including building area of 78,656 square meters of commercial housing,
rental housing construction area of 33,310 square meters, an area of 100 square meters of public
construction. Underground construction, including pump house, fire pump room, underground garage and
in the water treatment facilities, and supporting public service facilities.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 1,400,840,000 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: West Da Wang Road, policy-housing project
Stages of progress: Engineering -EIA at the same time
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting -for reference
Project:
Project is located in West Da Wang Road, Chaoyang District, east of the project construction land area
of 18,499.78 square meters. The nature of construction land for residential, public buildings, entertainment
and health care sites. The total planned construction area of 100,120 square meters, of which the total
building area of 61,909 square meters on the ground. Project a unified municipal heat heating pipe network.
The total sewage discharged into municipal sewage pipeline, import Gaobeidian sewage treatment plant.
The total investment is about 287.6 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction:*******
Postal Address:*******
Contact person: Li Zhen Wei
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Daxian I, North-South trunk road works in South Extension
Progress in stages: approval for the record
Construction period: July 2011 -2011 years
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
The project is located outside the town of South Daxian, about 2.5 km wide and 50 meters.
The total investment is not detailed.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Weining Forced Labor Camp in Benxi City, the overall drug removal and isolation of the
guard force, social assistance and education buildings, workhouse building projects
Progress stage: construction preparation
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Benxi City Mountain project is located in Magnolia, dairy cattle, with a total building size of about
10,941 square meters, is divided into two monomers, the 5-story frame structure.
The total investment is about 13 million yuan. Financing investment and self-government.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: North Town Municipal People's Procuratorate and expertise in handling cases space projects
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located south of the District Administrative Center, north side, east riverside road, the new
investigators, and professional and technical space of 5,000 square meters -estimated area of 20,470 square
meters, the project must be using new energy-saving design and construction.
The total investment is about 12.5 million yuan. Sources of funds: bond funds 6.25 million, 3.25 million
local financial support, raised 300 million units.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Beijing Hyundai Volkswagen 4S shop projects
Progress stage: construction preparation
Construction period: June 2011 -2012 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Zhongshan City, the Office of Changji nine Village, 2 standard 4S stores,
construction area of 7113.33 square meters.
The total investment is 9,000,000 yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction units:*******
Tel:*******
Project Name: Jieyang City, Guangdong Province People's Hospital of benefits to the county hospital new
building project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display -for reference
Project:
Project is located in town Hui Hui Hui Lai County Road No. 230, removal of the original hospital
building, build a new hospital building at the site a total of 15 floors with a total construction area of about
22,500 square meters, the area to 1,500 square meters, set the bed 600.
The total investment is unknown.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Tel :*******
Project Name: Reconstruction Project of Baoshan District Detention
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Stages of progress: preliminary design
Construction period: 2011 -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Baoshan District, No. 2101 Law Road, west of the detention center supervisor
district, covers an area of 39,840 square meters.
The total investment is about 58 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Bo Feng - Purple 11 # commercial and residential project domain
Progress stage: construction started in
Construction period: May 2011 -2012 in July
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Heating company located in the east of the project related to land, size of the project: 11 # F 30135.7
square meters, the structure: frame shear wall layers :22-28.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 33 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Anshan City Commercial Street, Building 1, South Korea Reconstruction Project
Progress stage: construction preparation
Construction period: June 2011 -2011 in August
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
Project is located in Anshan City of West Bay Road, Commercial Street, Jiefang South Korea,
construction area of 9450 square meters, a total of 6 layers.
The total investment estimated price of 11.82 million yuan.
Construction unit:*******
Contact:*******
Tel:*******
Project Name: Sui River in Anhui Province, Third District a project
Progress stage: construction preparation
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting. -For reference
Project:
The project is located northbound Huaibei City of mountain people, the new sui east, the project 4 floors,
total floor area of approximately 28238.26m2, wall structure, 11 floors above ground.
The total investment is about about 34,016,500 yuan. Source: Government investment and self.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Highway 113 lines Nim village temple floor Xinxing county section of a major repair works
to
Progress in stages: approval for the record
Construction period: 2011 -2012
Major equipment: excavators, bulldozers, cranes, road rollers, tamping machine, stirring hug, pavers,
protection plates, green facilities, fire facilities, lighting, drainage facilities, safety facilities, elevator,
boring machine, tunnel boring machine , rig, mud circulation reserve tank, etc. -for reference only
Project:
Nim project is located in Xinxing village, the route starting point Stake K119 +683.18, the end of the
intersection with Highway 276, the end Stake K134 +667.67, total length of 14.984 km of the project, the
old road to a highway project, the design speed of 60Km / h, roadbed width 23m.
The total investment is not detailed.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
Download