Southern Illinois University Edwardsville Department of Construction CNST 403 - Construction Planning and Scheduling Syllabus Fall Term 2005 Lectures: 4:00 p.m. - 5:50 p.m., Tuesday & Thursday Instructor: Dr. Dong-Eun, Lee Office: 3053 Telephone: (618) 650-2755 e-mail: dolee@siue.edu URL: http://www.siue.edu/~dolee Lecture Classroom: Lab Classroom: EB 2026 EB 2026 Office Hours: 9:00 a.m. -12:00 a.m., Wednesday (Please make an appointment to schedule available time.) General Course Description: This course is designed to provide CNST students with the fundamental principles of planning and scheduling construction projects. Students are presented with the necessary information to understand the planning and scheduling methods such as (1) bar (Gantt) charts, (2) Critical Path Method (CPM) along with Arrow Diagramming Method (ADM) and Precedence Diagramming Method (PDM), (3) Program Evaluation and Review Technique (PERT), (4) Linear Scheduling Method (LSM), and (5) Simulation based scheduling. Other related topics such as developing Baseline schedule, Resource allocation and leveling. Time-cost trade-off analysis, Updating Schedule, Monitoring and controlling, and generating progress reports are also covered by using computer applications in the course. Course Objective After completing the course, students must: Have the knowledge of the construction planning and scheduling methods including bar charts, CPM, PERT, LSM, and Simulation. Be able to use CPM method for developing baseline schedule of construction project. Master basic CPM-related techniques such as resource allocation and leveling, cost analysis, time-cost trade-off analysis, updating schedule, and schedule optimization. Be proficient in using the Primavera Project Planner (P3) computer system for construction planning and scheduling. Computer Usage: Students use Primavera Project Planner (P3), MS Word, MS Excel, and Microsoft Access for preparing their assignments, term projects, and exams. Mark Distribution: Attendance Assignments Term Project Exam #1 Exam #2 Final exam Comments in Course/Instructor Evaluation * * 05% 12% 15% 20% 20% 25% 03% There are six assignments for this course. Each of them carries the same weighting. Make sure that submittal is on time. Term project will be announced and discussed in class. The term project is an essential and mandatory component of this course. A student who fails to complete the term project will receive an INCOMPLETE (I) grade. The final letter grades will be assigned based on the score obtained by the student as shown in the following table. The following scheme will be applied in assigning the final grade: Points Obtained Final Grade 90% and above A 80% < 90% B 70% to < 80% C 60% to < 70% D Less than 60% F Homework and Grading Policy This course is designed to simulate a professional construction setting. Submittal should be on time. Late submittals will NOT be accepted for any reason. When the Blackboard system is out of service, a student should use one of the following alternative methods. 1. E-mail the assignment to instructor as an attachment. – Student should keep confirmation e-mail. 2. Fax it to the Construction department office. – Student should keep confirmation page. 3. FedEx it to the Construction department office. - Student should keep tracking number. 4. In person, submit it to instructor. – Student keeps the signature from instructor. Regardless of which method a student chooses, submittal should be on time. Instructor will keep students’ submittals. However, it is each student’s responsibility to keep all homework graded in his/her course notebook until final grade is posted. When a student needs to check for errors or grade appeals in posting, he/she should submit his/her original copy of the submittal. Each student is responsible for tracking his/her own grades. Grade will be posted on Blackboard. Grade Appeals Student can appeal for incorrect grading within five business days. The original homework (or quiz) graded must be provided to the instructor for changing grade. For missing or incorrectly recorded grades students are required to show instructor the original homework assignment turned in. Students are responsible for getting instructor’s signature confirming submission of all the submittals. If a student doesn’t have instructor’s acceptance signature, the student can not claim or appeal for the specific assignment, project, or exam. Attendance and Tardiness Policy Absences can be excused if and only if 3 business days prior notice is given to instructor with official letter and approved by the instructor. Students are strongly recommended not to leave class early because they may miss important announcements involved in assignments, quizzes, term projects, or exams. Prerequisite CNST 341 (Plans and Specifications) STAT 244 (Statistics) Senior Standing Requirements Students are required to submit their resume with photo by e-mail before Aug. 29. 2005. Students are expected to submit all the submittals (assignments, term project, midterm exam, and final exam, etc) to the instructor through Blackboard (refer to http://bb.siue.edu). Students are strongly advised to purchase Primaver Project Planner (P3) student version to increase their learning performance. Managing Printing Account It is students’ responsibility to make sure that they have enough money in their printing account for printing out In-class assignments, quizzes and exams at all times. On a regular basis, students need to print out In-class assignments, quizzes, exams, and reports. Late submission caused by lack of funds in printing account won’t be considered as an acceptable reason. Exams and Quizzes Policy All exams are closed book and closed note. Make up exams won’t be allowed. Student can take the exams early or make other arrangements in advance when expecting to miss an exam. The exam # 1, exam #2, and final exam will only be given on the scheduled date posted by the University Registrar. Students with 2 exams on a same day must submit a letter to the Assistant Vice Chancellor for Enrollment Management to request other arrangement (http://www.registrar.siue.edu/registrar/schedules/examschedulefa05weekday.htm). Using PDA, cell phone, or other software that are not taught in the class is prohibited during exams. Students are allowed to use the software taught in the class on the lab computers. Students can use a scientific/engineering programmable calculator for quizzes and exams. Students are NOT allowed to leave the classroom for a rest room break during exams. Instructor Absence Because the instructor is often required to attend conferences, seminars, or research meetings during the semester, Instructor may announce to the class in advance through Blackboard system. In instructor’s absence, a surrogate instructor may fill in or student will be given work to do during the scheduled class time. Classroom behavior and decorum The classroom (lab) should be considered as construction company settings. The computer lab’s policy should be respected. Disability Concerns Please notify instructor no later than the end of the first week of class concerning any academic accommodations you will need. You must have a documented disability and ID CARD from Disability Support Service (refer to: www.siue.edu/DDS). Academic Dishonesty Academic dishonesty will be handled consistent with university policy. Faculty members are responsible for reporting all instances of academic dishonesty to the Provost's Office. In addition, faculty members retain authority to determine grade penalties in cases of academic dishonesty. Please be aware that a grade of zero will be issued for assignments, projects, or exams involving academic dishonesty and additional grade penalties such as failing the course can be imposed. Please read the official university policy on plagiarism (refer to http://www.siue.com/POLICIES/1i6.html), student conduct code (http://www.siue.edu/POLICIES/3c1.html), and Student Academic Code (http://www.siue.edu/POLICIES/3c2.html). E-mail account policy Class information may be sent to your SIUE e-mail account. The instructor won’t reply to any e-mail sent by other commercial e-mail account. If you submit your assignment by commercial e-mail account rather than SIUE account, it results in a grade of zero for the assignment, because the instructor will consider it as garbage e-mail. Again, please send your resume with photo by your SIUE e-mail account within the due date. If you do not use SIUE e-mail account as your primary e-mail account, please be sure that you have your SIUE e-mail forwarded to your primary e-mail account. Textbook: Thomas E. Glavinich. (2004). Construction Planning and Scheduling. 2nd edition, AGCA. Reference: Charles, Patric. (2004). “Construction Project Planning and Scheduling.” Pearson Prentice Hall, Saddle River, NJ. Ahuja, N. Hira., Dozzi, P. S., and Abourizk, M. S. (1994). “Project Management Techniques in Planning and Controlling Construction Project.” 2nd, John Wiley & Sons. NY. Stevens, D. James. (1990). “Techniques for Construction Network Scheduling.” McGraw-Hill, NY. Newitt, S. Jay. (2005). “Construction Scheduling Principles and Practices.” Pearson Prentice Hall, Saddle River, NJ. Willis, M. Edward. (1986). “Scheduling Construction Project.” John Wiley & Sons. NY. Marchman, David A. (1998). Construction Scheduling with Primavera Project Planner. Delmar Publishing Company, NY.