ELECTRICAL

advertisement
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
Electrical System
After re-designing the lighting system for the children’s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board schedules. All lighting fixtures were placed on the same schedules based on area and
floor level: panelboard “L1” for the interior first floor and exterior, and panelboard “L2” for the interior second floor.
(N) PANELBOARD "L1"
VOLTAGE:
PHASE:
WIRE:
208/120
3
4
LOAD
LIGHTS - 101-102
LIGHTS - 103-110
SPARE
EXTERIOR LIGHTS
LTG CTRL PNL – LCP1
SPARE
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
A
1.2
A, 3P
A
B
C
1.0
0.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
BKR
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
ckt
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
abc
ckt
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
BKR
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
A
0.8
B
C
0.9
1.0
0.7
0.5
1.0
0.0
0.0
0.0
:MAIN C/B
:BUSSING
:MOUNTING
LOAD
LIGHTS - 113
LIGHTS - 113
LIGHTS - 113
EXTERIOR LIGHTS
EXTERIOR LIGHTS
EXTERIOR LIGHTS - CAR MOTION
SPARE
SPARE
SPARE
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
0.0
SPACE
SPACE
SPACE
0.0
1.2
KVA PHASE A:
KVA PHASE B:
KVA PHASE C:
LIGHTING TOTAL KVA:
RECEPTACLE KVA:
TOTAL:
0.0
0.0
2.0
2.7
3.4
2.0
Connected
8.1
0
8.1
20A-1P
20A-1P
20A-1P
37
39
41
38
40
42
20A-1P
20A-1P
20A-1P
1.5
1.4
2.0
28.11 :TOTAL LOAD AMPERES
(10.125 X 1000)/(1.732 X 208) = 28.11
D.F
1.25
1.0
Demand KVA
10.125
0
10.125
(N) PANELBOARD "L2"
VOLTAGE:
PHASE:
WIRE:
208/120
3
4
LOAD
LIGHTS - 206-209
LIGHTS - 209
LIGHTS - 212
LIGHTS - 212
LIGHTS - 214-217
LIGHTS - 214-217
LIGHTS - 213-213A
LIGHTS - controls
LIGHTS - 228-229,231
LIGHTS - 219,221,235-236
225A, 3P
225A
SURFACE
A
0.9
B
C
0.4
1.1
1.0
1.1
1.1
0.7
1.1
0.9
0.8
BKR
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
ckt
1
3
5
7
9
11
13
15
17
19
abc
ckt
2
4
6
8
10
12
14
16
18
20
BKR
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
A
0.8
B
C
0.7
0.7
1.0
0.8
0.7
0.6
0.6
1.2
1.0
:MAIN C/B
:BUSSING
:MOUNTING
LOAD
LIGHTS - 211,226-227
LIGHTS - 211,226-227
LIGHTS - 211,226-227
LIGHTS - 227
LIGHTS - 227
LIGHTS - 227
LIGHTS - 222
LIGHTS - 222
LIGHTS - 223,225,230
LIGHTS - 100,200
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
LIGHTS - 202,204-205,237-238
LIGHTS - 233
LIGHTS - 232
LIGHTS - 201,234
LIGHTS - 233
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
0.8
0.8
0.8
0.4
0.2
0.0
0.0
0.0
0.0
0.0
4.2
KVA PHASE A:
KVA PHASE B:
KVA PHASE C:
TOTAL LIGHTING
KVA:
RECEPTACLE KVA:
TOTAL KVA:
8.2
7.5
7.9
Connected
23.6
0
23.6
3.8
0.0
4.1
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
21
23
25
27
29
31
33
35
37
39
41
22
24
26
28
30
32
34
36
38
40
42
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
1.0
0.6
0.6
0.6
0.6
0.0
0.0
0.0
0.0
0.0
4.0
3.7
0.0
3.8
LTG CTRL PNL – LCP2
DAYLTG. DIM.CTRL
DAYLTG. DIM.CTRL
DAYLTG. DIM.CTRL
DAYLTG. ON/OFF DIM.CTRL
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
78.42 :TOTAL LOAD AMPERES
(28.25 X 1000)/(1.732 X 208) = 78.42
D.F.
Demand KVA
1.25
1.0
28.25
0
28.25
(N) PANELBOARD R1"
VOLTAGE:
PHASE:
WIRE:
LOAD
REC 101
REC 101
208/120
3
4
225A, 3P
225A
SURFACE
A
0.8
B
0.8
C
BKR
20A-1P
20A-1P
ckt
1
3
abc
ckt
2
4
BKR
20A-1P
20A-1P
A
0.7
B
1.8
C
:MAIN C/B
:BUSSING
:MOUNTING
LOAD
EF-4
ELEVATOR CONTROLLER
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
REC 101
REC 101
REC 102,103
TELECOM EQUIPMENT
REC 100,104
REC 101
TELECOM EQUIPMENT
REC 106
MOTORIZED SCREEN
REC 109
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
0.8
0.8
0.8
1.8
1.0
0.8
1.8
1.8
1.0
0.4
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.4
KVA PHASE A:
KVA PHASE B:
KVA PHASE C:
TOTAL LIGHTING KVA:
RECEPTACLE KVA:
REMAINING KVA:
TOTAL KVA:
6.6
6.6
7.1
Connected
0
11.6
8.7
20.3
3.4
0.0
4.8
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
0.3
0.3
1.2
1.8
1.0
0.2
DUCT SMOKE DETECTORS
0.2
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.2
3.2
FIRE DOOR - ELEVATOR
FIRE DOOR - LOBBY
GARAGE DOOR
SLIDING DOOR
WATER FOUNTAIN
0.0
2.3
FA CONTROL PANEL
FA POWER SUPPLY
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
56.35 :TOTAL LOAD AMPERES
(20.3 X 1000)/(1.732 X 208) = 56.35
D.F.
1.25
1.0
1.0
Demand KVA
0
11.6
8.7
20.3
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
(E) PANELBOARD R2"
VOLTAGE:
PHASE:
WIRE:
LOAD
REC 200, 206
WATER COOLER
HAND DRYER 205
HAND DRYER 204
REC 204, 205, 237, 238
REC 234, 235
REC 235
REFRIGERATOR
REC 230
REC 231, 228
COPIER
REC 232, 233
REC 233
REC 233
REC 233
REC 233
REC 210
REC 213
REC 213, 214
REC 214, 215
REC 215
208/120
3
4
225A, 3P
225A
SURFACE
A
0.8
B
C
1.8
1.8
1.8
0.8
0.8
0.8
1.0
1.0
1.0
1.0
0.6
0.8
0.8
1.2
0.6
0.8
0.8
0.8
0.8
6.6
7.0
0.4
6.6
BKR
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
ckt
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
abc
ckt
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
BKR
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
A
0.8
B
C
0.8
0.8
1.0
0.8
0.8
0.8
0.8
1.0
1.0
0.8
0.8
1.0
0.8
0.8
0.8
1.0
1.2
1.0
1.2
6.4
6.2
0.0
5.4
:MAIN C/B
:BUSSING
:MOUNTING
LOAD
REC 215
REC 215, 219, 221
REC 222
HAND DRYER 221
REC 222
REC 222
REC 211
VENDING
VENDING
REC 223
REC 223
REC 229
REC 225
REC 225
REC 225
REC 225
REC 225
REC 226
REC 226
REC 227
SPARE
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
KVA PHASE A:
KVA PHASE B:
KVA PHASE C:
TOTAL LIGHTING KVA:
RECEPTACLE KVA:
REMAINING KVA:
TOTAL KVA:
13.0
13.2
12.0
Connected
0
24.6
13.6
38.2
106.04 :TOTAL LOAD AMPERES
(38.2X 1000)/(1.732 X 208) = 106.04
9.4
15.2
D.F.
1.25
1.0
1.0
Demand KVA
0
24.6
13.6
38.2
(E) PANELBOARD “R2"
VOLTAGE:
PHASE:
WIRE:
208/120
3
4
LOAD
REC 211
MLO
225A
SURFACE
A
0.6
EXPRESS CHECK
THEFT CHECK DETECTION
PROJECTOR
MOTOR SCREEN
REC ROOF
REC 202
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
B
C
0.6
0.7
1.0
1.0
0.8
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
BKR
20A-1P
ckt
43
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
abc
ckt
44
BKR
20A-1P
45
46
20A-1P
47
49
51
53
55
57
59
61
63
65
67
69
48
50
52
54
56
58
60
62
64
66
68
70
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
A
0.2
B
C
0.4
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
:MAIN C/B
:BUSSING
:MOUNTING
LOAD
DUCT DETECTOR
PLMBNG SENSOR
204,205,237,238
MICROWAVE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
0.0
0.0
0.0
0.0
0.0
0.0
2.6
KVA PHASE A:
KVA PHASE B:
KVA PHASE C:
LIGHTING KVA:
RECEPTACLE KVA:
REMAINING KVA:
Ckts 43-84 TOTAL KVA:
1.6
2.8
2.0
2.5
Connected
0
2.4
4.9
7.3
0.0
1.5
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
71
73
75
77
79
81
83
72
74
76
78
80
82
84
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
20A-1P
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.4
0.0
1.0
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
106.04 :TOTAL LOAD AMPERES
(38.2X 1000)/(1.732 X 208) = 106.04
D.F.
1.25
1.0
1.0
Demand KVA
0
2.4
4.9
7.3
TOTAL LTG kVA:
TOTAL RECEPTACLE kVA:
REMAINING kVA:
TOTAL Kva:
0
27
18.5
45.5
D.F.
1.25
1.0
1.0
Demand kVA
0
27
18.5
45.5
The first floor receptacle/control panel is remaining basically the same since there were no changes added to the first floor of the
library.
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
Incoming service
3
UTILITY TRANSFORMER
2
PROVIDE SHUNT TRIP
CIRCUIT BREAKER
FOR ELEVATOR
SWITCHBOARD
1000 AMPS, 120/208 VOLTS, 3PHASE, 4 WIRE
M
225 AMPS
3POLE
1
GROUNDING
ROD
225 AMPS
3POLE
1
PNL “R1”
225 AMPS
225 AMPS
3POLE
1
PNL “R2”
225 AMPS
1
225 AMPS
3POLE
400 AMPS
3POLE
1
PNL “L1”
225 AMPS
PNL “L2”
225 AMPS
PNL “M1”
400 AMPS
220 AMPS
3POLE
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
The Lighting Load and Receptacle Loads were calculated using NEC Article 220. These are considered continuous loads and therefore
the computed load for the feeder must be based on 125% of the continuous load.
For the feeder taps to each panel:
Panel L1
(lighting)
Actual Load (kVA)
General Lighting Load
Rcptcl. First 10 kVA:
Total Load:
7.10
0.00
8.10
Final Total Load
(kVA):
D.F.
New Load (kVA)
add 20% spares
Final Load (kVA)
1.25
1.00
8.88
0.00
8.88
1.78
0.00
1.78
10.65
0.00
9.72
9.72
There is a difference of 2.3 kVA in this panelboard. The change in VA is negligible and neither the breaker nor panelboard need to be
resized.
conclusion
Panel L2
(lighting)
Actual Load (kVA)
General Lighting Load
Rcptcl. First 10 kVA:
Total Load:
23.60
0.00
23.60
Final Total Load
(kVA):
conclusion
D.F.
New Load (kVA)
add 20% spares
Final Load (kVA)
1.25
1.00
29.50
0.00
29.50
0.20
0.20
35.10
0.00
35.40
35.40
There is a difference of 1.5 kVA in this panelboard. The change in VA is neglible and neither the breaker nor panelboard need to be
resized.
Panel R1
Other Loads
Rcptcl. First 10 kVA:
Total Load:
(receptacles)
Actual Load (kVA)
8.70
11.60
23.60
D.F.
New Load (kVA)
add 20% spares
Final Load (kVA)
1.00
1.00
8.70
11.60
20.30
0.20
0.20
10.44
13.92
24.36
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
Final Total Load (kVA):
Panel R2
24.36
(receptacles)
Actual Load (kVA)
Other Loads
Rcptcl. First 10 kVA:
Total Load:
13.60
11.60
25.20
Final Total Load (kVA):
30.24
D.F.
New Load (kVA)
add 20% spares
Final Load (kVA)
1.00
1.00
13.60
11.60
25.20
0.20
0.20
16.32
13.92
30.24
For the feeder taps to each panel:
“L1”
General Lighting Load: 17,244 sqft at 1.2 VA/sqft = 20692.8 VA
Receptacle Load: 17,244 sqft at 0.5 VA/sqft = 8622.0 VA
Net computed load using demand factors from Table 12.2: 29314.8 VA at 100% = 29314.8 VA
Since it is a 208/120 V service:
Minimum Ampacity = 29314.8/(1.732 x 208) = 81.37 A
“L2”
General Lighting Load: 15,984 sqft at 1.2 VA/sqft = 19180.8 VA
Receptacle Load: 15,984 sqft at 0.5 VA/sqft = 7992.0 VA
Net computed load using demand factors from Table 12.2: 27172.8.0 VA at 100% = 27172.8.0 VA
Since it is a 208/120 V service:
Minimum Ampacity = 27172.8.0 /(1.732 x 208) = 75.43 A
For the main feeder:
Total computed load for six panels = 8.1 + 23.6 + 20.3 + 38.2 + 7.3 + 103.3 = 200.8 kVA
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
The Rosegarden Library, with its location in San Jose, California has its power supplied from PG&E. The connection is located in the
exterior of north side of the building and the transformer is located in the Electrical Equipment room on the ground level. Refer to riser
diagram above.
Tag
1
2
3
Quantity
1
3
2
New Conduit Schedule
Conduit (IN)
Use
2 1/2
(4)#4/0+(1)#4G
5
4
Remarks
PG&E to install conductors
PG&E to install conductors
Voltage drop calculations
To determine voltage drops, table 11.5 in S. David Hughes, Electrical Systems in Buildings was used.
Using 800 VA per common receptacle unit.
Use 120V Panelboards
X = length in ft.
System Type
The Rosegarden Library has a radial circuit arrangement. This building is composed of a main switchboard that branches out to
the five control panels in the building. This system is the simplest of the circuit arrangements since there is only one primary feeder and
one transformer through which the associated secondary bus is served. In order to leave it as simple as possible in order to avoid
confusion with the maintenance and electricians, this system will be left the same.
Utilization Voltage
The Utilization voltage of this building is 208/120 V and it is used on both levels.
Transformer Configuration
Rosegarden Library uses Nema 3R, UON Transformer in exterior of building with a copper clad grounding rod. This is one of
the best and most expensive kinds of system available. It is located on the northeast side of the building. This transformer is provided
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
by PG&E, and they don’t give us the rating. When you ask for a certain rating, they usually give you less. So it will probably be
according to one of the electrical engineers working on the project, and since it is a relatively small building a 300 kVA transformer
(830 Amps) will probably be provided. The secondary voltage is 120/208V, 3 phase. The library does not have much control over this,
since it is owned by the city of San Jose. It is a public building.
Emergency Power System
The emergency power system will not have automatic transfer switches since there is no emergency generator. There is a UPS in
the telecom room though, which the library is providing for battery backup for the server. Emergency light fixtures have emergency
ballasts incorporated, so there would be enough light in case of an emergency, for about 90 min. for most of them. These are all
operated mainly in 120V. In addition, a shunt trip circuit breaker is provided for the elevator.
Over Current Protective Devices
There is an over current protection device which is a 1000 A, 3 phase circuit breaker. There is also a transformer assembly with
two 40 VA transformers with separate secondaries in the relay panels. Transformers include internal over current protection with
automatic reset and metal oxide varistor protection against power line spikes. 120 or 277 VAC as required, 60 Hz +/- 10%.
Location of switchgears, panelboards and motor centers
The main switchboard is located in the Electrical Equipment room (room 108 on the first floor). there are no switchboards in
Rosegarden since they hold loads between 2000 – 5000 amps, and are more expensive. Switchboards are used in this building since
we only need front access to it and since it is not that big, we just need it to hold 800-2000 (but could go up to 5000) amps. The
mechanical equipment table will remain the same since no mechanical gear was changed.
Mechanical Equipment Table
Mech Eq
ACU 1
ACU 2
ACU 3
Type
Natural gas HTG
Electrical CLG
Package Unit
Natural gas HTG
Electrical CLG
Package Unit
Natural gas HTG
Service
Library central area
Voltage
208
Phase
3
Hz
60
Full Load Amps
66
Library North
Exposures
208
3
60
73
Library South
208
3
60
86
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
ACU 4
Electrical CLG
Package Unit
Natural gas HTG
Electrical CLG
Package Unit
Exposures
Library 1 st floor
community room
P
P
208
3
60
23
Typical lighting system
All the lighting systems in the building operate on 208/120V. The most common light fixtures in this library are the fluorescent
light fixtures, either linear florescent or compact fluorescent. These lamps were chosen for their low power consumption and easy
maintenance and repair.
All the ballasts in the light fixtures have a high power factor, CBM certified and bear the UL label. The electronic ballasts need to be
high power factor, high frequency and suitable for lamps specified.
The library has a Smartwire relay lighting control system as well as DMX controls, in order to allow for color changing in the
LED’s.
Fixture
Code
A
C
Lamps - total Input
Watts
1-42
1-5.5
Volts
Description
Mounting
120
120
5” Diameter, compact fluorescent downlight.
12” color LED
Recessed
Surface
T
(2x40,2x36)
232
1-70
1-34
1-100
1-70
120
Direct/Indirect fluorescent pendant fixture.
Pendant
120
120
120
120
Metal Halide wall mounted fixture.
Compact fluorescent wallwasher
Metal Halide Wall mounted fixture.
Metal Halide Bollard
Surface
recessed
Surface
Ballard
AA
W
AD
AJ
The new lighting design loads have been placed on a 208v panelboard which would be fed from the panelboard. Since the loads
have been reduced on the switchboard, it is going to be left as is. On the four spaces analyzed, there were not enough new fluorescent
lighting to fill up a decent sized panelboard. The panel is going to be left unsized due to the fact that that only a portion of the total
load can be applied to the panelboard without a full building analysis.
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
Mechanical Equipment Table
Mech Eq
ACU 1
ACU 2
ACU 3
ACU 4
EF1
EF2
EF3
EF4
GD1
EV1
Type
Natural gas
HTG Electrical
CLG Package
Unit
Natural gas
HTG Electrical
CLG Package
Unit
Natural gas
HTG Electrical
CLG Package
Unit
Natural gas
HTG Electrical
CLG Package
Unit
Centrifugal
exhauster
Centrifugal
exhauster
Centrifugal
exhauster
Centrifugal
exhauster
Service
Library
central area
Voltage Phase
208
3
Hz
60
Power factor
0.9
Full Load Amps
66
Library
North
Exposures
208
3
60
0.9
73
Library
South
Exposures
208
3
60
0.9
86
208
3
60
0.9
23
120
1
60
.9
5.8
120
1
60
.9
5.8
120
1
60
.9
9.8
120
1
60
.9
5.8
120
1
60
.9
9.8
208
1
60
.9
Library 1 st
floor
community
room
Men/women
restrooms
Men/women
restrooms
Men/women
restrooms &
public/staff
Men/women
restrooms &
public/staff
Parking
Garage
Elevator
equip room
P
P
Miory Kanashiro
Lighting/Electrical
Rosegarden Branch Library, San Jose, CA
Spring 2004
Utility
The local utility used to distribute power to the building is Pacific Gas & Electric. PG&E will provide all the electricity for
Rosegarden.
Controls
The controls used in this building were mostly DMX and iplayer 2.0 for the colored cove lights. This control along with the light
system manager software, should provide enough and easy information in order for the library caretakers to program different views
or environments in the children’s area of the library. These controls will allow for color changing through time. There will be various
programmed “scenes” which will run through the day creating vibrant colors which will energize the space.