Professional Resume Wilson Diaz Munar PERSONAL DETAILS Position Address Contact Details Date of Birth Place of Birth Civil Status Citizenship Email address : : : : : : : : Senior I&E Engineer/Turnover Engineer/ E&I QA/QC Engineer/QS Engineer ttachPhotograph San Francisco, San Fernando City, La Union, Philippines +971566898709/ +63726075941 November 23, 1960 Poro Point, San Fernando, La Union, Philippines Married Filipino wilsonmunar@yahoo.com EDUCATIONAL BACKGROUND Saint Louis University- Baguio City, Philippines. Bachelor of Science in Electrical Engineering-1978 ~ 1984 CAREER ASPIRATIONS In five years time I aim to be a Lead E & I Engineer or E & I Manager. I know that's ambitious and to get there I will need to deliver outstanding results. EXECUTIVE SUMMARY I have twenty-three (23) years of active and progressive experience in the field of Electrical and Instrumentation Engineering in Onshore & Offshore Oil & Gas Industries with different phase of Electrical Engineering, ranging from Electrical to Instrumentation practice, detailing, hook-up, commissioning, quality inspections, maintenance, estimation and start-up. Vast experiences in the Fabrication, Hook-up and Commissioning of offshore Topsides platforms. Involved in the preparations of bid proposals, detailed engineering, estimating and project executions. Design review E/I drawings for construction. Prepare project work schedule in preparation for the project execution. Prepare installation and project commissioning procedures of E & I equipments. Familiar and well conversant with the application of Standard Operating Procedures (SOP), engineering standards, design practices by Brunei Shell Petroleum, Sarawak Shell Berhad, Sabah Shell Petroleum, ESSO Production Malaysia Inc.(EPMI) and Petronas Carigali. Also knowledgeable with material standard specification codes such as PTS and MESC including international codes and standards such as IEE, ASME, API, ISO, ISA, NEMA, NEC, NFPA, AWS, MSS etc. AREAS OF EFFECTIVENESS 1. Project Management and QHSE supervision and implementation. 2. Supervision of Onshore Fabrication and Offshore Hook-up & Commissioning of Topside modular platforms. 3. Managed multi-discipline engineers for Mechanical Completion and Close Out activities of offshore HUC projects. 4. Quality control and implementation. Review, correct as required multi discipline ITPs, Procedures, Drawings & Vendor Data Sheets, Material Specifications, Method of Statements and other Quality related documents submitted by Implementation Contractors (IC). 5. Drafting, review, estimate and prepare Tender proposals (Technical and Commercial). 6. Workpackage preparations, Man-hour estimations, Jobcardings, material take-off and Construction Network Planning. Dossier preparations for Pre-commissioning and Commissioning of HUC projects. 7. Asset Integrity Inspection/ Verifications and Inspections of Explosion Proof (EE’x) Electrical and Instrumentation equipments in Hazardous Areas. 8. Verification and upgrading of the Well Test Facilities of Drilling Platforms. 9. Quantity surveying with a solid background on re-measurements, pricing, tender and variations identification of Electrical works. WORK EXPERIENCES Position Company Project Duration : Instrument & Control Commissioning Engineer (PROJECT MANAGEMENT TEAM) : Emirates Aluminium Company Ltd. (loaned from SPIE Oil & Gas Services ME LLC) : Emirates Aluminium Smelter Complex Proj. – Phase 1 (valued at 6.50 Billion USD) : October 2009 to present DUTIES AND RESPONSIBILITIES Performed quality control and over sight of construction works activities, and monitor contractor inspections and testing as per requirements approved inspection and test plan (ITP), specification, and drawings. Review ITP, Procedures, Drawings & Vendor Data Sheets, Material Specifications, and other Quality related documents submitted by Implementation Contractors (SNC-LAVALIN & WORLEY PARSONS). Assigned in the Material Handling Area, Reduction Area and Power Plant Area. Responsible for interacting with Company and Contractor Quality and Construction teams to ensure that all systems are mechanically complete prior to Hand Over to the Start-Up Team. Supported project in working closely with Contractor’s construction teams in tracking Mechanical Completion to Start-up transition in order to realize a timely and systematic commissioning campaign. Interfaces with Commissioning Leads ensuring alignment between Construction and Commissioning requirements, in order to maintain system prioritization. Advising and reporting directly to the Pre-Operations Area Manager. Monitored and coordinated administration of project’s Start-Up data base (Smart Plant Foundation). Ensure that documentation associated with the effort is available, correct and complete and meets Company standards. Reviewed/ revised/ prepared electrical/operation procedures/work Instructions on electrical power systems. Executing quality assurance of technical content in electrical and Instrumentation pre-commissioning. Oversight of various phases of the project including organization, scheduling, and submittal reviews, development and implementation of work plans, final testing and commissioning. In-charged of Quality Inspection for the process and final completion procedure conforming per approved project specification and standard prior to final acceptance and hand-over to the client. Witnessed Pre-operations Verification testing activities, review Functional Descriptions/ Method of Statements for every testing works and ensure the related safety aspects are in place. Reviewed/ revised/ prepared electrical/operation procedures/work Instructions on electrical power systems. Executing quality assurance of technical content in electrical and Instrumentation pre-commissioning. Oversight of various phases of the project including organization, scheduling, and submittal reviews, development and implementation of work plans, final testing and commissioning. Attends walk downs prior to discipline acceptance identifying and reporting any ‘hold points’ & deficiencies. Understand the Project standards and ensure the design meets the requirements. Position : Mechanical Completion Supervisor Company : StatOilHydro (loaned from SPIE Oil and Gas Services Middle East LLC) Offshore Projects : SPD-7/SPD-8 & SPD-9 Topsides Fabrication & HUC for South Pars Field-Iran Duration : May 6, 2008 – Aug. 31, 2009 DUTIES AND RESPONSIBILITIES Acted as a reliever to the Engineering Manager during her absence from work and directly responsible for the Engineering related matters and the implementation of the project offshore. Final review of work packages prepared by the discipline engineers ensuring that all the necessary reference documents/ drawings are attached in the Work Packages, the required safety procedures and all the materials required on the work orders have been called out and requested. Prepared weekly reports and conduct teleconference weekly with offshore personnel and land based Operation personnel to discussed progress and highlights problems and constraints encountered during the implementation of works offshore. Oversee all Contractors' development and implementation of a Project specific Completion Strategy, therein: Stage 1 (Mechanical Completion), Stage 2 (Function Testing), Stage 3 (System Commissioning) and Stage 4 (RFO, Ready for Operation). Review and verify all Contractors' completion input to Project Master Schedule and detailed planning of all Completion activities. Ensure all Contractors implement an effective organization for the Completion function and that they manage personnel to ensure a professional execution of responsibilities, therein; quality, timely completion and HSE aspects. Follow up all Contractors' preparations and execution of all Project Completion activities, also including developing and implementing of a Project specific Completion Safety Strategy. Assist all Contractors to liaise with Operations to ensure that Completion activities are executed in line with Operations' expectations and requirements. Divide the scope of work into relevant SubSystems and establish appropriate dossiers. Establish commissioning procedures. Follow-up of packages and testing activities. Define and provide necessary spare parts, test equipment, tools and "first fill". . Execute the mechanical and the commissioning scope and hand over the systems to the client's operation. Position Company Project Duration : E&I Hook-up Engineer : Samsung Heavy Industries-SHI (loaned from C.S. TOTAL Co. Ltd.- South Korea) : Vasai BCPA-2 Process Platform project – ONGC-Bombay High Offshore Field : Sept. 18, 2007 to April 2, 2008 DUTIES AND RESPONSIBILITIES Responsible for the supervision of E&I Contractors during the fabrication of the Vasai East Development project (BCPA-2 Process platform) for Oil and Natural Gas Commission of India (ONGC) at Samsung Heavy Fabrication Yard, Geojie Island, South Korea. Assigned as the main contractor’s (Samsung Heavy Industries) Site Representative (E&I) during the Hook-up of the project at Bombay High Field, Offshore India and responsible for the supervision of the Sub-contractor for both Hook-up and interconnection activities of the new platform and modifications and Tie-in works at existing ONGC facilities. Position Company Project Duration : E&I- Quality Control Surveillance Engineer (QCS) : GERMANISCHER LLOYDS Offshore & Industrial Services Brunei (B) Sdn. Bhd. : Asset Integrity Inspection of Certified Equipments in Hazardous Areas : Sept. 01, 2005 to Sept. 15, 2007 DUTIES AND RESPONSIBILITIES Seconded to the Client, Brunei Shell Petroleum Co. Ltd. (BSP)-Operations/ Maintenance Dept. (Indicator-BSPOPM/144) for the Certified-Equipments (Hazardous Areas) verifications/ inspections for all Brunei Shell Petroleum Asset Units (total of more or less than 200 offshore platforms and onshore satellite stations). Responsible for the verifications & inspections of all Electrical & Instrumentation Explosion proof (EEx) equipments for Hazardous Areas in Champion-07 Offshore Field East Asset Unit), Ampa Offshore Field (West AU) and Darat Onshore Field AU. Responsible for the generation of reports and inspection checklist for all EEx-certified equipment inspected/ verified, highlighting all the major findings of non-compliance to EEx equipments standards and specifications. Recommending solutions for rectifications of non-conformance and the replacement to certified types of equipments from existing non-certified equipments used in the Hazardous Areas. Performed work scoping inspection to determine conditions of all the Electrical and Instrument equipments in Hazardous Zone-1 & Zone-2 Areas and identify and hence subsequently quantify items on existing client’s asset which requires maintenance or replacements or repair. Position Company Duration : Workpack Engineer cum Construction Focal Point Engineer (E&I) : Sarku Engineering Services Sdn. Bhd.- Miri, Malaysia : July 08 2003 to Aug. 30, 2005 Offshore Projects Involved: Shallow Clastics SC (F13W) DR-A Topside Facilities HUC for Sarawak Shell Berhad E8 DR-A Topside Facility HUC for Sarawak Shell Bhd. E11–Complex Rejuvenation project for Sarawak Shell Berhad–(1.50 Million Offshore construction Manhours project for the total rejuvenations of the ageing twenty two (22) years old process complex platform to extend its operations for another 25 years. F-23 Complex Rejuvenation project for Sarawak Shell Berhad (same work scope as that of E-11 complex Rejuvenation project). Barton–B platform Rejuvenation Project for Sabah Shell Petroleum Co. Ltd. F6-DP-A Infill Well Tie-in– Pre- Drill for Sarawak Shell Berhad. Additional Four WH Conductors project - BARAM-B platform for Petronas Carigali Sdn. Bhd. DUTIES AND RESPONSIBILITIES Reviewed IFC, AFC drawings for Electrical / Instrumentation hook-up, safety shutdown system philosophy and identify work scope. Maintain complete project file as per “Workpack File System”. Prepared jobcards and allocate budgeted manhours for all E & I Hook up & Commissioning activities and incorporate into construction network planning for work pack compilation. Reviewed and identified the scope of work as indicated in the drawings against written scope of work and to raise and resolve technical queries, to clarify ambiguities/ discrepancies. Prepared Commissioning write-ups for the project specified equipments, instruments & control system. Reviewed design package material take-off lists and identify additional or shortage materials required for the project. Identified resources requirements i.e construction tools/ equipments and personnel, vendor assistance (if any) and special hook-up procedures required for the project implementation. Advised client’s Project and Discipline Engineer on expediting outstanding technical queries, proposals and project documents require for the project preparation and implementation. Highlighted workpack constraints and areas of concern that were encountered during project implementation. Established close contacts with the client’s Project and Discipline Engineers for timely input to the preparation of the work pack. Assigned as the focal point during offshore execution of works and responsible for the supervision, monitoring and planning of the construction and pre-com. works. Liaison with client’s discipline engineers with STQ, Technical clarifications, materials delivery projections and assist E & I supervisors to plan the next day activities, consolidate and feed back related information to the Project Planner. Attended daily coordination and progress meeting with the client, highlight any area of concern on the job, citing any constraints (i.e. materials, downtime due to weather or manpower incompetence) causing delays on work schedule and recommending any remedial measure to catch up with the original schedule. Position : Instrument Commissioning Engineer Company : Petrokon Utama Sdn. Bhd. – Negara Brunei Darussalam Offshore Project : Champion-07 Field Well Test Rectification project Duration : April 10, 2002 to March 31, 2003 DUTIES AND RESPONSIBILITIES Seconded to Brunei Shell Petroleum Co. Ltd. for the Champion Field-CP Well Test Rectification project. The project involved rectification and upgrading of current Well Testing Facilities for 31- platforms/locations in the East Champion Field Area. The Project includes Testing and Commissioning and Final Hand over to Operation Dept. Lead a team composed of a Mechanical Engineers and a Mechanical Draftsman and responsible for the commissioning of the individual Well Test facilities, identifies discrepancies based on the P&ID drawings against the actual status and condition of the Test Separators. Recommends necessary solutions for the upgrade and improvement of the existing facilities. Responsible for the calibrations and testing of the miscellaneous instrumentations of the Test Facilities. Performed continuity check of all I/O points from field Instruments of the Test facility to RTU & SCADA. Responsible for the verification of the condition and fitness of all existing instruments in the Test Separator unit. These include field instrumentations, control valves, gauges, relief valves, isolation valves, piping, fittings and any special items in the skid including the upstream and downstream piping. Generated list of potential piping and instrumentation items that may require change out based on the current condition of the items during the site survey. Responsible for the verification of wiring termination in the field junction boxes, marshalling cabinets and field devices. Field check and confirm availability of all input/output (I/O) points in the field and its respective interface with Flow Computer and Marshalling cabinets. Preparation of work packages for piping and instrumentation systems modifications and close out reports upon project completion. Position : E&I Field Engineer/ E&I QA/QC Engineer/ Proposals & Estimation Engineer Company : Orbtech Engineering (Group of Companies) Sdn. Bhd. – Kuala Lumpur, Malaysia Duration : June 18, 1993 to Jan. 15, 2002 Onshore and Offshore Projects involved: Commissioning of Resak Onshore Gas Terminal (ROGT) Project –Kerteh, Malaysia Hook-up and Commissioning of Produced Water system Upgrade (PWSU-Phase B) project for Esso Prod.(M) Inc. at Seligi-A Platform, Offshore Terengganu, Malaysia. Hook-up and Commissioning of High Integrity Piping System (HIPPS) project for RAYA-A Host Tie-in to Seligi-A platform - Offshore Terengganu, Malaysia. Commissioning of KELOIL-PTT Thailand LPG Bottling Plant (Seconded to the main contractor SHAPADU Energy & Engineering (SEEN)- Kelantan, Malaysia Hook-up & Commissioning of Seligi-A Crude Oil Metering system, Gas Launcher and Receiver for Raya-A platform Host Tie-in to Seligi-A platform for Esso Prod. (M) Inc. (EPMI)-Offshore Terengganu, Malaysia. Electrical Quantity Surveying for Kuala Lumpur City Center (KLCC) Petronas Twin Towers project GC1(Seconded to Hill International/ Intrecanales- Ekovest Sdn Bhd. Propane Dehydrogenation Plant (PDH) project for MTBE- Kuantan, Malaysia Hook-Up and Commissioning of various Oil and Gas platforms for Petronas CARIGALI Sdn. Bhd. (PCSB) under Contract No. EEP-1007: 1. Hook-up and Commissioning of Dulang-C platform-Offshore Malaysia 2. Hook-up and Commissioning of Dulang-D platform-Offshore Malaysia 3. Modifications/ Upgrading projects of satellite platforms: BARAM-AA, BARAM-G, BARAM-F and BARAM-E Platforms- Baram Oilfield, Sarawak Waters, Malaysia. 4. Hook-up and Commissioning of Dulang-B Water Injection and Gas Compression Modules – Offshore Malaysia 5. Hook-up and Commissioning of Tapis –E Drilling platform – Offshore Malaysia DUTIES AND RESPONSIBILITIES As a Proposals & Estimation Engineer (E&I) Received assignments and Bid documents from the Business Development Manager or Head of Projects. Study the project work scope of works, client’s requirement, Bill of Quantities (BOQ), project milestones, and specification from the supplied bid documents. Prepared the Indirect Cost of the project e.g. Supervisory manpower, temporary facilities both for the contractor/ client, sub-contractor, site overheads and running expenses. Prepared multi discipline conceptual, detailed and definitive cost estimates for Company Capital Projects and review estimates to ensure accuracy, completeness and compliance with the defined Scope of Work. Developed MTOs and/ or verify MTOs, equipments and bulk quantities against P&IDs and drawings. Coordinated with Planning Engineer for the Construction Schedule and Resources (Material & HR) Schedule. Participated in Clarification meetings for short listed tenders. Asked for Sub contractors Quotations as well as Service Suppliers. Man-hour and cost estimate preparations for Bid/ Tender proposals. As E&I QA/QC Engineer Seconded to the client Oil and Gas Petroleum (OGP) Technical Services to oversee contractor activities and ensure that all the Instrumentation Construction and Testing works adhere to the Plant’s Quality and Standards based on good working knowledge of British, American and other International Codes and Standards, proper Instrument installation practices as well as local statutory requirements. Follow up Field Quality Control Plan, witness and hold points as determined by the FQC manual. Responsible for the documentation for Quality Control : Field Quality Control Plan; QC Records Prepared Corrective Action Response as per any Non Compliant Report (NCR) issued. Monitored construction progress, verified the list and issue the relevant documents issued to the contractors. Verify materials for specification compliance. Witnessed calibration of all the instruments and signed their individual calibration certificates. Generated Punch list for every system and monitor punch killing. Monitor and witness loop checking activities of the miscellaneous instruments of the Propane Dehydrogenation Plant project. As E&I Field Engineer Assigned as the Supervising Engineer for various Oil and Gas Platforms projects for Petronas Carigali Sdn. Bhd. (PCSB) under contract no. EEP-007 Responsible for the simulation testing of all field instruments for the Oil in Water Separator vessels, Skimmed Oil Collective vessels and Skimmed Oil transfer Pumps. Supervised field calibrations of instruments such as pressure transmitters (DP-Cell types), flow transmitters, shutdown valves, flow control valves and level control valves. Bench calibrations of pressure control valves and Pop test of relief valves. Monitored Produced Water System Upgrade running parameters at the DCS. Adjust and control the Nominal Interface levels of the vessels to control oil skimming and adjust weir on the vessels to produce good quality of water on the system. Attended and witnessed Facility Acceptance Testing for the Switchgears and Motor Control Center’s protection relays and circuit breakers’ current injection test. Prepare commissioning checks sheets. Witnessed the validations of miscellaneous instruments’ calibrations and loop checks conducted by a Third Party Validation Team. Led and supervised E & I hook-up team for the loop checking, function testing and calibration of field instruments. Prepared Method of Statements and Commissioning procedures. As Electrical Engineering Quantity Surveyor Re-measurements, pricing, tender and variations identification of the Electrical works based on issued tender drawings in comparison to its corresponding revisions on letter of awards or contract drawings. Study and review the electrical system specifications and standards and apply to the measurement works. Position : E&I Construction Engineer/ E&I QA/QC Engineer Company : Atlantic Gulf & Pacific Co. of Manila, Inc.-Batangas Marine & Fabrication Yard- Philippines Duration : Sept. 1984 to 1993 Onshore Projects: Fabrication and Assembly of Seven (7) Trains ONGC-BPB Complex project for Oil & Natural Gas Commission of India (ONGC). Fabrication and Assembly of Baanpot Central Process Platform, Living Quarters and Utility Decks for Union Oil of California (UNOCAL). 4–Units 14.4 Mega Watts Diesel Engine Power Plant Barges project by Mitsui Engineering & Shipbuilding Company (MES) of Japan. Fabrication and Assembly of Zinc Production Plant Structures for Cominco Alaska Red Dog. Fabrication of 2-units 150 Ft Self Propelled Independent Tank Barge Projects (M/V Diana and M/V Cristina). DUTIES AND RESPONSIBILITIES As a QA/QC E&I Engineer Implemented QC procedures, assessed and reviewed the quality control plans, timely execution of projects, monitored and followed-up the Site activities. Review E&I Request for Quotation (RFQ) to provide required of certification code. Review E&I Engineering Drawing prior to issue RFQs. Review E&I Vendor package, Technical Bid, Technical Data sheet, Table of compliance (TOC) prior to issue purchase Order (PO) as per Project Specification. Review and evaluate E & I Contractors and Supplier’s Documents completion files for accuracy and adequacy. Liaise with Electrical & Instrumentation Proponents (Engineers) for Technical queries. Visit and perform witness inspections and monitor processes at Factory Acceptance Test (FAT) for Electrical Equipments. Submitted Major equipment Factory Acceptance Test report to Documents Control Center (DCC) to add in Team site. Review Third Party Inspection report, Factory Acceptance Test report, punch items and after inspection satisfactory instruct to issue “Release Notes” for Electrical and Instrumentation (E&I). Perform E & I Construction Assessment in accordance with Surveillance Program. Witness acceptance tests for E & I at site and perform final Quality Checks prior to acceptance of equipment and materials as appropriate. Attend and contribute to site and Project Audit, Technical meetings. As E&I Construction Engineer Plan and supervise all construction and installation activities at project site through the use of key contractors. Drive the integrated HSE improvement efforts at site working closely with the plant projects team, the operations team, Engineering & Maintenance personnel and key contractors. Supervise the construction and installation contracts together with other members of the company’s construction team. Ensure that the design and construction interfaces and coordination are managed efficiently, facilitating a swift resolution for any on-site technical queries. Contribute to the management and control of changes to scope, deviations from specifications, costs, schedule and contingency planning. SEMINARS/ TRAINING ATTENDED Basic Safety Training Course (Sea Survival, Fire Fighting, H2S and First Aid) – Kish International Safety Training Center, Kish Island, Republic of Iran- 2008 (valid until October 2010). Training on Project Information and Management Systems (PIMS) and Project Completion System (ProCoSys)- for encoding of Project Work Orders/ Work packages prepared and closing of Work Orders completed– StatOilHydro Office, Tehran, Iran- 2008 Competent Worksite Supervisor Training Course (IMS-5)- Megamas Training Center, Brunei- 2007 HUET + EBS (Helicopter Underwater Escape Training with Emergency Breathing Apparatus) – Megamas Training Center, Brunei - 2007 Certified Equipments for Hazardous Areas (CEFHA) for Zone-1 & Zone-2 Hazardous Areas - Human Development Learning Center - Brunei Shell Petroleum - Brunei - 2005 HSE Familiarization for Senior Staff – Megamas Training Center– Brunei-2005 Tropical BOSIET Training Course, Fire Fighting, First Aid and Travel by Boat Safety Course (OPITOrecognized) – Megamas Training Center, Brunei - 2005 Managing Hazards (PTW–1) Megamas Training Center, Brunei– 2002 and 2005 Permit to Work for Worksite Supervisor (PTW–2)– Megamas Training Center, Brunei- 2002 and 2005 HUET Training Course, Fire Fighting and First Aid Course, Miri Safety Training Center (MSTC)- Miri, Sarawak, Malaysia- 2004 Survival of Life at Sea (SOLAS) – Terengganu Safety Training Center - Malaysia – 1993 and 1996 Basic Foremanship Seminar – Atlantic Gulf & Pacific Co. – Philippines- 1986 Instrument Technician Training- Atlantic Gulf & Pacific Co. – Philippines- 1986 Basic Instrumentation Training Course – AG&P- Philippines- 1985 Mineral Insulated (MI) cables for DC system – AG&P-Philippines – 1985.