Government of the Sakha Republic (Yakutia)
INVESTMENT GUIDE BOOK
OF THE SAKHA REPUBLIC (YAKUTIA)
Yakutsk 2011
1
«… Nowadays the solution of numerous long-term tasks depends on
development of the Russian Far East. And these tasks are of crucial
importance for our country».
(Dmitry Medvedev, President of the Russian Federation)
«…The Sakha Republic (Yakutia) is the largest constituent entity of the
Russian Federation and one of its richest depositories of resources.
Naturally, sustainable and dynamic development of Yakutia is of key
importance for both the Far Eastern District and Russia on whole...»
(Vladimir Putin, Chairman of the Russian Federation Government)
«Our republic has everything to create a better life – abundant natural
resources, long-term strategic action plans, sustainable social
development, positive natural increase pattern, high educational level of
the population, relatively young and economically proactive labor force
…»
(Yegor Borisov, President of the Sakha Republic (Yakutia))
2
Ladies and Gentlemen!
Today, ensuring socioeconomic well-being of every
citizen and the state is only possible with the active use of
modern scientific - technological advances, extensive
enhancement of innovative activity, and development of
regional infrastructure under public - private partnership.
The Sakha Republic (Yakutia) is one of the fastest
growing federal subjects and has a significant influence on the
development of the Russian Far East. Its vast territory rich in
natural resources, presence of major export-oriented
companies, favorable geographical position and proximity of
the Asia-Pacific markets, as well as a unique tourist potential
create preconditions for becoming a strategic outpost of
Russia in the Far East.
The republic faces big strategic plans - the
implementation of the comprehensive development scheme till 2020. The region has concentrated largescale investment projects which are of great socioeconomic importance to the eastern part of Russia. The
construction of the railway "Berkakit-Tommot-Yakutsk” is being completed;the first line of the “Eastern
Siberia-Pacific Ocean" oil pipeline has been constructed; the republic continues to implement the
country's largest project "Integrated Development of Southern Yakutia"; the creation of Yakutia gas
production center was initiated in accordance with the Eastern Gas Program.
These and other projects will form a modern competitive economy based on innovative solutions
and advanced industrial base, which ultimately will create the conditions for a new quality of life. The
strategic goal is to overcome system-based infrastructure constraints, to create favorable environment to
attract investments and skilled workers, creating comfortable living conditions in the region.
We look forward to further successful cooperation of science, government and business to jointly
tackle major issues of socioeconomic development in general, creating an effective platform for
cooperation between federal and regional authorities, Russian and foreign investors to discuss the issues
of infrastructure development and implementation of promising investment projects throughout the Far
East.
Creating a favorable and stable investment climate in the region is one of the main objectives of
the Government of the Sakha Republic (Yakutia). The priorities of the republic’s authorities are to
diversify and attract investment in the priority economy sectors: oil and gas industry, including
production and processing of oil and gas, metal ores and coal mining, construction materials production,
processing of agricultural products and timber industry.
I am confident that joint efforts of the Government, business and society can transform the global
challenges and constraints into new opportunities for sustainable development of the Far East as the key
sector that strengthens the geopolitical position of Russia in the international community.
I wish all participants and guests of the international conference fruitful and constructive work,
interesting initiatives and success!
President of
the Sakha Republic (Yakutia)
Yegor Borisov
3
Yakutia in Figures
Yakutia lies in the north-eastern part of
Asia stretching 2,000 km north-south and 2,500
km east-west.
The area of 3,102 thousand square
kilometers covers one fifth of the total area of
Russia and is equal to 2/3 of Western Europe’s
territory.
Over 40% of Yakutia lies beyond the
Arctic Circle.
It spans three time zones (UTC +9, +10,
President, the State Assembly (Il Tyumen), the
Constitution and Supreme Courts.
The supreme legislative body is the State
Assembly (Il Tyumen).
The supreme executive body is
Government of the Sakha Republic (Yakutia).
The highest executive official and head of
the Sakha Republic (Yakutia) is President of the
Sakha Republic (Yakutia).
As of January 1, 2011, there are 445
municipal units, including 34 municipal regions,
2 urban districts and 409 urban and rural
settlements.
According to the interim data of the AllRussian 2010 Census, the population of the
republic makes 958,3 thousand people, including
urban population making 64.1% and rural
population – 35.8%. The republic is home to 126
nationalities, including the Yakuts – 45.5%;
Russians – 41.2%; Ukrainians – 3.6%; Evenks –
1.9%; and Evens- 1.2%. The population density
in the republic makes 0.3 people per sq.km.
Yakutia enjoys the variety of natural
conditions: its continental climate shows up in
the air temperature fluctuation range reaching
100 degrees Centigrade. The republic is home to
the pole of Cold of the northern hemisphere,
with the lowest temperature registered at 71.2
degrees C.
Москва
Якутск
+11).
Yakutsk, the capital of the republic, is
8,468 km away from Moscow.
Yakutia has borders with seven entities of
the Russian Federation:
on the west — Krasnoyarsk Krai,
on the south-west and south — Irkutsk
Oblast and Amur Oblast, Zabaikalsky Krai,
on the south-east — Khabarovsk Krai,
on the east — Magadan Oblast and
Chukotka Autonomous District.
The state authority is executed by
4
Social and Economic Situation
services.
Natural resources
Almost the entire territory of Yakutia is
situated in the permafrost area. 72% of the
republic’s territory is covered by taiga, the rest –
by forest-tundra, tundra, and the Arctic desert.
Forests cover 47% of the territory, making up
11% of all-Russia reserves.
Yakutia has preserved many places of
pristine nature. This unparalleled environment is
home for rare animal and bird species.
There are over 700 thousand rivers,
which exceed 10 km, flowing in the republic,
with 314 of them being over 100 km long. The
Kolyma, Indigirka and the Lena River's major
tributaries – Olyokma, Aldan and Vilyui –
surpass almost all the European rivers, including
the Rhine and Elba, by their length and water
volume.
Industrial production mostly depends on
non-ferrous metallurgy (mining of diamonds and
gold), as well as fuel and energy complex (coal
mining, oil and gas extraction). They account for
over 70% in the total volume of Yakutia’s own
production.
Major economic parameters trend
Over the period from 2005 to 2010, the
socioeconomic situation in the republic was
marked by the real growth of major
macroeconomic parameters: gross regional
product (116.2% in 2010 against 2005 level),
transport cargo turnover (102.9%), commodity
circulation (132.5%), fee-based services
rendered to the population (129.3%).
The Lena River, the republic's major
waterway, is among the ten greatest rivers of the
world. There are over 800 thousand lakes with
water surface exceeding 1 ha each. The waters
are abundant in rich fish resources – over 90
species.
The Sakha Republic (Yakutia) ranks first
in the Russian Federation by total reserves of
natural resources. Its raw material potential is
estimated at RUR 78.4 trillion.
Economy structure
The economy is based on export-oriented
industry connected with development of
abundant natural resources.
GRP is also
influenced by construction, commerce, transport
and communications, agriculture, and social
5
The following agricultural industries
remain traditional for people in the Sakha
Republic (Yakutia): beef and milk cattle
breeding, droving horse-breeding for meat,
reindeer herding, and farming. The republic has
the largest cattle stock in the Far East. In the
northern areas people practice hunting, trapping,
fishery, and fur farming. Due to the large share
of rural population in the republic (35.8%), the
government takes numerous measures to support
agriculture.
Investments into fixed capital
The period 2005-2010 witnessed
implementation of several large-scale investment
projects of great significance for Yakutia and the
entire Russia, as well.
The Sakha Republic (Yakutia) is
introducing production of innovative products. In
September 2010, there was launched a basalt
materials plant in the town of Pokrovsk.
In the city of Yakutsk, there is a project
on launching a facility assembling and producing
light diode equipment. It will be first welcomed
by the northern regions of the republic. In near
future, the plant's production will be supplied to
the Russian Far East, as well.
Population revenues and labor forces
The republic is solving urgent social
tasks. The real revenues of the population rose
by 1,2 within the 2005 — 2010 period.
In 2010 economically productive
population amounted to 490.8 thousand people,
with 447.4 thousand people employed in the
economy.
Education employs about 19% of the total
number of labor force, mining of natural
resources – 10%, medical care – 10%, transport
and communications – 9%, power engineering
and housing sector – 7%, construction – 6%,
processing – 4%, agriculture – 3%. The average
age of the employed is 39.6. The majority of
employees (26,7%) have higher professional
education; vocational education – 26.5%, and
secondary education – 23.6%.
Major indicators of the Sakha
Republic‘s socioeconomic development by
2030 (according to the innovative scenario):
GRP growth per capita at parity of the
purchasing power up to USD 48 thousand (90%
to the level of OECD countries);
real GRP growth in 2011-2030 by 3
times, including in 2011-2020 – 1,9, in 20212030 – 1,6;
increase of the average expected life
expectancy to 73,3 years;
growth of actual disposable income of
population by 4 times compared with 2010;
reduction of the population poverty to
6,3%.
reduction of general unemployment level
to 3,5% to EAP, level of registered
unemployment to 3% to EAP;
growth of provision of 1 citizen of the
republic with total usable housing to 34,05 sq.m.;
reduction of hazardous dwelling share to
2,03%;
Growing investment activity stems from
strategic investments of major Russian
companies into the republic’s economy –
construction of Eastern Siberia –Pacific Ocean
oil pipeline through the territory of the republic;
construction of underground diamond mines,
Talakan and Alinsky oil and gas fields, Elga coal
deposit, construction of railway line Berkakit –
Tommot – Yakutsk, power lines and others.
6
gas supply coverage of 76% of the
republic’s population;
increase of the share of population having
acess to centralized water supply and disposal to
69%;
elimination of hazardous schools by
2030;
fully meeting the demand for preschool
institutions for the children aged 3-6 by 2030;
double reduction of the share of
hazardous healthcare buildings;
bringing
year-round
transport
accessibility to 73% of the area. Growth of
transport mobility of the population by 3 times;
completion by 2014 of transfer to
rendering public services electronically;
increase of Internet use density to 85
people per 100 people.
7
INVESTMENT CLIMATE
By the Russian President commission,
the Sakha Republic (Yakutia) has developed
the Scheme of integrated development of
labor forces, transport and power industry in
the Sakha Republic (Yakutia) till the year
2020. The scheme outlines strategic priorities
and directions aimed at effective use of unique
raw material potential of the republic.
All the major investment projects are
included into the Strategy of social and
economic development of the Russian Far
East and Baikal area till the year 2025.
In the long-term (within the innovative
scenario in 2011 – 2030) RUR 5,5 trillion of
investment will be attracted to the fixed capital in
the prices of the respected years.
Creation of favorable and sustainable
investment climate in the region is one of the main
tasks of the Sakha Government. The Program of
forming a favorable investement climate in the
Sakha Republic (Yakutia) is implemented; it is
aimed at improving the regulatory legal base in the
field of investment activity, creating and
development
of
investment
infrastructure,
reduction of administrative barriers, formation of
new mechanisms to attract investments, formation
of favorable conditions to diversify production and
promotion of innovative technologies to the
market.
Priorities include enhancement of transport
and power infrastructure of the republic, hydro and
heat generation of power for exploitation of natural
resources in the economy.
In accordance with the Scheme of
intergarted development of labor forces, transport
and power industry in the Sakha Republic
(Yakutia) till the year 2020, the republic is
constructing a railway to the city of Yakutsk with a
bridge across the Lena River; in future it is
expected to reach the border with Magadan Oblast.
The republic is creating all-year-round
network of federal and republic’s motorways with
the major logistic hub in the city of Yakutsk; it is
also modernizing the airplane and river fleet. There
is a plan to connect central, western and southern
parts of the republic by power transmission lines,
to construct economical power stations.
As a result of these changes in
infrastructure, by the year 2020 weight-average
cost of bringing one ton of cargo to the regions of
the republic would halve and the power tariffs
would equal with the average all-Russian level.
In accordance with order of the Russian
Government of 10 March 2009 No. 302-r, there
started implementation of the first stage on
designing
documentation
for
“Integrated
Development of Southern Yakutia” investment
project. Since the launch of the project, it has
received for preparatory and pre-project works
RUR 24,2 billion, including RUR 16.5 billion of
private investments, RUR 7.25 billion – from the
Investment Fund of the Russian Federation. The
project includes the following sites: Kankun
hydropower station (OAO “RusHydro”, OAO
“Yuzhno-Yakutsky GEK”), Yakutsk Center for gas
production (OAO “Gazprom”), Elkonsky mining
Due to the sustainable socioeconomic
development, international rating agencies increase
the credit rating of the republic regularly. In
October 2010 Fitch Ratings confirmed long-term
ratings of the Sakha Republic (Yakutia) in foreign
and national currency at “BB” level, with the shortterm rating of the region on foreign currency at
“B”. Also, the agency confirmed the republic’s
long-term national rating “AA-(rus)” level. The
forecast for all long-term ratings is amended to
“Positive”.
In May 2011 Standard and Poor’s
International Rating Agency confirmed the
republic’s credit rating at “BB-/Positive/ruAA-”.
The Sakha Republic (Yakutia) is one of the
leaders of the Russian Federation by both the
number of investment projects to be implemented
on its territory and the volume of investments.
8
and smelting plant (OAO “Atomredmetzoloto”,
ZAO “Elkonsky GMK”), Inaglinsky coal complex
(OOO “Kolmar”, ZAO “Yakutskie ugli – new
technologies”), Tarynakh and Tayozhny GOKs
(mining and processing plants) (OAO “GMK
“Timir”), Seligdar mining and chemical plants
(OAO “ALROSA Investment Group”), 270 km of
railways, 150 km of motorways, 1,200 km of
power transmission lines and 7 substations. The
project
creates
conditions
for attracting
investments into Southern and Western Yakutia,
for realization of projects in related industries.
Besides, in Southern Yakutia OAO “Mechel” will
develop Elga cola deposit with balance reserves at
2.1 billion tons.
A similar cluster approach is applied to a
number of other megaprojects:
“Integrated development of Tomponsky
mining industrial region”. With the use of private
investments, this project includes development of
Nezhdaninskoe
gold
deposit,
VerkhneMenkechenskoe silver and polymetals deposit, as
well as construction of Dzhebariki-Khaya heat
power station, 3 power lines and 2 substations.
“Integrated development of Western
Yakutia”. This comprehensive investment project
includes development of oil and gas fields;
construction of pipelines; construction of
underground diamond mines; building Vilyui
motorway; building motorways and power
transmission lines connecting Yakutia with Irkutsk
Oblast.
The Eastern Gas Program of the Russian
Federation Government includes development of
Chayanda-Khabarovsk-Vladivostok and launching
the development of Yakutia gas center with the
development of Chayanda-Botuobinskaya group of
gas fields.
4. Federal Law of 9 July, 1999 No. 160-ФЗ
“On foreign investments in the Russian
Federation”;
5. Federal Law of 29 April, 2008 No. 57ФЗ “On procedure of foreign investments into
economic entities of strategic importance for
defense and national security”;
6. Federal Law of 29 October, 1998 No.
164-ФЗ “On financial rent (leasing)”;
7. Federal Law of 30 December, 1995 No.
225-ФЗ “On agreements about production
division”;
8. Federal Law of 30 December, 2004 No.
210-ФЗ “On tariff regulation in communal service
institutions”;
9. Federal Law of 14 April 1995, No. 41ФЗ “On state regulation of tariffs for electric and
heat power in the Russian Federation”;
The Republic’s normative acts:
1. The Sakha Republic (Yakutia) Law of
30 May, 2006 347-З No. 709-III “On investment
activity in the Sakha Republic (Yakutia);
amendments to the Law are to be approved before
the end of 2011.
2. The Sakha Republic (Yakutia) Law of
22 December, 1992 No. 1270-XII “On foreign
investments in the Sakha Republic (Yakutia);
amendments to the Law are to be approved before
the end of 2011.
3. The Sakha Republic (Yakutia) Law of
10 July, 2003 No. 48-З No. 97-III “On taxation
policy in the Sakha Republic (Yakutia);
4. Draft Law of the Sakha Republic
(Yakutia) “On Public-Private Partnership in the
Sakha Republic (Yakutia) is to be approved before
the end of 2011”;
5. Program on creating a favorable
investment climate in the Sakha Republic
(Yakutia) approved by the Resolution of the Sakha
Republic Government of July 1, 2011 No. 286.
6. Resolution of the Sakha Republic
Government of 26 April, 2007 No. 171 “On
adopting a procedure of approving investment
programs of regulated organizations”;
7. Resolution of the Sakha Republic
Government of 30 June, 2005 No. 404 «”On
procedure and terms of forming the united registrar
of capital investment objects in the Sakha Republic
(Yakutia)”;
8. Resolution of the Sakha Republic
Government of 30 June, 2005 No. 403 “On
establishing criteria for long-term termination of
Legislation regulating investment activity
in the Sakha Republic (Yakutia)
Federal normative acts:
1. Federal Law of 25 February, 1999 No.
39-ФЗ “On investment activity in the Russian
Federation, performed in the form of capital
investments”;
2. Federal Law of 21 July, 2005 No. 115ФЗ “On concession agreements”;
3. Federal Law of 22 July, 2005 No. 116ФЗ “On special economic zones in the Russian
Federation”;
9
financing investment projects from the state budget
of the Sakha Republic (Yakutia)”.
10
enterprises – on their property which is conserved.
Also, enterprises generating electric power
with diesel stations in the north are exempted from
the property tax if this activity earns over 70% of
the total revenues from production (works,
services) sale.
In order to support local manufacturing in
terms of basic production assets, food industry
enterprises pay the benefit property tax at 1.1%
rate.
Airports with property worth more than
RUR 300 million are also exempted from the
property tax. This benefit is aimed at modernizing
and reconstructing airport facilities, better working
conditions and labor safety.
To support airworthiness of aircarfts, air
transport enterprises which perform 50% and more
of socially important passenger traffic and are
enlisted as such by the Sakha Government, are
exempted from paying the property tax.
Tax incentives
One of the forms of investment activity
state regulation is to establish favorable conditions
by providing tax incentives.
In compliance with the Law of the Sakha
Republic (Yakutia) “On investment activity in the
Sakha Republic (Yakutia)”, the subjects of
investment activity may seek the following tax
incentives:
 on the income tax of the organizations
in the form of reduction by four percentage points
of the rate of income tax to be paid to the state
budget of the Sakha Republic (Yakutia);
 on the property tax of the organizations
in terms of the property newly created, purchased
or reconstructed (upgraded) to implement an
investment project, and (or) in terms of the
property provided for temporary ownership or use
in compliance with the financial leasing agreement,
and (or) in terms of the property purchased in
compliance with the financial leasing agreement;
 on transport tax in relation to vehicles
used to implement an investment project.
The incentives can be provided for five
years from the start of an investemt project
implementation.
In order to stimulate and modernize water
supply and draining, the tax benefit has been
established for enterprises dealing with withdrawal,
treatment and distribution of water and investing
capital for these goals.
In order to stimulate investment activity of
oil producing enterprises, the republic has lowered
the income tax going to the regional budget from
18% to 13.5%, on condition that the capital is
invested for development of natural resources.
In order to ensure timely supply of the Far
North and other territories with limited access with
necessary resources during the navigation period,
and to improve financial situation at water
transport enterprises,operating sea-river type
vessels, the abovementioned enterprises pay lower
income tax at the rate of 13.5% and are exempted
from corporate property tax.
Due to seasonal nature of their activity,
water transport enterprises are exempted from
paying the property tax on their property which is
conserved or idle; forestry and timber industry
To prevent higher tariffs for heat energy,
there is a tax benefit on property of utilities and
communal services organizations receiving
subsidies from the budget to compensate losses;
besides, enterprises in this sphere enjoy a benefit
on the transport tax in relation to their special
vehicles.
Like it is granted by the federal legislation,
there is a benefit for motorways of public use, both
republic’s and municipal.
Given high costs of agriculture, enterprises
producing and processing agricultural products are
granted some benefits on regional taxes.
To support small businesses using the
simplified taxation system with taxation target
being “revenues and expenses”, the tax rate has
been lowered from 15% to 10%, the simplified
patent-based taxation system has been introduced
for private entrepereneurs.
11
organization "National Securities Market
Association" (NSMA).
Financial infrastructure
The banking system of the republic is
represented by 22 credit institutions, including 4
independent banks, 18 branches of banks of other
regions.
Assets of credit institutions of the republic
in 2010 totaled RUR 109.3 billion and increased
the level of 2009 by 8.6%.
In the insurance market there are 2
republican insurance companies: OAO RIC
“Sterkh", and OAO GSMK "Sakhamedstrakh", 11
branches of insurance companies of other regions
of Russia.
The branch network of the RIC "Sterkh"
and OAO GSMK "Sakhamedstrakh" covers all
regions of the republic. Additionally, the regional
insurance company came to the inter-regional
level, opening branches of the RIC "Sterkh" in
Khabarovsk and GSMK "Sakhamedstrakh" in
Magadan.
There are 7 organizations with 20 licenses
for professional activity in the securities market.
OAO "Republican Specialized Registrar
“Yakutsk Fund Center "(YFC) is one of the
oldest independent Russian registrars at the federal
level in the Far East, carrying out activities in
keeping the register of holders of securities since
1993. Its license was issued by the Federal
Financial Markets Service of Russia for an
indefinite term. YFC is a member of a selfregulatory organization of securities market
participants - the Professional Association of
Registrars, Transfer Agents, Depositories
(PARTAD) since 1995.
OAO "Yakut Depository Center" (YDC)
was established on January 26, 1996. Activities:
brokerage, management of securities depository
activities. YDC is a member of a self-regulatory
Entrepreneurship
There are 47 thousand small and mediumsized business entities, including 5.1 thousand
small and medium-sized enterprises and 41.8
thousand registered individual entrepreneurs.
According to expert estimation (including
salaried employees of individual entrepreneurs),
the share of employment in small and medium
enterprises in the total employment in the economy
is 40%.
The turnover of small businesses in 2010
increased by a quarter and is RUR 80.7 billion and
the turnover of medium-sized enterprises almost
doubled and exceeded RUR 19.2 billion million.
Financial support for entrepreneurs is
facilitated through the relevant federal, republican
and municipal programs of the funds of
entrepreneurship support and development.
Businesses can partly recover expenses
incurred during the entire production cycle,
including cadastral work and promotion of
manufactured products to domestic and foreign
markets. Particular attention is given to innovative
small companies and companies involved in the
modernization of production and its export.
State support areas in high demand are the
following: grants, microfinancing, suretyship,
property support, educational programs.
Infrastructure of property support of
businesses includes business incubators in the
cities of Yakutsk and Neryungri. A business
incubator in Nyurba and a technopark in Neryungri
are being set up currently.
12
External economic activity
The Sakha Republic (Yakutia) has external Ukraine (6,9%), Korea (6,2%).
commercial relations with 45 countries. Ties have
In 2010 the enterprises and organizations
traditionally been strong with European countries; of Yakutia received USD 8,1 million from
external economic cooperation of the republic with India, rendering international services. They basically
Israel, USA, China is developing dynamically. 94% of
include transportation services (94,6%), services
the entire foreign turnover of the republic falls on these
of travel agencies, tourist agents and excursion
countries.
By the results of 2010 the growth of basic indices agencies.
In 2010 the number of participants of the
of the republic’s economic development has been
witnessed, including the external economic activity external economic relations in the Sakha
indices. In 2010 the exports volume made USD 3232,9 Republic (Yakutia) grew by 6,6% and made 129
million. The imports volume made USD 90,7 million. In units.
As of January 1, 2011, the accumulated
2010 the foreign turnover more than doubled compared
to the 2009 level up to USD 3323 million. Export surplus foreign capital in the republic’s economy made
went positive and made USD 3142,2 million, which is USD 2122 million, which is 43% more than a
year before.
USD 1761,0 million more than in 2009.
USD 1337 million of investments came to
the republic’s economy from abroad in 2010,
КАРТИНКА:
Foreign turnover anf investments of the which is 20% more than in the similar period of
2009. 99% of the total receipts volume was
Sakha Republic (Yakutia), USD million
invested in natural resources extraction.
In the structure of accumulated foreign
Imports, UDS million
investments at January 1 2011 the share of direct
Exports, USD million
investments made 11,9 %, portfolio investments
Investment receipts, USD million
0,2%, the share of other investments on the
revolving basis (credits) – 87,8%.
Luxemburg (80,9%) and Cyprus (13,1%)
Among the regions of the Far Eastern
Federal District the Sakha Republic (Yakutia) has were leading among the investing countries by
preserved its positions, holding the third place the the volume of the capital accumulated in the
foreign turnover index, being inferior to Sakhalin republic.
By the volume of investment income from
Oblast and Primorsky Krai.
Exports volume grew by the results of 2010 abroad to the regions of the Far Eastern Federal
due to the sales of precious stones, precious metals District in 2010 the Sakha Republic (Yakutia)
and products from them to Belgium, Israel and takes the 2nd place after Sakhalin Oblast.
India (81,7% of the total exports volume).
Goods were mostly delivered to the republic
from the USA (35,3% of the total imports volume),
China
(13,5%),
Japan (12,9%), Germany
(8,7%),
13
List of investment projects
Integrated Large-scale Projects
1. Project name
Integrated development of Southern Yakutia
Location
Aldansky, Neryungrinsky, Olekminsky regions of the Sakha Republic (Yakutia)
Project initiator
Government of the Sakha Republic (Yakutia), OAO “Development of South
Yakutia Corporation»
Project characteristics
The project purpose – creation based on the principles of public-private
partnership, of a new large industrial area with hydropower facilities, power
grid and transportation infrastructures and a cluster of industrial production
(electricity consumers guaranteed), mainly associated with advanced processing
of available mineral resources (natural gas, apatite, coal, iron and uranium ores
and other).
The project main tasks and expected oucomes:
- removal of infrastructural constraints for socio-economic development of the
area;
- maintaining high economic growth rates in the country;
- increase the economically active population in Yakutia - one of the most
sparsely populated regions of the Russian Federation;
- revenue growth and improving the quality of life;
- increase the revenue base of the budgets of all levels;
- development of strategic goods production;
- development of new production of advanced processing of raw materials;
- diversification of Russia's exports (as an extension of its geography and
increase the range of manufactured goods);
- strengthening Russia's geoplolitical position in Asian-Pacific Region.
Construction of industrial facilities:
- Inaglinsky coal complex (2013)
- Southern Yakutia metallurgy union (mining and processing of iron ore):
Tayozhny mining and processing plant (2016)
Tarynakhsky mining and processing plant (2016-2018)
- Seligdar gas and chemical complex (mining and production of phosphor
and complex fertilizers) (2019)
- Yakutsk Gas Production Center (2020)
- Elkon mining metallurgy plant (mining and processing of uranium) (2025)
- Kankun HPS (2019-2025)
Construction of infrastructure facilities:
- Railway infrastructure (about 270 km) (2012-2015):
Tommot-Elkon mining metallurgy plant,
Kosarevsky-Seligdar gas and chemical complex,
Tayozhnaya-Tayozhny mining and processing plant,
Chulbass-Inaglinsky coal complex,
Ikabiekan-Tarynakhsky mining and processing plant.
14
- Motorway infrastructure (about 150 km) (2014):
- Tommot-Elkon mining metallurgy plant,
- Malyi Nimnyr- Kankun HPS.
- Power supply network infrastructure (about 1200 km of HVL and seven
substations) (2012-2015):
- HVL “Kankun HPS-Neryungri” and substation “Neyungri”,
- HVL “Kankun HPS-aldan” and substation “Aldan”,
power supply to Elkon Elkon mining metallurgy plant,
Tarynakhsky and Tayozhny mining and processing plants, Seligdar
gas and chemical complex and Inaglinsky coal complex.
Investment volume
According to the project framework, approved by the Governmnetal
Commission on Investment Projects of national significance (protocol № 1 of
October 10 2008), the total volume of investment in 2007 prices will make RUR
422,477 billion, including budget allotments of RF Investfund RUR 14,5 billion,
funds of investors – RUR 308 billion.
Infrastructure available Land has been allocated for industrial facilities (except Seligdarsky MCC and
Yakutsk Gas Production Center).
Infrastructure required Included in the project.
Cost of project
Project planning: RUR 10 064,4 m, (including RF Investfund – RUR 7 428,2 m,
project co-investors – RUR 2 636,2 m)
Construction (in 2007 prices, according to the Project framework): RUR 413
602,1 m, (including RF Investfund – RUR 107 862,9 m, co-investors – RUR
305 739,2 m.)
Implementation period I stage – project documentation development – 2009 – 2012.
II stage – construction works – 2012-2025.
IRR
16,8%
NPV
RUR 83 265 m
Investor’s involvement Investors:
- OOO Kolmar - Inaglinsky coal complex
- OAO GMK Timir - Southern Yakutia metallurgy union
- OAO Atomredmetzoloto, ZAO Elkon mining metallurgy plant - Elkon
mining metallurgy plant
- OAO Gazprom - Yakutsk Gas Production Center
- AK ALROSA (OAO) - Seligdar gas and chemical complex
- OAO RusHydro, OAO Southern Yakutia MPP - Kankun HPS.
State support of the I stage of the project implementation in terms of funding
the design of infrastructure facilities is provided from the RF Investfund.
The state represented by the responsible officers secures design and
construction of the following:
- Railway infrastructure – Roszheldor,
- Motorway infrastructure – Rosavtodor,
- Poer supply network infrastructure, scheme of Kankun HPS poer output,
development of Kankun HPS design estimates, participation in funding of
Kankun HPS construction (dam construction) – Russian Energy Ministry,
- Development of Elkon MMP design estimates – Rosatom.
Project documentation development: – RUR 2 636,2 m)
Construction (in 2007 prices, according to the project framework): – RUR 305
15
739,2 m.
Project detailedness
Designing of the project estimates is available and there is the State Expertise
positive conclusion on Inaglinsky Coal Complex, road for the Elkonsky Mining
and Metallurgical Plant and a railroad for Inaglinsky Coal Complex.
Designing of the project estimates on other transportation infrastructure
facilities were sent for expertise.
The project documentation will be completed gradually during 2011-2012.
As of July 1 2011, state investments allocated for the project estimates made
RUR 7,253 billion. The remaining volume of financing fro RF Investfund in
2011 will make RUR 175,152 million (including for electric power supply
infrastructure facilities – RUR 100,6 million, railway infrastructure RUR 71
million, motorways – RUR 3,552 million).
The expenses of investors made RUR 16,952 billion, including RUR 687,3
million for desigs estimates within the Invetsment Agreement.
CEO of an
organization
implementing the
project
Mikhail Lvovich BRUK
General director ОАО “South Yakutia Development Corporation”
Conracts
ОАО SYDC, 127473, Russia, Moscow, Seleznevskaya str. 11б
tel. +7 (495) 232-42-44, fax: +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
2. Project name
“Integrated development of the mining industrial region Tomponsky”
Location
Tomponsky region of the Sakha Republic (Yakutia)
Project initiator
Government of the Sakha Republic (Yakutia), OAO “South-Verhoyanskaya
Mining Company” (OAO “Polyus Zoloto”)
Project characteristics
The aim of the project is to create based on public-private partnership principles
a large industrial area in the North-East of Russia on the base of electric power
supply infrastructure industrial production facilities related to nonferrous metals
mining.
The project assumes the implementation of the following large investment
projects:
“Development of Nezhdaninskoe gold deposit”
“Development of Verkhne-Menkechenskoe polymetals deposit”
“Construction of Dzhebariki-Khaya coal power station”
“Construction of electric power and transport infrastructure”
The following constructions will be financed at the expense of budget
allocations:
- Thermal power station on the existing Dzhebariki-Khaya coal deposits with
total funding of 15,4 mld. rubles VAT included in 2010 1st quarter prices;
- Electric power lines and substations
 HVL-220 kV “Khandyga – Razvilka”;
 HVL-220 kV ”Dzhebariki-Khaya – Khandyga”;
 HVL-110 kV “Razvilka – Nezhdaninskoe”; branch-line to
16
Verkhne-Mechenskoe
from
HVL-110
kV
“RazvilkaNezhdaninskoe”);
 Substation 220 kV “Khandyga”, “Razvilka”;
 Substation 110 kV “Nezhdaninskoe”;
 Substation 110 kV “Verhne-Menkechenskoe”, with total funding
of RUR12,2 billion VAT included in 2010 1st quarter prices.
The following construction works will be at the cost of private investors:
a) Nezhdaninsky Mining Enterprise with extraction and processing capacity of
3 m t a year. Construction investment is RUR 25,4 billion VAT included in
2010 1st quarter prices.
b) Verhne-Menkechensky Lead-Zink Mining Enterprise with of capacity
500 000 t of ore a year. Construction investment is RUR 4,2 billion VAT
included in 2010 1st quarter prices.
Investment volume
RUR 57,2 b
Infrastructure available KOLYMA Federal Road
Infrastructure required Design and construction of a thermal power station, power grid infrastructure
Cost of project
RUR 57,2 b (in 01.01.2010 prices including VAT)
Implementation period The first phase 2011 and 2014 includes construction project documentation
development (it should be finished by December 2012 and sent to FGU
“Glavgosekspertiza” followed by designing facilities):
1. Nezhdaninskoe Mining Enterprise (GOK).
2. Verhne-Mechegenskoe Lead-Zink Mining Enterprise.
3. Thermal power station on the existing Dzhebariki-Khaya coal deposits
4. Electric power infrastructure
The second phase 2013-2016 includes detailed engineering (designing finishes
in 2014) and facilities construction:
1. Industrial enterprices:
• Nezhdaninsky Mining Enterprise with extraction and processing capacity of
3 m t a year;
• Verhne-Menkechensky Lead-Zink Mining Enterprise with capacity 0.5 m t
of ore a year.
2. Thermal power station on the existing Dzhebariki-Khaya coal deposits.
3. Electric power infrastructure:
 double circuit 220 kV “Khandyga – Razvilka”;
 double circuit 220 kV ”Dzhebariki-Khaya – Khandyga”;
 HVL 110 kV “Razvilka – Nezhdaninskoe”;
 Substation 220 kV “Handyga”, “Razvilka
 Substation 110 kV “Nezhdaninskoe”.
IRR
Will be calculated after joining of all estimates into a single financial model
NPV
Will be calculated after joining of all estimates into a single financial model
Investor’s involvement Investors:
- ZAO Polyus – construction of Nezhdaninsky Mining Enterprise
- OAO Geopromining – Verhne-Menkechensky Mining Enterprise investors
to design and construct thermal power station and electric power supply
networks (power supply lines, step-down and step-up substations) have not
17
been identified.
Project detailedness
Techno-economic evaluation of construction of "Coal electric station in
Tomponsky region Republic of Sakha (Yakutia)."
Techno-economic evaluation of the cost of the external electrical network
infrastructure of the perspective companies of Tomponsky mining region.
Feasibility study of exploratory conditions for calculation of Nezhdaninskoye
gold deposit.
Preliminary geological and economic evaluation of Mining Complex on the
existing polymetallic deposit Verhne-Menkeche.
CEOof an organization General Director Igor Igorevich TSUKUROV - OAO “South-Verhoyansky
implementing
the Mining Company”
project
Contacts
677000, Yakutsk, Lermontova str., 25, 5th floor
Tel/Fax: +7 (4112) 22-61-40
Oil and Gas Complex
3. Project name
Location
Project initiator
Project characteristics
Volume of investment
Development of Chayanda gas condensate field
Lensky region, Sakha Republic (Yakutia)
OAO Gazprom
Field reserves:
 natural gas:
o С1 – 379.7 b cub.m;
o С2 – 861.2 b cub.m;
 gas condensate :
o С1 – 6088/5732 ths t;
o С2 – 13423/12657 ths t;
 oil:
o С1 – 165/42.5 m t;
o C2 – 32.6/7 m t.
Construction of Chayanda oil and gas condensate field:
10.
construction of the field oil fringe (beginning of oil production 2014):
1) construction of a pipeline from the field to the Eastern Siberia – the
Pacific Ocean (ESPO) system;
11.
construction of the field gas pool (beginning of gas production
- 2016):
1) construction of a trunk pipeline Yakutia – Khabarovsk Vladivostok;
2) construction of gas processing and gas-chemical facilities for
extraction of gas valuable components.
Volume of gas and oil production at the field, system of oil and gas
external transportation from the field, distribution and capacity of gas
processing and gas-chemical facilities will be determined by
“Justification of investments into construction of Chayanda filed,
transport and gas processing” (to be complete in the 3rd quarter of
2011).
RUR 986 236 m in 2010 prices (to be reviewed in accordance with
18
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
4. Project name
Location
Project initiator
Project characteristics
“Justification of investments into construction of Chayanda fieldd,
transport and gas processing”)
At Talakan field (immediate vicinity from Chayanda field), there is a
gas-turbine power station of OAO Surgutneftegaz. Its capacity may be
used for power supply of industrial facilities at Chayanda field.
There is a concrete-covered motorway from river berths in settlements
of Vitim and Peledui to Talakan field (which is very close to Chayanda
field), also owned by OAO Surgutneftegaz.
The route of major gas pipeline “Chayanda – Khabarovsk Vladivostok” has been identified:
«Chayanda – Lensk – Olyokminsk – Aldan – Berkakit – Tynda –
Skovorodino – Blagoveschensk – Khabarovsk-Vladivostok» (along the
ESPO).
Electric power is supplied to Lensky region via two HV-100 kV power
transmisison lines Mirny - Lensk.
With Option 1 route, there are constructed deposits of common mineral
resources (mines); HV-220 kV lines Suntar – Olyokmonsk and
Neryungri HPS – Nizhny Kuranakh – Tommot – Maya; roads along the
ESPO.
HVL 220 kV Chernyshevsky - Mirny - Lensk - Peledue (doublecircuit) and VILYUI federal motorway on route Mirny - Lensk –
Peledui – Vitim – Nepa – Ust-Kut are under construction.
Construction of a railroad Lena station – Nepa – Vitim – Lensk is
necessary.
RUR 986 236 m in 2010 prices
Beginning of oil production – 2014
Beginning of gas production – 2016
No information
No information
Upon results of “Justification of investments into construction of
Chayanda filed, transport and gas processing”) (to be complete in the
3rd quarter of 2011).
Subjects of the Russian Far East and Asian Pacific countries.
100% owned by OAO Gazprom
Works are conducted on drilling the prospect wells. In 2011-2013 it is
planned to drill 15 prospect wells (5 each year).
The project is going through a fesibility study stage, enfineering and
geologicval research is conducted.
General Director, ООО GAZPROM Invest Vostok
Dmitry Yurievich SHELEKHOV
680000, Khabarovsk Krai, Khabarovsk, 22 Shevchenko Str.
Tel. (4212) 41-53-08, (495) 984-63-73.
Fax (4212) 41-53-03, (495) 784-63-75
khabarovsk@gazprominvestvostok.ru
Development of Srednetyungskoe gas condensate field
Vilyuisky region, Sakha Republic (Yakutia)
Srednetyungskoe gas condensate field is situated within Vilyui
depression in the middle course of the Tyung River, the left tributary of
the Vilyui River.
OAO Sakhatransneftegas
Aim: creation of transport and electric power infrastructure.
19
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
Construction:
- construction of gas production facilties at Srednetyungskoe gas
condensate field (STGCF) with capacity of 403 m cub.m a year;
- construction of a trunk pipeline STGCF – Tamalakan, 135.2 km long.
RUR 5,106.70 m in 2011 prices
Cargoes are brought by the river transport along the Lena and Vilyui
Rivers via the settlement of Kysyl-Syr. Technical cargoes are carried
by small river fleet along the Tyung River. The navigation period on
the Vilyui River is usually short – June – early July, seldom throughout
August.
VILYUI federal motorway and Vilyuisk – Tyung temporary winter
road to the field site. Nearest airports – Yakutsk, Vilyuisk, Kysyl-Syr.
In summer, most cargoes and people are carried by helicopters.
Teher is a gas production facility near the settlement of Kysyl-Syr.
The nearest operating trunk pipeline Kysyl Syr – Tamalakan (Du 300)
is situated 135 km from Srednetyungskoe filed. The pipeline transports
gas from Srednevilyuiskoe gas condensate field (settlement of Kysyl
Syr).
Electric power to Vilyuisky and Verkhne-Vilyuisky regions is supplied
via HVL 110 kV Mirny – Suntar – Vilyuisk – Verkhnevilyuisk. To
enhance electric power infrastructure and increase power volume
delivered in this direction, there is being constructed HVL 220 kV
Mirny – Suntar – Nyurba. Mirny – Suntar leg has been complete and
operates with 220 kV substation in the settlement of Suntar.
RUR 5056,7 m
2012-2015
Central region of the Sakha Republic (Yakutia)
100% investor
Design estimates – available
Business plan - available
Ivan Konstantinovich MAKAROV
General Director, OAO Sakhatransneftegaz
Yakutsk, Kirova Str., 18, block B
Alexander Vasilievich GOGOLEV,
Deputy General Director, OAO Sakhatransneftegaz
Tel./fax +7 (4112) 42-48-44
е-mail: sakhatransneftegas@mail.ru
5. Project name
Development of Otradninskoe gas condensate field
Location
Lensky region of the Sakha Republic (Yakutia)
Otradninskoe gas condensate field is situated in Lensky region of the
Sakha Republic (Yakutia) 65 km north-west of the town of Lensk and
in proximate vicinity to the propsed gas pipeline Chaynda-KhabarovskVladivostok.
20
Project initiator
OAO Sakhatransneftegas
Project characteristics
Aim of the project: development of Otradninskoe GCF and supply of
consumers in the town of Lensk, Sakha Republic (Yakutia), with
natural gas; increase in natural gas balance reserves.
Gas stocks – С1-939 million m3, С2-5 400 million m3.
Forecast resources – Д1-39 018 million m3, С3-49 971 million m3
Stage 1 of the project will result in :
- development of transport and electric power infrastructure,
gasification of the town of Lensk;
- increased power and industrial safety of western region of the Sakha
Republic (Yakutia).
In middle-term perspective:
- eliminated local nature of the regional gas supply system;
- ensured export of gas;
- achievement of the task to fill the export gas pipeline.
Volume of investment
RUR 12,980 m in 2010 prices ($ 457 m)
Infrastructure available
There is an airport, operating all the year round and able to accept
almost all types of cargo planes; a large river port. Materials and
equipment are delivered by railway to Lena station, then by water
transport along the Lena River to the town of Lensk. From Lensk
cargoes are delivered by motor transport along Lensk – Mirny
motorway. Electric power supply of Lensky region comes from two
HVL-110 kV Mirny-Lensk.
In close proximity to the field there is a a pipeline system East Siberia –
Pacific Ocean. It is planned to construct a major gas pipeline Chayanda
– Khabarovsk – Vladivostok on route Chayanda – Lensk – Olyokminsk
– Aldan – Berkakit – Tynda – Skovorodino – Blagoveschensk –
Khabarovsk-Vladivostok (along ESPO).
There are equipped fileds of commonly occuring mineral resources
(mines).
HVL 220 kV Chernyshevsky - Mirny - Lensk - Peledui (doublecurcuit) and VILYUI federal motorway on route Mirny - Lensk –
Peledui – Vitim – Nepa – Ust-Kut are under construction.
Infrastructure required
Cost of project
Not required
Capital investment, RUR m,
21
12 980
including:
Improvement
Purchase of OOO Lensk-Gaz
Exploitation drilling
Prospect drilling
Gas pipeline
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
3 960
3 500
2 160
1 560
1 485
2011 – 2015
5.0%
RUR 3,079 m (not considering connecting in 2016)
Basic payback period 15.5 years, discounted payback period – 29.5
years
Consumers of Lensk, gas supplies to the designed major gas pipeline
Chayanda – Khabarovsk - Vladivistok.
Purchase of OOO Lensk-Gaz; the field development to annual
production capacity of 1,000 m cub.m.
Stage 1 design estimates (gasification of the town of Lensk) – there is a
justification of economic efficiency of developing Otradninskoe field
resource potential.
Ivan Konstantinovich MAKAROV
General Director, OAO Sakhatransneftegaz
Contacts
Yakutsk, Kirova Str., 18, block B
Alexander Vasilievich GOGOLEV,
Deputy General Director, OAO Sakhatransneftegaz
Tel./fax +7 (4112) 42-48-44
е-mail: sakhatransneftegas@mail.ru
6. Project name
Development of Biryuksky licensed site
Location
Olyokminsky region, Sakha Republic (Yakutia)
Project initiator
OAO Tyumaada-Neft Oil Company
Project characteristics
Project aim: production and selling of oil and natural gas; discovery of
new oil and gas fields and their further development.
The site is evaluated as a very promising territory in terms of oil and
gas bearing.
The site area is 3,608.7 sq.km. Carbohydrate resources of category D2
within the site amount to: oil (extractable) – 3.5 m t, gas – 40.0 b
cub.m. The reserves density on the site makes from 3-5 to 10-30 ths t of
reference carbohydrates per sq. km.
The following works have been done on the site:
- evaluation of the current background level on the territory;
- program on monitoring of the natural environment and subsurface
resources condition;
- program on prospecting and evaluation works for the period 2010 –
2015;
- project on seismic survey works.
In accordance with the License Agreement, the following works are to
be done within the next 5 years:
- seismic survey works МОГТ-2D, at least 1,800 running km;
22
Volume of investment
Infrastructure available
Infrastructure required
- construction of at least three prospecting holes.
The project includes creation of the production well fund; development
of the field for production; creation of infrastructure for oil and gas
selling.
RUR 21,500 m in 2011 prices ($862.7 m)
The largest settlement within the site territory – town of Olyokminsk,
the region's center, with population of 13 thousand people. There is a
river port and airport in the town. The major transport way is the Lena
River.
The distance from the site's northern border to pipelines is: settlement
of Tas-Yurekh-town of Mirny – 390 km; Kysyl Syr-Yakutsk – 400 km.
The ESPO trunk pipeline runs through the central part of the site. A gas
pipeline Chayanda-Khabarovsk-Vladivostok will be along the ESPO
system.
High-voltage power transmission line Suntar – Olyokminsk, OPS-14 of
ESPO system runs through the center of the site.
The distance to Berkakit – Tommot – Yakutsk (Nizhny Bestyakh)
railroad is 340 km. In October-April, transporting of cargo is done by
winter motorways. The road along the ESPO system is operated all the
year round.
Under way is construction of HVL 220 kV Chernyshevsky – Mirny –
Lensk – Peledui. End of constrcution – 2014.
Construction of an industrial terminal substation in the town of
Olyokminsk.
Cost of project
RUR 21,500 m
Implementation period
Gas pool – 20 years
Oil pool – 7 years
IRR
Estimated at 18-20 % (to be adjusted by the feasibility report results)
NPV
-
Payback period
-
Markets
1. Domestic market for needs of the housing and communal service
sector in the region and neighboring areas.
2. Delivery of oil to the ESPO pipeline and its further transportation to
the Russian Far East and Asian Pacific countries.
3. Delivery of natural gas into the trunk pipeline ChayandaKhabarovsk-Vladivostok and its further transportation to the Russian
Far East and Asian Pacific countries.
Investor's involvement
1. Partnership as a strategic partner with a share in charter capital.
2. Project financing.
3. Establishment of long-term of syndicated loans.
Project detailedness
Seismic survey has covered 0.12 running km/sq.km of the site. Four
deep holes have been drilled. Geological and engineering survey has
revealed three oil-bearing complexes: Riphean, Lower Lower Vendian
23
and Lower Cambrian subsalt.
Being developed:
- research report “Environmental study of Biryuksky licensed site”;
- monitoring of the environment and subsurface resources condition at
Biryuksky licensed site;
- prospecting and assessment works for OAO Tuymaada-Neft Oil
Company on Biryuksky licensed site;
- seismic prospecting works МОГТ-2Д at Biryuksky licensed site of
the Sakha Republic (Yakutia);
- feasibility study of the project;
- audit of oil and gas reserves under international standards;
- draft project on prospecting holes drilling.
CEO of an organization
implementing the project
Stepanov Mikhailovich CHEPALOV
General Director, OAO Tyumaada-Neft Oil Company
Contacts
Alexander Innokentievich MATVEEV,
Deputy General Director on Gas and Oil Projects
Tel. +7 (4112) 43-35-22
Innokenty Nikolaevich FADEEV,
Chief Geologist
cell # +7-914-2-710-861
е-mail: tuymaadaneftegas@mail.ru
7.Project name
Development of Zapadno-Anabarsky (West Anabar) licensed site
Location
Project initiator
Project characteristics
Volume of investment
Anabarsky National (Dolgan-Even) region, Sakha Republic (Yakutia)
OAO Tyumaada-Neft Oil Company
Project aim: production and selling of oil and natural gas from YuzhnoTigyanskaya (South Tigyan) area. Discovery of new oil and gas fields
and their further development.
The site is evaluated as a very promising territory in terms of oil and
gas bearing.
The site area is 1,564 sq.km. Carbohydrate resources of category D1+
D2 within the site amount to: oil – 10.3 m t, gas – 16.3 b cub.m.
The following works have been done on the site:
- evaluation of the current background level on the territory;
- program on monitoring of the natural environment and subsurface
resources condition, developed and approved;
- program on prospecting and evaluation works for the period 2008 –
2013, developed and approved;
- project on seismic survey works, developed and underwent expertise.
In accordance with the License Agreement, the following works are to
be done within the next 5 years:
- seismic survey works МОГТ-2D, at least 1,000 running km;
- construction of at least three prospecting holes.
The project includes creation of the production well fund; development
of the field for production; creation of infrastructure for oil and gas
selling.
RUR 38,500 m in 2011 prices ($1,355.6 m)
Infrastructure available
The site is situated on the Laptev Sea coastal area, between the Anabar
24
and Khatanga Rivers. The closest settlement Yurung-Khaya, with a sea
oil terminal and a helicopter landing site, is 80 km away.
There is a winter motorway. Electric power to the settlement of
Yurung-Khaya is supplied by a diesel power station owned by OAO
Sakhaenergo.
The regional center Saskylakh, with an airport and a sea port, is 180 km
away.
The settlement of Khatanga, Krasnoyarsk Krai, with a sea port is 250
km up the Khatanga River. The industrial base MAYAT, owned by
OAO Almazy Anabara is 250 km up the Anabar River.
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Via the Northern Sea Route, the Khatanga Bay is open for sea vessels.
Sea berth, terminal for storing and loading oil to tankers; industrial
facilities.
RUR 38,500 m
Gas pool – 12 years
Oil pool – 10 years
Estimated at 15 – 18 % (to be adjusted by the feasibility report results)
1. Domestic market for needs of the housing and communal service
sector in the region and neighboring areas.
2. Delivery of oil via the Northern Sea Route to EU and Asia-Pacific
countries.
1. Partnership as a strategic partner with a share in charter capital.
2. Project financing.
3. Establishment of long-term of syndicated loans.
Geophysical works started in the late 1930s. They have covered 566.6
running km of seismic profiles. 17 deep holes have been drilled, with
total length of 30,770 m and density of 19.7 m/sq/km.
The document available:
- research report “Environmental study of Zapadny Anabarsky licensed
site” by the Institute for Biological Problems of Cryolithozone,
Siberian Branch, Russian Academy of Sciences;
- program on monitoring of the environment and subsurface resources
condition at Zapadny Anabarsky licensed site by the Institute for
Biological Problems of Cryolithozone, Siberian Branch, Russian
Academy of Sciences;
- program on prospecting and assessment works for OAO TuymaadaNeft Oil Company on Zapadny Anabarsky licensed site by OAO
Tuymaada-Neft Oil Company;
- project for seismic prospecting works МОГТ-2Д at Zapadny
Anabarsky licensed site in the Sakha Republic (Yakutia).
Being developed:
- feasibility study of the project by OOO NIOKR-Service;
- audit of oil and gas reserves under international standards by the
International Audit Company;
- draft project on prospecting holes drilling.
Stepan Mikhailovich CHEPALOV
General Director, OAO Tyumaada-Neft Oil Company
25
Contacts
Alexander Innokentievich MATVEEV,
Deputy General Director on Gas and Oil Projects
Tel. +7 (4112) 43-35-22
Innokenty Nikolaevich FADEEV,
Chief Geologist
cell # +7-914-2-710-861
е-mail: tuymaadaneftegas@mail.ru
8. Project name
Location
Project initiator
Project characteristics
Development of Mukhtinsky licensed site
Olyokminsky region, Sakha Republic (Yakutia)
OAO Tyumaada-Neft Oil Company
Project aim: production and selling of oil and natural gas; discovery of
new oil and gas fields and their further development.
The site is evaluated as a very promising territory in terms of oil and
gas bearing.
The site area is 3,309.0 sq.km. Carbohydrate resources of category D2
within the site amount to: oil (extractable) – 18.5 m t, gas – 9.2 b
cub.m. The annual production volume averages to 1.2 m t for oil and
1.0 b cub.m for gas. The reserves density on the site makes 10-30 ths t
of reference carbohydrates per sq. km.
The following works are being done on the site:
- evaluation of the current background level on the territory;
- program on monitoring of the natural environment and subsurface
resources condition;
- program on prospecting and evaluation works for the period 2010 –
2015;
- project on seismic survey works.
In accordance with the License Agreement, the following works are to
be done within the next 5 years:
- seismic survey works МОГТ-2D, at least 1,600 running km;
- construction of at least three prospecting holes.
The project includes creation of the production well fund; development
of the field for production; creation of infrastructure for oil and gas
selling.
RUR 27,300 m in 2011 prices ($931.74 m)
The largest settlement within the site territory – town of Olyokminsk,
the region's center, with population of 13 thousand people. There is a
river port and airport in the town. The major transport way is the Lena
River. The distance from the site's northern border to pipelines is:
settlement of Tas-Yurekh-town of Mirny – 390 km; Kysyl Syr-Yakutsk
– 400 km. Major ESPO oil pipeline goes through the site’s central
zone. Gas pipeline Chayanda-Khabarovsk-Vladivostok will go in one
corridor with ESPO. HVL Suntar-Olyokminsk (HVL-220 kV SuntarOlyokminsk-OPS-14 for centralized power supply to Olyokminsk and
OPS-14 od ESPO system) goes along the site’s central part. The
distance to Berkakit – Tommot – Yakutsk (Nizhny Bestyakh) railroad
is 340 km. In October-April, transporting of cargo is done by winter
motorways. The road along the ESPO system is operated all the year
round.
HVL-220 Chernyshevsky-Mirny-Lensk-Peledui is under construction.
Construction finishes in 2014.
Volume of investment
Infrastructure available
26
Infrastructure required
Construction of an industrial terminal substation in the town of
Olyokminsk.
Cost of project
RUR 27,300 m
Implementation period
Gas pool – 7 years
Oil pool – 15 years
IRR
Estimated at 20-22 % (to be adjusted by the feasibility report results)
NPV
-
Payback period
-
Markets
1. Domestic market for needs of the housing and communal service
sector in the region and neighboring areas.
2. Delivery of oil to the ESPO pipeline and its further transportation to
the Russian Far East and Asian Pacific countries.
3. Delivery of natural gas into the trunk pipeline Yakutsk – Khabarovsk
and its further transportation to the Russian Far East and Asian Pacific
countries.
Investor's involvement
1. Partnership as a strategic partner with a share in charter capital.
2. Project financing.
3. Establishment of long-term of syndicated loans.
Seismic survey has covered 0.14 running km/sq.km of the site. Two
deep holes have been drilled.
Being developed:
- research report “Environmental study of Mukhtinsky licensed site” by
the Center for fauna assessment and cadastre under the Northern Forum
Academy non-profit partnership;
- monitoring of the environment and subsurface resources condition at
Mukhtinsky licensed site by the Center for fauna assessment and
cadastre under the Northern Forum Academy non-profit partnership;
- prospecting and assessment works for OAO Tuymaada-Neft Oil
Company on Mukhtinsky licensed site by Inno-Tech Research
Institution;
- seismic prospecting works МОГТ-2Д at Mukhtinsky licensed site by
OAO Yakutskgeophisica;
- feasibility study of the project by OOO NIOKR-Service;
- audit of oil and gas reserves under international standards by the
International Audit Company;
- draft project on prospecting holes drilling by OAO TomskNIPIneft.
Project detailedness
CEO of an organization
implementing the project
Stepan Mikhailovich CHEPALOV
General Director, OAO Tyumaada-Neft Oil Company
Contacts
Alexander Innokentievich MATVEEV,
Deputy General Director on Gas and Oil Projects
Tel. +7 (4112) 43-35-22
Innokenty Nikolaevich FADEEV,
27
Chief Geologist
cell # +7-914-2-710-861
е-mail: tuymaadaneftegas@mail.ru
9. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Construction of Yakutsk gas processing and gas-chemical complex
(business idea)
Lensky region, Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia), OAO Southern Yakutia
Development Corporation
Launching of gas processing enterprises producing synthetic
hydrocarbon products.
Capital investment for construction of the gas processing and gas
chemical complex are to cover costs of purchasing gas processing
equipment, helium liquefaction, ethylene processing,
light
hydrocarbon wide fractions processing, construction of underground
helium storage, stationary installations for liquid helium storage,
compressor stations for pumping helium into storage and methane feed
from the complex into the trunk.
Annual marketable products production volume:
methane – 16.9 bn cub.m.,
helium – 11.6 mn l,
polypropylene – 330.0 ths tons,
butane – 200.0 ths tons,
stable gasoline (fraction С5+) – 110.1 ths tons,
low density polyethylene – 295.1 ths tons,
high density polyethylene – 177.1 ths tons,
low density linear polyethylene – 295.1 ths tons.
RUR 35150 m ($ 1237,7 million) (reviewed by “Justification of
investments into development of Chayanda field, gas transportation and
processing”, to be complete by July 2011).
At Talakan field (in immediate vicinity to Chayanda GCF) there is a
gas turbine station owned by OAO Surgutneftegaz. It is possible to use
its facilities for power supply of Chayanda GCF facilties.
From river berths in settlements of Vitim and Peledui there is a
concrete motorway to Talakan GCF (which is in immediate vicinity to
Chayanda field), owned by OAO Surgutneftegaz.
Route of “Chayanda-Khabarovsk-Vladivostok” main gas pipeline.
“Chayanda - Lensk – Olyokmonsk – Aldan – Berkakit – Tynda –
Skovorodino – Blagoveschensk – Khabarovsk - Vladivostok” (along
ESPO).
Electrical power is supplied to Lensk region by two HVL-110 kV
Mirny-Lensk.
Developed deposits of widespread mineral resources (pits) are
available, as well as HVL-220 kV “Suntar-Olyokminsk” and HVL-220
kV Neryungri Regional Power Station – Nizhny Kuranakh – Tommot –
Maya – ESPO service drives.
Under construction are HVL 220 kV “Chernyshevsky – Mirny – Lensk
– Peledui (double circuit)” and VILYUI federal motorway on route
Mirny – Lensk – Peledui – Vitim – Nepa – Ust-Kut.
Construction of railway Lena station – Nepa – Vitim – Lensk is needed.
Construction of power and transport infrastructure:
28
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
10. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
RUR 35150 m
Updated
23.10%
RUR 24 050 m
10 years
Responding to growing demand for polymer products in Russia,
entering high-capacity polyethylene market on the US Pacific coast and
rapidly growing East and South-East Asian markets, helium exports to
the Asian-Pacific countires.
1. Partnership as a strategic partner with a share in charter capital.
2. Project financing.
3. Establishment of long-term of syndicated loans.
A part of Integrated Development of Southern Yakutia project;
feasibility report available.
“Justification of investments into development of Chayanda field, gas
transportation and processing” (to be complete in III quarter of 2011)
being worked out.
Mikhail Lvovich BRUK,
General Director, OAO “Southern Yakutia Development
Corporation”(SYDC)
OAO SYDC, 127473, Russia, Moscow, Seleznevskaya Str., 11б
Tel. +7 (495) 232-42-44, fax +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
Construction of Aldan motor fuels plant, a part of Yakut Gas
Production Center
Aldansky region, Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia), OAO Southern Yakutia
Development Corporation
The motor fuel plant in the town of Aldan would supply Southern
Yakutia with motor fuels, and given completion of railway Tommot –
Yakutsk in 2012 – central regions of the Sakha Republic (Yakutia) as
well.
The plant’s production breaks down as follows:
 winter diesel fuel — 368.2 ths t/year;
 gasoline with octane number 80 — 144.2 ths t/year;
 gasoline with octane number 91 — 51.6 ths t/year.
Oil products will be transported to consumers by motor and railway
transport all the year round.
RUR 16 570 million (USD 583,5 million) (reviewed by “Justification
of investments into development of Chayanda field, gas transportation
and processing” being done by OAO Gazprom, to be complete in III
quarter 2011).
Developed deposits of common minerals (mines); HVL 220 kV
Neryungri Regional Power Station – Nizhny Kuranakh – Tommot –
Maya; roads along the ESPO system; railroad.
Not required
RUR 16 570 m
Not available
27.50%
RUR 12 226 m
29
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
11. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
12. Project name
Location
Project initiator
8.3 years
Southern and central regions of the Sakha Republic (Yakutia): transport
companies and mining enterprises; electric power generation and
agriculture.
Investors' own funds
A part of Integrated Development of Southern Yakutia project;
feasibility report available.
“Justification of investments into development of Chayanda field, gas
transportation and processing” (to be complete by July 2011) being
worked out.
Mikhail Lvovich BRUK,
General Director, OAO Southern Yakutia Development Corporation
(SYDC)
OAO SYDC, 127473, Russia, Moscow, Seleznevskaya Str., 11б
Tel. +7 (495) 232-42-44, fax +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
Gas processing plant using GTL technology of converting gas into
liquid state
Yakutsk
OAO Yakut Fuel-Energy Company (OAO YaTEK)
A plant processing natural gas into motor fuels using GTL technology
RUR 10,786 m in 2011 prices (to be adjucted by the results of the
feasibility study) (USD 428,3 m)
Motorway (asphalt-concrete surface, all-the-year-round); trunk gas
pipeline. “Berkakit-Tommot-Yakutsk” is under consruction.
Tank farm; electric power supply; river terminal.
RUR 12 164,7 m in 2011 prices (to be adjusted by the results of the
feasibility study)
2012-2014
Will be identified by by the results of the feasibility study
Will be identified by by the results of the feasibility study
Will be identified by by the results of the feasibility study
Cenytral region of the Sakha Republic (Yakutia), Far-Eastern Federal
District
100% investor involvement
The project is now collecting the initial data, feasibilyt study is being
conducted, the technology of natural gas processing together with
Haldor Topse company experts is selected.
Igor Leonidovich DEMIDOV,
General Director
677000, Yakutsk, Khalturina Str., д. 4/1
Tel. +7 (4112) 22-39-11
e-mail: JSC-YGP@ygp.ru
http://www.yatec.ru
Establishment of a gas-chemical complex (GCC) in the Central
region of the Sakha Republic (Yakutia) (business idea)
Central region of the Sakha Republic (Yakutia)
Sakhatransneftegas OAO
30
Project characteristics
Gas-chemical complex of the Sakha Republic (Yakutia) includes:
1. Construction and operation of a pilot industrial installation with an
annual output of 3.5 thousand tons of methanol and 1.5 tons of oil
products per year;
2. Establishment of a gas-chemical complex with an annual output of
610 thousand tons of oil products, 450 thousand tons of methanol (with
an expansion to 1.5 million tons), and 200 thousand tons of ammonia,
to be commissioned in 2012 to 2016 period.
Volume of investment
RUR 8,000 million in 2011 prices for the first stage – first starting
complex (450 thousand tons of methanol a year) (USD 281,7 million).
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
Central Yakutia (3200 km tariff distance from Nakhodka port) is not
only located more conveniently in relation to Asian markets from the
geographic point of view than Irkutsk Oblast (4200 km) and
Krasnoyarsk Krai (5300 km), but also has all the necessary
infrastructure conditions for the implementation of such a project:
1. Two gas main pipelines along the whole length, an additional
pipeline along a significant part, with the last part of the third pipeline
in the final construction stage. Construction is done at the expense of
the republican budget within the frames of gas supply program with an
additional investment from the federal budget. Completion date: 2013.
After the completion the transport capacity will reach 4.5 billion cubic
meters a year.
2. Construction of a railroad “Berkakit-Tommot-Yakutsk”.
3. Methanol terminal in Nakhodka is operational with an annual
transshipment capacity of over 1.3 million tons of oil products and
methanol.
The GCC project in Central Yakutia uses the existing infrastructure and
is based on the ready resource base.
Infrastructure required at the project implementation location,
including:
- gas main pipeline with a capacity of 1.3 billion cubic meters a year
and a working pressure of no less than 1.6 MPa;
- 31 MW (first stage – first starting complex) and about 160 MW
when fully developed.
First stage – first starting complex (450 thousand tons of methanol a
year) – RUR 8,000 m
Construction – till 2017.
Production – starting in 2013.
18.9%
RUR 11 222 m
6.54 years.
Methanol:
- Internal market / gas extraction industries in Eastern Siberia and the
Far East;
- Export into the Asian Pacific region countries.
Synthetic liquid fuels:
- Internal market / Sakha Republic (Yakutia).
By agreement with an investor.
The GCC Establishment in the Central region of the Sakha Republic
(Yakutia) project is included in the Scheme of integrated development
31
CEO of an organization
implementing the project
Contacts
13. Project name
Location
Project initiator
Project characteristics
of labor forces, transport and power industry in the Sakha Republic
(Yakutia) till the year 2020. The project was reviewed at the session of
the Committee on the Issues of the North and the Far East of the State
Duma of the Federal Assembly of the Russian Federation, Minutes No.
31 of April 9, 2009.
The project is included in the list of the priority projects of the Russian
Ministy of Regional Development.
The project was reviewed at the session of the Commission on Natural
Monopolies of the Federation Council of the Federal Assembly of the
Russian Federation. Resolution No. 8-1 of May 26, 2009.
Minutes No. 10 of the Council on Science and Technical Policy under
the President of the Sakha Republic (Yakutia) of April 12, 2007.
- readiness level of project documentation (list of all project
documentation is available), including the availability of necessary
expert assessments of the project required by the Russian legislation
(tax, legal, environmental, technical-economic etc.)
Declaration (application) on intent to invest into the establishment of a
gas-chemical complex in Sakha Republic (Yakutia) (annual capacity:
450 thousand tons of methanol, 400 thousand tons of synthetic liquid
fuels, 200 thousand tons of ammonia).
Expert assessment of the Institute of Regional Economy of the North of
2008. Resolution No. 37 on reserving a land allotment for the project,
Megino-Kangalassky Inspection of Nature Protection.
Project documentation on Project S-01759:
- preliminary principal technological schematics;
- initial data for the project;
- preliminary equipment list.
Bankable feasibility study documentation has been developed.
For the first time in Russia a technical-economic justification of GTL
product production has been done with the participation of a foreign
licensor.
- the list of previously completed and currently realized activities for
the implementation of the project.
Methanol production project is being developed;
Land documents are being prepared;
Interaction with potential investors and attraction of investments are
being organized.
Sakhatransneftegas OAO Director-General
Ivan Konstantinovich MAKAROV
Yakutsk, Kirova, 18 str., “B” bloc
Sakhatransneftegas OAO Deputy Director-General
Alexander Vasilievich Gogolev
Phone/fax: +7 (4112) 42-48-44
E-mail: sakhatransneftegas@mail.ru
Supplying gas to settlements of the Sakha Republic (Yakutia)
Sakha Republic (Yakutia)
Ministry of Economy and Industrial Policy of the Sakha Republic
(Yakutia).
Supplying natural gas to Verkhnevilyuysk, Vilyuysk, Kobyaysk,
Namsky, Khangalassky, Gorny, Megino-Kangalassky, Churapcha, and
Lensk regions, Yakutsk City and its suburbs.
32
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
14. Project name
RUR 5 633,9 m ($ 198,4 million)
The project has the necessary engineering and transport infrastructure.
Not required.
RUR 5 633,9 m (in present prices).
2012-2016
Verkhnevilyuysk, Vilyuysk, Kobyaysky, Namsky, Khangalassky,
Gorny, Megino-Kangalassky, Churapcha, and Lensk regions, Yakutsk
City and its suburbs.
- Implementation os public-private partnership principles
- 100% budget funds (federal budget and state budget of the Sakha
Republic (Yakutia))
Project documentation and estimate is available for the individual
projects.
Minister of Economy and Industrial Policy of the Sakha Republic
(Yakutia)
Mikhail Anatolievich OSIPOV
Sakha Republic (Yakutia), Yakutsk, Lenina pr., 28
Phone: +7 (4112) 42-35-77 Department of Oil and Gas Complex and
Coal Industry Development
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Gas-main pipeline to Berdigestyakh settlement and branches to
Byas-Kyel, Kyurelyakh, Asyma, Dikimdya settlements of Gorny
region
Gorny region, Sakha Republic (Yakutia)
Ministry of Economy and Industrial Policy of the Sakha Republic
(Yakutia).
Supplying natural gas to settlements in Gorny region of the Sakha
Republic (Yakutia).
The total length of the gas pipeline is 179.4 km. 5 starting complexes:
First: 0 to 70 km, including a branch (0.68) and gas distributing station
in Byas-Kyel settlement (completed);
Second: 70 to 97.2 km, including a branch (1.86 km) and gas
distributing station in Kyurelyakh settlement (completed);
Third: 97.2 to 123.8 km, including a branch (1.07 km) and gas
distributing station in Asyma settlement;
Fourth: 123.8 to 155.0 km, including a branch (1.99 km) and gas
distributing station in Berdigestyakh settlement;
Fifth: 155.0 to 179.4 km, including a branch (0.07 km) and gas
distributing station in Dikimdya and Maay settlements.
RUR 1 256,6 m ($44,2 million).
The project has the necessary engineering and transport infrastructure.
Not required.
RUR 1 840,8 m (in present prices)
Implementation period
IRR
NPV
Payback period
Markets
2006-2016
Gorny region of the Sakha Republic (Yakutia)
Location
Project initiator
Project characteristics
33
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
15. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
16. Project name
-
Implementation os public-private partnership principles
100% budget funds (federal budget and state budget of the Sakha
Republic (Yakutia))
Project documentation and estimate is available.
Positive assessment of the State Expertise of Russia No. 032-07/ГГЭ
3150/02 of January 31, 2007.
Minister of Economy and Industrial Policy of the Sakha Republic
(Yakutia)
Mikhail Anatolievich OSIPOV
Sakha Republic (Yakutia), Yakutsk, Lenina pr., 28
Phone: +7 (4112) 42-03-10 (reception).
Gas-main pipeline Maya – Tyungyulyu – Borogontsy
Sakha Republic (Yakutia)
Ministry of Economy and Industrial Policy of the Sakha Republic
(Yakutia).
Creating conditions for the sustainable growth and social and economic
development of rural settlements, supplying natural gas to 8 settlements
of Megino-Kangalassky and Ust-Aldan regions.
The total length with all the branches is 169.8 km (the length of the
main pipeline is 146.1 km, branches – 23.7 km).
The project includes two starting complexes: first – 0 to 62.05 km (to
Tyungyulyu settlement, completed);
second – 62.05 to 146.1 km (to Borogontsy settlement).
Capacity: 277,5 million m³/year
RUR 1 886,3 million (USD 66,4 million)
The project has the necessary engineering and transport infrastructure.
Not required.
RUR 2 657 m (in present prices).
2009-2018
Megino-Kangalassky and Ust-Aldansky regions of the Sakha Republic
(Yakutia)
100% budget funds (federal budget and state budget of the Sakha
Republic (Yakutia))
Project documentation and estimate is available.
Positive assessment of the Khabarovsk Branch of the State Expertise of
Russia No. 176-09/ХГЭ-0323/02 of August 12, 2009 (positive
assessment for the technical part of the project).
Minister of Economy and Industrial Policy of the Sakha Republic
(Yakutia)
Mikhail Anatolievich OSIPOV
Sakha Republic (Yakutia), Yakutsk, Lenina pr., 28
Phone: +7 (4112) 42-35-77 Department of Oil and Gas Complex and
Coal Industry Development
Gas-main pipeline Maya – Tabaga – Churapcha – Ytyk-Kyel
34
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
17. Project name
Location
Project initiator
Project characteristics
Sakha Republic (Yakutia)
Ministry of Economy and Industrial Policy of the Sakha Republic
(Yakutia).
Supplying natural gas to settlements in Megino-Kangalassky,
Churapcha, Tatta regions (a total of 14 settlements).
The total length of the gas pipeline with branches is 221.1 km.
The project provides for the construction of five starting complexes:
First: 0 to 36.7 km (to Tabaga settlement, completed);
Second: 36.7 to 104.8 km (to Urun-Kyel settlement);
Third: 104.8 to 139.9 km (to Churapcha settlement);
Fourth: 139.9 to 215.94 km (to Ytyk-Kyel settlement);
Fifth: automated system of managing the technological processes of gas
transportation, radio relay lines of communication, electrical and
chemical protection.
RUR 1 083,4 m
The project has the necessary engineering and transport infrastructure.
Not required.
RUR 4 571,2 m (in present prices).
2008-2015
Megino-Kangalassky, Churapcha, Tatta regions of the Sakha Republic
(Yakutia)
- Implementation os public-private partnership principles
- 100% budget funds (federal budget and state budget of the Sakha
Republic (Yakutia))
Project documentation and estimate is available.
Positive assessment of the Khabarovsk Branch of the State Expertise of
Russia No. 176-09/ХГЭ-0323/02 of August 12, 2009 (for the technical
part).
Minister of Economy and Industrial Policy of the Sakha Republic
(Yakutia)
Mikhail Anatolievich OSIPOV
Sakha Republic (Yakutia), Yakutsk, Lenina pr., 28
Phone: +7 (4112) 42-35-77 Department of Oil and Gas Complex and
Coal Industry Development
Gas-main pipeline Khaptagay – Kysyl-Yuryuya with branches to
the settlements of Megino-Kangalassky and Khangalassky regions
of the Sakha Republic (Yakutia)
Sakha Republic (Yakutia)
Ministry of Economy and Industrial Policy of the Sakha Republic
(Yakutia).
Supplying natural gas to settlements in Megino-Kangalassky and
Khangalassky regions of the Sakha Republic (Yakutia).
The total length of the gas pipeline with branches is 78.17 km.
Capacity: 111.0 million cubic meters of gas a year.
The pipeline is divided into four parts:
First: gas-main pipeline Khaptagay – Kysyl-Yuryuya with a diameter
of 150 mm (66.9 km);
35
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
18. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Second: Pipeline – branch to Rossoloda settlement with a diameter of
100 mm (4.1 km);
Third: Pipeline – branch to Tiit-Ebe settlement with a diameter of 100
mm (3.97 km);
Fourth: Pipeline – branch to Kerdem settlement with a diameter of 100
mm (3.2 km).
RUR 755,5 million ($ 26,6 m).
The project has the necessary engineering and transport infrastructure.
Not required.
RUR 755,5 m (in present prices).
2012-2016
Megino-Kangalassky and Khangalassky regions of the Sakha Republic
(Yakutia)
-
Implementation os public-private partnership principles
100% budget funds (federal budget and state budget of the Sakha
Republic (Yakutia))
Project documentation and estimate is available.
Positive assessment of the State Expertise of Russia No. 318-10/ХГЭ0991/02 of December 12, 2010 (positive assessment is available only
for the project part).
Minister of Economy and Industrial Policy of the Sakha Republic
(Yakutia)
Mikhail Anatolievich OSIPOV
Sakha Republic (Yakutia), Yakutsk, Lenina pr., 28
Phone: +7 (4112) 42-35-77 Department of Oil and Gas Complex and
Coal Industry Development
Gas-main pipeline Gas Processing Facility of Talakan Oil and Gas
Condensate Field – Vitim of Lensk region of the Sakha Republic
(Yakutia)
Sakha Republic (Yakutia)
Ministry of Economy and Industrial Policy of the Sakha Republic
(Yakutia).
Supplying gas to settlements Vitim and Peledui of Lensk region. The
total length of the gas-main pipeline is 112 km.
RUR 1 000 m ($ 35,2 m).
The project has the necessary engineering and transport infrastructure.
Not required.
RUR 1 249,3 m (in present prices).
2013-2015
Lensk region of the Sakha Republic (Yakutia)
-
Implementation os public-private partnership principles
100% budget funds (federal budget and state budget of the Sakha
36
Project detailedness
CEO of an organization
implementing the project
Contacts
Republic (Yakutia))
Project documentation and estimate is available.
Assessment by the State Expertise of Russia is planned in 2011.
Minister of Economy and Industrial Policy of the Sakha Republic
(Yakutia)
Mikhail Anatolievich OSIPOV
Sakha Republic (Yakutia), Yakutsk, Lenina pr., 28
Phone: +7 (4112) 42-35-77 Department of Oil and Gas Complex and
Coal Industry Development
Mining Industry
Location
Project initiator
Project characteristics
Construction of Denisovskaya mines (№1, №2) and a coal
benefication plant
Neryunrginsky region, Sakha Republic (Yakutia)
OOO Kolmar (OAO Neryungriugol)
Coal production and selling. Construction of Denisovskaya and
Denisovskaya-2 mines; Denisovskaya benefication plant.
Denisovskaya mine with capacity up to 2.5 m tons.
Volume of investment
RUR 6500 m (in 2010 prices) ($229 m).
Infrastructure available
Railway and motorway, airport in the town of Neryungri.
The deposit is located 20 km north-east of the town of Neryungri.
Electric power is supplied by Neryungri hydropower station; 110 kV
high-voltage transmission line runs through the eastern part of the site.
Not required
Current investments into construction – RUR 4500 m.
No information
No information
No information
About 20 years, with the project to be complete in 2031.
Selling beyond the republic (Russian regions, Asian Pacific countries)
In the form of bank crediting or participation in shareholder capital
(USD 216,67 m)
Denisovskaya-1 mine has been put into commercial operation with
annual production volume at 0.5 m t, the second stage's design is
completing. The construction site for the benefication plant is ready.
Igor Ivanovich LUTSKOV,
General Director, OOO Kolmar
121108, Moscow, Ivana Franko Str., 8
Tel. +7 (495) 662-39-90
е-mail: info@kolmar.ru
http://www.kolmar.ru/nerungri.html
19. Project name
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
20. Project name
Location
Project initiator
Construction of Inaglinsky coal complex
Neryunrginsky region, Sakha Republic (Yakutia)
ZAO «Yakut coals – new technologies» (OOO “Kolmar”)
A part of Integrated Development of Southern Yakutia project. Initiator
- ОАО Southern Yakutia Development Corporation.
37
Project characteristics
Volume of invstments
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
21. Project name
Location
Project initiator
Project characteristics
Creation of Inaglinsky coal complex with an industrial mine, coal
production capacity 2.75 m t/year, and a benefication plant able to
process 3 m t/year with the yield at over 2 m tons of cocking
concentrate.
RUR 10500 m in 2011prices ($369,7 m)
There is Amur-Yakutsk mainline railroad (AyaM), LENA federal road,
railway, airport.
The key advantage of the project is availability of developed
infrastructure, including a dead-end railway track owned by OOO JV
Erel, a participant of OOO Kolmar Holding. The track is connected to
the public railway system owned by OAO JSC Railways of Yakutia
(OAO Russian Railways).
A railway line from Chulbas station – Inaglinsky coal complex; electric
power supply to Inaglinsky CC, with a 110 kV substation and 110 kV
transmission line.
RUR 10500 m ($370 m)
Project life cycle 25 years (till 2037)
26% at discount rate of 15%
RUR 6100 m
6,3 years
Internal market of the Russian Federation and Asian-Pacific countries
(Japan, Korea).
ООО Kolmar 100%
A part of Integrated Development of Southern Yakutia project. Project
documentation for a mine and a benefication plant complete and
approved by “Glavgosekspertisa’ (State Expertise); the construction
site for surface objects ready; the plant equipment purchased fully, the
mine equipment - partially; all required permits and approval received.
Positive opinion of VEB Supervisory Board has been obtained with a
credit of RUR 6,414 billion for construction.
Leonid Arkadievich BERLIN (under power of attorney)
Yakutian Coals – New Technologies ZAO Director-General
Mikhail Lvovich BRUK,
General Director, SYDC JSC
Yakutian Coals – New Technologies ZAO, 121108, Moscow, Ivana
Franko Str., 8
Tel. +7 (495) 662-39-90
е-mail: info@kolmar.ru
http://www.kolmar.ru/nerungri.html
OAO SYDC, 127473, Russia, Moscow, Seleznevskaya Str., 11б
Tel. +7 (495) 232-42-44, fax +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
Construction of Elginsky coal complex within north-western
section of Elginsky coal field in the Sakha Republic (Yakutia)
Neryungrinsky region, south-eastern part of the Sakha Republic
(Yakutia), near borders with Amur Oblast and Khabarovsk Krai
Mechel JSC
The project assumes construction of Elginsky coal complex for mining,
processing and shipment of coal from Elga coal field with designed
38
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
22. Project name
Location
Project initiator
capacity at:
Stage 1 (2013-2015) – 9,000 ths t a year;
Stage 2 (2016-2018) – 18,000 ths t a year;
Stage 3 (2019-2021) – 27,000 ths t a year.
RUR 52595.70 m in 2011prices ($1852 m)
The nearest settlements are:
- s. Verkhnezeisk, 320 km south of the field across the Stanovoi
Range at the eastern branch of Baikal-Amur railway;
- town of Neryungri and settlement of Chulman, 415 km west of the
deposit.
42 km north of Neryungri and 7 km north of Chulman there is an
airport, accepting TU-154, YK-40, AN-24 planes, MI-8 and MI-6
helicopters.
The nearest power supply sources are: Neryungri Regional Power
Station – 450 km directly, Zeiskaya HPS – about 500 km, 220/35/10
kV Prizeiskaya substation at BAM – about 300 km away. To supply the
field with power, the Development Scheme for the United Russian
Power System includes construction of HVL 220 kV Prizeiskaya –
Elgaugol till 2017.
The right to use forest sites is secured by lease contracts.
The project includes construction of the external infrastructure:
- access railway – 315 km;
- electric power grid objects (two one-circuit 220 kV transmission lines
Prizeiskaya – Elgaugol along the railway; Elgaugol PSA, PSB,
substation);
- landing strip.
The project is under development
2013-2021 гг.
The project is under development
The project is under development
The project is under development
Russia, Asian Pacific and CIS contires
The project is under development
At the moment in the development of coal mining complex pre-made
and survey work, a draft section of the primary mining and the railway
spur track. Project first construction phase of the coal complex referred
to GGE.
Igor Valerievich KHAFIZOV,
Managing Director, Yakutugol Holding Company JSC
Sakha Republic (Yakutia), Neryungri, Lenin Str., 3/1,
Tel. +7 (41147) 96-125
е-mail: post.yakutugol@mechel.com
http://www.yakutugol.ru/
Construction of Chulmakanskaya mine
Neryungrinsky region of the Sakha Republic (Yakutia), Vostochny
section of Chulmakan field
OOO En+Ugol (Moscow),
Koran External Coal Company (People's Democratic Republic of
Korea).
39
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
The project includes construction of Chulmakanskaya mine with
capacity up to 1,000 ths tons a year and a benefication plant with
capacity up to 1 .0 m tons of raw material.
Balance reserves of Vostochny section of Chulmakan field are
estimated at 42.77 m tons.
RUR 3913 m in 2011prices ($137,8 m)
35 km of Neryungri, the large industrial and transport center in
Southern Yakutia, there is a railway station – cargo and passenger;
motorways, connecting the town with other far-Eastern regions and
Central Yakutia.
Not required
The project is under development
Will be adjusted by the results of the project development (completion
in Quarter III of 2011)
Will be adjusted by the results of the project development (completion
in Quarter III of 2011)
Will be adjusted by the results of the project development (completion
in Quarter III of 2011)
Will be adjusted by the results of the project development (completion
in Quarter III of 2011)
Selling beyond the republic (Russian Federation and Asian Pacific
countries)
OOO En+Ugol – 50,1%, ZAO Baltic Trade and Indsustry Company –
29,9%,
Koran External Coal Company (People's Democratic Republic of
Korea) – 20%.
At the moment, Giproshakht Institute (St. Petersburg) is developing a
project on “Preparation and development of reserves at
Chulmakanskaya mine by OOO Erchim-Than”. Rostechnadzor
(Russian Technical Inspection) has approved amendments to the
Program on open mining with the use of drill and fire technique of host
rock opening. The equipment is purchased.
Yury Vitalievich FIRYULIN,
General Director, OOO Erchim-Than
678960, Neryungri, Kravchenko Str., 14
Tel. +7 (41147) 62-154.
e-mail: Erchim-Than@bk.ru
Mining Industry
40
23. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Construction of Elkonsky mining and smelting plant
Aldansky region, Sakha Republic (Yakutia)
OAO Atomredmetzoloto,
OAO Southern Yakutia Development Corporation
Elkonsky mining and smelting plant includes:
- five uranium mines, with ore mining capacity at 4.5 m t/year by
underground mining;
- a united radiometric enrichment plant or five separate enrichment
plants, a hydrometallurgical plant with capacity at 5 ths t of uranium
oxides a year;
- a flotation plant for extraction of accompanying gold, silver and
molybdenum components with capacity at 2,900 ths t/year;
- maintenance facilities;
- camps.
The enterprise production will be: uranium oxide – 5,000 t, gold –
1,570 kg, silver – 17,900 kg.
The project cost makes RUR 87,858 m in 2011 prices ($3,093.6 m),
breaking down as follows:
- investors' own funds - 28%,
- investors' borrowed funds - 64%,
- the Investment Fund of the RF - 8%.
Elkonsky horst deposits are located in Aldansky region of the Sakha
Republic (Yakutia) 50 km east of the regional administrative center
town of Aldan and 40 km south of the town of Tommot.
There is a railway and a motorway.
There is an airport in Aldan.
Electric power is supplied to Aldan and Tommot via high-voltage
transmission line (HVL) 220 kV Neryungrinskaya GRES (city's
regional power station) – Nizhny Kuranakh; HVL 110 (220) kV
Nizhny Kuranakh – Tommot; HVL 110 kV Chulman GRES –
Lebediny via 110 kV substations in settlements of Tommot and
Lebediny. To enhance the electric infrastructure, there is being
constructed 220 kV transmission line Neryungri GRES (City Regional
Power Station) – Nizhny Kuranakh – Tommot – Maya (with NGRES –
Nizhny Kuranakh 2 leg complete in 2010) to be complete in 2013;
power is supplied from Neryungri GRES.
Railway Tommot station – Elkonsky MSP;
Motorway Tommot – Elkonsky MSP;
Till 2016, project life cycle over 40 years
RUR 90,110 m
11.1%
RUR 10,490 m
31.6 years
In near future Russia is to implement the Program on nuclear power
development. One of the program’s tasks is to launch nuclear reactors
with installed capacity up to 4gW. These reactors make potential
market for the plant production.
OAO Atomredmetzoloto 100 %
41
Project detailedness
CEO of an organization
implementing the project
Contacts
24. Project name
Location
Project initiator
Project characteristics
A part of Integrated Development of Southern Yakutia project. Design
of project estimates are financed from the Russian Federation
Investment Fund. The General designer – OAO VNIPIPT
(Vniipromtechnologii) is working on the design in accordance with
contract # 0190 of 15 Dec 2009 with the Client (OAO EMSP-Project).
1. Geological and geophysical survey of the mine and ore
processing facility sites complete;
2. Basic technical solutions on the mining and ore processing
facilities, as well as some infrastructure objects elaborated;
3. Basic technical solutions on the ore processing and mining
facilities, as well as the sulfuric acid plant elaborated.
At the moment, most of exploration activities stipulated by license
agreements are complete, the reserves have significantly increased.
In 2010, there were drilled 94.669 ths running meters of exploration
holes. Also, in the frame of pre-feasibility study, there was evaluated
the raw material base of five Southern Elkon uranium-ore area in
accordance with JORC international code.
After review of the project conditions feasibility study at the RF State
Committee on Reserbes in 2011, ARMZ Uranium holding is going to
bring the license agreement terms in compliance with the project
documents.
Designing of Elkonsly MSP and the state expertise are expected in
2012.
Oleg Vladimirovich VARVARA,
General Director, ZAO Elkonsky MSP (established in 2007 for
development of Elkonsky uranium-ore area, with 100% of shares
owned by OAO Atomredmetzoloto)
Uranium Holding ARMZ (OAO AtomRedMetZoloto)
109004, Moscow, B. Drovyanoy per., 22
Tel. +7 (495) 508-88-08, fax +7 (495) 508-88-10
е-mail: info@armz.ru
http://www.armz.ru/companies/newcompany/elkon/
ZAO Elkonsky MSP
678955, Tommot, Ukulanskaya, 7
109004, Moscow, Zemlyanoy Val Str., 75
Tel. +7 (495) 644-35-36, fax +7 (495) 644-35-38
http://www.elkon.armz.ru
OAO SYDC, 127473, Russia, Moscow, Seleznevskaya Str., 11б
Tel. +7 (495) 232-42-44, fax +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
Development of iron-ore deposits in Southern Yakutia (Tayozhnoe,
Desovskoe, Tarynakhskoe and Gorkitskoe deposits)
Neryungrinsky region of the Sakha Republic (Yakutia) (Tayozhnoe and
Desovskoe deposits),
Olyokminsky region of the Sakha Republic (Yakutia) (Tarynakhskoe
and Gorkitskoe deposits)
OAO MSP Timir
ОАО Southern Yakutia Development Corporation
Tayozhny plant project capacity makes 4.1 m t of concentrate a year
with iron concentration at 67.7% basing on Tayozhnoe and Desovskoe
42
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
deposits with mining capacity of 20.1 m tons of ore a year.
Tayozhnoe deposit of iron ores is the most prepared for industrial
development. It is characterized by optimum technical and economic
parameters. Upper reserves of Tayozhnoe deposit down to 600 m can
be extracted in one open cast mine. Open pit reserves are estimated at
320 m t with iron concentration at 39.4. Total capacity – 9 m t of raw
ore a year.
Ore will be enriched through two-stage magnet separation with
subsequent flotation, which ensures production of iron-ore concentrate
with fixed sulphur concentration.
Tarynakhsky mining and processing plant has capacity of 46 m t of ore
and 14.6 m t of iron ore concentrate a year. The concentrate will be
processing into pellets (13.5 m t a year) basing on Tarynakhskoe and
Gorkitskoe deposits with capacity of 27.6 m t of ore a year. Tarynakh
deposit of iron ores is considered the largest of prospected deposits in
the east of Russia. The deposit will be developed by open cast mining.
Simultaneously, the deposit can provide crushed stone for construction,
up to 2 m cub.m. a year. The deposit ores are easily convertible; one
dry and three stages of wet separation result in concentration of iron at
68.5%.
The processing section of the plant, scheduled for construction in 20102013, will be located at the south-east end of the deposit, considering
involvement of Gorkitskoe and, in perspective, Imalykskoe deposits.
70% of the project cost
Tayozhnoe deposit is located in the immediate vicinity (3-5 km) from
Berkakit-Tommot-Yakutsk railway crossing the coal area from south to
north, 80-160 km north of Berkakit railway station and SouthernYakutian coking coal field. The deposit is located 4 km from the LENA
federal motorway.
Desovskoe deposit is situated 120 km north of the town of Neryungri
and 45 km south-west of Tayozhnoe deposit.
Tayozhnoe and Desovskoe deposits are situated near two HVL 220 kV
Neryungri GRES – Nizhny Kuranakh (6.6 km and 50 km, respectively).
Tarynakhskoe deposit lies 203 km from 220 kV substation in the
settlement of Khani.
Gorkitskoe deposit is situated 250 km south of the town of
Olyokminsk. Tarynakh deposit is located in the south of the Sakha
Republic (Yakutia) in Olyokminsky region 250 km south of
Olyokminsk and 190 km north of Khani railway station.
Transport and power grid infrastructure of the plant will be constructed
as part of Integrated Development of Sothern Yakutia project:
Railway Tayozhnaya station – Tayozhny MPP.
Railway Ikabiekan station – Tarynakhsky MMP.
Electric power supply of Tayozhny MMP with 220 kV substation and
HVL 220 kV.
Electric power supply of Tarynakhsky MMP with 220 kV substation
and HVL 220 kV.
Tayozhny MMP – RUR 96,600 m in 2010 prices ($3,220 m);
Tarynakhsky MMP – RUR 96,200 m in 2010 prices ($3,206.66 m).
Estimated period of construction and operation of the MMPs – 38 years
from the construction beginning or 30 years from the beginning of
mining.
43
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
25. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Tayozhny MMP – 14.32%; Tarynakhsky MMP – 6.5%
Tayozhny MMP – RUR 81,400 m; Tarynakhasky MMP – RUR 10,300
m; total RUR 91,700 m.
Payback of investments 17.8 years from beginning of investing or 11
years form launching.
The RF, Asian Pacific countries.
Is being determined
Justification of investment – done. Exploration work have began – the
project stage.
Vladimir Filippovich PETROV,
General Director, OAO MSP Timir
OAO MSP Timir, 678100, Neryungri, per. Geologov, 4
Tel../fax +7 (4112) 45-222
e-mail: post@timir.ru,
http://www.timir.ru/mestorojdeniya.html
OAO SYDC, 127473, Russia, Moscow, Seleznevskaya Str., 11б
Tel. +7 (495) 232-42-44, fax +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
Construction of Seligdar mining and chemical complex
Aldansky region of Sakha Republic (Yakutia).
Seligdarskoe apatite deposit is situated on the hilly banks of the
Seligdar River, rising above the valley at 180-240 m, with the slopes
angle at 20°-30°.
OAO Southern Yakutia Development Corporation.
A part of Integrated Development of Southern Yakutia investment
project.
Using apatites from Seligdar deposit, the mining and processing plant
)MPP) will include a mine, a processing plant to produce apatite
concentrate and a chemical plant to produce complex phosphormagnesium fertilizers. Apatite ore balance reserves – 1,228 m t of ore.
The mining and processing plant will produce apatite concentrate.
Capacity: 30 m t/year of ore, or 3.57 m t/year of concentrate with Р2О5
concentration at 35.5%, including marketable concentrate at 2.87 m
t/year and concentrate for the chemical plant – 0.7 m t/year.
The chemical plant will produce fused calcium-magnesium phosphates.
Capacity – 1.2 m t/year of marketable products.
In addition, the plant will use mill tailings for production of hematite
concentrate (about 600 ths t) and dolomite powder (up to 10 m t).
Efficient use of the mined ore requires construction of a crushed stone
plant, as a part of the complex. It will process the deposit overburdens,
producing marketable crushed stone of three grades (up to 12,5 m
t/year) and sand (1.2 m t/year).
RUR 46,950 m in 2007 prices ($1,653.7 m)
A horizontal area of 16 ha. Such a site, suitable for a buffer-balancing
storage with railway access and constructing a station is situated at the
mine's north-eastern end, 950-980 m level.
The processing facility will be built on an industrial site 18 km south of
Aldan, 9 km from Amur-Yakut railroad, and 8 km from a site near the
mine at western and northern slopes of the elevation.
44
Infrastructure required
Cost of project
IRR
NPV
Payback period
Project life cycle
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
26. Project name
Location
Transport and power grid infrastructure of the plant will be constructed
as part of Integrated Development of Sothern Yakutia project:
Railway Kosarevsky – Seligdarsky MCC.
HVL 220 kV, 7.5 km long with a 220 kV substation at the mine.
RUR 46,950 m
22.80%
RUR 15,600 m
11.3years
50 years
Internal consumption of the apatite concentrate produced (with
processing of 286 ths t of concentrate on the plant a year) and fertilizers
(designed capacity – 567.5 ths t a year) will make less than 20% of the
entire production.
Export to the Asian Pacific countries.
Public-private partnership.
Investor funds are required for construction of Seligdarsky MCC and
development of the apatite deposit.
Transport and electric grid infrastructure will be financed form the
Investment Fund of the Russian Federation.
A part of Integrated Development of Southern Yakutia investment
project, feasibility report available.
Designing works on Seligdar MCC are postponed until a managing
user of Seligdar apatite deposit is determined.
Mikhail Lvovich BRUK,
General Director, OAO SYDC
OAO SYDC, 127473, Russia, Moscow, Seleznevskaya Str., 11б
Tel. +7 (495) 232-42-44, fax +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
Opening-up and development of reserves of underground mines
Mir, Aykhal, and Udachny
Mirninsky region, Sakha Republic (Yakutia)
45
Project initiator
Project characteristics
Volume of investment
Infrastructure available
1. Mir Mine is located in Mirny region on the left bank of the middle
Irelyakh River within the borders of Mirny City.
2. Aykhal Mine is located in Mirny region of the Sakha Republic
(Yakutia) in the basin of the upper Markha River a short distance from
Aykhal settlement, which is located 395 km to the North of the regional
centre Mirny and 70 km to the South-West of Udachny City.
3. Udachny Mine is located in Mirny region of the Sakha Republic
(Yakutia) within the existing industrial zone of an opencast mine of
Udachnaya diamond pipe of Udachny ore-dressing and processing
plant.
OAO AK ALROSA
Mir Mine. Construction and commissioning of technological and
support installations, objects for engineering support of the surface
complex, as well as construction and commissioning of horizons for the
development of reserves. The mine is expected to reach the project
capacity of 1,000 thousand tons in 2012.
Aykhal Mine. Construction and commissioning of technological and
support installations, objects for engineering support of the surface
complex, as well as construction and commissioning of horizons for the
development of reserves. Reaching of the full capacity of the mine is
provided for by the commissioning of three starting complexes. 2012 –
commissioning of the 3rd starting complex, reaching the project
capacity of 500 thousand tons (commissioning of the installations of
the 3rd starting complex is to be implemented stage-by-stage till 2014).
Udachny Mine. Construction and commissioning of technological and
support installations, objects for engineering support of the surface
complex, as well as construction and commissioning of horizons for the
development of reserves. The mine is expected to reach the project
capacity of 4,000 thousand tons in 2016, the capacity with the
commissioning of the first starting complex in 2014 – 1,650 thousand
tons, 2nd starting complex in 2015 – 4,000 thousand tons.
Mir Mine – construction cost at a predicted price level: RUR 39,904.2
million (USD 1,361.91 million);
Aykhal Mine – construction cost at a predicted price level: RUR 16,232
million (USD 553.99 million);
Udachny Mine – construction cost at a predicted price level: RUR
55,296.5 million (USD 1,887.25 million).
Mir Mine. Heat supply: from North-Eastern boiler house with the
installation of a local unit on mine grounds.
Water supply: drinking water supply of the grounds is centralized from
the existing utilities and Mirny City water treatment plant (310 cubic m
a day, 94.55 thousand cubic m a year), industrial water supply from
industrial water utilities.
Sewage: water drainage system through sewage utilities to treatment
plants of Mirny City.
Power supply: from 220/110 Rayonnaya kV substation.
Communications: organized from ALROSA AK communication
center.
Natural gas supply: from gas main line extended from Mirny City
automatic gas distributing station.
Aykhal Mine. Heat supply: main site – centralized from the central gas
boiler of Aykhal settlement.
46
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
Water supply: industrial water supply from a pumping station at a water
reservoir created by a dam at the River Sokhsollokh; drinking water
supply – centralized from Aykhal settlement.
Sewage: centralized drainage of waste through sewage utilities to
treatment plants of Aykhal settlement.
Power supply: from the existing main step-down substation 5 by
constructing a double-circuit high-voltage line 110 kV.
Communications: from ALROSA AK communications center.
Natural gas supply: by constructing a gas pipeline from an automatic
gas distributing station.
Udachny Mine. Heat supply: centralized from an electric boiler of
concentrating mill No. 11.
Water supply: industrial water supply – through existing utilities from
the Sytykan River waterworks; for drinking water supply it is planned
to construct a water treatment plant on the mine grounds (250 cubic
m/day).
Sewage, drainage: centralized drainage of waste through sewage
utilities to treatment plants in Udachny Town.
Power supply: from the existing Udachnaya main step-down substation
220/110/6 kV via two independent 110 kV power lines, for distribution
it is planned to construct two 110 kV substations: main step-down
substation 1 with 6 transformers (25 MWA each), main step-down
substation 2 with transformers (25 MWA each).
Communications: from ALROSA AK communications center.
The project provides for the necessary installations of industrial
infrastructure, additional infrastructure is not required.
Mir Mine – project cost at a predicted price level: RUR 48,331.2 m;
Aykhal Mine – project cost at a predicted price level: RUR 18,211.5 m;
Udachny Mine – project cost at a predicted price level: RUR 55,296.5
m.
Mir Mine – 1999-2012, reaching of projected capacity in 2012,
operation until 2043;
Aykhal Mine – 2000-2013, reaching of projected capacity in 2012,
operation until 2025;
Udachny Mine – 2003-2016, reaching of projected capacity in 2016,
operation until 2030.
Mir Mine – 8.58%;
Aykhal Mine – 1.99%;
Udachny Mine – 4.34%.
Mir Mine – with 4% discount rare – RUR 20,837 m;
Aykhal Mine – with 3% discount rate – RUR 30,578 m (without loan),
with loan RUR 1,731 m;
Udachny Mine – with 4% discount rate – RUR 1,079.4 m.
Mir Mine – 11 years 11 months;
Aykhal Mine – in 2029;
Udachny Mine – 10 years and 2 months.
Foreign and internal markets.
100% participation of ALROSA Company
Mir Mine – approved project documentation and estimate available.
Feasibility study “Estimation of efficiency of investment into the
construction of underground mine Mir” in 2010. The project is being
corrected, to be released in 2011.
47
Aykhal Mine – approved project documentation and estimate available.
The project is being corrected, working documentation to be released in
2011. “Estimation of efficiency of investment into the construction of
underground mine Aykhal” (October 2010).
Udachny Mine – approved project documentation and estimate
available. Project “Udachny Mine. Opening-up and development of
first stage reserves. Opening-up and development of reserves to point 320/-580 m” is being developed with project documentation to be
released in 2011 (Uralgiproruda OAO, Yekaterinburg).
First Vice-President, Executive Director of ALROSA Company
Yuri Andreevich DOYNIKOV
Phone: +7 (41136) 9-01-12 (reception), Sakha Republic (Yakutia),
Mirny
Vice-President of ALROSA Company
Sergei Nikolaevich PUSHKIN
CEO of an organization
implementing the project
Contacts
27. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor’s involvement
Project detailedness
Moscow
119017, 1st Kazachy pereulok, 10/12
Tel: (495) 620-92-50, (495) 662-36-26
Fax: (495) 411-75-15
Telex: 113258 “Алмаз» RU
http://www.alrosa.ru
E-mail: info@alrosa.ru
Kyuchus gold-ore deposit development
Ust-Yansky region, Sakha Republic (Yakutia)
ОАО Polyus Zoloto
Launching development of Kyuchus gold-ore deposit: construction
of an open pit mine, an ore-processing facility and, in long-term
perspective, an underground mine
Approximately RUR 4b
Approximately RUR 4b
2018-2020
The project is being elaborated
The project is being elaborated
About 6 years
Foreign and internal markets of the RF
-
48
CEO of a company
implementing the project
Contacts:
28. Project name
German Rudolfovich PIHOYA, General director,
ОАО Polyus Zoloto
ОАО Polyus Zoloto
123104 Russia, Moscow, Tverskoi bulvar, 15, block 1
Tel.: +7 (495) 641 33 77
Fax: +7 (495) 785-45-90
e-mail: info@polyusgold.com
http://www.polyusgold.com
Development of PROGNOZ silver-polymetal deposit
Location
Project initiator
Project characteristics
Verkhoyansky region, Sakha Republic (Yakutia)
OOO Prognoz-serebro
Mining of silver, lead and zinc in open pit and underground mines
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Approximately RUR 5.3b
Approximately RUR 5.3b
2018-2020
The project is being elaborated
The project is being elaborated
About 8 years
Foreign and internal markets of the RF
-
Project detailedness
CEO of an organization
implementing the project
Contacts
Andrei Viktorovich KABANOV,
General director, OOO Prognoz-serebro
OOO Prognoz-serebro
123242, Russia, Moscow, Zoologocheskaya Str., 2
Tel./fax: +7 (495) 225-10-88, +7 (495) 225-10-89
Transport System
29. Project name
Location
Project initiator
Project characteristics
Construction of the railway line Berkakit – Tommot - Yakutsk with
a combined bridge across the Lena River near the city of Yakutsk to
Yakutsk river port station (the left bank) in the Sakha Republic
(Yakutia)
Yakutsk
Federal Railroad Agency, Government of the Sakha Republic (Yakutia),
Railway Berkakit-Tommot-Yakutsk with a combined bridge across the
Lena River near the city of Yakutsk to Yakutsk river port station (left
bank) in the Sakha Republic (Yakutia) will establish a large transport
hub in the republic's capital – the city of Yakutsk, with a united transport
network with all-the-year-round access to the all-Russian network of
motor and railways. All-the-year-round access will be enjoyed by
central, eastern and western regions of the republic, where 83% of the
49
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
30. Project name
population live.
The railway will have a direct impact on the republic's economy
development, reduce dependence from a season by 2/3, minimize costs
for the budget, enterprises and population.
By the year 2020, the combined motor-railway bridge would reach
capacity of 5.5m tons of cargoes and 2,000 vehicles in two directions a
day.
The combined bridge across the Lena River will connect existing and
being built motorways – KOLYMA, VILYUI, AMGA – to BerkakitTommot-Yakutsk railroad, still being built, thus enabling transport of
transit cargoes to Magadan Oblast, Chukotka and Krasnoyarsk Krai.
“Construction of the second launching complex from Pravaya Lena
station with a combined bridge abrocc the Lena River near the city of
Yakutsk to the Lena river port station (left bank)”. Total length – 109
km, including 3.2 km of a combined motor-railway bridge across the
Lena River.
RUR 79,985.5 m in 2007 prices ($2,816m)
220 kV power transmission line NGRES – Nizhny Kuranakh, LENA
federal motorway
Theer is being built 220 kV power transmisison line NGRES-Nizhny
Kuranakh-Tommot-Maya
RUR 79,985.5 m
2010 - 2015
The united transport network with all-the-year-round access to the allRussian network of motor and railways will provide all-the-year-round
transport access to central, eastern and western regions of the republic,
where 83% of the population live. Involvement of mineral deposits into
the economy.
Switching of the major freight flow to the railway will reduce costs and
financing of the stock. It will also provide an export opportunity for
Dzhebariki-Khaia coal, greater consumption of Khangalassky coal in
central Yakutia. As a result, costs for bringing goods to the republic will
decrease by 30% to 70%. Given the increased freight flow, it will save
up to RUR12-15b annually, thus creating new conditions for
development of new competitive enterprises.
State property
Sources of financing: Federal budget – RUR 76,985.5m; state budget of
the Sakha Republic (Yakutia) – RUR300m; extra-budgetary sources –
RUR 2,700.0 m.
Gennady Petrovich PETRAKOV,
General Director, Federal Railroad Agency
Moscow, Bolshaya Pochtovaya,18, building 5
Tel.: +7 (495) 788-55-70
е-mail: office@egz-fazt.ru
Transport and logistic center in the settlement of Nizhny Bestyakh,
Sakha Republic (Yakutia)
50
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
Settlement of Nizhny Bestyakh, Megino-Kangalassky region, Sakha
Republic (Yakutia)
Government of the Sakha Republic (Yakutia), OAO Gossnabsbyt
Yakutii
Establishment of the transport and logistic center is required by
construction of Berkakit-Tommot-Yakutsk railway, a bridge across the
Lena River, construction and reconstruciton of federal motorways
LENA (Berkakit0Never), KOLYMA (Yakutsk-Khandyga-Ust-NeraMagadan), sections of VILYUI motorway (being built M-53 BAIKAL
motorway through Bratsk, Ust-Kut, Mirny to Yakutsk) and regional
motorways: AMGA (Nizhny Bestyakh – Ust-Maya – Ayan), UMNAS
(Yakutsk-Pokrovsk-Olyokminsk-Lensk), YANA (533th km of
KOLYMA road – Topolinoe – Batagai – Ust-Kuiga – Deputatsky –
Belaya Gora).
The all-the-year-round network of key motorways will change
distribution and volume of freight flows.
Aim of the project – to meet the demand of the state, companies,
enterprises and population in modern and quality services of storing and
processing cargoes with the help of an integrated transport and logistic
center.
Main tasks of the center:
improved transport and logistic infrastructure;
higher efficiency of commodities flow;
better competitiveness of the transport system and realization of the
transit potential;
guaranteed access to transport and logistic services for individuals
and companies;
improved safety and sustainability of the transport system.
Estimated cost of construction – RUR 3,878m in 2010 prices ($136m)
Land plots of the total area at 80 ha are being allotted at the moment for
industrial sites.
Power supply, motor and railway access (included into the project)
Estimated cost of construction – RUR 3,878m
Stage 1 auxiliary sites, power supply facilities, engineering
communications, office building, storehouses, with total cost of
RUR2,150m;
Stage 2 - storehouse with a refrigerator, container and open sites,
garage, motor and railway access, with total cost of RUR1,728m.
Starting in 2012
Construction period – 2 years
14.93%
RUR1,281.1m
12 years
Freight service
100% investor
Investment justification and layout of the center in Nizhny Bestyakh are
developed.
Anna Ivanovna KONDRATIEVA,
General Director, OAO Gossnabsbyt Yakutii
OAO Gossnabsbyt Yakutii, 677004, Russia, Yakytsk, 50 let Sovetskoi
Armii Str., 53/1
51
Tel./fax: +7 (4112) 44-98-93
677904, Yakutsk, s. Magan, 40 let Pobedy Str., 1
Tel.: +7 (4112) 406-404, fax +7 (4112) 406-157
е-mail: aerosever@rambler.ru
31. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
Eurasia – America transcontinental trunk road
Yakutsk – Magadan – Whalen – Nome – Anchorage – British Columbia
Interhemispheric Bering Strait Tunnel & Railroad Group (IBSTRG)
Connection of continental transport networks into united global network,
creation of the international transport corridor, large0scale transit freight
flow between Eurasia and America.
Faster global economic integration and new opportunities for sustainable
development of the world system.
Economic exploration and joining of northern regions of Russia, USA,
Canada with rich natural resources potential to the world markets.
Positive impact on the international political relations.
$55.0-70.0 b
Available
Railway, tunnel under the Bering Strait and power supply infrastructure.
$55.0-70.0b
10-12 years
Economic efficiency project will be calculated after additional research
Economic efficiency project will be calculated after additional research
Economic efficiency project will be calculated after additional research
The main link of a single global rail network that provides transportation
between the continents of Eurasia and America
Is not determined
The concept developed of investment project and sketch of technical
proposals
G. Koumal – The President of IBSTRG USA
V. Razbegin – Vice President of IBSTRG, director Russian office
117997, GSP-7, Moscow, st. Vavilov, 7
Tel. (499) 135-00-04
Creating the network of key motorways
32. Project name
Location
Project initiator
Project characteristics
М-56 LENA motorway from Never to Yakutsk
Aldansky region, Sakha Republic (Yakutia)
Federal state enterprise “Interregional direction on road construction in
the Russian Far East”
М-56 LENA motorway from Never to Yakutsk is an important element
in the transport structure of Russia. In the Sakha Republic (Yakutia) it is
the only all-the-year-round overland line connecting central, northern
and Arctic regions of Yakutia and Magadan Oblast with the Russian
Federation transport system.
Construction and reconstruction of the motorway section involves
several gradual stages, including engineering research and development,
52
state expertise of the design estimates.
Volume of investment
Infrastructure required
The total investment by the federal program "Development of Transport
System of Russia (2010-2015)" – RUB 35074 m in 2010 prices (1169.13
m).
At the moment, М-56 LENA motorway from Never to Yakutsk has
technical category 4 and is 1,157 km long, with 268 km running through
Amur Oblast and 889 km – in the Sakha Republic (Yakutia).
Not required
Cost of project
Implementation period
RUR 142,717.3 m
Till 2030
Infrastructure available
Markets
nvestor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
33. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
М-56 LENA motorway from Never to Yakutsk is enlisted as an object
ensuring motor transport traffic within the all-Russian transport
corridors. It is 1,157 km long and crosses territories of Amur Oblast and
the Sakha Republic (Yakutia), connecting southern and central regions
of Yakutia. With further construction of KOLYMA federal motorway, it
will connect Magadan and Magadan Oblast with the railway system.
Federal property
Design estimates; sources of financing; the Federal budget funds.
Nail Malikovich NAZMUTDINOV,
Acting Director, Federal state enterprise “Interregional direction on road
construction in the Russian Far East”
680020, Khabarovsk, Fabrichny per., 2
Tel. +7 (4212) 473-950, fax +7 (4212) 473-959
е-mail: dsddv@dalvostok.su
KOLYMA motorway – a road being built from Yakutsk to
Magadan
Tomponskuy and Oymakonskuy regions Republic of Sakha (Yakutia)
Federal state enterprise “Interregional direction on road construction in
the Russian Far East”
KOLYMA federal motorway is the only road in eastern part of the
Sakha Republic (Yakutia), western and central parts of Magadan Oblast,
providing access to the Pacific coast. Construction and reconstruction of
the motorway section involves several gradual stages, including
engineering research and development, state expertise of the design
estimates.
The total investment by the federal program "Development of Transport
System of Russia (2010-2015)" - 41258 m in 2010 prices (1375.26 m).
At the moment, several complicated geological conditions cannot ensure
safe passability all-the-year-round.
Being 2,021 km long, KOLYMA motorway continues LENA motorway
Never – Yakutsk.
Not required
RUR 174171 m
Till 2030
53
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
34. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
The motorway provides access to the main transport gate – a sea trade
port of Magadan, which processes the major cargo flow. Economy of the
area at the other end of the motorway is based on gold and non-ferrous
metals mining. Almost all transport services in all the industries are
rendered by motor transport. The largest cargo flow runs through
Magadan – Yakutsk – Magadan road. Therefore, “Kolyma” motorway is
a part of interregional transport passage.
Federal property
Design estimates; sources of financing; the Federal budget funds.
Nail Malikovich NAZMUTDINOV,
Acting Director, Federal state enterprise “Interregional direction on road
construction in the Russian Far East”
680020, Khabarovsk, Fabrichny per., 2
Tel. +7 (4212) 473-950, fax +7 (4212) 473-959
е-mail: dsddv@dalvostok.su
Construction of VILYUI public federal motorway, from M-53
BAIKAL motorway through Bratsk, Ust-Kut, Mirny to Yakutsk
Mirninsky region, Sakha Republic (Yakutia)
Federal state enterprise “Department of VILYUI public federal
motorway” of the Federal Road Agency
It is also planned to construct VILYUI motorway at Mirny – Ust-Kut
leg, technical category 3 with asphalt-concrete surface, 183 km long, to
complete 8 stream crossings and to begin construction of 4 large bridges.
Construction and reconstruction of the motorway section involves
several gradual stages, including engineering research and development,
state expertise of the design estimates.
The total investment by the federal program "Economic and social
development in the Far East and Transbaikalia until 2013"
"Development of Transport System of Russia (2010-2015)" - RUR67069
m in 2009 prices ($2116.259 m).
Not required
RUR 306,880.6 m
Till 2030
VILYUI motorway is an artery of the western part of the Sakha
Republic (Yakutia ans is the shortest land way to the federal motorways:
LENA (Bolshoy Never – Tommot – Yakutsk), KOLYMA (Yakutsk –
Magadan). Besides, it reaches the border with Irkutsk Oblast and the
regional level motorway ANABAR.
The motorway connects to the united all-Russian transport network and
provides access to strategic deposits of mineral resources.
Russian Federation, subject of the RF, industrial enterprises.
Design estimates; sources of financing; the Federal budget funds.
Nikolai Ivanovich ANDREEV,
Director, “Department of VILYUI public federal motorway” of the
Federal Road Agency
677007, Sakha Republic (Yakutia), Yakutsk, Khabarova Str. , 21/6
Tel. +7 (4112) 44-14-42
54
е-mail: fgu-viluy@yandex.ru
35. Project name
Project initiator
Location
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
36. Project name
Location
Project initiator
Project characteristics
Construction of Khandyga – Dzhebariki-Khaya section of Eldikan –
Khandyga ALDAN motorway
Government of the Sakha Republic (Yakutia)
Tomponsky region, Sakha Republic (Yakutia)
Provision of all-the-year-round access to Dzhebariki-Khaya coal field
for coal consumers. The motorway will increase coal transportation by
motor vehicles to 200 ths t, including 100 ths t for consumption in
Oymyakonsky region. The motorway will be 45 km long with three
bridges of total length of 460 running meters, to be complete by 2013.
The total investment by the federal program "Economic and social
development in the Far East and Transbaikalia until 2013" - RUR 4659.5
m in 2008 prices ($ 187.12 m), including:
- Due to the Federal Budget RUR 1500 m;
- The budget of the RF subject RUR 3169.5 m.
The construction started in 2009. There have been built 11.2 km of
motorway and 72.94 running meters of constructions at 296 km –
Khandyga section. The bridge is being built across the Vostochnaya
Khandyga River. The funds spent – RUR 1,228.9 m.
Not required
RUR 7,446.90 m
2009- 2018
All-the-year-round access to Dzhebariki-Khaya coal field for coal
consumers. The motorway will increase coal transportation by motor
vehicles to 200 ths t, including 100 ths t for consumption in
Oymyakonsky region.
Property of the Russian Federation's subject
There are design estimates; sources of financing: the Federal budget, the
state budget of the Sakha Republic (Yakutia), extra-budgetary sources.
Semyon Viktorovich VINOKUROV,
Minister of Transport, Telecommunications and Information
Technologies of the Sakha Republic (Yakutia)
Ministry of Transport, Telecommunications and Information
Technologies of the Sakha Republic (Yakutia)
677018, Yakutsk, Lenin Ave., 22
Tel.: +7 (4112) 42-23-07, fax: 42-52-48, 42-52-36
е-mail: mintrans@gov.sakha.ru
http://www.sakha.gov.ru/mintrans
Construction and reconstruction of AMGA motorway sections on
route Yakutsk – Amga – Ust-Maya – Eldikan – Yugoryonok – Ayan
within the Sakha Republic (Yakutia)
Amginsky and Ust-Maisky regions of the Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia)
The total length of roads in the republic to n. Yugorenok is 710 km, 37
km - with an improved type of coating of asphalt, 220 km - with a
transitional type of sand and gravel IV technical category, 286 km - with
55
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
solid coverage of the type of sand V-gravel technical category, 167 km automobile winter road, 600 m - ice crossing the river Aldan and Amga.
Automobile winter road subject building, located on the road with.
Amga - Ust-Maya - n. Eldikan
The total investment "The development of transport complex of the
Republic of Sakha (Yakutia) in 2009-2011 and the main trends to 2015"
RUR 10688.42 m in 2011 prices ($337.17 m)
Design of road construction made from 2008 to 2010. Ground breaking
at the site with. Amga - Ust-Maya length of 103.5 km provided the
design and estimate documentation part. Construction of the site is from
1998 (introduced by 60.0 km.)
Not required
RUR 6,161 m
Till 2018
Provision of the all-the-year-round passability, access to the Sea of
Okhotsk.
Property of the Russian Federation's subject
There are design estimates; sources of financing: the Federal budget, the
state budget of the Sakha Republic (Yakutia), OAO Republic's
Investment Company.
Theer is partial design estimates for the soil gap at Amga-Ust-Maya
section, 101.1 km long. Construction of this section is being done since
1998 (60 km complete). The soil gap at Ust-Maya – Eldikan section, 60
km long, has no design estimates.
Mikhailov Yuri Petrovich General Director of public institution
"Managing roads of Republic of Sakha (Yakutia)"
State institution "Managing roads of Republic of Sakha (Yakutia)"
677007 Yakutsk city Avtodojnaya str. 10|2
Tel: +7
(4112) 35-79-55, Fax: 35-73-00
е-mail: uprdor@sakha.ru
Air transport
37. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Fleet replacement of OAO Yakutia Airlines aircrafts. Purchase of
Sukhoi Superjet-100
Yakutsk
ОАО Yakutia Airlines
Aircraft fleet replacement.
Long-term financial leasing of SSJ-100 aircrafts. Two aircrafts are
scheduled to be delivered in 2013.
The project cost is estimated at RUR 1,500 m in 2010 prices ($52.8m)
Technical facilities of OAO Yakutia Airlines in the city of Yakutsk
Not required
RUR 1,500 m
Financial lease up to 15 years, life cycle 25 years
56
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
38. Project name
10%
RUR 312 m (with calculation horizon at 15 years)
15 years
Population and organizations, flying on Yakutia Airline planes
Loan for construction of the aircrafts to be given into financial leasing
Business plan for operating SSJ-100 aircrafts developed.
Ivan Alexeevich PROSTIT,
General Director, OAO Yakutia Airlines
677014, Yakutsk, Bykovskogo Str., 9
Tel.(4112) 44-32-30, fax (4112) 44-30-60,
e-mail: office@yakutia.aero,
http://www.yakutia.aero/
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Fleet replacement of OAO Yakutia Airlines aircrafts. Purchase of
An-140-110 aircrafts
City of Yakutsk
ОАО Yakutia Airlines
Aircraft fleet replacement.
Long-term financial leasing of An-140-110 aircrafts. Two aircrafts are
scheduled to be delivered in 2012, another two – in 2013.
The project cost is estimated at RUR 1,350 m in 2010 prices ($47.5m)
Technical facilities of OAO Yakutia Airlines in the city of Yakutsk
Not required
RUR 1,350 m
Financial lease up to 15 years, life cycle 25 years
5%
RUR 150 m (with calculation horizon at 15 years)
15 years
Population and organizations, flying on Yakutia Airline planes
Investor's involvement
Loan for construction of the aircrafts to be given into financial leasing
Location
Project initiator
Project characteristics
Project detailedness
CEO of an organization
implementing the project
Contacts
39. Project name
Location
Project initiator
Project characteristics
Business plan for operating An-140-110 aircrafts being developed.
Ivan Alexeevich PROSTIT,
General Director, OAO Yakutia Airlines
677014, Yakutsk, Bykovskogo Str., 9
Tel.(4112) 44-32-30, fax (4112) 44-30-60,
e-mail: office@yakutia.aero,
http://www.yakutia.aero/
Small aviation fleet replacement
Yakutsk
ОАО Polar Lines company
Updating old fleet to modern to more fuel-efficient aircraft (aircraft type
PILATUS P-6 (DHC-3), AS 350 helicopters of type B (Bell-206B) and
Mi-8 MTV) in order to improve safety, control growth rates for air
57
transportation, quality of service for passengers on air transport
Volume of investment
RUR 1807.25 m in 2010 prices (the draft State Program "Development
of transport system of the Republic of Sakha (Yakutia) in 2012-2016"
Infrastructure available
Aircraft maintenance base of OAO "AK" Polar Airlines "in areas of the
country
Not required
RUR 1 807, 25 m
Till 2015
Small aviation aircrafts will be used for flying between regions of the
republic, which is of great social significance, including flights to
difficult of access places with low population, medical care flights,
flights on commission from the Ministry of Emergency Situations and
Forest Fires Prevention Service.
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
Budget of the RF's subject, the company's own funds.
At the present moment, the Russian Federation does not produce small
aircrafts certified for operation in the Far North.
Andrei Vasilievich KORYAKIN,
General Director, OAO JSC Polar Airlines
677014, Yakutsk, Zhukovskogo Str., 10
Tel. +7 (4112) 44-31-28, fax +7 (4112) 44-33-39
е-mail: palair@yakutia.ru
http://www.polarair.ru/
Power Supply, Housing and Communal Sector
40. Project name
Location
Project initiator
Project characteristics
Construction of Kankunskaya hydropower station
Aldansky region, Sakha Republic (Yakutia).
Kankunskaya HPS is designed to be built on the Timpton River 200
km of the mouth.
OAO “Yuzhno-Yakutsky GEK” (dependent subsidiary of OAO
“RusHydro”). A part of Integrated development of Southern Yakutia
investment project. Initiator – OAO Southern Yakutia Development
Corporation.
Under the plan to increase electric power generation in the Sakha
Republic (Yakutia) in order to ensure intensive development of
productive forces in the Sakha Republic (Yakutia).
Installed capacity – 1,200 MW;
Average annual electric power generation – 4.9 bn kW/h;
Water storage normal maximum operating level – 608.0 m;
Top of dead water storage – 587.0 m;
Water-surface area under NMOL – 258.8 sq.km;
Total water storage capacity – 18.0 cub.km;
Useful capacity – 5.0 cub.m.
58
Volume of investment
RUR 238,563m ($8,226m), VAT included (in 2008 prices).
Infrastructure available
Kankunskya HPS is located 110 km from the existing LENA federal
motorway and Amur-Yakutsk railroad. There is a winter motorway
connecting the power site with the LENA federal motorway and
railroad near the settlement of Maly Namnyr. There are two 220-kV
power transmission lines Neryungri HPS – Nizhny Kuranakh; and
Kankunskaya HPS construction site will get power from there via 95km long 220-kV transmission line.
Designing and construction of transport and electric grid infrastructure
is to be financed from the Investment Fund of the Russian Federation.
RUR 238,563m
2012-2022, life cycle over 50 years
8.3%
RUR 3,174 m
In accordance with the RF Government resolution of 10 March 2009
No. 302-p, designing of the Kankunskaya HPS project documentation
will be financed from the Investment Fund of the RF: 2009 – RUR
2,166.6 m, 2010 – RUR 842.6 m.
12 years (simple payback period)
Potential power consumers: Seligdar mining and chemical plant – 465
mW, Yakutsk gas processing and chemical center – 196 mW,
Elkonsky mining and smelting plant – 300 mW, Tarynakh MPP – 236
mW, Tayozhny MPP – 58 mW.
The project is being implemented under the Public-Private Partnership
program, with private capital investments estimated at least 60%.
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Availability of design
estimates
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
A part of Integrated Development of Southern Yakutia investment
project. Designing of the project estimates is financed from the
Investment Fund of the RF. In 2008 there were complete documents
on “Investment feasibility study for construction of the HPS cascade
on the Timpton River”.
B.E. Vedeneev Research Institute has developed pre-project statement
“Investment feasibility study for construction of the HPS cascade on
the Timpton: Nizhne-Timptonskaya HPS, Idzhekskaya HPS or
Kankunskaya HPS” No. 1008.104-1700.03 OI. There is the State
Expertise positive conclusion. In 2010 OAO Lengidroproject started
development of design estimates for construction of Kankunskaya
HPS.
Sergey Borisovich UGLOVSKY, Managing Director
OAO Yuzhno-Yakutsky GEK
Mikhail Lvovich BRUK,
General Director, OAO Southern Yakutia Development Corporation
Moscow, 57 Profsoyuznaya Str, office 812
Dmitry Borisovich POPOV,
Deputy Managing Director, OAO Yuzhno-Yakutsky GEK
Tel.: (495) 739-33-56,
Yakutsk, Dzerzhinsky Str., 23, office 207
Tel.: +7 (4112) 49-84-15
e-mail: PopovDB@gidroogk.ru
http://www.yakutia.rushydro.ru/
ОАО SYDC
59
127473 Moscow, Seleznyovskaya Str., 11B
Tel.+7 (495) 232-42-44, fax +7 (495) 232-95-13
e-mail: office@sy-corp.ru
http://www.sy-corp.ru
41. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Project detailedness
CEO of an organization
implementing the project
Contacts
42. Project name
Location
Project initiator
Construction of Yakutsk State Regional Electric Power Station
(YaGRES) – 2
Yakutsk
OAO JSC YAKUTSKENERGO
Electric and heat power generation
Electric capacity - 298 mW,
Heat capacity - 240 gCal/h
Annual heat production – 1,673,200 ths kWh/y
Annual electricity production – 2,409,200 ths kWh/y
Works to be complete:
- construction and connecting of communications;
- construction of 2 km long gas pipeline from the gas distributing
station;
- construction of a building;
- installation of equipment.
RUR 18,177 m in 2009 prices ($640m)
There is transport infrastructure available.
Construction of heat and electric power grids required.
RUR 18,177 m
Estimated date of launching Stage 1 (170 mW): April 2015 (putting
into operation). Project life cycle – 22 years.
40.30%
RUR 85,241 m
5 years
Electric power consumers – enterprises and population of the city of
Yakutsk, central Yakutia regions – Megino-Kangalassky,
Churapchinsky, Ust-Maisky, Tattinsky, Tomponsky, Namsky, Gorny,
and Khangalssky. In future – Berkakit-Tommot-Yakutsk railway sites.
Heat consumers - enterprises and population of the city of Yakutsk.
Additional shares issue and becoming a Company’s shareholder
Oleg Vladimirovich TARASOV,
General Director, OAO JSC YAKUTSKENERGO
677000, Yakutsk, Fedor Popov Str., 14
Tel. +7 (4112) 21-13-50, fax +7 (4112) 21-13-55
е-mail: inform@yakutskenergo.ru
http://www.yakutskenergo.ru/
Construction of coal electric power station in the settlement of
Khandyga and HVL-220 kV Khandyga-Nezhdaninskoe
Tomponsky region, Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia)
60
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
43. Project name
Location
Generation and transmission of electric power using the fuel from
Dzhebariki-Khaya mine.
Capacity – 165 mW,
Production – 990 m kWh,
HVL-220 kV length Khandyga–Nezhdaninskoe – 275 km.
The project is aimed at electric power supply of new mining
productions in eastern part of Tomponsky region, as well as
compensating electric power deficit in central Yakutia.
The power station will include 3 power units, consisting of a boiler
with 9.8 mPa pressure and a turbine generator with capacity of 55/60
mW.
Annual fuel consumption – 717 ths t.
RUR 19,503.724 m in 2009 prices ($686.8m)
There is a mine near Dzhebariki-Khaya settlement with the same
name, its production capacity is up to 1 m t of coal a year. There is
social and housing infrastructure. Transport infrastructure includes allthe-year-round road Khandyga – Dzhebariki-Khaya, 72 km and having
access to the federal Yakutsk – Khandyga – Magadan motorway; in
summer – river transport along the Aldan River.
Not required.
RUR 19,503.724 m
2011 - 2016, project life cycle over 25 years
20.50%
RUR 3,361.4 m
14 years
Potential consumers – Verkhne-Menkechensky lead-zinc MPP,
Nazhdaninsky gold MMP, settlements Dzhebariki-Khaia, Razvilka,
Tyoply Klyuch
The project’s implementation requires a strategic investor.
Feasibility study
Alexander Anatolievich ANTONENKO,
Minister of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
Ministry of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
677000, Yakutsk, Kirov Str., 13
Tel. +7 (4112) 42-28-75
e-mail: minjkx@gov.sakha.ru
http://www.sakha.gov.ru/minjkh,
Nikolai Konstantinovich YEFIMOV,
Head of Power Supply Department, Ministry of Housing, Communal
Service and Power Supply of the Sakha Republic (Yakutia)
Tel. +7 (4112) 34-27-05, fax 34-24-00
e-mail: dep_energy_sakha@mail.ru
Construction of heat and power plant of low capacity in the
settlement of Zyryanka (external engineering communications)
Verkhnekolymsky region, Sakha Republic (Yakutia)
61
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
44. Project name
Location
Project initiator
Government of the Sakha Republic (Yakutia) and Verkhnekolymsky
region municipal unit
Supply of heat and electric power to the population. Combined
generation of heat and electric power to supply settlements of
Zyryanka and Ugolnoe using local fuel instead of diesel fuel brought
from outside. It is planned to construct water supply network, heat and
electric power transmitting grids.
RUR 2,126.3 million with VAT in prices of 2010 (USD 74.9 million).
The plant is situated in the settlement of Zyryanka, coal to be supplied
from the settlement of Ugolnoe, which is 60 km away, by motor
transport all the year around; cargoes to be shipped by water transport
by the Kolyma River.
Not required
RUR 2,126.3 m with VAT in prices of 2010.
Project life cycle 24 years
Verkhnekolymsky region, settlement of Zyryanka and Ugolnoe
Construction of a small-scale heat and power station in Zyrianka
settlement is included into the Federal targeted program on Economic
and Social Development of the Russian far East and Transbaikalia till
2013, which is financed form the Federal and republican budget.
Sources of financing for out of site locations have not been defined.
Positive resolution of the State Expertise on the project documentation
and estimate.
Alexander Anatolievich ANTONENKO,
Minister of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
Ministry of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
677000, Yakutsk, Kirov Str., 13
Tel. +7 (4112) 42-28-75
e-mail: minjkx@gov.sakha.ru
http://www.sakha.gov.ru/minjkh,
Nikolai Konstantinovich YEFIMOV,
Head of Power Supply Department, Ministry of Housing, Communal
Service and Power Supply of the Sakha Republic (Yakutia)
Tel. +7 (4112) 34-27-05, fax 34-24-00
e-mail: dep_energy_sakha@mail.ru
Construction of a multi-functional power supply complex in the
settlement of Yurung-Khaya
Anabarsky region, Sakha Republic (Yakutia)
OAO SAKHAENERGO
62
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
Providing customers with electric power with the use of renewable
sources. The multi-functional power supply complex includes a diesel
power station.
Capacity 1,800 kW.
Electric power generation 3.2 m kWh.
Diesel fuel economy – 146 t/y.
Works to be completed: designing, construction of transmission lines,
construction of foundations, purchase and rigging of wind turbines and
diesel power stations, electric equipment installation.
RUR 150.9 m in 2010 prices ($5.3m)
The settlement of Yurung-Khaya is situated in Anabar River mouth,
where it flows into the Arctic Ocean. Transportation – during the
navigable period cargoes delivered by the Lena River, then by the sea
route to Yurung-Khaya.
Not required.
RUR 150.9 m
2013, project life cycle 25 years
21.50%
RUR 94.974 m
10.6 years
Customers in the settlement (population, housing and communal
services sector, social facilities).
100% investor. Implementation of the project as a testing ground for
of various types and modifications to determine potential of their wide
use in cold regions, given both technical characteristics and economic
parameters.
Business plan
CEO of an organization
implementing the project
Contacts
Nikolai Makarovich PARNIKOV,
General Director, OAO SAKHAENERGO
677000, Yakutsk, per. Energetikov, 2
Alexander Stepanovich YEFIMOV,
Head of Alternative Energy Sources and New technologies, OAO
SAKHAENERGO
Tel. +7 (4112) 497508,
e-mail:
efimov@sakha.yakute.elektra.ru,
mail@sakha.yakute.elektra.ru
http://www.sakhaenergo.ru
45. Project name
Construction and rigging of a wind power station in the settlement
of Yukagir
Ust-Yansky region, Sakha Republic (Yakutia)
OAO SAKHAENERGO
Providing customers with electric power with the use of renewable
power sources.
Electric capacity – 50 kW,
Electric power generation – 120 ths kWh.
Saving diesel fuel on account of substituting it with renewable energy
sources when generating power at diesel stations.
Needs: purchase of equipment, construction of transmission lines,
construction of foundations, rigging wind turbines and electric
technical equipment.
Location
Project initiator
Project characteristics
63
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
RUR 8 m in 2010 prices($0.28m)
No.
It is necessary to prepare the site, connect the power transmission line.
RUR 8 m
2010 - 2011, project life cycle 25 years
23%
RUR 8.677 m
5 years
Consumers in the settlement of Yukagir
100% investor. Implementation of the project as a testing ground for
of various types and modifications to determine potential of their wide
use in cold regions, given both technical characteristics and economic
parameters.
ZAO Research Organization NETRAEL, Moscow, has developed a
survey on construction of wind power stations in the Sakha Republic
(Yakutia) to supply power to settlements serviced by OAO
SAKHAENERGO.
Nikolai Makarovich PARNIKOV,
General Director, OAO SAKHAENERGO
Contacts
677000, Yakutsk, per. Energetikov, 2
Alexander Stepanovich YEFIMOV,
Head of Alternative Energy Sources and New technologies, OAO
SAKHAENERGO
Tel. +7 (4112) 497508,
e-mail:
efimov@sakha.yakute.elektra.ru,
mail@sakha.yakute.elektra.ru
http://www.sakhaenergo.ru
46. Project name
Construction and rigging of a wind turbine in the settlement of
Ust-Olenyok
Bulunsky region, Sakha Republic (Yakutia)
OAO SAKHAENERGO
Use of renewable energy sources for generating electric power.
Capacity – 50 kW.
Electric power generation – 120 ths kWh/y.
Saving diesel fuel through substituting it with renewable sources of
electric energy generation at diesel power stations. Construction of
transmission lines, construction of foundations, wind turbine rigging,
electric technical equipment installation.
RUR 8 m in 2010 prices($0.28 m)
No
Construction of power transmission lines, preparing the site
RUR 8 m
2010-2011, project life cycle 25 years
30%
RUR 13.424 m
4 years
It is necessary to prepare the site, connect the power transmission line.
Consumers in the settlement of Ust-Olenyok.
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Infrastructure available
Markets
64
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
47. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
100% investor. Implementation of the project as a testing ground for
of various types and modifications to determine potential of their wide
use in cold regions, given both technical characteristics and economic
parameters.
ZAO Research Organization NETRAEL, Moscow, has developed a
survey on construction of wind power stations in the Sakha Republic
(Yakutia) to supply power to settlements serviced by OAO
SAKHAENERGO.
Nikolai Makarovich PARNIKOV,
General Director, OAO SAKHAENERGO
677000, Yakutsk, per. Energetikov, 2
Alexander Stepanovich YEFIMOV,
Head of Alternative Energy Sources and New technologies,
OAO SAKHAENERGO
Tel. +7 (4112) 497508,
e-mail:
efimov@sakha.yakute.elektra.ru,
mail@sakha.yakute.elektra.ru
http://www.sakhaenergo.ru
Switching of boiler houses in the town of Lensk to gas
Lensk, Sakha Republic (Yakutia)
AK ALROSA
Aim: reliable heat supply of the town of Lensk; implementation of
gasification program; lower cost of heat power generation.
Modernization of the existing Central heat boiler house with
substitution of oil with gaseous and liquid fuel. Construction of boiler
houses №1,2 using gaseous fuel; switching Small boiler house №5 to
gas (ALROSA); switching of the industrial boiler plant to gaseous
fuel.
Cost of construction is estimated at RUR 506.4 m with mixed pricelevel ($17.8m).
It will be reviewed during feasibility study development.
Available
Not required
Cost of construction, compared to analogues, is estimated at RUR
506.4 m (with mixed price-level). It will be reviewed during feasibility
study development.
Designing – starting from 2009, construction – 2009-2013.
Figures to be specified during the project's feasibility study
Heat power supply to customers in the town of Lensk (population of
38.6 ths people).
100% participation of AK ALROSA investing their own funds; terms
of financing and participation of other investors will be considered
during feasibility study development.
Feasibility study to be completed in 2011.
OOO Lenskoe PTS, subsidiary of AK ALROSA, will operate the
modernized fixed asserts on renting terms.
Yury Andreevich DOINIKOV
65
implementing the project
Contacts
48. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Cost of project
Implementation period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
49. Project name
First Vice-president, Executive Director, JSC ALROSA (OAO)
Tel. +7 (41136) 9-01-12 (reception)
Moscow
119017, 1st Kazachy pereulok, 10/12
Tel: (495) 620-92-50, (495) 662-36-26
Fax: (495) 411-75-15
Telex: 113258 “Алмаз» RU
http://www.alrosa.ru
E-mail: info@alrosa.ru
220 kV High-voltage line Neryungri Power Plant – Nizhny
Kuranakh – Tommot – Maya with 220 kV Tommot substation and
220 kV Maya substation
Neryungrnsky, Aldansky, Khangalassky, Megino-Kangalassky regions
of the Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia), FSK EES OAO
The goal of the project is the development of power line infrastructure
and unification of the Central and South power regions, provision of
systematic reliability of the Central power region.
Power line with a voltage of 220 kV and length of 755 km, 220 kV
Tommot substation 2x63 MWA, and 220 kV Maya substation 2x63
MWA.
RUR 13,412.51 m in 2012-2014 ($470.6m).
Not required.
RUR 19,026.7 m (in 2010 prices).
2011-2014.
Consumers of the Central power region of the Sakha Republic
(Yakutia) with a population of over 500 thousand people, Berkakit –
Tommot – Yakutsk railroad installations, Nizhny Bestyakh railroad
station.
The project is financed by the federal budget and FSK EES OAO.
In 2011 the first stage has been completed and commissioned: the 220
kV high-voltage line from Neryungri Power Plant to Nizhny Kuranakh
2 (276.6 km), work on expanding 220 kV outdoor switchgear at
Neryungri Power Plant and 220 kV substation in Nizhny Kuranakh has
been completed.
In 2011 the project documentation and estimate were developed for the
second stage of the 220 kV high-voltage line Nizhny Kuranakh –
Tommot – Maya with 220 kV Tommot substation and 220 kV Maya
substation.
Oleg Mikhailovich BUDARGIN,
Chairman of the Board of FSK EES OAO
Address: 117630, Moscow, Akademika Chelomeya str., 5A
Phones:
Unified Information Center: 8-800-200-18-81;
For calls from outside Russia: +7 (495) 710-93-33;
Fax: +7 (495) 710-96-55 E-mail: info@fsk-ees.ru
220 kV High-voltage line Olekminsk – Aldan
66
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Cost of project
Implementation period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
50. Project name
Location
Project initiator
Project characteristics
Olekminsky and Aldansky regions
Government of the Sakha Republic (Yakutia)
Two single-circuit power lines with a length of 300 km for unifying the
power systems of West, South, and Central Yakutia. Power supply to
second stage installations of the Eastern Siberia – Pacific Ocean
pipeline.
RUR 13,800 m ($485.9m).
Not required
RUR 13,800 m
2020-2025.
Installations of natural gas and oil industries, consumers of West and
Central power regions of the Sakha Republic (Yakutia).
With the attraction of federal budget funds for the implementation of
the project.
Technical and economic assessment of the complex development of
power lines of the northern regions of Irkutsk Oblast and West power
region of the Sakha Republic (Yakutia), Vostsibenergosetproyekt
Institute, Irkutsk.
Alexander Anatolievich ANTONENKO,
Minister of Housing and Power Industry of the Sakha Republic
(Yakutia)
Ministry of Housing and Power Industry of the Sakha Republic
(Yakutia)
677000, Yakutsk, Kirova str., 13
Phone: +7 (4112) 42-28-75
E-mail: minjkx@gov.sakha.ru
http://www.sakha.gov.ru/minjkh
Nikolai Konstantinovich EFIMOV, Head of the Power Industry
Department of the Ministry of Housing and Power Industry of the
Sakha Republic (Yakutia)
Phone: +7 (4112) 34-27-05, fax: 34-24-00
E-mail: dep_energy_sakha@mail.ru
220 kV High-voltage line Chernyshevsky – Mirny – Lensk –
Peleduy with a branch to Oil-Pump Station No 14 with 220 kV City
(Lensk) substation and 220 kV Peleduy substation
Mirninsky and Lensky regions of the Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia), DVEUK OAO
The goal of the project is the strengthening of power infrastructure of
the West power region, increasing the power flow towards Lensk
industrial center for power supply to installations of the Eastern Gas
Program and second stage of the Eastern Siberia – Pacific Ocean
pipeline, as well as large consumers located in Irkutsk Oblast and
nearby, improving the reliability of power supply.
The length of circuit lines is 1,541 km, capacity of transformer
substations – 402 MWA.
The project provides for the construction of a power line on metal
supports and a voltage of 220 kV, including:
- construction of two single-circuit 220 kV high-voltage lines
Chernyshevsky – Mirny – City (Lensk) with a 220/110/6 kV City
substation, 2x336 km;
67
- construction of two single-circuit 220 kV high-voltage lines City
(Lensk) – Peleduy with a 220/110/10 kV Peleduy substation, 2x227
km;
- construction of a single-circuit 220 kV high-voltage line City (Lensk)
– oil-Pump Station No 12 – Oil-Pump Station No 13 – Olekminsk
substation – Oil-Pump Station No 14 with a 220/10 kV substation at
Oil-Pump Station No 12 and 220/10 kV substation at Oil-Pump Station
No 13 (to power Oil-Pump Stations 12 and 13) – 395 km.
Volume of investment
Infrastructure available
Cost of project
Implementation period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
51. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
RUR 41,171 m
Not required
RUR 41,171 m
2011-2014
Lensk industrial center, installations of the Eastern Siberia – Pacific
Ocean pipeline constructed within the frames of the Eastern Gas
Program, gold deposits in Irkutsk region: Chertovo Koryto and Sukhoy
Log.
The project is financed by the federal budget and DVEUK OAO.
Project documentation and estimate have been developed, expertise
assessment is available. Construction begun in 2011: auctions were
held and agreements signed with contractors. At present a path is being
cleared in the forest, support foundations are laid, supports are
assembled and installed. Construction ordered by DVEUK OAO.
Igor Vasilievich DZHURKO,
Director-General of DVEUK OAO
OAO DVEUK 699003, Vladivostok, Stanyukevicha Str., 1
Tel.: +7 (4232) 79-12-41, fax: +7 (4232) 79-12-42
www.dveuk.
Expansion and reconstruction of water intake station in the city of
Yakutsk, Sakha Republic (Yakutia)
Yakutsk
Ministry for Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
Aim: enhanced reliability of water supply, increased production of
water intake, qualitative improvement of fixed asserts. The project
includes construction of a water intake station of bucket type with a
pumping unit of first ans second lifting, with capacity of 100.0 ths
cub.m a day, chlorination unit and ultraviolet disinfection unit.
RUR 1,652.5 m ($55.08 m) for the period 2011-2013.
The water intake is under the authority of JSC VODOKANAL. The
engineering and transport infrastructure meets the construction
requirements. There is a land site for construction.
Not required.
RUR 1,652.5 m for the period 2011-2013.
2011 - 2013
Figures to be specified during the project's feasibility study
Figures to be specified during the project's feasibility study
20 years
Population and enterprises in the city of Yakutsk
68
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
52. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
100% investor
Design estimates by JSC Yakutagroproject, done in 2009 ш. 2697-СМ
арх. № 68206.
Positive expert opinion on design estimates and engineering survey
results № 14-1-3-10/33-03(1)-09 of 25.11.2009 by the Department of
State Expertise of Design Estimates and Engineering Survey Results
in Construction, Sakha Republic (Yakutia).
Alexander Ivanovich FEDOTOV,
General Director, OAO Republic's Investment Company (RIC)
Alexander Anatolievich ANTONENKO,
Minister of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
Nikolai Vasilievich ZHESTKOV
Director General, OAO VODOKANAL
OAO RIC, 677000, Yakutsk, Ordzhonikidze, 38
tel. +7 (4112) 39-02-51
e-mail: ric@ricsakha.ru
Ministry of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
677000, Yakutsk, Kirov Str., 13
Tel. +7 (4112) 42-28-75, 34-47-88, 42-25-78
e-mail: minjkx@gov.sakha.ru
http://www.sakha.gov.ru/minjkh,
ОАО VODOKANAL
677001, Yakutsk, Bogdana Chizhika Str., 19
Tel. +7 (4112) 21-01-63, fax +7 (4112) 21-52-89
е-mail: yvdk@sakha.ru
http://vodokanal.ya1.ru/
Construction of waterworks in the city of Yakutsk, Sakha
Republic (Yakutia)
Yakutsk
Ministry for Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
Aim - enhanced reliability of water supply, increased production of
water intake, qualitative improvement of fixed asserts. The project
includes construction of a water treatment plant with capacity of 100.0
ths cub.m a day.
RUR 1,434.0 m ($50.5m) for the period 2012-2013.
The waterworks are under the authority of JSC VODOKANAL. The
engineering and transport infrastructure meets the construction
requirements. There is a land site for construction.
Not required.
RUR 1,434.0 m for the period 2012-2013.
2012 - 2013
Figures to be specified during the project's feasibility study
Figures to be specified during the project's feasibility study
15 years
Population and enterprises in the city of Yakutsk
100% investor
Design estimates by JSC Yakutagroproject, done in 2009 ш. 2710-СМ
69
CEO of an organization
implementing the project
Contacts
арх. № 68169.
Positive expert opinion on design estimates and engineering survey
results № 14-1-3-10/33-03(2)-09 of 14.09.2009 by the Department of
State Expertise of Design Estimates and Engineering Survey Results
in Construction, Sakha Republic (Yakutia).
Alexander Anatolievich ANTONENKO,
Minister of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
Nikolai Vasilievich ZHESTKOV
Director General, OAO VODOKANAL
Ministry of Housing, Communal Service and Power Supply of the
Sakha Republic (Yakutia)
677000, Yakutsk, Kirov Str., 13
Tel. +7 (4112) 42-28-75, 34-47-88, 42-25-78
e-mail: minjkx@gov.sakha.ru
http://www.sakha.gov.ru/minjkh,
ОАО VODOKANAL
677001, Yakutsk, Bogdana Chizhika Str., 19
Tel. +7 (4112) 21-01-63, fax +7 (4112) 21-52-89
е-mail: yvdk@sakha.ru
http://vodokanal.ya1.ru/
Construction Sector
53. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Expansion of cement production with launching of the third
technological line and increasing the plant capacity to 600 ths t of
Portland cement a year in the settlement of Mokhsogollokh
Sakha Republic (Yakutia), Khangalassky region, settlement of
Mokhsogollokh
OAO Yakutcement
1. Construction of the third technological line
2. Reconstruction of electric filters in the firing house
3. Installation of a separating mil for cement grinding
RUR 3094.2 m ($109 m)
Land plot, transport infrastructure, electric power, gas, water and hear
supply, premises and constructions
Not required
IRR
RUR 3094.2 m
Construction of the third technological line – RUR 2594.2 m
Reconstruction of electric filters in the firing house – RUR 200 m
Installation of a separating mil for cement grinding – RUR 300 m
6 years, including:
Construction of the third technological line – 6 years
Reconstruction of electric filters in the firing house – 3 years
Installation of a separating mil for cement grinding – 3 years
Being specified
NPV
Being
Implementation period
70
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
54. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
4.6 years
The republic's companies in construction, mining, oil and gas industry
and others
Lent funds
“Justification of investing unto construction of a technological line
using cement wet-mix production” is developed by OAO
“SibNIIproektcement” in 2007.
Alish Zabid-ogly MAMEDOV,
General Director, ОАО Yakutcement
Yelena Gareevna KRYUCHKOVA,
Deputy General Director on Capital Construction,
Tel. +7 (411-44) 47-319,
Alexander Borisovich MATVEEV,
Head of Financial Department,
Tel. +7(411-44) 48-070
е-mail: mohoks@mail.ru
Launching a facility for production of dry building composites,
flooring cement and water-proof composite gypsum matrix,
restoration of the building lime facility
Sakha Republic (Yakutia), Khangalassky region, settlement of
Mokhsogollokh
OAO Yakut State Construction Design and Research Institute
Launching and restoring of the facility for production of :
- flooring cement with capacity up to 40 ths t a year (including waterproof one);
- lime with capacity up to 16 ths t a year;
- dry building composites of a wide range with capacity up to 30 ths t
a year.
RUR 700 m in 2010 prices ($24,6 m)
Land plot, transport infrastructure, electric power, gas, water and hear
supply
Not required
RUR 850 m
5 years
5.6 years
The republic's companies in construction, mining, oil and gas industry
and others
Lent funds
Business plan for dry construction composites and water-proof
gypsum facilities, developed by OAO Yakut State Construction
Design and Research Institute.
Olga Innokentievna MATVEEVA,
General Director, OAO Yakut State Construction Design and
Research Institute
677000, Yakutsk, Dzerzhinskogo Str., 20
Tel. +7 (411-2) 45-22-95
71
е-mail: yapniis@ysn.ru
http://www.yapniis.ru/
55. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
56. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
OOO ALMAS development
Lensky region, Olyokminsky region, city of Yakutsk, Sakha Republic
(Yakutia)
ООО ALMAS
Purchase of logging and timber transportation machinery,
technological equipment for timber housing construction.
Increasing volumes of stocking and processing of industrial timber
RUR 310.5 m in 2010 prices ($11.0 m)
Production facility
Construction of forest roads
RUR 621.0 m
3 years
5 years
Asian Pacific and European countries, Russian regions, Sakha
Republic (Yakutia)
Lent funds
Business plan
Andrei Yurievich NIKOLAEV,
Director, OOO ALMAS
677004, Yakutsk, 50 Let Sovetskoi Armii Str., 86/4 А
Tel. +7 (411-2) 44-96-09
е-mail: lpk@alanab.ru
http://alanab.ykt.ru/content/blogcategory/165/45/
Launching of desiccation service at ZAO YUPITER
Lensky region, town of Lensk, Sakha Republic (Yakutia)
ZAO YUPITER
Launching a timber desiccation facility, modernization of timber
processing facility, construction of forest roads, creation of new
workplaces
RUR 150.0 m in 2010 prices ($5 m)
Production facility in the town of Lensk, Lensky region, timber
logging unit in Lensky region
Construction of forest roads
RUR 210.0 m
3 years
Being specified
Being specified
5 years
Domestic market of the Sakha Republic (Yakutia)
Share in the charter capital
Business plan
Nikolai Vasilievich PEREVOZNIKOV,
Director, ZAO YUPITER
677000, Sakha Republic (Yakutia), town of Lensk, Pobedy Str., 74а
Tel. +7 (411-37) 4-98-67, cell # +7 (914) 252-88-91
72
е-mail: zao_yupiter@mail.ru
57. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
58. Project name
Location
Launch of timber production by OOO Logging Unit STVOR
Sakha Republic (Yakutia), Lensky region
OOO Logging Unit STVOR
Launching timber processing with the use of timber resources of
Lensky region, exporting the output to Europe and Asian Pacific
countries, creating new workplaces.
Designed capacity: industrial wood logging – over 100.0 ths cub.m;
processed goods – over 70 ths cub.m. Reconstruction and construction
of new forest tracks.
RUR 257.4 m in 2010 prices ($9.0 m)
There is upper and lower storages; wood processing facility, requiring
modernization of primary equipment; repair facilities; forest roads;
housing.
Construction of forest roads
RUR 495.0 m
3 years
53.1%
RUR 317,6
5 years
Asian Pacific countries, Europe, Russian regions, doemstic market of
the Sakha Republic (Yakutia)
Lent funds
Business plan
Vladimir Vasilievich KORYAKIN,
Director, ООО Logging Unit STVOR
677000, Yakutsk, Dzerzhinskogo Str., 2
Tel. +7 (411-2) 47-63-29, cell # +7 (924) 175-01-40
е-mail: alex8784400@mail.ru
Construction of wooden carcass housing from energy-efficient
modules with use of modified firebioproof composite
Yakutsk, Sakha Republic (Yakutia)
Project initiator
Engineering and Technical Faculty, Technopark of Arctic
Innovations Center, The M.K. Ammosov North Eastern Federal
University (NEFU)
(in the frame of “Development of Innovations Infrastructure of the
M.K. Ammosov North Eastern Federal University “Arctic
Innovations Center”)
Project characteristics
Implementation of module approach in construction, which allows
for significant reduction of construction period, maintenance of
high level of standardization and precision of design, as well as for
continuity of construction independent from weather conditions
Volume of investment
RUR 13.7 m ($0.5 m)
The volume of attracted investments and resources by partners and
73
investors into the project development: not less than 40% of NEFU
investments
Infrastructure available
On initial stage the project is based on the infrastructure of
Engineering and Technical Faculty, Technopark of Arctic
Innovations Center of NEFU
Infrastructure required
With active development of the project the necessity of
infrastructure development is determined together with investors
and partners
Cost of project
Determined together with investors and partners
Implementation period
Being specified
IRR
Being specified
NPV
Being specified
Payback period
Being specified
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
59. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
Construction services market of the Sakha Republic (Yakutia)
Upon agreement
Business offer
Roman Romanovich NOGOVITSYN
Director, Arctic Innovations Center of NEFU
Arctic Innovations Center of NEFU
677000, Yakutsk, Kulakovskogo Street 42, Office 110
Tel./Fax +7 (4112) 32-03-89,
е-mail: mggo04@mail.ru
Integrated development of Quarter 84 in the city of Yakutsk
Yakutsk, Sakha Republic (Yakutia)
ОАО Almazy Anabara (Diamonds of Anabar)
Construction of comfortable multiresidential house in Yakutsk (three
416-apartment and two 432-apartment houses, 2,112 apartments in
total with the total area of 147.3 ths sq.m)
RUR 6,475.5 m in 2011 prices ($228 m)
There is a 15 he land site allotted; it is integrated into the city's
transport network.
Electric power, heat, gas and water supply of the site
RUR 6,690.5 m
3 years
61.5%
74
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
RUR 655.1 m
3.5 years
Population in the city of Yakutsk
Lent funds
Design estimates, business plan, positive conclusion of the state
expertise; a construction site allotted in Quarter 84
Matvei Nikolaevich YEVSEEV,
General Director, ОАО Almazy Anabara
677000, Yakutsk, Chernyshevskogo Str., 6
Sergei Alexandrovich ULAROV, Aide to General Director
Tel. +7 (411-2) 45-11-00 (ext. 4315)
е-mail: ularovsa@alanab.ru
http://alanab.ykt.ru/
V Children of Asia International Sports Games Construction Facilities
60. Project name
Location
Project initiator
Project characteristics
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
61. Project name
Location
Project initiator
Project characteristics
Swimming pool in Yakutsk with 50х25 m tub
Yakutsk, Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia)
4-storey building,
The size of the tub complies with the international standards. It is
50.0x25.0 m with 10 lanes 2.5 m wide and 50.0 m long each.
Available
Not required
RUR 676,113.0 ths
June 1, 2012
The site is being constructed.
As of July 2011, the site is 46% complete.
Vyacheslav Ratmirovich SERGEEV,
Director General,
SE Service of Governmental Customer under the Government of the
Sakha Republic (Yakutia)
Tel/fax +7 (4112) 34-12-39
Sports Training Center (Covered Sports and Entertainment
Complex for 3,000 seats) in Yakutsk
Yakutsk, Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia)
In 2012 in the frame of the Russia is Sports Power International
Sports Forum the Sakha Republic (Yakutia) will host the 5th Children
of Asia International Sports Games in 20 kinds of sports.
The central venue for the Forum and the Games will be the Sports
Training Center (Covered Sports and Entertainment Complex for
3,000 seats) in Yakutsk, the construction of which began in 2009.
The venue is one of the most large-scale projects in sports industry of
the Far Eastern Federal District, which includes a covered arena for
holding sports, training and entertainment events. The complex will
have four 200m-long running lanes, sectors for 60m run, longjump,
highjump, and pole vault. Folding and demountable grounds of
75
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
62. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
medical center and sports hall (wrestling and boxing), etc, will be
used for holding team sports.
Total area of venue – 4.16 ha, construction area – 1.28 ha, area of
roads and other grounds – 3.06 ha.
External communications: Heating – Yakutsk Heating and Power
Central, closed circuit; Power supply – built-in transformer substation
in Block B, 200 kW module diesel power station; Water supply –
central sewage system; Gas supply – gas mains.
Not required
RUR 2,394.8m
June 2012
26,95%
The project is under construction.
As of July 2011 the project is 35% complete.
Vyacheslav Ratmirovich SERGEEV,
Director General,
SE Service of Governmental Customer under the Government of the
Sakha Republic (Yakutia)
Tel/fax +7 (4112) 34-12-39
Covered football stadium with artificial surface for 3,000 seats in
Yakutsk
Yakutsk, Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia)
In 2012 in the frame of the Russia is Sports Power International
Sports Forum the Sakha Republic (Yakutia) will host the 5th Children
of Asia International Sports Games in 20 kinds of sports.
This facility comprises:
- one-storey football stadium;
- three-storey office building;
- transformation station;
- universal sportsground 50m x 30m;
- skate-park;
- freestyle;
- 1000m-long skiing track.
The 110x65m football pitch and 400m running tracks comply with
international football and athletics standards.
Equipment and 30x15 m floor coverage without additional areas
comply with international standards for aerobics, rhythmic dancing
and table tennis.
Max daily capacity – 700 persons.
Available
RUR 1,448.1m
June 1, 2012
95%
The site is being constructed.
As of July 2011 the project is 10% complete.
Vyacheslav Ratmirovich SERGEEV,
Director General,
SE Service of Governmental Customer under the Government of the
76
Contacts
63. Project name
Location
Project initiator
Project characteristics
Infrastructure available
Infrastructure required
Cost of project
Implementation period
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
Sakha Republic (Yakutia)
677018, Yakutsk, Ammosova Str., 8
Tel: +7 (4112) 34-12-39
MODUN Sports Complex (Stage 2)
Yakutsk, Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia)
This facility will expand population access to services in physical
culture and sports, it will allow for holding various sports events,
efficiently develop native kinds of sports at regional, national and
international levels, various scientific research in native sports, it will
become base facility for federal center of native kinds of sports.
Total area of Stage 2 is 2,100.7 sq.m. It will house a 2-level hall for
competitions with amphitheatre for 300 seats, which will host
Taekwondo competitions of the 5th Children of Asia Games;
specialized training rooms for native sports (Khapsagay, MasWrestling, Yakut jumps, etc). Number of floors – three.
Total area of supra-constructed area is 838.50 sq.m. The upper part
will house athletics hall with 150-seat tribune and 3 running tracks,
with special soft cover for jumping, tensometric platforms for
scientific research, standard track for official competitions. Number
of supra-constructed part floors – 1. During the Children of Asia
Games the hall will be used as training hall in table tennis.
Max daily capacity – 300 persons.
External communications: Heating – Yakutsk Heating and Power
Central, closed circuit; Power – from Modun Sports Complex Stage
1; Water – centralized.
Not required
RUR 191.5m
June 1, 2012
95%
The project is under construction.
As of July 2011 the site is 41% complete.
Vyacheslav Ratmirovich SERGEEV,
Director General,
SE Service of Governmental Customer under the Government of the
Sakha Republic (Yakutia)
677018, Yakutsk, Ammosova Str., 8
Tel: +7 (4112) 34-12-39
Agroindustrial Sector
64. Project name
Location
Project initiator
Project characteristics
Development of agricultural production facility in the settlement
of Vitim
Lensky region, Sakha Republic (Yakutia)
Ministry of Agriculture and Food Policy of the SR(Y), OOO VitimAgro
The project is designed to:
1. Supply whole-milk products to a milk- processing plant producing
cultured milk products for the population;
77
Products: hardly transportable milk and cultured milk products from
basic-fat marketable milk produced at the animal farm in volume of
650 t.
2. Production of pork, selling piglets to the population in the
settlement of Vitim and neighboring areas.
3. Egg production in Vitim.
4. All-the-year-round production of vegetables and greens for selling
fresh and processing.
5. Wasteless manufacturing of agricultural products.
Basic facilities:
- cattle farm for 212 heads of milkers and 282 heads of young stock in
Vitim and the village of Tolon, Lensk region of the SR(Y).
- pig farm for 47 heads of sows.
- egg-oriented chicken farm for 10,000 laying hens.
- greenhouse vegetable production in Vitim.
- food producing facility in Vitim.
Volume of investment
Infrastructure available
Infrastructure required
Implementation period
Cost of project
IRR
NPV
Project design estimates
RUR 1,568.6 m in 2010 prices ($52.2 m)
Transport, electric grid and engineering infrastructure
Gasification of the settlement of Vitim
Up to the year 2017, project life cycle 26 years
RUR 1,568.6 m
10.08%
RUR 1,578.4 m
Design estimates are developed.
Stage 1 design estimates are developed for the following sites:
- food plant with meat and fish product shops, milk plant with
capacity of 3 tons a shift, bakery and confectioner's shop woth
capacity of 1.5 tons a shift, soft drinks shop with capacity 50 ths a
year;
- slaughter point;
- maintenance unit (garage for 10 vehicles with stores and repair
shops, shed for agricultural vehicles, cold store);
- veterinary unit with a laboratory;
- office building with sanitary post;
- cattle farm for 212 heads of loose housing system with full herd
turnover;
- pig farm for 47 heads of principle sows.
Estimated cost of the site construction amounts to RUR 753.678 m.
At the moment Stage 1 design estimates are undergoing state
expertise.
The state contract was signed for the construction of stage 2 sites to be
completed in August 2011.
Stage 2 sites:
- chicken farm for 10,000 birds;
- dung-yard for the cattle and pig farms with capacity of 10,000
tons;
- potato storage with capacity of 500 tons;
- biological waste processing facility with capacity of 1 ton a shift;
- greenhouses with total area of 6,000 sq.m, including used in
winter – 1,000 sq.m, in spring and summer – 5,000 sq.m;
- post control;
78
-
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
65. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
35 km of motor roads;
silo pit with capacity of 1,200 tons;
irrigation and drainage system for 50 ha of arable lands of the
agroindustrial complex;
- power supply to arable lands with 30 km long transmission lines;
- expansion of arable lands by 1,000 ha;
- engineering and geological survey and topographic mapping of
the territory;
Positive conclusion of the State Expertise Department of the Sakha
Republic (Yakutia).
12.25 years
Supply of local products to workers of the companies operating in
Western Yakutia and the north of Irkutsk Oblast.
The extent of an investor’s involvement is to be determined by an
investment agreement upon completion of design estimates.
Feasibility study – developed and approved by the state expertise;
design estimates for Stage 1 objects – developed; design estimates for
engineering and transport infrastructure objects - developed.
The project was discussed at a meeting of the Expert Board on
regional investment policy under the Ministry of Regional
Development of the RF on 25 August 2010. To include it into the list
of priority investment projects, the Board recommended to revise the
project as a project aimed at integrated development of the entire area.
OAO “Republican Investment Company” is acting as an investor at
the stage of preparing a construction site (engineering and transport
infrastructure facilities). The State Order Service under the Sakha
Government has signed the state contract for construction and
mountining.
Director, OOO Vitim-Agro
Anatoly Timofeevich NOEV
678150, Lensky region, s. Vitim, Lenin Str., 45
cell # +7 (914) 225-6256, fax +7 (411-23) 36-57-47
e-mail: tonda@ngc.ru
Reconstruction and modernization of fish processing facility
Yakutsk, Sakha Republic (Yakutia)
ООО Yakutsk Fish Plant
Replacement of obsolete equipment and production of safe fish
products in compliance with European standards and HASSP.
Production capacity – 1,000 tons of fresh frozen fish stored at a time.
Types of products: smoked, salted, balyk-type, cured products,
preserves and delicatessen.
RUR 133 m in 2011 prices ($4.7 m)
Available
Not required
RUR 133 m
2012 - 2013
12%
RUR 69.059 m
79
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
66. Project name
Location
Project initiator
Project characteristics
13 years
Sakha Republic (Yakutia), RF regions
100% investor
Design estimates done
Director, OOO Yakutsk Fish Plant
Yelena Kirillovna KUVSHINOVA
677000, Yakutsk, Truda Str., 1
Tel. +7 (4112) 45-90-58
e-mail: fish1928@mail.ru
Processing of fish harvested in the republic without quotas
Yakutsk, Sakha Republic (Yakutia)
ООО CheZaRo+, individual entrepreneur A.N. Chertkov
The project is aimed at intensive promotion of new competitive fish
products on markets of the Sakha Republic (Yakutia), Far-Eastern
regions and central parts.
Objectives: Development and production of over 100 new fish
products from local fish species harvested without quotas (pike, cisco,
peled, crucian carp).
Increased volume of fish products manufacturing up to 6,000 tons.
Construction of fish processing facilities; purchase of modern fishprocessing equipment; certification of newly-developed fish products.
Objects to be built: construction of a fish-processing facility in the city
of Yakutsk, compiling with the international standards
Volume of investment
Infrastructure available
Infrastructure required
Cost of project
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
RUR 520 m in 2009 prices ($18.3 m)
Transport and electric grid infrastructure
Not required
RUR 520 m:
- cost of constructing a building and facility related to processing of
up to 6000 tons of all kinds of fish – RUR 112.24 m
- cost of equipment of fish-processing facility (fillet –making line,
drying line, freezing line, packing) – RUR 250 m
- establishment of fixed facilities for the initial processing of fish on
the fishing sites – RUR 120 m.
- other costs – RUR 37,6 m.
5 years
35%
RUR 192.4 m at 7% discounting rate
7.5 years
Sakha Republic (Yakutia), Russian Far East, city of Moscow and
central regions of Russia
The extent of an investor’s involvement is to be determined by an
investment agreement upon completion of design estimates and the
construction site preparation.
Feasibility study is developed. The project was discussed at a meeting
of the Expert Board on regional investment policy under the Ministry
of Regional Development of the RF to be included into the list of
priority investment projects. The Board recommended to revise the
project as an integrated development project
80
CEO of an organization
implementing the project
Contacts
67. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Implementation period
Cost of project
IRR
Director
Alexander Nikolaevich CHERTKOV,
677000, Yakutsk, Korolenko Str., 2/2,
Tel. +7 (4112) 422-720, cell # +7 (914) 2705185
е-mail: chezaro@mail.ru
Development of innovative production of biologically active food
additives (BAA) and cosmetics from reindeer antlers with the use
of new biotechnologies
Yakutsk, Sakha Republic (Yakutia)
Closed Joint-stock TABA National Reindeer Company (ZAO NRC
TABA)
Project aims:
Commodity production in reindeer husbandry in Yakutia via
production of new products (BAA, preparations and cosmetics from
antlers and other reindeer endocrine material).
Products manufactured:
- hygienic preparation for baths Aqua-Tabapan-UU (antler baths are
recommended by the Russian Research Center for Recovery Medicine
and Balneology, Ministry for Healthcare of the RF);
- mud applications made from antler cake (recommended for
rheumatic and articular diseases);
- 4 kinds of cosmetic creams with reindeer velvet pantlers with
Tabapaan trademark;
- encapsulated BAA Tabapan (for improved intellectual and physical
performance, stronger immune system, better sexual function);
- sliced antlers Solpan (recommended for for improved intellectual and
physical performance, stronger immune system, better sexual
function);
- cosmetic creams based on antler hydrolyzate: nourishing, anti-age,
protecting, massage, for eye-lids.
There is no analogous production based on reindeer raw materials in
the Russian Federation; whereas the reindeer herd in the Sakha
republic (Yakutia) is capable of supplying the necessary volume of
antlers without affecting the reindeer population. The BAA
production's designed capacity requires up to 12 tons of raw antlers a
year.
RUR 46.0 m in 2010 prices ($1.6 m)
There is a BAA producing shop with total area of 1,588.9 sq.m. It has
been reconstructed, supplied with an autonomous boiler unit.
Expanded production requires the following:
- to conduct construction and rigging in the existing building to launch
perfume and cosmetic articles;
- to purchase a 200 kW transformer substation, provide water supply
ans sewage, increase gas boiler unit's capacity, construct a hard-cover
road.
6 years
RUR 80 m, including:
- own funds – RUR 34 m;
- investments – 46 m.
18.6%
81
NPV
Payback period
Markets
RUR 0.424 m
61 months
Russia regions, exports upon receipt of the international certificate
-
Investor's involvement
-
Project detailedness
CEO of an organization
implementing the project
Contacts
68. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Implementation period
share in business (51% of charter capital of ZAO TABA National
Company)
funds lent for 10 years, with the principle debt payment starting
from the third year of financing.
Business plan is developed.
There are design estimates for construction of a shop producing
perfume and cosmetic articles in the city of Yakutsk.
There has been launched production of encapsulated BAA and
hydrolyzate from reindeer antlers. Four types of cosmetic creams are
produced. The commodity products won eight gold medals at various
Russian exhibitions.
Documents:
- Certificate of state registration №77.99.11.3.У.1696.3.10 of
19.03.2010 for Solpan antler slices food BAA;
- Certificate of state registration №77.99.11.3.У.1694.3.10 of
19.03.2010 for Tabapan antler powder food BAA;
- Compliance certificate № РОСС RU.ПК05.В 31868 № 8354807 for
Tabapan protecting cream, universal Tabapan-Erchim massage cream;
- Compliance certificate № РОСС RU.ПК05.В 25476 № 7776581
for Tabapan anti-age cream, Tabapan nourishing cream»;
- Resolution on state registration of Tabapan trade mark of 9
December 2010.
General Director, ZAO NRC TABA
Mikhail Mikhailovich PAVLOV,
677000, Yakutsk, Ordzhonikidze Str., 20
Tel. +7 (4112) 34-01-56, fax +7 (4112) 42-04-77
е-mail: taba@sakha.ru
Establishment of a joint venture on breeding Yakut horses and
foal meat processing
Churapchinsky region, Sakha Republic (Yakutia)
OAO Republic's Investment Company
Export of foal products to international consumer markets, South
Korea in particular. The project is based on unique dietary and
therapeutic properties of Yakut foal meat.
RUR 100 m in 2011 prices ($3.5 m).
Federal motorway Moscow – Magadan, running through the territory
of Churapchinsky region; developed infrastructure in the settlement of
Churapcha, the regional center.
Not required
5 years
82
Cost of project
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
677000,Yakutsk, Ordzhonikidze Str., 38
tel. +7 (4112) 39-02-51
e-mail: ric@ricsakha.ru
Contacts
69. Project name
Location
RUR 200 m
Being approved
Being approved
Being approved
RF, Kazakhstan, South Korea
Investments up to 50%
The project documentation is being developed
General Director, OAO RIC
Alexander Ivanovich FEDOTOV
Creating a joint venture to manufacture footwear
Yakutsk
Project initiator
OAO “Sakhabult” Agro-Industrial Enterprise
Project
characteristics
Realization of leather and wet-blue (semi-manufactured).
Establishing an enterprise that would guarantee consuming of manufactured
products of the “Sakhabult” leather shop.
The project plans to synchronize the work of the “Sakhabult” leather shop with
the production activities of the enterprise. Production capacity is 200000 pairs
of shoes a year.
Production of footwear in the Russian Federation has been on level over the
recent years. The imported footwear accounts for 70% of sales.
Investment volume
Infrastructure
available
Infrastructure
required
Implementation
period
Project cost
RUR 22,5 m. in 2010 prices ($0,750 m.)
The main production building has 2 floors with total area of 1,5000 sq.m. It is
made of small concrete cinder block.
Electricity, water and sanitation provided.
It has self-contained heating.
The building is located on land with total area of 5 hectares.
The land is leased for the period of 49 years.
Transportation services reduction.
4 years
RUR 22,5 m., including:
- 51% (RUR 11,475 m.) long term trade credit in the form of raw hides
provided by OAO “Sakhabult”.
- 59% (RUR 11 025 m.) – direct investment
83
IRR
No information, IRR - 561,7%
NPV
RUR 66,8 m.
Payback period
8 months
Markets
The Sakha Republic (Yakutia), Khabarovsky Kari, Primorsky Krai, Magadan
Oblast, Sakhalin Oblast and the border territories of the PRC
Investor’s
involvement
- 51% (RUR 11,475 m.) long term trade credit in the form of raw hides
provided by OAO “Sakhabult”.
- 49% (RUR 11 025 m.) – direct investment
Project detailedness
Material and technical facilities are available.
The land is leased for the period of 49 years.
OAO “SAkhabult” assumes responsibilities in supply leather, the main raw
material for the footwear production, technological process management,
providing qualified shoemakers, realization of part of finished products.
CEO of an
organization
implementing the
project
Contacts
Petrov Nikifor Nikolaevich
The Director General of OAO “Sakhabult” ” Agro-Industrial Enterprise
677018 Yakutsk, Sovetskoy Armii str, 3
Tel. /fax: (4112) 21-10-00
E-mail: sakhabult@sakha.ru
Innovative projects
70. Project name
Location
Project initiator
Project characteristics
Developing a technology and launching a facility for producing
preparation based on polyunsaturated fat acids of young Yakut
horse
Company with imited liabilities (OOO) “Scientific-production unit
Biotechnologies of the North”
Company with limited liabilities (OOO) “Scientific-production unit
Biotechnologies of the North”, Yakutsk Research Institute of Agriculture
Developing a technology and launching a facility for producing
preparations and biologically active additives based on polyunsaturated
fat acids from internal fat of young Yakut breed horses.
(Critical technology of the federal level: Chemical and biological
synthesis of active medical and food structures; their further testing on
cell cultures, animals and in a clinic; development of a production
technology (standard requirements).
Fat of young Yakut horses contains polyunsaturated fat acids (linoleic,
arachidonic and alfa-linoleic fat acids); their concentration at 25.5%
makes it a potential source of producing Omega-3 and Omega-6 fat acid
preparations.
The project will also contribute into safeguarding preservation of the
Yakut horse gene fund; on the international scale – provide perspective
84
Volume of investment
export-oriented product. Analogues of the preparation being created are
used for treatment and prevention of a wide range of diseases, including
atherosclerosis and its complications – ischemic heart disease, arterial
hypertention, stroke, alimental obesity, oncological diseases,
tuberculosis, gastrointestinal tract diseases.
At least RUR 38 m in 2010 prices ($1.33 m) within implementing the
START-2007 innovative projects' program held by the Federal Fund for
supporting small businesses in science and technology sector, including:
- investor funds: at least RUR 25 m
- Federal budget: up to RUR 13 m
Infrastructure available
Infrastructure required
Project cost
Implementation period
On the initial stage, the project uses infrastructure of the Yakutsk
research Institute of Agriculture, Russian Agricultural Academy;
Research Institute of Diet, Russian Academy of Medical Sciences; and
Industrial Park, M.K. Ammosov Northeastern Federal University.
With extensive project development, the need in additional infrastructure
is to be determined in consultations with investors and partners.
RUR 38 m
36 months
IRR
NPV for stage 3
Markets
Investor's involvement
42.4 %
RUR 5.8 m
Russian and the world market.
An investor’s share in profit – to be negotiated; share in the charter
capital – up to 25%, depending on the volume of investment.
Project's detailedness
The innovative project is a winner of START-2007 contest held by the
Federal Fund for supporting small businesses in science and technology
sector. Stage 1 is complete: standard requirements for the raw material
developed, “Foalium” trade mark received; business plan available.
Konstantin Maksimovich STEPANOV, General Director,
“SPU Biotechnologies of the North”,
Doctorof Veterinary Sciences, Associate professor, RANS Professor,
Honorable agriculture worker of the Sakha Republic (Yakutia).
677013, Yakutsk, Kalandarishvili Str., 21, building 1, office 57
Tel./fax +7 (4112) 21-45-69, 35-04-84, cell # + 7 914 270 35 87
e-mail: stenco07@mail.ru
CEO of an organization
implementing the
project
Contacts
71. Project name
Location
Project initiator
Project characteristics
“Basalt – new technologies” in the area of “Basalt-plastic nanostructured composites for the Russian North”
Yakutsk, Sakha Republic (Yakutia)
Company with limited liabilities (OOO) TBM
The innovative project is aimed at the replacement of traditionally
used in the Russian North and Far East expensive construction
materials with more efficient alternative kinds of materials by
organizing local highly-technological production complex on the
production of composite materials based on continuous basalt fiber.
Products under the project:

Basalt continuous fiber (2850 t/y)
- reinforcement of concrete and other constructions;
- manufacture of composite materials (rods, profiles, tanks, tubes,
85
Volume of investment
Infrastructure available
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project's detailedness
CEO of an organization
implementing the project
Contacts:
72. Project name
Location
nets);
- manufacture of woven and nonwoven materials (for automobile,
plane, vessel and bridge constructions, wind-power generators).

Basalt-plastic reinforcement (2,600 t/y)
- reinforcement for concrete constructions;
- reinforcement for road carpet.

Basalt-plastic road geonet (1,400 ths cub.m/y)
- reinforcement of road carpets;
- reinforcement of embankments, earth-deposits, slopes, beautification.

Basalt-plastic constructions and products (33,370 cub.m/y)
- industrial and civil engineering.
RUR 950 m in 2010 prices ($33.5 m), including own funds: RUR 150
m.
Borrowed funds:ROSNANOTECH State Corporation — RUR 400 m,
OAO Republic's Investment Company (RIC) — RUR 150 m, ОАО
RosBR – RUR 250 m.
All infrastructure available.
Construction (development) of Infrastructure facilities of Pokrovsk
industrial zone and creation of energy infrastructure using highlyefficient gas-turbine plants (RUR 142 million).
RUR 950 m
2010 - 2018
18.6 %
RUR 173,1 m
66 months
Potential market – the market of reinforcement materials and products
such as basalt continuouss fiber,basalt-plasticc reinforcement, road
geonet, reinforced concrete constructions in the Sakha Republic
(Yakutia) and other regions of the Russian Far East.
The regional reinforcement market amounts to around 24-26 ths t of
steel reinforcement a year, equivalent to 3 ths t of basalt-plastic
reinforcement.
Stage 1 of the project focuses on the Sakha market and substitution of
steel reinforcement brought from othert regions by the alternative one.
Share in OOO TBM – 37,5%
Share in OAO Ros BR - 25%
Share in ROSNANOTECH – 37,5%
Positive assessment by the state expertise performed by Ros BR.
Positive opinion of scientific and technical, patent, productiontachnical and investment expertise by ROSNANOTECH. The project
is approved for funding by ROSNANOTECH.
Financing: funds borrowed from OAO RIC at RUR 150 m; loan from
OAO RosBR for the amount of RUR 100 m.
Directir general of OOO TBM
Yegor Petrovich ZHIRKOV
677000, Yakutsk, Ordzhonikidze Str., 38, office 105
Tel. +7 (4112) 390279, cell # +7 (924) 7652580
е-mail: gastep@yandex.ru
Production of motor fuel from solid fuel minerals and mechanic
thermochemical reactor for its realization
Neryungri, Sakha Republic (Yakutia)
86
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
ООО YAKUTIA, Moscow Institute for Solid Fuel Minerals
The technology of hydrogenation processing of coal into liquid fuel is
remarkable for its high economic efficiency (compared with the
industrial technology used in Germany and related research, recently
done in the USA, Japan, Great Britain, and other countries); potential
of rceiving liquid fuel from coal with competitive prices, compared
with their production from crude oil (cost of 1 t of coal oil is up to
$150).
Besides, there are other advantages of producing motor fuels through
coal hydrogenation compared with processes developed and being
improved in the USA, Germany, Japan, and Great Britain:
1. Lower capital investment into building an industrial facility by 5
times compared with the use of 20-30 mPa pressure.
2. Reduced total consumption of hydrogen for producing marketable
motor fuels to 5-6% against 13-14% of foreign analogues.
3. Use of swirl combustion chamber for drying coal instead of rotary
tube drier reduces metal consumptionby 22 times at this stage.
4. The use of vibratory coal grinding in dispensers results in 5.5 times
lower cost for coal grinding.
5. Slime semi-coking has been replaced by high-speed burning in
cyclone furnace.
6. The use of highly-porous active catalysts for hydro-refinement of
primary coal distillates halves the number of treatment stages when
producing commercial gasolines, jet engine and diesel fuels..
7. Short-cycle adsorbing treatment for refinement of circulating
hydrogenous gas reduces costs at this stage by 12 times, compared
with the known absorbing techniques of refinement.
8. The technique of gasification in boiling substance under pressure
and hot gas refinement for production of fuel gases (power station and
process) increases efficiency from 60-70% to 85%, reduces capital
costs in comparison with the known industrial techniques.
9. The use of a new-generation hydrogenation reactor (mechanic
thermochemical reactor) reduces consumption of metal at this stage by
25 times; power consumption – by 30 times; site area – by 17 times;
and productivity increases by 12.5 times.
10. Products
- coal oil – 10.4 ths t/y;
- EURO-3 gasoline — 2.8 ths t;
- low-sulfur EURO-4 diesel fuel- 6.2 ths t;
- annual coal processing volume– 33.4 ths t.
11. Alternative products:
- paving bitumen – 4.7 ths t;
- EURO-3 gasoline — 4.3 ths t.
RUR 1260 m in 2010 prices ($44.4 m).
Capital investment –RUR 260 m.
Circulating assets – RUR 1000 m.
Electric power generation 400kW; there are access roads; engineering
communications.
Land site with the area of 19,195 sq. m. Buildings and constructions
under ownership.
Mainline industrial facilities
87
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project's detailedness
CEO of an organization
implementing the project
Contacts:
73. Project name
Project initiator
Project characteristics
Volume of investment
RUR 1,260 m
4 years
36%
Precise calculation to be done under the project development stage
4 years
Mining industry
50% ROSNANOTECH
Application to ROSNANOTECH № ID 967, the Russian Federation
patent №2396303;
Application for European patent №РСТ/RU 2010/000296; patent
№2411423 of 11.02.2009.
Vasily Ivanovich REVA, Director General
Supervisor – Professor Anatoly Stanislavovich MALOLETNEV,
Doctor of technical sciences
Neryungri, Donetskaya Str., 34 а
Tel./fax +7 (41147) 9-21-53,
cell # +7 (924) 362-34-50, +7 (924) 160-43-34
е-mail: yakutiya@neru.sakha.ru
Developing a technology of producing and composition of the
detoxicant biologically active additive
Institute for Biological Problems of Cryolithozone, Siberian Branch,
Russian Academy of Sciences
Project aim: developing a technology of producing biopreparations with
detoxicant and antidrug effect basing on amino-β- oligosaccharides
extracted from lichen, effective for correcting metabolic dysfunctions
(insular diabetes, atherosclerosis, autoimmune allergic conditions);
marketing of the product.
Type of product: water-alcoholic solutions, encapsulated powders.
RUR 30 m in 2010 prices ($1,06 m)
Infrastructure available
The research and development is being done at the Institute for
Biological Problems of Cryptozoic, Siberian branch, Russian Academy
of Sciences, and Biochemistry department, M.K. Ammosov Northeastern
Federal University.
Infrastructure required
Significant investment will be required for construction of the industrial
facility in the city of Yakutsk.
1.5 years, project life cycle 10 years
RUR 30 m
35%
$ 0.3 m
3 years
Russian and foreign (South-East Asia and the EU) markets of
biopreparations and biologically active additives.
Joint completion of the research and development, production supply,
investment into production, establishment of joint production,
cooperation in selling the production in the RF and the EU. A share in
profit – to be negotiated.
Implementation period
Project cost
IRR
NPV
Payback period
Markets
Investor's involvement
88
Project's detailedness
CEO of an organization
implementing the project
Contacts:
74. Project name
Location
Project initiator
Project characteristics
There are the RF patents for invention, permissions from the Russian
Agency for Health and Consumer Rights to produce and sell the
products. The technological project is ready to be implemented.
Director of IBPC, SB, RAS
Pavel Alexandrovich REMIGAILO
677980, Yakutsk, Lenin Ave., 41
Boris Moiseevich KERSHENGOLTS,
cell # +7 (914) 235-11-78
е-mail: kershen@mail.ru
Development and production of polymer sealing devices and materials
for operating vehicles under severe Russian Arctic conditions in various
industries
Yakutsk, Sakha Republic (Yakutia)
Company with limited liabilities (OOO) NORDELAST
Project aims:
- creation and production of new cold-resistant elastomer materials;
development of elastomer sealing devices and materials with
enhanced operational properties and designed for various-industry
vehicles used in the Russian Arctic.
Manufactured products:
1. Sealing parts and devices for vehicles used for the Russian Arctic
zone.
Cold-resistant molded rubber technical articles, protected by the RF
patents, which ensure high reliability and durability of operation under
Arctic conditions.
The assortment produced – over 500 dimension types
2. Testing of climate resistance of elastomer materials and articles at a
special area simulating all kinds of deterioration under cold climate.
Volume of investment
Infrastructure available
Infrastructure required
Implementation period
Project cost
IRR
NPV
Payback period
Markets
Investor's involvement
RUR 3.8 m in 2010 prices ($0.12 m)
The major industrial facility ion the city of Yakutsk is based on
infrastructure of the Institute of Oil and Gas, Siberian Branch, Russian
Academy of Sciences.
Not considerable investment into infrastructure required.
1.5 year, project life cycle 15 years
RUR 10.0 m
22%
RUR 1.7 m
6 years
Enterprises in the city of Yakutsk and the Sakha Republic (Yakutia); in
perspective, Russian and foreign manufacturers of vehicle and equipment
to be operated under cold climate.
Professional marketing and product promotion – elastomer sealing
articles and devices for vehicles operating in various industries in the
Arctic regions of Russia beyond the republic.
89
Project's detailedness
CEO of an organization
implementing the project
Contacts:
75. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project's detailedness
CEO of an organization
implementing the project
Contacts:
76. Project name
Location
Project initiator
Project characteristics
The innovative project is a winner of START-2004 contest held by the
Federal Fund for supporting small businesses in the science and
technology sphere, Stage 3 participant. The production is established.
Raima Fazallyanovna BIKLIBAEVA
Director General, OOO NORDELAST
677007, Yakutsk, Avtodorozhnaya Str., 20
Tel/fax +7 (4112) 35-79-32
е-mail: nordelast@mail.ru
Development and implementation of innovative technologies of diamond
processing
Yakutsk, Sakha Republic (Yakutia)
Company with limited liabilities (OOO) SAKHASOFT
Project aim: commercialization of the research done on physical
properties of raw and polished diamonds with the use of mathematical
simulation in diamond cutting industry.
Types of products:
1) new fancy cut;
2) services on optimal raw diamonds marking
RUR 10 m in 2011 prices ($0.34 m)
No considerable investments required foe infrastructure development.
Licensed activity and service rendering is planned at the own facility.
Not required.
RUR 10.0 m
2 years
44%
RUR 0.7 m
5 years
Russian and foreign diamonters.
Investments into creation of intellectual activity results. Share in the
profit gained – to be negotiated.
There is a patent, registered PC software.
Yury Mikhailovich GRIGORIEV
Director, OOO SAKHASOFT
677013, Yakutsk, Kulakovsky Str., 48, office 607
Tel. +7 (4112) 49-68-62, cell # +7 (924) 165-2193
е-mail: grigyum@yandex.ru
Development and production of polymer tribotechnical composite
items, based on fluoroplastic, for using under extreme weather
conditions in cold regions
Yakutsk, Sakha Republic (Yakutia)
Company with limited liabilities (OOO) TECHNOPLAST
Project aim: creation and production of new polymer composite
materials for anti-friction and abrasive parts and devices with
improved operational features and designed for various-industry
vehicles used in cold regions of Russia.
Types of products:
1. Anti-friction articles for motor transport, machinery and equipment,
90
Volume of investment
Infrastructure available
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project's detailedness
CEO of an organization
implementing the project
Contacts:
77. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Project cost
heavy quarry vehicles, hydraulic and pneumatic systems, stop valves,
oil and gas pipelines;
2. Abrasive articles: abrasive wheels, grinding wheels, honing wheels;
3. Customer-made materials with required characteristics.
Up to RUR 3.75 m in 2010 prices ($0.12 m)
It is planned to launch a scientific, educational and industrial site at
Northeastern Federal University's premises, to purchase main
technological equipment.
Not required
RUR 8.25 m
1.24 years
26%
RUR 1.88 m
3 years
- mining enterprises of the Sakha Republic (Yakutia), motor transport
enterprises, utilities and communal service enterprises, owners of
motor vehicles.
Investment into production
- joint supply of products;
- cooperation in creating new materials;
- launch of a joint production.
Share in the profit gained – to be negotiated.
There is a business-plan, technological regulations, expert opinion.
The innovative project is a winner of START-2005 contest held by the
Federal Fund for supporting small businesses in the science and
technology sphere, Stage 2 participant.
Production of sample items is performed at the Institute of Oil and
Gas, Siberian Branch, Russian Academy of Sciences.
Sardana Afanasievna SLEPTSOVA
Director, OOO TECHNOPLAST
677016, Yakutsk, Kulakovsky Str., 48, office 583
cell # +7 (924) 1683745
е-mail: ssard@yandex.ru
Development and implementation of techniques of processing lowquality hard-to-cut raw diamonds
Yakutsk, Sakha Republic (Yakutia)
Company with limited liabilities (OOO) Scientific-research enterprise
FRAMEZIT
Aim of the project: sales of the developed and creation of new
techniques of processing low-quality diamonds for improved
efficiency of using them (science-based production). Types of
products: diamond tools (microtomes, chisels, edges), inserts of lowquality diamonds in jewelry production, technical products.
RUR 45.0 m in 2006 prices($1.65 m)
No considerable investment into infrastructure required, as the facility
is based at the Institute of Diamond and Precious Metals Geology,
RAS, Yakutsk.
Not required
RUR 45 m
91
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
1,5 years
35%
RUR 22.5 m
3 years
Russian and foreign producers of diamond tools, equipment and
machinery, made with the use of low-quality diamonds, for scientifictechnical sphere and jewelry production.
100%
There are 2 patents received. Business plan – being detailed.
CEO of an organization
implementing the project
Pavel Pavlovich SHAMAEV, Director,
Scientific-research enterprise FRAMEZIT
Contacts:
677007, Yakutsk, Lenin Ave., 39, office 18
Tel. +7 (4112) 33-65-66
е-mail:centerdiam@yandex.ru
78. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Development and promotion of a regional portals network in
Russian and CIS cities basing on Ykt.ru network's technology and
know-how
Yakutsk, Sakha Republic (Yakutia)
Company with limited liabilities SAKHA INTERNET NEW
TECHNOLOGIES Company
The project is aimed at deploying multi-service information portals in
regions of the Russian Federation, ensuring large number of visitors
and gaining profit from advertisement and Internet-services, high
capitalization of portals.
Type of product:
- Multi-service regional Internet-portals
- Accompanying businesses – Internet-services, electronic trade,
interactive entertainments.
Major advantages of the portals:
- high science linkage of the modules and innovative solutions
enabling the system's efficient operation;
- high complexity and capital intensity of implementing similar
solutions on the Russian market, which ensures its competitiveness;
- distributed operation model provides for high-level scalability of the
system with low costs for server equipment;
- possibility to sell media and context Internet advertisement, the most
promising type of advertising.
In order to develop portals in the Russian regions we involve partners
out of regional Internet providers. SAKHA INTERNET NT Company
provides server equipment, software, promotion know-how, content,
consulting and methodological support.
In 2010 the portals are launched in the cities of Khabarovsk, Irkutsk,
Ulan-Ude, Krasnoyarsk, Petropavlovsk-Kamchatsky, Blagoveshensk.
Next in the line: Astrakhan, Vladivostok, Norilsk, and others.
The business plan assumes 20 new portals until 2012.
Subject to negotiations
Project's strategic partners providing technical infrastructure:
TRANSTELECOM, SIBTELECOM. Since 2011, negotiations are
being held with DALSVYAZ Company.
92
Infrastructure required
Not required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
RUR 56 m in 2010 prices ($ 1.9 m)
2 years
3 years
Advertisers based in the regions where the portals are located. Users of
the Internet services, interactive entertainments from the portal
visitors.
Possible assigning of a share in the project. Cost and size of a share –
to be negotiated.
A portal solution ready to be deployed. Business plan. Standard
contracts, layouts, banners, videos, etc. Promotion know-how.
Director
Arsen Grigorievich TOMSKY
677000, Yakutsk, per. Glukhoi 2/1
Е-mail: far@yaknet.com
Investor's involvement
Project's detailedness
CEO of an organization
implementing the project
Contacts:
79. Project name
Location
Project initiator
Project characteristics
Production of autoclaved concrete from local raw materials
protected as a know-how for construction of housing and
production buildings
Yakutsk, Sakha Republic (Yakutia)
Engineering and Technical Faculty and Industrial Park of the Arctic
Innovative Center, M.K. Ammosov NEFU
Under program on “Development of innovative infrastructure of M.K.
Ammosov North-Eastern Federal University (NEFU) “Arctic
Innovative Center” there is being created a small innovative
enterprise (SIE) OOO Stroikomposit with participation of M.K.
Ammosov NEFU.
Concrete-foam or composite blocks (concrete-foam layer from two
sides, polystyrene foam) have low firmness and durability.
By its physical and technical characteristics, autoclaved foam concrete
is the optimum construction material in the North. Autoclave foam
concrete blocks may be used as constructional and insulating wall
materials when making low-rise buildings. When used in multi-layer
wall constructions and ventilated facades in cast-in-place reinforced
concrete frame buildings, autoclave foam concrete can be used not
only as undercoating layer, but as an insulating layer, as well, thus
reducing thickness of the main insulator (polystyrene foam and basalt
wool boards) and enhancing the building's thermal stability. Besides,
autoclaved foam concrete blocks are used as partition slabs,
considerably reducing load on the floor and the foundation,
consequently.
Production of autoclaved foam concrete in volume of 9,000 cub.m a
year (35 cub.m a day) from local raw materials protected as a knowhow.
The equipment is a technological line with capacity of 35 cub.m of
foam concrete a day.
The main advantage of autoclave processing is quick curing of the
93
product, better durability, improved performance of the facility.
Volume of investment
At least RUR 60 m in 2010 prices ($2,1 m), of them NEFU RUR 42,8
m
Infrastructure available
On the initial stage, the project uses infrastructure of Engineering
Department and Industrial Park, Arctic Innovative Center, M.K.
Ammosov NEFU.
Under project's intensive development, the infrastructure required is
determined together with investors and partners.
To be determined together with investors and partners
To be specified with investor
To be specified with investor
To be specified with investor
To be specified with investor
By the year 2015, the demand in the Sakha Republic (Yakutia) may
reach 61.0 m reference bricks; by 2020 – 76.1 m units.
To be used to construct the NEFU facilities (a library for 3 million
books in the city of Yakutsk; a studying building of 34 ths sq.m; the
Medical Institute's buildings; a dormitory for 941 beds in quarter 67 in
Yakutsk, etc.).
Volume of attracted investment and resources from the partners and
investors: at least 40% of NEFU investments
Business proposal
Roman Romanovich NOGOVITSYN,
Director, Arctic Innovative Center,
M.K. Ammosov NEFU
Arctic Innovative Center, M.K. Ammosov NEFU
677000, Yakutsk, Kulakovskogo Str., 42, office 110
Tel./fax +7 (4112) 32-03-89, е-mail: mggo04@mail.ru
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project's detailedness
CEO of an organization
implementing the project
Contacts:
80. Project name
Location
Project initiator
Project characteristics
Manufacturing of light steel thermal profiles with improved crosssection shapes and implementation of new technologies for
assembling exterior filler structures in frame construction
Yakutsk, Sakha Republic (Yakutia)
Engineering and Technical Faculty and Industrial Park of the Arctic
Innovative Center, M.K. Ammosov NEFU, the project's partner –
OOO Adgesia
Innovative features:
Light steel thin-wall constructions (LSTW) use cold-bent profiles of
open and closed cross-section.
Preliminary design engineering with the use of up-to-date software
(including 3D modeling) significantly reduced the steel construction
weight, consequently, decreasing cost of construction, as well as work
period.
Integration of space modeling (automatic compilation of project
documentation) with automatized production of constructive elements
enables manufacturing of fully identifiable fragments, with some
allowance, which are assembled on a construction site within short
period of time.
94
Volume of investment
Infrastructure available
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project's detailedness
CEO of an organization
implementing the project
Contacts:
LSTW offer light weight along with durability, stability (especially for
seismic load), simplicity and easiness of assembling, combined
bearing and filling functions. All these features increase labor
efficiency by 1.5-2 times and bring the technical level of metal
construction industry nearer to machinery production.
At least RUR 29.9 m ($ 0,8 m), including NEFU RUR 16.35 m in
2010 prices.
On the initial stage, the project uses infrastructure of Engineering
Department, OOO Adgesia and Industrial Park, Arctic Innovative
Center, M.K. Ammosov NEFU.
Under project's intensive development, the infrastructure required is
determined together with investors and partners.
To be determined together with investors and partners
To be determined together with investors and partners
To be determined together with investors and partners
To be determined together with investors and partners
To be determined together with investors and partners
Development potential of OOO Adgesia MK stems from
implementation of the state target programs, including a subprogram
on housing construction; development of agriculture; social facilities
construction.
To be negotiated. The volume of investment and resources from
patners and investors: at least 40% of NEFU investment.
Business proposal
Roman Romanovich NOGOVITSYN,
Director, Arctic Innovative Center,
M.K. Ammosov NEFU
Arctic Innovative Center, M.K. Ammosov NEFU
677000, Yakutsk, Kulakovskogo Str., 42, office 110
Tel./fax +7 (4112) 32-03-89,
е-mail: mggo04@mail.ru
Small and Medium Business Projects
81. Project name
Location
Construction of Technopark in Neryungri
Neryungri, Sakha Republic (Yakutia)
Project initiator
Ministry of Entrepreneurship and Tourism Development of the Sakha Republic
(Yakutia)
1. Training of specialists and entrepreneurs;
2. Formation of innovative teams;
3. Production and delivery to the market of high technologies, competitive
production, software;
4. Creation and development of infrastructure and supporting environment of
highly-technological business;
5. Formation of innovative, investment climate and culture of entrepreneurship in
the region.
RUR 273 m (USD 9,6 m)
Project characteristics
Volume of investment
95
Infrastructure
available
The territory of the technopark is located in the south-eastern part of Neryuingri
in close proximity to the acess roads and power supply and communal
communications, near the interregional main roads
Infrastructure required
Project cost
Terms
of
implementation
IRR
NPV
Срок окупаемости
Рынки сбыта
Investor’s
involvement
Project detailedness
CEO
of
an
organization
implementing
the
project
Contacts
Not required
RUR 273 m
Until 2012
20 years
Sakha Republic (Yakutia), Russian regions and foreign countries
100% investor
Design estimates available, construction is conducted
Minister of Entrepreneurship and Tourism Development of the Sakha Republic
(Yakutia) E.I. KORMILITSYNA
18 Kirova Str., Yakutsk, 677988, tel. (4112) 42-13-27; fax 34-27-65
http://www.minpred.ru Е-mail: minpred@gov.sakha.ru
82. Project name
Location
Computer games creation
Yakutsk, Sakha Republic (Yakutia)
Project initiator
Project characteristics
Limited Liability Company «Sulus Games»
1. Creation and sales of games for social networks like Facebook, VContacte
2. Creation and sales of games for mobile devices like iPhone, iPad, Google
Andriod
RUR 20 m in 2011 prices (USD 0,7 m)
There are production facilities, computers and creation technologies
Volume of investment
Infrastructure
available
Infrastructure required
Project cost
Terms
implementation
IRR
NPV
Payback period
Markets
Investor’s
involvement
Project detailedness
CEO of an
organization
Not required
- costs of creating 3 games for social networks RUR 10 m
- costs of creating 5 games for mobile devices RUR 10 m
of 2 years. Project’s life cycle is 10 years
150 %
RUR 15 000
2 years
World
Credit resources
There is a business plan, own technologies of the game’s development, established
process of production development, contracts with major market players, well-known
brand Sulus Games, 7 games have been produced, 8 are under development, 5-year
experience of the team
President of LLC «Sulus Games» Alexei Alexeevich Ushnitsky
96
implementing the
project
Contacts
677000, Yakutsk, 1/1 Oktyabrskaya Str., office 501, office phone (4112)33-5025
e-mail: alexey@sulusgames.com
83. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Implementation period
Cost of project
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
84. Project name
Location
Project initiator
Project characteristics
Launching a facility for production of building materials
Megino-Kangalassky region, Sakha Republic (Yakutia)
Private entrepreneur (PE) M.I. Kaplin
Entrepreneur Kaplin can supply lumber to the construction sites of
Tyungulu village and the neighboring areas (a sports and recreation
center, a hospital).
There is a growing demand for lumber due to gasification of the
village Tyungulu and other close settlements, as well as intensive
building in the private sector.
In perspective, it is possible to supply lumber to enterprises and
population of adjacent regions (Ust-Aldansky, Churapchinsky,
Tattinsky).
For future development and expansion the following is required:
- MTZ-82 based loader;
- 20-ton truck;
- timber processing equipment with capacity of 9.0 ths cub.m.
RUR 10.5 m in 2011 prices (USD 0.35 m)
The enterprise is situated in the settlement of Nizhny Bestyakh, the
administrative center of Megino-Kangalassky region. It is a large
transport hub with:
- river ferry Nizhny Bestyakh - Yakutsk;
- cargo berth and electric grid infrastructure;
- federal motorway “Lena” and “Kolyma”;
- in future – a railroad hub.
Not required
2012 - 2013, project life cycle 25 years
RUR 10.5 m
RUR 1.650 m
3 years
Megino-Kangalassky region, other regions of the Sakha Republic
(Yakutia) across the river from Yakutsk
Share in business, lent resources – RUR 9 m.
Design estimates, business plan, work experience.
Private entrepreneur Milenty Osipovich KAPLIN
678075, Sakha Republic (Yakutia), Megino-Kangalassky region,
village of Tyungulu, Ozernaya Str., 6
Tel. +7 (411-43) 2-34-79, cell # +7 (914) 2908804
Roundwood logging and saw timber production in Chapanda
Ust-Maisky region, Sakha Republic (Yakutia)
OOO Timber Logging Company DIAMANTER
OOO Diamanter focuses on industrial wood logging and processing, as
97
Volume of investment
Infrastructure available
Infrastructure required
Implementation period
Cost of project
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
85. Project name
Location
Project initiator
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Implementation period
Cost of project
IRR
well as construction of low-rise wooden houses. Larger volume of
wood logging requires purchase of modern wood logging equipment
and timber carriers, as well as timber processing equipment.
RUR 60.0 in 2010 prices ($ 2 m),
including RUR 45.0 m ($ 1.5 m) – borrowed funds,
RUR 15.0 m – own funds
The logging and lumber production site is located 40 kn from the
settlement of Belkachi, Ust- Maisky region, Sakha Republic (Yakutia).
The industrial facilities are located in the city of Yakutsk, the
settlement of Nizhny Bestyakh. Chappanda site. The site has a 160kV
diesel station. The mobile round-saw bench, set at Chapanda site, has
capacity of up to 1.5 ths cub.m of round timber a month.
Approach roads.
2011 - 2012, project life cycle 25 years
RUR 60 m
Being calculated
Being calculated
3 years
Domestic market of the Sakha Republic (Yakutia)
Share in the charter capital
Business plan
Albert Titovich ZAKHAROV
Director of OOO Diamanter
677004, Yakutsk, Markhinka Str., 1 «А».
Tel. +7 (4112) 40-30-21, cell # +7 (914) 2705991
е-mail: les.2007@mail.ru
Production of synthetic motor fuels from Kharbalakh field coal
Village of Kharbalakh, Tattinsky region, Sakha Republic (Yakutia)
Administration of Tattinsky region, Sakha Republic (Yakutia)
Purchase of a production facility for coal processing with a tank farm.
This facility would enable production of a synthetic motor fuel and
liquified hydrocarbon gas from processes coal of Kharbalakh field,
using the technology of fast thermal decomposition, in order to supply
regions of the Sakha Republic (Yakutia) across the Lena River from
Yakutsk.
RUR 387.11 m in 2010 prices ($13,6 m)
OAO TELEN has a license for Kharbalakh coal field development.
The field's capacity guarantees the sufficient volume for processing.
Crashing and sorting equipment is owned by OAO TELEN.
Buildings: a processing facility with a tank park, co-generation of
minimal capacity of 1.0 mW, automatic management system, gasfilling station with a refuelling point, industrial laboratory, equipment
for gas liquifying;
Transport: gas truck, quarry dump truck, loader, escavator;
Land plot of 1.5 ha.
RUR 387.110 m
3 years
59.5%
98
NPV
Payback period
Markets
Investor's involvement
Project detailedness
RUR 453.43 m
5 years
Regions of the Sakha Republic (Yakutia) across the river from
Yakutsk
100%
Business plan
CEO of an organization
implementing the project
Contacts
Prokopy Dmitrievich RAKHLEEV,
Director, OAO TELEN
678666, Sakha Republic (Yakutia), Tattinsky region, village of
Kharbalakh
Tel. +7 (41152) 24-371, 24461, fax 24401.
e-mail: telen1985@mail.ru
86. Project name
Location
Construction of road service facilities at public motorways
Yakutsk, Aldansky, Verkhnevilyuisky, Megino-Kangalassky,
Neryungrinsky, Suntarsky, Mirninsky, Churapchinsky, Tomponsky
and other regions, Sakha Republic (Yakutia)
Project initiator
Ministry of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
Road service facility of 3rd type includes a motel for 20 beds, cafe for
30 people, minimarket, service station, heated parking for cars and
trucks. The gasoline station consists of the operator's cabin with
necessary conveniences, two tanks of 10 cub.m and one tank of 20
cub.m; it is designed to operate at temperatures down to -60 C.
Heating will be supplied by a module boiler unit with capacity of
1.6MW, using gas, reduced crude, oil, diesel and solid fuel.
At VILYUI federal public motorway – the territory of the city of
Yakutsk (25th km), Verkhnevilyuisk region (670th km, v. Khoro),
Nyurbinsky region (790th km, t. Nyurba), Suntarsky region (866th km,
v. Sheya or 870th km, v. Kutana), Mirninsky region (1151th km, s.
Novy);
At KOLYMA federal public motorway – being approved;
At LENA federal public motorway – being approved due to
reconstruction works;
4. At public motorways of republic's and municipal levels – in
accordance with resolution of the Sakha Republic (Yakutia)
government №986-р of 6 September 2010 “On recommended scheme
of distributing road service facilities at public motorways in the Sakha
Republic (Yakutia)”.
RUR 51.48 m in present prices of 2010, 2 quarter ($1.81 m)
Transport infrastructure
Electric power grid and engineering infrastructure
RUR 17.28 m in the current prices of 2010, 2 quarter (cost of each
complex)
2012 - 2016, the project's life cycle is over 25 years
Being calculated
Being calculated
Being calculated
Project characteristics
Volume of investment
Infrastructure available
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
99
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts:
Municipal units, where the public motorways run: KOLYMA federal
motorway – five units, namely Megino-Kangalassky, Churapchinsky,
Tattinsky, Tomponsky and Oimyakonsky regions; LENA federal
motorway – four units, namely Neryungrinsky, Aldansky,
Khangalassky, Megino-Khangalassky regions; VILYUI federal
motorway – six units, namely Gorny, Vilyuisky, Verkhnevilyuisky,
Nyurbinsky, Suntarsky and Mirninsky regions.
An investor is required for implementation of the project. The project
is to receive the state support under the republic's target program
“Development of entrepreneurship and tourism in the Sakha Republic
(Yakutia) in 2012-2016”.
The project documentation is developed for “Complex of road service
facilities”, including architectural and construction solutions, heating
and ventilation, water supply ans sewage, electric power supply, power
equipment, designs and estimates.
Minister of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
Yekaterina Ivanovna KORMILITSYNA
Ministry of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
677018, Yakutsk, 18 Kirova Str.
Tel: +7 (4112) 34-46-06, 34-49-59
е-mail: minpred@gov.sakha.ru
http://www.sakha.gov.ru/minpred
Tourism
87. Project name
Location
Project initiator
Project characteristics
Volume of investment
Tourist recreation cluster in the Sakha Republic (Yakutia) “The
Northern World”
Yakutsk, Sakha Republic (Yakutia)
Ministry of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
The project is being implemented in central Yakutia, 33 km from the
city of Yakutsk, on the left Lena River bank, on the natural landscape
park “Meche-sise”; total area – 5.9 ths ha. The project site is situated
in two neighboring municipal units: the city of Yakutsk and
Khangalassky region (the Tabaga Cape). It is one of the most
picturesque and geographically favorable places on the Lena River in
terms of tourism development.
The Northern World project will benefit from unique natural and
climatic conditions: extremely low temperature and permafrost,
mineral water springs.
The project includes construction of the following sites: the World
Mammoth Center, museum and research institution, The Kingdom of
Permafrost underground complex, the Northern Mosaic and the Town
Estates ethnographic parks, all-the-year-round ski resort, the “Lenskie
zori” sanatorium, an amusement park and an accommodation complex
with a 5-star hotel (100 people), a 3-star hotel (100 people) and a
cottage camp (100 people).
RUR 5106 m in 2011 prices ($179.9 m), including:
- the RF budget – RUR 943 m;
100
Infrastructure available
Infrastructure required
Implementation period
Cost of project
IRR
NPV
Payback period
Markets
Investor's involvement
- the SR(Y) budget – RUR 818 m;
- local budgets – RUR 5 m
- private investment – RUR 3340 m.
By the year 2013, all-type transport communications will meet on the
territory of the cluster: railroad, motorway, aviation and river
transports. The external infrastructure of the project is financed from
the Federal and the republic’s budgets: construction of a railroad to the
city of Yakutsk, a railroad-automobile bridge across the Lena River,
construction of a new international airport terminal, a railway station,
development of the Yakutsk river port, reconstruction and
construction works at the federal motorways: “Lena”, “Kolyma”,
“Vilyui”; regional-level roads: “Amga”, “Umnas”, “Yana” and
“Kobyai”. The project site has convenient access by asphalt roads
leading directly to the objects. The distance to the river port – 36 km;
the nearest railroad station – 23 km; the international Yakutsk airport
– 40 km. The territory has reliable power and gas supply, mobile
communication infrastructure, mineral water springs.
The project site has convenient access by asphalt roads leading
directly to the objects. The territory has reliable power and gas supply,
mobile communication infrastructure, mineral water springs.
In future, with construction of the railroad-automobile bridge across
the Lena River, it is planned to reconstruct a motorway to the city of
Yakutsk, making the site even more accessible; it will also connect the
city with a large number of regions across the river. Also in future, it
is planned to construct a city water intake in close vicinity, which will
solve the problem of water supply to the project facilities.
The project includes construction of 12 running kilometers of internal
roads, ensuring transport communication inside the zone, and about 3
km of an access road; construction of a gas vent and gas boiler-house
for autonomous heat supply; a power transmission line. Water supply
will be provided from the Tabaga water intake; sewage will be
collected in detritus tanks, pumped out and taken out of the zone.
2011 - 2017
RUR 5106 m
16.9%
RUR 2033.2 m
6 years
Domestic tourism market of the SR(Y) and the RF. International incoming tourism market, mostly from the Asian Pacific countries.
Implementation of the project requires investment of RUR 5100 m,
including:

the RF budget – RUR 943 m (infrastructure and the World
Mammoth Center);

the regional budget – RUR 818 m (infrastructure and the Town
Estates and the Northern Mosaic parks);

the municipal regions budgets – RUR 5 m (infrastructure);

extra-budget funds (investors) – RUR 3,340 m (all-the-yearround ski resort, the Kingdom of Permafrost, the Northern Mosaic and
the Town Estates parks, the accommodation complex).
Each object may be considered a separate investment project.
101
Project detailedness
CEO of an organization
implementing the project
Approved by resolution of the Sakha Government of May 27, 2009 №
236, Concept of the project’s implementation in the SR(Y), feasibility
study and design estimates (business plan) were considered and
approved by the Ministry for Economic Development of the RF.
The expertise was conducted by the State Department of Expertise of
the Sakha Republic (Yakutia), Sakha Academy of Sciences. The
revised design estimates were approved by resolution of the Economic
Council under Sakha Government of 20 January 2010, № 74/3.
The cluster borders – outlined; the cluster draft layout – designed; the
project’s expertise by leading foreign consulting agencies – done; the
World Mammoth Center exposition and scheme (layout, architectural
and scientific) – complete. The design estimates – completed.
The project has been approved by the IV Meeting of the Expert Board
on regional investment policy under the Ministry of Regional
Development of the RF and enlisted as a priority project under the
Program of inter-regional cooperation of the Russian Far East and
Eastern Siberia with the north-east of the People’s Republic of China
(2009-2018).
Minister of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
Yekaterina Ivanovna KORMILITSYNA
Contacts
Ministry of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
677018, Yakutsk, 18 Kirova Str.
Tel: +7 (4112) 34-46-06, 34-49-59
е-mail: minpred@gov.sakha.ru
http://www.sakha.gov.ru/minpred
88. Projects name
Tourist recreation cluster in Khangalassky region of the Sakha
Republic (Yakutia)
Khangalassky region of the Sakha Republic (Yakutia)
Government of the Sakha Republic (Yakutia),
Khangalassky Region Administration
Creation of an investment ground and a tourism center for attracting
investment into traveling industry under public-private partnership.
The main purpose is to convert the region into the central tourism
place in the Sakha Republic (Yakutia).
Creation of four investment sites using facilities of multi-functional
tourist complexes: “Coachmen’s village Yelanka”, “Samartai”,
“Buluus”, “Orto Doidu”.
Location
Project initiator
Project characteristics
Volume of investment
RUR 348.09 m in 2009 prices ($12.3 m), including:

RUR 52.3 m for infrastructure development;

RUR 140.25 m for tourist recreation sites;

RUR 155.5 m for furniture and equipment.
Infrastructure available
The project site has convenient access by asphalt roads leading
directly to the objects. The territory has partial power and gas supply.
In future, with construction of the bridge across the Lena River, it is
102
Infrastructure required
Implementation period
Cost of project
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
planned to reconstruct a motorway to the city of Yakutsk.
“Coachmen’s village Yelanka”:
- a station house museum, various buildings to show old coachmen’s
lifestyle, a river mill; convenient access roads; a village of the same
name with infrastructure.
“Buluus”:
- temporary constructions like pavilions, tables and benches.
“Orto Doidu”:
- a restaurant for 120 people, a hunter's cabin for 25 people, sliding
slopes, a dance-floor for 300 people, an open-air café, a ritual site for
celebrating the national summer festival Erkeni Ysyakh with 16
dwellings.
“Samartai”:
- operating “Samartai” ethnographic museum.
For all-the-year-round functioning, each of the complexes requires:
4.
Internal and access motorways;
5.
Gas vents;
6.
Gas boiler-house;
7.
Heat supply network;
8.
Transformation station;
9.
Electric grids;
10.
Water supply and sewage network;
11.
Communications means;
12.
Viewing point.
Stage 1 – 2010-2019
Construction of objects and infrastructure.
RUR 308 m
49.3 %
RUR 1002.8 m
Average payback period – 3 years and 7 months, including:
 “Coachmen’s village Yelanka” – 3 years 5 months;
 “Buluus” – 3 years 4 months;
 “Orto Doidu” - 3 years 9 months;
 “Samartai” – 2 years 9 months.
The SR(Y) domestic tourism and in-coming tourism: Asian Pacific
countries (Japan, Korea, China), Germany, the USA, Great Britain,
France.
Construction of the cluster objects – on investor’s account
Investment project “Creation of tourist recreation investment sites in
Khangalassky region of the Sakha Republic (Yakutia) is developed;
Concept of “Coachmen’s village Yelanka” development was approved
by the Resolution of the Sakha Government of October 19, 2009 №
1006-p;
General Plan of “Coachmen’s village Yelanka” tourist recreation
cluster was developed and approved by the Resolution of the Deputies
Session of Malzhagarsky 2nd nasleg of 23.12.2009.
Minister of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
Yekaterina Ivanovna KORMILITSYNA
103
Contacts
Ministry of Entrepreneurship and Tourism Development of the Sakha
Republic (Yakutia)
677018, Yakutsk, 18 Kirova Str.
Tel: +7 (4112) 34-46-06, 34-49-59
89. Project name
Tourist complex "Tuostaakh- Kihilyakh"
Location
Tourist complex is located 90 km from the regional center Batagay
settlement or 40 km from Betenkes settlement of Verkhoyansky region. On
the left bank of a mountain river Tuostaakh 8 km from the foot of the
mountain Kihilyakh.
Project initiator
Project characteristics
OOO Arctika
Full service company OOO Arctika launched a tourist route “Sacred
Mountains of Kihilyakh” in 2007.
In 2011, at the international competition “Best Goods and Services of
Eurasia – GEMMA” it was awarded with the highest award - the Golden
GEMMA in the Far Eastern Federal district.
In 2008, at the All-Russian competition “Leaders of tourist industry” it
became a winner in the category “Best Regional Tourism Company”.
Mysterious Kihilyakh Mountains (Mountain of the Gods, Northern
Shambala, the Promised Land) are located in the northern rivers Yana and
Adycha interfluve area, and are a part of the Chersky Range system. Flat
plateau (elevation - 1081 m above sea level) is covered with dense rows of
granite rocks, statues of the most unexpected forms and whimsical
compositions. By Sakha belief, these maternal rocks crystallize the magic
power of Aar Aiyy- Upper gods of Sakha people. Numerous travelers from
Russia and other countries recognize this miraculous mountain as the
Planet’s Energy Center.
In the pristine wilderness a tourist base was built on the shore of a crystal
clear mountain river Tuostaakh with a comfortable modern hotel for 30
beds, consisting of 2 and 3-bed rooms, cafe and dining area, Sakha balagan,
sports grounds, a Russian sauna and a shower.
The tour offers a wide range of tourist services, such as: spinning trout,
grayling and lenok fishing; dizzying kayaking tours; breathtaking boat and
motor boat cruises; hunting rabbits, ducks, and large animals (mountain
sheep-Chubuku, elk, deer, bear); fascinating exotic and ethnographic tours
of Chersky Range; gathering berries and herbs; visiting historical and
paleontological museum; search for the remains of mammoth tusks, search
for the Yakut Yeti - Chuchuna; research expeditions to study the mysterious
region; delicious national cuisine, etc.
Volume of investment
RUR 30 m ($1,1 m)
Infrastructure available -
horse breeding base for kumis production, showing famous
Verkhoyansk horses and for the work of the children's production camp.
building for medical purposes: for diagnosis, treatment procedures and
traditional health improving trainings.
hunter’s cabins for recreation and fishing.
stationary hotel complex on Kihilyakh Mountain.
104
-
watchtower – fortress at the camp site and on Shaman-Tree passage
floating-terrain vehicle
river - airboat for 6-12 people.
ATVs
Jet skis
Catamarans
Motoplan
water cannons
1. Regular passenger Yakutsk-Batagay-Yakutsk flights are operated by
Polar Airlines and Buryat Airlines companies (total 10 flights per week).
In the regional center Batagay there is a hotel, cafes and restaurants.
2. Batagay-Betenkes - year-round ground motorway. Transportation of
tourists by the minibuses. In Betenkes in 2010 a new building of historical
and paleontological museum was built.
3. Betenkes - Tuostaah- Kihilyakh Camping - transportation of tourists by
Ladoga and Yamaha motor boats.
4. The camp site is equipped with:
- Hotel of 2-3-bedrooms for 30 people, with the area of 22 x 10 sq.m.
- Cafe - dining room, with the area of 8 x 7 sq.m.
- Residential building for 8 staff, the area of 6 x 6 sq.m.
- Russian sauna with a shower and laundry area. 7 x 5 sq. m.
- Sheded icebox with a capacity of 3 x 3 x 4 m³
- Warm toilet, the area of 3 x 4 sq.m
- Warehouse, the area of 4 x 8 sq.m.
- Sakha balagan for 7 people, the area of 6 x 6 sq.m.
Infrastructure required
Implementation period
Cost of project
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an
organization
implementing the
project
Contacts
Power and communal infrastructure
RUR 30 m
2 years
Under detalization
Under detalization
5 years
Domestic and incoming tourism
State support, crediting, participation in capital
Operating tourist object. 652 tourists have visited the Tuostaakh-Kihilyakh
route for 4 seasons. Gross income made over RUR 10 million.
General Director, OOO Arctika
Vladmir Khristoforovich TCHIRIKOV
www.kisilyakh.ykt.ru
8-914-22-74-500
HEALTHCARE
90. Project name
Republican Oncological Dispensary for 115 beds with radiology
unit for 40 beds and maintenance unit (1 and 2 stage)
Location
Yakutsk, Sakha Republic (Yakutia)
105
Project initiator
Healthcare Ministry of the Sakha Republic (Yakutia)
Project characteristics
Oncological diseases take one of the leading places in the structure
of diseases of Russian people. For 10 years the indices of the
malignant tumors sick rate have grown by 2,1 times (to 213,6 per
1000 people) in the Sakha Republic. Annually over 25,7 thousand
people are diagnosed with neoformations of different localization;
over 2000 of them are malformations. Oncological diseases are one
of the main reasons of primary disability - 11,2% and mortality 13,4
% of all death cases.
Construction of Republican Oncological Dispensary for 115 beds
with radiology unit for 40 beds and maintenance unit (1 and 2 stage)
Volume of investment
RUR 1 995,9 m ($ 70,3 m)
Infrastructure available
Required infrastructure available
Infrastructure required
Not required
Cost of project
RUR 1 995,9 m
Implementation period
2012-2015
Investor’s involvement
10-year loan with 3-year period payment by installments
Project detailedness
1. The Sakha Government has completed the ground-work (pillars
for the 1st stage construction) with a balance cost of RUR 13,5 m in
2005 prices.
2. The design estimates of the 1st stage were developed in 2008
(design organization – Sakhapoject OAO) and has a positive opinion
of the State Expertise № 14-1-5-0237-08 of 25.09.2008, and is
approved by the order of Sakha Construction Ministry of 30.09.2008
№ 174.
3. In 2008 the contract was signed between the Sakhaproject OAO
and the Institute of Medical Physics and Engineering in Moscow for
the development of MTT (being completed). Based on it, there will
be developed the terms of reference.
CEO of an organization Healthcare Minister of the Sakha Republic (Yakutia) Alexander
implementing the project
Vasilievich GOROKHOV
Contacts
Healthcare Ministry of the Sakha Republic (Yakutia)
677011, Yakutsk, 30 Lenin Ave.
Tel.: +7 (4112) 42-40-22 Fax: (4112) 42-07-72
E-mail: minzdrav@gov.sakha.ru
Medical Director of Yakutsk Republican Oncological Dispensary
Petr Dmitrievich KARATAEV
106
Yakutsk, 3/2 Sverdlova
Tel.: +7 (4112) 43-41-28; Fax: (4112) 22-41-72
E-mail: onko@sakha.ru
91. Project name
Republican Cardiological Dispensary in Yakutsk (2 stage –
cardiovascular center for 150 beds)
Location
Yakutsk, Sakha Republic (Yakutia)
Project initiator
Healthcare Ministry of the Sakha Republic (Yakutia)
Project characteristics
The diseases of cardiovascular system take one of the leading places
in the structure of structure of diseases of Russian people.
Between 1998 and 2006 in the Sakha Republic the indices of blood
circulatory system diseases have grown from 96,4 to 164,8 per 1000
adults. Annually about 5000 people are diagnosed with ischemia;
600 of them having acute myocardial infarction. Blood circulatory
system diseases are the main reason of temporary disability (9,9%),
primary disability (24,1%), mortality (41,3% of all death cases).
Hospital lethality of acute cardiovascular catastrophes (myocardial
infarction, sudden heart death) in the Sakha Republic fluctuates from
11 to 20%.
Construction a Cardiological dispensary in Yakutsk
Volume of investment
RUR 1508,9 m ($ 53,1 m)
Infrastructure available
Required infrastructure available
Infrastructure required
Not required
Cost of project
RUR 1508,9 m
Implementation period
2012-2014
Markets
Population of the Sakha Republic (Yakutia), Far East Federal
District regions
Investor’s involvement
10-year loan with 3-year period payment by installments
Project detailedness
Design estimates are under development (to be completed in Quarter
IV of 2011). Graphic design is ready.
107
CEO of an organization
implementing the project
Minister of Healthcare of the Sakha Republic (Yakutia) Alexander
Vasilievich GOROKHOV
Contacts
Healthcare Ministry of the Sakha Republic (Yakutia)
677011, Yakutsk, 30 Lenin Ave.
Tel.: +7 (4112) 42-40-22 Fax: (4112) 42-07-72
E-mail: minzdrav@gov.sakha.ru
92. Project name
Support and development of pharmaceutical industry in the
Sakha Republic (Yakutia) until 2020
Location
Yakutsk, Sakha Republic (Yakutia)
Project initiator
Healthcare Ministry of the Sakha Republic (Yakutia)
Project characteristics
Construction of warehouses and microbiological laboratory for GUP
SakhaMedProm
Volume of investment
RUR 122,4 m ($ 4,3 million)
Infrastructure available
Required infrastructure available
Infrastructure required
Not required
Cost of project
RUR 122,4 m
Terms of implementation
2012-2016
IRR
-
NPV
-
Markets
Medical institutions and population of the Sakha Republic (Yakutia)
RF regions
Investor’s involvement
Budget of the Sakha Republic (Yakutia)
Project detailedness
It is developed as a sub-program of the State Program “Development
of Healthcare of the Sakha Republic (Yakutia) in 2012-2016”
108
CEO of an organization
implementing the project
Yegor Yegorovich BORISOV – Head, GUP SakhaMedProm
Contacts
Healthcare Ministry of the Sakha Republic (Yakutia)
Sardana Makarovna TARABUKINA – Head, Medical technics
Pharmacy Directorate, Sakha Healthcare Ministry, tel. (4112) 36-6975; 42-53-28
Ekaterina Ilinichna FYODOROVA – Deputy Head, GUP
SakhaMedProm, tel. (4112) 47-52-06
Culture
93. Project name
National innovative project on establishing a complex “The Land of
Olonkho” of the Sakha Republic (Yakutia) “Olonkholand”
Location
Yakutsk, Sakha Republic (Yakutia)
Project initiator
Government of the Sakha Republic (Yakutia), Yakutsk Administration
Project
characteristics
On the terms of public-private partnership creating a national innovative
complex of the Sakha Republic (Yakutia) “The Land of Olonkho”, as a selfsufficient urban innovation type in the historically sacred part of the city of
Yakutsk - on the shore of the Lake Saysary with an emphasis on
conservation, development, and visualization of cultural and spiritual
component, civilizational values of the population.
The main purpose of the cluster development is to create an innovative model
of urbanized infrastructure in the conditions of permafrost of the Eastern
Siberia and the Far East.
Urban cluster “The Land of Olonkho” is a self-sufficient and self-sustaining
new town within an existing one, with residents and infrastructure of the new
technological order (ecological transport, IT-technologies, energy saving
technologies, etc.) created with the purpose of applying modern technologies
to solve problems of infrastructure organization in the permafrost area.
The philosophy of the complex life activity is based on the traditional life
experience of the Sakha people, whose livelihood was adapted to the
conditions of permafrost and reflects this experience in the heroic epos–
Olonkho that was recognized by UNESCO in 2005 as the intangible oral
masterpiece of humanity.
“The Land of Olonkho” complex appears as the center of Tuymaada valley
comprising a technological park “Three Valleys”, in the future planned as a
complex of three valleys in the Lena River middle stream -Erkeeni,
Tuymaada and Ensieli.
“The Land of Olonkho” should have a common structure, based on a
common understanding of Olonkho as a cosmological model of the universe
where man and nature, information and space interact.
The territory of the complex is conventionally divided into three zones:
lower, middle and upper worlds, in terms of having a readable image of the
109
World
Volume
investment
Tree,
with
the
apex
directed
to
the
south.
of Estimated cost of the complex construction – RUR 15 b ($ 525 million).
Infrastructure
available
By the Decree of the President of the Sakha Republic (Yakutia) of April 26,
2010 № 1904, areas in Quarters 67 and 68 of Yakutsk with operating urban
infrastructure were identified.
Infrastructure
required
Electrical and communal loads are being estimated.
Aproximate indices:
- Total length of the hinged foot tracks - 2800 m
- Total area of the main pedestrian routes and spaces - 7.9 ha
- The total length of interdistrict driveways - 2500 m.
- Total area of parking lots - 0.6 ha
- Total area of the territory - 80, 4 hectares
- The area of the 1st stage construction - 20.7 ha
- The area of landscape and recreation area - 2.0 ha
- The area of ritual and ceremonial area - 2.7 hectares
- The area of ethnographic zone of the city’s masters - 0.98 ha
Project cost
RUR 15 b, including of the 1st stage – RUR 1, 35 b.
Terms of
implementation
The initial stage (to 2012):
• creation of the executive department, managing the project;
• development of an integrated innovative-investment project’s plan;
• identification of funding sources;
• attraction of investors;
• development of the Cluster’s general plan;
• granting the project with the status of a large innovative-investment project
on the federal level;
• formation of the leislative base to realize the project;
• designing and construction of the 1st stage of the Cluster’s objects;
The 2nd stage (to 2015):
• designing and construction of financial and business, cinema and
multimedia centers, etc.
The 3rd stage (to 2020):
• designing and construction of the technological part of the project –
production and residential Cluster’s modules.
IRR
Under development
NPV
Under development
Payback period
Under development
Markets
Sakha Republic (Yakutia), Far Eastern Federal District regions
Investor's
involvement
Providing credit funds
Preliminarily, the share of borrowed funds for the construction can be
distributed in the following proportions:
110
- Budget funds - 50% (RUR 7.5 b, including the 1st stage – RUR 0, 675 b)
- Borrowed funds - 50% (RUR 7.5 b, including the 1st stage – RUR 0, 675 b).
Project detailedness
Concept of the national innovative project on the creation of “The Olonkho
Land” Complex
CEO of an
organization
implementing the
project
Minister of Culture and Spiritual Development of the Sakha Republic
(Yakutia), Manager of the national innovative project “The Land of Olonkho
” of the Sakha Republic (Yakutia)
Andrey Savvich BORISOV
Contacts
Deputy Director, State Institution “Olonkho Theatre”
Lena Valerievna FEDOROVA
tel.: +7 (4112) 33-45-88, +8 (924) 1659522 cell
www.olonkholand.ru, sakhaflena@mail.ru
Nature Protection
94. Project name
Location
Project initiator
Project characteristics
(goals, project
opportunities, brief
description)
Volume of investment
Infrastructure available
(engineer, transport, land
site)
Infrastructure required
Cost of project
Implementation period
Establishment of a nursery for rare and endangered species of
Yakutia (Orto-Doidu)
Khangalassky region, Sakha Republic (Yakutia)
Ministry of Nature Protection of the Sakha Republic (Yakutia)
The project is developed with the aim of keeping and breeding rare
and endangered animal species of Yakutia. At the moment, the
republic has not a single nursery for breeding animal species enlisted
in the Red Data Book of Yakutia.
The Republic's Zoo ORTO-DOIDU, has been working for 10 years. It
is a member of “Safeguarding of Cranes in Eurasia” and “Creating
Reserve Populations of Siberian Grouse” programs (European-Asian
Regional Association of Zoos and Aquariums); a member of the
Northern Forum's “Northern Zoos Cooperation” working group.
The following aims are to be fulfilled under the project:
- accumulating and safeguarding the gene fund of local fauna
protected species for further dispersal in natural habitat and
reconstruction of vanishing natural populations;
- participating in international programs on rare and endangered
species breeding;
- conducting study of rare animal species of Yakutia.
RUR 12.0 m ($0.4 m)
Land site of 60 ha on the Lena River bedrock shore, infrastructure of
the Republic's Zoo ORTO-DOIDU.
1,000 km long road, 1,000 m long power transmission line, industrial
facility (for boiler house, laboratory, hatching apparatus, electrical
control unit), food storage, enclosures for birds and ungulates, 1,135 m
long fencing.
RUR 24.0 m
10 years
111
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the project
Contacts
Nature territories of the Sakha Republic (Yakutia)
Participation in the implementation of the state environment protection
projects
Requirements specification to develop the design estimates
Luka Nikolaevich SAFONOV,
Director, Republic's Zoo ORTO-DOIDU
Republic's Zoo ORTO-DOIDU
Tel./fax +7 (4112) 22-52-59
e-mail: ykt-zoo@rambler.ru
95. Project name
Wood bison keeping
Location
Nursery farm №1 “Ust-Byotama”, Kangalassky region.
Nursery farm №2 “Tympynai”, Gorny region
Project initiator
Government of the Sakha Republic (Yakutia).
State Institution “Department of Biological Resources of the Ministry
of Nature Protection of the Sakha Republic (Yakutia)”
Goal: Restoring the historic range of bison on the Eurasian continent
and its preservation as a species in case of a force majeure situation on
the North American continent.
Contribution of the Sakha Republic (Yakutia) in the conservation of the
rare species listed in the Red Data Book
Objectives:
 Keeping bison breeding stock in the nurseries “Ust-Buotama” in the
Lena Pillars Nature Park in Khangalassky region and “Tympynai” in
Sinyaya Nature Park in Gorny region to receive a regular litter.
 Delivery of the second party of wood bison from Canada in 2011,
and keeoing in the nurseries “Tympynai” and “Ust-Buotama” to
prevent the inbreed processes in the existing herds of animals.
 Enlargement of pasture area of the nurseries “Ust-Buotama” and
“Tympynai” by building additional enclosures.
 Monitoring of captive wood bison herd.
Project characteristics
Volume of investment
RUR 30.0 m ($ 21,1 m)
Infrastructure available There are two nurseries with infrastructure (personnel’s house, sauna,
diesel station, garage, warehouse, etc.). Transportation available mostly
in winter.
Infrastructure required Summer road to “Tympynai” nursery (Gorny region).
112
Project cost
RUR 60, 1 m
Implementation period
Years 2007 – 2011
IRR
-
NPV
-
Payback period
Saving a vanishing species – wood bison – to restore its historical
range and abundance will take several decades.
Markets
-
Project detailednes
The project was approved by the Government of the Sakha Republic
(Yakutia).
CEO of an
organization
implementing the
project s
Head, State Institution “Department of Biological Resources of the
Ministry of Nature Protection of the Sakha Republic (Yakutia)”
Yakov Semenovich SIVTSEV
Contacts
Yakutsk, 14 Sverdlova Str.
Reception 8(4112) 22-57-49
Fax 8 (4112) 22-30-92
96. Project name
Location
Project initiator
Project characteristics
Development of the Living Diamonds of Yakutia Nature Park
Sakha Republic (Yakutia), Mirny, 11 km north-west to the city of
Mirny close to Mirny – Chernyshevsk motorway
Ministry of Nature Protection of the Sakha Republic (Yakutia) AK
ALROSA (OAO)
Goal:
- to restore populations of wild ungulates;
- to research the status of natural systems and develop a methodology
of semi-free keeping of wild animals in the park;
- to promote nature protection ideas;
- to increase environmental awareness;
- recreational activities.
Objectives:
- Conservation and improvement of environment within the Nature
Park and in surrounding area;
- Carrying out biotechnological activities to attract wild animals
and provide their protection;
- Keeping the animals in the conditions close to their natural
habitat, to show the diversity of wildlife;
- Distribution of natural science and propaganda of wildlife
protection ideas;
113
Volume of investment
Infrastructure available
Infrastructure required
Project cost
Implementation period
IRR
NPV
Payback period
Markets
Investor's involvement
Project detailedness
CEO of an organization
implementing the
project
Contacts
Organization of cultural recreation.
RUR 8, 7 m
From Tchuonalyr recreation facility to the nature park there is a
gravel road.
- Construction of power lines to the Living Diamonds of Yakutia the
Nature Park ;
- Construction of road to the 2nd cordon;
- Construction of semi-free enclosure for wild ungulates.
RUR 17, 4 m
2007-2016
30 years
Population of the Sakha Republic (Yakutia) and Russian regions
Participation in the implementation of the state environment
protection projects
The draft program “Operation and development of the Living
Diamonds of Yakutia Nature Park till 2014” was developed.
The Board of Trustees for the development of the Living Diamonds
of Yakutia Nature Park was established.
Director, Living Diamonds of Yakutia Nature Park
Sergey Semenovich SIMONOV
678170, Sakha Republic (Yakutia), Mirny, % Soldatova Str., office
16
Tel./fax: +7 (41136) 4-26-62, +7 (41136) 2-98-81
e-mail: park-priroda@yandex.ru
Creation of Special Economic Zones
97. Project name
The concept of development of the municipal entity “Tiksi settlement”
of the Republic of Sakha (Yakutia)
Location
Tiksi – the administrative center of Bulun region of the Sakha Republic
(Yakutia).
Located beyond the Arctic Circle, on the shore of Tiksi Bay (Laptev Sea).
Distance to Yakutsk: by land - 1694 km, by air - 1270 km, by water - 1703
km.
Project initiator
Government of the Sakha Republic (Yakutia)
Project characteristics
Goal - realization of the Russian national priorities in the Arctic on the basis
of creating a sustainable socioeconomic environment in the region.
Objectives - modernization and development of infrastructure of Tiksi
settlement, taking into account the interests of science, conservation of
unique Arctic ecosystems, development of traditional northern industries,
safeguarding the national security
Volume of investment
RUR 28 m ($ 1 m)
114
Infrastructure
available
Northern sea port,Tiksi Airport
Infrastructure required
Providing human resources,
creating comfortable living conditions
Cost of project
RUR 26 m
Implementation period 2010-2020
Investor's involvement Project detailedness
A draft concept was submitted to the RF Government
CEO of an
organization
implementing the
project
Minister of Federal and External Relations of the Sakha Republic (Yakutia)
Valery Ivanovich MAXIMOV
Contacts
Ministry of Federative and External Relations of the Sakha Republic
(Yakutia)
677011, 30 Yakutsk Lenin Ave.
Tel.: +7 4112342441
Fax: +7 4112 341939
E-mail: mvs@gov.sakha.ru
98. Project name
“Creating a special industrial-production type economic zone in
Yakutsk”
Location
Yakutsk, the Sakha Republic (Yakutia)
Project initiator
Government of the Sakha Republic (Yakutia)
Project characteristics
Goal - to create economic and legal conditions for stabilization and dynamic
development of diamond cutting and jewelry manufacturing as one of the
major export-oriented manufacturing industries of the Sakha Republic
(Yakutia).
Objectives to be solved during the implementation of the SEZ:
- removal of legislative and administrative restrictions for the development
of diamond cutting and jewelry industries,
 construction in Yakutsk of the industrial infrastructure accommodating the
full cycle of production from diamond cutting to the production of diamond
jewelry. Taking into account the existing Sakha diamond cutting and jewelry
manufacturing production capacities, as well as the existing and future
demand and capacity of the Russian and world diamond market, the SEZ is
planned to locate until 2030:
- diamond cutting companies with a total project capacity of processing up
to 1.0 million carats of rough diamonds and production to 0.5 million
carats of diamonds (1.35 billion USD) per year (processing of 155
thousand carats of rough diamonds from 2010, annual growth rate of
115
-
processing - 8%);
jewelry companies with a total project capacity of up to 0.7 million of
jewelry pieces (1.1 billion USD) per year (production of 200 thousand
jewelry from 2010, annual production growth rates - 7%);
other local industries (furs, production of pieces of art, souvenirs, etc.)
Volume of investment
RUR 3 574,3 m
Infrastructure
available
Connection to Severnaya SS, 2 MVA electrical substation; independent 2,1
Gcal/h gas boiler house, gas supply to the gas boiler house is proveded from
the distribution networks of Lenagaz OAO; connection to water supply
networks of GUP Vodocanal (the connected capacity – 400 m³ per day), to
increase the water pressure there are two booster pumps; wastewater
pumping station; ATS lines of up to 50 numbers capacity.
Infrastructure required
Access motorways to the checkpoints with a total length of 0,4 km (two
drives).
Cost of project
RUR 3 574,3 m
Implemenation period
2013-2032
IRR
35,14%
NPV
RUR 6776,9 m
Investor's involvement Providing borrowed funds
Project detailedness
Business plan of the investment project “Creating a special industrialproduction type economic zone of diamond cutting and jewelry
manufacturing in Yakutsk” is ready.
CEO of an
organization
implementing the
project
Minister of Economy and Industrial Policy of the Sakha Republic (Yakutia)
Mikhail Anatolievich OSIPOV
Contacts
Ministry of Economy and Industrial Policy of the Sakha Republic (Yakutia)
Address: 677000, Yakutsk, 28 Lenin Ave.
Теl.: (4112) 42-03-10
Fax: (4112) 42-10-89
Integrated Investment Projects of Non-diversified Localities
99. IIP name
Location
Integrated investment plan of development of the municipal
entity “Vitim settlement” of Lensk region of the Sakha Republic
(Yakutia) in 2011-2020.
Vitim settlement of the Sakha Republic (Yakutia)
116
Administration of “Vitim settlement” municipal entity
Goal – mitigation of risks of the locality’s non-diversified economy
and creation of conditions for the sustainable development of the
municipal entity’s economy.
IIP strategic directions:
1. Exploration and development of oil and gas fields
2. Development of agriculture
3. Upgrading of housing and community amenities and housing
construction
4. Development of small and medium businesses
5. Development of social infrastructure
6. Settlement improvement
Major undertakings, key IIP investment projects:
1. Development of Talakan oil and gas condensate field
2. Infrastructure development of Chayanda oil and gas condensate
field
3. Construction of Lena-Nepa-Lensk railroad line
4. Construction of airport complex in Vitim
5. Establishment of modern agro-industrial enterprise in Vitim
6. Improvement of living standards in the municipal entity
7. Development of small and medium businesses
Volumes and sources of IIP Total – RUR 977 274,2 m
undertakings funding
Terms and stages of I stage (short-term) - 2011-2012. Formation of institutional
implementation of IIP key environment and upgrading of engineering infrastructure.
undertakings
II stage (mid-term) – 2013-2015. Planned realization of the municipal
entity’s resource potential, completion of investment phase of the
primary investment projects and programs.
III stage (long-term) – 2016-2020. Dynamic development and
diversification of economy and social sphere of the settlement.
Expected outcomes of IIP Planned development of the settlement as an urban-type settlement
implementation
under the general plan of development.
Achieving a stable situation in the social sphere.
Enhancement of production capacity.
Development of transportation and communication infrastructure.
Improvement of the population well-being.
CEO of the organization Head of Administration of Vitim settlement of Lensk region
implementing the project
Valery Matveevich FILIPPOV
Contacts
Sakha Republic (Yakutia), Lensk region,
678150 Vitim, 45 Lenin Str.
Phone: 8 (41137) 3-56-55, 3-53-41
http://sakha.gov.ru/minecon/
IIP contractor
IIP characteristics
100. IIP name
Location
IIP contractor
IIP characteristics
Integrated investment plan of development of Dzhebariki-Khaya
settlement of Topmonsky region in 2011-2020
Dzhebariki-Khaya settlement of Tomponsky region of the Sakha
Republic (Yakutia)
Administration of the municipal entity “Dzhebariki-Khaya
settlement” of Tomponsky region
Goal – secure the conditions for the sustainable socioeconomic
development of the municipal entity, promotion of the prospective
directions of economic development and development of a set of
117
Volumes
funding
and
sources
Terms and stages
implementation
of
of
IIP
Expected outcomes of IIP
implementation
measures for the sustainable economic growth, securing the
population’s living standards.
Major undertakings, key IIP investment projects:
- Integrated development of Tomponsky mining area.
- Development of coal industry.
- Construction of 165 Mwatt Dzhebariki-Khaya TPP in Khandyga
settlement.
- Construction of HVL-220 kV Khandyga-Nezhdaninskoye.
- Construction of “Khandyga – Dzhebariki-Khaya” sector of EldikanKhandyga motorway.
- Development of social infrastructure.
TOTAL – RUR 131 270 m, including:
Federal budget – RUR 80 930 m
Republican budget – RUR 700 m
Local budget – RUR 40 m
Private investments – RUR 49 600 m
I stage (2011): preparing documentation for the projects, IIP status
execution and approval.
II stage (2012 – 2016): launch and implementation of primary
investment projects, IIP correction.
III stage (2017 – 2020): completion of implementation of all IIP
investment projects with corrections.
The implementation of program undertakings has to result in the
creation of mechanisms for the efficient use of the municipal entity’s
potential to create economic, social, organizational, and legal bases; it
will also result in the involvement of the population in local
problems’ solving, in the optimization of the local budget, the
improvement of the local self-governance regulatory legal base, the
creation of systems of staff training and retraining for the settlement’s
enterprises and organizations.
Roman Mikhailovich SCHEGELNYAK
CEO of the organization
implementing the project
Contacts
Sakha Republic (Yakutia), Tomponsky region
678711 Dzhebariki-Khaya, 5 Lesnaya Str.
Phone: 8 (41153) 2-36-94
http://sakha.gov.ru/minecon/
101. IIP name
Location
IIP contractor
IIP characteristics
Integrated investment plan of development of the municipal entity
“Lensk town” of Lensk region of the Sakha Republic (Yakutia) in
2011 ─ 2016 and main directions until 2020
Lensk town of Lensky region of the Sakha Republic (Yakutia)
Administration of the municipal entity “Lensk town” of Lensk region
IIP strategic directions:
1. Development of oil and gas fields.
2. Construction of Lena-Nepa-Lensk railroad
line.
3. Upgrading of housing and community
amenities infrastructure.
4. Development of small and medium
businesses.
5. Development of social infrastructure.
Major undertakings, key IIP investment projects:
118
1. Development of Talakan oil and gas condensate field.
2. Infrastructure development of Chayanda oil and gas condensate field.
3. Gas processing complex on the extraction of helium and other valuable
components of Chayanda oil and gas condensate field.
4. Construction of Lensk gas processing and gas-chemical complex.
5. Construction of sections of VILYUI motorway in the single corridor
with ESPO and major gas pipeline on the site Peledui-Vitim-Lensk.
6. Construction of HVL-220 Lensk-Olyokminsk-Aldan.
7. Construction of HVL-220 kV Chernyshevsky–Mirny-Lensk-Peledui
with a branch line to OPS -14.
8. Construction of HVL-500 Lensk-Ust-Kut with SS 500 kV.
9. Construction of main fiber-optic communication lines SkovorodinoAldan-Yakutsk and Irkutsk-Lensk.
10.
Reconstruction of Lensk airport.
Volumes and sources of Total – RUR 496 139,02 m, including:
IIP funding
Federal budget – RUR 163652,8 m
Budget of Lensk region ME – RUR 13,1 m
Budget of Lensk town ME – RUR 84,2 m
Extra-budget sources – RUR 332389,0 m
Terms
of
IIP 2011 – 2016 and until 2020
implementation
Expected outcomes of IIP 1) Achievement of the social sphere’s stable condition, which will allow
implementation
in the conditions of budget deficit to focus on the main social problems,
create organizational, tax and legal incentives for their solving.
2) Enhancement of production capacity.
3) Development of transportation and communication infrastructure.
4) Improvement of the town’s population well-being.
During the IIP implementation it is expected:
- the number of the employed in the economy will grow by 15,6% by
2016
- the level of average monthly salary by 2016 will grow to 70% compared
with 2011
- the turnover of enterprises in all activities will grow by 6% by 2016
- the dynamics of consumer goods production will on average grow by 910% on average
CEO of the organization Head of Administration of Lensk region
implementing the project
Leonid Alexeevich ILYAKHIN
Contacts
Sakha Republic (Yakutia), Lensk region
678140 Lensk, 65 Lenin Str.
Phone: 8(41137) 4-68-68
http://sakha.gov.ru/minecon/
102. IIP name
Location
IIP contractor
Integrated investment plan of development of non-diversified
municipal entities the towns of Mirny, the settlements of
Chernyshevsky and Svetly within the united agglomeration of
Mirny region of the Sakha Republic (Yakutia)
Mirny town, Chernyshevsky settlement, Svetly settlement of Mirny
region of the Sakha Republic (Yakutia)
Administrations of the municipal entitites the towm of Mirny, the
settlement of Chernyshevsky, the settlement of Svetly of Mirny region
of the Sakha Republic (Yakutia)
119
IIP characteristics
The goal of the integrated investment development of the
agglomeration is to form conditions for the sustainable development of
the economy of the agglomeration of three non-diversified settlements
(Mirny town, Chernyshevsky and Svetly settlements) and to improve
the living standards of the local communities.
Major undertakings, key IIP investment projects:
I. Supporting the formation of MCS-agglomeration:
- asphalting a motorway between Mirny, Svetly and Chernyshevsky and
enhancement of passenger transport traffic;
- construction of HVL-220 kV Chernyshevsky – Mirny – Lensk –
Peledui with a branch line OPS №14;
- creation of a united portal of the three urban settlements of the
agglomeration;
- formation of a unified labor market of the agglomeration;
- formation of an association of entrepreneurs of the agglomeration;
- formation of unified management and coordination bodies of MCSagglomeration;
- project of consolidation of interests of town-forming enterprises of the
agglomeration and Lensk town.
II. Strengthening of service functions of the central Mirny town:
- reconstruction of Mirny airport and construction of an airstrip;
- upgrading of Mirny milk plant;
- enlargement of the park “Living diamonds of Yakutia” in Mirny;
- development of tourism;
- construction of the second stage of Mirny Polytechnic Institute
(studying building);
- construction of consumer services center;
- creation of auto technical center;
- construction of mini-plant on the production of mineral fertilizers;
- construction of new housing, including the private one;
- full repair of dilapidated housing;
- construction of kindergarten and primary school building in Quarter
25 of Mirny;
- full repair of two schools;
- Mirny gasification
III. Diversification of local economy of Chernyshavesky and Svetly
settlements:
Chernyshevsky
- upgrading of Chernyshevsky fish-breeding plant;
- construction of shopping center;
- establishment of service center for household appliances repair;
- establishment of Internet-cafe;
- establishment of business-incubator and training center;
- formation of fund of micro-crediting/equipment leasing;
- construction of dormitory for the Republican Cadet Boarding School;
- establishment of preventorium on the base of medical complex;
- establishment of summer camp for the kids’ social rehabilitation;
- conversion of social sphere facilities;
- resettlement of citizens from dilapidated and hazardous housing;
- construction of engineering infrastructure facilities.
Svetly
-establishment of bottled drinkable water production facility;
120
Volumes and sources of
funding
Terms and stages
implementation
of
Expected outcomes of IIP
implementation
CEO of the organization
- establishment of vegetable processing and conservation facility;
- construction of hockey court;
- full repair of CASCADE Cultural Center;
- introduction of the third stage of Mirny Industrial College;
- construction of dormitory for Mirny Industrial College;
- organization of temporary employment for youth;
- creation of a local energy-efficiency zone.
IV. Strengthening of the agglomeration’s town-forming enterprises:
- reconstruction and upgrade of Vilyui HPS -1,2;
- construction of the 4th hydraulic unit of Vilyui HPS -3;
- construction of underground mines and development of new deposits
of AK ALROSA.
To implement the Integrated investment plan of development of MCSagglomeration in 2011-2020 the following financial resources are
needed: RUR 286 014,5 m, including:
Federal budget – RUR 43 503,1 m;
Regional budget – RUR 38 395,9 m;
Municipal budgets – RUR 567,7 m;
Private investments – RUR 203 547,8 m.
Start of implementation: 2011. Finish: 2020.
The plan is supposed to be implemented in 3 stages.
I. Short-term measures solve the issues of strengthening the internal
unity of all settlements making the MCS-agglomeration.
Implementation period: 2011
II. Mid-term measures solve the issues of strengthening the unity of
all three municipal entities making the agglomeration; on diversification
of economy of the three municipal entities.
Implementation period: 2012 – 2014
III. Long-term measures are aimed at providing a balanced
combination of the industrially-developed service center-town Mirny
and diversified in the local economy structure settlements Mirny and
Chernyshevsky within the unified agglomeration for the sake of
sustainable development and comfortable living conditions of the
population.
Implementation period: 2015 – 2020
The main result of implementation of the Integrated investment plan of
development of MCS-agglomeration will be as follows:
- enhancement of competitiveness of town-forming enterprises (АК
ALROSA, Cascade of Vilyui HPS-1,2, Svetly HPS-3) being the main
sources of tax income to the ME budget (investment in development of
these enterprises until 2020 will make RUR 124 816,7 m);
- promotion of development of small and medium businesses
(investments in development of small business in 2011-2020 will make
RUR 361,0 m);
- double reduction of unemployment;
- increase of financial stability of the municipal entities of MCSagglomeration (additional incomes to the budget of the municipal
entities in 2011 – 2020 will make RUR 2 284,2 m);
- growth of actual income of the agglomeration population by 1,2-1,3;
- growth of investments in the economy of the agglomeration (in 20112020 the estimated sum of investments will make RUR 285 940,52 m)
Head of Mirny town - Sergei Yurievich ALEXANDROV
121
implementing the project
Contacts
Head of Chernyshevsky settlement - Anatoly Pavlovich SHUSHUEV
Head of Svetly settlement - Vladimir Dmitrievich BELIKOV
Sakha Republic (Yakutia), Mirny region
678170, Mirny, 19 Lenin Str.
Phone: 8 (41136) 3-29-35, 3-21-05
678185, Chernyshevsky, 1«б» Kosmonavtov Str.
Phone: 8(41136) 7-28-57
678196, Svetly, 6 Sovetskaya Str.
Phone: 8 (41136) 7-13-97
http://sakha.gov.ru/minecon/
103. IIP name
Integrated investment plan of development of a unicentric
agglomeration of Neryungri region (Serebryany Bor settlement,
Neryungri town, Berkakit settlement, Chulman settlement)
Location
Serebryany Bor settlement, Neryungri town, Berkakit settlement,
Chulman settlement of Neryungrinsky region of the Sakha Republic
(Yakutia)
IIP contractors
Administrations of Serebryany Bor settlement, Neryungri town, Berkakit
settlement, Chulman settlement of Neryungrinsky region of the Sakha
Republic (Yakutia)
IIP characteristics
IIP strategic directions:
1. Development of coal mining industry.
2. Diversification of structure of economy.
3. Small business development.
4. Provision of scientific-innovative development.
5. Upgrading of infrastructure and housing.
6. Labor market development.
7. Socioeconomic integration of the settlements of Neryungri
agglomeration .
Major undertakings, key IIP investment projects:
The project has several large undertakings capable of considerable
influence on the socioeconomic situation of Neryungri urban
agglomeration, including:
- Construction of metallurgic plant (Investor ООО «TIMIR»);
- Mastering the production of cargo railroad carriages (ОAО
«MECHEL»);
- Enhancement of poultry production (ОАО «Neryungri Poultry Plant»);
- Establishment of Technological Park.
Volumes and sources of IIP To implement the Integrated investment modernization plan of Neryungri
undertakings funding
agglomeration, total funds of RUR 377,443 b will be required in 20112020.
In 2011 the volume of financing will make RUR 44,235 b, including:
federal budget – RUR 2,999 b,
funds of the Sakha Republic (Yakutia) – RUR 0,077 b,
funds of local budget – RUR 0,283 b,
extra budget sources – RUR 40,876 b.
In 2012-2013 the volume of financing will make RUR 71,03 b, including
Federal budget – RUR 10,026 b,
Funds of the Sakha Republic (Yakutia)– RUR 0,123 b,
Funds of local budget – RUR 0,138 b,
Extra budget sources – RUR 60,743 b.
In 2014-2020 the volume of financing will make RUR 262,177 b,
122
including
federal budget – RUR 35,449 b,
funds of the Sakha Republic (Yakutia) – RUR 0,323 b,
funds of local budget – RUR 0,8 b,
extra budget sources – RUR 239,252 b.
Terms and stages of IIP 2011-2020
implementation
1 stage – 2011-2012
2 stage – 2013-2016
3 stage– 2017-2020
Expected outcomes of IIP The implementation of the Integrated investment plan of Neryuingri
implementation
agglomeration modernization will bring the following socioeconomic
results:
1.Reduction of share of the town-making enterprise in the total volume of
the shipped goods from 72,6% to 40,1%;
2.Reduction of share of the employed at the town-forming enterprise from
58% to 52%;
3.Growth of small enterprises number by 22%;
4.Increase of share of the local budget’s own income by 25%;
5.Making 12,8 thousands of new jobs;
6.Reduction of the registered unemployment level from 1,2% to 1%.
CEO of the organization Head Neryungri town - Vladimir Sergeevich RUSINOV
implementing the project
Head of Serebryany Bor settlement - Vladimir Ilich REZIKOV
Head of Berkakit settlement - Oksana Anatolievna ALEEVA
Head of Chulman settlement - Natalia Mikhailovna SUKHOTINA
Contacts
Sakha Republic (Yakutia), Neryungri region
678922 Neryungri, 22 Druzhby Narodov Ave.
Phone: 8(41147) 4-89-48
678995 Sewrebrynay Bor, Str.
Phone: 8(41112) 7-96-35
678990 Berkakit, 5 Optimistov Str.
Phone: 8(4112) 7-33-41
678980 Chulman, 22 Sovetskaya Str.
Phone: 8(41147) 7-15-68, 7-15-69
http://sakha.gov.ru/minecon/
123
Contacts
Ministries
Ministry of Federal and External Relations of the
Sakha Republic (Yakutia)
Minister – Mr. Valery I. MAXIMOV
30, Lenin ave., Yakutsk, Sakha (Yakutia) 677011
Tel.: +7 4112 342441
Fax: +7 4112 341939
E-mail: mvs@gov.sakha.ru
Ministry of Professional Education, Staff
Training and Deployment of the Sakha
Republic (Yakutia)
Minister – Mr. Yury S. KUPRIYANOV
36, Kurashov str., Yakutsk, Sakha (Yakutia)
677007
Tel.: +7 4112 455156, 423589
Fax: +7 4112 425159
E-mail: minnauka@gov.sakha.ru
Ministry of Housing, Communal Service and
Power Supply of the Sakha Republic (Yakutia)
Minister – Mr. Alexander A. ANTONENKO
13, Kirov str., Yakutsk, Sakha (Yakutia) 677000
Tel.: +7 4112 422578
Fax: +7 4112 422739
E-mail: minjkx@gov.sakha.ru
Ministry of Education of the Sakha Republic
(Yakutia)
Minister – Mr. Afanasy S. VLADIMIROV
30, Lenin ave., Yakutsk, Sakha (Yakutia) 677011
Tel.: +7 4112 420356
Fax: +7 4112 424929
E-mail: minobr@gov.sakha.ru
Ministry of Healthcare the Sakha Republic
(Yakutia)
Minister – Mr. Alexander V. GOROKHOV
30, Lenin ave., Yakutsk, Sakha (Yakutia) 677011
Tel.: +7 4112 424022
Ministry of Nature Protection of the Sakha
Republic (Yakutia)
Minister – Mr. Vladimir A. GRIGORIEV
3/1, Dzerzhinsky str., Yakutsk, Sakha (Yakutia)
124
Fax: +7 4112 420772
E-mail: minzdrav@gov.sakha.ru
Ministry of Property and Land Relations of the
Sakha Republic (Yakutia)
Minister – Mrs. Evgeniya V. GRIGORIEVA
8, Ammosov str., Yakutsk, Sakha (Yakutia) 677000
Tel.: +7 4112 341655
Fax: +7 4112 421363
E-mail: mio@gov.sakha.ru
677000
Tel.: +7 4112 341290
Fax: +7 4112 421372
E-mail: minprirody@gov.sakha.ru
Ministry of Entrepreneurship and Tourism
Development of the Sakha Republic (Yakutia)
Minister – Mrs. Ekaterina I. KORMILITSYNA
6/1, P. Alexeev str., Yakutsk, Sakha (Yakutia)
677018
Tel.: +7 4112 421327
Ministry of Culture and Spiritual Development of Fax: +7 4112 342765
E-mail: minpred@gov.sakha.ru
the Sakha Republic (Yakutia)
Minister – Mr. Andrey S. BORISOV
30, Lenin ave., Yakutsk, Sakha (Yakutia) 677011
Ministry of Youth Policy and Sports of the
Tel.: +7 4112 421163
Sakha Republic (Yakutia)
Fax: +7 4112 421248
Minister – Mr. Alexander G. PODGOLOV
E-mail: minkult@gov.sakha.ru
4/2 Lenin ave., Yakutsk, Sakha (Yakutia) 677011
Tel.: +7 4112 422793
Fax: +7 4112 422793
Ministry of Agriculture and Food Policy of the
E-mail: minmol@gov.sakha.ru
Sakha Republic (Yakutia)
Minister– Mr. Ivan I. Sleptsov
28, Kurashov str, Yakutsk, Sakha (Yakutia) 677000 Ministry of Economy and Industrial Policy of
Tel.: +7 4112 341862
the Sakha Republic (Yakutia)
Fax: +7 4112 344406
Minister – Mr. Mikhail A. OSIPOV
E-mail: minselhoz@gov.sakha.ru
28, Lenin ave., Yakutsk, Sakha (Yakutia) 677022
Tel.: +7 4112 420310
Fax: +7 4112 421089
Ministry of Architecture and Construction
E-mail: minekon@gov.sakha.ru
Complex of the Sakha Republic (Yakutia)
Minister – Mr. Sergey Y. DEREPOVSKY
8, Ammosov str., Yakutsk, Sakha (Yakutia) 677000 Ministry of Transportation and Road Facilities
Tel.: +7 4112 424412
of the Sakha Republic (Yakutia)
Fax: +7 4112 341413
Minister – Mr. Semen V. VINOKUROV
E-mail: minstroy@gov.sakha.ru
22, Lenin ave., Yakutsk, Sakha (Yakutia) 677018
Tel.: +7 4112 422307
Ministry of Labour and Social Development of the Fax: +7 4112 425636
E-mail: mintrans@gov.sakha.ru
Sakha Republic (Yakutia)
Minister – Mr. Nikolay N. DEGTYARYOV
State Committee on Communication and
6/1, Petr Alexeev str., Yakutsk, Sakha (Yakutia)
Informational Technologies of the Sakha
677000
Republic (Yakutia)
Tel.: +7 4112 424034
Chairman – Mr. Konstantin E. SEMENOV
Fax: +7 4112 340425
22, Lenin ave., Yakutsk, Sakha (Yakutia) 677018
E-mail: mintrud@gov.sakha.ru
Tel.: +7 4112 422307
Fax: +7 4112 425636
Ministry of Finance of the Sakha Republic
(Yakutia)
State Committee on Pricing Policy – Regional
Minister – Mr. Vadim A. NOVIKOV
Energy Commission of the Sakha Republic
12, Kirov str., Yakutsk, Sakha (Yakutia) 677007
(Yakutia)
Tel.: +7 4112 423684
Chairman – Mrs. Valentina I. LEMESHEVA
Fax: +7 4112 423337
28, Lenin ave., Yakutsk, Sakha (Yakutia) 677000
E-mail: minf-kanc@gov.sakha.ru
Tel.: +7 4112 343439
Fax: +7 4112 344648
125
State Committee on Geology and Natural
Resources of the Sakha Republic (Yakutia)
Chairman – Mr. Leonid N. KOVALEV
13, Kirov str., Yakutsk, Sakha (Yakutia) 677892
Tel.: +7 4112 423503
Fax: +7 4112 423587
E-mail: goscomgeo@gov.sakha.ru
E-mail: scomtsen@gov.sakha.ru
State Committee on State Orders Placement of
the Sakha Republic (Yakutia)
Chairman – Alexander I. POPOV
22, Lenin ave., Yakutsk, Sakha (Yakutia) 677018
Tel.: +7 4112 423438
Fax: +7 4112 421066
State Committee on Science and Innovation Policy E-mail: goscomtorg@gov.sakha.ru
of the Sakha Republic (Yakutia)
Chairman – Mr. Maxim M. TROFIMOV
36, Kurashov str., Yakutsk, Sakha (Yakutia) 677007
Tel.: +7 4112 420545
Fax: +7 4112 425159
E-mail: goskomin@mfil.ru
Representative Offices
Permanent Representation of the Sakha
Republic (Yakutia) under the President of the
Russian Federation
Permanent representative – Mr. Alexander K.
AKIMOV
107078, Moscow, 3/26 Myasnitsky proezd
Tel./fax: (495) 628-42-21
Representation of the Sakha Republic
(Yakutia) within the RF Trade Representation
in the PRC
Representative – Mr. Alexander I. YADREEV
100600 China, Beijing, Dongzhimennei Dajie,
Mashao Hutong, 27A
Tel.: (86-10) 653-222-01, fax: (86-10) 653-25398
Permanent Representation of the Sakha
Republic (Yakutia) in Saint-Petersburg
Permanent representative – Mrs. Galina M.
MAKAROVA
199053, Saint-Petersburg, 1/10 Birzhevoi
pereulok, 1st floor
Tel./fax: (812) 323-34-46
Trade Commissioner of the Sakha Republic
(Yakutia) in Toronto, Canada – Mrs. Marina T.
DESSIATKINA,
200 North Service Rd, Unit1, Suite 375, Oakville,
Toronto, ON L6M 241 Canada
Tel.: (1-905) 334-49-66
Permanent Representation of the Sakha
Republic (Yakutia) in the Far Eastern Federal
District in Khabarovsk
Permanent representative – Mr. Georgy D.
NIKONOV
680000, Khabarovsk, 16 Volochaevskaya Str.
Tel./fax: (4212) 31-58-58
Representative of the Sakha Republic
(Yakutia) at the Northern Forum Secretariat
in Anchorage, USA
Representative – Mrs. Anastasia N.
BOZHEDONOVA
4401 University Drive, APU Carr-Goitstein
Center, Suite 221 Anchorage, Alaska 99508 USA
126
Tel.: (1-907) 561-32-80, fax (1-907) 561-66-4
Major Enterprises
Company name, CEO
JSC “ALROSA” (OAO)
President – Fyodor Borisovich
ANDREEV
Activity
Diamond mining
ОАО “Almazy Anabara”
General Director – Matvey
Nikolaevich YEVSEEV
Diamond mining,
timber industry
ОАО “Nizhne-Lenskoe”
General Director – Vladimir
Romanovich KYCHKIN
ОАО “Aldanzoloto” GRK
General Director – Igor Yurievich
SUKHOBAEVSKY
Diamond mining
ОАО “Surgutneftegaz”
General Director – Vladimir
Leonidovich BOGDANOV
Oil production
Gold mining
127
Address
678170, Sakha Republic (Yakutia),
Mirny, 6 Lenin Str.
Tel.: (411-36) 2-23-02
Fax: (411- 36) 2-50-30
E-mail: adm.AK@alrosa-mir.ru
677000, Sakha Republic (Yakutia),
Yakutsk, 6 Chernyshevskogo Str.
Tel.: (4112) 45-01-00, 42-01-02
Fax: (4112) 42-50-30
677000, Sakha Republic (Yakutia),
Yakutsk, 4 Lenin Ave.,
Tel.: (4112) 34-41-00
678940, Sakha Republic (Yakutia),
Aldansky region, s. Nizhny Kuranakh,
14 Stroiteley Str.
Tel.: (411-45) 6-29-41
Fax: (411-45) 3-08-82
628415, Tyumenskaya Oblast, Surgut,
1 Kukuevitskogo Str.
Tel.: (3462) 42-61-33
Tel. Moscow office: (495) 980-15-86
Е-mail: secret_b@surgutneftegas.ru
ОАО “Sakhatransneftegaz”
General Director – Ivan
Konstantinovich MAKAROV
ОАО “Yakut Fuel and Power
Company”
General Director – Igor
Leonidovich DEMIDOV
OOO “Vostoknefteprovod”
General Director – Victor
Alexandrovich BRONNIKOV
ООО “Taas-Yurekh
Neftegazdobycha”
General Director – Ivan
Mikhailovich MENSHIKOV
ОАО Holding Company
“Yakutugol”
Acting director – Igor Valerievich
KHAFIZOV
ОАО «Southern Yakutia
Corporation»
General Director – Mikhail
Lvovich BRUK
Gas production and 677000, Sakha Republic (Yakutia),
transportation
Yakutsk, 18 Ammosov Str.
Tel.: (4112) 42-40-95
Fax: (4112) 42-48-44
E-mail: sakhatransneftegas@mail.ru
Gas production
677015, Sakha Republic (Yakutia),
Yakutsk, 4/1 Khalturin Str.
Tel.: (4112) 22-39-11
Fax: (4112) 22-35-74
Е-mail: JSC-YGP@ygp.ru
Oil transportation
665734, Irkutsk Oblast, Bratsk,
Energetic District, 14 Olympiyskaya
Tel: (3953) 30-07-37, 30-07-74
Fax: (4112) 22-35-74
Oil production
678144, Sakha Republic (Yakutia),
Lensk, 32A Pervomaiskaya Str.
Tel.: (411-37) 4-62-88
Fax: (411-37) 4-62-96
E-mail: iroil@mail.ru, iroil@yandex.ru
Coal mining and
678960, Sakha Republic (Yakutia),
enrichment
Neryungri, 3/1 Lenin Str.
Tel.: (411-47) 96-125
Fax: (411-47) 4-20-24
Е-mail: post@yakutugol.ru
GUP “ZhKH RS(Y)”
General Director – Alexander
Alexandrovich NOGOVITSYN
Implementation of
“Integrated
Development of
Southern Yakutia”
investment project
Generation,
transmission and
distribution of
electric and heat
power
Generation and
distribution of heat
power
ОАО “Yakutia Airlines”
General Director – Ivan
Alexeevich PROSTIT
Cargo and
passenger air
traffic
ОАО JSC “Railroads of
Yakutia”
General Director – Vasily
Vladimirovich SHIMOKHIN
Railway
transportation
ОАО JSC “Yakutskenergo”
General Director – Oleg
Vladimirovich TARASOV
128
Moscow, 11B Seleznyovskaya Str.
Tel.: (495) 232-42-44
Fax: (495) 232-95-13
Е-mail: office@sy-corp.ru
Web: http://www.sy-corp.ru
677000, Sakha Republic (Yakutia),
Yakutsk, 14 F. Popova Str.
Tel.: (4112) 21-13-50
Fax: (4112) 21-13-55
E-mail: inform@yakute.elektra.ru
677000, Sakha Republic (Yakutia),
Yakutsk, 5, 50 let Sovetskoy Armii
Tel.: (4112) 39-93-03
Fax: (4112) 39-93-26
677014, Sakha Republic (Yakutia),
Yakutsk, 9 Bykovskogo Str.
Tel./fax: (4112) 44-30-60
E-mail: yakutia@yakutia.ru
678900, Sakha Republic (Yakutia),
Aldan, 14 Mayakovskogo Str.
Tel.: (411-45) 3-26-35,
Fax: (411-45) 3-22-56
Tel. Yakutsk office: (4112) 42-05-00,
42-51-06, 42-51-19, 42-41-32
ОАО “Lena River Shipping
Company”
General Director – Sergei
Alexandrovich LARIONOV
Branch ОАО “Sakhatelecom”
OAO “Rostelecom”
General Director – Konstantin
Genndievich VOLOSHIN
ОАО “Republic’s Investment
Company”
General Director – Alexander
Ivanovich FEDOTOV
ООО NPC “EPL Diamond”
General Director – Valery
Petrovich FYODOROV
FAPC “Yakutia”
General Director – Andrey
Petrovich SAMSONOV
ОАО “Integrated housebuilding factory”
General Director –
Alexander Adolfovich BERSH
ОАО “Yakutcement”
General Director –
Alish Zabid-ogly MAMEDOV
GUP “Committee on precious
metals and precious stones of
the Sakha Republic (Yakutia)”
General Director –
Karl Innokentievich VASILIEV
ООО “Pokrovsk basalt material
plant”
General Director – Yegor
Petrovich ZHIRKOV
Cargo and
passenger river
transport traffic
677000, Sakha Republic (Yakutia),
Yakutsk, 2 Dzerzhinskogo Str.
Tel.: (4112) 42-02-07, 42-42-50
Fax: (4112) 42-00-11
Telex: 135134 LENA RU
E-mail: direct@lorp.ru
Telecommunicatio 677000, Sakha Republic (Yakutia),
ns
Yakutsk, 22 Kurashova Str.
Tel.: (4112) 42-37-08, 42-38-75
Fax: (4112) 34-10-77
E-mail: telecom@sakha.ru
Investment activity 677000, Sakha Republic (Yakutia),
Yakutsk, 38 Ordzhonikidze Str.
Tel. (4112) 39-02-51
Fax (4112) 34-42-07
E-mail: ric@ricsakha.ru
Jewelry production 677022, Sakha Republic (Yakutia),
and retail
Yakutsk, 4 Oyunskogo Str.
Tel.: (4112) 35-41-51
Fax: (4112) 35-10-92
Food product
677009, Sakha Republic (Yakutia),
manufacturing,
Yakutsk, 68 Dzerzhinskogo Str.
catering
Tel.: (4112) 45-90-06
Fax: (4112) 45-90-58
E-mail: fapc@sakha.ru
Building of houses, 677002, Sakha Republic (Yakutia),
production of
Yakutsk, Pokrovsky Trakt, 6th km
construction
Tel.: (4112) 43-17-30, 43-13-16, 35materials
10-90
Fax: (4112) 35-28-67
Production of
678020, Sakha Republic (Yakutia),
cement and
KHangalassky ulus, s. Mokhsogollokh,
crushed stone
32 Zavodskaya Str.
Tel.: (411-44) 48-0-21, 47-9-13
Fax: (411-44) 48-1-45
E-mail: info@yakutcement.ru,
sale@yakutcement.ru
Supply,
677018, Sakha Republic (Yakutia),
stocktaking and
Yakutsk, 18 Kirova Str.
build-up of the
Tel.: (4112) 48-22-04, 34-31-64
State Fund of
precious metals
and precious stones
of the Sakha
Republic (Yakutia)
Production
of 678000, Sakha Republic (Yakutia),
construction
Pokrovsk, 1 Zavodskaya Str.
materials
Tel.: (411-44) 43-1-42
Office in Yakutsk:
677018, Sakha Republic (Yakutia),
Yakutsk, 38 Ordzhonikidze Str.
Tel.: (4112) 39-02-72, 42-11-76
129
ОАО “Gold of Yakutia”
General Director – Alexander
Afanasievich FYODOROV
Production
and 677007, Sakha Republic (Yakutia),
sale of jewelry
Yakutsk, 2/1 Glukhoi pereulok
Tel.: (4112) 42-06-10
Fax: (4112) 42-05-56
677000, Sakha Republic (Yakutia),
JSCB “Almazergienbank” OAO Banking
Chairman of the Board –
Yakutsk, 1 Lenin Ave.
Alexander
Tel.: (4112) 34-22-22
S. MIRONOV
Fax: (4112) 425-425
E-mail: bank@albank.ru
Banking
677000, Sakha Republic (Yakutia),
JSB “Taatta” (ZAO)
Chairman of the Board – Ivan
Yakutsk, 52/3 Dzerzhinskogo Str.
Ilyich
Tel.: (4112) 45-99-11
PANTAZIEV
Fax: (4112) 42-23-61
E-mail: inform@taatta.ru
Banking
119180, Moscow, 23 Bolshaya
MCB “MAC-Bank” (ООО)
Chairman of the Board –
Yakimanka Str.
Alexander Mikhailovich
Tel.: (499) 230-10-40
PREDEIN
Fax: (499) 230-36-66
Banking
678960, Sakha Republic (Yakutia),
NCB “Neryungribank” (ООО)
Chairman of the Board –Olga
Neryungri, 29/4 Druzhby Narodov
Alexeevna DMITRIEVA
Ave.
Tel.: (41147) 4-07-07
Fax: (41147) 6-35-50
E-mail: info@nerungribank.ru
Telecommunicatio 677000, Sakha Republic (Yakutia),
Branch of “MTS” ОАО in the
ns
and Yakutsk, 4/1 Chiryaeva Str.
Sakha Republic (Yakutia)
Head – Roman Alexandrovich
communications
Tel.: (4112) 707-780
MESSING
Fax: (4112) 707-277
Telecommunicatio 677000, Sakha Republic (Yakutia), 25
Yakutsk Regional Office of Far
and Lermontova Str.
East Branch of “Megafon” ОАО ns
Head – Andrei Gennadievich
communications
Tel.: (4112) 35-55-51
GAMYANIN
Fax: (4112) 22-36-81
Yakutsk Branch of “Vympelcom Telecommunicatio 677000, Sakha Republic (Yakutia),
ns
and Yakutsk,136/2 Lermontova Str.
Communications” ОАО
Head – Andrei Vladimirovich
communications
Tel.: (4112) 35-55-65
BUGAEV
Fax: (4112) 36-55-37
E-mail: rhczdfo27@vic.ru
130
TABLE OF CONTENTS
ADDRESS BY THE PRESIDENT OF THE SAKHA REPUBLIC (YAKUTIA)
3
YAKUTIA IN FIGURES
4
SOCIAL AND ECONOMIC SITUATION
5
INVESTMENT CLIMATE
8
EXTERNAL ECONOMIC ACTIVITY
13
PRIORITY INVESTMENT PROJECTS
14
Integrated Large-scale Projects
12
Oil and Gas Complex
16
Mining Industry
41
Transport System
49
Power Supply, Housing and Communal Sector
58
Construction Sector
69
V Children of Asia International Sports Games Construction Facilities
74
Agroindustrial Sector
77
131
Innovative Projects
84
Small and Medium Business Projects
95
Tourism
100
Healthcare
105
Culture
108
Nature Protection
110
Creation of Special Economic Zones
114
Integarted Investment Projects of Non-diversifeid
Localities
116
CONTACTS
124