V.SIVAKUMAR SKS Sdn Bhd., Brunei Ph: +673 – 8764252 Email: sivakumar_40448@yahoo.com ACADEMIA 2010 2009 2005 1993-95 1991-94 API 570 – Piping Inspector NACE Protective Coatings Specialist NACE Level 3 - Peer Review Advanced Diploma in Computer Applications Diploma in Mechanical Engineering PERSONAL DETAILS Date of Birth: Permanent Address: Marital Status: Passport Details: Driving License: 5th April 1976 No.9 Annamalai Street, Bharathipuram, Chromepet, Chennai – 44, Tamilnadu, Married F8074644 - valid till 4th October 2016, issued in Doha, Qatar 1) IQ51196671K5/08 – valid till 14th October 2010, issued in Brunei 2) 27635603325 - valid till 30th October 2011, issued in Qatar 3) F/TN/022/003179/2005 - valid till 1st February 2025, issued in India WORK EXPERIENCE SUMMARY 14 years experience in the area of Quality, Inspection, Operations, Team Management and HSE Having hands-on experience in protective coatings, GRE lamination/bonding, cathodic protection, pipeline pigging, corrosion inhibitors, Auto Blast, Pipe Internal Blasting, Crack injection on Concrete Structures, NDT such as UT, MT, DP & RT Conversant with API, ASME, SSPC & NACE Standards An astute person with the flair for adopting modern project execution methodologies, systems in compliance with quality standards KEY RESULT AREAS Quality Assurance Reviewing contract documents such as Scope of Work, Quality Control Plan or Inspection Test Plan, Method Statement, Procedures, technical evaluation, concession request, etc Designing appropriate specification in concern with material selection, coatings/insulation to avoid corrosion failures Updating and cascading the latest technological development related to corrosion and its prevention Developing & Implementing the Quality Systems at the unit level Identifying areas of quality failures and taking steps to rectify the system wide preventive and corrective actions to avoid the reoccurrences Conducting Quality Audits as per the guidelines Practicing quality standards with key emphasis on improving quality and improvement opportunities Inspection Inspection of day-to-day activities, mandatory hold points as specified in the QCT/ITP Raising NCR / CAR on observing deviation from the specified standard and specification Page 1 of 5 Operations Coordinating with Operations & Production departments for KPI & related issues Drafting inspection reports on the observations with history and recommendations for repair Preparing mechanical punch-list on the observations Assessing cost and time factor apart from manpower and material requirement Team Management Imparting /organizing training programs for achieving pre planned business targets Imparting training on wastage control and effective handling of manufacturing equipments Coordinating with the Stores Department for evaluation and inventory control Safety Ensuring safe working practices are followed as specified in the MSDS Hands-on experience Corrosion monitoring/survey and control by Protective Coatings/Lining, Wrapping, Insulation, PFP Cathodic Protection Chemical Injection Material Selection & Design Pipeline pigging Non-destructive testing such as MT, PT, UT & RT Operation of Auto Blast, Pipe Internal Blasting machine Load testing of Lifting equipments Pressure test Pre-cast concrete crack injection GRP/FRP field lamination, GRE application on Tank Internal Bottom floor In-plant hot dip galvanizing and FBE coating Above ground Storage Tank Jacking for Bottom/Annular plate replacement Block-setting with reference to Docking plan Docking/Undocking of ship, Scaffolding, Hydro-jetting, wet blasting and tank cleaning PROFESSIONAL EXPERIENCE SKS Sdn.Bhd., Brunei Senior Inspector Since Aug’08 Role: Drafting Procedure Specification, Method Statement, Daily inspection reports Inspection/surveillance on mandatory hold points as per ITP Co-ordinate with the client representative on daily inspection activities Record-keeping of inspection findings ISO Quality Audit Projects: Replacement of Bottom Plate in Steam Condensate Tank by Jacking-up the tank – BLNG Sdn Bhd New Construction of Floating Roof Crude Oil Storage & Fixed Roof tanks Tank Major Restoration of various Tanks including Bottom/Shell plate replacement, Piping modification, GRE lining on the bottom plate and in shell up to 1.5m height, GRP bonding, pressure testing of piping, hydro-static test of tanks – Seria Crude Oil Terminal, BSP Sdn Bhd Page 2 of 5 Applied Corrosion Technology, UAE QA/QC Engineer Jan’08-Apr’08 Role: Inspection of Hull, Tanks, Quality control measures for Surface Preparation & Protective Coatings application (coating, lining, passive fireproofing) Preparation of daily inspection reports Projects: Offshore jack-up rigs (new construction and maintenance), FPSO Topside modules and barges Qatar Petroleum, Doha Senior Technician (Inspection Services) May’05-Aug’07 Role: Arising warranty claim against the Contractor of any corrosion / erosion failures and defects including: o Glass flake internal lining of pipelines, Motor Operated Valves, Rubber Bellow Expansion Joints o Pump Bay, Casing & Impeller o Concrete Structure Conducting periodical Corrosion Survey on the assets of ‘Common Seawater Facility’ and proposing suitable maintenance repair Inspection of Seawater Supply & Return Pipelines, Header manifold and associated equipments as per shutdown schedule, reporting and recording the observations including number of defects, calculating the rate of corrosion and certifying fit-for-service on repair with reference to the specification Preparing Pipeline sketches with identified defects using MS Visio Raising Non-Conformance Report (NCR) or Corrective Action Request (CAR) on any deviation from the specification Monitoring CP functioning – soil to pipe potential and adjusting the potential on the transformer rectifier Witnessing Factory Acceptance Test (FAT) of Flow Control Valves Observing Pressure test on new GRE lines and walk-through inspection (external and internal - large diameter) Coordinating with third party certifying delegate for periodical inspection of lifting tools & tackles for Safe Working Load test Observing MPI & non-destructive test on any modification work in existing pipelines Raising ‘Notification’ & ‘Work Orders’ in SAP Conducting the investigations / root cause and failure analysis of the following: o Erosion of Aluminum Bronze disc of Control Valves o GRP cracks and de-lamination (external and internal) o Erosion of 2” Copper Nickel By-pass spool of Combined Check Valve o Crack in Pre-cast concrete structure in Receiving Basin o External Cracks in Rubber Bellow Expansion joint Projects: Operation and Maintenance of ‘Common Cooling Seawater Facility’ Maintenance of Utilities and Facilities incorporated to the employer Achievement: Bagged Mabrouk Award for outstanding performance in the year 2005 Page 3 of 5 Gulf Petrochemical Services & Trading-LLC, Oman Corrosion Inspector Apr’03-Aug’04 Role: Represented in ‘External and Internal Corrosion Management’ project in Removal of Damaged PE/FBE coating, surface preparation, Coating, wrapping, Holiday Detection of 30” MOL and other belowground pipelines, pig launching and retrieval, excavation, backfilling and ROW (Right of way), monitoring of CP functioning Coordinating with NDT personnel for Manual/Auto UT as and when required and consequently for installing ‘SLEEVE’ by means of “Hot-tapping” or ‘CLOCK-SPRING’ on the ‘External Defect’ locations of the live pipeline based on the UT report Refurbishment of Damaged Coating on Belowground pipelines for OGC-CES with: o ‘Stopaq’ wrapping coating o ‘Shrink Sleeve’ coating of Field Weld joints o Patch repairing with ‘Thermoplastic stick’ in the existing PE coating Projects: EPIC – Birba Seconded to TOCO (The Oman Construction Co – Wilbros group) in the ‘Refurbishment of BVS’ - Block Valve Station in 38” & 42” MOL(Main Oil Line) External and Internal Corrosion Management – North & South Oman GITIC ENGG-WLL, Doha QC Supervisor - Coating Nov’00-Feb’03 Role: Planning, execution, coordination, supervision of coating works on daily basis Liaise with the client or third party inspector and ensuring the desired quality is maintained as per designed specification and standard Attending job progress meeting, preparing daily inspection reports with the basic inputs such as Reference standard / specification, inspection and acceptance criteria, observations Drafting Surface Preparation and Coating Procedure, ITP (Inspection Test Plan) or QCP (Quality Control Plan) and getting approval from the client prior to the commencement of the job/Project Preparing CWR (Contract Work Request)/Measurement Sheet), Invoice and getting it approved from the client Coordinating during the Internal Technical Audit & External Auditing with ISO Projects: Worked for Qatar Petroleum, formerly QGPC in Major Shutdown performing the following duties: o Mol. sieve column cleaning, furnace tube cleaning, vessel cleaning, spading/de-spading and Maintenance coating of Compressor House Structural in NGL-2 plant, pipe supports’ replacement in NGL-2 jetty NF Sour Gas pipeline – external coating in NGL-3 Internal Glass flake lining and External coating of Sludge Catcher Vessel in Halul Island External coating of Copper Nickel fire hydrant pipeline in PS-4 offshore platform Compressor house Structural coating and cladding refurbishment in PS-2 & PS-3 offshore platform External coating and wrapping of underground pipeline in Station-S Wrapping coating and Holiday Detection test of Underground Live Pipelines (Oil/Gas) of various size in NGL External coating of various pipeline and structural in RasGas, QatarGas and Arab “D” Gas plants Worked for Qatar Fertilizer Co., during shutdown / major turnaround Page 4 of 5 Worked for Qatar Steel Co., in Internal and External Coating of pipeline Worked for Maersk Oil in Exhaust Duct coating Royal Marine, Chennai Supervisor (Ship Repair) Aug’98-Aug’00 Role: Execution and supervision of welding, coating, insulation (hot/cold) and scaffolding work Projects: Motor Tanker and Motor Vessel of Shipping Corporation of India on call-on basis in Anchorage / Berth Chokhani International Limited, Chennai Supervisor (Shipwright) Oct’94-Aug’98 Role: Employed as Supervisor-Shipwright being involved in following activities: o o o o o o o o o Inspection of Hull, Tanks with Ultrasonic gauging, marking thin areas beyond the acceptable allowance for replacement / patching Blasting/Coating of Ship’s hull, tank, Cargo hold and decks Block-setting with reference to the Docking plan Docking/Undocking, Mooring/Unmooring of vessel Operation of Floating Dry-Dock Control Room Erection and Dismantling of Scaffolding Carpentry and Insulation works Anchor and Chain related works Hydro-jetting and Tank cleaning Projects: Motor Vessel (MV), Motor Tanker (MT) of Shipping Corporation of India, Dredging Corporation of India, Transport Corporation of India, Coast guard, Navy and Foreign Flag vessel docked in Floating Dry Dock and in Anchorage / Wharf Others H2S Awareness & Escape Job Hazard Analysis Permit to Work (Signatory) Enhanced Site Supervisory Workshop ISO 9001:2000 ISO 14001:2004 SAP on ‘Purchase Requisition’, ‘Notification’ & ‘Work Order’ Introduction to RBMI Page 5 of 5