Position held: Project Manager

advertisement
Name of Firm
: VISA POWER LIMITED
Name of Staff
: SUPRATIM BASU
Profession
: Civil Engineer
Date of Birth
: 25.10.1969
Nationality :
: Indian
Membership of
Professional
Societies
: Institute of American Society of Civil Engineers
Member of Indian Concrete Institute(Kolkata Chapter)
Address
: K56 BOSEPARA ROAD, KAMDAHARI, GARIA, KOLKATA700084,mobile:+919903977169,
Mail id :supratim.basu@rediffmail.com
Key Qualifications :
Mr Basu has more than 19.5 years experience in Civil & Structural design in
different Industrial Projects, Power Projects, (Main Power Plant Structures,
BOP), Material handling Projects(Sinter Plant, Four Poster Structure, Blast
Furnace Foundation), Water Supply Project in India, UAE , UK and Qatar .
Handled large industrial, Power , Steel Plant and Metal Projects &
infrastructure projects (for 19 yrs);
As a HOD-Civil he is leading the Design Team of 15 to 20 people for
Design and Detailed Engineering for Power Plant Projects.
Handling other organizational responsibilities like assessment of job and
manpower requirements; develop appropriate organizational structure in
line with business strategy; manage and sustain skill development &
create a learning organization.
Has also the experience of Preparation of Detailed Project Reports,
Feasibility study and Viability study reports Preparation of Preliminary
Project Reports, review of Structural Drawings, Preparation of Cash Flow
and Finalisation of Tender documents and assisting the Client in
negotiation with the Contractor
Experience in Quantity Estimation (for FEED or Pre-bid work), bids
analysis & evaluation for civil and structural items for EPC Projects,
preparation of construction specs, review of vendor inputs & designs,
with focus towards continual improvement.
Handling other organizational responsibilities like assessment of job and
manpower requirements; develop appropriate organizational structure in line
with business strategy; manage and sustain skill development & create a
learning organization
Mr Basu has total exposure in design and detail engineering using software like
SLOPE STABILITY ANALYSIS, STAAD, MS PROJECT.
Some Salient Structural & Civil Design work undertaken during the career:
1.Structural Design of TG( Power House Building) for
600MW,660MW, 250MW and 300MW Unit
2.TG Building Foundation
3Design of ESP Foundation.
4.Chimney Design for 600MW unit
5Design of Coal Handling Structures.
6Design of structures related to Water system
7Design of Blast Furnace Foundation of capacity of 4060m3
8Design of Four Poster Structure of Blast Furnace Project of 4060m3
9Civil Design of Ash silo
10.Road pavement Design
11. Bridge Design
12 Design of Coal Mill Building
13 Structural Design of Bunker
14Structural Design of ESP Structures
16 Pavement Design
17 Design of Traffic Appurtances
18Design of Highrise Building Structures
19 Design of structures pertaining to Township Projects in India and
abroad
Education:
B.E. (Civil) – 1993 B.E. College, Shibpore, Howrah,
West Bengal under Calcutta University
Employment Record
VISA POWE LIMITED
September2010 till date
DGM-ENGINEERING CIVIL(HEAD OF CIVIL)
As Head of Engineering –Civil , responsible for total
Engineering , Design Management of 600MW Power Plant
Projects & 660 MW Power Plant Projects in different parts
of India.
Also responsible in Liaso with different departments for
coordination with Mechanical Department, Electrical
Department for different process lines
and responsible for preparation of Budgetory cost estimate
for the Project and Technical & Commercial negotiation
with the Bidders(vendors), Man-management, Involvement
in Technical journal and Co-ordination with Engineering
Consultants(like DCPL, L&TS&L, Lahmeyer).
Reporting to Director- Power
January’06 to August2010
:
TATA Consulting Engineers Limited, (TCE)
Senior Design Manager
/Design Manager- Civil
As Design Manager,/ Lead Engineer, responsible for design and leading the team
of Engineers in design detailing of different Power Projects, Steel Plant
Projects and Industrial Projects. Liaso with different clients in India and abroad.
Responsible in Liaso with different departments for coordination with Mechanical
Department, Electrical Department for different process lines
Reporting to Office Head
2004 to 2005
Laing O Rourke Technical Services India Private Limited, a unit of John
Laing International in UK
Principal Engineer
As Principal Engineer, responsible for Project management & design and
leading the team of Engineers in design, detailing of different Gas based Power
plant Projects,Mining Projects, Airport , Township in India, UK, Baharin, Dubai.
Liaso with different clients in UK, UAE, Qatar and India. Responsible in Liaso with
different departments for coordination with Mechanical Department, Electrical
Department for different process lines, Preparation of Project Reports,
Feasibility study and Viability study reports,Project planning using MS
Projects.
2000 to 2004
Halcrow Consulting India Ltd, New Delhi
Design Manager
As Project Manager, responsible for design, and detailing of buildings , roads,
and other infrastructure projects. Also responsible for design of substructure
of Hydro/ Gas Based Combined Cycle and Thermal Power Plant Projects,
and other infrastructure projects in India and Sarjah,
1993 to 1999
Consulting Engineering Services (India) Private Limited, New Delhi
Trainee Engineer then Assistant Engineer, later Senior Engineer
As Engineer, responsible for design of industrial structures, design of
substructure of Hydro/ Gas Based Combined Cycle and Thermal Power
Plant Projects multi storeyed buildings, geotechnical investigation of buildings ,
bridges and other industrial structures and design of their foundation and
substructures. Also responsible for Preparation of Project Reports, Feasibility
study and Viability study reports, preparation of BOQ, tender documents, etc.,
production of construction drawings.
OF THE SEVRAL PROJECTS HANDLED / UNDERTAKEN SOME OF THE
BEST PROJECTS WHICH HAS BEEN HANDLED IN 19.5 YEARS OF CAREER
Project Name: 2x600MW POWER PLANT IN RAIGARH
LOCATION: RAIGARH, INDIA
Position held: HOD-CIVIL
Year: September2010
Position held: Head of Civil
TIME SPENT: ONGOING
As Head of Civil , is responsible for Design management and Engineering of
total Power Plant including BTG and BOP Structures pertaining to Civil &
Structural
As a Client Engineer, is also responsible for Cost management, Contracts
and Design Management & Interface Co-ordination with other Departments
and Consultants
Project Name: 2x660MW POWER PLANT IN CUTTACK
LOCATION: CUTTACK INDIA
Position held: HOD-CIVIL
Year: September2010
Position held: Head of Civil
TIME SPENT: ONGOING
As Head of Civil , is responsible for Design management and Engineering of
total Power Plant including BTG and BOP Structures pertaining to Civil &
Structural
.
As a Client Engineer, is also responsible for Cost management, Contracts
and Design Management & Interface Co-ordination with other Departments
and Consultants
Project Name: AKRNATAKE WATER SUPPLY PROJECT
LOCATION: BANGALORE, INDIA
Position held: Project Civil Engineer
TIME SPENT: 2 YEARS
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design review, detailing of different civil structures of Water
supply system, responsible for cash flow and vialbilty study
Project Name: 2X600MW POWER PANT PROJECT IN RAGHUNATHPUR
t
LOCATION: WEST BENGAL INDIA
Position held: Project Civil Engineer
TIME SPENT: 2 YEARS
As Design manager , is responsible for leading a team of design engineers for
review of design and detailing of civil and structures for TG Building,
Chimney Design, CHP Civil Design, Design of Ash silos and Ash handling
Structures, Boiler Foundations , Structural Design of Pipe racks, STG
Foundation and other structures
Project Name: Design & detailed Engineering of Blast Furnace Project of
Bhushan Steel in Angul
(Client L&T)
Position held: Lead Design Engineer
Year: June 2010
As Lead Design Engineer , is responsible for leading a design team for design
and Detailing of PCI Building, Bunker Structure, Slag Granulation Plant, Cast
house, Design of, pipe supporting structures, slag Granulation Pant, Yard Pipe
system
Project Name: Design & detailed Engineering of BF#5 in Rourkela
(4060m3)(Client Tata Projects Limited)
Position held: Project Civil Engineer
Year: Jan09
As Project Engineer , is responsible for leading a design team for design and
Detailing of Four Poster Structure, Blast Furnace Foundation, Blast system,
Preparation of BOQ, Design Basis Report, Design of, pipe supporting
structures, slag Granulation Pant, Yard Pipe system
Project name: 2X500MW POWER PLANT IN ANGUL
LOCATION: ANGUL, INDIA
Position held: Project Civil Engineer
Year: Jan08
As Design manager , is responsible for leading a team of design engineers for
design and detailing of civil and structures for TG Building, Chimney Design,
CHP Civil Design, Design of Ash silos and Ash handling Structures, Boiler ,
Structural Design of Pipe racks, STG Foundation
Project name: 2x550MW POWER PLANT IN MAITHON
LOCATION: MAITHON, INDIA
Position held: Project Civil Engineer
Year: December’07
As Design manager , is responsible for leading a team of design engineers for
design and detailing of civil and structures for TG Building, Chimney Design,
CHP Civil Design, Design of Ash silos and Ash handling Structures, Boiler ,
Structural Design of Pipe racks, STG Foundation
Project name: Preparation of DPR for 2x500MW POWER PLANT IN Dumka
LOCATION: DUMKA, INDIA
Position held: Project Civil Engineer
Year: December’07
As Project Engineer, for preparation of Civil DPR for Main Power Plant & BOP
Packages
Project name: EXTENSION OF 1x250 MW PWER PLANT IN BUDGEBUDGE
LOCATION: KOLKATA INDIA
Position held: Project Civil Engineer
Year: 2007
TIME SPENT: ONGOING
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design review, detailing of different civil structures(Boiler
foundation, TG foundation, Ash Handling structures, ESP , etc.) . Liaso with
CESC and other agencies
Project name: DESIGN OF SINTER PLANT FOR ISP PROJECT
LOCATION: KOLKATA INDIA
Position held: Design Manager
Year: 2007
TIME SPENT: ONGOING
As Design manager , is responsible for leading a team of design engineers for
design and detailing of crusher house, junction houses, conveyor gallaries
of Sinter Plant
Project name: DESIGN & DETAIL Engineering of civil structures of for
Bhuswal Power Plant
LOCATION: KOLKATA INDIA
Position held: Design Manager
Year: 2007
TIME SPENT: ONGOING
As Design manager , is responsible for leading a team of design engineers for
design and detailing of civil and structures for TG Building, Chimney Design,
CHP Civil Design, Design of Ash silos and Ash handling Structures, Boiler ,
Structural Design of Pipe racks, STG Foundation
Project name: MODERNISATION OF DELHI INTERNATIONAL AIRPORT
LOCATION: DELHI, INDIA
Position held: Project Manager
Year: 2006
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design review, detailing of Terminal Building Complex . Liaso
with Airport Authority of India and GMR.
Project name: TOWNSHIP PROJECT IN INDORE
LOCATION: INDORE, INDIA
Position held: Project Manager
Year: 2006
TIME SPENT: ONGOING
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design, detailing of different Building Units and infrastructure works.
Liaso with client. Responsible in Liaso with different departments for coordination
with Mechanical Department, Electrical Department for different process lines. Coordination with different agencies for executing Topographical survey,
Geotechnical Survey and other different survey activities.
Project name: MODERNISATION OF AUTOMOBILE UNIT OF HERO HONDA
LOCATION: GURGAON, INDIA
Position held: Project Manager
Year: 2006
TIME SPENT: ONGOING
As Project Manager, responsible for project co-ordination and leading the
team of Engineers in design, detailing of different Building Units and Steel
Structures. Liaso with client. Responsible in Liaso with different
departments for coordination with Mechanical Department, Electrical
Department for different process lines.
Project name: Old Township Complex Project in Dubai
LOCATION: DUBAI, UAE
Position held: Project Manager
Year: 2004
TIME SPENT: 1 YEAR
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design, detailing of different Building Units and infrastructure works.
Liaso with different client in UAE. Responsible in Liaso with different departments
for coordination with Mechanical Department, Electrical Department for different
process lines. Co-ordination with different agencies for executing Topographical
survey, Geotechnical Survey and other different survey activities,
Project name: Township project in Atlantis, Dubai, UAE
LOCATION: DUBAI, UAE
Position held: Project Manager
Year: 2004
TIME SPENT: 4 MONTHS
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design, detailing of different Building Units and infrastructure works.
Liaso with different client in UAE. Responsible in Liaso with different departments
for coordination with Mechanical Department, Electrical Department for different
process lines. Co-ordination with different agencies for executing Topographical
survey, Geotechnical Survey and other different survey activities,
Project name: Township project in Baharin
LOCATION: BAHARIN
Position held: Project Manager
Year: 2005
TIME SPENT: 8 MONTHS
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design, detailing of different Building Units and infrastructure works.
Liaso with different client in Baharin. Responsible in Liaso with different
departments for coordination with Mechanical Department, Electrical Department
for different process lines.
Project name: ARORA HOTEL COMPLEX IN HEATHROW ,UK
LOCATION: UK
Position held: Project Manager
Year: 2006
TIME SPENT: 3 MONTHS
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design, detailing of Hotel Complex and infrastructure works. Liaso
with different client in UK and design Consultant Robert Bird Group in Australia
Project name: EXPANSION OF TERMINAL BUILDING(T5) IN HEATHROW
AIRPORT
LOCATION: UK
Position held: Project Manager
Year: 2005-06
TIME SPENT: 12 MONTHS
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design, detailing of Terminal Building Complex . Liaso with client in
UK and design Consultant WSP and MOTT in UK
Project name: EXPANSION OF DUBAI AIRPORT IN DUBAI, UAE
LOCATION: UAE
Position held: Project Manager
Year: 2005
TIME SPENT: 6 MONTHS
As Project Manager, responsible for project co-ordination and leading the team of
Engineers in design, detailing of Terminal Building Complex . Liaso with Airport
Authority of Dubai and design Consultant NORR
Project name: PANAGARH PALSIT ROAD PROJECT IN WESTBENGAL
Position held: Project Bridge Engineer
Year: 2000
Time Spent: 12 Months
As Project Engineer is responsible for design of Bridges( Design of RCC
Bridges & steel Bridges) and preparation of tender documents. and conducting
the Geotechnical Investigation of site and its analysis.
Project name: TOWNSHIP FOR PURULIA PUMP STORAGE PROJECT
LOCATION: PURULIA, WEST BENGAL
Position held: Project Engineer
Year: 2000
Time Spent: 6 Months
As Project Engineer is responsible for design of buildings and preparation of
tender documents. Supervision of township project as per IS Standard and
conducting the Geotechnical Investigation of site and its analysis.
Project name: TOWNSHIP FOR HALDIA PETRO CHEMICAL
LOCATION: HALDIA, WEST BENGAL
Position held: Design Engineer
Year: 1998
Time Spent: 8 Months
As Design Engineer is responsible for design of buildings and preparation of
tender documents.
Project name: VIABILITY STUDY OF TOWNSHIP AND URBAN PLANNING IN
LAOS
LOCATION: LAOS,PDR
Position held: Engineer
Year: 1997
Time Spent: 3 Months
As Engineer is responsible for conducting viability study of township and city
planning.
Language
: Speaking
Reading
Writing
English
Excellent
Excellent
Excellent
Hindi
Excellent
Excellent
Excellent
Bengali
Excellent
Excellent
Excellent
Download