Name: Anthony P. Crawford Nationality: Filipino Date of Birth: Sept. 12, 1958 EDUCATION: Degree : BS in Commerce University : San Sebastian College Year : 1977-1980 Contact Details: Telephone No. 0917 821 2870 Email Add: tontoncraw@yahoo.com ======================================================================= EXPERIENCE STATEMENT: 30 years experience in the field of Estimating, Material Management, Costing and Requisitioning as a Senior Estimator, Material/Cost Specialist, Supervisor and Material Coordinator in Saudi Electricity Company formerly SCECO-East and King Wilkinson (Saudi Arabia) Ltd.- Riyadh Refinery Shutdown, Saudi Aramco Project. WORK HISTORY: Years of experience: 30 Years of work in KSA: 30 Years of experience in Saudi Aramco work: 10 POSITIONS HELD (Latest position first) Employer Name: SNC-Lavalin Fayez Engineering From: July 1, 2012 To: Present Location: Al Khobar, KSA Position Held & Duties: Senior Estimator Page 1 of 5 Prepare Estimating Procedures/Plan, develop Work Breakdown Structure and analyzed Project Milestone. Check the design scope criteria and quantities and coordinates with project developed additional estimating basis. Work within the given cost estimate format. Determines all the factors and allowances that ought to be considered which requires being part of the estimate, i.e. contingency, location factors, cut & waste, etc. Prepare Expenditure Request (ER) Estimate which include labor and material cost used for approval of fund allocation for a particular Budget item (BI) as per SAEP-25 Coordinates with Project Managers, Discipline Engineers and Department Heads to develop all the requirements needed for an accurate estimate. Coordinates with design engineer regarding details and drawings of materials subject for vendor inquiries and estimates. Ensures that the material specified in the design meet Saudi Aramco and other client requirements. Ensures the accuracy of material takeoff and shall be prepared in accordance with SAES and SAMSS and as required by other clients. Follow-up with Procurement all quotations required for the project. Review all quotations to be used in the estimate and forward major items to concerned Engineer for technical review and approval. Maintain, update and file vendors quotation for the project. Project Experience in this Position: Dhahran Residential- Package 1,2,3,4 Sulfur Railcar Facilities Expand Asphalt Production Facilities Upgrade Government Security Facilities- Kingdomwide Upgrade Wastewater Facilities at RTR Provide Telephone and Data Connectivity at North Haradh YASREF- Warehouse Facilities & Administration Building Shaybah AXL- Crude Increment & Support Facilities Construct UYUN Parking Primary Care Expansion-Phase-1 Corrosion Probes Remote Monitoring System Install Temperature Control Valve at Cold Boxes Upgrade Fire Alarm System at Tanajib Warehouse Connecting Tank Level & Temperature Tags to DCS Upgrade Split type A/C at Shaybah Site KAPSARC Residential & Community Complex WASIT Project Install Shy-1 Pipeline 4 & 5 Page 2 of 5 Employer Name: Zuhair Fayez Partnership Consultants From: June 4, 2005 To: June 30, 2012 Location: Al Khobar, KSA Position Held & Duties: Material /Cost Specialist Prepare Expenditure Request (ER) Estimate which include labor and material cost used for approval of fund allocation for a particular Budget item (BI) Coordinates with design engineer regarding details and drawings of materials subject for vendor inquiries and estimates. Ensures that the material specified in the design meet Saudi Aramco and other client requirements. Prepare Direct Charge Purchase Requisitions in accordance with Saudi Aramco Engineering Procedures and Standards. Check materials availability on Saudi Aramco Material Stock (SAMS) database prior to developing the Purchase Requisition. Review and check materials ensuring compliance with clients specifications and standards Ensures the material takeoff is prepared in accordance with SAES and SAMSS and as required by other clients. Sourcing qualified vendors in accordance to Saudi Aramco requirements Prepare Inquiries for multi disciplinal materials containing detailed technical specifications Follow up with vendors and prepare quotation comparison sheet. Maintain and update vendors quotation list and files. Project Experience in this Position: KAUST-Perimeter Security Systems Rabigh (BI-25-00026) Expand STP at Abqaiq Plant Abqaiq Plant (BI-10-00977) King Abdullah Monument Rabigh (BI-25-00021-003) KAUST- Thuwal Town Development Phase I & II Rabigh (BI-25-00002 & 00012) Expand Emergency Medical Facilities-Udhailiyah Udhailiyah (BI-10-00696) Construction of North Dhahran Sports Facility Dhahran North (BI-10-00680) Jubail Export Refinery (Package 5C-Auxiliary Utilities) Jubail (SATORP) Jubail Export Refinery (Package 9-Port Tank Farm) Jubail (SATORP) Replace Online Analyzer at Berri Gas Plant Berri Gas Plant (BI-10-00708) AH Crude Oil Pipeline to Ras Az-Zawr Pipeline-SKRZ-1 (BI-10-00709) Improve Water Supply Quality at Dhahran Dhahran (BI-10-00668) Manifa and Tanajib Plant Facility Manifa and Tanajib Plant (BI-10-00450) Long Range Surveillance & Detection System Page 3 of 5 Abu Ali, Tanajib & Shaybah Plant (BI-10-00505) Khurais Residential and Industrial Complex Khurais (BI-10-03453) Wasea Bulk Plant Project- Riyadh (SINOPEC) ======================================================================== Employer Name: King Wilkinson (Saudi Arabia) Ltd. From: Aug. 2003 To: Oct 2003 Location: Riyadh, KSA Position Held & Duties: Material Specialist Prepare Purchase Requisitions for direct charge materials Check and initiate order of materials request through Saudi Aramco Material System Receive, process and follow-up field material request from Project Engineers for various projects. Responsible for maintenance and replenishment of stock. Control and maintain hot items intended for Projects. Prepare report of Transfer and Utilization of surplus materials. Project Experience in this Position: 1. Project: Riyadh Refinery Shutdown Client: Saudi Aramco Location: Riyadh, KSA ======================================================================== Employer Name: Dubaib & Sulaim Co. (DSCO) From: July 1997 To: Dec. 2002 Location: Khobar, KSA Position Held & Duties: Material Supervisor In-charge in controlling overall operations and procurement of materials. In-charge of controlling materials requisitions, verifications and updating records Responsible in processing and follow-up of materials purchase request for the operation. In-charge in the annual inventory of materials in stock under direction of the Internal Auditor. Responsible for items subject for Cataloging and record modification. Conduct periodic review on materials subject for surplus. Control of telecommunication test equipment for repair. Perform and conduct annual asset inventory in coordination with Comptrollers Dept. Coordinate with Asset Account Division for plant tag request, movement and retirement of assets. Control of telecommunication test equipment for repair. Determining specifications and quantity of materials for Operations and Projects and prepares Cost Estimates. Prepare cost report of materials processed, operating expenditure report and budget. Project Experience in this Position: 1. Project: Saudi Electricity Company- Telecommunications Department Client: Saudi Electricity Company-Eastern Region Branch Location: Dammam, KSA Page 4 of 5 ======================================================================== Employer Name: Saudi Consolidated Electric Company- SCECO-East From: May 1980 To: July 1995 Location: Dammam, KSA Position Held & Duties: Material Coordinator Ensuring availability of the required material requirements for maintenance and projects. Responsible for the maintenance of an acceptable material service level to users as per order status code. Coordinator in the annual inventory of materials conducted by Internal Auditor. Responsible for items subject for Cataloging and Materials Disposition Request. Processing of materials request and updating daily transactions. Responsible for the preliminary receiving and inspection of materials delivered by Petty Cash Buyer, Vendors and Saudi Aramco Material Supply. Search materials availability for Projects using SEC and Saudi Aramco Material System. Verification and processing of Invoices and Claims. Prepares receiving variance report and coordinate with the Vendors for settlement. Checking of daily activities in the computer printout and reconcile for any discrepancy. Prepare weekly and monthly reports. GENERAL INFORMATION: Computer Skills: Internet Word, Excel, PowerPoint Having the ability to learn quickly any new software using manuals and online support. Seminar Attended: 2012 Introduction to Risk Management, Al-Khobar, KSA. 2013 Primavera P6 Advanced Rel 8.2 Ed 1 PRV, Al-Khobar, KSA. 2014 Introduction to Aspen Capital Cost Estimator, Al-Khobar, KSA. Reference: Mr. Magdy Yousef Estimating Manager SNC-Lavalin Fayez Engineering Page 5 of 5