Phase IV – The Operation Phase Page 1 Phase IV – The Operation Phase 1. System Changeover System Changeover is the process of moving from a current system to a totally new or enhanced one. During the system changeover stage, all employees who use the system must be collaborative and willing to shift their reliance on the current system to the new system. This is a very critical stage because it dictates the fate of switching from the current system to the new system. There are four different changeover approaches: direct cutover, parallel operation, single location, and phased. To minimize the interruption of the currently already busy business at Hoang Video, the parallel operation approach is the preferred choice for the project. Currently the customers of the Hoang Video make rental orders through a manual system in two ways: calling in to order or walking in to order. Although the current system at Hoang Video has not involved any computing system, the parallel operation changeover method is used. The parallel operation changeover has many advantages. It is a safe changeover approach because the old and the new systems coexist. After the completion of the web-based reservation system, the customers from either local or remote area may visit the Website to browse and make rental orders through the new web-based reservation system. Meanwhile, the phone line ordering service, the old manual system, is still available. If there are problems with the new web-based reservation system, the phone line ordering service can be used as a backup until the new system recovers. Therefore, the parallel operation is a relatively low risk changeover approach and minimizes the interruption of the current business operation. Prepared by: Minh Thu Nguyen Phase IV – The Operation Phase Page 2 The disadvantages of the parallel operation are that it is a relatively expensive changeover method due to the duplication of effort to run and maintain two systems. Users must work between both systems and temporary employees may be needed to handle the extra workload. In addition, running both systems at the same time might confuse the users and cause processing delays. However, the staff members at the Hoang Video have been using the manual system for a while, training a designated staff member is the only overhead in the system changeover stage. 2. Routine Operation During the changeover process stage, the system is considered to be operational. The manager and staff members of the Hoang Video have to take their assigned responsibilities. In order to keep the system operating efficiently and beneficial to the business, both user training and technical support are necessary. Training seminars will be provided for the Hoang Video and all the store personnel including the manager will learn to understand and operate the new system. In addition, the user manual will be provided at the end of the project. The user manual will provide the detailed information in operating and maintaining the new system for the users. The documentation support is very important in order to resolve any unpredictable problems that the new system may have in the future. Documentation support is not limited to just answering user’s questions about how to use the system, to perform a specific task, or to maintain the system. The documentation support provided to Hoang Video consists of such tasks as processes for recovery and backup, for disaster recovery, and for PC maintenance. The purpose of the support is to make the new system operate properly, effectively, and efficiently. Prepared by: Minh Thu Nguyen Phase IV – The Operation Phase 3. Page 3 System Performance Evaluation System performance evaluation is the systematic determination of the productivity of hardware, system software, application software, and the programming staff. The system performance evaluation assesses the overall quality of the web-based reservation system. It also grades if the new web-based system meets the specified requirements, achieves the expected benefits and reaches user objectives. Moreover, the feedback from the evaluation will definitely help the developer to enhance a sustaining system. The evaluation is for users to grade from strongly disagree to strongly agree and includes the categories of System Output, User Interface and User Training. The following, Table 3.1, is the system evaluation for the Hoang Video. . Prepared by: Minh Thu Nguyen Phase IV – The Operation Phase Page 4 The Hoang Video system evaluation Please circle the number from 1 (strongly disagree) to 6 (strongly agree) for each factor to evaluate the new system. System Output 1. Ease of use 1 2 3 4 5 6 5 6 2. Accuracy of information 1 2 3 4 3. Completeness of information 1 2 3 4 5 6 4. Timeliness of information 1 2 3 4 5 6 3 4 5 6 5 6 5 6 4 5 6 3 4 5 6 3 4 5 6 3 4 5 6 3 4 5 6 User Interface 1. Ease of use 1 2 2. Appropriateness of options 1 2 3 4 3. Clarity of instructions 1 2 3 4 4. Clarity of web content 1 2 3 5. Quality of layout 1 2 Training 1. Completeness 1 2 2. Appropriateness 1 2 3. Schedule 1 2 Talbe 3.1 Prepared by: Minh Thu Nguyen Phase IV – The Operation Phase 4. Page 5 User manual The users need to connect the client computer to the ISP, and lunch the Internet Explorer (IE 6.0). Key in the web address of the Hoang Video to visit the main page of the store’s website Main page of the website: Click the About Us hyperlink: the users will be directed to the about us web page. Click the Video Browsing / Reservation hyperlink: the users will be able to view the video category menu web page. Click the Video News hyperlink: the users will be directed to the news web page. Click the Contact Us hyperlink: the users will be prompted with the feedback form web page. Video Category Menu: Click the new tapes hyperlink: the users will be about to select new videotapes from the list. Click the tape list hyperlink: the users will be able to select the videotapes of interest and submit the request for reservation. Click the view images hyperlink: the users will be able to view the sample pictures of the new upcoming videotapes. Reservation function: When the users are on any of the movies information pages, the users can click the list menu and select the Rent Me. Page 5 Phase IV – The Operation Phase Page 6 Fill out the customer information of the customer ID and password. Click the submit button at the bottom of the each video information web page to sent the reservation form. Contact Us: The users need to fill out the customer information and leave the suggestion or any message in the comment board section. Click the submit button at the bottom of the web page to sent the feedback form. Checking and processing the reservations: The Hoang Video’s staff members need to use the Outlook Express to check the incoming reservation emails every hour. The staff members need to reply a message to the customers that their reservation orders are received. Print out the reservation emails for documentation and prepare the videotapes for customers. System update: Connect the store computer to the Internet via ISP account. Open the FTP client program, and log onto the FTP server. Select the files from the client site computer then click the upload button to upload the files to the server site. Page 6 Hoang Video Project Weekly Diary 5. Weekly Diaries Week # 1 Date Covered: August 29 – September 4 During the first half of the week I had been soliciting and evaluating for possible project ideals from friends, relatives, and classmates. After compiling the ideas collected, I had decided to work on a web-based information system for a Vietnamese video rental store to serve its customers. Through the introduction of my friend, I contacted the manager of a Vietnamese video rental store, Hoang Video located at Bellaire Avenue. After explaining the purpose and the scopes of the project, I finally obtained a verbal permission from the manager on Hoang Video Project During the second half of the week, I had interviewed the user to obtain the goal and the scopes of the project. The final activity of the week was to finalize the Project Agreement for the user, the manager of Hoang Video to sign. Week # 2 Dates Covered: September 5 – September 11 I had visited the store and collected the following information from the manager: The current operating cost. The budget the store would like to allocate for the project. The current processes in doing the business. The willingness the store would like to enhance the current processes and the system. The functionalities of the system the user expected. Week # 3 Dates Covered: September 12 – September 18 I have visited the computer lab to apply for a Linux account for the web site development of the Hoang Video project. Meanwhile I have started analyze the Prepared by: Minh Thu Nguyen 7 Hoang Video Project Weekly Diary information collected during the past week from the Hoang Video store. I have also given the user a couple of calls to confirm my understandings about the user’s requirements. At the end of the week, I started drafting the phase I report for the Hoang Video Project. Week # 4 Dates Covered: September 19 – September 25 While finishing up the Phase I report, I have learned to use the Microsoft Project to create the Gantt Chart for senior project as in the appendix. I have wrapped up and concluded the Phase I of the System Development Life Cycle (SDLC). I have started to develop a design for the web-based system for the next phase – the design phase or Phase II. I have already started some activates of the design phase. In addition, I have launched a testing web site at URL: http://gator.dt.uh.edu/~nguym007/ on my Linux account. Week # 5 Dates Covered: September 26 – October 2 I have continued working on the three of the activities for the design and report phase of the project. The activities in this week are Computer Program Function Definition, Data Base Design, and Computer Program Design. For the data base design activity, I have outlined the required data fields according to the user’s need. I have also drafted the tentative data type for each required data field. Week # 6 Dates Covered: October 3 – October 9 I have completed the collection of hardware information from the vendor, Dell. Prepared by: Minh Thu Nguyen 8 Hoang Video Project Weekly Diary I have visited the earthlink.com web site to collect information about web hosting. I have started drafting data flow diagram for the Hoang Video web-based system. I have planned the outlines for Phase II report. Dates Covered: October 10 – October 16 Week # 7 I have been working on the Design Phase report for my senior project. I have completed Database Design including the data needed, field name, data type, data length, as well as data source. I have finished proof reading of my first draft of the Phase II report. I have drawn and included the charts and figures needed for the report. Week # 8 Dates Covered: October 17 – October 23 1. I have completed all the activities of Phase II. 2. I have made the corrections of the Phase II Report and emailed it to my friend to check for grammatical errors. 3. I have drawn all necessary tables, charts and diagrams for Phase II report. 4. I am working on and finalizing the content page and cover page for the Report. Week # 9 Dates Covered: October 24 – October 30 1. I have been working on web page implementation. 2. I have been using both DreamWeaver and FrontPage to build the web pages. 3. The main page has been finished. Prepared by: Minh Thu Nguyen 9 Hoang Video Project Weekly Diary 4. I have collected samples movie images from Hoang Video. Week # 10 Dates Covered: October 31 – November 6 1. I have been working on the web site. 2. I have finished the Phase III report. 3. I have been creating the database. 4. I have collected the images for the web site. Week # 11 Dates Covered: November 7 – November 13 1. I have finished the web site http://gator.uh.dt.edu/~nguym007/hoangviedeo. 2. I have been working on coding and debugging the web site. 3. I have shown the web site to the user for his review. 4. I have started working on my final report. Week # 12 Dates Covered: November 14 – November 20 1. I have been testing the programs. 2. I have been testing the new web-based reservation system. 3. I have finished the Phase III report. 4. I have started working on the final oral presentation. Week # 13 Dates Covered: November 21 – November 27 1. I have been working on the system changeover plans. 2. I have been organizing the routine operation plans 3. I have been working on the user manual. Prepared by: Minh Thu Nguyen 10 Hoang Video Project Weekly Diary 4. I have started working on Phase VI report. Week # 14 Dates Covered: November 28 – December 4 1. I have finished the Phase IV report. 2. I have been training the users to use the new web-based system. 3. I have been working with the user to evaluate the new web-based system. 4. I have asked the users to fill the evaluation form. Week # 15 Dates Covered: December 5 – December 11 1. I have finished the final project report. 2. I have prepared for my final project presentation. Prepared by: Minh Thu Nguyen 11