Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #1 1 General Information 1.1 Notice The Board of Trustees of the Nebraska State Colleges will receive responses to a Request for Proposals (RFP) in the form of sealed bids for an electronic Payment Gateway System (PGS). The Nebraska State College System (NSCS) consists of Chadron State College (CSC), Peru State College (PSC), and Wayne State College (WSC). The APPROXIMATE student headcounts for each of the three State Colleges, based on the Fall Term of the 2014-15 Regular Academic Year, are: CSC – 2,791 PSC – 2,538 WSC – 3,319 1.2 Purpose The NSCS is requesting proposals for a PGS Solution. Successful Respondents will propose an online student payment Solution or Module, along with such alternate (optional) solutions as defined later in this RFP. All Solutions/Modules will be priced individually, based on an annual cost, and include responses to the various questions and specifications presented in this RFP. The NSCS will announce intent to award based on the quality of the proposed Solution responses, and then negotiate a five-year contract with at least two (2) one-year renewals agreed to by both parties. It is anticipated that the master contract will have three supplemental contracts to define the Solutions to be initially implemented at each of the three State Colleges. Subsequent alternate/optional Solutions may be implemented after the initial implementation utilizing supplemental contract addenda with pricing per the master contract. The pricing model for any future contract addenda must be consistent with the response to this RFP. 1.3 Definitions Definitions used in these requirements and any resultant contract documents shall have the respective meaning as herein given. — — — — — — Respondent -- a party submitting a proposal based on these specifications. Contractor -- the party which submits the successful proposal and which subsequently enters into a contract with the College. College – Chadron State College, Peru State College, or Wayne State College. Federal -- all agencies, departments or other subdivisions of the Government of the United States of America. State -- the State of Nebraska, including all agencies, departments or other subdivisions thereof. Accounting Period -- the reporting and payment dates for both Contractor and College as defined by the contract document. Nebraska State College System — — — — — Payment Gateway RFP, 8-26-2015 Page #2 Regular Academic Year -- that period of time beginning with the opening of the fall semester and ending with the close of the spring semester as established by the College's approved academic calendar. Vendor—to have the same meaning as “Contractor” above. Purpose – the need expressed in section 1.2 of this document. Solution – the combination of product and services proposed by the Contractor; may be considered a “Module” by some Respondents. Campus Constituency – those parties affiliated with the College which has some vested interest in the Solution. 1.4 Basis of Proposals Proposals are to be based upon specifications contained in this Request for Proposals, including all sections. No telephone or fax proposals will be considered. No Respondent may withdraw a proposal for a period of sixty (60) days after the date of proposal opening. It is the responsibility of the prospective Respondent submitting a proposal to become fully acquainted with this RFP and the conditions for providing the Solutions to the NSCS. These conditions include, but are not limited to, legal and tax requirements, compatibility requirements of the PeopleSoft Student Information System that the NSCS current shares with the University of Nebraska, and the costs involved in providing software, training, and services to three geographically diverse Colleges in the State of Nebraska. 1.5 Contractor Selection The Respondents will be screened and a Contractor selected on the basis of any and all information that the College deems pertinent to the Purpose of the RFP. The College reserves the right to reject any or all proposals, to accept other than the low bid, to negotiate with one or more Respondents on the basis of their initial proposal, and to waive informalities or technicalities in the bidding and evaluation process. 1.6 Notice of Intent to Award All Respondents submitting proposals will be promptly notified as to the successful Respondent after the NSCS has approved the intent to award contract, contingent upon successful negotiation of the contract. 1.7 Contract and Contract Documents The College and the successful Respondent shall enter into a written contract, the terms of which shall reference conditions and specifications put forth in this Request for Proposal, including the terms mentioned above in Section 1.2. Note that responses to this RFP will include the submission of a draft contract, per Section 7. 2 CRITICAL DATES The following summary outlines the critical dates in the process of selecting a Contractor. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #3 August 26, 2015 - Request for Proposal Issued Specifications, including these critical dates, Respondent’s qualification requirements, and other information, are published and made available to prospective Respondents. This is also the date of the first of three notices/advertisements in two newspapers. September 10, 2015 – Deadline for written questions All questions are due via e-mail to the RFP Communications Liaison by 4:00PM Central Standard Time (CST). The subject line for written questions must be “NSCS PGS RFP Written Questions”. September 22, 2015 - Proposals Due Proposals submitted in response to this Request for Proposal must be received by 2:00 p.m. in the Office of the Vice Chancellor for Facilities and Information Technology (also the RFP Communications Liaison), at which time and place the names of prospective contractors submitting proposals will be read. October 14, 2015 – Announce intent to award contract. November 2, 2015 – Contracting Process Concludes with Final Contract; Begin Initial Implementation. March 31, 2016 – Completion of Initial Implementation at all three State Colleges. 3 INSTRUCTIONS TO BIDDERS 3.1 Proposal Submission Responses will be placed in sealed envelopes marked as noted in section 3.1.1, received at the location specified in 3.1.2 until the time specified in 3.1.3, at which time and place the bids will be publicly opened. A complete proposal shall consist of the items listed in section 3.1.5. All deadline times in this document should be interpreted as Central Standard Time (CST). 3.1.1 RFP Identification Nebraska State College System Payment Gateway System (PGS) Proposal 3.1.2 RFP Opening Location Office of the Vice Chancellor for Facilities and Information Technology Nebraska State College System 1327 H Street, Suite 200 Lincoln, NE 68508 2:00 PM, September 22, 2015 3.1.3 RFP Due Date Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #4 3.1.4 RFP Responsible parties 3.1.4.1 RFP and Contract Responsible Party Steven P. Hotovy Vice Chancellor for Facilities and Information Technology Nebraska State College System 1327 H Street, Suite 200 Lincoln, NE 68508 shotovy@nscs.edu p) 402-471-2505 3.1.4.2 RFP Communications Liaison Same as 3.1.4.1 above. 3.1.5 RFP Response Contents Original Proposal, in sealed envelope mailed or delivered to the above address. One electronic copy, provided to shotovy@nscs.edu. 3.2 Proposal Organization Respondents must provide written responses or acknowledgements to the following questions and statements intended to establish their qualification to provide Solutions in accordance with the specifications included in this RFP. Responses should be numbered to coincide with the numbering of the questions below and should be presented in the sequence indicated. This information must be provided as part of the response even if the same or similar information has been provided to the NSCS as part of previous bids or proposals. Responses should be straightforward and concise while still covering the topics adequately. Omissions, inaccuracies or misstatements may be considered cause for disqualification of the Respondent. 3.3 RFP Communication All communications and/or questions in regard to this request should be in writing, and Respondents are encouraged to e-mail written questions to the RFP Communications Liaison listed in Section 3.1.4.2. Please note the deadline for written questions in Section 2 above. 3.4 RFP Errors If any significant ambiguity, error, conflict, discrepancy, omission, or other deficiency is discovered in this RFP, Respondents have five (5) business days prior to the RFP due date to notify, in writing, the RFP Communications Liaison of such error and request modification or clarification of the RFP document. All written questions will be responded to in writing and provided via post to the RFP website to all Respondents. In the event that it becomes necessary to provide additional clarifying data or information, or to revise any part of this RFP, supplements or revisions will be provided to all recipients of this initial RFP. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #5 4 NEBRASKA STATE COLLEGE SYSTEM PROFILE 4.1 NSCS Mission The Nebraska State College System (NSCS) consists of three Colleges – Chadron State College, Peru State College, and Wayne State College – all of which are open enrollment regional public institutions geographically positioned to serve the needs of all Nebraskans. The NSCS focuses on accessibility and affordability while striving to develop students of all academic abilities through quality teaching and support, and to assist with the development of the three Colleges’ service regions through the delivery of public service programs and activities. The three Colleges are primarily undergraduate institutions offering a comprehensive curriculum with equal emphasis on the arts and sciences, business and teacher education. Graduate programs are offered at the Master's level in education and business administration and at the specialist level in education. The Colleges have built upon its rich tradition of teachers colleges by emphasizing strong teaching and helpful out-of-class support in a personalized setting. Comprehensive co-curricular programs of student activities offered in manageable residential settings provides students with opportunities to enhance personal characteristics and leadership abilities. In addition, the Colleges have become regional service centers enhancing the quality of life and fostering development in their largely rural service regions. The three Colleges have a combined unduplicated student headcount of approximately 8,650 (see 1.1). Over the last fifteen years, enrollment has steadily increased during a period that has seen many facility improvements, as well as new facilities, along with the revitalization of significant programs. 4.2 College/Contractor Relations The NSCS believes a quality contractual arrangement is most likely to be achieved when there is good communication between the NSCS and the Contractor. To assure effective communication, each College will identify a liaison officer to serve as the primary representative to the Contractor and will identify those other College officials with specific responsibilities to the program. 5 EXISTING ENVIRONMENT The three State Colleges are part of a shared PeopleSoft student information system called the Nebraska Student Information System (NeSIS) owned and operated by the University of Nebraska. The University of Nebraska and the NSCS are separate constitutional entities with their own individual Boards. The NSCS pays annual amounts to the University of Nebraska for our three-College share of the costs of operating the system. A similar arrangement is in place for shared human resource (HR) and payroll systems operated by the University. The HR and payroll systems are SAP systems which are separate from NeSIS. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #6 All three Colleges make up one instance of PeopleSoft in the existing NeSIS environment. However, each College has its’ own business unit within the instance. The current version of PeopleSoft operating in the NeSIS environment is PeopleSoft Campus Solutions 9.0, utilizing PeopleTools 8.54, and single sign-on architecture. Although the University and the NSCS are separate constitutional entities, IT systems governance committees have been established for both NeSIS and SAP systems that include key personnel of both entities. Seven campuses in total (four at the University of Nebraska plus the three State Colleges) are represented on various IT governance committees. Each of the three State Colleges has their own IT department to manage IT systems on campus. 6 GENERAL CONDITIONS OF THE CONTRACT All Respondents must indicate their ability to comply with the following terms which are intended to be set forth in a contract entered into with the Contractor: 6.1 Prompt Payment Act In the event any amount due under any contract resulting from this RFP remains unpaid for forty-five (45) days after the due date, the unpaid amount shall bear interest from the 31st day after the due date at the rate specified in the Prompt Payment Act, Neb. Rev. Stat. §§81-2401 to 81-2408. 6.2 Independent Contractor The Contractor shall be an independent contractor and not a College employee for all purposes, including, but not limited to, the application of the Fair Labor Standards Act, minimum wage and overtime payments, the Federal Insurance Contribution Act, the Social Security Act, the Federal Unemployment Tax Act, the provisions of the Internal Revenue Code, any Nebraska revenue and taxation law, Nebraska workers' compensation law and Nebraska unemployment insurance law. The Contractor agrees that it is a separate and independent enterprise from the NSCS, that it has a full opportunity to find other business, that it has made its own investment in its business, and that it shall utilize a high level of skill necessary to perform the work. This contract shall not be construed as creating any partnership, joint venture, or joint employment relationship between the Contractor and the NSCS, and the NSCS shall not be liable for any obligation incurred by the Contractor, including but not limited to unpaid minimum wages or overtime premiums. If the Contractor has employees or subcontractors, the Contractor further agrees to maintain at least the prescribed minimum workers' compensation insurance coverage for all of the Contractor's employees for the duration of this contract. The Contractor agrees to furnish the College proof of workers' compensation insurance coverage upon request. 6.3 Liability Insurance Requirements The Contractor is required to carry liability insurance in the amount of one (1) million dollars per occurrence. The Contractor's insurance policy shall be primary and non- Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #7 contributory. The NSCS shall be named as an additional insured party on the policy and the certificate of insurance shall reflect that the policy waives its right of subrogation against the NSCS. A copy of the certificate shall be provided to the NSCS. Copies of certification of insurance shall be provided by the Contractor at the beginning of contract negotiations. If work performed under this contract will span multiple years, the Contractor must provide annual evidence of recertification. 6.4 Access to records The Contractor agrees to maintain complete records regarding the expenditures of funds provided by the Colleges under this contract. The Contractor agrees to allow authorized representatives of the Colleges, the Board, the funding Federal Agency, if any, and the United States Comptroller General, if appropriate, free access at reasonable times to all records generated or maintained as a result of this contract for a period of three (3) years after the termination of this contract. 6.5 New Employee Work Eligibility Status The Contractor will be required to abide by one of the two following options. All Respondents must affirm that they will be able to do so. □ □ The Contractor is required and hereby agrees to use a federal immigration verification system to determine the work eligibility status of new employees physically performing services within the State of Nebraska. A federal immigration verification system means the electronic verification of the work authorization program authorized by the Illegal Immigration Reform and Immigrant Responsibility Act of 1996, 8 U.S.C. 1324a, known as the E-Verify Program, or an equivalent federal program designated by the United States Department of Homeland Security or other federal agency authorized to verify the work eligibility status of a newly hired employee. The Contractor is an individual or sole proprietorship. The Contractor must complete the "United States Citizenship Attestation Form," available on the Department of Administrative Services website at www.das.state.ne.us. If the Contractor indicates on such attestation form that he or she is a qualified alien, the Contractor agrees to provide US Citizenship and Immigration Services (USCIS) documentation required to verify the Contractor's lawful presence in the United States using the Systematic Alien Verification for Entitlements (SAVE) Program. The attestation form and USCIS documents (if applicable) must be attached to the contract. The Contractor understands and agrees that lawful presence in the United States is required and the Contractor may be disqualified or the contract terminated if such lawful presence cannot be verified as required by Neb. Rev. Stat. §4-108. 6.6 Non-Discrimination The Contractor agrees to comply fully with Title VI of the Civil Rights Act of 1964, as amended, and the Nebraska Fair Employment Practice Act, Neb. Rev. Stat. §§48-1101 to 48-1125, as amended, in that Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #8 there shall be no discrimination against any employee who is employed in the performance of this contract, or against any applicant for such employment, because of age, color, national origin, race, religion, disability or sex. This provision shall include, but not be limited to employment, promotion, demotion, transfer, recruitment, layoff, termination, rates of pay or other forms of compensation, and selection for training including apprenticeship. The Contractor further agrees to insert a similar provision in all subcontracts for services allowed under this contract. 6.7 ADA & Drug-Free Workplace Requirements All provisions of this contract are subject to the Americans with Disabilities Act (ADA). Further, the Contractor certifies that the Contractor operates a drug-free workplace and, during the term of this contract, will be in compliance with the provisions of the Drug-Free Workplace Act of 1988. 6.8 Debarment/Suspension Certification If this contract involves the expenditure of federal funds in the amount of $25,000 or more, the Contractor certifies that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. 6.9 Use of Information; Property Ownership The Contractor agrees that any and all information gathered in the performance of this contract, either independently or through the NSCS, shall be held in the strictest confidence and shall be released to no one other than to the NSCS, without prior written authorization of the NSCS. The Contractor agrees that no authority or information gained through the existence of this contract will be used to obtain financial gain for the Contractor, for any member of the Contractor's immediate family, or for any business with which the Contractor is associated except to the extent provided by this contract. 6.10 Parties; Subcontractors; Assignment References to the Contractor and the NSCS include the parties' officers, employees, agents, and independent contractors and subcontractors. The Contractor agrees that no subcontractors shall be utilized in the performance of this contract without the prior written authorization of the College. The Contractor agrees not to assign or transfer any interest, rights, or duties in this contract to any person, firm, or corporation without prior written consent of the College. 6.11 Cancellation The contract may be canceled by either party upon ninety (90) days' written notice unless a longer period is negotiated and stated in the contract. Settlement of the amount due to the Contractor upon cancellation shall be negotiated between the parties based upon (a) specified deliverables completed by the Contractor and accepted and usable by the College as of the date of termination when the Contractor initiates termination, or (b) the percentage of services performed by the Contractor as of the date of termination when the College initiates termination. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #9 6.12 Default; Remedies If the Contractor defaults in its obligations under this contract, the NSCS may, at its discretion, exercise any remedy available by law or in equity. In addition to any other available remedy, the NSCS may terminate this contract immediately by written notice to the Contractor. The NSCS shall pay the Contractor only for such performance as has been properly completed and is of use to the NSCS. The NSCS may, at its discretion, contract for provision of the services required to complete this contract and hold the Contractor liable for all expenses incurred in such additional contract over and above the consideration set forth in the contract. 6.13 Unavailability of Funding Due to possible future reductions in state and/or federal appropriations, the NSCS cannot guarantee the continued availability of funding for this contract beyond the current fiscal year. In the event funds to finance this contract become unavailable either in full or in part due to reductions in appropriations for a future fiscal year, the NSCS may terminate the contract or reduce the consideration by notice in writing to the Contractor. The notice shall be delivered by certified mail, return receipt requested, or in person with proof of delivery. The NSCS shall be the final authority as to the availability of funds. The effective date of contract termination or reduction in consideration shall be the actual effective date of the elimination or reduction of appropriations. In the event of a reduction in consideration, the Contractor may cancel this contract as of the effective date of the proposed reduction by written notice to the NSCS. 6.14 Complete Agreement; Governing Law; Amendment This contract sets forth the entire agreement of the parties and supersedes all prior negotiations, discussions, and proposals. There are no promises, understandings, or agreements of any kind pertaining to this contract other than those stated herein. This contract will be construed, interpreted, governed and enforced under the laws of the State of Nebraska. This contract may be amended at any time in writing upon the agreement and signature of both parties. 6.15 Technology Access All contracts, that include provisions of technology products, systems, and services, including data, voice, and video technologies, as well as information dissemination methods, shall comply with the Nebraska Technology Access Standards adopted pursuant to Neb. Rev. Stat. §73-205. These Standards are available for viewing on the Web at http://nitc.ne.gov/standards/2-201.html, and are incorporated into this contract as if fully set forth therein. 6.16 Designated NSCS Representative The designated NSCS representative for purposes of monitoring and oversight of this contract is identified in Section 3.1.4.1 7 DRAFT CONTRACT SUBMISSION The NSCS recognizes that the Contractor will have certain desired contract terms and provisions. Knowledge of these Contractor standard contract terms will help the NSCS gauge the complexity and Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #10 length of the contract drafting and negotiation process. This draft contact submission is part of the criteria for evaluation of the proposals. As part of the proposal, please submit a draft contract complete with all desired terms and provisions, as well as pricing for all of the Solutions detailed in this RFP, per Section 18. 8 SPECIFIC CONDITIONS 8.1 Term of Contract The term of the contract will be for a period of five years, with a minimum of two (2) one-year optional renewals. 8.2 Firm Prices Prices for the hardware, software, and services provided must remain firm for two years from the date of the signed contract. Prices established may be lowered due to general market conditions. Price increases after the initial two-year period will be limited to 3% per year. Price increase requests proposed above the 3% limit must be received by the Contract Responsible Party in writing 60 calendar days prior to the effective date of proposed increase for acceptance or rejection. Such proposed price increases are limited to fully documented cost increases submitted with the request. If the NSCS deems cost increases are not acceptable, it reserves the right to rebid the contract in whole or part. Acceptance of the price increases shall be in the form of an amendment to the contract fully executed by both parties. 9 PAYMENT GATEWAY FUNCTIONAL GOALS The NSCS has determined the need to implement a system that will be flexible, affordable, easy to use, and free of significant reconciliation (or other) issues that require significant time or effort to rectify. The Solution(s) must: Be a turnkey installation with configuration and support originating from one source; Be easy and fast to install without placing a demand on NSCS or College resources; Integrate in real time with PeopleSoft Campus Solutions, including mobile solutions; Be validated for both PCI DSS and PA-DSS compliance; Be scalable to incorporate future system expansion; Be flexible enough to communicate with our bank’s recommended credit card processor and to change processors in the future; Provide a central payment gateway capable of processing payments by campus, including transactions made by electronic checks, credit cards, and debit cards; Offer separate branding for each of the three Colleges; Have a proven track record with institutions of Higher Education; The NSCS considers the following to be the most important requirements of this project: Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #11 Ease of installation/implementation, with expandability to add Solutions/Modules in the future as needs require, and as funding allows; Separate onsite installation/implementation at each of the three Colleges; Excellent onsite training during the initial implementation, and training available for future needs (new employees, added Solutions, and system upgrades/updates). Excellent customer service that partners with the NSCS to provide the best possible electronic payment experience for our students. FUNCTIONAL REQUIREMENTS, SECTIONS 10 – 15: 10 ORACLE/PEOPLESOFT COMPATIBILITY Explain your Solutions compatibility with Oracle/PeopleSoft systems, and the degree to which your company is an Oracle/PeopleSoft Partner. 11 ONLINE INTEGRATED STUDENT PAYMENTS 11.1 User Authentication Requirements a. b. c. d. 11.2 Describe how students are authenticated by your system. Does your system support single sign-on? If so, does your system support LDAP? Does your system support SAML 2.0? Does your system support two-factor authentication? Authorized Users Requirements a. Describe how students are able to give third-party users (parents, guardians, etc.) access to their account. Is your authorized user functionality compliant with FERPA? Can students limit access rights for each authorized user? If so, explain. b. Are authorized users given separate passwords or must they use their student’s ID and password to access billing and account information? c. Can authorized users maintain separate payment methods (credit cards, checking accounts, etc.) from their students? d. Can authorized users make payments for more than one student at the same time? e. Are students notified if an authorized user makes a payment on their account? 11.3 Electronic Notification Requirements a. Does your system load email addresses from PeopleSoft? If so, do you also allow for additional email addresses to be managed by the student? b. Do you offer text messaging capabilities? Please describe. c. What types of automated notifications are provided by your system? d. Can the Colleges edit automatic notifications to reflect our business policies? e. Can students receive automatic notifications on mobile devices? Nebraska State College System f. 11.4 Payment Gateway RFP, 8-26-2015 Page #12 In addition to automatic messaging, does your system offer the ability to send onetime electronic messages in email and/or text message format? Real-Time Requirements a. The electronic payment system must update the student’s account in real time. Describe your system’s ability to post payment transactions in real time. b. Describe your system’s ability to present students and authorized users with the current account balance. Does the balance include estimated financial aid? (Note: the reference to financial aid is only for obtaining the account balance. It is not intended to have all financial aid information flow into the payment system.) c. Describe your system’s ability to pull current account balances (but not necessarily all detailed account activity) for activity posted on the student account since the billing date, in real time. 11.5 Payment Requirements a. Students and authorized users must be able to store payment profiles. These profiles must also be accessible to payment plans. Confirm your system has this capability. b. Does your system provide users with a payment receipt? Is the receipt available via email? c. Does your system allow for line item payments? d. Can students or authorized users purchase additional items, such as yearbooks, or make donations while making online payments on their accounts? e. Does the system allow students to make payments for multiple terms, or only for a single term? f. Can students use mobile devices to make payments? View scheduled payments? Access account balances and activity? g. Describe the access administrators have to student account information. h. Is the front end of your student pay system mobile ready, and can each College brand their front ends? i. Please explain your browser support. 11.6 Convenience Fees a. Does your system apply convenience fees? If so, please describe. b. Please describe the process flow for the payer. 12 INSTALLMENT PAYMENT PLANS 12.1 Payment Plan Options a. The NSCS desires to receive prices for two payment plan options. The first option would be to implement a solution very similar to the current payment plan functionality the Colleges have. In this option, the vendor would provide software that allows the Colleges to set up and manage their own tuition payment plans. The price for this entry level option should entered in the appropriate place in Section 18. b. The second payment plan option would be for a full service option where students choose from several payment plans, and then the vendor manages the plans from that Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #13 point, including balancing, reconciling, and delinquencies. The price for this full service option should entered in the appropriate place in Section 18. 12.2 Student Self-Service Requirements a. Describe the student enrollment process in a tuition payment plan. b. Does your system give students the option to set up scheduled payments in order to automatically pay plan installments? c. Can students use mobile devices to make payments and/or view payment plan installments? 12.3 Plan Administration Requirements a. Describe the process for administrators to create and manage tuition payment plans. Include available options for setting up installments, due dates, and payment plan fees (including late fees). b. Will the system allow each of the three State Colleges to set up different types of plans to meet the needs of different students? Please describe. c. How does your payment plan system account for charges and credits eligible for a payment plan? d. The system must allow for financial aid to be included in the payment plan. Describe how financial aid is used in the plan calculation. e. Recalculation functionality already exists in our PeopleSoft environment, so we do not anticipate the need for recalculation in the payment system. Please comment as necessary. f. Does your system allow for extended payment plans that cover the entire school year? g. Can students be automatically migrated from one plan to another? For example, if a student is enrolled in an Estimated Amounts plan, can they be automatically switched to a real-time plan? h. Please describe the flow of payment plan funds. Will the vendor transmit payment plan funds to the institution via remittance files or will payments be made directly to the institution and posted directly to the institution’s accounts? 12.4 Administrative Access to Student Payment Plan Requirements a. Administrators must have the ability to enroll students in a payment plan. b. Do administrators have access to signed payment plan enrollment agreements? c. Does your system utilize User Emulation for administrative staff to provide better assistance to students? 12.5 Reporting Requirements a. Describe and include examples of payment plan reports available to plan administrators. Include descriptions and examples of enrollment reports, revenue reports, delinquency and/or payment plan aging reports, etc. b. Describe the reports available to plan administrators that can be used for reconciliation purposes. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #14 13 HOSTED WEB-BASED CASHIERING 13.1 Cashiering Options a. The NSCS desires pricing for two different licensing models. See Section 18 for entering the price for each individual user license at each College. In this model, the price entered is the cost per license. Please show if discounts apply when a certain amount of licenses are purchased. In the “Total for all three Colleges” box, offer a pricing package for “x” amount of licenses that can be distributed as needed to the three Colleges. b. Section 18 also provides boxes for pricing of unlimited users/licenses at each College (as well as a total for all three Colleges as a system). Note that the final Cashiering licensing options chosen could be a combination of individual licenses and unlimited, depending on the needs of each College, and the pricing provided. 13.2 System Integration Requirements a. Do you provide real-time integration with PeopleSoft Campus Solutions? b. Has your integration been validated by Oracle on a current release of PeopleSoft Campus Solutions? Please provide your Oracle Datasheet. c. Please describe how student account payments collected through your solution are posted to our PeopleSoft student system. d. Note that the Colleges’ current (and future) credit card processing is as follows: Our Vendor accepts the credit card information on their site and the debit/credit card processor is TSYS Merchant Solutions, which is the State of Nebraska current contractor. TSYS the transfers the funds to the State of Nebraska Treasurer account at US Bank. However, the state has entered into a new contract with US Bank to be the state’s debit/credit card processor. US Bank owns Elavon which will replace TSYS as the card processor, effective October, 15, 2015. Please state your ability/willingness to work successfully under this scenario. 13.3 Available Payment Methods a. Credit Card Processing Requirements i. Does your solution support credit card transaction processing? ii. Describe your credit card authorization and settlement process. Are credit cards authorized in real time? How long before funds are deposited into our bank account? iii. The credit card processing software must be processor independent and work with our existing (and future) credit card processor. Please provide a current list of credit card processors with whom your solution is certified to work. b. Electronic Check Processing Requirements i. Does your solution support ACH transaction processing? ii. Is your organization a member of NACHA? iii. Does your organization employ Accredited ACH Professionals (AAP)? Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #15 iv. Describe your electronic check authorization and settlement process. Are routing numbers validated in real time? How long before funds are deposited into our bank account? v. Solution must provide a system that does not require changes to our current banking relationship. c. PIN/PINless Debit Processing Requirements i. Does your solution support debit card transactions? If so, what type (PIN, PINless, etc.)? d. Other Payment Methods i. Do you offer campus card processing? If so, what type of campus cards do you support? 14 E-COMMERCE 14.1 Centralized Online Stores a. The system must provide a centralized storefront application with consolidated payments into a secure and PCI/PA-DSS certified enterprise payment gateway. b. The system must be designed to allow multiple merchants (i.e. Departments) to operate and run stores and accept payments. (Examples: Alumni, Athletics, Parking, Continuing Education, etc.) c. The e-Store capability must include a home page, product pages, a shopping cart, a checkout page, and order status information. d. Can your system accommodate different tender types and shipping methods on a merchant-by-merchant and/or product-by-product basis? e. Does your system have the ability to display stores and/or merchandise items by category? f. Can store managers limit access to online stores to selected users? g. Can non-technical users set up storefronts without extensive vendor support? h. Does your solution allow customers to register and establish profiles with stored payment methods, addresses, and order history? i. The online storefronts should allow for external data to be collected with each product purchased (such as size, color, etc.). j. Describe the process of shopping, including adding the desired products to the shopping cart. Can the shopper pay for all purchases in a single checkout even if they purchase from multiple online storefronts? k. Does your system provide confirmation or notification when a payment has been made? How is this confirmation sent? Via email? Text message? 14.2 Online Donations (Not Part of NeSIS/PeopleSoft System) a. Does your solution accept donations? b. Can the system be configured to accept donations as recurring payments, with specified beginning and ending dates? Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #16 c. Does the system allow the Colleges to change default verbiage to language more appropriate to donations (e.g. “Additional Gifts” instead of “Continue Shopping”)? d. Can your system be configured to request donations from shoppers during checkout? 14.3 Online Event Registration (Not Part of NeSIS/PeopleSoft System) a. Does your system manage event registration? b. Can the system accept multiple registrations? c. Can the system accept additional information about the registrant (name, address, etc.?) d. Can the system generate a list of event attendees? 14.4 Integration Requirements a. The system must be capable of providing payment functionality to existing campus applications. Current third-party applications at the Colleges include CBORD, Heartland Payment Systems, Blackboard, Sakai, and ISDeducation. Describe your solution’s ability to meet requirements for these applications. b. Can ancillary data be appended and “tag along” through the payment process to then be posted to the URL of the College’s choosing? c. Can the system integrate with other third-party applications that provide services for Higher Education? If so, with which systems do you offer integration? 14.5 Mobile Capabilities a. Can campus customers access online stores from their mobile devices? If so, can mobile shoppers purchase from more than one online store with a single checkout? b. Can shoppers access their stored payment profiles from their mobile devices? c. Can campus donors make donations, and register for events, from their mobile devices? 14.6 POS Capabilities a. Does your system allow our staff to use POS devices to take in-person payments, and can we control which administrative users have access to the POS Solution? b. How does your POS solution integrate with online storefronts? c. Which devices, and which payment methods, are supported? 15 SECURITY 15.1 PCI Compliance a. The system must be hosted in a PCI DSS certified data center, and all payment applications provided in vendor’s solution must be certified PA-DSS compliant. b. The hosting facility must strictly control physical and electronic access. 15.2 Hosting Services a. The system must have both a Production and a Test environment. b. Operations must be monitored 24 x 7. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #17 c. Contractor must guarantee 99% up time. d. The system must provide hardware configurations and redundancy to protect against equipment failures. 16 INSTALLATION, TRAINING AND CUSTOMER SERVICE 16.1 Implementation a. Describe the project management to be provided by the vendor and quantify how staff and time are to be allocated to the project). b. What technical support is provided both during development and post implementation? c. Identify the resources you will need from the Institution. d. What type of education and marketing support will you provide to our administration and students regarding your programs? 16.2 Training a. Describe your pre-implementation, implementation and ongoing training program. Describe training methods (in-person, web-based, user-group conferences, etc.). b. A test system for testing system upgrades, training and troubleshooting purposes, connected to the Institution test system and test portal systems must be available. Describe your provisions. c. The State Colleges very much desire individual onsite implementations for each campus. Please describe how your company can accomplish this, and estimate the amount of time required for the initial implementation at each College. 16.3 Customer Service a. Describe the type of support you provide your customers. Include hours of operation of your Help Desk, website support and email support. b. What are the escalation procedures when a problem occurs in the system? How are these problems communicated to the vendor? c. The Contractor or his authorized representatives shall meet periodically with the Institution, when requested, to discuss any upgrades, improvements or deficiencies in the system operation; please indicate your acceptance of this requirement. d. How will you support upgrades to the system? 17 RESPONDENT QUALIFICATION REQUIREMENTS Only proposals from qualified organizations or individuals currently engaged in comparable Solutions to those requested in this RFP and which have demonstrated the ability to perform as specified with excellent service shall be considered further in the evaluation process. The College alone shall determine whether a Respondent meets the minimum qualifications for consideration. The College reserves the right to inspect facilities and operations currently under the Respondent's management and to consult other colleges or entities which are currently being or have in the past been served by the Respondent. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #18 a. Provide a brief history of your company demonstrating your experience in providing software solutions to Higher Education. Also explain any mergers, buyouts, or acquisitions of your company – or your company acquiring another company – within the last two (2) years, and describe how your business model has changed as a result. b. Indicate how long the Vendor has been performing the services required by this RFP. How many campuses do you currently support for the proposed services? c. Identify at least five (5) institutions of higher education for which you have performed similar services. Describe the service performed, results obtained and current status of the project. Provide the name, title, telephone number, email address of your key contact(s) at the organization and solutions implemented. d. The Institution prefers not to deal with multiple vendors during either the deployment or operation of the system. We understand some companies rely on business partners to implement their systems. If applicable, please submit your partner(s) complete contact information as well as a description of their services. 18 PRICING Pricing shall be provided below as annual fees per the first year of the contract. Please refer to Sections 8.2, 12.1, and 13.1, and then state the prices below: Section, Solution Chadron State College 11, Online Integrated Student $ Payments Peru State College $ Wayne State College $ Total for all Three Colleges $ 12, Installment Payment Plans, Entry Level Option $ $ $ $ 12, Installment Payment Plans, Additional Cost for Full Service Option 13, Hosted Web-Based Cashiering, Price for each Individual License 13, Hosted Web-Based Cashiering, Price for Unlimited Licenses 14, E-Commerce $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #19 19 EVALUATION OF PROPOSALS The NSCS desires creative proposals that incorporate the requirements and approaches outlined in this RFP. Proposals will be evaluated using the following weighted criteria: Criteria Contract General Conditions Draft Contract Submission Specific Conditions Functional Goals are Met Functional Requirements Quality of Responses Implementation, Training, and Customer Service Responses Respondent Qualifications Financial structure and total economic value of the proposal Overall quality of RFP response Corresponding RFP Section 6 7 8 9 10 - Oracle/PeopleSoft Compatibility 11 - Online Integrated Student Payments 12 - Installment Payment Plans 13 - Hosted Web-Based Cashiering 14 - E-Commerce 15 - Security 16 Weight 5 5 5 5 5 5 5 5 5 5 10 17, plus reference checks 18 10 25 All 5 After determining that a proposal satisfies the mandatory requirements in the RFP, a comparative assessment of the proposal in relationship to the published evaluation criteria shall be made. The NSCS reserves the right to consider historic information and fact, whether gained from the proposal, questions and answer conferences, references, or any other source, in the evaluation process. It is the Respondent’s responsibility to submit complete responses to all questions in this RFP in accordance with the format and instructions requested. The Respondent is cautioned that it is the Respondent’s responsibility to submit information related to the evaluation categories, and the College is under no obligation to solicit such information if it is not included in the submitted proposal. Failure to submit such information may cause an adverse impact on the evaluation of the Respondent’s proposal. 19.1 Proposal review and selection process Proposals submitted in response to this RFP shall be reviewed and evaluated by a committee of the Colleges’ Constituency convened for that purpose. The committee shall prepare observations and comments to the individual noted in section 3.1.4, who shall together prepare a recommendation to the Chancellor as to award of contract. Nebraska State College System Payment Gateway RFP, 8-26-2015 Page #20 19.2 Pre-award Presentations and Negotiations The NSCS may require presentations from the highest ranked Respondents, and may be asked to provide additional information about their proposal. Prior to the award, the NSCS may elect to communicate with the highest ranked Respondents submitting a proposal for the purposes of: — — — — Resolving minor differences; Clarifying necessary details and responsibilities; Emphasizing important issues and points; Examining ways to improve any subsequent contract and/or its constituent documents. The NSCS reserves the right to request additional information or clarification on any matter included in a proposal. The NSCS reserves the right to negotiate with any Respondent to arrive at a final decision. 19.3 Award The NSCS reserves the right to: Accept or reject any or all proposals, or any part thereof, or to withhold the award and to waive, or decline to waive, irregularities in any proposal when determined that it is in its best interest of the NSCS to do so Cancel and/or reissue this RFP at any time Retain all proposals submitted in response to this RFP Invite some, all, or none of the Respondent(s) for interviews, demonstrations, presentations and further discussion Award one, some, or none of the Respondents who submit proposals 19.4 Notification of Award An award is made on execution of a written contract by both parties. Only the NSCS is authorized to issue news releases relating to this Request for Proposals, its evaluation, award and/or performance of the contract. END.