Name ______________________ Assigned Student # __________ POM 3321 Extra Credit Exercise Points: 6 points Due Date: Tuesday, April 26, 2005 Material Master Data Exercise Learning Objective: The purpose of this exercise is to understand the material master data requirements (in a manufacturing setting) within an SAP R/3 system. This exercise covers creation, display, changes, and copying of material master data. After you are done, submit the last page with answers for grading. You will create your own 1. 2. 1. Material master Bill of materials Create a Material Master Path: Logistics Æ Production Æ Master Data Æ Material Master Æ Material Æ Create(special) Æ Finished product Create Finished Product: Initial Screen: Enter • Material number POM3321-XXX (XXX is student # assigned to you) • Industry sector Mechanical engineering • Copy from Material 1300-1500 • Click the green check mark (or Select view(s) button) Select views pop-up screen: • Select Basic data 1&2, MRP1, MRP2, Work Scheduling, Accounting 1 &2, and Costing 1&2 views • Check Create views selected • Click the green check mark Organizational levels pop-up screen: • In the Organizational level Section go to Plant field and enter 3000 copy from 3000 Storage Location enter 0001 copy from 0001 • Click the green check mark Create Finished Product: Basic data 1 screen: • Material description MSI 1000 cc Motorcycle W/2 mirrors • Gross weight 200 (KG) • Net weight 180 • Click the green check mark (or the Next screen icon) Create Finished Product: Basic data 2 screen: There are no changes required on this screen. Click the green check mark. Create Finished Product: MRP 1 screen: • MRP type M1 • Planning time fence 10 • MRP controller 001 • Lot size key MB 1 Click the green check mark. Create Finished Product: MRP 2 screen: • Procurement type X • In-house production 5 • SchedMargin key 000 Click the green check mark Create Finished Product: Work scheduling screen: There are no changes required on this screen. Click the green check mark. Create Finished Product: Accounting 1 screen: • Go to the standard price field and enter 1500 • Moving price 1500 • Click the green check mark. Create Finished Product: Accounting 2 screen: There are no changes required on this screen. Click the green check mark. Create Finished Product: Costing 1 screen: There are no changes required on this screen. Click the green check mark. Create Finished Product: Costing 2 screen: There are no changes required on this screen. Click the green check mark. Last data screen has been reached, so save your data. Click on Yes. 1. Write down the message on the status bar. ________________________________________ 2. Display the Material Master Display the material master you have just created to see which views you have created. Path: Logistics Æ Production Æ Master Data Æ Material Master Æ Material Æ Display Æ Display Current 2. Write down all the views which were created for the material master record. _____________________________________________________________________________ _____________________________________________________________________________ 2 3. Create a Bill of Materials BOM for POM3321-XXX will be created by copying from existing BOM of 1300-1500 and then making appropriate changes. First view the existing BOM for 1300-1500 by Path: Logistics Æ Production Æ Master data Æ Bills of material Æ Reporting Æ BOM Explosion Æ Material BOM Æ Multilevel BOM Explode BOM: multi-level BOM: Initial Screen • Enter Material 1300-1500 • Plant 3000 • BOM application PP01 • Required qty. 1 • Click on Execute (clock with green check mark) Notice the existing BOM and the materials shown at levels 1, 2 and 3. 2.1 Create BOM for POM3321-XXX by Path: Logistics Æ Production Æ Master data Æ Bills of material Æ Bill of material Æ Material BOM Æ Create Create material BOM: Initial Screen • Material number POM3321-XXX • Plant 3000 • BOM usage 1 Click on Copy from icon on the application toolbar Copy From… • Enter copy from material number 1300-1500 • Plant 3000 • BOM usage 1 Click on check mark. Click on Select all icon on the application toolbar Click on Copy on the application tool bar Now save BOM by clicking on Save 3. 2.3 Write down the message on the status bar. ___________________________________ Make the required changes on the BOM by Path: Logistics Æ Production Æ Master data Æ Bills of material Æ Bill of Material Æ Material BOM Æ Change Change material BOM: Initial Screen • Material number POM3321-XXX • Plant 3000 • BOM usage 1 Click on check mark (enter icon) 3 Change material BOM: General Item Overview screen Overtype 2300-100 in place of 2300-101 Scroll down to item 3300-500 and overtype quantity 2 in place of 1 Click on check mark (enter icon) 4. Write down the components (first level) needed to assemble MSI 1000cc Motorcycle w/2 mirrors. Item ICT Component Component Description Quantity Un Now click on Save to save the changed BOM 5. According to the SAP R/3 Glossary (see Help), what is a bill of material? _______________________________________________________ 4 Name ______________________ Assigned Student # __________ POM 3321 Extra Credit Exercise Points: 6 points Due Date: Tuesday, April 26, 2005 Material Master Data Exercise 1. Write down the message on the status bar. ________________________________________ 2. Write down the views which were created for the material master record. __________ ____________________________________________________________________________ 3. Write down the message on the status bar. ________________________________________ 4. Write down the components (first level) needed to assemble MSI 1000cc Motorcycle w/2 mirrors. Item 5. ICT Component Component Description Quantity Un According to the SAP R/3 Glossary (see Help), what is a bill of material? __________________________________________________________________________ 5