TNF Construction Method Tender Net Foundation The Special Raft Foundation System for Soft Ground Patent Number : 3608568 Low Cost Foundation by Using System of Raft Foundation with Shallow Soil Improvement TNF Foundation The structure of the foundation and the structure of the raft foundation with shallow soil improvement of the building consisting of the improved ground mass and the raft foundation. Foundation Excavation Second Improvement Unimproved Ground First Improvement Confined Soil Not require things like the underground beams for TNF. The foundation and concrete slab materials are directly placed on the lattice-typed improved ground layer. As the improved ground layer, the foundation and the slab are constructed in one body, it can transfer the load of a structure to the ground effectively. In case of building on soft grand, so far the bearing pile foundation system has been mainly adopted in which the piles are penetrated down to the firm bearing stratum through the week layer. However, TNF can realize the low-cost foundation without piles by using the ground surface layer as the bearing stratum. The Merits of TNF-System Safety Environmental Friendly Low-Cost 1. No damage to the underground environment It is possible to construct without any damage to the underground natural environment such as underground water veins. 2. No influence on buried property It is possible to build on ruins without destroying them. It is also possible to construct on the disposal station of industrial wastes. 3. Reduction of CO2 It is possible to reduce a large amount of CO2 by using fewer building materials and shortening the construction terms, so that the operating time of heavy construction machine can be decreased. 1. Little settlement There is no extra increase in load because the design load at the foundation is almost equal to that of the ground. Alluvial layer Foundation beam Foundation (improved ground) Diluvium layer Bearing Stratum 2. Control of the differential settlement As this foundation is lattice-type, underground stresses become uniformly. The curb type shallow stabilized ground disperses the underground load, and distribution of the settlement become uniformly by the effect of rigidity of the improved ground. 3. No difference in level caused by the arising of piles in case of the structure with the bearing pile foundation system. The TNF raft foundation is constructed in one body with the ground, so there is no arising of piles by the ground settlement. Therefore, there are to equipped pipes under the ground or the slab. 4. Prevention of the liquefaction when earthquakes occur The effect of confining the ground prevents the liquefaction effectively because it controls the liquidity of soil when earthquakes occur. 1. Combine of the foundation slab and the improved ground layer Crushed stone, concrete, reinforcing bars, and molds can be reduced considerably, and low-cost can be realized by the combine of foundation slab and improved ground layer. 2. Improvement of the on-site ground Since only the shallow ground soil is improved, the amount of soil carried out and in are decreased considerably because it is not necessary to dispose of excavated soil. 3. Reduction of the cost for removal In case of the structure with pile foundation on a fixed leased land, the cost of removing and disposing of the piles arises when the land is returned. In TNF system, the cost of destruction becomes low largely because the improved layer can be used effectively as the soil generated under construction, or put aside. 4. Shortening of construction terms Since the foundation and the slab concrete is directly placed on the improved ground layer, construction terms can be reduced considerably. TNF Construction Method Construction Procedures / Example of Construction Project Positioning Up Combing Excavating Shallow layer Compaction Backfilling Second Improvement Second Improvement First Improvement First Improvement First Improvement Second Improvement First Improvement First Improvement First Improvement ⑦ ④ ① Spreading solidified materials Sectioning and penetration Test Sectioning and adjustment Quality Control and Spreading Solidified Material First Improvement First Improvement Foundation Excavation Cutting ground Second Improvement Second Improvement First Improvement Second Improvement First Improvement First Improvement First Improvement ⑧ ⑤ ② Mixing and Stirring First Improvement Leveling Mixing and Stirring Second Improvement Leveling Completion of foundation excavation Second Improvement First Improvement Positioning of Foundation Compaction First Improvement First Improvement Second Improvement Foundation First Improvement First Improvement Foundation First Improvement ⑨ ⑥ ③ Second Improvement ▼Setting Anchor Bolts ▼Casting Foundation Concrete ▼Steel Frame Work Example of Construction Project Business Facilities Kinder Garden Rehabilitation facility for Elderly Distribution Warehouse Takeuchi Construction Inc. Head office 4-2-14 En-ichi-cho Mihara-shi Hiroshima 723-0015 Japan TEL:0848-60-1331 FAX:0848-62-6973 E-mail: mail@takeuchi-const.co.jp Tokyo office 1-12-2 Higashiueno Taito-ku Tokyo 110-0015 Japan TEL:03-5817-8303 FAX:03-5817-8304 E-mail: mail2@takeuchi-const.co.jp URL : http://www.takeuchi-const.co.jp/ ※The contents of this pamphlet please do not replicate. ※TNF is a registered trademark. Housing Complex