QA-RD7D Section 1. ISO: 9001/2008 Rev No.5 July 2009 S.I. Unit Formula Sheet Page 1 of 4 Filled-in Kill Sheet Exercises - Gauge Problem Actions. Gauge Problem Exercises are constructed from a completed kill sheet ‘filled-in’ with all relevant volume and pressure calculations. Each question is based on the strokes, pump rate, drill pipe and casing gauge readings at a specific point in time during a well kill operation. Any one or a combination of these readings could indicate the action required. Options are shown in the multiple-choice answers. The casing and/or drill pipe pressures will only be relevant to the action if – The casing and/or drill pipe pressures given in the question are below the expected pressures, or The casing and/or drill pipe pressures given in the question are 70 psi or more above the expected pressures. Section 2. Calculation Formula. Abbreviations Used in this Document BHP BOP 3 kg/m kPa kPa/m kPa/hr LOT m m/hr m/min 3 m 3 m /m m3/min 3 m /stroke MAASP SICP SIDPP SPM TVD 0.00981 1. Bottom hole pressure Blowout preventer = = = = = = = = = = = = = = = = = = Kilogram per cubic metre KiloPascal (pressure) KiloPascal per metre KiloPascal per hour Leak-off Test Metre Metre per hour Metre per minute Cubic metre Cubic metres per metre Cubic metres per minute Cubic metres per stroke Maximum Allowable Annular Surface Pressure Shut in Casing Pressure Shut in Drill Pipe Pressure Strokes per minute True Vertical Depth Constant factor HYDROSTATIC PRESSURE (kPa) 2. = = Mud Density kg/m3 0.00981 TVD m PRESSURE GRADIENT (kPa/m) Mud Density kg/m3 0.00981 3. DRILLING MUD DENSITY (kg/m3) Pressure kPa TVD m 0.00981 or P TVD P . International Well Control Forum Inchbraoch House, South Quay Montrose, Angus DD10 9UA Scotland. Tel: +44 1674 678120 Fax: +44 1674 678125 QA-RD7D 4. Rev No.5 July 2009 ISO: 9001/2008 S.I. Unit Formula Sheet Page 2 of 4 FORMATION PORE PRESSURE (kPa) Hydrostatic Pressure in Drill String kPa SIDPP kPa 5. PUMP OUTPUT (m3/min) Pump Displacement m3/stroke x Pump Rate SPM 6. ANNULAR VELOCITY (m/min) P O A 7. C / / EQUIVALENT CIRCULATING DENSITY (kg/m3) Annular Pressure Loss kPa TVD m 0.00981 Mud Density kg/m or A P TVD 8. L P . Mud Density kg/m MUD DENSITY WITH TRIP MARGIN INCLUDED (kg/m3) Safety Margin kPa TVD m 0.00981 Mud Density kg/m or S M TVD 9. P Mud Density kg/m . NEW PUMP PRESSURE (kPa) WITH NEW PUMP RATE approximate Old Pump Pressure kPa N P R SPM O P R SPM 10. NEW PUMP PRESSURE (kPa) WITH NEW FLUID DENSITY approximate Old Pump Pressure kPa N M D O M D / / 11. MAXIMUM ALLOWABLE FLUID DENSITY (kg/m3) Surface LOT Pressure kPa Shoe TVD m 0.00981 LOT Mud Density kg/m or S LOT P S TVD P . LOT Mud Density kg/m 12. MAASP (kPa) Maximum Allowable Mud Density kg/m Current Mud Density kg/m 0.00981 Shoe TVD m 13. SICP (kPa) Mud Density kg/m – Influx Density kg/m x 0.00981 x Influx Vertical Height m SIDPP kPa International Well Control Forum Inchbraoch House, South Quay Montrose, Angus DD10 9UA Scotland. Tel: +44 1674 678120 Fax: +44 1674 678125 QA-RD7D Rev No.5 July 2009 ISO: 9001/2008 S.I. Unit Formula Sheet Page 3 of 4 14. KILL MUD DENSITY (kg/m3) SIDPP kPa TVD m 0.00981 Original Mud Density kg/m or SIDPP TVD P Original Mud Density kg/m . 15. INITIAL CIRCULATING PRESSURE (kPa) Kill Rate Circulating Pressure kPa SIDPP kPa 16. FINAL CIRCULATING PRESSURE (kPa) K M O D M / D Kill Rate Circulating Pressure kPa / 17. BARYTE REQUIRED TO INCREASE DRILLING MUD DENSITY (kg/ m3) K M D / O M K M D D / / 18. GAS MIGRATION RATE (m/hr) R I S D M D P / . P / 19. GAS LAWS P P1 x V1 = P2 x V2 P V V V P V P 20. PRESSURE DROP PER METRE TRIPPING DRY PIPE (kPa/m) D M R D C / . C M / M D D / / 21. PRESSURE DROP PER METRE TRIPPING WET PIPE (kPa/m) D M R D C / . C C / C E E D D / / 22. LEVEL DROP PULLING REMAINING COLLARS OUT OF HOLE DRY (metre) L C R M C D C / / 23. LEVEL DROP PULLING REMAINING COLLARS OUT OF HOLE WET (metre) L C R C C E D C / / 24. LENGTH OF TUBULARS TO PULL DRY BEFORE OVERBALANCE IS LOST (metre) O D P R M G C C P / M / M D International Well Control Forum Inchbraoch House, South Quay Montrose, Angus DD10 9UA Scotland. D / / Tel: +44 1674 678120 Fax: +44 1674 678125 QA-RD7D Rev No.5 July 2009 ISO: 9001/2008 S.I. Unit Formula Sheet Page 4 of 4 25. LENGTH OF TUBULARS TO PULL WET BEFORE OVERBALANCE IS LOST (metre) O P R D M C C G P / / C C E E D D / / 26. VOLUME TO BLEED OFF TO RESTORE BHP TO FORMATION PRESSURE (m ) I S F P P P I f P I V S P P 27. SLUG VOLUME (m ) FOR A GIVEN LENGTH OF DRY PIPE L D P S P D C / / D D M M D D / / 28. PIT GAIN DUE TO SLUG U-TUBING (m ) Slug Volume m S D D F D / 1 / 29. RISER MARGIN (kg/m3) Air Gap m Water Depth m Mud Density kg/m TVD m Air Gap m Water Depth m Water Depth m Sea Water Density kg/m 30. HYDROSTATIC PRESSURE LOSS IF CASING FLOAT FAILS (kPa) M D / . C C C C / A / U f C C H / International Well Control Forum Inchbraoch House South Quay Montrose Angus DD10 9UA, Scotland, Tel: 44-1674-678120 Fax: 44-1674-678125 Email: admin@iwcf.org Internet site URL; http://www.iwcf.org Chief Executive Officer; David Price The International Well Control Forum is a legally constituted non-profit making organisation whose articles of association are bound by the laws of the Netherlands. The Forum is registered at The Dutch Chamber of Commerce in The Hague, The Netherlands, Reg. No. 41157732 International Well Control Forum Inchbraoch House, South Quay Montrose, Angus DD10 9UA Scotland. Tel: +44 1674 678120 Fax: +44 1674 678125