The Wharton School Quarter II Fall 1999 The University of Pennsylvania OPIM 631 Operations Management: Quality and Productivity Key Event Schedule M 11/1 Class 1 • • Introduction Operations Strategy (Web Tour) W 11/3 Class 2 • • • Process Flow Analysis Analysis of an Assembly Line (Toshiba Case) M 11/8 Class 3 • • • • Bottleneck Analysis Analysis of a Continuous Process (National Cranberry Case) W 11/10 Class 4 • • Process Design Work Methods (Work Methods Design Exercise) M 11/15 Class 5 • • Variability and Process Performance Simulation W 11/17 Class 6 • • • • Managing Variability I (Beau Ties Ltd. of Vermont) M 11/22 Class 7 • • • • Managing Variability II (Manzana Insurance Case) W 11/24 Class 8 • Summary of “Process Management” M 11/29 Class 9 • • • • • Bottleneck Management Production Control (The Goal) NOTE: The book, The Goal, may be read any time before 11/29. W 12/1 Class 10 • • • • • • • • Competing through Operations (Stonehaven, Inc.) Take-Home Quiz Due (individual assignment) M 12/6 Class 11 • • • Toyota Production System Process Improvement (Toyota Case) W 12/8 Class 12 • • Service Operations (MGH Case) M 12/20 Final Exam 1:30-3:30pm Team Exercise Due Tuesday 11/9