Materials System Specification

Materials System Specification
45-SAMSS-005
29 December 2004
Valves and Wellhead Equipment
Requirements per API SPEC 6A
Drilling & Workover Wellhead & Valves Standards Committee Members
Smith, S.W., Chairman
Turki, S.I., Vice Chairman
Abouelnaaj, K.K.
Akroosh, F.A.
Alwan, W.M.
Al Tissan, A.M.
Cole, E.L.
Shiha, S.M.
Saudi Aramco DeskTop Standards
Table of Contents
I
II
III
IV
V
VI
Scope............................................................. 2
Conflicts and Deviations................................. 2
References..................................................... 2
Definitions....................................................... 3
Qualifications of Equipment/Manufacturers... 3
Modifications to API SPEC 6A....................... 3
Appendix A........................................................... 7
Appendix B......................................................... 29
Appendix C......................................................... 34
Previous Issue: 1 December 1996 Next Planned Update: 1 January 2010
Revised paragraphs are indicated in the right margin
Copyright©Saudi Aramco 2009. All rights reserved.
Page 1 of 45
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
I
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Scope
API SPEC 6A, in conjunction with this specification, and the Purchase Order, defines the
minimum requirements for Saudi Aramco oil and gas production trees, wellheads, valves
and miscellaneous equipment relating to the wellhead as covered by API SPEC 6A.
II
III
Conflicts and Deviations
A.
Any conflicts between this specification and other applicable Saudi Aramco
Materials System Specifications (SAMSSs), Engineering Standards (SAESs),
Standard Drawings (SASDs), or industry standards, codes, and forms shall be
resolved in writing by the Company or Buyer Representative through the
Manager, Drilling and Workover Engineering Department of Saudi Aramco,
Dhahran.
B.
Direct all requests to deviate from this specification in writing to the Company or
Buyer Representative, who shall follow internal company procedure SAEP-302
and forward such requests to the Manager, Drilling and Workover Engineering
Department of Saudi Aramco, Dhahran.
C.
Conflicting requirements between the specification and drawings, the
manufacturer's specifications and drawings, and data sheets or specification sheets
not specifically covered as an exception by the purchase order shall be resolved
using Appendix D "Saudi Aramco Manufacturer's Deviation Review Procedure
(AMDR)".
References
The selection of material and equipment, and the design, construction, maintenance, and
repair of equipment and facilities covered by this specification shall comply with the
latest edition of the references listed below, unless otherwise noted.
A.
Saudi Aramco References
Saudi Aramco Engineering Procedure
SAEP-302
B.
Instructions for Obtaining a Waiver of a
Mandatory Saudi Aramco Engineering
Requirement
Industry Codes and Standards
American Petroleum Institute
API SPEC 6A
Wellhead and Christmas Tree Equipment
Page 2 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Commentary Note:
This Specification also includes by reference, either in total or in part, other
standards listed in Table 104.1 of API SPEC 6A.
IV
Definitions
Buyer or Purchaser: The Company (Saudi Aramco, ASC, or AOC) actually placing
the order for the material.
Vendor: The other party to the order for the material who is supplying may or may not
be the manufacturer of the equipment.
Buyer's Representative: The person acting on behalf of the Buyer or Purchasing, who
may be from the Drilling & Workover Services Department, Vendor Inspection (or his
agent).
Responsible Standardization Agent (RSA): A Saudi Aramco organization
responsible for the technical aspects of the material/order in question. RSA duties for
the material covered by this SAMSS have been assigned to Drilling & Workover
Engineering Department, Rig Support Division, Materials Acquisition and Forecasting
Unit.
V
VI
Qualifications of Equipment/Manufacturers
A.
The vendor's plant shall be API-approved for the Product Specification Level
specified in the P.O.
B.
The RSA may require that the vendor's product be tested and approved via the
RSA's Trial Test Program before it is considered acceptable.
Modifications to API SPEC 6A
The following paragraph numbers Refer to API SPEC 6A, "Wellhead and Christmas
Tree Equipment," which is part of this specification. The text in each paragraph below
is an addition, exception, modification, or deletion to API SPEC 6A as noted.
Paragraph numbers not appearing in API SPEC 6A are new paragraphs to be inserted in
numerical order.
SECTION 600
601
(ADDITION) PSL 1-4 The items manufactured to this specification are
subject to the verification by the Buyer's Inspection Representative per
Saudi Aramco Inspection Requirements Form 175 (either 453800 or
453900) attached to the Purchase Order.
Page 3 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
(ADDITION) PSL 4 A Pre-inspection meeting between the primary
manufacturer and Buyer's Inspection Representative is required for all
PSL-4 equipment. The meeting must be held before any action against the
order is taken by the manufacturer as soon as possible after receipt date of
the order.
As a minimum, the meeting shall include the manufacturer's
representatives of Production, Engineering and Quality Assurance
Departments and the Buyer's Inspection Representative. The meeting's
objective will be to discuss the assigned specification, identify, clarify and
document any technical areas or question of difficulty. The Buyer's
Inspection Representative shall be acting for the RSA, but the RSA shall
have the final approval of any deviation from the assigned specification or
procedures.
In the event material ordered is "stock" material, an exception to this
specification can be approved by the RSA. Request for this exception
must be submitted to the Buyer in writing in no more than thirty (30)
calendar days after initial contact between the Manufacturer and Saudi
Aramco. The initial contact date is determined and documented (and the
Manufacturer advised of that set date) by the assigned Buyer's Inspection
Representative.
605.2a(3)
(ADDITION) PSL 1-4 Each piece of 10M psi rated equipment listed in
the drawing of Appendix A shall have its hardness tests performed in the
locations so marked on the appropriate manufacturer's representative or
generic drawings located in Appendix A.
If equipment being manufactured is not included in Appendix A, hardness
tests are to be per the manufacturer's normal procedures.
605.2b(9)
(ADDITION) PSL 2-4 For non-ferromagnetic materials, all liquid
penetrant inspections shall be performed using fluorescent penetrant.
605.2c(10) (ADDITION) PSL-3 only All equipment rated at 10M psi working
pressure or above must have prior approval (via Saudi Aramco
Manufacturer's Deviation Review Procedure (AMDR) (see Appendix D
for details) before any weld repairs may be made.
605.2c(14) (ADDITION) PSL 3-4 Volumetric testing of cast materials shall be done
by radiography. Forgings shall be ultrasonically tested. In the event the
prescribed test method is impractical, the Buyer's Inspection
Representative shall approve an alternative method of testing during the
Pre-Inspection meeting. In the event there is no pre-inspection meeting
Page 4 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
required, approval of alternate method must be made before production of
the equipment begins.
(MODIFICATION) PSL 3-4 Hot Worked Parts - Ultrasonic examination
of hot worked parts shall be performed in accordance with both the flat
bottom hole procedures (straight beam examination) and applicable angle
beam examinations specified in ASTM A388 (except immersion method
may be used) and ASTM E428.
(ADDITION) PSL 3-4 Castings - Angle beam examination in accordance
with ASTM A609 shall be applied when any area of the casting cannot be
effectively examined using a longitudinal beam due to casting design or
possible discontinuity orientation.
(ADDITION) PSL 3-4 Acceptance Criteria, Castings - Castings
examined in accordance with ASTM A609 shall meet Quality Level 1
(Table 2 "Rejection Level") requirements.
605.2d(3)
(ADDITION) PSL 4 Please include ADDITION to 605.2a(3) in this
specification.
605.9c(3)
(ADDITION) PSL 1-4 All cast body equipment - Prior to hydrostatic test
of cast body equipment, an acid bath of 15% unihibited HCL is required.
An immersion time of 15 minutes is required. In addition, all cast body
equipment (of all pressure ratings) require both hydrostatic and gas tests to
working pressure after acid bath.
605.9c(5)
(ADDITION) PSL 1-4 Functional tests of all valves shall be conducted at
full differential pressure between 1st and 2nd seat tests. Valves ordered
with actuators shall be tested with actuator installed.
605.9e(4)
(ADDITION For Body Tests On 10M psi Or Above Equipment)
PSL 1-4 100% of the equipment shall also be nitrogen gas tested as per
PSL-4 requirements. Should each flange of the equipment carry a
different working pressure, only the 10M flange is to be gas tested. See
Appendix B drawings.
605.9e(5)
(ADDITION) PSL 1-4 Same as 605.9e(4).
606.1c
(ADDITION) PSL 1-4 Additional records may be required by assigned
Saudi Aramco Inspection Requirement Form 175 or Purchase Order
description. If so noted by assigned A175 form, Manufacturer will furnish
a complete set of inspection documents to the Saudi Aramco
Vendor/Inspection (or his agent) representative.
Page 5 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
SECTION 900
913.4
29 December 2004
(ADDITION) PSL 1-4 Production trees and side outlet valves on spools
shall be assembled as per drawings in Appendix C.
Revision Summary
Revised the "Next Planned Update". Reaffirmed the contents of the document, and
reissued with change of responsibility from Drilling and Workover Services Dept. to Drilling
and Workover Engineering Dept.
Page 6 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A
Lower Master Valve/Bonnet
PART #
DESCRIPTION
HARDNESS
QTY. OF CHECKS
RANGE
1.
BODY
4
2.
BONNET
3
3.
VALVE STEM
1
4.
SEAT
1
5.
GATE
1
6.
BONNET SEAL RING
1
7.
DRIVE BUSHING
2
8.
BEARING RET. UNIT
1
9.
EXPANDER
1
10.
PACKING CARTRIDGE
1
11.
BONNET STUD
1
12.
STUD
1
13.
NUTS
1
14.
INJECTION FITTING
See Page of this Appendix
Page 7 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Lower Master Valve/Bonnet
8
10
TWO REQUIRED
3
2
7
13
14
6
9
5
4
11
13
12
1
Page 8 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
COMPOSITE VALVE
PART #
DESCRIPTION
HARDNESS
QTY. OF CHECKS
RANGE
1.
BODY
5
2.
BONNET
3
3.
VALVE STEM
1
4.
SEAT
1
5.
GATE
1
6.
BONNET SEAL RING
1
7.
DRIVE BUSHING
2
8.
BEARING RET. UNIT
1
9.
EXPANDER
1
10.
PACKING CARTRIDGE
1
11.
BONNET STUD
1
12.
NUT
1
13.
STUD
1
14.
INJECTION FITTING
See Page of this Appendix
Page 9 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Composite Valves
8
10
TWO REQUIRED
3
7
12
2
14
6
5
9
4
11
12
13
PUNCH OUTLET FACE
1
Page 10 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
LOWER MASTER VALVE/BONNET
PART #
DESCRIPTION
HARDNESS
QTY. OF CHECKS
RANGE
1.
BODY
4
2.
BONNET
3
3.
VALVE STEM
1
4.
SEAT
1
5.
GATE
1
6.
BONNET SEAL RING
1
7.
DRIVE BUSHING
2
8.
EXPANDER
1
9.
BONNET STUD
1
BEARING RET. NUT
1
10.
11.
PACKING CARTRIDGE
1
12.
NUT
1
13.
INJECTION FITTING
See Page of this Appendix
Page 11 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Flanged Valve
10
11
TWO REQUIRED
3
7
2
12
6
13
5
8
4
9
1
Page 12 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Studded Tee W/45 Outlet
HARDNESS
PART #
1.
2.
3.
DESCRIPTION
BODY
STUDS
NUTS
QTY OF
CHECKS
RANGE
3
1
1
HARDNESS TEST LOCATION
3
2
1
Page 13 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Tubing Hanger
HARDNESS
PART #
DESCRIPTION
QTY OF
RANGE
CHECKS
1.
TUBING HANGER
2
HARDNESS TEST LOCATION
1
Page 14 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Casing Hanger W & W-D15
HARDNESS
PART #
DESCRIPTION
QTY OF
RANGE
CHECKS
1.
BODY
2*
2.
STUDS
2*
* ONE PUNCH PER SEGMENT
HARDNESS TEST LOCATION
1
2
Page 15 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Casing Spool Less Screws
HARDNESS
PART #
DESCRIPTION
1.
2.
3.
STUD
NUT
4.
5.
INJECTIONFITTING
BLEEDERPLUG
QTYOF
CHECKS
RANGE
BODY
HARDNESSTESTLOCATION
2
3
5
1
4
Page 16 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Casing Head & Tubing Head Spool W / Set Screws
HARDNESS
PART #
1.
2.
3.
4.
5.
6.
7.
DESCRIPTION
QTY OF
CHECKS
6
BODY
SET SCREW
1
SET SCREW GLAND
1
STUD
1
NUT
1
INJECTION FITTING
SEE PAGE
BLEEDER PLUG
SEE PAGE
HARDNESS TEST LOCATION
RANGE
OF THIS APPENDIX
OF THIS APPENDIX
2
3
5
4
6
1
7
Page 17 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Adapter-Double Studded Pack-off
HARDNESS
PART #
1.
2.
3.
4.
5.
DESCRIPTION
QTY OF
CHECKS
RANGE
BODY
6
1
STUD
NUT
1
INJECTION FITTING (K) SEE PAGE
BLEEDER LPUG (K)
SEE PAGE
OF THIS APPENDIX
OF THIS APPENDIX
HARDNESS TEST LOCATION
2
3
1
4
5
Page 18 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Blind Flange
HARDNESS
PART #
DESCRIPTION
1.
BODY
QTY. OF
CHECKS
RANGE
3
HARDNESS TEST LOCATION
1
Page 19 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
API Seal Ring
HARDNESS
PART #
1.
DESCRIPTION
API RING GASKET
QTY. OF
CHECKS
RANGE
1
HARDNESS TEST LOCATION
1
Page 20 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Bleeder Plug
HARDNESS
PART #
DESCRIPTION
QTY. OF
CHECKS
1.
BODY
1
2.
CAP
1
RANGE
HARDNESS TEST LOCATION
1
2
Page 21 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
VR Plug
HARDNESS
PART #
DESCRIPTION
QTY. OF
CHECKS
1.
BODY
1
2.
STEM NUT
1
3.
STEM
1
RANGE
HARDNESS TEST LOCATION
2
1
3
Page 22 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Bolting
HARDNESS
PART #
DESCRIPTION
QTY. OF
CHECKS
1.
STUD
1
2.
NUT
1
RANGE
HARDNESS TEST LOCATION
1
2
Page 23 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Injection Fitting
HARDNESS
PART #
DESCRIPTION
QTY. OF
CHECKS
1.
BODY
1
2.
CAP
1
RANGE
HARDNESS TEST LOCATION
1
2
Page 24 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Model D Injection Fitting
HARDNESS
PART #
DESCRIPTION
1.
BODY
QTY. OF
CHECKS
RANGE
1
HARDNESS TEST LOCATION
1
Page 25 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Model C Injection Fitting
HARDNESS
PART #
DESCRIPTION
QTY. OF
RANGE
CHECKS
1.
BODY
1
2.
STEM
1
HARDNESS TEST LOCATION
2
1
Page 26 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Type K Injection Fitting
HARDNESS
PART #
DESCRIPTION
QTY. OF
CHECKS
1.
BODY
1
2.
BLIND PLUG
1
RANGE
HARDNESS TEST LOCATION
2
1
Page 27 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix A (Continued)
Type K Injection Fitting
HARDNESS
PART #
DESCRIPTION
1.
BODY
BLIND PLUG
2.
QTY. OF
CHECKS
RANGE
1
1
HARDNESS TEST LOCATION
2
1
Page 28 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix B
Test Procedure for Single Completion Tubing Bonnet with or without Control Lines
M2
M1
STEP 1
STEP 2
M3
STEP 3
SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS AMSS. AFTER
EACH AREA HAS BEEN TESTED SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION
SHOWN ABOVE. IF TUBING BONNET HAS NO CONTROL LINE, ELIMINATE STEP 3. IF TUBING
BONNET HAS MORE THAN ONE CONTROL LINE, EACH ONE MUST BE TESTED SEPARATELY.
Page 29 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix B (Continued)
Test Procedure for Tubing and Casing Spools with Different PSI Rated Flanges
M1
M2
FIGURE 1
FIGURE 3
M2
FIGURE 2
SHADED PORTIONS ARE THE AREAS TO BE TESTED PER API 6A AND THIS AMSS IF THE
TOP, BOTTOM, AND OUTLETS ARE NOT THE SAME PRESSURE RATINGS. AFTER EACH
CONNECTION HAS BEEN TESTED SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION
SHOWN ABOVE.
Page 30 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix B (Continued)
Test Procedure Tee or Cross
M
SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS AMSS. AFTER
EACH AREA HAS BEEN TESTED SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION
SHOWN ABOVE.
Page 31 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix B (Continued)
Test Procedure for Tubing and Casing Spools
M1
FIGURE 1
SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS AMSS, IF ALL
CONNECTION ARE THE SAME PRESSURE RATING. AFTER THIS AREA HAS BEEN TESTED
SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION SHOWN ABOVE.
Page 32 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix B (Continued)
Test Procedure for Casing Head
M
SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS AMSS IF ALL
CONNECTION ARE THE SAME PRESSURE RATING. AFTER THIS AREA HAS BEEN TESTED
SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION SHOWN ABOVE.
M2
SHADED PORTION IS THE AREA TO BE TESTED PER API 6A AND THIS AMSS IF ALL
CONNECTION ARE NOT THE SAME PRESSURE RATING. AFTER THIS AREA HAS BEEN TESTED
SATISFACTORILY, PLACE APPROVAL STAMP IN LOCATION SHOWN ABOVE.
Page 33 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C
Figure 1: 2" 3M Tree
2-1/16" 3M PSI Onshore Production Tree
2" 3M GATE VALVE
14-5/8"
2" 3M FLANGE
9"
38-1/4
2" 3M CROSS
14-5/8"
2" 3M GATE VALVE
21-1/8"
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
2-1/16" TREE ASSEMBLY
Page 34 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 2: 3" 3M Tree
3-1/8" 3M PSI Onshore Production Tree
3" 3M PSI GATE VALVE
17-1/8"
3-1/8" FLANGE
10"
44-1/4"
17-1/8"
3" 3M PSI GATE VALVE
25-3/16"
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
3-1/8" TREE ASSEMBLY
Page 35 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 3: 4" 3M Tree
4-1/16" 3M PSI Onshore Production Tree
4-1/16" 3M GATE VALVE
20-1/8"
4-1/16" 3M FLANGE
52-1/4"
12"
4-1/16" 3M TEE
20-1/8"
4-1/16" 3M GATE VALVE
29-3/4"
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
4-1/16" TREE ASSEMBLY
Page 36 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 4: 4" 3M Offshore Tree
4-1/16" 3M PSI Onshore Production Tree
4" 3M QUICK UNION TREE CAP
13-1/2"
4" 3M MANUAL GATE VALVE
20-1/8"
4" 3M FLANGE
12"
4' 3M TEE
20-1/8"
4" 3M HYDRAULIC ACTUATED SSV
4" 3M QUICK UNION TREE CAP
20-1/8"
29-3/4"
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
4-1/16" TREE ASSEMBLY
Page 37 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 5: 7" 3M Tree
7-1/16" 3M PSI Onshore Production Tree
7" 3M GATE VALVE
24-1/8"
7" 3M FLANGE
16"
7" 3M TEE
24-1/8"
7" 3M GATE VALVE
32-1/4"
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
7-1/16" TREE ASSEMBLY
Page 38 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 6: 7" 3M Offshore Tree
7-1/16" 3M PSI Onshore Production Tree
7" 3M QUICK UNION TREE CAP
14-7/8"
24-1/8"
7" 3M GATE VALVE
7" 3M FLANGE
16"
7" 3M TEE
24-1/8"
7" 3M HYDRAULIC ACTUATED SSV
24-1/8"
7" 3M GATE VALVE
32-1/4"
SAUDI ARAMCO
3M PSI WP WOG
6M PSI TP
Page 39 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 7: 3" 10M Tree
3" 10M TREE CAP
15"
3" 10M GATE VALVE
3" 10M SSV
24-3/8"
FLANGE
17-3/4"
3" 10M TEE OR CROSS
3" 10M SSV
24-3/8"
3" 10M TEE OR CROSS
133-1/4"
17-3/4"
3" 10M GATE VALVE
3" 10M SSV
24-3/8"
3" 10M GATE VALVE
24-3/8"
SAUDI ARAMCO
10M PSI WP WOG
15M PSI TP
Page 40 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 8: 4" 10M Tree
4-1/16" QUICK UNION TREE CAP
16"
4-1/16" MANUAL GATE VALVE
26-3/8"
4-1/16" TAPPED FLANGE
23"
4-1/16" SSV
4-1/16" 45 DEGREE TEE
38"
4-1/16" DUAL SSV BLOCK
4-1/16" MANUAL GATE VALVE
103"
Page 41 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Appendix C (Continued)
Figure 9: 7-1/16" 10M Tree
7-1/16" QUICK UNION TREE CAP
16-3/4"
7-1/16" MANUAL GATE VALVE
26-3/8"
7-1/16" TAPPED FLANGE
23"
7-1/16" SSV
7-1/16" 45 DEGREE TEE
38"
7-1/16" DUAL SSV BLOCK
7-1/16" MANUAL GATE VALVE
103-3/8"
Page 42 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
Saudi Aramco Manufacturer's Deviation Review Procedure (AMDR)
This procedure is to be used when any deviation from the assigned Specification,
Procedure or Purchase Order description is noted by Buyer's Inspection Representative
or the Manufacturer's Inspection Department.
I.
This section is the "formal" AMDR process and will only pertain to all equipment
produced under API SPEC 6A PSL-4 service level rating.
A.
Buyer's Inspection Representative (BIR) is advised of the deviation by the
Manufacturer (or finds the deviation in their inspection process).
B.
Saudi Aramco Vendor Inspection (SAVI) evaluates the problem and
determines if the situation constitutes the use of the balance of this section of
the AMDR Procedure. If this formal section is not required by SAVI, use
procedure in section 2 (informal) to obtain deviation approvals.
C.
If the procedure is required, SAVI advises the Manufacturer to submit a full
report and advises the RSA and Buyer of the deviation. If applicable, the
Manufacturer should notify the Vendor.
The Manufacturer's full report shall consist of a complete explanation of the
problem and their proposal to repair or correct the deviation. The report
shall contain drawings if there is any doubt as to a text explanation giving a
complete picture of the nature and/or location of the problem. In addition, it
will state the length of delay (if any) the proposed repairs or corrections will
have on the delivery of the complete order. The report shall be reviewed by
the manufacturer's Chief Quality Engineer (or the Manufacturer's titled
equivalent). He/she shall then draft a cover letter for the report on his
letterhead concurring with the proposed repair and/or corrections.
D.
Upon receipt of the report, SAVI will:
1.
Log the report using the following format:
a.
XMDR-AOC(or ASC)-87-YYY-000-ZZ
b.
The "X" is the first letter in the Manufacturer's name.
c.
The "87" is the current year.
d.
The "YYY" is the sequentially numbered report for the subject
order number.
e.
The "0000" is the last 4 digits of the subject order number.
Page 43 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
f.
The "ZZZ" is the first letters of the location of the Manufacturer's
plant. For example, AOC would use "SIN" to identify Gray's
Singapore plant.
g.
An example number would be:
CMDR-AOC-91-003-8926-SIN.
This number would indicate AOC 1991 report number 003
concerning order 8926 being made in Gray's Singapore plant.
II.
E.
The RSA shall review the report and consult with any appropriate
organizations for information and approvals (if required) resulting in the
resolution of the matter.
F.
The RSA shall advise the SAVI and the Buyer of its findings and
recommended actions. The disposition shall be reported to the Manufacturer
by SAVI.
G.
If the disposition from the RSA has a commercial impact against the
Manufacturer and/or the Vendor, the matter is resolved between said parties
and the Buyer.
H.
If the Vendor and/or Manufacturer is not satisfied and wishes to appeal the
case, he can submit another report or clarification to the original report. This
can be done through the channels of communications described above. The
appeal must be made within thirty (30) days of the date of the RSA's issue of
the disposition. This set time limit shall also pertain to any and all additional
appeals to the deviation disposition.
This section pertains to equipment made under PSL ratings 1-3.
A.
Buyer's Inspection Representative (BIR) is advised of the deviation by the
Manufacturer (or finds the deviation in their inspection process).
B.
BIR advises SAVI of deviation and Manufacturer advises his Vendor and
the Buyer.
C.
A full informal report is submitted to the RSA by SAVI. This informal shall
be in writing (telex or fax); but does not require an assigned log number or
formal review and documentation from the Manufacturer's executive quality
assurance management.
D.
The RSA findings will be issued per paragraph F. in Section I.
E.
Paragraph G. of Section I shall also apply to this informal process.
Page 44 of 45
Copyright©Saudi Aramco 2009. All rights reserved.
Document Responsibility: Drilling & Workover Wellhead & Valves
Issue Date: 29 December 2004
Next Planned Update: 1 January 2010
F.
45-SAMSS-005
Valves and Wellhead Equipment
Requirements Per API SPEC 6A
The Vendor and/or the Manufacturer will retain the ability to appeal the
RSA's findings in this informal process. They may appeal using the same
process described in this section within a thirty (30) day period from the date
of the RSA's issue of the disposition.
Page 45 of 45