445 Grant No. 27 32 - Ministry of Housing and Public Works Medium -Term Expenditure (Taka in Thousand) Budget 2011-12 Projection 2012-13 Projection 2013-14 Projection Projection 2014-15 2015-16 Non-Development 824,97,00 984,35,89 1025,76,59 1075,83,54 1136,01,65 Development 686,06,00 577,29,11 718,59,41 872,61,46 1040,40,35 1511,03,00 1561,65,00 1744,36,00 1948,45,00 2176,42,00 Total 1.0 Mission Statement and Major Functions 1.1 Mission Statement Improve standard of living of the people by ensuring proper use of residential land, and the provision of accommodation for the people through planned housing, construction of establishments and urbanisation. 1.2 2.0 Major Functions a) Preparation of architectural and structural design of public buildings and other infrastructure, its construction and maintenance; b) Preparation/amendment of policies, laws, codes and rules for the expansion of planned housing sector; c) Undertake measures to ensure planned urbanization, proper use of land and other matters related to development d) Allotment of government residential accommodation to government officers and staff and collection of rent; e) Research and technological innovation on urban development, housing, construction of buildings, construction materials and techniques etc.; f) Management of vested property controlled by the ministry; g) Creation of opportunities for involvement of the private sector in solving urbanization and housing problems. Medium -Term Strategic Objectives and Key Activities Medium -Term Strategic Objectives 1. Ensuring affordable housing for different income groups specially homeless, low-income and ultra poor people Key Activities • • • • • Development of sites and services of residential plots for people of different income groups Construction of multi-storied residential buildings for sale on rental-purchase basis to the people of different income groups Construction of Satellite Town Implementing Departments/Agencies • NHA • • • RAJUK CDA KDA • • RDA NHA • • • RAJUK CDA KDA • RDA • NHA • • RAJUK KDA • • Directorate of Urban Housing Department of Architecture Construction, repair and maintenance of residential buildinsg for Government officers and employees • PWD • Department of Architecture Construction, repair, and maintenance of dormitories for working /job seeking women • PWD • • RAJUK CDA 446 Medium -Term Strategic Objectives Key Activities Implementing Departments/Agencies • KDA • Department of Architecture • NHA • RAJUK • • PWD Department of Architecture 2. Involvement of the private sector in development of the housing sector in the country • 3. • Construction, repair and maintenance of new installations for different ministries/division and its departments • Construction of disabled- friendly infrastructures • Rationalization of organizational set-up, modernization of asset management, reform of law, rule, regulation, updating of information technology for improving efficiency of the concerned ministry and relevant authorities under it • • PWD CDA • KDA Formulation/modernization and implementation of detailed area planning, master plans and structural plans for Dhaka/Chittagong/Khulna/ Rajshahi Town • RAJUK • • CDA KDA • RDA • Formulation/modernization and implementation of detailed area planning, master plans and structural plans outside Dhaka/Chittagong/Khulna/Rajshahi town areas • Directorate of Urban Development • Conduct research regarding low cost eco-friendly house building technology. • H&BRI • House building technology dissemination, testing and training • H&BRI • Construction of link roads, fly- overs, underpasses, overpasses and bypasses • PWD • RAJUK • • • CDA KDA RDA • PWD • • • RAJUK CDA RDA • • KDA Department of Architecture • • NHA RAJUK • • • CDA RDA KDA • PWD • • • RAJUK CDA KDA • • RDA H&BRI • Directorate of Urban Development • Urban Development Directorate Ensuring appropriate infrastructural facilities for Governmental works 4. Capacity building for strengthening planned urbanization 5. Ensuring optimum use of land for planned urbanization 6. 7. Innovation of technology in planned housing and house construction techniques Preserving the environment through planned urbanisation • • • • • Construction of satellite Towns under PPP Implementation of open spaces, playgrounds, parks, lakes, canals, preservation and development of water reservoirs and implementing greening programmes Construction of multi-storied car parking and multi-purpose complexes Identification, rehabilitation or removal of buildings at risk Research on matters related to urbanisation 447 3.0 Poverty and Gender Reporting 3.1 Impact of Strategic Objectives on Poverty Reduction and Women’s Advancement 3.1.1 Ensure affordable housing for different income groups specially homeless, low-income and ultra poor people Impact on Poverty Reduction: Employment opportunities will be created for the poor people through the activities to achieve this objective. This activity will be supportive to poverty reduction. Impact on Women’s Advancement: Dormitories will be constructed under this activity to provide safe housing to working/job seeking women. As a result, this will increase their social security and opportunities for work. This plays a key role in the development of women and their empowerment. In addition, women will benefit from earning and income as construction workers. 3.1.2 Involvement of the private sector in development of the housing sector in the country Impact on Poverty Reduction: Opportunities for employment and income generation for poor people will be created while implementing the adopted activities in order to achieving this objective Impact on Women’s Advancement: No direct impact. However, employment and income generating opportunities will be created for women as construction workesr in development of satellite towns which will contribute to women’s advancement. 3.1.3 Ensure appropriate infrastructural facilities for Governmental works Impact on Poverty Reduction: There will be opportunities for poor people to avail of governmental assets and services that will assist in poverty reduction Impact on Women’s Advancement: This activity will help women to avail of governmental assets and service that will play a significant role in women’s advancement 3.1.4 Capacity building for strengthening planned urbanization Impact on Poverty Reduction: No direct impact Impact on Women’s Advancement: No direct impact 3.1.5 Ensuring optimum use of land for planned urbanization Impact on Poverty Reduction: The poor section of the society is most affected by the misuse of land. This activity will protect poor people from it which will help in the reduction of poverty. Impact on Women’s Advancement: Women in the society have been deprived of their rights due to the misuse of land. This activity will help to protect women from such deprivation which will play due role in women’s advancement. 3.1.6 Innovation of technology in planned housing and house construction techniques Impact on Poverty Reduction: Low cost, eco-friendly and sustainable building materials made available to poor people will directly help to fulfil their basic housing needs and that will play positive role in poverty reduction. Impact on Women’s Advancement: Training will be provided to women on the innovated technology and they may get involved in marketing these products as small entrepreneurs. That will contribute to the development and empowerment of women. 3.1.7 Preserving the environment through planned urbanisation Impact on Poverty Reduction: Poor people are usually the first or direct victims of air and water pollution and of climate changes. This effort will help protect them from these damages that may indirectly ease the burden of poverty. Impact on Women’s Advancement: Women are directly and most affected by pollution and climate changes. This effort will help to protect them from these damages that will indirectly play a role in their advancement. 3.2 Allocation for Poverty Reduction and Women’s Advancement (Taka in Thousand) Particulars Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 Poverty Reduction 682,50,14 572,95,89 797,45,76 1091,17,32 1276,97,78 Gender 180,66,91 166,80,12 197,14,74 230,19,36 266,13,76 448 4.0 Priority Spending Areas/Programmes Priority Spending Areas/ Programmes Related Strategic Objectives 1. Ensuring the optimum use of land in urban areas through planned urbanisation Unplanned houses and establishments are being built in urban areas of Bangladesh due to the ever-increasing population and the scarcity of land. The overall environment including city roads and the transport system, trade and commerce, livelihoods are being affected to unplanned urbanisation. To improve this situation, planned urbanisation has been identified as the number one priority. • Ensure the optimum use of land for planned urbanization 2. Ensuring affordable housing for different income groups : Housing is one of the basic needs for human beings. The present government is committed to ensure proper housing for all by 2021 in order to fulfil this basic need. Development of an optimum number of appropriate plots and flats will ensure accommodations different income groups with a view to fulfilling the government’s commitment. This has been considered as the 2nd top priority sector. • Ensure affordable housing for different income groups specially homeless, lowincome and ultra poor people 3. Development of the environment and of the transport system through construction of planned infrastructure in urban areas Environmental degradation in the urban area occurs due to the inadequate open water areas, play grounds, parks etc and traffic jams created by the construction of unplanned transport infrastructure. Considering the urgency associated with development and preservation of the environment, this has been identified as number three priority 4: Rationalization of the organizational set-up, modernization of asset management, reform of laws, rules, regulations, updating of information technology for improving efficiency of the Ministry and relevant authorities under it Enhancing capacity of the Ministry and authorities under it is vital to the objective of planned urbanization and building a digital Bangladesh. With this in mind, rationalization of the organizational set-up, modernization of asset management, reform of laws, rules, regulations, and updating of information technology have been considered as the 4th top priority sector. • • Preserve the environment through planned urbanisation Enhancement of capacity building for properly planned urbanization • 5. Research and Training related to house building: In light of the importance of innovation of house construction technology for the low income group and the provision of training to all concerned on the innovated technology, this has been identified as the Ministry’s 5th priority sector Innovation of technology in planned housing and house construction techniques Key Performance Indicators (KPIs) Budget Medium Term Targets 2011-12 2012-13 2013-14 2014-15 2015-16 Related Strategic Objectives Unit Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2010-11 1. Satellite town development/expan sion 1 Number (Plots) 2,831 2,831 9,759 9,759 6,971 9,713 7,114 5,313 6115 2. Creation of housing facilities 1 Number (Flats) 410 410 2600 2600 50716 49068 38332 12562 3550 3. Structure Plans, Master Plans and Detailed Area Plans 5 Number 2 0 3 3 52 42 47 20 6 4. Reduction of traffic jam and easing transportation 7 K.M (Road Cons.). 28.33 33.33 103.98 103.98 36.18 76.77 86.25 89.50 42.70 5. Increasing efficiency 6 Number (Trainees) 700 600 1010 1010 1890 2005 2220 2385 1985 Indicators 5.0 Recent Achievements, Key Activities and Outputs of the Departments and Agencies under the Ministry 5.1 National Housing Authority 5.1.1 Recent Achievements: In the last three financial years, 360 flats in Lalmatia and Mohammadpur areas were sold to government officers on a hire-purchase system, 600 flats in Mirpur area were sold to low and medium income people. 182 in Lalmatia, 360 in Mirpur flats for government officers,1020 flats at the “F” block in Mohammadpur and 108 at Halishahar in Chittagong for limited income people have been under construction. In addition, construction of flats in Mirpur ,Mohammadpur, Dohar in Dhaka, Chittagong and Bogra has just comenced. Plots have been allotted in Khustia, Natore, Shantahar in Bogra, MoulaviBazar and Pabna. Allotment of plots are being processed in Maizdi of Noakhali, Raozan of Chittagong and Shibchar in Madaripur. 449 5.1.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity Related Strategic Objectives 1.Development of residential plots for people of different income groups • Creation of opportunities for development of 17,125 residential plots 1 2. Construction of multi-storied residential buildings for sale on rental-purchase basis to the people of different income groups • Creation of opportunities for housing through construction of 47,275 flats 1 3. Construction of satellite Town under PPP • Creation of housing opportunity through construction of 10,000 residential plots and 54,024 flats 2 5.1.3 Output Indicators and Targets Output Indicators Related strategic objectives Unit Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2010-11 Budget 2011-12 2012-13 Medium Term Targets 2013-14 2014-15 2015-16 1. Opportunity for housing 1 Number (flats) 165 165 3321 3321 28166 39018 28262 2500 3500 2. Development of plots 1 Number (plots) 995 995 1145 1145 5619 7903 5603 3500 4500 Note: List of allotment letters against plots and flats considered in the projects approved and under process of approval as targets. 5.1.4 Forward Budget Estimates (Taka in Thousand) Non-development Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 14,50,00 15,00,00 15,75,00 16,53,75 17,36,43 0 0 0 0 0 14,50,00 15,00,00 15,75,00 16,53,75 17,36,43 Development Total 5.1.5 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Operational Unit 1. National Housing Authority 1-2 Approved Projects 1. Development of sites and services residential plot for low and medium income people in Maizdi of Noakhali(2nd Phase) project 1 2. Development of sites and services residential plot at Chittagong- Rangamati Road in Raozan of Chittagong project 1 3. Development of sites and services residential plot at Chittagong- Kaptai Road in Raozan of Chittagong project 1 4. Development of sites and services residential plot for low and medium income people in Moulavibazar project 1 5. Site and Services Residential Plot Development for Low and Medium Income People at Kushtia(3rd phase) project 1 6. Site and Services Residential Plot Development in Pabna town project 1 7. Development of sites and services residential plot for low and medium income people in Shibchar of Madaripur project 1 8. Development of sites and services residential plot for low and medium income people in Shariatpur town project 1 9. Development of sites and services residential plot for low and medium income people in Magura project 1 450 Operational Unit/Project/Programme Related Key Activity 10. Development of self-financed sites and services residential plot for low and medium income people in Gopalgonj project 1 11. Construction of 143 flats(revision 182) for sale to government officers in Lalmatia Housing Estate of National Housing Authority project 2 12. Construction of 360 flats of 1336 sq.ft. in “ I” block,section-2, Mirpur , Dhaka 2 13. Construction of 1020 flats for sale to limited income people in “F” block at Mohammadpur of National Housing Authority project 2 14. Construction of 13 Storey Commercial Building Near Town Hall on Asad Avenue at Mohammadpur project 1 15. Construction of 168 flat of 1298 sq. ft. for limited income people in Dohar upazila. project 2 16. Construction of 1716 flats of 1000 sq. ft. at section -16, of Mirpur in Dhaka 2 17. Construction of 324(revised 108) of 1000 sq. ft flat. for limited income people in Halishahar Housing Estate in Chittagong Port City. project 2 18. Construction Residential flat Project, Bogra project 2 19. Construction of 144 flats of 1224 sq.ft. and 72 flats of 986 sq. ft totalling 216 flats for low and middle income people in “ G” block at Halishahar in Chittagong project 2 5.2 Urban Development Directorate 5.2.1 Recent Achievements: During last three financial years, preparation of Master Plans/Land Use Plans in 8 municipalities/upazila towns have been completed. Preparation of structural plans, master plans and detailed area plans for Sylhet and Barisal divisional towns were completed in June,2010. A project for Sea beach area development plan from Cox’s bazaar town to Teknaf has started its work in FY 2008-09 and would have been completed in June,2011. Over and above, clearances were issued after examination of land use plans for different towns and assistance offered on land surveys on demand from different government departments including the Public Works Department. In addition, National Housing Guidelines2010, the Urban and Regional plan, and the draft of Land Use management – 2010 have been completed. Training of 38 officers and employees of this department has been completed for capacity building. One research has successfully been completed. 5.2.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity Related Strategic Objectives 1. Formulation/modernization and implementation of detailed area planning, master plans and structural plans outside Dhaka/Chittagong/Khulna/Rajshahi town areas • Structural Plans, Master Plans and Detailed Area Plans prepared for 193 cities 5 2. Identification, rehabilitation and removal of buildings at risk • Identification of risky buildings in 192 upazilas 7 3. Construction of Satellite Towns • Support in preparation of plans for construction of 3 satellite towns to be implemented by the National Housing Authority 1 4. Rationalization of organizational set-up • Preparation of the revised organizational structure of the Directorate of Urban Development 4 5. Modernization of asset management • Increase in efficiency 4 6. Reform of laws, rules and regulations • Preparation of the National Housing Guidelines-2010, and the Urban and Regional Planning and Land Use Management Law-2010 4 7. Updating Information technology • Modernization of the webpage of the Directorate of Urban Development 4 451 5.2.3 Output Indicators and Targets Indicators 1. Preparation of Structural Plans, Master Plans and Detailed Area Plans 5.2.4 Related Strategic objectives Unit 5 Number Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2010-11 2011-12 Medium Term Targets 2012-13 2013-14 2014-15 2015-16 3 3 31 31 51 40 47 19 5 Forward Budget Estimates (Taka in Thousand) Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 Non-development Development Total 5.2.5 3,89,83 4,08,15 4,27,98 4,49,18 4,71,92 0 0 0 0 0 3,89,83 4,08,15 4,27,98 4,49,18 4,71,92 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Operational Unit Urban Development Directorate 1-7 Approved Projects 1. 1, 3,4 Preparation of Coastal Area Development Plan from Cox’s Bazar Town and Sea beach to Teknaf Project 5.3 Public Works Department 5.3.1 Recent Achievements: In order to reduce housing problems of government officers and staff in the Dhaka city, 476 flats of different categories were built and allotted for as residence for 476 officers and staff during last three financial years. Night shelters were constructed for 120 workers/ labourers in Mirpur, Dhaka. Repair and maintenance works of 100.00 lakh square metres of different government establishments were completed. In addition, the construction and maintenance of and tree planting in parks around the country including Dhaka were implemented. Construction of physical infrastructure of the main building of the Training Academy and Testing Laboratory was completed. In addition, development and maintenance works of the places /installations related to the liberation war including the mausoleum of Father of the nation Bangabandhu Sheik Mujibor Rahman, have been completed. 5.3.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity Related Strategic Objectives 1. Construction, repair and maintenance of residential buildings for government officers/ staff • Construction of 5,431 residential flats for officers and staff 1 2 Construction, repair and maintenance of new installations for different ministries/divisions and their departments • Necessary facilities for disabled people will be ensured during the construction of residential buildings/ Construction of 4,44,240 sq. ft. office space 3 3. Construction of disabled friendly infrastructures • 4,256 flats constructed at Mahakhali and Mirpur in Dhaka/ with necessary facilities for disabled people 1,3 4. Identification, rehabilitation or removal of buildings at risk • Determination of Earthquake resistance capabilities of different Key Point Installations 7 5.3.3 Output Indicators and Targets Output Indicators 1.Construction of buildings Related Strategic objectives Unit Target 2009-10 Actual 2009-10 Target 2010-11 Office space 2 Flat 1 Revised Target 2011-12 2010-11 Sq. m 4693 10592 2190 2190 No - - 15 15 Medium Term Targets 2012-13 2013-14 2014-15 2015-16 86660 87526 88401 89285 90178 1060 1071 1082 1093 1110 452 Output Indicators Related Strategic objectives Unit 1,2 6 Repairs 2. Capacity increase (Training) 5.3.4 Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2011-12 2010-11 Medium Term Targets Lac Sq. m 90 100 105 105 110 116 122 128 135 Person 200 250 300 750 825 910 1000 1010 1110 2012-13 2013-14 2014-15 2015-16 Forward Budget Estimates (Taka in Thousand) Non-development Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 658,83,39 866,96,60 906,93,28 950,97,59 996,28,06 6,68,00 0 0 0 0 665,51,39 866,96,60 906,93,28 950,97,59 996,28,06 Development Total 5.3.5 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Operational Unit 1. Public Works Department 1-5 Approved Programmes(Development) 1. Construction of Engineering Staff College, Bangladesh (2d Phase) 2 Approved Programmes (Non-Development): 1. Construction of a 11 Storey Residential Building(14 storey) for the officers of Special Security Forces in Allenbari,Tejgaon 1,2 2. Construction of a 17 Storey Residential Building(14 storey) for the Non gazetted Staffs of Special Security Forces in Allenbari,Tejgaon 1,2 3. Investigation and Assessment of Damage, Emergency Repair and Renovation of Affected Areas of Darbar Hall of Banga Bhaban 4 4. Modernization of Janata Tower building from ground floor to 13 floor( civil, sanitary and electrical works) at Kawran Bazar,Dhaka 2 5. Construction of 2 units of 9 storey building of 1500 sq. ft. at the abandoned property house no:14/35 for government officers at Sir Syed road in Mohammadpur,Dhaka 1 6. Construction and repair for modernization of different installations of Officer’s Club at 26 Baily road,Dhaka 2 7. Construction of 6 storey Residential Flats for Government Officer’s at plot no.18, road no.130 Gulshan, Dhaka 1 8. Construction of 14 storey Residential Building (600 sqare feet) for staff adjacent to PWD godown at malibagh,Dhaka. 1 9. Construction of High rise Residential Flats for Government Officer’s (R.C.C frame bldg. (Residential) with Fifteen Storied Foundation with a Basement and4 units in each floor) at Karail, Mohakhali, Dhaka 1 10. Construction of infrastructure at the mausoleum complex of the Father of the nation in Tungipara,Gopalgonj 8 11. Construction of 16 units of 9 storey building of 1500 sq. ft. at 13/6 for government officers at Sir Syed road in Mohammadpur,Dhaka 1 12. Construction of One Extra Room, One Bathroom in G Type Building at Motijheel 1 13. Construction of One Extra Room, One Bathroom in F Type Building at Motijheel 14. Construction of non-gazetted dormitory and a guard shed adjacent to D C’s court in Gopalgonj 1 1,2 5.4 Department of Architecture 5.4.1 Recent Achievements: Department of Architecture prepares physical planning and architectural designs for approved projects of different ministries and their departments. In the last three financial years, 50 such large projects were prepared. In addition, this Department contributed significantly to the preparation of the Dhaka Building Construction Rules - 2008 and the Chittagong Building Construction Rules -2008. This 453 Department provided advice including on legal matters on housing, prepared plans and played a significant role in the construction of buildings throughout the country. 5.4.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity 1. Construction, repair and maintenance of new installations for different ministries/division and its departments 2. Construction of disabled friendly infrastructures 5.4.3 Related Strategic Objectives • 50 designs prepared 3 • Physical infrastructures that are friendly to the disabled are included in the above architectural designs 3 Output Indicators and Targets Output Indicators Related strategic objectives 1. Preparation of Designs 5.4.4 1,3,7 Unit Target Actual 2009-10 2009-10 Number 45 Target 2010-11 Revised Target 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 40 40 45 55 55 55 55 45 Medium Term Targets Forward Budget Estimates (Taka in Thousand) Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 Non-development Development Total 5.4.5 6,29,52 6,29,56 6,59,42 7,45,12 7,43,98 0 0 0 0 0 6,29,52 6,29,56 6,59,42 7,45,12 7,43,98 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Operational Unit 1. Department of Architecture 1- 2 5.5 Rajdhani Unnayan Kartripakkha 5.5.1 Recent Achievements: In the last three financial years, different projects and programmes were implemented for easing traffic congestion, protecting the environment and beautifying the Dhaka city. These included, the eastward expansion of the road from Bijoy Sarani to Tejgaon Industrial Area, rd development of Purbachal, Uttara 3 Phase and the Jilmil residential area and preparation of detailed area plans for Dhaka metropolitan city. In addition, steps have been taken to introduce of e-governance into the operation of RAJUK to make its activities speedy and transparent. As a part of this activity, work on digital archiving has been going on. 5.5.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity Related Strategic Objectives 1. Development of sites and services of residential plots for people of different income groups • Development of 32,000 plots for people of different income groups 1 2. Construction of multi-storied residential buildings for sale on rental-purchase basis to the people of different income groups • Construction of 1 lakh flats for sale on rental-purchase basis 1 3. Construction of link roads, fly overs, underpasses, overpasses and bypasses • Construction of 1,114 km of link roads including a bridge for lessening traffic congestion 7 4. Implementation of open spaces, playgrounds, parks, lakes, canals, preservation and development of water reservoirs and implementing greening programmes • Development of 3 parks in the Nikunja residential area and in sectors 13 and 14 in Uttara residential area for the preservation of the environment and planned urbanization 7 • Plantation of 20,000 plants uner the greening programme. 454 Key Activity Outputs related to the Activity Related Strategic Objectives 5. Formulation/modernization and implementation of detailed area planning, master plans and structural plans for Dhaka/Chittagong/Khulna/Rajshahi Towns • Detailed area plan in the Dhaka city for ensuring planned urbanization and land use. 5 6. Construction of multi-storied car parking and multi-purpose complexes • Construction of 2 multi-storied car parks and multi- purpose complexes built in Gulshan and Motijheel area 7 5.5.3 Output Indicators and Targets Output Indicators Related Strategic objectives Unit 1. Alottment of residential plots 1 Number 2. Approval of designs 5 3. Construction of internal roads 4. Removal of unapproved structures 5.5.4 Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2010-11 Medium Term Targets 800 6582 7000 7000 3000 3,300 1000 500 500 Number 2000 716 2300 2300 2400 2500 8500 9000 9500 7 KM 107 19.20 147 147 120 186 60.00 70.00 75.00 7 Number 500 251 300 300 400 400 3300 3500 4000 2011-12 2012-13 2013-14 2014-15 2015-16 Forward Budget Estimates (Taka in thousand) Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 Non-development 0 0 0 0 0 Development 327,00,00 349,64,96 286,27,50 0 0 Total 327,00,00 349,64,96 286,27,50 0 0 5.5.5 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Approved Projects 1. Integrated Development of Hatirjheel Area Including Begunbari Khal 4 2. Eastward expansion of Madani Avenue(Progati saroni up to river Balu) 3 3. Development of Gulshan—Banani--- Baridhara Lake 3 Approved projects(Self financing) 1. Development of Jhimil satellite town beside Dhaka-Maowa road, for low and medium income people 1 2. Construction of New town of Purbachal(yusufgonj) project 1 3. Construction of Uttara Model town(3rd phase) 1 4. Purbachal Link Road Project 3 5. Preparation of Detailed Area Planning of the area under capital 5 6. Computerization and Management Information System(MIS) in Rajuk 4 7. Construction of multi storied car parking cum office building in Gulshan 7 8. Rehabilitation of affected owners of residential houses for Hatirjheel project and construction of apartment for sale 1 5.6 Chittagong Development Authority 5.6.1 Recent Achievements: Allotment of 1,733 plots in the Anaynna Residential Area and 1,779 plots in the Kalpolok Residential Area were made in the last three financial years. In addition, about 15 Km of new roads were built and widened under different projects and a Detailed Area Plan for the Chittagong Metropolitan City has been completed. 455 5.6.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity Related Strategic Objectives 1.Development of housing for different income groups • Construction of plots in the Anaynna residential area for low and medium income people 1 2. Construction of multi-storied residential buildings for sale on rental-purchase basis to the people of different income groups • Construction of flats in the Kazir Dewri area 1 3. Construction, repair and maintenance of dormitories/hostels for working/job seeking women • Construction of 269 dormitories in saltgola, patenga areas 3 4.Preparation of Cities Structural Plans, Master Plans and Detailed Area Plans • Implementation of the Detailed Area Plan for the Chittagong city 5 5.Construction of link roads, fly overs, underpasses, overpasses and bypasses • Construction and expansion of 17.04 km of link roads and 6km of fly-overs to reduce traffic jam 6.Preservation and development of open spaces, play fields, lakes, canals and water areas • 2 water reservoirs in the Askhar pond and Agrabad canal conserved 7.Construction of parks/ implementation of the greening programme • • 1,20,00,000 trees planted 3 parks established 7.Construction of multi-storied car parking and multi-purpose complexes • Construction of 2 multi-storiesd Car Parking and multi-purpose Complexes in Agrabad and Laldighi 7 5.6.3 Output Indicators and Targets Output Indicators Related Strategic objectives Unit Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2010-11 2011-12 2012-13 1.Approval of designs 7 2.Construction of internal roads Numbe r 5000 831 5000 5000 5000 5000 3000 3000 3000 7 KM 6.31 9.00 7.00 700 7.50 8.00 8.00 9.00 9.00 3.Allotment of plots 1 Numbe r 4.Allotment of flats 1 Numbe r 5.6.4 765 --- 64 --- 50 50 50 Medium Term Targets 100 50 100 100 100 2013-14 2014-15 100 100 50 2015-16 100 50 50 Forward Budget Estimates (Taka in thousand) Non-development Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 0 0 0 0 0 Development 260,31,00 210,78,44 63,38,38 88,38 0 Total 260,31,00 210,78,44 63,38,38 88,38 0 5.6.5 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Approved Projects 1. Expansion and Development of Kapashgola Road 2. Construction of Muradpur # 2 Gate and GEC Junction Flyover 3. Construction of Kadamtoli Junction Flyover 4. Expansion and Development of Sagorika Road 5. Development of Kolpolok residential area in Bakalia 5 1 456 Operational Unit/Project/Programme Related Key Activity 6. Development of Anannya residential area 1 7. Construction of dormitory for working women and commercial building in Saltgola, Patenga 1 8. Construction of Bahadder Hat Junction Flyover 5 9. Construction of flats in Kazidewri Katcha Bazar 1 10. Construction of multistoried shopping mall B- block 7 11. Construction of Officers’ qrts. in Mehedi area 1 12. Construction of Outer ring road in Chittagong city 5 5.7 Khulna Development Authority 5.7.1 Recent Achievements Completion of 2 link roads and completing the acquisition of land for another 2 link roads were done. DPP for 3 link roads has been sent to Ministry. During last 3 years, DPP for development of 1100 plots including 64 plots, master plans of one 10 storied building in the Newmarket located in the heart of Khulna City and one 8 storied commercial building have been processed by the Planning Commission and construction of the KDA rest house in Nikunja in Dhaka was almost complete. 90% of the Master plan to expand Khulna up to Mongla town was completed. Preparation of Khulna Detailed Area Plan has started. 5.7.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity 1. Development of housing for different income groups • 2. Preparation of Cities Structural Plans, Master Plans and Detailed Area Plans/ Construction of Satellite Towns Preparation of Cities Structural Plans, Master Plans and Detailed Area plans • 3. • Outputs related to the Activity Related Strategic Objectives 1,086 plots allotted through development of the Ahsanabad Residential Area 1 Allotment of 1000 plots in Rupsa Satellite Town 1 Additional 372.87 square km area included through the expansion of the Master Plan’s Area 5 • Detailed Area Plan for Khulna prepared 4. Construction of multi-storied residential buildings for sale on rental-purchase basis to the people of different income groups • Construction of 32 flats near M.A.Bari road 1 5. Construction of link roads, fly overs, underpasses, overpasses and bypasses • Construction 28 km of roads, and 6 link roads in different places in Khulna 7 6. Construction, repair and maintenance of new installations for different ministries/division and their departments • Construction of a monumental pillar in front of the Khulna Engineering and Technology University to keep alive the spirit of the liberation war. 3 5.7.3 Output Indicators and Targets Output Indicators 1.Approval of designs Related Strategic objectives Unit 5 Number 2.Allotment 1 3.Construction of internal roads 7 Target 2009-10 Actual Target Revised 2009-10 2010-11 Target 2010-11 750 750 Medium Term Targets 2011-12 2012-13 2013-14 2014-15 2015-16 900 950 1100 1200 1500 850 718 Number 160 28 160 160 50 1138 420 50 50 Km 2.34 -- 2.34 2.34 3.30 7.52 6.25 5.50 8.70 457 5.7.4 Forward Budget Estimates (Taka in thousand) Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 Non-development 0 0 0 0 0 Development 14,49,00 15,73,23 0 0 0 Total 14,49,00 15,73,23 0 0 0 5.7.5 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Preparation of Structural Plan, Master Plan and Detailed Area Plan extending areas of Khulna Master Plan up to Mongla Town 3 Approved Projects: 1. 2. Construction of 2 link roads in between Khulna-Jessore Road and City road and City by pass road 5 3. 4. Preparation of a Detailed Area Plan for Khulna Metropolis Construction of liaison cum rest house in Dhaka 3 1 5. Survey plan and design for re- construction of KDA New market 3 5.8 Rajshahi Development Authority 5.8.1 Recent Achievements: RDA has completed the work of Mahananda Residential Area. Construction of 1.20 km road from sahebbazar zero point to the Gorahanga circle has also started. 34% of work of a liaison cum rest house in Dhaka has been completed on a self- financing basis. In addition, repair works of the Pubali market, Godhuli market and RDA market have been completed through PPP in order to modernize and develop the commercial activity in the city. 5.8.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity 1.Development of residential plots for people of different income groups • 2.Construction of link roads and bypasses 3.Implementation of open spaces, playgrounds, parks, lakes, canals, preservation and development of water reservoirs and implementing the greening programme 4.Construction of multi-storied car parking and multi-purpose complexes 5.8.3 Related Strategic Objectives 694 plots in 3 Residential Areas developed 1 • 7.45 km of link roads constructed 7 • Trees planted on both sides of 7.45 km of roads and in three residential areas • 2901.82 square meters of multi-purpose complexes constructed Output Indicators and Targets Output Indicators Related Strategic objectives Unit Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2010-11 2011-12 2012-13 1. Allotment of plots 1 2. Approval of designs Medium Term Targets 2013-14 2014-15 2015-16 Number 144 0 145 0 145 203 203 205 205 5 Number 900 800 900 900 900 900 900 1000 1000 3. Construction of internal roads 7 K.M 1.2 0 0.54 0.54 3.66 1.25 2.00 0 0 4. Land use clearance 7 Number 1000 895 1000 900 900 1000 1000 1000 1000 5. Allotment of commercial plots 1 Number 59 0 43 0 43 60 70 43 43 458 5.8.4 Forward Budget Estimates (Taka in Thousand) Budget Projection Projection Projection Projection 2011-12 2012-13 2013-14 2014-15 2015-16 Non-development 20,50 30,00 35,00 40,00 45,00 Development 5,81,00 0 0 0 0 Total 6,01,50 30,00 35,00 40,00 45,00 5.8.5 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Approved Projects 1. Construction and Widening of Road from Saheb Bazaar to Gour Hanga 2 2. Liaison cum rest house in Dhaka 1 5.9 Housing and Building Research Institute 5.9.1 Recent Achievements: In the last three financial years, 6 research works on house building materials and the innovation of technology were completed. Samples of 812 construction materials of government/nongovernment and private establishments and load bearing capacity of 65 construction establishments were examined, advice was given to 5 government organizations, and 1142 persons were provided training on housing and construction. In addition, among construction materials introduced by the Institute, 1.14 lakh rft Precast Pre-stressed Piles, 94 ferro-cement water tanks and other items of ferro-cement were sold. 15 national and international papers were published. 5.9.2 Key Activities, Outputs related to the Activity and related Strategic Objectives Key Activity Outputs related to the Activity Related Strategic Objectives 1. Conduct research regarding low cost ecofriendly house building technology. • 15 research activities conducted 6 2. Housing technology dissemination, construction materials testing and training • 8 meetings, seminars and symposiums arranged. 6 5.9.3 Output Indicators and Targets Output Indicators Related Strategic objectives Unit Target 2009-10 Actual 2009-10 Target 2010-11 Revised Target 2010-11 Medium Term Targets 2011-12 2012-13 2013-14 2014-15 2015-16 1. Research activity 6 Number 11 5 3 3 4 4 4 08 10 2. Sale of materials a. Precast prestressed pile b. Ferro-cement water tank 6 a) Thousand RFT 40.00 36.16 40.00 40.00 40.00 40.00 45.00 50.00 55.00 40 14 40 40 40 40 45 50 55 3. Training 6 Number 700 521 500 500 500 600 600 700 750 4. Quality control examinations 6 Number 500 570 400 400 400 500 600 700 750 5.9.4 b) Number Forward Budget Estimates (Taka in Thousand) Budget 2011-12 Non-development Development Total Projection 2012-13 Projection 2013-14 Projection 2014-15 Projection 2015-16 4,29,31 4,55,67 4,71,60 4,86,71 5,00,87 77,00 1,12,48 0 0 0 5,06,31 5,68,15 4,71,60 4,86,71 5,00,87 459 5.9.5 List of Projects, Programmes and Operational Units Operational Unit/Project/Programme Related Key Activity Operational Unit 1. House Building Research Institute 1-2 Approved Projects 1. Feasibility study on fuel saving bricks, blocks and fire security of high rise building of Dhaka city 1 2. Amendment of building codes and re-printing 1