Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 Profile Summary Over thirty years of experience in the development industry. Management skills include analytical and creative thinking and the ability to focus on short-term goals to achieve long-term success. Thrives on collaboration and takes on challenges that others avoid. Decisive, persuasive and risk-averse, has been called upon time and again to solve problems and insert much-needed leadership. Professional Experience Senior Project Executive/General Manager – Circa Capital Corporation - Dallas, TX August ’08 - December ‘09 Market analysis, environmental analysis, project due diligence. Senior Vice President, Design and Development – Probity International Corporation - Beverly Hills, CA March ’07 - March ‘08 Responsible for predevelopment analysis. Design, Development, and Construction. Vice President – Fifield Companies - Irvine, CA February ’06 - March ‘07 Responsible for Fifield Companies- Western region projects. Program, Development, Design, Construction. Senior Vice President – The Kor Group - Los Angeles, CA January ’04– January ’06 Responsible for pre-development analysis, project inception, department interface. Assembled a team of 24 and organized the staff to meet the needs of a growing company with multiple projects. Developed the baseline and systems fabric to create tools and procedures for real estate development (for example, project cost reporting systems, cash flow analysis/projections, project reporting packages for partners and investors). Primarily responsible for the design, development, and construction of all projects in the Los Angeles area, Anguilla and Mexico. Responsible for managing daily activities, reporting and coaching. Partner – Bousquet Dennis & Associates - Pasadena, CA November ’01 – January ‘04 Partner of Real Estate Development and Project Management Company. Primarily responsible for the strategic direction of the company, business development and infusion of expertise and leadership on all projects. Senior Vice President, Design & Construction – TrizecHahn Development Corporation - Hollywood, California August ‘99 – May ‘02 Development of an urban, mixed-use complex in the heart of Hollywood, California. Project includes 1.2 million square feet overall plus a 3,000 subterranean parking structure. Primary components: 350,000 square feet of multi-level retail, an expansion to Grumman’s Chinese Theater (6 screen Cineplex); 640 room full-service hotel, state-of-the-art live entertainment theater with 3,300 seats; broadcast-ready (for the Academy of Motion Picture Arts & Science Awards (aka Oscar-cast)), a 30,000 square foot Ballroom, and specialty indoor/outdoor entertainment venues. After two years of pre-development and 9 months of actual construction, the project’s budget and schedule were in jeopardy. My responsibilities were to limit corporate exposure and create strategies to steer the project toward successful and timely completion. It was also essential to maintain positive relationships with existing staff, consultants, jurisdictional entities, and the lending environment. Team development was essential to the success of the project. Public Entity approvals—Primary liaison with the City of Los Angeles, Community Redevelopment Agency, CalTrans, Metropolitan Transit Authority and other groups with jurisdiction Team development and management—Established a seasoned and capable team to manage all aspects of the project. Responsible for managing daily activities, reporting, and coaching. Cost & schedule controls—Developed strategies to contain costs and accelerate the schedule. Logistics planning—Created logistics plans to benefit the hotel and retail projects simultaneously. Worked with legal representatives on neighborhood issues, Deal negotiations—Negotiate various key components including telecommunications sponsorship, worked toward condemnation and land acquisition as required. Represent Design and Construction issues to Executive Management team—Develop reports to aid in the leasing, financing, sponsorship and marketing efforts. Assist all departments in their efforts to maximize value within the built environment. Project completed in November 2001 with mitigated cost overruns/accelerated schedule. 1 Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 Director of Construction – Walt Disney Imagineering - Glendale, California Feb ‘97 – Aug ‘99 Part of development team for new theme park adjacent to Disneyland. Total project value of $3.5 billion on a 126-acre parcel. Risk Assignment Management Program (RAMP) - Responsible for creating a risk avoidance program including “what if” scenarios and recommended actions to mitigate development risks. Traffic Mitigation Plan - Responsible for creating a $1.2 billion Traffic Mitigation Plan with Caltrans and the City of Anaheim. MBE & WBE Program - Responsible for developing project-wide Minority & Women-Owned Business participation program. Director of Design & Development – Disney Development Company - Burbank, California April ’91 – Feb ‘97 Responsible for the design, development, and construction of corporate projects. Managed a staff of 26. All projects were completed within a 5-year period, on schedule and within budget. Partner / Director of Design & Construction – Pioneer Development Company - Syracuse, New York July ’90 – April ‘91 Director of Development - Responsible for all development activities for Pioneer Development Company, including entitlements, design, development and construction. Director of Construction - Responsible for all construction activities. Ran the day-to-day operations for the in-house Pioneer Construction Company. Vice President, Design & Construction – Prentiss Properties, Limited, Inc. (formerly Cadillac Fairview Urban Development, Inc.) - Washington D.C./Virginia Region June ’84 – Jan ‘90 Head of Design & Construction for the Virginia and Washington, D.C. regions. Primarily responsible for project inception, entitlements, master planning, zoning/building department interface, design development, consultant and contractor selection, contract negotiations, construction of base building/tenant build out. Upon finalized drawings and contracts, the project was transferred to a staff member to place responsibility and maintain control. All projects completed on schedule/within budget . Construction Manager – Cadillac Fairview Urban Development, Inc - Houston, Texas 1981 – 1984 Houston Center - Joint-venture project with Texas Eastern Corporation to develop thirty-three blocks of downtown Houston. Project Manager – Brown & Root, Inc - Houston, Texas 1978 - 1981 Property Development Services (PDS) – Development & Construction Management group responsible for the Parent, Halliburton Corp. Real Estate Holdings. In addition, PDS rendered project and construction management services for clients in the public and private sectors. Brown & Root Development, Inc. (BARDI) - Responsible for initiating public sector business development for PDS, working primarily with the Veterans Administration Office of Construction. 2 Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 Current and Completed Projects Project Description Type/Cost August ‘08 – September ’09 One Resort Two Hotels – Playa del Carmen, Mexico market analysis, environmental analysis, project due diligence. March ‘07 – March ’08 World Jewelry Center – 1,200,000sf, 55 story mixed use commercial office condominium tower, 137,000sf retail center 98 residential units, 2,750 unit parking structure. Finalized program, design development phase. New Construction New Construction $ 998,000,000 February ’06 – March ‘07 Club View – 23-story condominium, Los Angeles, CA 35 units, finalized design, started construction Dec. ’07 New Construction $ 91,000,000 Allure Waikiki – 31-story condominium. Honolulu, Hawaii. 300 units finalize program, entitlements, design Start construction February ‘08. New Construction $208,000,000 January ’04 – February ‘06 Viceroy Anguilla- Meads and Barnes Bay, Anguilla -program, master plan, schematic and design development phases; started horizontal construction. A 35-acre Hotel and Condominium Resort complex, Consisting of a luxury Boutique Hotel with 114 units, 5 Beachfront Condominium Buildings with a total of 33 units, 35 private Villas, 6 Town homes, meeting rooms, tennis courts, pools, restaurant, and spa. New Construction $350,000,000 Mayacoba- Playa Del Carmen, Mexico – program/concept A resort complex consisting of a Greg Norman championship golf course, a series of waterways/lagoons which connect the various development parcels, 137 rms. New Construction $300,000,000 Hollywood and Vine Lofts - Hollywood, CA High-end high-rise adaptive reuse condominium, 10 story building. Approximately 133,000 sf, 96 condo units, approximately 153 parking spaces at the lower floors using industrial elevators. Average sales price is $741,000 or $536 per sf. Renovation $63,000,000 Santa Fe Lofts - Los Angeles, CA High-rise adaptive reuse apartment building. 132 Units. Historic tax credits. Renovation $23,000,000 Barker Brothers Gallery Lofts - Los Angeles, CA Urban condo lofts, eight existing warehouse Buildings located in the artists-in-residence neighborhood. 5.8 acres, 300 condo units, 500 parking spaces. Renovation $400,000,000 3 Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 10001 Venice Boulevard - Los Angeles, CA 115 multi family residential units, 4 stories, 1.5 levels of sub terrain parking with 220 spaces. New Construction $25,000,000 Eastern Columbia - Los Angeles, CA High end High rise adaptive reuse condominium project, 14 story, 147 units, new parking structure, approximately 255 spaces. Renovation $69,000,000 Sunset and Myra - Silverlake, CA 47 live work condominiums, 1.5 levels of underground parking. New Construction $14,000,000 Molino – Los Angeles, CA Urban condo lofts, 92 units, artists-in-residence neighborhood. Renovation $40,000,000 November ’01 – January ‘04 Art Center College of Design - Pasadena, CA Hilltop campus expansion - master plan, schematic and design development phase of prestigious hilltop campus. Design by Gehry, Partners and Alvaro Siza. Central plant, parking structures, library, technical skills buildings and water feature. Expansion $250,000,000 Sheraton Gateway LAX – Los Angeles, CA High rise hotel renovation – 805 rooms/public areas Renovation $12,000,000 Sheraton Four Points – Santa Monica, CA High rise hotel renovation – 311 rooms/public Areas Renovation $9,000,000 Canoga Park NEW Academy – Canoga Park, CA Development of 536 student, 24 classroom K-5 school for non-profit developer. New Construction $17,000,000 Western Asset Plaza – Pasadena, CA -250,000’ of office building and subterranean garage. Pre-development/entitlements/budgeting assistance for Maguire Partners. New Construction $56,000,000 August ’99 – May ‘02 Hollywood & Highland – Hollywood, CA Urban, mixed-use complex in the heart of Hollywood, CA. Project includes: 1.2 million square feet overall plus a 3,000 subterranean parking structure. Primary components: 350,000 square feet of multi-level retail, an expansion to Grauman’s Chinese Theater (6 screen Cineplex); 640 room full-service hotel, state-of-the-art live entertainment theater with 3,300 seats; broadcastready (for the Academy of Motion Picture Arts & Sciences Awards, aka Oscar-cast), a 30,000 square foot Ballroom, and specialty indoor/outdoor entertainment venues. 4 New Construction $615,000,000 Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 February ’97- August ‘99 Disney’s California Adventure – Anaheim, CA New theme park adjacent to Disneyland. Shows, Rides, and interactive attractions are themed to three California motifs; the fast-paced glitzy movie-making world of Hollywood, the outdoor recreation opportunities and rich farmlands of The Golden State, and the “Fun in the Sun” of Surf City. New Construction $3,500,000,000 April ’91 – February ‘97 Walt Disney Studios – Burbank, CA. $650 million redevelopment of the existing studio lot. Master plan, entitlements, and infrastructure redevelopment. Renovation $650,000,000 Feature Animation Building – Walt Disney Studios Burbank, CA. Award winning 250,000 sf state-ofthe-art animation facility. Steel structure with masonry and EIFS skin. 6,000sf, computer room, raised floor throughout. Design by Robert A.M. Stern. New Construction $42,200,000 Frank G. Wells Building II – Walt Disney Studios – Burbank, CA. Tenant improvements for class A office to house TV Animation Group. Customized furniture designs. Designed by Venturi Scott Brown. New Construction $5,000,000 Studio Commissary - Walt Disney Studios – Burbank, CA. Renovation and expansion of 1940’sera Ken Webber design. Expansion/Renovation $35,000,000 Child Care Center - Walt Disney Studios – Burbank, CA. 12,000 s.f. child care facility. Modular construction, ”turn-key” project with two surface parking lots. Built for dependents of Walt Disney Studios. New Construction $18,000,000 Zorro Parking Garage - Walt Disney Studios – Burbank, CA. 1,550 space parking structure, 17,000 sf adjacent mill fabrication building sits on top of basement property and drapery. Circulation tower has custom stained glass artwork. New Construction $12,000,000 Sound Stages 6 & 7 - Walt Disney Studios – Burbank, CA. 34,180 sf TV tape stages, 57,334 sf support building with basement. Audience seating of 299 per stage. Removable demising partition to allow for one film sound stage. Three foot crawl space beneath stage floor. Support building includes rehearsal hall, editing rooms, dressing rooms, production company offices, wardrobe, make-up, hair styling, set dressing, green rooms and day care/classrooms. New Construction $22,000,000 Riverside Building - Walt Disney Studios – Burbank, CA. 10-story, 385,000 sf office building and 2,000 space subterranean parking structure. Designed by the late Aldo Rossi. New Construction $143,000,000 5 Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 Second Campus – Burbank, CA Evaluation and acquisition of 100-acre parcel including entitlements, master planning, site selection, and development. ABC Studios – Los Feliz, CA. Redevelopment of existing studio lot, including sound stages, offices and infrastructure. Renovation $27,000,000 Team Disneyland – Anaheim, CA. 320,000 sf office building includes four-story atrium, computer rooms, 200-seat auditorium. Park side of building has bright yellow plaster finish; freeway side of building has green quilted stainless steel panels. Building is 900 feet long with no expansion joints. Designed by Frank O. Gehry. New Construction $125,000,000 Corporate Tenant Improvements $20–$25 million annual volume over a 3-year period in North America and the Far East. Renovation Mighty Ducks – Anaheim, CA. Development of team headquarters, locker facilities and retail at The Pond in Anaheim. New Construction $17,000,000 Disney ICE – Anaheim, CA. 86,000 sf, two story Mighty Ducks practice facility and community ice training center. Design by Frank O. Gehry. New Construction $15,000,000 Edison Field (Home of the Anaheim Angels) – Anaheim, CA. Renovation and redevelopment of 48,000 seat Major League Baseball stadium. Designed by HOK and Robert A.M. Stern. Renovation $127,000,000 New Amsterdam Theater – New York, NY Award-winning restoration and redevelopment of 1903 Broadway Theater for The Lion King musical. Project met National Parks Service and IRS Renovation Tax Credit standards. Funded privately and via three New York public entities. Designed by Hardy Holzman Pfeiffer Associates. Historic Renovation $44,000,000 Times Square Signage – New York NY Responsible for development of Signage Extravaganza. Renovation $11,500,000 Chicago Theatre – Chicago, IL. Redevelopment of Existing theatre for Disney Theatrical Productions. Project also included retail/entertainment complex. Renovation $7,000,000 6 Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 July ’90 – April ‘91 Pioneer Business Park on the Canal – Rochester, NY Program master plan, infrastructure/area development construction finalized, 2000,000sf of structures permitted. 340,000 acre mixed-use commercial park. Project included 1,015,000 sf of industrial space, 1,0150,000 sf of office space, 470,000 sf of retail space and on- and off-site land development including two interchanges, roads and utilities. Finalized master plan, obtained entitlements. New Construction $35,000,000 Pioneer Business Park, - Corporate Center – Rochester, NY. – Program, master plan, entitlements, infracture cd’s. Commercial office park comprising 52 acres. Project included 580,000 sf of office space, and on- and off-site land development. New Construction $35,000,000 June ’84 – January ‘90 Fairview Park – Arlington and Falls Church, VA. Mixed-use project comprising 235 acres of undisturbed woodlands. Project included 18 office buildings totaling 3,600,000 sf 500 room hotel constructed in two phases, 100,000 sf of retail development, three lakes totaling an area of 33 acres, and land development (utilities, two primary road systems, $18 million highway interchange). New Construction $750,000,000 Trinity Centre – Centerville, VA. Mixed-use project comprising 188 acres of undisturbed woodlands. Project includes ten office building totaling 1,800,00 sf, 500 room hotel, 100,000 sf of retail development, two lakes totaling 21 acres, and land development (utilities, primary road system, highway interchange). New Construction $650,000,000 Franklin Square – Washington D.C. – 12 story, 575,000 sf office building including a 530 space, three-level subterranean parking structure. Included restoration/reconstruction of historical facades. New Construction $53,000,000 1001 Pennsylvania Avenue – Washington D.C. – 14 story, 795,000 sf office building and 545 space, three-level subterranean parking structure. Included restoration/reconstruction of historical facades. New Construction $83,000,000 The Park at Houston Center – Houston TX – 18story, 1,000,000 sf fast-track, mixed-use project accompanied by 200,000 sf of retail space, spanning two blocks. New Construction $245,000,000 Gulf Tower / 3 Houston Center – Houston, TX – 52 story, 1,250,000 sf fast-track office tower with four level parking structure below the tower. New Construction $200,000,000 1981 - 1984 7 Jack Bousquet 24116 Mentry Drive, Newhall, CA 91321Home: 661-254-3963Cell: 323-821-5517 1978 - 1981 Brown & Root Office Park - Phase I, Lombard, Illinois - 4-story, 200,000 sf fast-track office building accompanied by a 450-space parking structure. New Construction $27,000,000 Life Insurance Co. of the Southwest, Office Facility, Dallas, TX (Assistant Project Manager) - 6-story, 162,000 s.f. fast-track office building. New Construction $17,000,000 Education The Georgia Institute of Technology, School of Architecture; B.S. in Building Construction - 1978 Manatee Junior College - Bradenton, Florida - 1974-1975 Middlesex Community College - Middleton, Connecticut - 1971-1972 Morgan High School - Clinton, Connecticut - 1971 Earned 100% of college expenses References Available upon request. 8