STATE LOAD DESPATCH CENTER AGENDA FOR 25th MEETING Of State Level Co-ordination Forum Date: 16/05/2012 Venue: S.L.D.C, HOWRAH ITEM No:1. CONFIRMATION OF THE MINUTES OF THE 24th SLCF MEETING HELD ON 16.02.2012. The minutes was circulated vide memo no: SLDC/How/109A (SLCF)/2765 (1-17) Dated 17/03/2012 and the same was also published in the website (www.wbsldc.in) No comments for any changes were received. ---- Members may please discuss and pass the same. ITEM No: 2. REVIEW OF STATE GRID PERFORMANCE: Power point presentation on grid performance for the month of February 2012, March 2012 and April 2012. ITEM No. 3. IMPORTANT GRID INCIDENTS: (a) On 21.03.12 at 06.55 hrs, the 132 KV Titagarh- B.T. Road ckt of CESC tripped which resulted in islanding of Titagarh and New Cossipore generating stations. Due to low voltage the created island eventually collapsed. ---- CESC representative may please deliberate. (b) On 30.03.12 at 03.15 hrs 220 KV B- Phase CT of Bus-Coupler Bay at 220KV Durgapur sub-stn burst out. This caused tripping of all 220 KV outgoing feeders at Durgapur sub-stn. STPS # 6 and DPL# 4, 5& 7 also tripped. ---- WBSETCL representative may please deliberate. (c) On 03.04.12 at 16.29 hrs both the 132 KV SRS-Majerhat ckts of CESC tripped causing splitting of CESC system into two subsystems. Southern generating station remains synchronized with WBSETCL system at Howrah point, whereas Titagarh, New Cossipore and Budgebudge generating stations got islanded with almost matching load. ---- CESC representative may please deliberate. (d) On 04.04.12 starting from 20.09 hrs a series of network hazards in CESC systems took place due to heavy storm. Titagarh, New Cossipore and Budgebudge generating stations got islanded and several unit tripped. ---- CESC representative may please deliberate. (e) On 04.04.12 at 21.15 hrs during charging 132 KV Kasba- Sonarpur ckt from Kasba end all the 220/132 KV Transformers at Kasba substation tripped. As CESC was synchronized at Kasba point, CESC system got split from rest of the Grid. This resulted in total power failure at Salt-lake 132 KV Sub- station also. ---- WBSETCL representative may please deliberate. (f) On 13.04.12 at 10.31 hrs during diversion of 220 KV Arambag – Domjur # 1 through bus- tie breaker at Arambag end 220 KV bus fault occured. All adjacent 400KV ckts and 400/220 KV, 315 MVA Transformers at Arambag Sub Station tripped. ---- WBSETCL representative may please deliberate. (g) System disturbance at Titagarh Gen. Stn. Of CESC on 22.04.12 at around 18.20 hrs. ---- CESC representative may please deliberate. (h) On 22.04.12 at 23.30 hrs, 400 KV B-phase CT of Bus transfer bay at Jeerat 400 KV sub-station burst out causing fire hazards and total power failure at Jeerat 400 KV Sub Station. ---- WBSETCL representative may please deliberate. (i) On 24.04.12 at 19.40 hrs due to lightning stroke on 33KV Kulpi feeder the total DC system at Laxmikantapur 220 KV sub- stn failed, which eventually led to total power failure at Laxmikantapur 220 KV sub-stn. ---- WBSETCL representative may please deliberate. (j) On 04.05.12 at 06.23 hrs due to operation of bus bar differential Relay the 132 KV west side bus of BTPS got dead. Unit #5 and 132 KV Chanditola, Satgachhia and Khanyan feeders which were on west side bus tripped. ---- BTPS representative may please deliberate. ITEM No: 4. OPERATIONAL PLANNING. (a) ANTICIPATED POWER SUPPLY POSITION FOR THE MONTH OF MAY,JUNE & JULY 2012. [All concerned are requested to furnish anticipated demand and generation forecast for these months to SLDC] (b). SETTLEMENT OF SHUT DOWN PROPOSALS FOR THE MONTH OF MAY, JUNE, & JULY 2012 i.r.o GENERATING UNITS, TRANSMISSION LINES AND OTHER EQUIPMENTS ETC. [All concerned are requested to furnish their shut down proposals for these months to SLDC] (c). PROLONGED OUTAGES OF POWER SYSTEM ELEMENTS IN WBSETCL. Sl.No. Network elements under outage From 1. At Durgapur 400 kV sub-station, 315 MVA transformer-II 28.12.10. 2. At DGP, Breaker of 400 kV Parulia ckt # 2. Since long 3. 220 KV Jeerat-Satgachia ckt # 1 & 2 13.08.10. ------ Concerned constituents may share the latest status on outage of above elements. ITEM No: 5. ISSUES RAISED BY SLDC: 5.1. The decision of taking a set of meter readings before and after time synchronization of meter was not maintained by BTPS on 31.03.2012. 5.2. Communication gap between ALDC (WBSEDCL) and BKTPP causing mismatch in Schedule on 22.04.2012. 5.3. Data Display status at SLDC control room i.r.o---a) Unit wise data of PPSP. b) Data of Kharagpur 400 KV Sub-stn. ITEM No: 6. AGENDA NOTE PUT UP BY SLCF MEMBERS FOR DISCUSSION: 6.1. Agenda note put up by KTPS, WBPDCL (i) Frequent backing down and withdrawal affects plant health. (ii) Review of Ramp up/down rate in preparing injection schedule for generating constituent like KTPS, when DC in MW is less than its 100% capacity. 6.2. Agenda note put up by STPS, WBPDCL (i) Technical minimum Generation for Unit # 5 & #6 of STPS: Unit# 5: Generation: 175 MW (ex-bus: 159 MW) Unit# 6: Generation: 175 MW (ex-bus: 159 MW) 6.3. Agenda note put up by BTPS, WBPDCL (i) Solution of excessive VAR loading on BTPS during evening peak hours. ITEM No: 7. MISCELLANEOUS: (i) (ii) Schedule of FSTPP Unit #6 i.r.o WBSEDCL on 03.04.12. Date and venue of next SLCF (i.e. 26th) Meeting. *** Copy for information and kind necessary action please:1. Sri A.C.Sarkar, Managing Director, WBSETCL, Vidyut Bhavan, Kolkata-91. 2. Sri.S.Nag, Director (Operations), WBSETCL, Vidyut Bhavan,Kolkata-91. 3. Sri.A.Guha, Director (RT & IT), WBSEDCL, Vidyut Bhavan, Kolkata-91. 4. Director (Operation & Maintenance), WBPDCL, Salt Lake City, Kolkata-700 098. 5. Sri A. Nayak, Chief Engineer, CLD, DVC, Maithon. (Attention Sri. S. K. Pal, Sr. Manager). 6. Sri. M.S. Pal, C.E.( PTR ) WBSEDCL, Vidyut Bhavan, Kolkata-91. 7. Sri V.Chakraborty, Vice-President (S.O.), CESC Ltd., Statesman House, Kolkata-1. 8. Sri. P. P. Biswas, Addl. Chief Engineer, ALDC, WBSEDCL. 9. Sri. S.K.Das, Addl.C.E, Transmission Headquarter, WBSETCL, Vidyut Bhavan, Kol-91. 10. Sri.R.Chakraborty, Sr.Manager (System Control), CESC Ltd, Statesman House, Kol- 01. 11. Sri Swapan Kumar Sarkar, G.S.(T&D, Load Management), DPSC Ltd. 12. Sri Sushmit Kumar Roy, DGM (Opn), ALDC, DPL. 13. Sri. Soumen Chatterjee(SO), Sr. Manager, KTPP, WBPDCL. 14. Sri. Sushanta Sarkar, Sr. Manager(MO), BKTPP, WBPDCL. 15. Sri. G. C. Saha, Sr. Manager(EO), BKTPP, WBPDCL. 16. Sri A. K. Mondal , Sr.Manager, SGTPP, WBPDCL. 17. Sri. P. Sinha, Sr. Manager (E), STPS, WBPDCL. 18. Sri. P.K. Pal, Sr. Manager,(System Operation –Electrical),BTPS, WBPDCL.