RUBIGAS Biogas as an alternative source of energy in rural areas RUBIGAS Project Quality Management Manual (2013-1-PL1-LEO05-37532) Introduction and basic tenets. The Quality Management Manual (QMM) describes how the project management team will implement the quality policy required for successful executing of the project and providing highest quality of project results. The QMM provides input to the overall project management plan and includes quality control, quality assurance and continuous process improvement approach for the project. Project QMM is established to provide processes and activities to be performed to determine quality policies, objectives and responsibilities, so that the project will satisfy the needs for which it was undertaken. It implements the quality management system through policy and procedures with continuous process improvement activities conducted throughout, as appropriate. The basic approach to quality management described herein is intended to be compatible with that of the International Organization for Standardization (ISO). This is compatible with proprietary approaches to quality management such as those recommended by Deming, Juran, Crosby and others, and non-proprietary approaches such as Total Quality Management (TQM), Six Sigma, failure mode and effects analysis (FMEA). This document complements project management and as such recognizes the importance of: Customer/End user satisfaction; understanding, evaluating, defining and managing expectations so that customer requirements are met. Continuous improvement; the plan-do-check-act cycle is the basis for quality improvement as defined by Shewhart and modified by Deming. Quality improvement initiatives undertaken by the project consortium should improve the quality of the project’s management as well as the quality of the project’s product. Prevention over inspection; the quality is planned, designed and built in and it is prior to inspection as preventing mistakes generates much less cost. Management responsibility; success requires the participation of all consortium participants and all members of the project team. Process approach Following recommendation of International Organization for Standardization this document promotes process approach when developing, implementing and improving the effectiveness of a quality management system, to enhance partners and potential user satisfaction by meeting their requirements. Process approach means identification of processes, together with their mutual interactions and their management to produce desired outcomes. An advantage of process approach is the ongoing control that it provides over the individual processes as well as their combination and interaction. Usage of process approach within a quality management system emphasizes the importance of: a) Understanding and meeting requirements and needs, b) The need to consider processes in terms of added value c) obtaining results of process performance and effectiveness d) continual improvement of processes based on objective measurement The model of a process-based quality management system based on Deming’s scheme and adapted to projects needs is shown on the picture below. This illustration shows that potential user satisfaction as well as partners trouble-free cooperation is obtained by means of communication and customers/partners feedback on each, specific stage of the project. The illustration also emphasizes the role of prevention, which is much more economically reasonable, than inspection and introducing of ameliorations. Nonetheless the ‘check’ stage is compulsory to provide high quality project outcomes. This stage will by fully implemented during project activity by realization of pilot testing training, which will provide feedback from users. Feedback forms will be delivered by separate document attached to pilot testing methodology. Reporting Constant monitoring of project progress executed by specific partner is to be reported regularly in half a year period. Regularly delivered reports are not only to acknowledge tasks realization, but also to prevent possible risks and collect feedback from partners. It helps to improve project quality during its realization as well as level of project outcomes. It is crucial tool for implementation ISO based standards together with plan-do-check-act cycle, emphasizing role of prevention and in-between communication oriented towards partner’s feedback. Reporting procedure will contain filling of: 1) staff timesheets form, 2) activity report form, 3) travel & subsistence report form, 4) dissemination report form (this form as well as the whole procedure is elaborated separately), 5) financial report table (provided by Polish National Agency). Reporting forms are attached to this manual. External evaluation Evaluation can be defined as the systematic appraisal of the success and quality of a project. Success refers to whether the project objectives have been achieved, and quality refers to whether the needs of the stakeholders have been met. The evaluation of the project progress, management and final outputs/products will be performed by external evaluator in 2 separate parts: - The first part undertaken at the end of first period of the project should be done in the form of Formative evaluation, which aims to assess initial and ongoing project activities, with a view to improve the work in progress and increase the likelihood that the project will be successful - The second part undertaken at the end of the second period of the project should be done in the form of Summative evaluation, which aims to assess the quality and impact of a fully implemented project, and to verify if the project has reached its stated goals. Evaluation, in context of process approach to project realization, is two-sided tool of synergic goals. It helps with outcomes assessment as well as being a factor raising the project quality. Tools and techniques for best quality of project management Below list show processes specified to deliver trouble-free project realization: Time table – to define deadlines for scope of activities Risk management – to define possible risk and threats Internal communication – to communicate problems within the consortium Partner’s feedback – information gathered from partners to rise quality level of the project It is important to remember that above list dynamically changes and importance of the processes as well as their ways of implementation can be modified according to project progress and realization. Tools and techniques for best quality of project results Below list show processes specified to deliver high quality project products/outcomes: Need analysis – to define customers/end users expectations and needs Training methodology results/products/outputs Internal evaluation of project results performed by project partners Partners responsibility range – to define particular partner tasks and partners responsibility – to define level of quality for final project It is important to remember that above list dynamically changes and importance of the processes as well as their ways of implementation can be modified according to project progress and realization. Time table it is a tool which, in graphical form provides full information about project tasks during lifetime of the project. Thanks to it, all partners have opportunity to keep deadlines and check own tasks to do: Meeting No 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 2 2.1 2.2 2.3 2.4 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 4 4.1 4.2 4.3 5 5.1 5.2 5.3 5.4 5.5 6 6.1 6.2 6.3 7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 Work package/task Management and coordination activities Kick-off meeting, Kraków 09-10.01.2014 Constitution of the Project's working groups Signature of collaboration contracts with partners Development of project's intranet Development of the project's website Six month internal raport Mid-term report and final report Consortium meeting Bulgaria Consortium meeting Cyprus Consortium meeting Romania Consortium meeting Slovakia Need analyses Methodology and questionaire development Survey Development of national needs report Development of Integrated report Update and development of the training content Developing training metodology Update and development of the general module Update and development of biomass module Update and development of agro-biogas plants module Update and development of geothermal energy module Update and development of solar energy module Update and development of wind energy module Update and development of water energy module Translation Electronic resources development and administration Development and maintaning training platform Integration of the training resources into training platform Management electronic resources of the project Pilot testing Development of the manuals for tutors and trainees Development of questionnaire for evaluation report Providing pilot case Development of the national evaluation reports Development of the integrated evaluation report Quality control plan Development of the quality management plan 6 months evaluation report Evaluation report at the end of the project Dissemination and valorisation Development of project leaflet and promotion materials Development project website Providing dissemination national conferences Providing dissemination international conference Articles, advertisments etc.in press, electronic media, etc. National reports from the conferences Development integrated conferences raport Development integrated dissemination raport Lead partner Partner involved IZ PIB All IZ PIB All IZ PIB All IZ PIB All IZ PIB All IZ PIB All IZ PIB All IZ PIB All Zem. Inst. All Eurosuccess All CPIP All SUA All SUA All SUA All SUA All SUA All SUA SUA Zem. Inst. All CPIP Zem.Inst. SUA IZ PIB Zem. Inst. IZ PIB IZ PIB Zem.Inst. SUA CPIP Eurosuccess Zem.Inst. CPIP Eurosuccess SUA IZ PIB Eurosuccess All IZ PIB All IZ PIB All IZ PIB All IZ PIB All Eurosuccess All IZ PIB SUA Eurosuccess All All All Eurosuccess All Eurosuccess Eurosuccess IZ PIB All IZ PIB CPIP IZ PIB All IZ PIB IZ PIB CPIP All CPIP All IZ PIB All CPIP All SUA All CPIP All CPIP All CPIP All CPIP All 2013 12 1 2 3 4 Deliverables 5 6 2014 7 8 Conferences 9 10 11 12 1 2 3 4 5 2015 6 7 8 9 10 11 Risk management – faces difficulties which may appear during implementation and realization of the project. The most important part of the process is identification and definining of risks in a selected domain of interest. Once risks have been identified, they must then be assessed as to their potential severity of impact (generally a negative impact, such as damage or loss) and to the probability of occurrence. The fundamental difficulty in risk assessment is determining the rate of occurrence since statistical information is not available on all kinds of past incidents. Furthermore, evaluating the severity of the consequences (impact) is often quite difficult for intangible assets. As the project is not of very high complexity, identification of main threats is possible and those are: delays in elaborating of specific tasks, communication problems caused by cultural variety and linguistic barrier, staff problems, despite of using the same standards established by consortium, various level of training materials, problems – mostly technical - caused by sub-contraceted companies. QMM faces most of the above threats. To avoid serious risks endangering the project, consortium partners are obliged to inform the leader about problems and difficulties as soon as they appear. Internal communication - It is important to use a range of tools, including face-to-face meetings. Good communication and good partnership working need good tools. Communication methods should allow partners to stay focused on the project objectives. Realization of the project within international consortium is cultural and linguistic challenge. There are no easy solutions, but recognizing the problems is an important step towards a solution. Internet voice conferences and webinars will be used to solve arisen problems in the time between the meetings. These tools will also be used for preparation of the partnership for meetings. Need analysis – is basic and key tool required for providing high quality of project outcomes. It stands grounds for any further project activity as well as delivery of high quality of final products corresponding to real needs of project beneficiaries. Training methodology – needs to be elaborated throughout partners’ cooperation and established to define level of quality for final project results/products/outputs. Elaborating of training methodology is very important process, which by means of partners close cooperation and mutual feedback has to determine outcomes level according to the same standards. It refers directly to the ‘inspection over prevention’ concept being – together with needs analysis – part of the project planning. Training methodology defines: theoretical background and training curricula, methodology of training materials elaboration (technical requirements), methodology of executing of the training(s). Internal evaluation – is deemed as a part of ‘check’ stage. This process starts directly after finishing of training materials content elaboration and engages all partners’ activity. Cross-evaluation of elaborated materials should be executed by the whole consortium before triggering of another process related to project stage of pilot training. Feedback provided by partners is measurable and as such, very important as beginning of the checking process. Internal evaluation will be executed by means of: a) internal evaluation form; according to: b) internal evaluation schedule. Partners’ responsibility range – while being described in the attachments to the contracts between the partners and the leader, scope of partners’ responsibility must be precisely defined, but also stays dynamic in face of possible risks. Attachments: 1) 2) 3) 4) 5) 6) staff timesheets form, activity report form, travel & subsistence report form, financial report table (provided by Polish National Agency) internal evaluation form internal evaluation schedule (Above attachments are provided as separate documents)