Dynamic MRP Script MRP Demo Steps Stock/Requirements List Complicated, Dynamic MRP Record Show collective access to Stock/Requirements List Show Define Traffic Light Set new, opening date in past to Yellow Set new, start date in past to Red Select NRG-A and NRG-B, then show overview tree Show Favorites Icons (5 Max) Add Create Sales Order (VA01) Use icon ICON_CALL_CONSULT (near bottom of list) Load Navigation Profile (5 Max) MRP 1 Show Lot Size is EX (LFL). MRP 2 In-house Production Time: 10 GR Processing Time: 2 Sched. Margin Key: Floats MRP 3 Strategy 10 (display list) Total Replenishment Lead Time Explain Refresh Functionality Minimize database “calls”, so display is not dynamic Show Title: Stock/Requirements List as of XX:XX Hrs Refresh, then show new time Demonstrate by created planned independent requirements. 1 Dynamic MRP Script Create Planned Independent Requirements Use Version 10 Confirm requirements type LSF Create Planned Independent Requirements of 100 units for 3 months Note: Make sure that 1st of the first month is at least 15 days in the future Save, demonstrate refresh Run MRP Demonstrate: GR/AV Date Display Production Order Show Order Finish and Order Start: Difference? Go to MRP 2 via double-click on Material Number Change Lot Sizing: FX (50) Run MRP—two orders!? How to get 1 order in multiples of 50? EX with rounding value of 50. Demo. Change 1st planned independent requirement to 120. Run MRP. Get 1st order for 150 units. Change Independent Requirement back to 100 and add demand for 100 units in earlier period Run MRP. Notice Red Traffic Light. Notice Exception Message. Release Production Order Note basic date differences: Why? Display Production Order Click on Operation Overview icon Scroll over to see times (setup, operation, wait, queue) Times come from routing: Importance of routings are underemphasized in textbooks BOM levels vs. operations on routings an interesting issue Click on Header icon Note backward scheduling Note: Can tell SAP to make In-house production time consistent with routing times 2 Dynamic MRP Script Confirm Production: No change on S/R list—accounting change. Receive goods for order: Movement Type 101 Storage Location 300 (use search to show list) Refresh Display Stock/Stock Overview—note storage location Change Units of Measure. Show conversion on Material master. What if we want to build up inventory for a seasonal product? Create Independent Production Order Create New Session Follow menu path: Logistics Production Production Control Order Create CO01 With Material Show how to use transaction code CO01 Material: 00F100 Plant: 00PT Order Type: PP01 Total quant.: 100 CS Finish Date: 2 weeks into future Save. Switch back to S/R List. Point out difference between this process and using icons Refresh Should end up with 100 units in inventory at end of planning horizon Rerun MRP. Refresh Can we build up inventory with Strategy 10? No! This is typical logic taught in MRP texts Need a different strategy (11). 3 Dynamic MRP Script Relationship of Customer Orders to MRP Plans Create Customer Order for 50 Units: Order type: OR Sales Org.: 00FS Dist. Ch.: DI Division: SB Customer: 1 PO: any number Req. deliv. date: leave as today Order Quantity: 50 Show Availability Check: Delivery Proposal allows for 2 days to pick/pack (1 day) & load time (1 day) To display these entries: Switch sessions Go to IMG (transaction code SPRO) Follow menu path: Logistics Execution Shipping Basic Shipping Functions Scheduling Delivery Scheduling and Transportation Scheduling Define Scheduling By Shipping Point Display 00SP Note entries Note importance of knowing where to find things in SAP! Switch back to Sales Order session Save order Refresh Note that customer order does not impact calculations—no negative inventory, no reduction of planned independent requirements 4 Dynamic MRP Script Create Customer Order for 100 Units: Order type: OR Sales Org.: 00FS Dist. Ch.: DI Division: SB Customer: 1 PO: any number Req. deliv. date: today Order Quantity: 50 Show Availability Check (should be automatic) Delivery Proposal gives options for: One-time delivery on required delivery date Complete delivery (new date) Delivery Proposal (Multiple shipments) Select Delivery Proposal Save order Refresh Note there is no effect on available quantity. Note that the order shows as one line. Display second order Click on Schedule lines for Item icon Where does last delivery date come from? Display calendar, count number of days: 17 Exit to S/R List, display Material Master, MRP 3 View Availability Check, Tot. Repl. lead time: 15 days Plus 1 day for pick/pack and 1 day for load Exit Run MRP. No additional planned orders created. How do we consider customer orders? Strategy 40. 5 Dynamic MRP Script Demonstrate Strategy 11 Clear S/R List Display details of customer orders, change order, click on Reject Document icon , use Unreasonable Request, save. Delete planned independent requirements Rerun MRP Display production order, change, FunctionsDeletion flagActivate Save order. Change Material Master to Strategy 11, Mixed MRP to 2 (Gross requirements planning) Create Planned Independent Requirements (version 11, BSF, 3 periods of 100 units) What if we want to build up inventory? Create Independent Production Order Switch Sessions Enter Transaction CO01 Material: 00F100 Plant: 00PT Order Type: PP01 Total quant.: 100 CS Finish Date: 2 weeks into future Save. Switch to S/R List. Refresh. Rerun MRP. Refresh. Can we build up inventory? Yes! 6