Risk Assessment Form – Level Crossing PART A – Assessment Summary Risk Assessment Number: Assessment Date & Time: Assessment Location: Initial Assessment Revised Assessment Department: RISK ASSESSMENT TEAM NAME POSITION SIGNED RLX Number (Crossing number): Crossing type (e.g. Passive – Give Way): Line section (Railway reference) INSERT PHOTO / DIAGRAM DEPARTMENT / WORKS MANAGER (sign-off once completed): Name: Signed: Date: REW REPRESENTATIVE (sign-off once completed): Name: Signed: Date: Railway Interface Risk Assessment Form Uncontrolled when printed Page 1 of 7 Page 1 of 7 Review date: : February 2016 DATE Risk Assessment Process Prior to completing the on-site assessment, ensure you are appropriately attired – PPE Identify all interface hazards that concern the Road Corridor and risk assess them using the matrices included in this tool. Whilst on site, observe traffic and motorist behaviour, where possible. For example, drivers consistently/regularly failing to check both ways prior to crossing where only passive controls (e.g. Give Way signs) are in place will increase the likelihood of an incident occuring. All identified risks should be recorded on a Rail Interface Risk Register. Please also identify and record where another party (other than Rail or Road operator) may be implicated, and who will notify them. Example layout of the Danger Zone and Safe Places in a rail corridor Railway Interface Risk Assessment Form Document Number: XXX Version: 1 Dated: Aug 2014 PART B – Hazard Identification No. Potential hazards to check 1. 1.1 Risk rating (refer Matrix) Proposed actions / treatment Responsible party Road Pavement – in road corridor Surface conditions 1.2 Risks identified Worn/smooth? Corrugations? Potholes, loose materials, vegetation? e.g. braking issues for vehicles due to smooth surface Pedestrian trip hazards Additional comments 2. Yellow Box Marking 2.1 3 metres before level crossing? 2.2 5 metres after level crossing? 2.3 Visible/good condition? (scrubbing, faded?) e.g. train-vehicle collision caused by short stacking on northerly approach. Additional comments Railway Interface Risk Assessment Form Document Number: XXX Version: 1 Dated: Aug 2014 Uncontrolled when printed Page 3 of 3 Page 3 of 7 Review date: Aug 2015 No. Potential hazards to check 3. Risks identified Risk rating (refer Matrix) Proposed actions / treatment Responsible party Pavement marking – in road corridor 3.1 ‘Rail X’ (scrubbing?) 3.2 ‘Stop’ line 3.3 ‘Give Way’ line 3.4 Barrier (condition) Additional comments 4. Traffic control 4.1 Advance warning signage – visible on approach by motorists (e.g. line of sight issues with vegetation or design/placement) 4.2 Active advanced warning signs visible on approach by motorists (e.g. line of sight issues with vegetation or design/placement) Additional comments Railway Interface Risk Assessment Form Document Number: XXX Version: 1 Dated: Aug 2014 Uncontrolled when printed Page 4 of 3 Page 4 of 7 Review date: Aug 2015 No. Hazards identified 5. 5.1 5.2 Risks identified Risk rating (refer Matrix) Proposed actions / treatment Responsible party Line of sight From road (both approaches): Left? Right? At road corridor interface (assess in situ at driver height for standard sedan vehicle) At passive? At active? e.g. vehicle-train collision caused by vegetation obscuring view to left/east on northerly approach e.g. vehicle-train collision caused by poor visibility when looking to the east in static position at level crossing whilst travelling/facing south. Additional comments Railway Interface Risk Assessment Form Document Number: XXX Version: 1 Dated: Aug 2014 Uncontrolled when printed Page 5 of 3 Page 5 of 7 Review date: Aug 2015 Risk Rating LIKELIHOOD Label A Descriptor Almost Certain B Likely C Possible D Unlikely E Rare Description This event will occur at least on an annual basis The event has occurred several times or more in your career The event might occur once in your career The event does occur somewhere in the industry from time to time Heard of something Indicative frequency More than one occurrence per year Recorded occurrences within a 5 year period Recorded occurrences within 10 year period Recorded occurrences within a 20 year period Once in 30 years CONSEQUENCE Label 5 4 3 Descriptor Catastrophic Major Moderate 2 Minor 1 Insignificant Reputation/Brand High impact long-term issue with major reputation or community consequences requiring Board intervention Long-term issue with major reputation or community impact requiring Board Committee intervention Financial / Legal Infrastructure Financial Loss over $5M Major third party litigation Long term loss of or inability to use critical infrastructure Financial Loss between $1 5M Serious third party litigation/dispute Long term loss of or inability to use support infrastructure Long-term issue with major reputation or community impact requiring CEO intervention Financial Loss between $500k – 1M Limited impact third party litigation / dispute Significant degradation of infrastructure Medium term issue with significant or community impact with requiring CEO intervention Community incident requiring management incident Financial Loss between $100k – 500k Threat of third party litigation Financial loss under $100k Minor threat of third party litigation Railway Interface Risk Assessment Form Document Number: XXX Version: 1 Dated: Aug 2014 Safety Permanent disabling injury of fatality Multiple serious injuries. Extended inpatient treatment and or rehabilitation Outpatient treatment at a hospital or inpatient treatment for non permanent injury Environment Serious environmental issue with long term wide scale irreversible impacts Long-term issue with major environmental impact, some possible irreversible impacts Regulatory intervention, local community angst longer term but reversible impacts Degradation of infrastructure Minor lost timer and or medical treatment at a hospital Possible intervention by regulator, some community interest, short term reversible impact Short term minor issues with use of infrastructure No treatment required or minor first aid treatment Minor incident no intervention by regulator minor community interest Uncontrolled when printed Page 6 of 3 Page 6 of 7 Review date: Aug 2015 RISK RATING MATRIX Insignificant 1 Minor 2 CONSEQUENCES Moderate 3 Major 4 Catastrophic 5 Medium (M) High (H) High Extreme (E) Extreme Medium Medium High High Extreme C – Possible Low (L) Medium High High High D – Unlikely Low Low Medium Medium High E – Rare Low Low Medium Medium High LIKELIHOOD A – Almost Certain B – Likely RISK RATING Extreme High Medium Low Immediate senior management attention required. No recommencement of activity until formal management guidance is received Senior management attention needed. Action plans and management responsibility specified. Managed at line management level. Manage by specific monitoring or response procedures, with management responsibility specified Managed at team level. Managed by routine procedures, unlikely to need specific application of resources. HIERARCHY OF CONTROL 1. Eliminate 2. Substitute/ Isolate/ Engineering 3. Admin/ PPE Eliminate the hazards Substitute the hazard with something safer. Isolate the hazard from people. Reduce the risks through engineering controls Reduce exposure to the hazard using administrative actions. Use personal protective equipment (PPE) Railway Interface Risk Assessment Form Document Number: XXX Version: 1 Dated: Aug 2014 Uncontrolled when printed Page 7 of 3 Page 7 of 7 Review date: Aug 2015