31421_Nyhamna_SecuringALongerFuture_CL Film Transcript

advertisement
Title: 31421_Nyhamna_SecuringALongerFuture_CL
Duration: 3:23 minutes
31421_Nyhamna_SecuringALongerFuture_CL Film Transcript
[Text Displays]
Nyhamna Expansion Project
Securing a longer future for the Nyhamna gas plant
[Background Music]
Shell theme instrumental music.
[Video Footage]
Aerial view of Nyhamna by night, the plant lit up by a myriad of lights, set against a black landscape
and a dark blue night sky.
Interview with Kitty Eide
[Kitty]
This is Nyhamna. This is where the Ormen Lange gas is processed and exported to Europe. Production
is running as normal, at the same time as Nyhamna is undergoing a major expansion project in order to
take in gas from other fields. We also install new compressors to boost the gas recovery and extend
the lifetime of the giant Ormen Lange gas field.
[Video Footage]
Bird’s eye view of plant buildings by night, light reflecting building exteriors that appear to be gold and
platinum in colour, against a background of a black night sky.
A couple of trucks and another vehicle can be seen, driving along the lit roads of the plant.
Cut to turnstile exit gates of plant by night, several workmen in overalls seen in the background as one
workman in overalls and headlamp, crosses from left to right of frame at close range
Close-up of front view of bus, driver visible through the darkened windscreen as workmen in reflective
jackets file onto the bus, LED destination sign ‘shuttle’ clear against the darkness of evening.
Wide fast motion view of plant entrance, seen against a night sky, street lamps burning, turnstile and
bicycle racks visible as light reflects off the asphalt surface.
People and vehicles are seen coming and going through the shot in fast motion.
Wide shot of plant at street level view, tall street lights burning, buildings lit against a dark blue night
sky, taillights of a bus in motion visible in rear view.
Rear view of workman in overalls, helmet and safety gear, walking away from camera against the
background of the plant by day, the background dominated by a line of red road barriers, scaffolding, a
bridge structure and a truck.
Mid-shot of three workmen by day, against the background of the plant, wearing reflective coats and
safety helmets, as the central figure hands one of his two files to the figure left of frame.
[Video Footage]
Mid-shot of Kitty, wearing orange overalls, googles and a yellow safety helmet on which the shell logo
is visible, all against the background of the plant, buildings lit by night against a black sky.
[Super: Name and title]
Kitty Eide
Communications Manager – Norway Operations and Projects
[Kitty]
A great deal of work has gone into planning, design and fabrication at the various locations all over the
world.
[Video Footage]
Close-up of Kitty.
[Kitty]
And it’s all coming together, here at Nyhamna.
[Video Footage]
Wide aerial shot of plant by day, against a background of green fields and blue sea.
[Audio]
Jackhammer-type sounds
[Video Footage]
Wide shot of workman wearing reflective clothing, helmet and goggles, and peering through the lens
atop a surveying tripod, another workman visible in the background and all set against gleaming metal
pipes and structures of the plant in the background.
Close-up of crane head tearing through rock.
Wide shot of crane seen against the background of the plant, drilling into the rock beneath it.
[Super]
From 2013
Foundation Work
- 40 000 M3 of concrete
- 220 000 M3 of excavation
5 000 tonnes of reinforcement bars
Video Footage]
Aerial view of plant by day.
Aerial pan over various structures of the plant.
[Super]
2014
Expanding Camp Capacity
- Norway’s biggest hotel with 1 584 rooms at peak
- Hosting workers of many nationalities
Video Footage]
Wide bird’s eye view of Nyhamna by day, both green and rocky scenery shown in the background,
fading to the distant view of the sea beneath a sky of wispy clouds.
Wide shot of a large signboard showing a pretty aerial view of buildings alongside written information.
The signboard is set in front of a burgundy-painted building, and a man can be seen ascending a short
flight of stairs to enter the building.
Wide low angle shot of ships, lights reflecting across the still waters in the foreground, the black night
sky forming the background.
Wide shot of jig-type plant equipment pulling a pipe into position, set against the background of a
night sky.
[Super]
March 2015
Polarled Tie-in
- 482 km long pipeline starting at Nyhamna
- Taking Norwegian gas infrastructure north of the Arctic Circle
Video Footage]
Wide view of pipeline, against the background of a night sky lit by the lights of the plant, three
workmen also seen in the background.
Wide rear view of gesturing workman in safety gear, shell logo on his back, against the background of
the plant and the night sky.
Wide side view of pipeline, three workmen in safety dear in the background.
Wide view of two workmen by night in safety gear, high-fiving against the background of a fence
structure set in front of a rocky area.
[Super]
May-June 2015
Nyhamna Turnaround
- 41 days production shutdown
- Large project modifications scope
- 1 500+ people on site at peak
- 220+ new connection points established
Video Footage]
Bird’s eye view of Nyhamna, plant, green countryside and seas/waters visible in the background.
[Super]
Spring-Summer 2015
Arrival of the Giants
- Booster compressor modules – 1 100 tonnes each
- Export compressor module – 980 tonnes
- 50+ new modules included in total scope
[Video Footage]
Cut to side view of compressor module in process of being moved, against the background of the plant
and surrounding waters and green countryside.
Fast motion shot of compressor being moved within the plant.
Interview with Léon Schöpping
[Léon]
This transportation operation is for the first big module. It has been moved very safely and steadily
throughout the plant.
[Video Footage]
Close-up of Léon, wearing safety gear, shown against the background of the plant.
[Super: Name and title]
Léon Schöpping
Site Construction Manager
Shell
[Léon]
So I’m really pleased by the way how this transportation has been carried out.
[Super]
Autumn 2015
[Audio]
Factory sounds, workmen voices.
[Video Footage]
Close-up side view of workman, wearing safety gear, against the background of pipes and various other
plant machinery, other workmen also visible in the background.
Close-up of hands in safety gloves, one hand on a long pipe attached to plant machinery, the other
operating pliers to cut a wire over the pipe.
Wide side angle of the same pipe scene, one gloved hand holding the pipe.
Interview with Sondre Roven
[Super: Name and title]
Sondre Roven
Shift Worker – Concrete AF Group
Shell
[Video Footage]
Close-up of Sondre, waring safety gear, including helmet and goggles, against the background of the
plant.
[Sondre]
It is fun to be a small part of all the big things that has happened here, to see the big modules arrive
[Video Footage]
Wide view of crane lifting and turning scaffolding carrying the module.
[Sondre]
And be put into place and that the puzzle is sort of coming together.
Interview with Trond Helge Olsen
[Super: Name and title]
Trond Helge Olsen
Supervisor – Piping
Kværner
[Video Footage]
Close-up of Trond against the background of the plant.
[Trond]
A lot is going on; we see buildings rising and new sections and pipe racks are coming in.
[Video Footage]
Wide high angle view of plant scaffolding.
[Trond]
Of course, with so many people it is a challenge getting everything to work, but I believe it has gone
really well.
[Video Footage]
Blurred close up of workmen crossing from left to right frame, revealing rear view of ‘Flagman’ in
safety gear, guiding a flatbed transporter vehicle.
Close-up of three men in safety gear, gesturing and thumbs-upping.
Low angle mid-shot of ready-mix truck crossing from right to left frame, against the background of the
plant.
Close-up of smiling workman in safety gear, shown behind hydraulic mechanism of ready-mix truck.
Close-up of ready-mix truck chute, pouring concrete.
Close-up side view of workman looking on as concrete is pouring.
Wide-view from inside a plant container of extension crane reaching out to a truck seen in side view.
Interview with Jan-Willem Verkaik
[Jan-Willem]
The project is like a big orchestra where you have the various musicians preparing their own part in
isolation, and then it has to come together here at Nyhamna.
[Video Footage]
Close-up of pipe hydraulically down pumping into reinforced template, the safety shod feet of a
workman alongside the pump.
Wide view of workmen standing on reinforced template, workmen frame left operating cables involved
in the setting of the concrete.
Zoom down into reinforced template.
Wide view of white plant structures, plant machinery moving left to right in the foreground.
[Super: Name and title]
Jan-Willem Verkaik
Senior Project Manager
Shell
[Video Footage]
Close-up of Jan-Willem, wearing safety gear, including goggles, against the background of the plant and
grey skies.
[Jan-Willem]
All into one big orchestra. So far, we’re two-thirds of the way, it has worked. We’re hopeful and, in
fact, confident that we’ll make it all the way.
[Audio]
Sounds of bolts engaging and workmen’s voices.
[Video Footage]
Wide side angle of workmen in safety gear assembling pipes, supporting chains hanging in the
foreground.
Side view close-up of workman assembling large pipes in the plant.
Front view close-up of workman giving thumbs-up.
Wide view of workman assembling pipes.
[Super]
Polarled Partners:
Statoil, Petoro, Wintershall, OMV, Shell, TOTAL, DEA,
Edison, ConocoPhillips, Maersk Oil, GDF SUEZ
Ormen Lange Partners:
Shell, Petoro, Statoil, DONG, ExxonMobil
[Audio]
Shell jingle
[Graphic]
Shell logo
[Text Displays]
A/S Norske Shell
Download