Rutotech International Limited HEALTH, SAFETY AND ENVIRONMENTAL POLICY January 2011 1 HEALTH SAFETY AND ENVIRONMENT POLICY (HSE) SAFETY POLICY RUTOTECH INTERNATIONAL LIMITED recognizes the importance of health and safety issues and is fully committed to developing an HSE policy and management system. We have implemented a full HSE policy to ensure that our operations are done in a safe manner. Identification and awareness of RUTOTECH’s HSE issues is the responsibility of all employees and associated consultants. All personnel have an obligation to apply operating practices and procedures, which will ensure the safety and health of themselves and their colleagues. Employees and consultants are advised to make themselves aware and adhere to the HSE policies of a Client, when visiting or working within the client's premises. OBJECTIVES RUTOTECH INTERNATIONAL LIMITED has identified the following key objectives to serve as the core in-house Safety Policy: To comply with regulatory guidelines and industry standards. For example, RUTOTECH INTERNATIONAL LIMITED adhere to the following Acts of Parliament: Health and Safety at Work etc Act 1974 Factories Act 1961 Mines and Quarries Act 1954 Offices, Shops and Railway Premises Act 1963 To reduce levels of all lost time accidents To report all safety incidents and issues To continually develop and improve the Safety Management System To develop an awareness of HSE issues in employees and consultants To continually improve HSE standards SAFETY MANAGEMENT SYSTEM 2 Responsibility Rutotech International Limited's Directors and Managers are responsible for commitment to this Policy by ensuring that resources are provided for all employees and associated consultants to adhere to the Safety Management System. Awareness and Reporting All employees and associated consultants are made aware of RUTOTECH’s Safety policy during induction to the company. All employees and associated consultants are made aware of the need to complete an Accident/Near-Miss Incident Report Form following an incident at RUTOTECH’s or a client's premises. Company HSE targets are discussed at quarterly Company Performance Meetings with all employees in attendance. RUTOTECH’s performance in relation to these targets is monitored and discussed. Targets Targets for the reduction of lost time accidents and the reduction of incidents are set annually within the annual budget review. Examples of HSE targets set: Have no lost time accidents Responsibility: All employees and associated consultants Reduce incidents Responsibility: All employees and associated consultants Audits RUTOTECH’s performance in relation to these targets is discussed at quarterly Company Performance Meetings. The Managing Director, in conjunction with RUTOTECH’s Consultant Services Manager, will report on the progress towards these targets and discuss awareness if the targets are not being met. Incentives RUTOTECH INTERNATIONAL LIMITED distributes company bonus to all employees if all company budget targets are met. This includes performance, quality, safety and environmental targets. 3 CONTRACT MANAGEMENT SAFETY ISSUES On award of a major contract, RUTOTECH INTERNATIONAL LIMITED will adopt key HSE performance standards thus aligning themselves with those of our client. To date, examples of alignment with our customers (Operator, Lead Contractor and Sub-Contractor) has been through the development of interface documents which define responsibilities and provide a formal record (as detailed in the points above) that all aspects of managing health and safety are suitably cross-referenced between the various Management Systems involved. Although we have been successful in the development and application of these interfaces according to recognized methodology, we recognize that there is a need for a Safety Management System (SMS) interface which uses the most successful and innovative approach of the companies involved with the objective to apply best HS&E practices throughout the project. We believe it necessary to implement a process of comparing the individual companies approach to such topics as Risk Assessment, COSHH procedures, Incident Investigation (Causation Analysis techniques), auditing and inspection procedures, etc. From this comparison the technique(s) judged to be the most successful could then be adapted across all companies participating in the project SMS interface to develop a common safety culture with shared purposes, objectives, resources (training, etc.) and an improved sense of ownership and identity of the SMS Interface which would be demonstrable at all levels. Through application of such a policy it is not intended to undermine the individual companies working practices, but to provide, through consensus, the widest application of those procedures shown to be the most successful. By definition, SMS allows for continuous improvement and the adaptation of procedures to individual contract/customer requirements. As individual companies gain expertise within safety management over the duration of the project (and in other contracts/with other customers) the SMS interface can be amended through such feedback to reflect these experiences. Hazard and Risk Management In conjunction with existing hazard register documenting generic hazards inherent in the scope of work being tendered, RUTOTECH INTERNATIONAL LIMITED will review the ability to firstly comply with existing management controls and secondly take steps to possibly further reduce the risks. New risks identified, once assessed, shall either be prevented (engineered out) or managed through a combination of mitigation and 4 control such that the risk is acceptable. The identification of risks and hazards will not only be limited to personal safety but will also extend to include risks to the environment as a result of RUTOTECH’s activities. The foundation of any HSE management is the identification of risks from the frequency, severity and type of near misses and accidents. A risk identification and elimination program will be used from which a risk profile is generated identifying areas of the operation in which more training and resources are required. Risk assessments and hazard registers shall be reviewed and updated at specific intervals and as changes occur. Projects and Operations A clearly defined and auditable process shall be documented which defines RUTOTECH’s management of their activities with regard to planning, engineering, execution and evaluation in such a way that RUTOTECH INTERNATIONAL LIMITED does not exceed acceptable levels of risk. Thus technical and safety integrity can be demonstrated and maintained throughout. Significant changes to approved written programmes shall be documented by a formal process with QA/QC documentation controls demonstrating these and previous management activities. The servicing of any equipment used in the provision of the services performed by RUTOTECH INTERNATIONAL LIMITED (including lifting equipment, protective devices) will be undertaken in accordance with schedules that maintain the technical integrity of the equipment. Where equipment repairs or re-manufacture of equipment is required, then these shall be done to specifications which preserve the original integrity or equipment manufacturer specification respectively. Competence, Selection and Training Following a review of RUTOTECH INTERNATIONAL LIMITED key roles and responsibilities, senior management will select a team in order to meet the requirements of the positions identified. This will be performed by review of CV’s, relevant industry experience and interview. Training, development and competence assurance programmes currently exist within the front line field activities performed by RUTOTECH INTERNATIONAL LIMITED. In the strive for continuous improvement, any changes to job holders current roles and responsibilities will be further assessed and, where necessary, changes made to the training, development and competence assurance controls. Job descriptions and detailed roles and responsibilities will be developed for all key / critical positions. Performance in these positions will be regularly appraised against 5 agreed Standards of Performance and the results used to plan further development and continuing improvements in performance. Communications RUTOTECH INTERNATIONAL LIMITED will provide for an open and effective consultation medium with representatives from the workforce, suppliers and clients management. This communication will be both informal and through a hierarchy of HSE functions, which will also provide for the sharing of significant HSE experiences and lessons learnt by all concerned. Examples of these methods are: Safety bulletin boards, HSE alerts etc. Presentations within RUTOTECH INTERNATIONAL LIMITED A mechanism for continuous improvement that will provide opportunities for suggestions to be made, assessed and implemented where appropriate Circulation of safety publications and in-house magazines/newsletters The use of an electronic mail system Occupational Health and Safety It will be RUTOTECH’s policy to promote a work place, which protects the health of the workforce, contractors and the surrounding community. The emphasis will be through prevention, education, voluntary participation and personal responsibility. Through improvement of industrial hygiene, ergonomics and safety, the aim is to reduce work related health risks. We will also promote fitness and well-being as a proactive initiative for all employees who will be required to have a medical examination. Environmental Protection Environmental management is an issue of great complexity involving the whole spectrum of human activities. Recognizing that we all share in environment protection, RUTOTECH INTERNATIONAL LIMITED has made a pledge to improve its technology and train its people to minimize damage to the environment. As such, it will be RUTOTECH’s policy to conduct its operations in a manner, which assures optimum protection of the environment. In addition to careful compliance with relevant laws and regulations, efficient use of natural resources and waste reduction are keys to achieving this objective. The policy commits us to provide regular training to all employees, improve our technology and enlist the co-operation of our suppliers, customers and neighboring communities to build better environmental practices. 6 The policy will be further managed through: Periodic environmental audits of all sites to ensure compliance with and continuous improvement of operating standards. Environmental impact assessments of new products, processes and operations. Product Stewardship RUTOTECH INTERNATIONAL LIMITED undertakes assessments of both hazards and risks associated with all products used in the provision of services within their industry activities. The assessment includes consideration of the potential consequences for the user and the environment arising from the accidental release of the products during transportation, storage and disposal. Purchasing and Contracting RUTOTECH INTERNATIONAL LIMITED will assess the capability of the supplier to satisfy our requirements prior to commitment. The assessment and selection of suppliers, and sub contractors when required, shall be based on the capability of the HSE risk potential to the activities to be performed. Any assessments, in the form of questionnaires and / or audits will include HS & E policies and management systems with the aim of assessing whether these important matters are handled effectively and the capability of the supplier / sub-contractor to satisfy HS & E Management System requirements. Where required, as in the case of HSE risk potential being critically high, mechanisms for monitoring performance shall be designed and appropriate to the concerns identified to ensure good and improving performance is maintained. Poor HSE performance shall merit consideration of early termination of any agreements. Interface documents for the HSE system interfaces shall also be provided for those identified as critically high. Incident Investigation All accidents and incidents with a seriously high potential will be reported and investigated. Resources will be dedicated to facilitate the establishment of their basic cause(s), which is fundamental to the identification of remedial measures required to prevent recurrence. The level of investigation shall be determined by RUTOTECH INTERNATIONAL LIMITED based upon the severity, or potential severity, of the event. Results of investigations and the development of accident trends will be communicated. Emergency Preparedness RUTOTECH INTERNATIONAL LIMITED will consolidate existing emergency response plans within the organization in order to benefit from any synergy gained. The plans will be appropriate to the responsibility of RUTOTECH INTERNATIONAL LIMITED and 7 applicable to the types of operations being performed. RUTOTECH INTERNATIONAL LIMITED workforce will comply with any requirements of the company’s emergency response systems and will encourage active involvement in any training exercises or drills taking place. Self Regulation and Audit Compliance with any management system can only be verified through self regulation, inspections and audits. A detailed audit plan will be prepared to cover both office and field activities performed by RUTOTECH INTERNATIONAL LIMITED. Audits shall be carried out by auditors independent of the function being audited. Continuous improvement shall be achieved by formally reviewing audit findings, implementing appropriate action plans and following up to ensure effectiveness of those improvement plans. Performance Standards Based on the performance standards and objectives of our client, RUTOTECH INTERNATIONAL LIMITED will develop an HSE performance standard aligning with those of the clients, and appropriate to the level of influence and responsibility of RUTOTECH INTERNATIONAL LIMITED and applicable to RUTOTECH INTERNATIONAL LIMITED activities. Regular review and audits of these standards will indicate the degree of success. ENVIRONMENTAL POLICY RUTOTECH INTERNATIONAL LIMITED recognizes the importance of protecting the environment and is fully committed to developing an environmental policy and management system. We have implemented an environmental policy to ensure that the impact of our operations upon the environment is reduced to a minimum. Identification and awareness of RUTOTECH’s environmental impact is the responsibility of all employees and associated consultants. All personnel have an obligation to apply operating practices and procedures, which will ensure the protection of the environment, and the safety and health of themselves and their colleagues. Employees and consultants are advised to make themselves aware and adhere to the environmental policies of a Client, when visiting or working within the client's premises. 8 OBJECTIVES RUTOTECH INTERNATIONAL LIMITED has identified the following key objectives and to serve as the core of the in-house Environmental Policy: To comply with regulatory guidelines and industry standards. To reduce levels of energy consumption. To reduce levels of waste produced and recycle or reuse wherever possible. To continually develop and improve the Environmental Management System. To develop an awareness of environmental issues in employees and consultants. To continually improve environmental performance. ENVIRONMENTAL MANAGEMENT SYSTEM Responsibility Rutotech International Limited's Directors and Managers are responsible for commitment to this Policy by ensuring that resources are provided for all employees and associated consultants to adhere to the Environmental Management System. Awareness All employees and associated consultants are made aware of RUTOTECH’s Environmental policy during induction to the company. Company Environmental targets are discussed at quarterly Company Performance Meetings with all employees in attendance. RUTOTECH’s performance in relation to these targets is discussed. Energy Consumption and Waste Reduction Targets Targets for the reduction of energy consumption and the reduction of waste produced are set annually within the annual budget review. Examples of Environmental targets set: Recycle as much as possible and as a minimum all paper in the office Responsibility: All employees and associated consultants Audits RUTOTECH’s performance in relation to these targets is discussed at quarterly Company Performance Meetings. The Managing Director, in conjunction with RUTOTECH’s Office Manager's, will report on the progress towards these targets and discuss awareness if the targets are not being met. 9 RUTOTECH ENVIRONMENTAL AND WASTE MANAGEMENT MANUAL 10 TABLE OF CONTENT Section No. Title Page 1 The General Environment 3 2 Environmental Management Policy Statement 3 3. The Industrial and Oil Industry Environment 4 4. Safe Handling of Chemicals 5 5. Rutotech Operations and Waste Mgt 8 6. Management of Discharges to Water and 7. Emissions to Air 12 Pollution Prevention and Spill Response 14 11 1. THE General Environment 1.1 What is the environment Environment is man's life support system consisting of air, water, land and all plants, human beings and animals living there-in and the inter-relationship which exists among them. The environment is therefore the structure around which our lives and those of future generations are built. The environment permits all the things we require for life, too much or too less of which is adverse to our existence. 1.2 Why is the environment important? The environment is important in terms of its function, characteristics, working principles and sensitivities. Function The environment is the support system for our life and that of future generations. The environment is the material base for all industrial activities. Characteristics The environment is continuous all over the world. Impact on the environment is never localized. The environment is resilient but dependent on time to re-establish itself. Working principles Everything is connected to everything in the environment. Everything in the environment must go somewhere in the environment. Sensitivity Environmental sensitivity indicates how easily we can destroy the characteristics of the environment, for example through pollution, or through over-exploitation. 2.0 ENVIRONMENTAL MANAGEMENT POLICY STATEMENT All operations of RUTOTECH shall be planned and executed in such a way as to minimize any adverse effects or impact on the environment in which we work. RUTOTECH shall promote and encourage plans, activities, and programmes aimed at environmental preservation and protection. 12 Staffs are encouraged to pay appropriate regard to the environment by protecting it from adverse effect. All wastes generated in course of our operations must be collected, handled, treated and disposed of in an environmentally sound manner Discharges of pollutants into air, or in water bodies are strictly prohibited. All such disregard to environmental laws must be reported immediately. This policy and manual aligns with the International Standard ISO-14001 specification for an Environmental Management System (EMS) covering relevant environmental requirements, procedures, specifications, objectives and targets that will be communicated to contractors. “The Environment is our common Home” be a part to protect it. 13 3.0 3.1 THE INDUSTRIAL AND OIL INDUSTRY ENVIRONMENT The key characteristics and sensitivities of the Oil Industry environment are: The main vegetation consists of mangroves, unique plants that are capable of surviving in brackish water. Mangroves are robust, but not resilient. They can tolerate a wide range of adverse conditions from our operations but, once they are destroyed, they hardly recover. It is a brackish riverine environment. The water is either neutral or very slightly acidic and extremely hard in both dry and wet seasons. This also gives a wide tolerance threshold which nevertheless can be abused with prolonged discharges. It is experiences high rainfall. This ensures adequate water for flushing and dispersal. It is a hot environment. The temperature especially during the dry season can be very intense. There are few people resident in these areas. It has wide bio-diversity. This implies there is a wide range species of plants and Animals most of which have not yet been fully understood. It has a rich fish/marine life and has a limited oil and gas reserves, which can only be produced for a finite time; not forever. HOW IS THE ENVIROMENT AFFECTED BY RUTOTECH OPERATIONS Our operations can either direct or indirect, impact on the environment. The operation of equipment in our facility affects the environment. For example, poor operation of the supply vessel can lead to too high levels of oil-inwater, or even to spills. The maintenance of equipment in our facility affects the environment. For example, a poorly maintained diesel engine will produce black smoke. Our waste handling effects the environment. For example, we should not dispose of used lube oil by letting it flow into the drain system or directly into the sea. Instead, we should collect it for disposal in the used oil compartment of the supply vessel. Our environmental awareness affects the environment. This is reflected in our own behaviour and in the attention we pay to the environmental performance of others. For example, we should explain to contractors and other visitors to the location what we expect of them in terms of environmental protection. 14 3.2 RUTOTECH’s responsibility in minimizing impacts on the environment The responsibility for minimizing impact on the environment lies with everyone in the Company employ. Although there may be aspects beyond your control and authority level, you can all contribute to a better environment. Some examples of what can be done include: Read the Company and Clients’ HSE Policies, and ask your team leader or cocoordinator to explain what is not clear. Know your operational controls. Handle waste from your activities properly and in line with the procedures. It is your responsibility to clean up any waste or pollution, even if it has not resulted from your own activity. We are to be observant and report anything that may constitute an environmental risk to our team-leader/Supervisors. Ask questions or even stop others who are performing environmentally unsound activities. The training on General Environment that will be executed by RUTOTECH is meant to expose the links between the environment and our jobs. By appreciating these links, we will be motivated to initiate actions that will prevent, control and mitigate environmental risks associated with our jobs. Beyond this, it should leave us in a better position to instruct others. 4.0 SAFE HANDLING OF CHEMICALS 4.1 Introduction Exploration & Production operations involve the use of chemicals of different make and composition. Within the Company and Clients’ operations, policies, guidelines and procedures are available to guarantee Health, Safety and Environment as we work with chemicals. All these are embedded in the concept of Safe Handling of Chemicals (SHOC). In participating in the SHOC training, your learning objectives should include: Understand the nature of chemicals used in Oil Industry. Use chemicals with the desired benefits. Ensure human safety before and after use of chemicals. Prevent avoidable impacts on the environment. Enhance reference and use of SHOC manual. Understand and apply basic first aid in an emergency. Improve chemical storage and retrieval system. Comply with regulatory requirements. 1. 2. 3. 4. 5. 6. 7. 8. 15 4.2 1. 2. 3. 4. 5. 6. The Concept “Chemical” Chemicals are synthesized or naturally occurring substances (solid, liquid or gaseous) with unique properties. Within Company and Clients’ operations, chemicals are simply industrial products used to facilitate specific processes in its entire spectrum of operation. Important chemicals used Oil Industry facilities include demulsifier, diesel, lube oil and cleaning agents. A chemical is said to be hazardous if it has a real or potential ability to cause health problems to man and animals and negatively affect the environment. Six properties are associated with hazardous chemicals. It only requires a chemical to possess one or more of these properties to be hazardous. These properties are: Toxicity. Irritation. Asphyxiation. Corrosiveness. Flammability. Explosiveness. Our concern with chemical hazards is in the area of Safety, Health and the Environment. 1. Safety related chemical hazards present themselves through fire, explosion and toxic fumes. The precautions to adopt here are to avoid open flames, sparks and smoking near explosive chemicals and chemicals with great affinity for fire. Fire extinguishers should be available, accessible and usable by all staff. 2. Health related chemical hazards present themselves through inhalation, skin contact, eye contact and in rare cases, ingestion. Precautions should include use of appropriate PPE and availability of a competent first aider. 3. Environmental related chemical hazards present themselves in the form of toxicity, non-biodegradability and bio-accumulation. Precautions should include avoiding contamination of soil and water and the use of environmentally friendly chemicals. 16 4.3 Basic First Aid Administration Health Hazard Rating. Corrosive /Highly Toxic 4.4 Inhalation Skin Eyes Ingestion Do not delay. Remove victim to fresh air. Obtain medical attention promptly. Do not delay. Wash with water while removing clothing. Obtain medical attention promptly. Do not delay. Flush with water. Obtain medical attention promptly. Do not delay. Obtain medical attention promptly. Do not induce vomiting. Severe Irritant/ Toxic. Remove to fresh air. Wash with water. Use soap. Do not induce vomiting. Slight or no effect. No specific measure. No specific measure. Flush with water. Obtain medical attention if eye irritation persists. No specific measure. No specific measure. SHOC process, tools and techniques The SHOC process encompassed in the following four aspects: 1. Procurement: Procurement is the action that brings a chemical into use in Company operations. To procure a chemical, besides every other thing, the following must be considered: - Environmental impact, Performance and Cost. 2. Handling: After procurement comes usage. In using chemicals, factors to consider that should guarantee safety to workers and protection for the environment are The flash point of the chemical (this will advice where and when to use such chemicals), proper and legible labelling for easy identification, Personal Protective Equipment, storage and storage conditions, chemical transportation and transfer process. 3. Hazards: At any point in time, the real or potential health, safety and environmental hazard of a chemical being used must be at the front of our mind. This will ensure that we use adequate and appropriate PPE and prevent avoidable contact with the environment. 17 4. Disposal: At the end of the day, we will be left with chemical waste after usage and may be even from storage. We need to safely manage these wastes. Within Company and client’s operations, the following chemical wastes management measures are recommended: treatment, landfill, dilution and flushing, stabilisation / encapsulation, containment and storage (where no disposal method is available). 4.5 1. 2. Chemical storage precautions Keep dry. Protect from light. 3. 4. 5. 6. Fire proof (especially for combustible substances with flash point below 55oC) Adequate ventilation. Separate from incompatible chemicals. For large volumes of liquid chemicals, a concrete floor should be designed for accidental discharges to run off to a saver pit. 4.6 The SHOC manual and SHOC cards The SHOC manual gives information on the properties and handling procedures for all chemicals in Company and Clients’ operations. The SHOC manual consists of numerous SHOC cards. A SHOC card lists the threats and hazards inherent in the properties of a particular chemical and the precautions we must take in using this chemical. The SHOC card is laminated and made available in SHOC racks in all operational facilities. Every chemical must have a SHOC card. It is your duty to refer to the SHOC card when you are not sure before using any chemical. It is also your right to insist on the SHOC card for a chemical from your supervisors if you must handle such chemical. Beyond this, it your responsibility to inform your supervisor or Environmental department of any chemical you know is in use but for which no SHOC card has been prepared. Being a field worker brings you in contact with chemicals one way or the other. Working safely with these chemicals is an important factor being a good worker. Every worker has a duty to himself to stay alive and healthy while on the job and to preserve the integrity of the environment. Safe Handling of Chemicals (SHOC) is an essential part of your daily work. 18 5.0 RUTOTECH OPERATIONS AND WASTE MANAGEMENT 5.1 Introduction Waste as a concept admits of several meaning depending on the context from which we are looking at it. Waste is defined as any unavoidable material resulting from an industrial operation for which there is no economic demand and which must be disposed of. It is also described as an unwanted material that must be managed as a finished product. Waste is any material that is surplus to requirement and can no longer be used as feed stock for a similar requirement. Simply put, waste management is the conscious and deliberate effort at putting away our wastes without re-contaminating the environment. Below, we will treat the following aspect of waste management: Segregation Transport Inventory and tracking 5.2 Waste management policies The Company waste management policies include a policy statement that “we will reduce solid waste streams (particularly hazardous wastes) progressively to a practical minimum and that “we will manage and dispose of wastes in a controlled and environmentally acceptable manner”. This implies that we will take all practical and cost effective measures to minimize the generation of waste by employing the four Rs (Reduce, Re-use, Re-cycle, and Recover) through process optimization or redesign, efficient procedures and good housekeeping. 5.3 Waste Streams 5.3.1 Classification The classification of waste streams from the Northern Swamp Area compressor stations and flow stations is based on the physical nature of wastes - i.e. whether gaseous, liquid or solid - and also on source of generation. 1. Gaseous waste Flare Combustion engines Vents Fugitive emissions 19 2. Liquid waste Vessel and process relief drains Process liquid leakages. Storm/Surface water drainage. Spent lubricating oils. Spilt and leaked liquid fuels and chemical additives. Chemical additive residues. Oily sludge. Domestic sewage. Paints and related chemical residues. 3. Solid waste Empty drums Domestic wastes Pigging wastes Medical wastes Contaminated soil Batteries. 1. 2. 3. Another way to classify waste is to distinguish between: Domestic waste (including office and house hold waste). Hazardous waste. Industrial waste (i.e. waste generated during industrial activity which is neither domestic nor hazardous). 5.3.2 Hazardous Waste Hazardous waste is defined as any liquid, solid or gaseous waste which because of its quantity, physical, chemical or infectious characteristics, can result in hazards to human health or the environment when improperly treated, stored, transported or disposed of. A material can therefore be said to be hazardous if it is reactive, corrosive, ignitable and/or toxic. Hazardous waste at Oil Industry includes: Batteries Contaminated soil Spent lube oil Oil filters Oily debris Paint 20 Special requirements for the management of hazardous waste are specified in the DPR Environmental Guidelines and Standards (EGS). They include that the waste producer keeps a register of detailed material data. 5.4 Waste Segregation Wastes generated should be segregated at site using the coloured bins. All staff must be able to segregate any waste generated at the facility. Staffs are required to be conversant with the different colours used for the bins/containers for effective segregation of waste. It is the responsibility of the Team Leaders/Supervisors to ensure that all wastes generated are disposed in the right bins. The team Leaders/Supervisors should carry out routine checks to ensure that segregation is carried out at source. Segregation should be a key performance indicator in staff appraisal. Below is the approved colour scheme for all classes of waste generated in Company operations, which is also applicable to Client’s operations. 5.5 Improvement Programme 5.5.1 Waste transportation Segregated waste is collected from Company and Clients’ facilities in the Work Area on a routine basis. Waste is then taken to the approved transfer station and from there, taken to respective sites for ultimate disposal. HSE Supervisors routinely audits the waste collection process and final disposal to manage Oil Industry waste from cradle to grave. 5.5.2 Oily sludge storage facility Oily waste such as debris from vessel cleaning and polluted surfaces has been dumped indiscriminately previously. This is not an environmentally acceptable solution, because the oil will most likely be washed out by rain and subsequently flushed into the ground or rivers where it may pollute the groundwater river water. In addition, this practice does not meet the strict requirements of the DPR for the disposal of oil-polluted soil. Oily waste is now being stored for final disposal at Clients’ approved Thermal Desorption Unit (TDU) facility. 21 SEGREGATION OF WASTES AT SOURCE Black bin General wastes,e.g packaging materials, rags etc Green bin Food/Garden wastes Blue bin Burnt electric bulbs & Glass waste Black plastic bags/Grey bin Paper waste: to be shredded White bin IT consumables, e.g toners cartridges/computer tapes Red bin Dangerous wastes, e.g paints, asbestos, aerosol cans, etc Brown bin Waste plastic containers Figure 5.4: Colour scheme for waste segregation 5.6 Waste inventory It is the responsibility of the Team Leaders/Supervisors to inventorise the segregated waste generated and report it on his monthly report to the Base operations Managers. The quantities of waste generated, disposed of, and the balance left at site shall be reported. It is the responsibility of the Base operations Managers to plan with the Clients by entering the data on the Report Form and submit same for necessary action. The reason for the monthly waste reporting is to keep track of the amount waste generated, to enable target setting, and to monitor our performance against targets. 22 5.7 Waste Consignment Notes (WCN) To ensure that waste collected from Company’s operations is disposed of at designated waste management facilities and in the same condition and quantity, all waste shall be accompanied by a Waste Consignment Note (WCN). The WCN is a form that contains the description and quantity of waste and the disposal facility. The form comes in four sheets – a white master sheet, and blue, pink and yellow copy sheets. A WCN note shall be completed, signed and kept for each waste shipment. WCNs shall be used by everyone who produces, handles, transfers and receives waste in all Company and Clients’ facilities. They assist in monitoring waste from "cradle to grave". They also provide evidence of responsible waste management - i.e. "duty of care" The WCN is the enabling document for transfer of waste, to waste disposal facilities. The procedure for using this document is stated below. Dispatcher fills WCN in quadruplicate. Dispatcher retains the yellow coloured sheet of the WCN Dispatcher sends the pink coloured sheet to Company’s responsible HSE Officer. Dispatcher sends blue and white sheets of the WCN together with the waste shipment. Receiver at disposal facility fills both white and blue copies, retains white and sends blue copy back to dispatcher through the driver. 1. 2. 3. 4. 5. 5.8 The Waste Tracking System (WTS) The WTS is a computerized system that combines the functions of keeping a waste inventory and the WCN system. RUTOTECH improvement initiative is ongoing to segregate waste and to put a regular waste collection service in place. The amount of waste shipped from any given site shall be recorded, and the total volumes reported accordingly at the end of each month. A Waste Consignment Note shall accompany every waste shipment. 23 6.0 MANAGEMENT OF DISCHARGEs to Water and Emissions to Air 6.1 Discharges to water 6.1.1 Environmental effects Discharges to water are liquid effluents we discharge to the environment during our normal or abnormal operations. The major sources of discharges to water in Area of Operations are: Discharges from Support Vessels. Sewage from the houseboats/living quarters Domestic wastewater (laundry / kitchen) In addition we may have incidental discharges such as oil or chemical spills. Discharges to water may cause reduced growth or even the death of flora and fauna, reduced fish catch and polluted drinking water for any given neighboring communities. 6.1.2 Legal requirements The relevant environmental legislation on management of discharges to water is mainly the Department of Petroleum Resources (DPR) Environmental Guidelines and Standards (EGS). The discharge limits for discharges to tidal brackish environments are: Table 6.1: DPR limits for discharges to Water Pollutant Units Discharge limit pH Temperature C 6.5 – 8.5 40 Oil and grease Salinity as Cl- Mg/l Mg/l 20 2000 Turbidity NTU 15 Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Mg/l Mg/l 5000 50 In addition, the DPR EGS require the installation of a biological waste water plant to treat sewage from any given production installations, which also applies to our vessels/houseboats. In case there is any chemical aftertreatment, the residual chlorine in the discharges shall be between 0.8 and 2.0 mg/l. In other words, there shall be enough chlorine to ensure that bacteria in the sewage are killed, but not too much chlorine, to ensure that the receiving environment is not damaged. 24 6.1.3 Operational control of Waste Discharge Tanks on Board Vessels The Waste Discharge Tank is the facility that is designed to discharge, contaminated water/oil to the environment on board a supply vessel. During servicing of boat engines and rotating equipment the spent lube oil should not be drained via the open drain system but collected in receptacles and discharged into the Waste Discharge Tank. Used lube oil filters should be placed upside down on a drain pan to allow the remaining oil to drain. The oil shall then be collected and discharged in the Waste Discharge Tank. Technicians must always check for leaks at the inlet manifold, vessels, piping etc and report findings immediately to the Crew Leader. Technicians must operate the facility in accordance with the given Plant Operating Manual and Integrated Operations Standards. 6.2 Emissions to air 6.2.1 Environmental effects Emissions to air involve the release of gasses to the environment during normal operations, abnormal operations, or incidents. Major emission sources in our Operational Area are: Combustion in gas engines driving compressors and generators Combustion in Diesel (emergency) engines Venting from relief valves Venting of instrument gas Venting of gas from gas-lift lines damaged by corrosion or sabotage or theft. The environmental impacts of our emissions are: Air pollution and associated potential health problems resulting from emissions of NOx, SOx, CO, volatile hydrocarbons, and particles (soot). Global warming because of the increased level of greenhouse gasses in the atmosphere. Hydrocarbon gasses such as methane, released during venting, are powerful greenhouse gasses. Acid rain because of the dissolving of emission components in water. A related significant environmental effect of gas flaring is the waste of natural resources. 25 6.2.2 Legal requirements FEPA has recommended guidelines for ambient air quality in Nigeria. DPR, the governing organisation for the oil industry, does not set emission limits, except for the requirement of a smokeless flare. The smokiness of the flare can be expressed on a scale from 0 to 5 as the Ringelmann number, and the DPR EGS require a Ringelmann number not exceeding 2. In addition they stipulate limits for heat and noise of the flare, and they give requirements for monitoring of emissions. 6.2.3 Operational control The most important operational control of the emissions is to avoid misconfigurations and operational failures of equipment. 6.2.4 Improvement programme Emissions to air from support vessel engine form one of the most significant environmental effects of our operation, and therefore it plays a major role in our environmental improvement programme. The components of the Facilities Upgrade aiming at the reductions of emissions to air are: Facilities to capture all relief valve emissions. The replacement of instrument gas by instrument air, to reduce venting. The installation of continuous metering to quantify volumes of gas released more accurately than we can do at present. 26 7.0 POLLUTION PREVENTION AND SPILL RESPONSE 7.1 Introduction In the E&P industry, oil spills, discharges to water, emissions to air and chemical waste are the main sources of pollution. Although it may not be possible to eliminate all pollution from the business, our Environmental Management Systems shall focus on preventing pollution from incidents and minimising pollution from continuous discharges and emissions. In addition, we need to have emergency plans and procedures in place to minimise the pollution from incidents, might they occur. 7.2 Pollution 7.2.1 Causes of Pollution Pollution may be as a result of: Equipment failure. Human factors. Sabotage. Natural factors. Pollution is also caused by the little things we do unobserved like the careless dumping of refuse, channeling of waste oil into public drains (that eventually empty into rivers), bush burning, wrong handling of chemicals, etc. 7.2.2 Consequences/Implications of pollution Environmental degradation. Economic implications. - Reduced crop yield. - Re-localization / reduction / extinction of game in our forests and aquatic life. - reduced agricultural output (income) for the affected communities. - Costs of pollution control to government and industries. Social implications. - Health implications. - Psychological implications. 7.2.3 Pollution prevention Every activity and action taken to prevent the occurrence of pollution incident is what is known as pollution prevention. In RUTOTECH operations, such actions include: 27 Use of well-trained personnel. Use of equipment and materials that are fit for purpose. Regular inspection and preventive maintenance of equipment and materials to detect or prevent defects. Replacement of equipment and materials at the expiration of their service. Inspection of plants, equipment, etc regularly. Awareness training. 7.2.4 Improvement programme Specific improvement objectives in RUTOTECH operations Programme related to spill prevention and response are: To implement an improved preventive maintenance programme system. To construct appropriate secondary containment for oil and chemical storage at our facilities and Supply Vessels. 7.3 Oil spills 7.3.1 Oil spill response levels Oil spills are classified according to volume so that a clear indication of response competence level required for each tier is mapped out. 7.3.2 Oil spill response Despite the various preventive measures, pollution still occurs one way or the other. Controls to prevent the extent of the impact involve: Oil / Chemical Spill Contingency Plan activation. Containment. Recovery. Clean-up and disposal of residual oil / debris from the environment. Remediation / Rehabilitation. How to Respond to Emergencies: Corporate emergency response procedures are documented in the RUTOTECH HSE Contingency Plans and Procedures. Containment is the phase that has to do with limiting and confining the spread of a spill. The equipment used here is the boom. Booms are floating devices used to block oil from spreading in the event of a spill. 28 Recovery is the act of collecting as much of the (contained) oil as possible. Equipment for this includes: Skimmer boats to collect oil in large creeks. Portable skimmers, to collect oil in smaller creeks. Pumps to transfer/pump the collected oil to storage tanks. Tanks and barges for storing recovered oil. Clean-up and disposal of oily debris is a legal obligation. Although the work is normally performed by expert’s input. The oily debris should not be disposed of in the sea, as was often done in the past, but should be collected for responsible disposal. Remediation / Rehabilitation of the impacted area are also a legal obligation. 29 RUTOTECH JOURNEY MANAGEMENT POLICY AND PLAN 30 INTRODUCTION Application and Scope This Operating Manual details the method by which individual journeys shall be managed so as to reduce the risks associated with road transport. It also provides criteria for deciding which journeys require management. 1.1.1.1 Basic Principles of Journey Management Journey management is carried out to ensure that journeys are authorized and that any risk to health, safety or the environment is identified, assessed and controlled. The responsibility for journey management shall be with the supervisor operating the journey. The supervisor managing the journey is called the journey Manager It is not possible to specifically address every possible type of transport because of the variety of transport operations. In the event of any uncertainly over how to or who manages the journey, the relevant supervisors shall decide who best can control the journey, concentrating on the basic principle in paragraph 2 above. RUTOTECH shall always be responsible for making sure that subcontractors comply with this Operating Manual. RUTOTECH shall take care to brief the management and supervisor of these subcontractors companies as necessary. DEFINITIONS The word Journey shall mean any journey carried out in the pursuit of RUTOTECH business whether by her or its subcontractors which is required by RUTOTECH to be managed in accordance with this manual. Journey Management: shall mean the actions taken by a person to authorize, plan, monitor, and close-out a journey so that any risk to health, safety or the environment is identified, assessed and controlled, and so that recovery measures are made available should the journey not be completed as planned for any reason. Journey Plan: shall mean the document which details the timings and route of the journey, including rest stops, the vehicle and the driver and passengers. Home Base: shall mean the operating base where the driver and vehicle are normally based, and from where the outward journey starts. The Authorising Person is a manager or department head that guarantees the integrity of the journey management system of the company or department. 31 The Journey Manager is the person who plans, monitors, and closes out the journey. The Journey Manager also initiates any relevant accident or man-lost procedures in the event of an accident or a vehicle becoming overdue RUTOTECH JOURNEY MANAGEMENT POLICY It is the objective and intention of RUTOTECH to manage all her journeys in such a manner that all accidents are reduced to the bearest minimum. This is in view of the fact that operations during job execution might involve movement of personnel, equipment and materials from one place to another. In most cases, vehicle involve in transportation could cause accidents that may result death and material loss worth millions of naira. For this course therefore, all journey shall be manage as follows: i. ii. iii. iv. v. vi. vii. viii. ix. x. A journey logbook shall be kept by drivers, departure point destination point and aim of movement shall be indicated and duty signed by an authorized signatory. Vehicle moving from one place to another shall be reduced at a time in other to avoid irrelevant movements. Any vehicle leaving work premised must be entered into movement register. Approval must be granted for any vehicle bid for assignment. Heavy-duty vehicles shall not be allowed to be driven at night. Drive-Right monitoring system (IVMS) shall be installed in all vehicles for speed management. Radio shall be installed for easy of communication during errands. All movement shall be arranged in such a way that all persons going to the same route will board one vehicle. All drivers must be DDC certified and their efficiency guaranteed. Drivers must ensure that arbitrary stop on the way for lifts are avoided. Management priority and goals are to ensure that all journeys undertaken are free of vehicle thefts, accidents and personnel abscond from duty. Signed…………………………… Managing Director 32 JOURNEY MANAGEMENT RESPONSIBILITIES General The following people are involved in a journey, each with certain responsibilities: The Authorising Person The Journey Manager The driver The passenger (s) Responsibilities of the Authorising Person The Authorising Person is a manager or department head who guarantees the integrity of the journey management system of the company or department. The Authorising Person is responsible for appointing supervisors as Journey Manager and for ensuring that they are fully aware of their responsibilities. There can be more than one Authorising Person in the company or department, but their identity and function shall be understood by all supervisors and other Journey Managers. The Authorising Person is responsible for compliance with this manual by his subordinates, and for arranging for the briefing of supervisors and drivers. Responsibilities of the Journey Manager The Journey Manager is responsible for the planning, monitoring, and analysis of a journey. The Journey Manager remains responsible for the vehicle and driver until they return to the home base, unless the vehicle and driver are retained by another location for other work. The responsibility for the driver and vehicle must then be accepted by a Journey Manager at that other location. The Journey Manager is responsible for Initiating any emergency procedures (such as man-lost, accident, etc.) when he is notified of an accident or the vehicle becomes overdue, by contacting the relevant emergency control Duty Officer. Where a journey would end after normal working hours, the journey manager shall hand over the responsibility of managing the journey at 33 the close of work to a competent person on duty (i.e. Duty Supervisor/Dispatcher) as agreed with the driver the planning phase of the journey. The journey manager shall ensure that the person is sufficiently briefed about the journey and given the journey plan. When the Journey Manager is changed within the normal working hours, the driver shall be informed at the earliest opportunity. Responsibilities of the Driver To drive only if authorized and fit to drive and to wear seat belt and to ensure all passengers wear seat belts. For the condition of his vehicle, load and for driving safely and in accordance with the Journey Plan. The driver shall not depart until he has received and understood the Journey Plan, together with the manifest and any relevant SHOC Card (if the load is hazardous). To contact the Journey Manager at certain times or places during the journey or at destination, as agreed with the Journey Manager before departure. The driver shall contact the Journey Manager if there are any problem or difficulties en-route, and when he returns to home base. Responsibilities of the Passenger To wear seatbelts To ensure no unauthorized passengers are carried in the vehicle. To ensure driver adheres to the journey plan. To ensure the driver operates within national and RUTOTECH speed limits, and in a safe manner, taking note of prevailing weather conditions. Passengers shall not pressurize or divert the driver to change from Journey Plan except for safety reasons THE JOURNEY MANAGEMENT SYSTEM Qualification of Journeys The following journeys shall (as a minimum) be managed according to the provision of this manual: All journeys involving medium and heavy vehicles All inter-state journeys All journeys which exceed 100 km round trip. All journeys at night outside RUTOTECH base 34 All Journeys at night shall be authorised by the Managing Director, or the Duty manager. Journeys not covered by the above still require to be authorized, planned and recorded. Management of the Journey Each journey shall have a Journey Manager. Each journey shall have a written Journey Plan. A copy of the Journey Plan shall be given to the driver. The master copy shall stay with the Journey Manager. The Journey Manager shall: verify that the journey is necessary and obtain permission if the journey required higher authority verify that security of personnel and vehicle is assured Check the suitability of the vehicle type, and that the inspection certificate is still valid. Check that the driver has completed his daily checks and reported any defects with the vehicle or the load. Check that the proposed Journey Plan will not violate RUTOTECH policy on drivers hours and rests, especially checking the timing of rest stops. Ensure appropriate points where the driver shall call the Journey Manager are included in the Journey Plan where appropriate. Check that the driver is licensed (Nigerian Driver’s license) and qualified (SPDC driving permit) to drive the vehicle, and that the driver is familiar with the vehicle. Check that the driver knows what to do if there is an accident or an emergency during the journey. Provide adequate food, water and where necessary accommodation for the journey or provide enough money for the driver and passengers. Discuss the Journey Plan with the driver. De-brief the driver at the final completion of the Journey. The Journey Plan The Journey Plan can be in any format or size, but the following information shall be included: Purpose of journey Registration number and type of vehicle * Driver details * Number of passengers/ cargo on manifest. * Departure point * Actual departure date and time * Planed route with name or time of each rest point * Destination and contact name and telephone number * Estimate duration and distance of journey * Name of Journey Manager and contact telephone numbers. 35 * If part of the journey is to be done at night, the reason why, and attach the written authorization. Tick-boxes to show that: * A SHOC Card has been issued if Hazardous Materials are carried, * Vehicle condition has been checked * Drivers license/permit checked * Welfare items required The Journey Plan does not need to be faxed or sent to any other party, unless it is specifically requested. The master copy of the Journey Plan stay with the Journey Manager Journey Plans shall be kept for a minimum of 3 months for reference purpose. ROAD TRANSPORT To ensure accident free operation, the management of RUTOTECH maintains the following land and water transport objectives: Minimize exposure by engaging in an unauthorized trip. Identify specific relevant transport hazards and provide mitigating. Establish compliance with the use of appropriate PPE by each passenger before departure. TO ALL VEHICLE/CRAFT OPERATORS Before you start your journey, follow the under listed points. 1. Ensure you are AUTHORIZED to take your journey on RUTOTECH’s business. 2. Ensure you have valid statutory documents (driver’s license, vehicle particulars, etc.) 3. Agree on a journey plan and instruction (written) 4. Log name of authorized and time of authorization. 5. Carry out routine pre-start checks. 6. Ensure you and your entire passengers wear seat belt before driving BE ALERT ALWAYS, PAY ATTENTION TO MAKE THE JOURNEY INCIDENT FREE. 36 GENERAL DRIVERS RESPONSIBILITIES Before driving the Company’s vehicle the driver must adhered to the following:Driving permit and all statutory licenses must be obtained. Must have attended D. D. C. I & D. D. C.II Must not carry passengers Must not take alcohol Must maintain Authorized speed limit. JOURNEY PRE – START CHECK LIST: VEHICLE GOOD POOR BAD REMARK TYRE / BRAKE, CONDITION JACK WHEEL SPENNER ENGINE OIL / FUEL LEVEL BATTERY ACID CONDITION VEHICLE BODY CONDITION SIDE MIRRORS FIRE EXTINGUISHER PORTABLE TOLL BOX FIRST AID KIT FUEL / WATER LEVEL WIPERS CONDITION SEAT BELT CONDITION HORN CONDITION FAN BELT CONDITION VEHICLE PARTICULARS RADIO 37 RUTOTECH ROAD JOURNEY MANAGEMENT FORM DATE: VEHICLE REG NO: JOURNEY SERIAL NO: TIME: User Name Job Title Purpose of Journey / Destination ROUTE AGREED--------------------------------------------------------------------------Vehicle Checked Y/N Hazard Analyzed and HSE Briefing Y/N Estimated Distance Km Reading Arrival Time Authorized By: Name: Signature: Date: 38 RUTOTECH MARINE JOURNEY MANAGEMENT FORM Journey Number: Dept: Take-off location: Vessel Name/fleet No. Purpose of Journey: Final Destination: Pre-Trip Instruction Agreed Route: Vessel/Name Estimated Duration Hrs. Date / Time out Date / Time in Total Outstation Vessel Type Hazard Analyzed/HSE briefing Y/N Authorized Passengers/Cargo Valid Certification Checked Y/N Estimated Distances Nm Hazard Analysis Location: Hazard: Control: Post Trip Observations: Note: NO NIGHT SAILING AFTER 06.00 PM. Quartermaster Details: Journey Authorized by: Name: Name: Company: Destination: Signature: Signature: 39 40