A LOCAL PUBLIC SERVICE AGREEMENT (PSA) FOR CUMBRIA Page 1 of 27 LOCAL PUBLIC SERVICE AGREEMENT BETWEEN CUMBRIA COUNTY COUNCIL AND THE GOVERNMENT Introduction 1. Cumbria County Council and the Government have made this Local Public Service Agreement (Local PSA) with the intention of further improving the services to local people that Cumbria County Council provides. This agreement covers the period 1 April 2003 to 31 March 2006. 2. The agreement records the present intentions of the Council and the Government. It is entered into by both in good faith, but it is expressly recognised that neither can fetter the future discretion of the Council or of Ministers and Parliament. The agreement is therefore not intended to create legal relations. Subject to that, the following points are agreed. The Intentions of Cumbria County Council 3. Cumbria County Council will use its best endeavours to achieve more demanding performance targets than those it would be expected to achieve in the absence of this Local Public Service Agreement. These enhanced targets are specified in Schedule 1 to this agreement. The Intentions of the Government 4. The intentions of the Government set out in this agreement are subject to the outcome of any statutory consultations and any necessary approval of the Treasury and Parliament. 5. The Government will implement the changes to statutory and administrative requirements set out in Schedule 2 to this agreement, subject to confirmation of the legal and operational feasibility of the changes described and to Parliamentary approval of any necessary legislation. The Government will also undertake the discussions with the Council described in Schedule 2. 6. It is recognised by Cumbria County Council that, on further investigation, it may be necessary to modify the detail of the changes set out in Schedule 2 in ways that seek so far as possible, to give substantially the same extent of benefit to the Council. It is recognised by the Government that, if a change set out in Schedule 2 proves infeasible, it will use its best endeavours to provide an alternative that corresponds as closely as possible and has, so far as possible, substantially the same effect. 7. The Government will pay Cumbria County Council a grant of £1,237,607 in 2003/04 in support of the expenditures described in Schedule 3 to this agreement. The conditions attached to this "pump-priming" grant are also set out in Schedule 3. Page 2 of 26 8. The Government will pay a performance reward grant to Cumbria County Council, as set out in Schedule 4 to this agreement, if it achieves all the enhanced targets (“performance target with Local PSA”) specified in Schedule 1. Schedule 4 also sets out the grant it intends to pay if the Council secures a substantial improvement in performance that falls short of the target. The Schedule also stipulates the intended timing of payments of the grant. Cumbria County Council undertakes to provide audited information confirming the extent of improvement in their performance relative to the Local PSA performance targets set out in Schedule 1, as a precondition for the determination and payment of the performance reward grant. Date of Agreement: For Cumbria County Council For Her Majesty's Government ............................................……………… Cllr ARM Toft Leader of the Council ............................................……………… Rt Hon Nick Raynsford MP Minister of State, Office of the Deputy Prime Minister ............................................……………… Mr Louis Victory Chief Executive ............................................……………… Rt Hon Paul Boateng MP Chief Secretary to Her Majesty's Treasury The above ministers sign on behalf of their colleagues listed below: Rt Hon John Prescott MP, Deputy Prime Minister and First Secretary of State Rt Hon Gordon Brown MP, Chancellor of the Exchequer Rt Hon Alistair Darling MP, Secretary of State for Transport Rt Hon John Reid MP, Secretary of State for Health Rt Hon Charles Clarke MP, Secretary of State for Education and Skills Rt Hon David Blunkett MP, Home Secretary Rt Hon Andrew Smith MP, Secretary of State for Work and Pensions Page 3 of 27 Schedule 1: Performance Targets Target 1 2 3 4 5 6 7 8 9 10 11 12 Description Reduce the annual average number of people killed and seriously injured in road traffic accidents on all roads in Cumbria from 555 during 1994-1998 to 413 or fewer during 2003-2005 Increase the number of young people looked after on 1 April in their 17th year who are engaged in training, education or employment at the age of 19 to 85% by 2005/06 Reduce school truancies by 10% by 2004 compared to 2002, sustain the new lower level and improve overall attendance levels thereafter Reduce the rate of re-offending of all young offenders Ensure continuous improvement in the economy, efficiency and effectiveness of local services through annual improvements on cost-effectiveness of at least 2% To Increase the employment rate of people with disabilities in West Cumbria. N/L National Improve the quality of life and independence of older people (aged 65 or over) so that they can live at home wherever possible, by increasing by March 2006 the number of those supported intensively to live at home to 30% of the total being supported by Social Services at home or in residential care Increase opportunities for local people (including young people) to be actively involved in strengthening their communities and to influence local public services through Neighbourhood Forums Develop family literacy skills and increase the number of children and their families visiting the library Raise the attainment of boys in order to contribute to overall GCSE improvement and reduce the gap between boys and girls by 50% by 2006 in 10 selected schools Increase the percentage of Year 11 pupils in Cumbria who progress into full-time post-16 education from 67.9% in 2001 to exceed the national average of 71.5% by an additional 1.5% by March 2006 Reduce the number of recorded incidents of domestic abuse in Cumbria by 30% and increase the number of convictions for offences related to domestic violence by 30%, both by 2005 National National National National National National Local Local Local Local Local Page 4 of 26 TARGET 1 (National) Road safety Cumbria Target 1 Proactive Reducing deaths and serious injuries on the roads in Cumbria Indicator(s) by which performance will be measured Number of people killed or seriously injured (all KSI) on the roads in Cumbria, as measured by STATS 19. Current performance All KSI 1994/98 average 1999 2000 2001 555 557 488 487 Performance at the end of the period of the Local PSA (Annual average for 3 years ending 31 December 2005) Performance expected without the Local PSA All KSI 454 on average a year Performance target with the Local PSA All KSI 413 on average a year Enhancement in performance with the Local PSA 41 fewer people killed or seriously injured on average each year. Page 5 of 27 TARGET 2 (National no. 6) Outcomes for care leavers Specification of target Increase the number of young people looked after on 1 April in their 17 th year who are engaged in training, education or employment at the age of 19 to 85% by 2005/06 Indicator(s) by which performance will be measured 1. Percentage of young people looked after on 1 April in their 17th year (aged 16) who are engaged in training, education or employment at the age of 19 as collected on DH OC3 return. For the purposes of the LPSA however the definition will be amended to include looked after children who were in care on their 16 th birthday but who left care before the 1st April. PAF A4 2. Percentage of young people who were looked after on 1 April in their 17 th year (aged 16) who had regular contact with the Social Services Department until their 19th birthday. For the purposes of the LPSA however the definition will be amended to include looked after children who were in care on their 16 th birthday but who left care before the 1st April. QP11 3. Percentage of young people who were looked after on 1 April in their 17th year (aged 16) who on their 19th birthday were known to have suitable accommodation. For the purposes of the LPSA however the definition will be amended to include looked after children who were in care on their 16th birthday but who left care before the 1st April. QP12 4. Number of “Life Skills” modules completed by care leavers working towards the ASDAN award. The full list of 6 modules is Coping with People, Everyday Living, Meal Preparation and Cooking, Money, Independent Living and Personal Safety. Local PI Note that for all 4 indicators performance will be measured cumulatively over 2004/05 and 2005/06. Cumulative performance for Indicators 1 to 3 is calculated by adding the number achieved in 2004/05 to the number achieved in 2005/06, and then dividing by the sum of the number in the cohort for 2004/05 and 2005/06. Current performance (2001/02) 1. 2. 3. 4. 47.1% 58% 58% 0 Performance at the end of the period of the Local PSA (cumulative performance 2004/05 - 2005/06) Page 6 of 26 Performance expected without the Local PSA 1. 2. 3. 4. 68.3% 87.5% 87.5% 0 Performance expected with the Local PSA 1. 2. 3. 4. 85% 95% 95% 100 Enhancement in performance with the Local PSA 1. 2. 3. 4. An increase of 16.7% points An increase of 7.5% points An increase of 7.5% points An increase of 100 Note: For this target, Performance Reward Grant will be split amongst the indicators as follows: Indicator 1, 55%; Indicator 2, 15%; Indicator 3, 15%; Indicator 4, 15%. Page 7 of 27 TARGET 3 (National no. 3) Truancy Specification of target Reduce school truancies by 10% by 2004 compared to 2002, sustain the new lower level and improve overall attendance levels thereafter Indicator(s) by which performance will be measured 1. The percentage of half days missed due to unauthorised absence in primary schools maintained by the Local Education Authority 2. The percentage of half days missed due to unauthorised absence in secondary schools maintained by the Local Education Authority 3. The percentage of half days missed due to unauthorised absence in special schools maintained by the Local Education Authority Current performance (2001/2002) 1. 0.2% 2. 0.8% 3. 0.5% Performance at the end of the period of the Local PSA (2005/2006) Performance without LPSA 1. 0.18% 2. 0.70% 3. 0.45% Performance with LPSA 1. 0.16% 2. 0.65% 3. 0.40% Enhancement in performance with Local PSA 1. A decrease of 0.02% points 2. A decrease of 0.05% points 3. A decrease of 0.05% points Interim performance targets (2004/2005) 1. 0.18% 2. 0.72% 3. 0.45% Note: For this target, Performance Reward Grant will be split between the indicators as follows: Indicator 1, 40%; Indicator 2, 50%; Indicator 3, 10%. Page 8 of 26 TARGET 4 Youth re-offending Specification of target Reduce the rate of re-offending of all young offenders. Indicator(s) by which performance will be measured The rate of re-offending of young offenders aged 10 to 17, as measured by data specified by the Youth Justice Board and collected by the Youth Offending Team. The measurement is based on data from particular cohorts, collected in the last 3 months of each calendar year. The cohort is tracked for 12 months, and a count made of the number of offenders receiving further reprimands, final warnings and sentences. Current performance (March 2003) Out of 557 young people in the October-December 2001 cohort, 211 re-offended over 12 months. This represents a re-offending rate of 37.9%. Performance at the end of the period of the Local PSA (Measured by tracking the October to December 2004 cohort for 12 months - information available January 2006) Performance expected without the Local PSA 32.9% Performance target with the Local PSA 30.9% Enhancement in performance with the Local PSA A reduction of 2% points Page 9 of 27 TARGET 5 (National no. 15) Cost-effectiveness Cumbria County Council will seek to work with ODPM to establish a basket of indicators against which the cost effectiveness of the Council can be judged, within three months of signing the agreement. The basket will be based upon the work undertaken in conjunction with the pilot PSA authorities but tailored to reflect the particular circumstances of the Council. The Council also agrees, in principle, that an increase in cost effectiveness of 2% per year should be regarded as the performance achievable without the PSA, and that the target performance with the PSA will be set at a higher level. An agreement on the target is, however dependent on consideration of the specification of the measure of cost effectiveness that is eventually adopted. The Council and ODPM agree that the portion of the Performance Reward Grant related to the cost effectiveness measure, as specified in schedule 4 to the Agreement, will relate to whatever measure of cost effectiveness is incorporated in the Agreement at the time the grant entitlement is determined. If there is no agreed measure of cost effectiveness, no Performance Reward Grant will be paid in respect of cost effectiveness. Page 10 of 26 TARGET 6 Unemployment Heading: To increase the employment rate of people with disabilities. Indicators by which performance will be measured (i) Numbers of sick and disabled people* in receipt of benefit living in deprived wards** assisted by Cumbria County Council into permitted paid work.*** (ii) Numbers of sick and disabled people* in receipt of benefit living in deprived wards** assisted by Cumbria County Council into paid work.**** * A disabled person is defined as anyone who has a physical or mental impairment, which has a substantial and long-term adverse effect on his/her ability to carry out normal day-to-day activities. ** ALLERDALE: Salterbeck, Ewanrigg, Westfield, Northside, Moorclose, Ellenborough, Clifton, Netherhall, Flimby, St Michael’s. COPELAND: Mirehouse West and East, Sandwith, Cleaton Moor North and South, Egremont North, Distington, Frizington, Harbour, Holborn Hill (Millom), Hensingham, Kells Howgate. *** Permitted paid work is defined as employment of less than 16 hours per week for a minimum of 13 weeks. **** Paid work is defined as employment of at least 16 hours per week for a minimum of 13 weeks. - To count towards the target, for each client the Council will need to demonstrate clear additionality to mandatory Jobcentre Plus provision. This will need to be demonstrated by client records, feedback and other sources such as independent evaluation. - To count towards the target a client may only be counted against one of the two performance indicators. Current performance 1. 0 2. 0 Performance during the period of the Local PSA (between 1 April 2003 and 31 March 2006) Performance expected without the Local PSA 1. 0 2. 0 Performance target with the Local PSA 1. 50 2. 70 Enhancement in performance with the Local PSA 1. 50 2. 70 Special Conditions The reward payment will be divided between both performance indicators in the following way: Performance Indicator 1 - 40%; Performance Indicator 2 - 60%. Page 11 of 27 TARGET 7 (National no. 5) Independence of older people Specification of target Improve the quality of life and independence of older people so that they can live at home wherever possible, by increasing by March 2006 the number of those supported intensively to live at home to 30% of the total being supported by social services at home or in residential care Indicator(s) by which performance will be measured 1. PAF C28: Households receiving intensive home care (more than 10 contact hours and 6 or more visits) per 1,000 population aged 65 or over 2. PAF C32: Older people helped to live at home per 1,000 older people at 31st March 3. PAF C26: Admissions of supported residents aged 65 or over to residential/nursing care per 10,000 population 4. Local PI: Households receiving 10 or more hours home care and less than 6 visits per week, or 5-10 hours with any number of visits per week per 1,000 population aged 65 or over Current performance (Financial Year 2001/02) 1 11.00 2 82 3 124.8 4 12.28 Performance at the end of the period of the Local PSA (Financial Year 2005/06) Performance expected without the Local PSA 1 11.80 2 96 3 108 4 13.12 Performance target with the Local PSA 1 14.00 2 98 3 102 4 15.03 Enhancement in performance with the Local PSA 1 An additional 2.2 2 An additional 2.0 3 A reduction of 6 4 An additional 1.91 Interim Performance targets (financial year 2004/05) 1 12.8 2 97 3 106 4 14.00 Page 12 of 26 TARGET 8 (Local) Building Active Communities Specification of target Increase opportunities for local people (including young people) to be actively involved in strengthening their communities and to influence local public services through Neighbourhood Forums Indicator(s) by which performance will be measured Residents’ satisfaction with their engagement in community planning (this will be evidenced by % point improvement in positive answers to the primary survey question “Are there enough opportunities for the needs of your community to be heard?” 2. Young peoples’ views on their involvement in local decision making (this will be evidenced by % point improvement in positive answers to the primary survey question “Are there enough opportunities for you to express views on public services?” 3. Residents’ satisfaction about influencing public service delivery (this will be evidenced by % point improvement in positive answers to the survey question “Are there enough opportunities for you to express views on public services?” 1. For these indicators the calculation of % point improvement in responses is calculated using a net Likert scale further details of which are at Annex A. 4. Number of Neighbourhood Forum areas enabling residents to engage in Community Planning*. 5. Number of Neighbourhood Forum areas with active youth participation**. 6. Number of Neighbourhood Forum areas in which budget holding or operational representatives of public spending bodies*** attend forum meetings to hear the views of residents. Cumbria County Council will agree the survey methodology supporting all 6 indicators with the ODPM through GONW and for indicators 4,5 and 6 validation will also involve the relevant Local Strategic Partnerships. * To qualify, during 2005/06, a Neighbourhood forum area must have a minimum of 4 quorate meetings a year. To be quorate, a minimum of 12 forum area residents must attend the meeting. ** To qualify, during 2005/06, a Neighbourhood forum area must have a minimum of four meetings a year at which: a minimum of 3 young people, defined as people aged between 13 and 19, attend the meeting; or a minimum of 6 young people (aged 13-19) attend a youth forum meeting, in Neighbourhood Forum areas where separate youth forums have been developed. *** To qualify, during 2005/06, a Neighbourhood forum meeting must have a minimum of 12 people attending. Public Spending Bodies that will be counted are: County Council, District Councils, Police, Health Trusts, Local Regeneration Bodies (where applicable), Registered Social Landlord (where applicable). Page 13 of 27 Current performance There are no existing ‘hard’ benchmarks for any of the proposed indicators, but an agreed survey and benchmarking exercise will be carried out to provide baseline data for each indicator in the 2nd Quarter 2003-4, and reported to the relevant LSPs, GONW and ODPM during Q2 2003-4. Performance at the end of the period of the Local PSA: Financial Year 2005/06 Performance without Local PSA 1. Baseline plus 4 percentage points 2. Baseline plus 6 percentage points 3. Baseline plus 0 percentage points 4. 34 5. 26 6. 32 Performance with Local PSA 1. Baseline plus 9 percentage points 2. Baseline plus 11 percentage points 3. Baseline plus 7 percentage points 4. 55 5. 52 6. 55 Enhancement in performance with the Local PSA 1. An increase of 5 percentage points 2. An increase of 5 percentage points 3. An increase of 7 percentage points 4. An increase of 21 5. An increase of 26 6. An increase of 23 Condition of Grant: To receive the Performance Reward Grant allocated to Indicator 6, each of the public spending bodies listed above must attend at least one forum meeting per neighbourhood forum area in 2005/06. Note: For this target, performance reward grant will be divided between the indicators as follows: Indicator 1, 20%; Indicator 2, 20%; Indicator 3, 20%; Indicator 4, 10%; Indicator 5, 15%; Indicator 6, 15%. Page 14 of 26 Methodology Annex A The proposed technique used within the questionnaire surveys is that devised by Rensis Likert. This presents a set of attitude statements, subjects being asked to express agreement or disagreement of a five-point scale. Each degree of agreement is given a numerical value, thus a total numerical value can be calculated from all the responses. Net scoring Net scores are calculated by analysing the opinions of all respondents and giving responses a positive or negative value dependent on the response. The score is calculated by subtracting the percentage who are either "very dissatisfied" or "dissatisfied" from the percentage who are either "very satisfied" or "satisfied". The scores that will be used for this target are: Method – net scoring Strongly Agree Neither Disagree Strongly agree agree disagree nor disagree Weighted *2 *1 *0 *-1 *-2 The baseline survey will produce a numerical value which will need to be improved by the percentages specified in the indicators. For percentage scores to be comparable the data collected at different times will need to be standardised. For example: Assuming a sample size of 600, the maximum conceivable difference between two survey points is 2400 - the maximum score is 1200 (600 X +2) and the minimum score is -1200 (600 X -2). Over the survey period the percentage change is calculated by dividing the change in score by 2400. Page 15 of 27 TARGET 9 (Local) Family literacy Specification of target Develop family literacy skills and increase the number of children and their families visiting the library Indicator(s) by which performance will be measured 1. 2. 3. Number of children, aged 0 - 18 who are active members* of library service Number of items issued to active members aged 0 - 18. Number of adults** currently participating*** in basic family literacy courses**** in Cumbria's libraries * ** *** **** Based on the CIPFA definition of at least one usage in a calendar year Aged 16 or over. Attends a minimum of 70% of the Course for which they are registered. A list of the relevant courses is attached at Annex A Current performance (Financial Year ending 31 March 2003) 1. 2. 3. 26,955 412,613 0 Performance at the end of the period of the Local PSA (Financial Year ending 31 March 2006) Performance expected without local PSA 1. 2. 3. 26,984 413,025 100 Performance expected with a local PSA 1. 2. 3. 31,027 454,286 1,000 Enhancement in performance 1. 2. 3. An additional 4,043 An additional 41,261 An additional 900 Note: Performance Reward Grant will be divided amongst the indicators as follows: Indicator 1, 35%; Indicator 2, 25%; Indicator 3, 40% Page 16 of 26 Annex A Keeping Up With The Children – a 12 hour course aimed at parents, grandparents and carers with children at various stages in the school system. Keeping Up With The Children – a 24 hour course that is specifically designed for adults with a basic skill need which enables them to better understand the Literacy Hour. Storytellers Certificate – this is linked to Storysacks, and encouraging adults to support the development of children’s reading. Storysack training – based around effective use of Storysacks as a way of encouraging adults to enjoy reading and books with their children. Note: Family Literacy courses are likely to be developed as the project runs its course and may be subject to change throughout the project period. Any adaptations will be done under the guidance of Adult Education and agreed with ODPM. Page 17 of 27 TARGET 10 (Local) Educational attainment Specification of target Raise the attainment of boys in order to contribute to overall GCSE improvement and reduce the gap between boys and girls by 50% by 2006 in 10 selected schools Indicator(s) by which performance will be measured Local PI: Average GCSE/GNVQ points score of all 15 year old pupils in schools maintained by the Local Education Authority Note 1: this was formerly BV37, but was discontinued after 2001/02 Note 2: the definition of GCSE average point scores changed in 2002, and the results are now “capped” (ie based on a pupil’s best 8 GCSE results rather than all of their GCSE results). However, it is proposed that “uncapped” average points scores will be used for the purpose of this target. Current performance (summer 2002) Girls: 44.2 Boys: 38.4 Performance at the end of the period of the Local PSA (summer 2005) Performance expected without the Local PSA Boys 40.1 Performance target with the Local PSA Boys 41.5 Enhancement in performance with the Local PSA Boys An increase of 1.4 points Condition of Grant: Cumbria will lose 30% of the potential performance reward grant for this target if the average GCSE/GNVQ points score for girls in summer 2005 is either less than 45.6 or does not match the enhancement achieved by boys over the lifetime of the PSA should this be higher than 1.4 points. Eg should boys achieve an average points score of 42 in summer 2005, Cumbria would lose 30% of the potential performance reward grant if girls did not achieve an average points score of 46.1. Page 18 of 26 TARGET 11 (Local) Post-16 education Specification of target Increase the percentage of Year 11 pupils in Cumbria who progress into full-time post-16 education in schools and colleges and who remain in full time education for one year or more. Indicator(s) by which performance will be measured 1. County-wide Percentage of Year 11 pupils progressing into post-16 full-time education. (Local PI) 2. Percentage of young people remaining in post 16 full-time education for at least one year as a proportion of the total number of 16 and 17 year olds. (Local PI) Current performance (School Year 2001/02) 1. 67.9% 2. 22.2% Performance at the end of the period of the Local PSA (School Year 2005/06) Performance expected without the Local PSA 1. 70% 2. 24.5% Performance target with the Local PSA 1. 73% 2. 28% Enhancement in performance with the Local PSA 1. An increase of 3% 2. An increase of 3.5% points Interim performance target: (School year 2004/05) 1. 70.5% 2. 26% Page 19 of 27 TARGET 12 (Local) Tackling domestic violence Indicators by which performance will be measured (i) Incidents of domestic violence* reported annually to the police. (ii) Percentage of victims of reported domestic violence incidents annually that were a victim of reported domestic violence incident in the previous 12 months (BVI 154). (iii) Victim retraction statements post charge as a percentage of all domestic violence cases – average rate over two year period 04/5 to 05/06. (iv) Number of convicted adults (18 years and over) recorded by the Probation Service on the Offender Assessment System (OASys) in section 6.7 who have ‘evidence of domestic violence / partner abuse (including threats and psychological abuse) in a 12 month period (April to March) Current Performance (02/03) (i) (iii) (iii) (iv) 4741 incidents of domestic violence reported to the police Repeat victimisation rate equals 33.5 % Statements retracted by victims in 27% of cases (41 out of 152) 94 convicted adults Performance at the end of the period of the LPSA (05/06) Performance expected without the LPSA (i) (ii) (iii) (iv) 5452 incidents of domestic violence reported to the police Repeat victimisation rate equals 28.5% Statements retracted in 24% of cases 108 convicted adults recorded by probation service. Performance with the LPSA (i) (ii) (iii) (iv) 6163 incidents of domestic violence reported to the police Repeat victimisation rate equals 23.5% Statements retracted in 21% of cases 134 convicted adults recorded by the Probation Service Enhancement in Performance (i) (ii) (iii) (iv) A further 711 incidents of domestic violence reported to the police. A further 5 percentage point reduction in repeat victimisation Victim statements retracted in 20% fewer cases 26 more convicted adults recorded by the Probation Service Page 20 of 26 *Domestic Violence is any incident of threatening behaviour, violence or abuse (psychological, physical, sexual, financial or emotional)) between adults who are or who have been intimate partners or are family members regardless of gender. (Adults here meaning that both parties are over 18.) Note: For this target, Performance Reward Grant will be divided between the indicators as follows: Indicator 1, 20%; Indicator 2, 60%; Indicator 3, 10%; Indicator 4, 10%. Page 21 of 27 Schedule 2: Freedoms and Flexibilities The Government intends to make the changes specified below in various statutory and administrative requirements, as they relate to Cumbria County Council [and to pursue the further discussions described below]. The legal and practical feasibility of some of the changes had not been established at the time that this agreement was concluded. If the precise changes specified prove infeasible, the Government will use its best endeavours to achieve substantially the same effects by other means. In support of Target 1 Change 1 Department for Transport agree for consideration to be given in the future to the inclusion of skidding resistance as a factor in the formula for distributing grants for principal roads maintenance. In support of Target 4 Change 2 The Youth Offending Team will in individual cases be allowed to sign off national standards relating to secure accommodation, training and detention for young people placed more than 70 miles from their home on a case by case basis. Each case will be dealt with on its individual merits and relaxation of national standards for each case will be subject to the approval of the Regional Manager (YJB) Change 3 The Youth Justice Board confirms that funding is approved for ISSP and Cumbria is included in the roll out to the YOT’s that do not currently have ISSP. In support of Target 11 Change 4 Through the auspices of the National Rates Advisory Group (NRAG), the LSC and DfES have, and will continue to consider evidence to support the introduction of a sparsity factor into the funding methodology from 2004/05 and onwards. Change 5 DfES will work with Cumbria LEA to examine the best options for gathering information on post-16 transfer from LEA schools in order to meet expectations within the Code of Practice on LEA/school relations, the requirements to reduce the bureaucratic burden on schools and the necessity for the LEA to monitor and evaluate progress towards achievement of this target. Page 22 of 26 Schedule 3: Pump Priming Grant To assist in achieving the targets set out in this Agreement, the Government will make a pump priming grant of £1,237,792 to Cumbria County Council as a contribution towards expenditure of an “invest to save” or “invest to improve” nature. This grant will be paid no later than the financial year following that in which this agreement was concluded. Should involvement of districts be considered substantive an additional £50,000 of pump priming grant will be payable. The grant is intended to contribute to the costs of the delivering the targets. The County Council intends to allocate the grant on a pro rata basis in relation to the total estimated cost of each of the targets which are included in the final agreement. The grant must be spent, during the period of this Local PSA, in accordance with this Schedule, or as otherwise agreed with the Government as likely to assist in achieving the enhanced performance specified in Schedule 1. Conditions protecting the proper use of public funds will apply. Target Project 1 Road Safety – Reduce KSI’s Improve outcomes for Care Leavers Reduce Truancy Reduce Youth-ReOffending Improve costeffectiveness Reduce Unemployment Improve the quality of life and independence of older people Build Active Communities Increase family literacy Raise the attainment of boys at GCSE level Increase participation in post 16 education in Furness and West Cumbria Reduce Domestic Violence TOTAL ESTIMATED COST 2003-04 PRICES 2 3 4 5 6 7 8 9 10 11 12 Total Planned total of Council expenditure (£000’s) 720 Grant contribution towards this expenditure PPG (£000’s) 277 333 128 357 606 137 233 0 0 95 384 37 148 141 54 262 231 100 50 195 40 89 34 3,413 1,238 Page 23 of 27 Schedule 4: Performance Reward Grant The provisions of this Schedule are subject to any additional provisions on the performance reward grant elsewhere in the Agreement. The total potential grant The total potential grant is equivalent to 2.5% of the authority's (and those district councils substantively involved in the agreement) with net budget requirement for financial year 2002/03. It is divided equally among the targets. Where a target has sub-targets, the amount for the target is sub-divided equally among the sub-targets, unless otherwise stated. The relevant net budget requirements are: Authority Cumbria County Council Allerdale Barrow Carlisle Copeland Eden South Lakeland Total NBR: 402,762,000 12,192,360 9,873,670 12,968,755 8,839,000 6,387,192 11,842,500 ----------------464,865,477 ODPM will seek to reach agreement with the County Council on whether the districts’ collaboration can be considered to be substantive for the purposes of determining entitlement to performance reward grant. Since the Government regards collaboration in the cost effectiveness target as a particularly important consideration in assessing whether the collaboration is substantive, it intends that the assessment should take place once agreement has been reached on the specification of the cost effectiveness target. The reward for achievement on a target The proportion of the potential grant attributed to a target or sub-target that is payable is the same as the proportion of the ‘enhancement in performance with the Local PSA’ specified in Schedule 1 that the authority achieves, subject to a maximum proportion of 100% and a minimum of 60%. If the authority achieves less than 60% of that enhancement in performance, nothing is included in the grant in relation to that target or sub-target. Payment of the grant Main grant The grant will be paid in two equal instalments in the financial year following that in which the end date of the Local PSA falls, and the next financial year, subject to the qualification below relating to interim payments on account. Page 24 of 26 Interim payment on account Where the authority and the Government have agreed an interim level of performance in relation to a target (or sub-target), as specified in Schedule 1, and the authority achieves it, the Government intends to pay one-fifth of the grant attributed to that target (or sub-target) in the financial year before the first year in which payment of the main grant would be due. This is treated as a ‘payment on account’. The definitive calculation of the grant will be made as described above. The balance of the grant entitlement will be paid in equal instalments in the two subsequent financial years. If the definitive calculation yields a smaller grant entitlement than the ‘payment on account’, the excess payment will be recovered. Half of each instalment of the grant will be paid as a capital grant, and half as a revenue grant. Page 25 of 27