May10 NANPA Report - NANC

advertisement
NANPA Report to the NANC
May 21, 2010
John Manning
NANPA Director
1) CO Code Activity – Jan-Apr 2010
2) NPA Assignment Activity
3) NPAs Exhausting within Next 36 Months
4) NANPA Change Orders
5) NANP and NANPA News
1
Central Office Code Activity
Central Office Code Activity (January – April 2010)
CO code activity for the first four months of 2010:
Assignments
Denials
Returns/Reclamations
Net Assignments
Jan- Apr07
1,413
315
217
1,196
Jan-Apr08
967
260
201
766
Jan-Apr09
829
280
237
592
Jan-Apr10
1,107
337
97
1,010
Observations:


Increase in CO code assignments as compared to 2008 and 2009.
 January and February 2010 had over 250 assignments; March had over 350
assignments; April had less than 140 codes assigned.
Significant decrease in quantity of returns/reclamations.
NPA Assignment Activity
Four (4) area codes have been assigned in 2010:




NPA 539 was assigned as the relief area code for the Oklahoma 918 NPA. (PL-403)
NPA 929 was assigned as the relief area code for the New York 347/718 NPAs. (PL402)
NPA 873 was assigned as the relief area code for the Quebec, Canada 819 NPA.
NPA 365 was assigned as the relief area code for the Ontario, Canada 289/905 NPAs.
Three (3) area codes have been placed in service since the beginning of 2010:
 NPA 458 (Oregon) went into service on February 10, 2010 in relief of the 541 area code.
 NPA 470 (Georgia) went into service on February 26, 2010 in relief of the 404/770/678
NPA overlay complex.
 NPA 343 (Ontario, Canada) went into service on May 15, 2010 in relief of the 613 area
code.
There are three (3) area codes with future 2010 in service dates:



NPA 938 (Alabama) to overlay NPA 256 on July 10, 2010. Mandatory ten-digit dialing
will begin June 5, 2010. (PL-389)
NPA 534 (Wisconsin) to overlay NPA 715 on August 14, 2010. Mandatory ten-digit
dialing will begin July 17, 2010. (PL-384)
NPA 579 (Quebec, Canada) to overlay NPA 450 on August 21, 2010. (PL-401)
2
NPA Relief Planning
Status of NPA Codes Exhausting Within 36 Months (report attached)
There are no NPAs currently projected to exhaust within the next 12 months. Below is a
summary of other NPA relief planning activities.
Other NPA Relief Activities

PA 570, 717 and 814 NPAs – Public input hearings were conducted for these three NPA
codes from February through April, 2010.

NE 402 NPA – On September 15, 2009, the Nebraska Public Service Commission approved
an all-services overlay as the relief method for the 402 NPA. The new 531 NPA will serve
the same geographic area currently served by the existing 402 NPA. Permissive seven-digit
or ten-digit dialing begins June 26, 2010. Mandatory 10-digit dialing begins February 26,
2011. The new 531 NPA is effective March 26, 2011. (PL-397)

OK 918 NPA – On January 4, 2010, the Oklahoma Corporation Commission approved an allservices overlay as the relief method for the 918 NPA. The new 539 NPA will serve the
same geographic area currently served by the existing 918 NPA. Permissive 10-digit local
dialing starts August 7, 2010. Mandatory ten-digit dialing starts March 5, 2011. (See PL403).

NY 718/347 – On January 7, 2010, the State of New York Public Service Commission
ordered an overlay of the 718/347 NPA and NANPA assigned the 929 NPA. No permissive
dialing is necessary since ten-digit dialing is already in place. Network preparation and
customer education will start July 16, 2010 and be completed by March 19, 2011. (PL-402)

AR 870 NPA – The Arkansas PSC ordered an overlay of the 870 NPA and NANPA assigned
the 327 NPA in December 2009. Permissive seven-digit or ten-digit dialing starts on October
20, 2012. Mandatory ten-digit dialing begins April 20, 2013. The new 327 NPA is effective
May 18, 2013. (PL-400)

Sint Maarten 721 NPA – The Regulatory Authority of the Government of Sint Maarten, NA
requested the introduction of the 721 NPA be delayed. A new schedule has not yet been
developed. Another planning letter will be issued when the Authority has established new
dates for implementation. (PL-404)
3
NANPA Change Orders
Change Order 18 – This change order was approved by the FCC on February 19, 2010.
Implementation is targeted for the fall of 2010.
This change order requires NANPA to compare thousand-block (NPA-NXX-X) assignment data
obtained from the Pooling Administrator (PA) with the utilization data collected from service
providers during the semi-annual Number Resource Utilization and Forecast (NRUF) reporting
process. Through this comparison, NANPA is to identify the assigned thousand-blocks for which
no utilization data was provided and contact the service provider to which the block is assigned to
request that it submit appropriate utilization information. NANPA is to also identify those
instances where a service provider indicates on their NRUF submission that a thousand-block was
donated to the PA but the PA block assignment data shows the block is assigned to the service
provider.
Other NANP and NANPA News

The 2009 NANPA Annual Report was posted to the NANPA website on March 30, 2010.

The 1Q10 NANPA Newsletter was posted on the NANPA website (www.nanpa.com) in
early April. It can be found under Publications, Newsletters.

The April 2010 NPA and NANP exhaust projections were posted to the NANPA website on
April 30, 2010.

NANPA Public Website Training - NANPA is conducting training concerning the public
website. Three (3) training sessions (April 26, May 10 and May 18) have been held. This
training is a result of feedback received from the 2009 NANPA operational review session.
4
Status of NPAs exhausting within 36 months
----------------------------- Relief Planning Process ------------------------------Industry
Loca
-tion
PA
NPA
Exhaust
Date
570
3Q11
PSC
Filing
Due
Relief
Plan
Filed
Relief
Type
Proposed
07/02/09
Overlay
Impl.
Date
Prop.
Req.
Apprvl.
Date
------------------ Implementation Process -----------------
PSC
Apprvl.
Recd.
Type of Relief
Approved
Apprvd.
Relief Impl. Mtg.
Date
Notice
Issued
___________________________________________________________________________________________________________________________________
03/30/09
07/08/09
NANPA declared jeopardy for the 570 NPA on 4/1/09 and conducted the NPA Relief Planning meeting on 5/27/09. Public input hearings held 2/1-3/10
and 3/11/10.
NE
402/531
4Q11
06/28/99
09/15/99
09/15/99
None
None
09/15/09
Overlay
3/26/2011
07/28/09
On 6/30/09 the NE PSC ordered an overlay of the 402 NPA and NANPA assigned the new 531 NPA. On 9/15/09 the NE PSC adopted the industry’s
implementation intervals: permissive dialing starts 6/26/10, mandatory dialing is 2/26/11, relief is effective 3/26/11.See PL-397.
MD
410/443/667
1Q12
02/17/00
05/12/00
05/12/00
Overlay
None
01/03/01
Overlay
TBD
02/22/01
Overlay
TBD
11/19/99
NANPA is directed to notify the MD PSC and industry when NPA is within 10 months of exhaust.
CT
860/959
2Q12
NA
NA
09/29/99
The DPUC relief order provided no specific implementation parameters. Therefore, the date for the introduction of the new area code has not yet
been determined. Mandatory 10 digit dialing was implemented 11/14/09. See PL-388.
___________________________________________________________________________________________________________________________________
Projected exhaust dates are based on April, 2010 NRUF analysis with updates.
Page 1 of 4
"R" indicates that the projected exhaust date is based on rationing.
Applicable notes follow each entry.
Report Generated 5/10/2010 8:36:49 AM
5
----------------------------- Relief Planning Process ------------------------------Industry
Loca
-tion
NY
NPA
Exhaust
Date
718/347
2Q12
PSC
Filing
Due
Relief
Plan
Filed
Relief
Type
Proposed
01/20/09
Overlay
Impl.
Date
Prop.
Req.
Apprvl.
Date
------------------ Implementation Process -----------------
PSC
Apprvl.
Recd.
Type of Relief
Approved
12/16/09
Overlay
Apprvd.
Relief Impl. Mtg.
Date
Notice
Issued
___________________________________________________________________________________________________________________________________
10/08/08
01/20/09
4/16/11
01/21/10
On 1/7/10 the NY PSC ordered an additional overlay. NANPA assigned the new 929 NPA on 1/8/10. Industry’s joint implementation schedule filed
2/4/10. Network preparation and customer education starts 7/16/10. New NPA effective 4/16/11.
PA
814
2Q12
01/23/02
06/10/09
06/10/09
Overlay
NANPA conducted a pending petition review call on 4/29/09 and the industry decided to file the pending petition. Public input hearings held
2/22,23,24; 3/4 and 4/20/10.
NH
603
3Q12
NANPA will re-file the relief plan within two years of exhaust and call an industry meeting at that time to review the situation prior to filing.
CA
408/669
4Q12
08/20/98
08/20/98
Overlay or Split
S 8/12/00
O 5/19/01
11/20/98
Overlay
01/04/99
On 12/16/99 the CPUC indefinitely suspended the 408-669 NPA overlay. See PL- 206. NANPA has notified the CPUC that NPA 408 is within 36 months of
exhaust.
___________________________________________________________________________________________________________________________________
Projected exhaust dates are based on April, 2010 NRUF analysis with updates.
Page 2 of 4
"R" indicates that the projected exhaust date is based on rationing.
Applicable notes follow each entry.
Report Generated 5/10/2010 8:36:49 AM
6
----------------------------- Relief Planning Process ------------------------------Industry
Loca
-tion
OK
NPA
Exhaust
Date
918
4Q12
PSC
Filing
Due
Relief
Plan
Filed
Relief
Type
Proposed
05/05/08
Overlay
Impl.
Date
Prop.
Req.
Apprvl.
Date
------------------ Implementation Process -----------------
PSC
Apprvl.
Recd.
Type of Relief
Approved
01/04/10
Overlay
Apprvd.
Relief Impl. Mtg.
Date
Notice
Issued
___________________________________________________________________________________________________________________________________
01/16/08
4/1/11
02/10/10
On 1/4/10 the OCC ordered an overlay. Permissive dialing starts 8/7/10, mandatory dialing is 3/5/11, the new 539 NPA is effective 4/1/11. See PL-403
PA
717
4Q12
07/01/09
10/22/09
10/20/09
Overlay
On 9/10/09 NANPA conducted the NPA Relief Planning meeting. Public input hearings held 3/22,23,24,25 & 30, 2010.
SC
843
1Q13
10/03/00
02/23/01
06/01/01
The industry recommended a 17-month implementation interval.
OH
740
1Q13
Relief planning is done by the Ohio Public Utility Commission.
___________________________________________________________________________________________________________________________________
Projected exhaust dates are based on April, 2010 NRUF analysis with updates.
Page 3 of 4
"R" indicates that the projected exhaust date is based on rationing.
Applicable notes follow each entry.
Report Generated 5/10/2010 8:36:50 AM
7
----------------------------- Relief Planning Process ------------------------------Industry
Loca
-tion
IL
NPA
Exhaust
Date
217/447
2Q13
PSC
Filing
Due
Relief
Plan
Filed
Relief
Type
Proposed
Impl.
Date
Prop.
10/18/01
Overlay
None
Req.
Apprvl.
Date
------------------ Implementation Process -----------------
PSC
Apprvl.
Recd.
Type of Relief
Approved
08/26/06
Overlay
Apprvd.
Relief Impl. Mtg.
Date
Notice
Issued
___________________________________________________________________________________________________________________________________
06/15/01
10/19/01
09/12/06
On 8-26-06 the ICC ordered an overlay. On March 6, 2007 the ICC approved the industry’s implementation plan to wait on setting implementation
dates until the number of remaining codes available for assignment reaches 50 to allow for a 13-month implementation interval of the new 447 NPA.
FL
407/321
2Q13
No Relief Project Required
___________________________________________________________________________________________________________________________________
Projected exhaust dates are based on April, 2010 NRUF analysis with updates.
Page 4 of 4
"R" indicates that the projected exhaust date is based on rationing.
Applicable notes follow each entry.
Report Generated 5/10/2010 8:36:50 AM
8