NANPA Report to the NANC September 20, 2005 1) CO Code Activity Status Report 2) NPAs Exhausting within Next 36 Months 3) NAS NRUF/NNS/Website Training 1 CO Code Activity Status Report For August 2005 State (1) Total Quantity of New Applications Rec'd by NANPA (2) Total Quantity of Returns/ Reclamations (5) Assignments, Denials and Returns/ Reclamations (6) Total Quantity of Applications Processed by NANPA (7) Total Quantity of Assignments (3) Total Quantity of Denials (4) AK AL AR AS AZ CA CO CT DC DE FL GA GU HI IA ID IL IN KS KY LA MA MD ME MI MN MO MS MT NC ND NE NH NJ NM NN NV NY OH OK OR PA PR RI SC SD TN TX UT VA VI VT WA WI WV WY 5 8 69 0 4 71 25 7 0 1 50 64 0 8 29 19 103 57 70 14 89 23 90 0 62 22 91 5 22 22 2 5 1 34 4 0 11 31 70 24 11 81 0 0 15 0 29 223 18 42 0 3 20 43 5 1 5 2 26 0 2 19 2 0 0 0 36 3 0 0 4 1 9 6 2 3 6 1 1 0 8 11 8 0 2 4 1 0 1 4 3 0 4 24 10 2 2 7 0 0 7 0 7 17 0 7 0 0 3 2 0 0 1 2 7 0 1 3 9 3 0 1 8 1 0 0 0 4 16 33 30 2 4 3 3 0 44 2 48 1 0 4 0 0 1 8 0 0 0 7 46 8 5 31 0 1 3 0 6 43 1 15 0 2 3 22 5 0 0 3 0 0 0 8 0 0 0 0 1 1 0 0 3 0 5 0 0 1 3 2 1 0 2 0 1 4 1 1 0 1 0 2 0 0 4 1 4 2 0 0 0 0 0 0 5 6 0 0 0 0 1 0 0 1 6 7 33 0 3 30 11 3 0 1 45 5 0 0 7 5 30 39 32 6 13 6 5 0 54 13 57 5 3 9 1 1 2 14 3 0 8 32 60 12 7 38 0 1 10 0 18 66 1 22 0 2 7 24 5 1 6 12 50 0 4 44 38 5 0 1 56 56 0 8 29 6 65 77 74 11 15 31 88 0 104 16 116 6 19 15 1 5 3 64 3 0 10 48 109 24 12 111 0 2 14 0 28 219 11 37 0 5 12 52 11 1 TOTAL Offline TOTAL 1,703 262 437 64 763 262 437 64 763 1,734 4 1,738 1,703 2 CO Code Assignments Comparison of first eight months of 2005 with same time period in 2004: Assignments Denials Returns/Reclamations January-August 2005 2,326 2,269 686 January-August 2004 2,167 1,212 615 The average assignment rate for the first eight months of 2005 was 290 codes per month. For the first eight months of 2004, the average assignment rate as compared with the same time period in 2004 of 270 codes. NPA Relief Planning Status of NPA Codes Exhausting Within 36 Months (report attached) There are 4 NPAs currently projected to exhaust within the next 12 months. A summary of their relief planning status is provided below: CA 310 – On August 25, 2005, the CPUC ordered an overlay. The new relief code is 424. Permissive 7D or 1+10D dialing begins December 31, 2005, and mandatory 1+10D dialing starts July 26, 2006. New codes from the 424 NPA will be effective as early as August 26, 2006. IL 630 and 815 have an approved relief plan in place. GA 706 – Approved relief plan in place. Delta NRUF for MO 417 On July 27, 2005, NANPA issued a delta NRUF for NPA 417 in Missouri. The new exhaust date is 2Q09. The previous exhaust date was 3Q08. A notification concerning this change was distributed via the NANP Notification System (NNS) on July 28, 2005. NPA Inventory Since January 1, 2005, NANPA has made 2 NPA assignments (730 for Illinois 618 and 762 for Georgia 706). One NPA (835 in Pennsylvania for 484/610) has been returned. Two area codes have gone into service (829 in the Dominican Republic and 769 in Mississippi). For NPA 769, no CO code assignments will be made until the 601 NPA exhausts. NPA/NANP Exhaust Projections In accordance with the NANPA technical requirements, NPA and NANP exhaust projections will be made available at the end of October 2005. Projections will be posted to the NANPA website (under Reports, NRUF). Notice will be sent to the NANC when the projections are available. 3 NAS NRUF/NNS/Website Training In response to some comments from the 2004 NANPA performance evaluation survey, NANPA is planning some refresher training on the use of the NANP Administration System (NAS) NRUF on-line capabilities as well as the NANP Notification System (NNS) and public website. NANPA provided similar training in early 2004 with the implementation of NAS. NNS/Public Website Training This training will address the number resource information found on the NANPA website as well as the use of the NAS NANP Notification System (NNS). The purpose of the training is to familiarize interested parties with what data is available on the website and where it can be found and to help users access NPA relief planning and other important documents available via NNS. Tentative training dates and times are as follows: October 13, 2005 – 11:00am ET – 2 hours October 19, 2005 – 2:00pm ET – 2 hours Each session is limited to 30 participants on a first-come, first-serve basis. An NNS notice will be distributed the week of September 26, 2005 announcing the two training sessions. Notice will not require participants to register with NANPA; participation on a first/come, first/serve basis. For more information, contact Wayne Milby (wayne.milby@neustar.biz) or Joe Cocke (joe.cocke@neustar.biz). NAS NRUF Training This training will focus primarily on the NAS NRUF on-line submission functionality used by service providers submitting utilization and forecast data. A review of the email (excel) submission method will also be addressed. Tentative training dates and times are as follows: October 27, 2005 – 11:00am ET – 2 hours November 2, 2005 – 2:00pm ET – 2 hours November 8, 2005 – 11:00am ET – 2 hours Each session is limited to 30 participants. Additional sessions will be scheduled if demand warrants. An NNS notice will be sent the week of October 10, 2005 announcing the three training sessions. Participants will be required to register with NANPA (Al Cipparone, NRUF Manager). 4 Status of NPAs exhausting within 36 months ----------------------------- Relief Planning Process ------------------------------- ------------------ Implementation Process ----------------- Industry PSC Relief Relief Impl. Req. PSC Apprvd. Notice Filing Plan Type Date Apprvl. Apprvl. Type of Relief Relief Impl. NPA Issued Due Filed Proposed Prop. Date Recd. Approved Date Mtg. ______________________________________________________________________________________________________________________________________________ Loca -tion CA Exhaust Date 310 4Q05 R NA NA 08/25/05 Overlay 8/26/2006 09/16/05 On 8/25/05 the CPUC ordered an overlay (canceling the former Split backup plan), The new relief code is 424. Permissive 7D or 1+10D dialing starts 12/31/05, mandatory 1+10D dialing starts 7/26/06, new codes from the 424 NPA will be effective as early as 8/26/06. On 9/8/05 NANPA issued PL # 347. IL 630 1Q06 09/10/98 11/18/98 11/18/98 Overlay NA 02/01/99 07/01/99 Overlay TBD 09/21/99 NANPA is to notify the ICC when NPA is within 30 days of exhaust. The new relief NPA 331 will be opened 90 days after exhaust. IL 815 2Q06 03/22/00 06/29/00 06/29/00 Overlay None 02/04/04 Overlay TBD 03/15/04 On 2/4/04 the ICC issued an overlay order. NANPA has assigned the new 779 NPA as the relief code. On 10/21/04 the ICC approved the industry’s implementation plan to wait on setting implementation dates until the number of remaining codes available for assignment reaches 24. GA 706 2Q06 08/07/00 11/09/00 11/09/00 Overlay None 06/23/05 Overlay 5/16/06 07/12/05 NANPA has contacted the GA Public Service Commission about the current status of the NPA and the need for area code relief. Jeopardy declared 12/7/04. Industry set rationing at 4 codes/month with 82 codes currently available. At the request of the GA PSC Staff, on 4/14/05 NANPA updated the record for the NPA Relief Petition filed November 2000. The GA PSC Staff conducted an industry meeting on 5/10/05 to plan for the introduction of the new area code. On June 23, 2005 the GA PSC approved an all-services overlay for the 706 NPA. Permissive 7 or 10 digit dialing starts 9/1/05 and mandatory 10 digit dialing starts 4/3/06. CT 203 4Q06 N/A 09/29/99 Overlay TBD 11/19/99 The DPUC relief order provided no specific implementation parameters. Therefore, the date for the introduction of the new area code has not yet been determined. On May 25, 2005, the DPUC reopened the instant docket to review implementation of the 475 area code overlay. NE 402 4Q06 06/28/99 09/15/99 09/15/99 None None NANPA provided the PSC with updated projections of relief alternatives in Oct. 2003. No PSC decision has been made on type of relief. On 11/23/04 the PSC petitioned the FCC to require mandatory pooling in LNP capable rate centers outside the top 100 MSAs in the 402 NPA. ______________________________________________________________________________________________________________________________________________ Projected exhaust dates are based on April, 2005 NRUF analysis with updates. Page 1 of 4 "R" indicates that the projected exhaust date is based on rationing. Applicable notes follow each entry. Report Generated 9/10/2005 5 ----------------------------- Relief Planning Process ------------------------------- ------------------ Implementation Process ----------------- Industry PSC Relief Relief Impl. Req. PSC Apprvd. Notice Filing Plan Type Date Apprvl. Apprvl. Type of Relief Relief Impl. NPA Issued Due Filed Proposed Prop. Date Recd. Approved Date Mtg. ______________________________________________________________________________________________________________________________________________ Loca -tion OK Exhaust Date 580 1Q07 02/04/04 05/06/04 Overlay The industry recommended a 14 to 16-month implementation interval. On 10/14/04 the OCC petitioned the FCC for authority to require mandatory pooling in non-Top 100 MSA - rate areas with 2 or more LNP-capable service providers. WV WA 304 360 2Q07 3Q07 03/16/00 06/21/00 06/21/00 Overlay or Split None 11/15/00 WV PSC established work group to evaluate need for relief. First meeting was held 3/19/2004; final report filed with PSC on 5/19/2004. FCC requested comments by December 30, 2004 on the WV PSC’s petition to implement additional mandatory pooling with reply comments by January14, 2005. 03/05/99 09/22/99 09/22/99 Overlay None 05/10/00 Overlay TBD 10/14/99 The WUTC has suspended the implementation of relief until it determines necessary. The UTC staff indicated it will give a 6-month notice of when to start relief. On 5/7/04 NANPA rescinded the jeopardy status of the 360 NPA. WI 715 4Q07 04/09/02 08/12/02 Overlay None The industry recommended a 19-month implementation schedule. NH 603 1Q08 10/12/98 02/18/99 02/18/99 Overlay NA 06/01/99 Jeopardy rescinded 5/7/04 OH 740 1Q08 Relief planning is done by the Ohio Public Utility Commission KY 270 2Q08 02/06/01 07/25/01 07/25/01 Overlay None The industry recommended a 19-month implementation interval. ______________________________________________________________________________________________________________________________________________ Projected exhaust dates are based on April, 2005 NRUF analysis with updates. Page 2 of 4 "R" indicates that the projected exhaust date is based on rationing. Applicable notes follow each entry. Report Generated 9/10/2005 6 ----------------------------- Relief Planning Process ------------------------------- ------------------ Implementation Process ----------------- Industry PSC Relief Relief Impl. Req. PSC Apprvd. Notice Filing Plan Type Date Apprvl. Apprvl. Type of Relief Relief Impl. NPA Issued Due Filed Proposed Prop. Date Recd. Approved Date Mtg. ______________________________________________________________________________________________________________________________________________ Loca -tion MD Exhaust Date 410/443 2Q08 02/17/00 05/12/00 05/12/00 Overlay None 01/03/01 Overlay TBD 02/22/01 Overlay TBD 04/20/99 NANPA is directed to notify the MD PSC and industry when NPA is within 10 months of exhaust. CA 714 2Q08 R 11/30/98 11/30/98 Overlay or Split S 2/10/01 O 1/6/01 03/18/99 On 12/16/99 the CPUC suspended relief until further notice, see PL # 206. Codes are rationed at 2 per month. IL 618 2Q08 07/26/00 10/18/00 10/19/00 Overlay 04/20/05 Overlay 05/24/05 NANPA has assigned the 730 NPA as the new relief code. At the industry implementation mtgs an implementation plan will be developed which NANPA is to file for ICC approval within 160 days of the 4/20/05 order. Codes are rationed at 5 per month. UT 801 2Q08 08/12/99 11/04/99 Overlay 04/26/00 Split 05/18/00 On 6/21/04 the UT PSC suspended the split until further notice. See PL# 337. Codes are rationed at 6 per month. WI 920 2Q08 08/18/99 The industry deferred filing the relief plan until further review of the NPA’s status after the October 2005 NRUF is published. IL 217 4Q08 06/15/01 10/19/01 10/18/01 Overlay None NANPA will report the status of the 217 NPA to the ICC on Dec. 7, 2005 IN 812 4Q08 10/12/01 02/01/02 02/01/02 Overlay None The industry recommended a 16-month implementation interval. ______________________________________________________________________________________________________________________________________________ Projected exhaust dates are based on April, 2005 NRUF analysis with updates. Page 3 of 4 "R" indicates that the projected exhaust date is based on rationing. Applicable notes follow each entry. Report Generated 9/10/2005 7 ----------------------------- Relief Planning Process ------------------------------- ------------------ Implementation Process ----------------- Industry PSC Relief Relief Impl. Req. PSC Apprvd. Notice Filing Plan Type Date Apprvl. Apprvl. Type of Relief Relief Impl. NPA Issued Due Filed Proposed Prop. Date Recd. Approved Date Mtg. ______________________________________________________________________________________________________________________________________________ Loca -tion MS Exhaust Date 662 4Q08 06/05/01 10/01/01 09/28/01 Overlay None The industry recommended a 22-month implementation interval. NM 505 4Q08 Relief Planning Not Yet Started CA 760 4Q08 R 07/06/98 03/16/99 03/16/99 Split 7/21/01 07/08/99 Split TBD 08/12/99 On 7/20/00 the CPUC indefinitely suspended the split to the 442 NPA see PL # 238. MI 989 4Q08 Relief Planning Not Yet Started ______________________________________________________________________________________________________________________________________________ Projected exhaust dates are based on April, 2005 NRUF analysis with updates. Page 4 of 4 "R" indicates that the projected exhaust date is based on rationing. Applicable notes follow each entry. Report Generated 9/10/2005 8