Doc. Identifier: Minutes EGEE-JRA4-ALLConference call KaSubject: EGEE JRA4 CONFERENCE CALL Place: Conference Call Date: 21 January 2005 (2pm GMT, 3pm CET) Kostas (KK), Ratna (RA), Charaka (CJP) [UEDIN], Maarten (MB), Loukik (LK), Anand (AP) [DANTE], Gloria (GV), Giovanni (GC) [GARR], [CNRS] Mark (ML) [DL], Ahmed (AA), Sophie (SN), Benjamin (BV), Pete (PC), Robert (RS) Attendees Apologies Details CERN conference system: +41 22 767 7000 Ask for code: EGEE JRA4 Organized by: Kostas Kavoussanakis 1. SUMMARY OF ACTIONS NEW: [All] Submit 10-line activity report to KK for pre-minutes, by 13:00 CET, 24 Feb 2005 [SN/BV] Investigate final security scheme on EDG::WP7 RGMA server [SN] Produce a document titled "NPM DJRA4.2 prototype deployment" that: - Provides 3-5 references to EDG::WP7 architecture - Describes the architecture that we put in place for DJRA4.2 - Lists the issues with the deployment of the DJRA4.2 prototype - Recommends changes and additions to the architecture - Recommends the list of EDG::WP7 tools that we should package up for (potential) deployment. [SN] Replace UCL's central Producer and other necessary components with entities running in CNRS [LK] Address NMWG Schema issue when the next NMWG Schema gets published by the GGF working group [RA] Chase up the three JRA1 contacts that Tiziana provided [DANTE] Confirm who will be attending to the February 05 f2f meeting and which days (dates). [BAR] Produce security summary similar to NPM’s PUBLIC 1/7 Doc. Identifier: Minutes EGEE-JRA4-ALLConference call [KK] Invite Julien to retake active interest in JRA4 and be the link with SA2 [KK] Publish to SA1/JRA3 NPM security document [KK] Identify who will use BAR so as to look for further requirements [KK] Put security on the agenda of the F2F meeting [KK] Add an item for "BAR/NSAP Demo" in the agenda for the f2f BAR meeting at CERN [KK] Check with Edinburgh team whether the EGEE network resource allocation is dynamic or static [AP] Browse JRA1 Developers Guide and WS-I Basic Profile 1.0 and raise issues if necessary. [CP/AP] Read updated SA2 requirements document. [CJP] To develop a BAR client by end-January [CJP] Send "Deployment Scenario for BAR/NSAP services" document to AP/MB ON-GOING: [All] Mail KK holidays in the near future for inclusion in the minutes. [RA] Produce a document summarising issues raised by design, development and deployment of NPM prototype [CP] to produce schema for the HLM-BAR interface - Preliminary version to be ready and circulated by Thursday 25 Jan 05 - Agreed version to be ready later [AP] to produce XML schema for BAR-NSAP interface - Preliminary version to be ready and circulated by Tuesday 25 Jan 05 - Agreed version to be ready later [RA] Investigate links under “Software Engineering” in http://egee-jra1.web.cern.ch/egee%2Djra1/. [RA] Provide account of interactions with JRA1 in Den Haag PUBLIC 2/7 Doc. Identifier: Minutes EGEE-JRA4-ALLConference call [CJP] to read requirements in SA2 Network Resource Provision doc [DANTE] to develop a "dummy" NSAP to test handshake by end-January. [CJP] to develop a BAR service and deploy it preferably on a Linux box by end-January. [CJP] Write an installation document for BAR by end Feb 05. [LK] Propose the target for aggregation for the NPM prototype due in March 05 COMPLETED THIS TIME: [All] Submit 10-line activity report to KK for pre-minutes, by 13:00 CET, 20 Jan 2005 [KK] Organise NPM phone conference for Friday 14 Jan [KK] Organise phone conference between MB, SA2 and potentially CJP/RA to discuss alignment of service-class terminology [KK] Book meeting for February face-to-face [AP/DANTE] Circulate the updated DJRA4.1 (BAR interface document) to JRA4 team by 24 December 04. [RA] Chase up Tiziana re JRA1 documents promised in Den Haag [CP] Send current architecture document to MB [CP] Check with Kostas when's telecon between SA2 and JRA4 is held to discuss DSA2.1. 2. MINUTES 1. Approval of minutes 07 January. Approved. 2. Managerial Issues PUBLIC 3/7 Doc. Identifier: Minutes EGEE-JRA4-ALLConference call Face-to-face meeting Finally organised for 7-8 February as planned; KK will be more efficient next time, that he knows how things work. Please keep the ideas for agenda items coming. Holidays and Absences See Section 3. 3. Progress update Network Performance Monitoring DJRA4.2 (T1.3) 21/Jan MJRA4.3 (T1.4) 3/Sep “Study existing request/response methods” (S-T1.3.1) Partners: “Security & AAA requirements” (S-T 1.3.2) GARR, DANTE, DFN, CNRS, UEDIN, DL “Definition & modelling of interfaces” (S-T 1.3.3) Leading: Mark / Ratna / Gloria “Study and Selection of Architectures” (S-T 1.4.1)1 / Nicolas / Robert / Benjamin Deliverable approved by the EGEE PEB on 20 January 2005 Prototype Partners: “Development and Integration of Interfaces” (S-T1.4.2) UCL, DANTE Leading: Paul / Yee / Loukik / and Mark This milestone is the development of the software prototype for network performance monitoring. Closely working with DJRA4.2, it will develop the software to make sure what it has been specified in DJRA4.2 works. The main goal of this milestone is to produce a web service with a wsdl document that describes how a network domain can publish (using the nm-wg schemas) the performance metrics gathered in the network itself. Initially this web service will work with a single product like WP7 software, but part of the goal is to make possible that other products like gridmon or pipes can use the same web service. Once the web service is done, should start the process to interface with R-GMA, so XML schemas talking to SQL. 07/Jan KK will organise a phone-conference to discuss priorities and features for the next prototype, due 31/03 21/Jan Phone conference took place on 19/Jan. The priority is with the deployment of the EDG::WP7. Development work will focus on data aggregation/merging and also security. KK to circulate minutes within the day. 1 This Sub Task has been moved from MJRA4.3 to DJRA4.2 since it makes more sense to have the definition and description of the architecture in this deliverable PUBLIC 4/7 Doc. Identifier: Minutes EGEE-JRA4-ALLConference call Bandwidth Allocation and Reservation MJRA4.4 (T2.2) 12/Nov 03/Dec “Prototype bandwidth reservation with static network Partners: UEDIN / DANTE / configuration” (S-T2.1.4) CNRS / DFN / GARR Leading: The next activity is a prototype, due end of January. However, BAR is currently understaffed. The main thrust for November and perhaps December will go towards the architecture, fuelled by the Den Haag meeting. CJP: Produced a straw man BAR architecture document and sent it to the BAR team. Prepared and delivered a presentation on BAR at the Hague meeting. Had a meeting with Anand to discuss the way forward with the BAR prototype. It is decided that I should write an XML schema to describe the BAR interface and Anand should write one for the NSAP interface. These are to be ready by beginning of January. Once this is ready, dummy BAR service and NSAP service to be produced and deployed by end of January. We also discussed how HLM request parameters can be used to work out BAR-NSAP request parameters. 17/Dec CJP produced a draft architecture document. There is also a plan to produce a nonfunctional, but complete prototype as follows: - DANTE update interfaces in DJRA4.1 by 24 Dec - DANTE produce BAR NSAP schema by 15 Jan - CJP develops a basic BAR service for 31 Jan - DANTE produce dummy NSAP for 31 Jan The activity is short-staffed and the workplan is obsolete anymore. 21/Jan CJP: - Browsed WS-I Basic profile 1.0. This is the version that JRA1 has recommended in using when developing Web Services for EGEE. - Started building the software development platform MJRA4.5 (T2.2) 12/Nov 07/Jan “Specification of end-to-end bandwidth reservation Partners: UEDIN / DANTE / system” (S-T2.1.4) CNRS / DFN / GARR Leading: CJP is drafting an architecture document. Architecture taskforce will be constituted during/after forthcoming phone conference. We don’t know about progress with the interfaces update, as Anand is away. CJP: - Had a telecon with DANTE to discuss BAR work PUBLIC 5/7 Doc. Identifier: Minutes EGEE-JRA4-ALLConference call - wrote minutes and circulated to JRA4 - Updated and released the BAR architecure document - Added requirements - Added examples of BAR-NSAP request mapping - Updated the architures diagram - Removed all references to NE 21/Jan CJP: - Browsed WS-I Basic profile 1.0. This is the version that JRA1 has recommended in using when developing Web Services for EGEE. - Installed and tested Axis 1.1 on Tomcat 5.5.4 - Updated the BAR architecture document following EPCC Technical Reviewers comments and some details that became clear from reading various EGEE documents. - Wrote an incomplete first draft of a deployment scenario for BAR and NSAP services on EGEE infrastructure. This scenario is to be used for demonstration purpose. 4. Architecture With the exception of security, no other benefit envisaged from tackling the architectures together. 5. Coordination with external activities JRA1: We need users of the BAR service from JRA1 to read our interfaces. JRA3: RA to read JRA3’s document; however for security requirements we need to talk to the deployment people. SA2: Coordination meeting went well, but there is fundamental misunderstanding about the level (application/middleware/network) of research that SA2 are pursuing. DANTE (mainly) are pursuing that. SA1: No progress GN1/2: No progress PUBLIC 6/7 Doc. Identifier: Minutes EGEE-JRA4-ALLConference call GGF NMWG: We will attempt to demonstrate the next NPM prototype at the next GGF, provided that our timescales are favourable. New schemas will be made available very soon and will go into NPM. 6. AOB 7. Next meeting: Next F2F: This is taking place on 7-8 Feb 2005 Next conference call: Friday 25 February 2005 – 2pm UK time (3pm CET) 3. STAFF UNAVAILABILITY Who When Where/Why K. Kavoussanakis 2-4 Feb Geneva, EGEE Review Rehearsal K. Kavoussanakis 9-11 Feb Geneva, EGEE Review PUBLIC 7/7