2. Minutes - Indico

advertisement
Doc. Identifier:
Minutes
EGEE-JRA4-ALLConference call
KaSubject:
EGEE JRA4 CONFERENCE CALL
Place:
Conference Call
Date:
21 January 2005 (2pm GMT, 3pm CET)
Kostas (KK), Ratna (RA), Charaka (CJP) [UEDIN],
Maarten (MB), Loukik (LK), Anand (AP) [DANTE],
Gloria (GV), Giovanni (GC) [GARR],
[CNRS]
Mark (ML) [DL], Ahmed (AA), Sophie (SN), Benjamin (BV), Pete (PC), Robert
(RS)
Attendees
Apologies
Details
CERN conference system: +41 22 767 7000
Ask for code: EGEE JRA4
Organized by: Kostas Kavoussanakis
1. SUMMARY OF ACTIONS
NEW:
[All] Submit 10-line activity report to KK for pre-minutes, by 13:00 CET, 24 Feb 2005
[SN/BV] Investigate final security scheme on EDG::WP7 RGMA server
[SN] Produce a document titled "NPM DJRA4.2 prototype deployment" that:
- Provides 3-5 references to EDG::WP7 architecture
- Describes the architecture that we put in place for DJRA4.2
- Lists the issues with the deployment of the DJRA4.2 prototype
- Recommends changes and additions to the architecture
- Recommends the list of EDG::WP7 tools that we should package up for (potential) deployment.
[SN] Replace UCL's central Producer and other necessary components with entities running in CNRS
[LK] Address NMWG Schema issue when the next NMWG Schema gets published by the GGF
working group
[RA] Chase up the three JRA1 contacts that Tiziana provided
[DANTE] Confirm who will be attending to the February 05 f2f meeting and which days (dates).
[BAR] Produce security summary similar to NPM’s
PUBLIC
1/7
Doc. Identifier:
Minutes
EGEE-JRA4-ALLConference call
[KK] Invite Julien to retake active interest in JRA4 and be the link with SA2
[KK] Publish to SA1/JRA3 NPM security document
[KK] Identify who will use BAR so as to look for further requirements
[KK] Put security on the agenda of the F2F meeting
[KK] Add an item for "BAR/NSAP Demo" in the agenda for the f2f BAR meeting at CERN
[KK] Check with Edinburgh team whether the EGEE network resource allocation is dynamic or static
[AP] Browse JRA1 Developers Guide and WS-I Basic Profile 1.0 and raise issues if necessary.
[CP/AP] Read updated SA2 requirements document.
[CJP] To develop a BAR client by end-January
[CJP] Send "Deployment Scenario for BAR/NSAP services" document to AP/MB
ON-GOING:
[All] Mail KK holidays in the near future for inclusion in the minutes.
[RA] Produce a document summarising issues raised by design, development and deployment of NPM
prototype
[CP] to produce schema for the HLM-BAR interface
- Preliminary version to be ready and circulated by Thursday 25 Jan 05
- Agreed version to be ready later
[AP] to produce XML schema for BAR-NSAP interface
- Preliminary version to be ready and circulated by Tuesday 25 Jan 05
- Agreed version to be ready later
[RA] Investigate links under “Software Engineering” in http://egee-jra1.web.cern.ch/egee%2Djra1/.
[RA] Provide account of interactions with JRA1 in Den Haag
PUBLIC
2/7
Doc. Identifier:
Minutes
EGEE-JRA4-ALLConference call
[CJP] to read requirements in SA2 Network Resource Provision doc
[DANTE] to develop a "dummy" NSAP to test handshake by end-January.
[CJP] to develop a BAR service and deploy it preferably on a Linux box by end-January.
[CJP] Write an installation document for BAR by end Feb 05.
[LK] Propose the target for aggregation for the NPM prototype due in March 05
COMPLETED THIS TIME:
[All] Submit 10-line activity report to KK for pre-minutes, by 13:00 CET, 20 Jan 2005
[KK] Organise NPM phone conference for Friday 14 Jan
[KK] Organise phone conference between MB, SA2 and potentially CJP/RA to discuss alignment of
service-class terminology
[KK] Book meeting for February face-to-face
[AP/DANTE] Circulate the updated DJRA4.1 (BAR interface document) to JRA4 team by 24
December 04.
[RA] Chase up Tiziana re JRA1 documents promised in Den Haag
[CP] Send current architecture document to MB
[CP] Check with Kostas when's telecon between SA2 and JRA4 is held to discuss DSA2.1.
2. MINUTES
1. Approval of minutes 07 January. Approved.
2. Managerial Issues
PUBLIC
3/7
Doc. Identifier:
Minutes
EGEE-JRA4-ALLConference call
Face-to-face meeting
Finally organised for 7-8 February as planned; KK will be more efficient next time, that he knows
how things work. Please keep the ideas for agenda items coming.
Holidays and Absences
See Section 3.
3. Progress update
Network Performance Monitoring
DJRA4.2
(T1.3)
21/Jan
MJRA4.3
(T1.4)
3/Sep
“Study existing request/response methods” (S-T1.3.1)
Partners:
“Security & AAA requirements” (S-T 1.3.2)
GARR, DANTE, DFN, CNRS,
UEDIN, DL
“Definition & modelling of interfaces” (S-T 1.3.3)
Leading: Mark / Ratna / Gloria
“Study and Selection of Architectures” (S-T 1.4.1)1
/ Nicolas / Robert / Benjamin
Deliverable approved by the EGEE PEB on 20 January 2005
Prototype
Partners:
“Development and Integration of Interfaces” (S-T1.4.2)
UCL, DANTE
Leading: Paul / Yee / Loukik /
and Mark
This milestone is the development of the software prototype for network performance
monitoring. Closely working with DJRA4.2, it will develop the software to make sure
what it has been specified in DJRA4.2 works.
The main goal of this milestone is to produce a web service with a wsdl document that
describes how a network domain can publish (using the nm-wg schemas) the
performance metrics gathered in the network itself. Initially this web service will work
with a single product like WP7 software, but part of the goal is to make possible that
other products like gridmon or pipes can use the same web service.
Once the web service is done, should start the process to interface with R-GMA, so
XML schemas talking to SQL.
07/Jan
KK will organise a phone-conference to discuss priorities and features for the next
prototype, due 31/03
21/Jan
Phone conference took place on 19/Jan. The priority is with the deployment of the
EDG::WP7. Development work will focus on data aggregation/merging and also
security. KK to circulate minutes within the day.
1
This Sub Task has been moved from MJRA4.3 to DJRA4.2 since it makes more sense to have the
definition and description of the architecture in this deliverable
PUBLIC
4/7
Doc. Identifier:
Minutes
EGEE-JRA4-ALLConference call
Bandwidth Allocation and Reservation
MJRA4.4
(T2.2)
12/Nov
03/Dec
“Prototype bandwidth reservation with static network Partners: UEDIN / DANTE /
configuration” (S-T2.1.4)
CNRS / DFN / GARR
Leading:
The next activity is a prototype, due end of January. However, BAR is currently
understaffed. The main thrust for November and perhaps December will go towards the
architecture, fuelled by the Den Haag meeting.
CJP:
Produced a straw man BAR architecture document and sent it to the BAR team.
Prepared and delivered a presentation on BAR at the Hague meeting.
Had a meeting with Anand to discuss the way forward with the BAR prototype. It is
decided that I should write an XML schema to describe the BAR interface and Anand
should write one for the NSAP interface. These are to be ready by beginning of January.
Once this is ready, dummy BAR service and NSAP service to be produced and deployed
by end of January. We also discussed how HLM request parameters can be used to
work out BAR-NSAP request parameters.
17/Dec
CJP produced a draft architecture document. There is also a plan to produce a nonfunctional, but complete prototype as follows:
- DANTE update interfaces in DJRA4.1 by 24 Dec
- DANTE produce BAR NSAP schema by 15 Jan
- CJP develops a basic BAR service for 31 Jan
- DANTE produce dummy NSAP for 31 Jan
The activity is short-staffed and the workplan is obsolete anymore.
21/Jan
CJP:
- Browsed WS-I Basic profile 1.0. This is the version that JRA1 has recommended in
using when developing Web Services for EGEE.
- Started building the software development platform
MJRA4.5
(T2.2)
12/Nov
07/Jan
“Specification of end-to-end bandwidth reservation Partners: UEDIN / DANTE /
system” (S-T2.1.4)
CNRS / DFN / GARR
Leading:
CJP is drafting an architecture document. Architecture taskforce will be constituted
during/after forthcoming phone conference.
We don’t know about progress with the interfaces update, as Anand is away.
CJP:
- Had a telecon with DANTE to discuss BAR work
PUBLIC
5/7
Doc. Identifier:
Minutes
EGEE-JRA4-ALLConference call
- wrote minutes and circulated to JRA4
- Updated and released the BAR architecure document
- Added requirements
- Added examples of BAR-NSAP request mapping
- Updated the architures diagram
- Removed all references to NE
21/Jan
CJP:
- Browsed WS-I Basic profile 1.0. This is the version that JRA1 has recommended in
using when developing Web Services for EGEE.
- Installed and tested Axis 1.1 on Tomcat 5.5.4
- Updated the BAR architecture document following EPCC Technical Reviewers
comments and some details that became clear from reading various EGEE documents.
- Wrote an incomplete first draft of a deployment scenario for BAR and NSAP services
on EGEE infrastructure. This scenario is to be used for demonstration purpose.
4. Architecture
With the exception of security, no other benefit envisaged from tackling the architectures together.
5. Coordination with external activities
JRA1:
We need users of the BAR service from JRA1 to read our interfaces.
JRA3:
RA to read JRA3’s document; however for security requirements we need to talk to the
deployment people.
SA2:
Coordination meeting went well, but there is fundamental misunderstanding about the level
(application/middleware/network) of research that SA2 are pursuing. DANTE (mainly) are
pursuing that.
SA1:
No progress
GN1/2:
No progress
PUBLIC
6/7
Doc. Identifier:
Minutes
EGEE-JRA4-ALLConference call
GGF NMWG:
We will attempt to demonstrate the next NPM prototype at the next GGF, provided that our
timescales are favourable.
New schemas will be made available very soon and will go into NPM.
6. AOB
7. Next meeting:
Next F2F: This is taking place on 7-8 Feb 2005
Next conference call: Friday 25 February 2005 – 2pm UK time (3pm CET)
3. STAFF UNAVAILABILITY
Who
When
Where/Why
K. Kavoussanakis
2-4 Feb
Geneva, EGEE Review Rehearsal
K. Kavoussanakis
9-11 Feb
Geneva, EGEE Review
PUBLIC
7/7
Download