ANGEL FERNÁNDEZ #1 - 2712 40th Street SW, Glendale T3E 3J7 Phone: 587- 433 - 1559 E-mail: afff137@gmail.com Profile / Objective Petroleum Specialist with seven years of experience in production engineering related to heavy oil production and EOR seeking a production position in a challenging job environment. Summary of Qualifications Strong background in Well Completion, Artificial Lift, Nodal Analysis and Field Operations for heavy oil production. Experience in using EOR steam stimulation (huff & puff). Ability to create optimum exploitation strategies as a part of a multidisciplinary team evaluating production performance. Specialize in rod pumping and progressive cavity pumping. Experienced in Identifying, evaluating and selecting well completions for inactive well according to reservoir features, production flows, hole setup, available infrastructure and available resources. Ability to analyze main parameters for production in order to identify deviations and establish all necessary actions to accomplish the production target. Work with Field Operations to ensure production optimization and operating costs meet company production goals. Generate production and operating budget and tracked capital projects using internal database. Provided preliminary scoping for proposed facilities like pipelines, storage tanks, treatment equipment or technology for the well area. Provided and received information and reports to and from various departments such as Production Accounting, Financial Accounting, Joint Ventures, and Government Relationships. Proficiency in Rod star, C-Fer, Rodtstar, Nodal B, Progressive 2.0.0. Experience as Windows and MS Office suite user. Good communicational, organizational and time management skills and leadership ability. Trilingual Spanish/English/French with overseas experience. Work Experience Production Engineer and Governmental Relationships Aug 2012 to Jan 2013 PETROZAMORA, S.A. (PDVSA and GAZPROM Joint Venture) E&P Oil and Gas at Bachaquero Tierra Field. Management of average oil production: 3200 bbl/d - Gas: 227 mcf/d at Bachaquero Tierra Field. Developed a standardized process for official oil and gas sampling tests and their evaluation in external laboratories that streamlined administrative process maximizing partners return by: Establishing contact with external laboratories and prepared service order in order to do test sampling and analysis according to standards of the Ministry of Energy and Oil. Organizing field operators and ministry officer to take and then analyze samples. Ensuring quality control of laboratory process Providing information to the Ministry and partners PDVSA and GAZPROM. Production Engineer Jan 2006 to Jul 2012 PETROLEOS DE VENEZUELA, S.A (PDVSA) E&P Oil and Gas at Bachaquero Tierra and Lagunillas Tierra Fields, Maracaibo Lake East Coast Management of average oil production: 5000 bbl/d - Gas: 325 mcf/d at fields Bachaquero Tierra and Lagunillas Tierra. Increased production by 600 bbl/d during a well reactivation project in 2006-2007 by: Doing an inventory of well information then selected better wells to be reactivated and organized a reactivation sequence Recommending workover and reactivation when needed. Applying reactivation plan up to project capitalization. Monitored well performance and production in more than 200 drilled wells operated by rod pumping and progressive cavity pumping with some of them stimulated with cyclic steam injection (huff and puff). Generated well service programs (pulling, wire line and workover) in order to install better well completion. Determined inflow performance relationship (IPR), interpreted well test result, and performed nodal analysis. Scoped surface equipment. Worked closely with Storage Tank Yard Department to monitor process. Developed stimulation and production strategies. Increased unit run life and subsurface production by 40% by designing and optimizing artificial lift mechanism (PCP and Rod Pump). Student Researcher Jul 2006 to Oct 2011 UNIVERSITY OF ZULIA – MASTER’S STUDIES Thesis: “Development of Computer Software for the Design of Progressive Cavity Pumping Artificial Lift Systems”. Evaluated the methodologies of the Design of Progressive Cavity Pumping Artificial Lift Systems, with the goal of standardizing a procedure of optimum design. Made the flow charts in order to translate them into a programming language Developed a computer assisted program which allows the optimization of a Cavity Pumping Artificial Lift Systems. Evaluated the functionality of the computer assisted tool with true field information. Production Engineering Consultant Mar 2011 – Apr 2011 PINFRA & ENDEVPRO JOINT VENTURE Activo Samaria Luna Pemex at Villahermosa, México As a part of a multidisciplinary team increased oil production by 150 bbls/d in well Samaria 824 in a stimulation project by: Selecting the best completion and production method. Monitoring and evaluating performance of surface (Rod Pumping Unit) and subsurface (completion) equipment installation after well stimulation and making accurate operation decisions. Attending coiled tubing operation during stimulation. Conducted stimulation assessment (pressure evaluation, production parameters) Generating a technical report. Junior Production Engineer Nov 2004 – May 2005 VOPG – BITOP COMPANY Lagunillas Field in Maracaibo Lake East Coast Reduce the frequency of well services by 30% by: Improving diagnostics accuracy in well evaluation. Monitoring production performance in wells operated by rod-pump and progressive cavity pump. Evaluating with nodal analysis and design software. Generating subsurface programs (Pulling/Workover) for production recovery. Production Engineer Intern PETROLEOS DE VENEZUELA, S.A. (PDVSA) Lagunillas Field in Maracaibo Lake East Coast Apr 2004 – Oct 2004 Thesis: “Assessment of the production operational conditions in well subjected to cyclic steam injection in Lagunillas Field”. Selected wells that have had mechanical problems after they had been stimulated between years 2000 and 2004 Evaluated characteristics in common among selected wells with the purpose to identified main critical features that affected production well performance. Made well completions assessment. Did better production operational suggestions in order to be applied in future condition. It allows identify some of critical features in steam stimulation (huff and puff) through an assessment of the production operational conditions in well subjected to cyclic steam injection at Lagunillas Field”. Education and Training Master Petroleum Engineering University of Zulia. Maracaibo, VENEZUELA. Oct 2011 Bachelor’s Degree in Petroleum Engineering University of Zulia. Maracaibo, VENEZUELA Dec 2004 Training & Courses Electro Submersible Pumping. Tamare, Venezuela. July 2009. Intevep - PDVSA. Production Rod Pumping Simulation, Suite: Rodstar, X-Diag, C-Balance. Maracaibo, Venezuela. December 2008. UPCO de Venezuela Production Optimization Diploma. San Tome, Venezuela. Abril 2008. NeXT (Schlumberger – Heriot Watt – Texas A&M University – The University of Oklahoma) Nodal Analysis. Caracas, Venezuela. September 2007. Intevep - PDVSA. Hydrocarbons Measurement Operations. Barinas, Venezuela. August 2007. HIDROEX. OFM Basic, Intermediate y Advanced. Schlumberger. Maracaibo, Venezuela. September 2006. Echometer. Training Center. CIED Tamare, Venezuela. Mayo de 2006. Training Center CIED Tamare - PDVSA Optimization of Production Systems. Maracaibo, Venezuela. November, 2005. BITOP. Aspect to be considered in Static and Flowing Pressure Tests. Maracaibo, Venezuela. February, 2005 VOPG-Bitop. Training in “ECLIPSE by Schlumberger” Reservoir Simulator. Maracaibo, Venezuela December, 2003. University of Zulia. Organizations SPE Canada Member Venezuelan Engineers Association. Member No.: 180.099