KENYA PORTS AUTHORITY SUPPLY AND COMMISSIONING OF ONE (1NO.) TUG BOAT TENDER NO. KPA/057/2013-14/MO JANUARY 2014 TABLE OF CONTENTS 2 TABLE OF CONTENTS TABLE OF CONTENTS ........................................................................................................................ 2 ABBREVIATIONS AND ACRONYMS .......................................................................................................... 3 SECTION I: INVITATION FOR TENDERS ......................................................................................... 5 VISION, MISSION, &CORE VALUES................................................................................................. 8 HEALTH, SAFETY AND ENVIRONMENT ........................................................................................ 9 POLICY STATEMENT.......................................................................................................................... 9 SECTION II: INSTRUCTION TO TENDERERS (ITT) ...................................................................... 10 SECTION III: TENDER DATA SHEET .............................................................................................. 41 SECTION IV: GENERAL CONDITIONS OF CONTRACT ............................................................... 53 SECTION V - CONTRACT DATA SHEET (SPECIFIC CONDITIONS OF CONTRACT) ........................ 66 SECTION VI: SCHEDULE OF REQUIREMENTS............................................................................ 81 SECTION VII: TECHNICAL SPECIFICATIONS ............................................................................. 82 SECTION VIII: TENDER FORMS ................................................................................................... 164 SECTION IX: FORMS OF SECURITY ............................................................................................ 176 SECTION X: APPLICATION TO PUBLIC PROCUREMENT REVIEW BOARD ......................... 182 2 SUPPLY AND COMMISSIONING OF 1NO. TUG BOAT Abbreviations and Acronyms ABBREVIATIONS AND ACRONYMS CDS Contract Data Sheet GCC General Conditions of Contract PE Procuring Entity PPDA 2005 Public Procurement and Disposal Act, 2005 PPDR 2006 Public Procurement and Disposal Regulations, 2006 PPOA Public Procurement Oversight Authority STD Standard Tender Documents SOR Statement of Requirements SP Service Provider VAT Value Added Tax 3 SUPPLY AND COMMISSIONING OF 1NO. TUG BOAT 3 4 Newspaper Advertisement . 4 SUPPLY AND COMMISSIONING OF 1NO. TUG BOAT SECTION I: INVITATION FOR TENDERS SECTION I: INVITATION FOR TENDERS 6 KENYA PORTS AUTHORITY Tender No. KPA/057/2013-14/MO For: Supply and Commissioning of 1No. Tug Boat Invitation for Tenders Date: January, 2014 1. The Kenya Ports Authority now invites sealed Tenders from manufacturers for the Supply and Commissioning of 1No. Tug Boat. 2. Tendering will be conducted through the International Competitive Bidding procedures specified in the Public Procurement and Disposal Act, 2005 and the Public Procurement and Disposal Regulations, 2006 and Amendment Regulations (2013) Nos. 106 and 114 and are open to all Tenderers as defined in the Regulations. 3. A complete set of Tender Document(s) can be obtained/purchased by interested Tenderers at the address given under paragraph 6 below [and upon payment of a non-refundable fee of Kshs. 1,000.00 in Bankers Cheque payable to Kenya Ports Authority. 4. The document can also be viewed and downloaded from the KPA website www.kpa.co.ke at no fee. Bidders who download the tender document from the website must forward their particulars immediately for records and communication of any further tender clarifications or addenda. Enquiries can be made via email address: ctcsecretary@kpa.co.ke fax number +25422 2226721. Bidders are advised to regularly visit the KPA website to obtain any additional information/addendum on the tender. 5. Tenderers shall be required to submit a Tender Security amounting to US$ 100,000.00 in the form of a Bank Guarantee or an Insurance Company Guarantee issued by an insurance firm approved by the Public Procurement Oversight Authority (PPOA), cash, letter of credit or guarantee by a deposit taking microfinance institution, Sacco society, the Youth Enterprise Development Fund or the Women Enterprise Fund valid for 120 days from the date of tender opening in the format provided in the tender document. 6. All Tenders in one original plus [two-2 copies], properly filled in, and enclosed in plain envelopes must be delivered to the address below and addressed as follows TENDER NO. KPA/057/2013-14/MO DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF ONE (1NO.) TUG BOAT “DO NOT OPEN BEFORE 1000 HOURS ON TUESDAY 18TH FEBRUARY, 2014” Addressed: THE SECRETARY CORPORATION TENDER COMMITTEE KENYA PORTS AUTHORITY KIPEVU HEADQUARTERS 4TH FLOOR Page 6 of 183 SECTION I: INVITATION FOR TENDERS 7 FINANCE BLOCK III, DOOR BLK-3.4.3 KILINDINI MOMBASA Phone: +254 (41) 2113600/ 2113999 Fax: +254 (41) 2226721 E-mail: ctcsecretary@kpa.co.ke Completed tenders shall be placed in Tender Box No. 7 located at the BUS TERMINUS, PORT MAIN PEDESTRIAN GATE NO.8, KILINDINI, MOMBASA BEFORE 1000 HOURS ON TUESDAY 18TH FEBRUARY, 2014. Bulky tenders shall be submitted at the office of Head of Procurement & Supplies located on the 4th floor of office Block III at the Kenya Ports Authority Headquarters, Kipevu, Kilindini Mombasa BEFORE 1000 HOURS ON TUESDAY 18TH FEBRUARY, 2014. 7. Prices quoted shall be in United States Dollars (US$), should be net inclusive of all taxes and delivery and shall remain valid for 90 days from the opening date of the tender. 8. Tenders will be opened promptly thereafter in the presence of Tenderers’ representatives who choose to attend the opening from 1030Hours at the Procurement Conference Room located at the New Service Area (Kapenguria), in the former Supplies Accounts office and Tenderers or their representatives may attend. Late or incomplete tenders shall not be accepted. 9. Late or incomplete Tenders shall not be accepted. 10. Canvassing or lobbying for the tender shall lead to automatic disqualification. Yobesh Oyaro HEAD OF PROCUREMENT AND SUPPLIES FOR: MANAGING DIRECTOR Page 7 of 183 8 VISION, MISSION, &CORE VALUES Vision World Class Seaports of Choice. Mission To facilitate and promote global maritime trade through the provision of competitive port services. Values Customer Focus: Service excellence is key to our operations and we endeavor to exceed customer expectations. Integrity: We uphold fairness, honesty, professionalism and transparency in all our undertakings. Teamwork: We embrace team spirit in all that we do. We Care: We care for our staff, the communities around us and are sensitive to the environment. Page 8 of 183 9 HEALTH, SAFETY AND ENVIRONMENT POLICY STATEMENT The Kenya Ports Authority recognizes and appreciates the importance of Health, Safety and Environment in the organization. The Authority therefore places Health, Safety and Environment matters as important Boardroom Agenda. To translate this commitment into actions, the Authority shall adopt a health, safety and environment policy that shall ensure: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Compliance with all relevant statutory instruments in all matters of Health, Safety and Environment. Appropriate consideration of relevant international conventions and recommendations. Formulation and compliance with rules, regulations and guidelines on matters of Health, Safety and Environment. All reasonably practicable precautions are taken to safeguard the safety and health of all employees and Port users. Appropriate systems for providing adequate information and instructions to all cadres of employees on risks to their health and safety are in place. That all work places and equipment/plant are safe and regularly inspected. All employees and Port Users assume defined responsibilities in matters of health, safety and environment in conformity with this policy. Appropriate training for all employees to enhance their performance is provided. That all Suppliers comply with Health, Safety and Environment rules, regulations and guidelines. Adequate provision for prevention and control of fires and proper use of Fire fighting appliances. Adequate provision for prevention and control of environmental pollution. That Environmental Impact Assessment is carried out for all projects likely to have an impact on the environment. Provision and promotion of First Aid services and activities. Contravention of the Health, Safety and Environment Management System attracts severe disciplinary action including dismissal and/or prosecution. Review of the Health, Safety and Environment Management System to conform to changing trends. (Signed) Gichiri Ndua MANAGING DIRECTOR Page 9 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 10 SECTION II: INSTRUCTION TO TENDERERS (ITT) Page 10 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 11 Table of Clauses TABLE OF CONTENTS ........................................................................................................................ 2 ABBREVIATIONS AND ACRONYMS .......................................................................................................... 3 SECTION I: INVITATION FOR TENDERS ......................................................................................... 5 Invitation for Tenders 6 VISION, MISSION, &CORE VALUES................................................................................................. 8 HEALTH, SAFETY AND ENVIRONMENT ........................................................................................ 1 POLICY STATEMENT.......................................................................................................................... 9 SECTION II: INSTRUCTION TO TENDERERS (ITT) ...................................................................... 10 A. Introduction 14 1. Scope of Tender 14 2. Source of Funds 14 3. Eligible Tenderers 14 4. Eligible Goods and Related Services 15 5. One Tender per Tenderer 16 6. Alternative Tenders by Tenderers 16 7. Cost of Tendering 16 B. Tender documents 17 8. Content of Tender documents 17 9. Clarification of Tender documents 17 10. Amendment of Tender documents 18 C. Preparation of Tenders 18 11. Language of Tender 18 12. Documents Constituting the Tender 18 13. Documents Establishing Eligibility of Goods and Related Services and Conformity to Tender documents 19 14. Documents Establishing Eligibility and Qualification of the Tenderer 20 15. Form of Tender 21 16. Tender Prices 21 17. Tender Currencies 23 18. Tender Validity Period 24 19. Tender Security 24 20. Format and Signing of Tender 25 D. Submission of Tenders 25 21. Sealing and Marking of Tenders 26 22. Deadline for Submission of Tenders 26 23. Late Tenders 26 24. Modification, Substitution and Withdrawal of Tenders 26 E. Opening and Evaluation of Tenders 27 25. Opening of Tenders 27 26. Confidentiality 29 27. Clarification of Tenders 29 28. Preliminary Examination of Tenders 29 29. Technical Evaluation 30 30. Financial Evaluation 31 31. National Preference 34 32. Post-qualification of Tenderer 34 F. Award of Contract 35 33. Criteria of Award 35 34. Procuring Entity’s Right to Accept any Tender and to Reject any or All Tenders 35 Page 11 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 12 Procuring Entity’s Right to Vary Quantities at the Time of Award 35 Notification of Award 35 Post Tender Concurrence 36 Signing of Contract 36 Performance Security 37 Advance Payment 37 Adjudicator 37 Fraud and Corruption 38 G. Review of Procurement Decisions 39 43. Right to Review 39 44. Time Limit on Review 40 45. Submission of Applications for Review by the Public Procurement Administrative Review Board 40 46. Decision by the Public Procurement Administrative Review Board 40 47. Judicial Review 40 35. 36. 37. 38. 39. 40. 41. 42. SECTION III: TENDER DATA SHEET .............................................................................................. 41 A. Introduction 42 B. Tender documents 42 C. Preparation of Tenders 43 D. Submission of Tenders 48 E. Opening and Evaluation of Tenders 48 F. Contract Award 51 G. Review of Procurement Decisions 51 SECTION IV: GENERAL CONDITIONS OF CONTRACT ............................................................... 53 1. Definitions 55 2. Application 56 3. Governing Language 56 4. Applicable Law 56 5. Country of Origin and Nationality of Supplier 56 6. Standards 57 7. Use of Contract Documents and Information; Inspection and Audit by the Government of Kenya 57 8. Patent and Copy Rights 57 9. Performance Security 57 10. Inspections and Test 58 11. Packing 58 12. Delivery and Documents 59 13. Incidental Services 59 14. Spare Parts 59 15. Warranty 60 16. Payment 60 17. Prices 61 18. Change Orders 61 19. Contract Amendments 62 20. Assignment 62 21. Subcontracts 62 22. Delays in the Supplier’s Performance 62 23. Liquidated Damages 62 24. Termination for Default 62 25. Termination for Insolvency 63 26. Force Majeure 63 27. Disputes 64 28. Procedure for Disputes 64 29. Replacement of Adjudicator 64 Page 12 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 30. 31. 32. Limitation of Liability Notices Taxes and Duties 13 64 65 65 SECTION V - CONTRACT DATA SHEET (SPECIFIC CONDITIONS OF CONTRACT) ........................ 66 SECTION VI: SCHEDULE OF REQUIREMENTS............................................................................ 81 SECTION VII: TECHNICAL SPECIFICATIONS ............................................................................. 82 SECTION VIII: TENDER FORMS ................................................................................................... 164 A. Form of Tender 165 B. Price Schedules for Goods and Related Services 166 C. Confidential Business Questionnaire 167 D. Integrity Declaration 171 UNDERTAKING BY TENDERER ON ANTI – BRIBERY POLICY / CODE OF CONDUCT AND COMPLIANCE PROGRAMME 171 ANTI-CORRUPTION DECLARATION COMMITMENT/ PLEDGE 172 E. Letter of notification to Unsuccessful Bidders 173 F. Letter of Acceptance 174 G. Form of Contract 175 SECTION IX: FORMS OF SECURITY ............................................................................................ 176 A. Tender security (Bank Guarantee) (MANDATORY REQUIREMENT) 177 B. Performance Bank/ Guarantee [Unconditional] 178 C. Bank Guarantee for Advance Payment 179 D. Manufacturer’s Authorization Form (Mandatory if the bidder is not the manufacturer) 180 SECTION X: APPLICATION TO PUBLIC PROCUREMENT REVIEW BOARD ......................... 182 FORM RB 1 183 Page 13 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 14 A. Introduction 1. Scope of Tender 2. Source of Funds 3. Eligible Tenderers 1.1 The Procuring Entity indicated in the Tender Data Sheet (TDS) invites Tenders for the provision of Goods as specified in the Tender Data Sheet and Section VII, Technical Specification. 1.2 The successful Tenderer will be expected to complete the supply of the goods by the required completion date specified in the Tender Data Sheet. 2.1 The Procuring Entity has set aside sufficient funds for the operations of the Procuring Entity named in the Tender Data Sheet during the Financial Year indicated in the Tender Data Sheet. It is intended that part of the proceeds of the funds will be applied to cover eligible payments under the contract for the supply of goods as described in the Tender Data Sheet. 2.2 Payments will be made directly by the Procuring Entity for each call-off order and will be subject in all respects to the terms and conditions of the resulting contract placed by the Procuring Entity. 3.1 A Tenderer may be a natural person, private entity, governmentowned entity, subject to ITT sub-Clause 3.4 or any combination of them with a formal intent to enter into an agreement or under an existing agreement in the form of a joint venture, consortium or association. In the case of a joint venture, consortium or association, unless otherwise specified in the Tender Data Sheet, all parties shall be jointly and severally liable. 3.2 The invitation for Tenders is open to all suppliers as defined in the Public Procurement and Disposal Act, 2005 and the Public Procurement and Disposal Regulations, 2006 except as provided hereinafter. 3.3 Local Tenderers shall satisfy all relevant licensing and/or registration requirements with the appropriate statutory bodies in Kenya. Foreign Tenderers who are selected as having submitted the lowest evaluated Tender shall register with the appropriate statutory body and shall be required to submit evidence of registration as an approved Service Provider in Kenya before signing the Contract. Page 14 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 3.4 15 A Tenderer shall not have a conflict of interest. All Tenderers found to have a conflict of interest shall be disqualified. A Tenderer may be considered to have a conflict of interest with one or more parties in this Tendering process, if he/she seeks or has a direct or indirect pecuniary interest with another Tenderer or has a direct or indirect pecuniary interest with a person that would conflict with that person’s duties with respect to the procurement. Conflicts of interest would arise where Tenderers: a) Are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring Entity to provide consulting services for the preparation of the design, specifications and other documents to be used for the procurement of the goods to be purchased under this Invitation for Tenders; or b) Have controlling shareholders in common; or c) Receive or have received any direct or indirect subsidy from any of them; or d) Have the same legal representative for purposes of this Tender; or e) Have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the Tender of another Tenderer, or influence the decisions of the Procuring Entity regarding this Tendering process; or f) Submit more than one Tender in this Tendering process, except as an alternative Tender as provided for under Clause 6. However, this does not limit the participation of subcontractors in more than one Tender, or as Tenderers and subcontractors simultaneously; or g) Participated as a consultant in the preparation of the design or technical specifications of the goods and related services that are the subject of the Tender. 4. Eligible Goods and Related Services 3.5 Tenderers shall not be eligible to submit a Tender if they have been debarred under Section 115 of the Act. 3.6 Tenderers shall provide such evidence of their continued eligibility satisfactory to the Procuring Entity, as the Procuring Entity shall reasonably request. 4.1 All goods and related services to be supplied under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such goods and services. For purpose of this Tender ineligible countries, if any, are listed in the Tender Data Sheet. 4.2 For the purposes of this Clause, the term “goods” includes commodities, raw materials, machinery, equipment and industrial plants, and “related services” includes services such as insurance, installation, training and initial maintenance. Page 15 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 5. One Tender per Tenderer 4.3 For purposes of this Clause, “origin” means the place where the goods are mined, grown, cultivated, produced, manufactured, or processed, or through manufacture, process, or assembly, another commercially recognized article results that differs substantially in its basic characteristics from its imported components or the place from which the related services are supplied. 4.4 The nationality of the firm that produces, assembles, distributes, or sells the goods and services shall not determine their origin. 4.5 To establish the eligibility of the supplies and the related services, Tenderers shall fill the country of origin declarations included in the Form of Tender. 4.6 If so required in the Tender Data Sheet, the Tenderer shall demonstrate that it has been duly authorized by the manufacturer of the goods to supply in Kenya, the goods indicated in its Tender. 5.1 A firm shall submit only one Tender in the same Tendering process, either individually as a Tenderer or as a partner in a joint venture. However, this does not prevent a Tenderer from submitting an Alternative Tender as provided for under Clause 6.2. 5.2 No firm can be a subcontractor while submitting a Tender individually or as a partner of a joint venture in the same Tendering process. A firm, if acting in the capacity of subcontractor in any Tender, may participate in more than one Tender but only in that capacity. 5.3 6. Alternative Tenders by Tenderers 7. Cost of Tendering 16 5.4 A Tenderer who submits or participates in more than one Tender (other than as a subcontractor or in cases of alternatives that have been permitted or requested) will cause all the Tenders in which the Tenderer has participated to be disqualified. 6.1 Tenderers shall submit offers that comply with the requirements of the Tender documents, including the basic Tenderer’s technical design as indicated in the specifications and Schedule of Requirements. Alternatives will not be considered, unless specifically allowed for in the Tender Data Sheet. If so allowed, sub-Clause 6.2 shall Prevail. 6.2 If so allowed in the Tender Data Sheet, Tenderers wishing to offer technical alternatives to the requirements of the Tender documents must also submit a Tender that complies with the requirements of the Tender documents, including the basic technical design as indicated in the specifications. In addition to submitting the basic Tender, the Tenderer shall provide all information necessary for a complete evaluation of the alternative by the Procuring Entity, including technical specifications, breakdown of prices, and other relevant details. Only the technical alternatives, if any, of the lowest evaluated Tenderer conforming to the basic technical requirements shall be considered by the Procuring Entity. 7.1 The Tenderer shall bear all costs associated with the preparation and submission of its Tender, and the Procuring Entity shall in no case be responsible or liable for those costs, regardless of the conduct or outcome of the Tendering process. Page 16 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 17 B. Tender documents 8. Content of Tender documents 8.1 The goods required, Tendering procedures, and contract terms are prescribed in the Tender documents. In addition to the Invitation for Tenders, the Tender documents which should be read in conjunction with any addenda issued in accordance with ITT clause 9.2 include: Section II Instructions to Tenderers (ITT) Section III Tender Data Sheet (TDS) Section IV General Conditions of Contract (GCC) Section V Contract data sheet (CDS) Section VI Schedule of Requirements Section VII Technical Specifications Section VIII Tender Forms a) Form of Tender b) Price schedule for Goods and Related Services c) Confidential Business Questionnaire d) Integrity Undertaking by Tenderer on Anti-bribery Policy/ Code of Conduct and Compliance Program e) Letter of Acceptance f) Form of Contract Section IX Forms of Security a) Tender Security Form b) Performance Bond/Security Form c) Bank Guarantee for Advance Payments d) Manufacturer’s Authorization Form Section X Form RB 1 Application to Public Procurement Administrative Review Board 8.2 9. Clarification of Tender documents The number of copies to be completed and returned with the Tender is specified in the Tender Data Sheet. 8.3 The Procuring Entity is not responsible for the completeness of the Tender documents and their addenda, if they were not appropriately obtained directly from the Procuring Entity. 9.1 A prospective Tenderer requiring any clarification of the Tender documents may notify the Procuring Entity in writing or electronic mail or facsimile at the Procuring Entity's address indicated in the Tender Data Sheet prior to the deadline for the submission of Tenders prescribed in subClause 22.1. The Procuring Entity will within the period stated in the Tender Data Sheet respond in writing to any request for clarification provided that such request is received no later than the period indicated in the Tender Data Sheet prior to the deadline for the submission of Tenders prescribed in subClause 22.1. 9.2 9.3 Copies of the procuring Entity's response will be forwarded to all Purchasers of the Tender documents, including a description of the inquiry, but without identifying its source. 9.4 Should the Procuring Entity deem it necessary to amend the Tender documents as a result of a clarification, it shall do so following the procedure under ITT Clause 10. Page 17 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 10. Amendment of Tender documents 18 10.1 Before the deadline for submission of Tenders, the Procuring Entity, for any reason, whether at its own initiative or in response to a clarification requested by a prospective Tenderer, may modify the Tender document by issuing addenda. 10.2 Any addendum issued shall be part of the Tender document pursuant to sub-Clause 8.1 and shall be communicated in writing to all who have obtained the Tender documents directly from the Procuring Entity. Prospective Tenderers shall acknowledge receipt of each addendum by writing electronic mail, telex or facsimile to the Procuring Entity. 10.3 In order to allow prospective Tenderers reasonable time in which to take an addendum into account in preparing their Tenders, the Procuring Entity, at its discretion, may extend the deadline for the submission of Tenders, pursuant to Sections 55(3) and 61(1) of the Act. C. Preparation of Tenders 11. Language of Tender 11.1 The Tender prepared by the Tenderer, as well as all correspondence and documents relating to the Tender exchanged by the Tenderer and the Procuring Entity shall be written in English unless another language is specified in the Tender Data Sheet. Supporting documents and printed literature furnished by the Tenderer may be in another language provided they are accompanied by an accurate translation of the relevant passages in the language specified in the Tender Data Sheet, in which case, for purposes of interpretation of the Tender, the translation shall govern. 12. Documents Constituting the Tender 12.1 The Tender prepared by the Tenderer shall constitute the following components: a) Form of Tender and a Price Schedule completed in accordance with ITT Clauses 15, 16, and 17; b) Documentary evidence established in accordance with ITT Clause 14 that the Tenderer is eligible to Tender and is qualified to perform the contract if its Tender is accepted; c) Documentary evidence established in accordance with ITT sub-Clause 14.3(a) that the Tender has been authorized by the manufacturer to supply the goods into Kenya, where required and where the supplier is not the manufacturer of those goods; d) Documentary evidence established in accordance with ITT Clause 13 that the goods and ancillary services to be supplied by the Tenderer are eligible goods and services and conform to the Tender documents; Page 18 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 19 e) Tender securing declaration or Tender security furnished in accordance with ITT Clause 19 and/or 19A; f) Written Power of Attorney authorizing the signatory of the Tender to commit the Tenderer, in accordance with ITT Clause 20.2; and g) Any other document required in the Tender Data Sheet. 13. Documents Establishing Eligibility of Goods and Related Services and Conformity to Tender documents 13.1 Pursuant to ITT Clause 12, the Tenderer shall furnish, as part of its Tender, documents establishing the eligibility and conformity to the Tender documents of all goods and related services which the Tenderer proposes to supply under the contract. 13.2 The documentary evidence of the eligibility of the goods and related services shall consist of a statement in the Price Schedule of the country of origin of the goods and related services offered which shall be confirmed by a certificate of origin issued at the time of shipment. 13.3 The documentary evidence of conformity of the goods and related services to the Tender documents may be in the form of literature, drawings, and data, and shall consist of: a) a detailed description of the essential technical and performance characteristics of the Goods; b) an item-by-item commentary on the Procuring Entity’s Technical Specifications demonstrating substantial responsiveness of the Goods and Services to those specifications, or a statement of deviations and exceptions to the provisions of the Technical Specifications; and c) Any other specific documentation requirement as stated in the Tender Data Sheet. 13.4 The Tenderer shall also furnish a list giving full particulars, including available sources and current prices of goods, spare parts, special tools, etc., necessary for the proper and continuing functioning of the Goods during the period specified in the Tender Data Sheet following commencement of the use of the goods by the Procuring Entity. 13.5 For purposes of the commentary to be furnished pursuant to sub-Clause 13.3(c) above, the Tenderer shall note that standards for workmanship, material, and equipment, as well as references to brand names or catalogue numbers designated by the Procuring Entity in its Technical Specifications, are intended to be descriptive only and not restrictive. The Tenderer may substitute alternative standards, brand names, Page 19 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 20 and/or catalogue numbers in its Tender, provided that it demonstrates to the Procuring Entity’s satisfaction that the substitutions ensure substantial equivalence to those designated in the Technical Specifications. 14. Documents Establishing Eligibility and Qualification of the Tenderer 13.6 The required documents and other accompanying documents must be typewritten in English or as stated in Tender Data Sheet. In case any other language than English is used the pertinent translation into English shall be attached to the original version. 14.1 Pursuant to ITT Clause 11, the Tenderer shall furnish, as part of its Tender, documents establishing the Tenderer’s eligibility to Tender and its qualifications to perform the contract if its Tender is accepted. 14.2 The documentary evidence of the Tenderer’s eligibility to Tender shall establish to the Procuring Entity’s satisfaction that the Tenderer, at the time of submission of its Tender, is from an eligible country as defined under ITT Clause 4. 14.3 The documentary evidence of the Tenderer’s qualifications to perform the contract if its Tender is accepted shall establish to the Procuring Entity’s satisfaction: a) that, in the case of a Tenderer offering to supply goods under the contract which the Tenderer did not manufacture or otherwise produce, the Tenderer has been duly authorized by the goods’ Manufacturer or producer to supply the goods in Kenya ; b) The Tenderer has the financial, technical, and production capability necessary to perform the Contract, meets the qualification criteria specified in the Tender Data Sheet, and has a successful performance history in accordance with criteria specified in the Tender Data Sheet. If a prequalification process has been undertaken for the Contract, the Tenderer shall, as part of its Tender, update any information submitted with its prequalification; c) that, in the case of a Tenderer not doing business within Kenya, the Tenderer is or will be (if awarded the contract) represented by an Agent in that country equipped and able to carry out the Supplier’s maintenance, repair, and spare parts stocking obligations prescribed in the General Conditions of Contract and/or Technical Specifications; and d) That the Tenderer meets the qualification criteria listed in the Tender Data Sheet. Page 20 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 21 14.4 When Tendering for more than one Contract under the lots, the Tenderer must provide evidence that it meets or exceeds the sum of all the individual requirements for the lots being applied for in regard to:a) Average annual turnover; b) Particular experience including key production rates; c) Financial means, etc; d) Personnel capabilities; and e) Equipment capabilities. In case the Tenderer fails to fully meet any of these criteria, it may be qualified only for those lots for which the Tenderer meets the above requirement. 15. Form of Tender 15.1 The Tenderer shall fill the Form of Tender furnished in the Tender documents. The Tender Form must be completed without any alterations to its format and no substitute shall be accepted. 16. Tender Prices 16.1 The Tender prices and discounts quoted by the Tenderer in the Form of Tender and in the Price Schedules shall conform to the requirements specified below. 16.2 Unless otherwise indicated in the Tender Data Sheet, all items in the Schedule of Requirements must be listed and priced separately in the Price Schedules. If a Price Schedule shows items listed but not priced, the Tender will be rejected as being substantially non-responsive. Items not listed in the Price Schedule shall be assumed to be not included in the Tender and the Tender will be rejected as being substantially non-responsive. 16.3 The Tender price to be quoted in the Tender Form in accordance with sub-Clause 16.1 shall be the total price of the Tender, excluding any discounts offered. 16.4 The Tenderer shall quote any unconditional discounts and the methodology for their application in the Tender Form in accordance with sub-Clause 16.9. 16.5 The Tenderer shall indicate on the appropriate Price Schedule the unit prices (where applicable) and total Tender price of the goods it proposes to supply under the contract 16.6 Prices indicated on the Price Schedule shall be entered separately in the following manner: a) For goods offered from within Kenya : i) The price of the goods quoted EXW (ex works, ex factory, ex warehouse, ex showroom, or off-the-shelf, as applicable), including all customs duties and sales and other taxes already paid or payable: On the components and raw material used in the Page 21 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 22 manufacture or assembly of goods quoted ex works or ex factory; or On the previously imported goods of foreign origin quoted ex warehouse, ex showroom, or offthe-shelf; ii) Taxes which will be payable on the goods if the contract is awarded; iii) The price for inland transportation, insurance, and other local costs incidental to delivery of the goods to their final destination, if specified in the Tender Data Sheet; and iv) The price of other (incidental) services, if any, listed in the Tender Data Sheet. b) For goods offered from abroad: i) The price of the goods shall be quoted using the INCOTERMS specified in the Tender Data Sheet; ii) The price for inland transportation, insurance, and other local costs incidental to delivery of the goods from the port of entry to their final destination, if specified in the Tender Data Sheet; and iii) The price of (incidental) services, if any, listed in the Tender Data Sheet. 16.7 Prices proposed on the Price Schedule for goods and related services shall be disaggregated, where appropriate as indicated in this sub-Clause. This desegregation shall be solely for the purpose of facilitation the comparison of Tenders by the Procuring Entity. This, shall not in any way limit the Procuring Entity’s right to contract on any of the terms offered:a) For Goods:i. The price of the Goods, quoted DDP or other INCOTERMS as specified in the Tender Data Sheet; ii. All customs duties, value added tax, and other taxes applicable in the United goods or on the components and raw materials used in their manufacture or assembly, if the contract is awarded to the Tenderer; and b) For Related Services i. The price of the related services, ii. All customs duties, value added tax, and other taxes Page 22 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 23 applicable Kenya, paid or payable, on the related services, if the contract is awarded to the Tenderer; and c) 17. Tender Currencies The total price for the item. 16.8 Prices quoted by the Tenderer shall be fixed during the Tenderer’s performance of the contract and not subject to variation on any account, unless otherwise specified in the Tender Data Sheet. A Tender submitted with an adjustable price quotation will be treated as non-responsive and shall be rejected, pursuant to ITT Clause 28. If, however, in accordance with the Tender Data Sheet, prices quoted by the Tenderer shall be subject to adjustment during the performance of the contract, a Tender submitted with a fixed price tender will not be rejected, but there will be no price adjustment in any resulting contract. 16.9 If so indicated in the Invitation for Tenders and Instructions to Tenderers, that Tenders are being invited for individual contracts (Lots) or for any combination of contracts (packages), Tenderers wishing to offer any price reduction for the award of more than one contract shall specify in their Tender the price reductions applicable to each package, or alternatively, to individual contracts within a package. 17.1 Prices shall be quoted in the following currencies: For goods and services that the Tenderer will supply from within Kenya, the prices shall be quoted in Kenya Shillings, unless otherwise specified in the Tender Data Sheet. For goods and related services that the Tenderer will supply from outside Kenya, or for imported parts or components of goods and related services originating outside Kenya, the Tender prices shall be quoted in the foreign currency stated in the Tender Data Sheet. 17.2 For purposes of evaluating Tenders, the PE shall fix exchange rates for the nominated foreign currency by foreign or international Tenderers from eligible countries. In fixing the exchange rates for the nominated foreign currencies indicated in the Tender Data Sheet, the PE shall use ruling mean rate obtained from the Central Bank of Kenya (Website: www.centralbank.go.ke for more information) for the nominated foreign currency on the date of the Tender opening. The fixed exchange rate, which shall be indicated in the Tender Data Sheet by the PE, is for purposes of evaluation of tenders ONLY. The rates of exchange to be used by the Tenderer in arriving at the local currency equivalent and the proportions mentioned in sub-Clause 16.1 above shall be the selling rates for similar transactions established by the Central Bank of Kenya prevailing on the date specified in the Tender Data Sheet or, if no date is specified, the date 28 days prior to the latest Page 23 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 17.3 18. Tender Validity Period 19. Tender Security 24 deadline for submission of Tenders. These exchange rates shall be adjusted for all payments so that no exchange risk will be borne by the Tenderer. If the Tenderer uses other rates of exchange, the provisions of sub-Clause 30.1 shall apply. In any case, payments will be computed using the rates quoted in the Tender. Tenderers shall indicate details of their expected foreign currency requirements in the Tender. 17.4 Tenderers may be required by the Procuring Entity to clarify their foreign currency requirements and to substantiate that the amounts included in Lump Sum and in the Contract data sheet are reasonable and responsive to sub-Clause 17.1. 18.1 Tenders shall remain valid for the period specified in the Tender Data Sheet after the Tender submission deadline prescribed by the Procuring Entity, pursuant to ITT Clause 22. A Tender valid for a shorter period shall be rejected by the Procuring Entity as non responsive. 18.2 In exceptional circumstances, prior to the expiration of the Tender validity period, the Procuring Entity may request that the Tenderers consent to an extension of the period of validity of their Tenders. The request and the Tenderers responses shall be made in writing electronic mail, telex and facsimile. The Tender security provided under ITT Clause 19A.1 shall also be suitably extended. A Tenderer may refuse the request without forfeiting its Tender security or causing to be executed its Tender securing declaration. A Tenderer agreeing to the request will not be required nor permitted to modify its Tender, but will be required to extend the validity of its Tender security or Tender Securing declaration for the period of the extension, and in compliance with ITT Clause 19 in all respects. 19.1 In addition, pursuant to ITT Clause 12, if specified in the Tender Data Sheet, the Tenderer shall furnish as part of its Tender a Tender Security in original form and in the amount and currency specified in the Tender Data Sheet. 19.2 The Tender security shall be denominated in the currency of the Tender and shall be in one of the following forms: a) cash b) a bank guarantee; c) an insurance company guarantee issued by an insurance firm approved by the PPOA; or d) an irrevocable letter of credit. 19.3 Any Tender security must be valid for a period of at least 30 (Thirty) days after the expiry of the Tender Validity Period. 19.4 The Tender security shall be payable promptly upon written demand by the Procuring Entity in case any of the conditions listed in sub-Clause 19.A.7 are invoked. Page 24 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 25 19.5 Unsuccessful Tenderers’ Tender security will be discharged or returned as promptly as possible but not later than the expiration of the period of Tender validity prescribed by the Procuring Entity pursuant to ITT Clause 18. 19.6 The successful Tenderer’s Tender security will be discharged upon the Tenderer signing the contract pursuant to ITT Clause 38, and furnishing the performance security, pursuant to ITT Clause 39. 19.7 The Tender security shall be forfeited if a Tenderer: a) Withdraws its Tender during the period of Tender validity specified in sub-Clause 18.1 except as provided for in subClause 18.2; or b) Does not accept the correction of errors pursuant to subClause 30.2; or c) In the case of a successful Tenderer, if the Tenderer fails: i. To sign the contract in accordance with ITT Clause 38; or ii. To furnish performance security in accordance with ITT Clause 39. 20. Format and Signing of Tender 20.1 The Tenderer shall prepare an original and the number of copies of the Tender indicated in the Tender Data Sheet, clearly marking each “ORIGINAL” and “COPY,” as appropriate. In the event of any discrepancy between them, the original shall prevail. 20.2 The original and the copy or copies of the Tender shall be typed or written in indelible ink and shall be signed by the Tenderer or a person or persons duly authorized to sign on behalf of the Tenderer. This authorization shall consist of a written confirmation as specified in the Tender Data Sheet and shall be attached to the Tender. The name and position held by each person signing the authorization must be typed or printed below the signature. All pages of the Tender, except for un-amended printed literature, shall be initialled by the person or persons signing the Tender. 20.3 Any interlineations, erasures, or overwriting shall be valid only if they are signed or initialled by the person or persons signing the Tender. 20.4 The Tenderer shall furnish information as described in the Form of Tender on commissions or gratuities, if any, paid or to be paid to agents relating to this Tender and to contract execution if the Tenderer is awarded the contract D. Submission of Tenders Page 25 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 21. Sealing and Marking of Tenders 26 21.1 The Tenderer shall seal the original and each copy of the Tender in separate envelopes, duly marking the envelopes as “ORIGINAL” and “COPY.” The envelopes shall then be sealed in an outer envelope securely sealed in such a manner that opening and resealing cannot be achieved undetected. 21.2 The inner and outer envelopes shall: a) Be addressed to the Procuring Entity at the address given in the Tender Data Sheet; and b) Bear the Tender name indicated in the Tender Data Sheet, the Invitation for Tenders (ITT) title and number indicated in the Tender Data Sheet, and a statement: “DO NOT OPEN BEFORE,” to be completed with the time and the date specified in the Tender Data Sheet, pursuant to subClause 22.1. 22. Deadline for Submission of Tenders 23. Late Tenders 24. Modification, Substitution and 21.3 In addition to the identification required in sub-Clause 21.2, the inner envelopes shall also indicate the name and address of the Tenderer to enable the Tender to be returned unopened in case it is declared “late” pursuant to ITT Clause 23 and for matching purpose under ITT Clause 24. 21.4 If all envelopes are not sealed and marked as required by subClause 21.2, the Procuring Entity will assume no responsibility for the misplacement or premature opening of Tender. 22.1 Tenders shall be received by the Procuring Entity at the address specified under sub-Clause 21.2 no later than the date and time specified in the Tender Data Sheet. 22.2 The Procuring Entity may, in exceptional circumstances and at its discretion, extend the deadline for the submission of Tenders by amending the Tender documents in accordance with ITT Clause 9, in which case all rights and obligations of the Procuring Entity and Tenderers previously subject to the deadline will thereafter be subject to the new deadline. 22.3 The extension of the deadline for submission of Tenders shall not be made later than the period specified in the Tender Data Sheet before the expiry of the original deadline. 23.1 The Procuring Entity shall not consider for evaluation any Tender that arrives after the deadline for submission of Tenders, in accordance with ITT Clause 22. 23.2 Any Tender received by the Procuring Entity after the deadline for submission of Tenders shall be declared late, rejected and returned unopened to the Tenderer. 24.1 A Tenderer may modify or substitute or withdraw its Tender after it has been submitted, provided that written notice of the Page 26 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 27 modification, including modification, substitution or withdrawal of the Tender, is received by the Procuring Entity prior to the deadline for submission of Tenders. Withdrawal of Tenders 24.2 The Tenderer’s modification, substitution or withdrawal notice shall be prepared, sealed, marked, and dispatched in accordance with the provisions of ITT Clauses 20 and 21 with the outer and inner envelopes additionally marked “MODIFICATION” “SUBSTITUTION” or “WITHDRAWAL” as appropriate. The notice may also be sent by electronic mail or facsimile but followed by a signed confirmation copy, postmarked not later than the deadline for submission of Tenders. 24.3 Tenders may only be modified by withdrawal of one or more pages of the original Tender and submission of replacement pages of the Tender in accordance with sub-Clause 24.1. Modifications submitted in any other way shall not be taken into account in the evaluation of Tenders. Each modified page must be marked “MODIFIED” with the date of modification. 24.4 Tenderers may only offer discounts to or otherwise modify the prices of their Tenders by substituting Tender modifications in accordance with this Clause or included in the original Tender submission. 24.5 No Tender may be withdrawn, replaced or modified in the interval between the deadline for submission of Tenders and the expiration of the period of Tender validity specified by the Tenderer on the Form of Tender. Withdrawal of a Tender during this interval shall result in the Tenderer’s forfeiture of its Tender security or execution of the Tender Securing Declaration, pursuant to the sub-Clause 19.7 E. Opening and Evaluation of Tenders 25. Opening of Tenders 25.1 The Procuring Entity will open all Tenders including modifications, substitutions or withdrawal notices made pursuant to ITT Clause 24, in public, in the presence of Tenderers or their representatives who choose to attend, and other parties with a legitimate interest in the Tender proceedings at the place, on the date and at the time, specified in the Tender Data Sheet. The Tenderers’ representatives present shall sign a register as proof of their attendance. 25.2 Where it is stated in the Tender Data Sheet that technical and financial proposals shall be submitted in separate envelopes, only the technical envelope will be opened at the initial opening of Tenders. The financial envelope will be opened following technical evaluation and only in respect of those offers that pass the technical evaluation. Envelopes marked “WITHDRAWAL” shall be opened and read out first. Tenders for which an acceptable notice of Page 27 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 28 withdrawal has been submitted pursuant to ITT Clause 24 shall not be opened but returned to the Tenderer. If the withdrawal envelope does not contain a copy of the “Power of Attorney” confirming the signature as a person duly authorized to sign on behalf of the Tenderer, the corresponding Tender will be opened. Subsequently, all envelopes marked "MODIFICATION" shall be opened and the submissions therein read out in appropriate detail. Thereafter all envelopes marked “SUBSTITUTION” shall be opened and the submissions therein read out in appropriate detail. 25.3 All other envelopes shall be opened one at a time. The Tenderers names, the tender prices except where numerous items are quoted separately, the total amount of each Tender and of any alternative Tender (if alternatives have been requested or permitted), any discounts, the presence or absence of Tender security, Tender Securing Declaration and such other details as the appropriate Tender Opening Committee may consider appropriate, will be announced by the secretary of the Tender Opening Committee at the opening. If technical evaluation precedes the opening of financial offers, no prices will be read out at the opening of the technical offers. 25.4 Tenders or modifications that are not opened and not read out at the Tender opening shall not be considered further for evaluation, irrespective of the circumstances. In particular, any discount offered by a Tenderer which is not read out at Tender opening shall not be considered further. 25.5 Tenderers are advised to send in a representative with the knowledge of the content of the Tender who shall verify the information read out from the submitted documents. Failure to send a representative or to point out any un-read information by the sent Tenderer’s representative shall indemnify the Procuring Entity against any claim or failure to read out the correct information contained in the Tenderers Tender. 25.6 No Tender will be rejected at Tender opening except for late Tenders which will be returned unopened to the Tenderer, pursuant to ITT Clause 23. 25.7 The Secretary of the tender opening committee shall prepare minutes of the Tender opening. The record of the Tender opening shall be recorded on the Tender Opening Register and shall include, as a minimum: the name of the Tenderer and whether or not there is a withdrawal, substitution or modification, the Tender price per Lot if applicable, including any discounts and alternative offers and the presence or absence of a Tender Security or Tender Securing Declaration. 25.8 The Tenderers’ representatives who are present shall be Page 28 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 29 requested to sign the record. The omission of a Tenderer’s representative’s signature on the record shall not invalidate the contents and affect the record. A copy of the record shall be distributed to all the Tenderers. 26. Confidentiality 27. Clarification of Tenders 28. Preliminary Examination of Tenders 25.9 A copy of the minutes of the Tender opening shall be furnished to individual Tenderers upon request. 26.1 Information relating to the examination, clarification, evaluation and comparison of Tenders and recommendation of contract award shall not be disclosed to Tenderers or any other persons not officially concerned with such process until the award to the successful Tenderer has been announced. 26.2 Any effort by a Tenderer to influence the Procuring Entity processing of Tenders or award decisions may result in the rejection of its Tender. 26.3 Notwithstanding sub-Clause 26.2 from the time of Tender opening to the time of contract award, if any Tenderer wishes to contact the Procuring Entity on any matter related to the Tendering process, it should do so in writing. 27.1 To assist in the examination, evaluation and comparison of Tenders and post-qualification of the Tenderers, the Procuring Entity may, at its discretion, ask any Tenderer for a clarification of its Tender including breakdown of prices. Any clarification submitted by a Tenderer that is not in response to a request by the Procuring Entity shall not be considered. 27.2 The request for clarification and the response shall be in writing. No change in the prices or substance of the Tender shall be sought, offered, or permitted except to confirm the correction of arithmetic errors discovered by the Procuring Entity in the evaluation of Tenders in accordance with ITT Clause 30. 27.3 From the time of Tender opening to the time of Contract award if any Tenderer wishes to contact the Procuring Entity on any matter related to the Tender it should do so in writing. 28.1 Prior to the detailed evaluation of Tenders, the Procuring Entity will determine whether: a) The tender has been submitted in the required format; b) Any tender security submitted is in the required form, amount and validity period; c) The tender has been signed by the person lawfully authorized to do so; d) The required number of copies of the tender have been submitted; Page 29 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 30 e) The tender is valid for the period required; f) All required documents and information have been submitted; and g) Any required samples have been submitted. The Procuring Entity's determination of a Tender's responsiveness will be based on the contents of the Tender itself. 28.2 A substantially responsive Tender is one which conforms to all the terms, conditions, and specifications of the Tender documents, without material deviation or reservation. A material deviation or reservation is one that:a) Affects in any substantial way the scope, quality, or performance of the Services; b) Limits in any substantial way, inconsistent with the Tender documents, the Procuring Entity's rights or the Tenderers obligations under the Contract; or c) If rectified, would affect unfairly the competitive position of other Tenderers presenting substantially responsive Tenders. 28.3 The Procuring Entity will confirm that the documents and information specified under ITT Clause 11, ITT Clause 12 and ITT Clause 13 have been provided in the Tender. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Tenderers, the Tender shall be rejected. 28.4 The Procuring Entity may waive any minor informality, nonconformity, or irregularity in a Tender which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Tenderer. 28.5 If a Tender is not substantially responsive, it will be rejected by the Procuring Entity and may not subsequently be made responsive by the Tenderer by correction of the nonconformity. 29. Technical Evaluation 29.1 The Procuring Entity shall examine the Tender to confirm that all terms and conditions specified in the General Conditions of Contract and the Contract data sheet have been accepted by the Tenderer without any material deviation or reservation. 29.2 The Procuring Entity shall evaluate the technical aspects of the Tender submitted in accordance with ITT Clause 12, to confirm that all requirements specified in Section VI – Schedule of Requirements of the Tender documents and Section VII – Technical Specifications have been met without material deviation or reservation. 29.3 If after the examination of the terms and conditions and the technical evaluation, the Procuring Entity determines that the Tender is not substantially responsive in accordance with Page 30 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 31 ITT Clause 28, it shall reject the Tender. 30. Financial Evaluation 30.1 Tenders determined to be substantially responsive will be checked for any arithmetic errors. Errors will be corrected as follows:a) If there is a discrepancy between unit prices and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the total price shall be corrected, unless in the opinion of the Procuring Entity there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected; b) If there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall prevail and the total shall be corrected; and c) Where there is a discrepancy between the amounts in figures and in words, the amount in words will govern. 30.2 The amount stated in the Tender will be adjusted by the Procuring Entity in accordance with the above procedure for the correction of errors and, with, the concurrence of the Tenderer, shall be considered as binding upon the Tenderer. If the Tenderer does not accept the corrected amount, its Tender will then be rejected, and the Tender security shall be forfeited or the Tender securing declaration may be executed in accordance with sub-Clause 19.5. 30.3 Where applicable and as stated in the Tender Data Sheet, the Procuring Entity will convert all Tender prices expressed in the amounts in various foreign currencies in which the Tender prices are payable to Kenya Shillings at the selling exchange rate established for similar transactions by the Central Bank of Kenya or a commercial bank in Kenya. 30.4 The currency selected for converting Tender prices to a common base for the purpose of evaluation, along with the source and date of the exchange rate, are specified in the Tender Data Sheet. 30.5 The Procuring Entity shall evaluate and compare only the Tenders determined to be substantially responsive, pursuant to ITT Clause 28. 30.6 The Procuring Entity’s evaluation of a Tender will include and take into account: a) In the case of goods manufactured in Kenya or goods of foreign origin already located in Kenya, VAT and other similar taxes, which will be payable on the goods if a contract is awarded to the Tenderer; b) In the case of goods of foreign origin offered from abroad, customs duties and other similar import taxes including value added taxes which will be payable on Page 31 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 32 the goods if the contract is awarded to the Tenderer; and c) Any allowance for price adjustment during the period of execution of the contract, if provided in the Tender. 30.7 30.8 30.9 The comparison shall be between the EXW price of the goods offered from within Kenya, such price to include all costs, as well as duties and taxes paid or payable on components and raw material incorporated or to be incorporated in the goods, and the landed cost (CIF named port of destination or CIP border point, or CIP named place of destination) making up the price of the goods offered from Kenya. a) In evaluating the Tenders, the evaluation committee will, in addition to the Tender price quoted in accordance with sub-Clause 15.1, take account of the evaluation criteria specified in the Tender Data Sheet. For the evaluation criteria specified in the Tender Data Sheet pursuant to sub-Clause 32.4, one or more of the following quantification methods will be applied, as detailed in the Tender Data Sheet: a) Inland transportation from EXW/port of entry/border point, Insurance and incidentals. Inland transportation, insurance, and other incidental costs for delivery of the goods from EXW/port of entry/border point to Project Site named in the Tender Data Sheet will be computed for each Tender by the PE on the basis of published tariffs by the rail or road transport agencies, insurance companies, and/or other appropriate sources. To facilitate such computation, Tenderer shall furnish in its Tender the estimated dimensions and shipping weight and the approximate EXW/CIF (or CIP border point) value of each package. The above cost will be added by the PE to EXW/CIF/CIP border point price. b) Delivery schedule. The goods covered under this invitation are required to be delivered (shipped) within an acceptable range of weeks specified in the Schedule of Requirement. No credit will be given for earlier deliveries, and Tenders offering delivery beyond this range will be treated as non-responsive. Within this acceptable range, an adjustment per week, as specified in the Tender Data Sheet, will be added for evaluation to the Tender price of Tenders offering deliveries later than the earliest delivery period specified in the Schedule of Requirements. Page 32 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) c) 33 Deviation in payment schedule. Tenderers shall state their Tender price for the payment schedule outlined in the CDS. Tenders will be evaluated on the basis of this base price. Tenderers are, however, permitted to state an alternative payment schedule and indicate the reduction in Tender price they wish to offer for such alternative payment schedule. The Procuring Entity may consider the alternative payment schedule offered by the selected Tenderer. d) Total cost of ownership The Procuring Entity will take account of the total cost of ownership of the items being supplied including the following criteria: e) Cost of spare parts The Procuring Entity will estimate the cost of spare parts usage in the initial period of operation specified in the Tender Data Sheet, based on information furnished by each Tenderer, as well as on past experience of the Procuring entity or other purchasers in similar situations. Such costs shall be added to the Tender price for evaluation. f) Spare parts and after sales service facilities in Kenya The cost to the PE of establishing the minimum service facilities and parts inventories, as outlined in the Tender Data Sheet or elsewhere in the Tender documents, if quoted separately, shall be added to the Tender price. g) Operating and maintenance costs Since the operating and maintenance costs of the goods under procurement form a major part of the life cycle cost of the equipment, these costs will be evaluated in accordance with the criteria specified in the Tender Data Sheet or in the Technical Specifications. h) Performance and productivity of the equipment. Tenderers shall state the guaranteed performance or efficiency in response to the Technical Specification. For each drop in the performance or efficiency below the norm of 100, an adjustment for an amount specified in the Tender Data Sheet will be added to the Tender price, representing the capitalized cost of additional operating costs over the life of the plant, using the methodology specified in the Tender Data Sheet or in the Technical Specifications. i) Specific additional criteria. Other specific additional criteria to be considered in the evaluation and the evaluation method shall be detailed in the Tender Data Sheet and/or the Technical Specifications. Page 33 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 31. National Preference 34 30.10 If these Tender documents allow Tenderers to quote separate prices for different Lots, and the award to a single Tenderer of multiple Lots, the methodology of evaluation to determine the lowest evaluated Lot combinations, including any discounts offered in the Form of Tender, is specified in the Tender Data Sheet. 31.1 In the evaluation of Tenders the Procuring Entity shall apply exclusive preference to citizens of Kenya where: 31.2 a) The funding is 100% from the Government of Kenya or a Kenyan body; b) The amounts are below the prescribed threshold of KShs.50 million (or KShs.200 million for procurements of works); To qualify for the preference the candidate shall provide evidence of eligibility by: a) Proving Kenyan citizenship by production of a Kenyan Identity Card; or b) Providing proof of being a “citizen contractor” in terms of section 3(1) of the Act, i.e. being a natural person or an incorporated company wholly owned and controlled by persons who are citizens of Kenya. 32. Post-qualification of Tenderer 31.3 In the event of the Minister for Finance prescribing additional preference and/or reservation schemes, details will be given in the Tender Data Sheet. 32.1 If specified in the Tender Data Sheet Post-qualification shall be undertaken. 32.2 The Procuring Entity will determine to its satisfaction whether the Tenderer that is selected as having submitted the lowest evaluated responsive Tender is qualified to perform the contract satisfactorily, in accordance with the criteria listed in sub-Clause 13.3. 32.3 The determination will take into account the Tenderer’s financial, technical, and production capabilities. It will be based upon an examination of the documentary/physical evidence of the Tenderer’s qualifications submitted by the Tenderer, pursuant to sub-Clause 13.3, as well as such other information as the Procuring Entity deems necessary and appropriate. Factors not included in these Tender documents shall not be used in the evaluation of the Tenderers’ qualifications. 32.4 An affirmative determination will be a prerequisite for award of the contract to the Tenderer. A negative determination will result in rejection of the Tenderer’s Tender, in which event the Procuring Entity will proceed to the next lowest evaluated Tender to make a similar determination of that Tenderer’s capabilities to perform satisfactorily. Page 34 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 35 F. Award of Contract 33. Criteria of Award 33.1 Subject to ITT Clause 32, the Procuring Entity will award the Contract to the Tenderer whose Tender has been determined to be substantially responsive to the Tender documents and who has offered the lowest Evaluated Tender Price, provided that such Tenderer has been determined to be: a) Eligible in accordance with the provisions of ITT Clause 3; b) Is determined to be qualified to perform the Contract satisfactorily; and c) Successful negotiations have been concluded, if any. 33.2 If, pursuant to sub-Clause 14.4, this Contract is being let on a slice and package” basis, the lowest evaluated Tender price will be determined when evaluating this Contract in conjunction with other Contracts to be awarded concurrently, taking into account any discounts offered by the Tenderers for award of more than one Contract. 34.1 34. Procuring Entity’s Right to Accept any Tender and to Reject any or All Tenders 34.2 Notwithstanding ITT Clause 33, the Procuring Entity reserves the right to accept or reject any Tender, and to reject all Tenders at any time prior to notification of contract award, without thereby incurring any liability to the affected Tenderer or Tenderers. 34.3 The Procuring Entity shall upon request communicate to any Tenderer the grounds for its rejection of its Tender, but is not required to justify those grounds. 35.1 35. Procuring Entity’s Right to Vary Quantities at the Time of Award The Procuring Entity reserves the right at the time of contract award to increase or decrease the quantity of goods or related services originally specified in these Tender documents (schedule of requirements) provided this does not exceed the percentage indicated in the Tender Data Sheet, without any change in unit price or other terms and conditions of the Tender and Tender documents. 36.1 The Tenderer whose Tender has been accepted will be notified of the award by the Procuring Entity prior to expiration of the Tender validity period by e-mail, or facsimile and confirmed by registered letter. This letter (hereinafter and in the Conditions of Contract called the "Letter of Acceptance") will state the sum that the Procuring Entity will pay the Service provider in consideration of the provision and maintenance of the Service(s) as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price). 36.2 The notification of award will constitute the formation of the Contract, subject to the Tenderer furnishing the Performance Security (if required) in accordance with ITT Clause 39 and signing of the contract in accordance with sub-Clause 38.2. 36. Notification of Award Notice of the rejection of all Tenders shall be given promptly to all Suppliers that have submitted Tenders. Page 35 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 37. Post Tender Concurrence 36 36.3 At the same time as the person submitting the successful tender is notified, the Procuring Entity will notify each unsuccessful Tenderer, the name of the successful Tenderer and the Contract amount and will discharge the Tender security or Tender securing declaration of the Tenderers. 36.4 If, after notification of award, a Tenderer wishes to ascertain the grounds on which its Tender or application for pre-qualification was unsuccessful, it should address its request to the secretary of the Tender Committee that authorized the award of contract. The secretary of the Tender Committee shall, within fourteen days after a request, provide written reasons as to why the tender, proposal or application to be pre-qualified was unsuccessful. However, failure to take this opportunity to clarify the grounds for rejection does not affect the Tenderer’s right to seek immediate review by the Public Procurement Administrative Review Board under Clause 43. 37.1 Limited negotiations may be undertaken with the evaluated Tender under Direct procurement method relating to the following areas: a) A minor alteration to the technical details of the statement of requirements; b) Reduction of quantities for budgetary reasons, where the reduction is in excess of any provided for in the solicitation documents; c) A minor amendment to the contract data sheet; d) Finalising payment arrangements; e) Delivery arrangements; f) The methodology; or g) Clarifying details that were not apparent or could not be finalised at the time of Tendering. 38. Signing of Contract 37.2 Where negotiation fails to result into an agreement, the Procuring Entity may invite the next ranked Tenderer for negotiations. Where negotiations are commenced with the next ranked Tenderer, the Procuring Entity shall not reopen earlier negotiations. 38.1 Promptly after notification, the Procuring Entity shall send the successful Tenderer the agreement and Contract data sheet, incorporating all agreements between the parties obtained as a result of Contract negotiations. 38.2 Within the period specified in the notification or Tender Data Sheet but not later than fourteen (14) days since notification of award of contract, the successful Tenderer shall sign and date the contract and return it to the Procuring Entity. No contract is formed between the person submitting the successful tender and the procuring entity until the written contract is entered into. Page 36 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 39. Performance Security 37 39.1 Within twenty one (21) days, but no earlier than fourteen (14) days, after receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Procuring Entity a Performance Security in the amount and in the form stipulated in the Tender Data Sheet and the Contract data sheet, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract. 39.2 If the Performance Security is provided by the successful Tenderer in the form of a Bank Guarantee or Insurance Bond, it shall be issued either: a) At the Tenderer's option, by a bank or insurance firm located in Kenya, or a foreign bank or insurance firm through a correspondent bank or insurance firm located in Kenya, OR b) With the consent of the Procuring Entity, directly by a foreign bank acceptable to the Procuring Entity. 40. Advance Payment 41. Adjudicator 39.3 Failure of the successful Tenderer to comply with the requirement of sub-Clause 39.1 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Tender security, in which event the Procuring Entity may make the award to the next lowest evaluated Tenderer or call for new Tenders. 40.1 If provided for in the Tender Data Sheet, the Procuring Entity will provide an Advance Payment on the Contract Price as stipulated in the General Conditions of Contract. 40.2 The Advance Payment request shall be accompanied by an Advance Payment Security (Guarantee) in the form provided in Section IX. For the purpose of receiving the Advance Payment, the Tenderer shall make and estimate of, and include in its Tender, the expenses that will be incurred in order to commence Delivery of Goods. These expenses will relate to the purchase of equipment, machinery, materials, and on the engagement of labour during the first month beginning with the commencement date of the Contract. 41.1 Where so provided in the Tender Data Sheet, the Procuring Entity may propose the person named in the Tender Data Sheet to be appointed as Adjudicator under the Contract, at an hourly fee specified in the Tender Data Sheet, plus reimbursable expenses. If the Tenderer disagrees with this proposal, the Tenderer should so state in the Tender. If, in the Letter of Acceptance, the Procuring Entity has not agreed on the appointment of the Adjudicator, the Adjudicator shall be appointed by the Appointing Authority designated in the Contract data sheet at the request of either party. Page 37 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 42. Fraud and Corruption 42.1 38 The Government requires that Procuring entities (including beneficiaries of Government funded projects and procurement) as well as Tenderers/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts. It is the responsibility of the procuring entity to require that Tenderers suppliers, and contractors and their subcontractors observe the highest standard of ethics during the procurement and execution of such contracts. In pursuance of this policy: a) For the purpose of this provision, the following definitions are provided:“Corrupt practice” includes the offering, giving, receiving or soliciting of anything of value to influence the action of a public official in the procurement or disposal process or in contract execution; “Fraudulent practice” includes a misrepresentation of fact in order to influence a procurement or disposal process or the exercise of a contract to the detriment of the Procuring Entity and includes collusive practices amongst Tenderers prior to or after Tender submission designed to establish Tender prices at artificial non competitive levels and deprive the procuring entity of the benefits of free and open competition; “Collusive practice” means an arrangement between two or more suppliers, contractors and subcontractors designed to achieve an improper purpose, including to influence improperly the actions of a procuring entity (PE) prior to or after Tender submission , designed to establish Tender prices at artificial non competitive levels and to deprive the PE of the benefit of free and open competition; “Coercive practice” means impairing or harming, or threatening to impair or harm, directly or indirectly a supplier, contractor or subcontractor or the property of either to influence improperly the actions of a PE; “Obstructive practice” means deliberately destroying, falsifying, altering or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede an investigation into allegations of a corrupt, fraudulent, coercive or collusive practice; and /or threatening, harassing or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation. b) A procuring entity (PE) has the right to require that Tenderers, suppliers, and contractors and their subcontractors permit persons duly appointed by KACC/PPOA to inspect their accounts and records and other documents relating to the Tender submission and contract performance, c) The Procuring Entity will reject a proposal for award if it determines that the Tenderer recommended for award has engaged in any of the above practices in competing for the contract; Page 38 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 39 d) In pursuit of the policy defined in sub-Clause 45.1 the Procuring Entity will cancel the portion of the funds allocated to a contract for goods, works, or services if it at any time determines that corrupt or fraudulent practices were engaged in by representatives of the procuring entity or approving authority or of a beneficiary of the funds during the procurement or the execution of that contract, without the procuring entity or approving authority having taken timely and appropriate action satisfactory to the Government of Kenya to remedy the situation e) The Director-General may, on the advice of the Advisory Board, debar a person from participating in procurement proceedings on the ground that the person has committed an offence under the Public procurement and Disposal Act, 2005, or any other Act, or on other grounds as specified in Section 115 of the Act. A debarment shall be for a period of time of not less than five years. Before a person is so debarred, he/she will be given an opportunity to make representations to the Director-General and may request the Review Board to review the debarment. 42.2 The Government of Kenya reserves the right, where a firm has been found by a foreign country, international organization or other foreign organization to have engaged in corrupt or fraudulent practice, to declare that such a firm is ineligible, for a specified period to be awarded a public financed Contract in Kenya. 42.3 Any communications between the Tenderer and the Procuring Entity related to matters of alleged fraud or corruption must be made in writing. G. Review of Procurement Decisions 43. Right to Review 43.1 A Tenderer who claims to have suffered or to risk suffering, loss or damage or injury as a result of breach of a duty imposed on a Procuring Entity or an approving authority by the Public Procurement and Disposal Act 2005 or regulations, the procurement proceedings or processes, may seek administrative review as prescribed by the Act. The following matters, however, shall not be subject to the administrative review: The choice of procurement method; A decision by the procuring entity to reject all tenders, proposals or quotations; Where a contract is signed in accordance to section 68 of the Public Procurement and Disposal Act,2005; and Where an appeal is frivolous. Page 39 of 183 SECTION II: INSTRUCTION TO TENDERERS (ITT) 44. Time Limit on Review 44.1 45. Submission of Applications for Review by the Public Procurement Administrative Review Board 45.1 45.2 46. Decision by the Public Procurement Administrative Review Board 46.1 40 The Tenderer shall submit an application for review in the number of copies and pay fees as prescribed by regulations within fourteen (14) days of the occurrence of the breach complained of where the request is made before the making of an award or within fourteen (14) days of the notification under sections 67 or 87 of the Act Any application for administrative review shall be submitted in writing to the Secretary, Public Procurement Administrative Review Board on Form RB 1 (which may be downloaded from the PPOA website) at the address shown in the Tender Data Sheet. The secretary to the review board shall immediately after filing of the request under Regulation 73, serve a copy thereof on the procuring entity or DirectorGeneral as the case may be. The application for administrative review shall be in accordance with the requirements of Regulation 73 of the Public Procurement and Disposals Regulations,2006, including: a) Reasons for the complaint ,including any alleged breach of the Act or Regulations; b) An explanation of how the provisions of the Act, Regulation or provision has been breached or omitted, including the dates and name of the responsible public officer, where known; c) Statements or other evidence supporting the complaint where available as the applicant considers necessary in support of its request; d) Remedies sought; and e) Any other information relevant to the complaint. The Administrative Review Board shall within thirty days after receipt of a application for administrative review deliver a written decision which shall indicate: a) Whether the application is upheld in whole, in part or rejected; b) The reasons for its decision; c) The corrective measures to be undertaken; and d) Order payment of costs as between parties to review. 47. Judicial Review 46.2 The decision of the Administrative Review Board shall be final unless the Tenderer institutes an appeal with High Court under section 100(1) of the Act 47.1 The Tenderer not satisfied with the decision of the Public Procurement Administrative Review Board may appeal to the High Court within fourteen days after the decision is made and the decision of the High Court will be final. 47.2 The Secretary to the Administrative Review Board may be contacted at the address shown in the Tender Data Sheet. Page 40 of 183 SECTION III: TENDER DATA SHEET 41 SECTION III: TENDER DATA SHEET Page 41 of 183 SECTION III: TENDER DATA SHEET 42 Tender Data Sheet The following specific data for the goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Tenderers (ITT). Whenever there is a conflict, the provisions herein shall prevail over those in ITT. TDS Clause Number ITT Clause Number Amendments of, and Supplements to, Clauses in the Instruction to Tenderers A. Introduction 1. 1.1 Name of Procuring Entity: The Kenya Ports Authority (KPA). The subject of procurement is: Supply and Commissioning of One (1No.) Tug Boat 2. 1.2 3. 2.1 & 2.2 Period for supply of goods: as per contract Expected commencement date for supply of Goods: as per contract Required completion date for supply of the Goods: as per contract Financial year for the operations of the Procuring Entity: 2013/14 Name and identification number of the Contract: KPA/057/2013-14/MO - Supply and Commissioning of One (1No.) Tug Boat Tender is open to manufacturers Joint Venture is applicable…………… [“NO”] Ineligible country(s) is or are [Clause deleted 4. 3.1 5. 4.1 6. 4.6 13.3 6 N/A 9. 8.2 20.1 9.1 10. 9.2 The number of copies of the Tender to be completed and returned in addition to the original shall be [two -2]. The address for clarification of Tender documents is The Secretary, Corporation Tender Committee, Kenya Ports Authority, P.O. Box 95246 -80104 Mombasa KENYA Tel +254 041 2112600/999 Fax: +254-041-2226721 Email: ctcsecretary@kpa.co.ke Period to respond to request for clarification (3 days) 7 8. Alternative Tenders to the requirements of the Tender documents ["will not,'] be permitted with respect to technical specifications documents with material deviations from the specifications shall be rejected B. Tender documents Period prior to deadline for submission of Tenders for the Tenderers to request clarifications (7days) Page 42 of 183 SECTION III: TENDER DATA SHEET 43 C. Preparation of Tenders 11. 11.1 12. 12.1 (g) The Language of all correspondence and documents related to the Tender is: English In addition to the documents stated in ITT Clause 12, the following documents must be included with the Tender and submitted as prescribed below; The tender prepared by the tenderers shall comprise of a Technical submission “Envelope A” and a financial submission “Envelope B”. Envelope A – Shall contain NO indication of the tender price or other financial information of the bid. The tender submission shall be placed in an inner envelope that shall itself contain two envelopes, Envelopes A and B. Envelope A shall contain the technical submission and shall be clearly marked “Envelope A – Technical Submission”. Envelope A shall contain NO indication of the tender price or other financial information of the bid and: The tender submission; 1. Shall have a table contents pages clearly indicating Sections and Page Numbers (Mandatory). 2. Shall have pages in the whole document numbered in the correct sequence and serialized (Mandatory). Envelope A shall contain the following components: (i) Qualification Information Statement that the tenderer (including all members of a joint venture and subcontractors) is not associated, or have been associated in the past, directly or indirectly, with a firm or any of its affiliates which have been engaged by the Procuring Entity to provide consulting services for the preparation of the design, specifications, and other documents to be used for the procurement of the goods under this Invitation for tenders (MANDATORY). (ii) Particulars of Tendering Company including the Company background, profile and Statutory registration certificates (incorporation certificate and evidence of tax compliance from the country of domicile) (MANDATORY). (iii) Tender Security as described in the format provided herein. amounting to US$ 100,000.00 in the form of a Banker’s guarantee or an Insurance Company Guarantee issued by an insurance firm approved by the Public Procurement Oversight Authority (PPOA) cash, letter of credit or guarantee by a deposit taking microfinance institution, Sacco society, the Youth Enterprise Development Fund or the Women Enterprise Fund valid for 120 days from the date of tender opening in the format provided in the tender document (MANDATORY). (iv) Valid quality certificate for the manufacturing company stating clearly that their systems are certified for design, manufacture and supply of Tug Boats i.e. ISO certification or equivalent Page 43 of 183 SECTION III: TENDER DATA SHEET 44 (MANDATORY). (v) Valid Environmental Management System ISO 14001:2004 or equivalent for the manufacturing company (MANDATORY). (vi) Duly filled, signed and stamped Confidential Business Questionnaire Form provided herein (MANDATORY). (vii) Duly filled and completed Declaration Form in the format provided herein (MANDATORY). (viii) Duly filled, signed and stamped Anti-Corruption Declaration Form in the Format provided herein (MANDATORY). (ix) Duration of Warranty (defects liability) period clearly stated as 24 months and the manufacturer’s detailed Defects Liability Period Support Plan. This must cover warranty obligations of the manufacturers and customer and clearly set conditions under which warranty claim is valid or void. (MANDATORY). (x) Defects liability period support plan (NOTE: The manufacturer’s engineer shall give a minimum 4 months on site technical support as long as the Procuring entity has given notice to require their presence. Thereafter, the manufacturer’s engineer shall be availed on site within 48 hours of notification) (MANDATORY). (xi) Duly completed and signed Local Dealer Nomination Form. The following particulars of tendering company’s nominated local agent shall be attached: - company profile, email address and statutory documents i.e. KRA Taxpayer Registration Certificate, current Tax Compliance Certificate, Certificate of incorporation, and Single Business Permit. The agency nomination shall be in the format prescribed in this tender document and must be complete and shall include full name(s) and details of the tenderers representative to be contacted on matters of the tender during the tender period and contract if awarded (MANDATORY). (xii) List complete with serial numbers of at least twenty (20)vessels, identical to the specified vessel in this tender built and supplied by the tenderer in the last 10 years including detailed names of purchasers, sites/ports of operations including at least ten (10) different distinct foreign sites/ports other than the country of building. At least five sites shall be in Africa (MANDATORY). (xiii) A written undertaking: (a) of ability to supply spares for at least 15 years after handing over and also to be capable of upgrading the supplied software during the same period (MANDATORY). (b) to supply the Equipment accompanied by a computer based Maintenance Program(e.g. SAP, AMOS, etc) and engine diagnostic software for execution of maintenance schedules, should the tenderer be awarded the contract (MANDATORY). (c) to supply the Equipment accompanied by all necessary manuals in soft and hard copies from the original Page 44 of 183 SECTION III: TENDER DATA SHEET 45 manufacturer of each major component where the hard copies to be of good quality, plastic covered, and in the English language as will be required to operate and maintain the Equipment and in five (5) copies for each of the following categories: - Wartsila Operation Manual & Auxilliary /other ancilliary Equipment operation manuals (MANDATORY) - Wartsila Service/Maintenance Manual & Auxiliary / Other Ancillary Equipment Service/Maintenance manuals (MANDATORY) - Wartsila Parts lists & Auxiliary / Other Ancillary equipment Part lists. The soft copy and its back up of the parts manual shall contain explodable and collapsible views of components, subcomponents down to individual parts using navigational tool (MANDATORY). (d) Written undertaking that the Shipbuilder shall ensure the Factory Acceptance and Test (FAT) for the Wartsila Main Engines is carried out at the factory before shipping for installation. The Shipbuilder shall carter for two engineers to travel for this exercise (MANDATORY). (e) Written undertaking that, in the case of a tenderer not doing business within Kenya, the tenderer is or will be (if awarded the contract) represented by an Agent in Kenya equipped, and able to carry out the Tenderer’s maintenance, repair, and spare parts-stocking obligations prescribed in the Conditions of Contract and/or Technical Specifications (MANDATORY). (xiv) Duration of Warranty (defects liability) period clearly stated as 24 months (MANDATORY). (xv) Major Component Manufacturer Documentation Form. This should list the major components used on the vessel and their manufacturers’ details to include name, address & location, contacts and name of the contact person where applicable and be submitted in the format provided in the tender document (MANDATORY). (xvi) Recommended list of Spares to be supplied with the Equipment for one year's preventive maintenance consumption after the 24 months Defect Liability period (MANDATORY). (xvii) A complete set of Audited Accounts for the last three years i.e 2009/10, 2010/11 and 2011/12 (MANDATORY). (xviii) Annual turnover of > USD 1 Billion (MANDATORY). (xix) Tenderer’s Technical specifications and drawings of the vessel. This should be in form of a clause-by-clause commentary on the Procuring Entity’s Technical Specifications demonstrating substantial responsiveness of the Equipment to those specifications, or a statement of deviations and exceptions to the provisions of the Technical Specifications. Tenderer’s Technical Specifications shall not be a reproduction of the Procuring Page 45 of 183 SECTION III: TENDER DATA SHEET 46 Entity’s specifications. ( refer to clause 13 of the ITB) (MANDATORY). (xx) The tenderer shall be a shipyard with in-house design, research and development. Written proof to be provided that the vessel in this tender is designed by the tenderer and built on the shipyard fully owned by the tenderer. The Ship Designer should be identified in the submission (MANDATORY). (xxi) The tenderer shall provide proof that FEM analyses, vibration and noise predictions as well as bollard pull prognosis have been carried out for the vessel specified in this tender. (MANDATORY). (xxii) The tenderer shall provide written proof that he has an in-house after sales organization in place. (MANDATORY). (xxiii) Work plan for design, building, shipping, delivery, testing and commissioning in descriptive Gantt chart format. The detailed program must demonstrate a completion period of 18 Months or less upon confirmation of order. Details of major components used to build the Crane must be included in the chart (MANDATORY). (xxiv) Schedule of deviations from specifications, if any. The schedule of deviations should be accompanied by a commentary of how they enhance the vessel operational efficiency, cost effectiveness, maintainability, durability, environmental and economic advantages. (xxv) Details of Training courses for operators and maintenance staff for both local and overseas training five operators and five engineers / technicians. (MANDATORY). (xxvi) Details of specialized training for engines/generators for Five Technicians (MANDATORY). (xxvii)List of accompanying technical documents i.e. Operator manuals, Maintenance manuals etc. (MANDATORY). (xxviii)List of non-technical documents accompanying the tender, if any. (xxix) Any other item and information which the Tenderer considers may support his technical proposal. Envelope B – FINANCIAL PROPOSAL shall contain: i. Form of Tender. ii. Schedule of Prices (corresponding to the schedule of Requirements), with separate details indicating a breakdown of the cost of the Tug Boat, cost of ancillary equipment, cost of back up spares listed in the tender document, and the Cost of Overseas and Local Training, cost of special tools, cost of specialized for engines/generators training for five (5) technicians, cost of AMOS & Diagnostic Software, etc. all of which comprise the Form of Tender Price. Page 46 of 183 SECTION III: TENDER DATA SHEET 47 iii. Cost of recommended Running spare-parts to be used for one year’s preventive maintenance after warranty period. iv. Cost of deviations 2.17.1 The inner envelope shall itself contain two envelopes, Envelopes A and B. Envelope A shall contain the technical submission and shall be clearly marked “Envelope A – Technical Submission”. Envelope A shall contain NO indication of the tender price or other financial information of the bid and: 1. Shall have contents pages clearly indicating Sections and Page Numbers 2. Shall have pages in the whole document numbered in the correct sequence and serialized. Envelope B shall contain the financial submission and shall be clearly marked “Envelope B – Financial Submission”. Envelope B shall also indicate the name and address of the tenderer to enable return of unopened financial submissions in case they do not qualify past the technical evaluation stage. 2.17.2 The inner envelopes shall also indicate the name and address of the tenderer to enable return of unopened tenders in case it is declared “late”. 13. 13.3 (c) The information required from Tenderers in ITT Clause 13.3 is modified as follows: none 14. 13.4 Spare parts required for 2 of years of operation. 15. 14.3 (b) The qualification criteria required from Tenderers in ITT Clause 14.3(b) is modified as follows: NONE The total monetary value of good(s) supplied for each of the last three years should be indicated 16. 14.3 (d) Clause deleted 17. 16.6 (a) The price quoted shall be CIF MOMBASA. 18. (iii), (iv) N/a clauses deleted (optiona) The price quoted shall be CIF MOMBASA 16.6 (b) (i) N/a clause deleted 19. (ii), (iii) Price for local training and commissioning should be inclusive of all (optiona) applicable taxes (iv), (v) (optional The price shall be fixed 16.8 20. 17.1 a) For goods and related services originating in Kenya the currency Page 47 of 183 SECTION III: TENDER DATA SHEET 48 of the Tender shall be Kenya Shillings or USD; b) For goods and related services originating outside of Kenya , the Tenderer shall express its Tender in United States Dollars USD 21. 17.2 22. 18.1 23. 19.1 24. 20.2 For the purpose of evaluation only, the rate of exchange to be used will be those established by the Central Bank of Kenya prevailing on [ date of Tender opening] The Tender validity period shall be [90] days. The amount of Tender security is United States Dollars One Hundred Thousand (USD 100,000) in the form of a Bank guarantee in the format provided in the tender document and shall be valid for 120 days. Written confirmation of authorization are : Duly signed Power of Attorney D. Submission of Tenders 25. 26. 21.2 (a) 21.2 (b) Tender shall be submitted to: THE SECRETARY CORPORATION TENDER COMMITTEE KENYA PORTS AUTHORITY 4TH FLOOR FINANCE BLOCK III ROOM (3.4.3) KPA KIPEVU HEADQUARTERS KILINDINI MOMBASA Alternatively, completed tenders may be deposited at Tender Box No.7 located at the BUS TERMINUS, PEDESTRIAN GATE NO. 8, KILINDINI, (DOCKS) MOMBASA BEFORE 1000 HOURS (EAT) ON TUESDAY 18TH FEBRUARY, 2014. Bulk tenders can be deposited at the office of the Head of Procurement & Supplies situated on the 4th floor of office Block III door no 3.4.3, KPA Headquarters Kilindini Mombasa. Tender name: Supply and commissioning of 1No. Tug Boat ITT title and number : KPA/057/2013-14/MO 1000 HOURS (EAT) ON TUESDAY 18TH FEBRUARY, 2014 27. 22.1 28. 22.3 The deadline for Tender submission is on TUESDAY 18TH FEBRUARY, 2014 BEFORE 1000 HOURS (EAT) Extension of the deadline for submission of Tenders shall not be made later than 7 Days before date of tender opening E. Opening and Evaluation of Tenders 29. 25.1 30 29. Technical Evaluation The Tender opening shall take place at: Procurement Conference Room located at the New Service Area (Kapenguria), in the former Supplies Accounts office Kipevu, Kenya Ports Authority, Mombasa TUESDAY 18TH FEBRUARY, 2014 FROM 1030 HOURS (EAT) Technical proposals shall be subjected to the following evaluation criteria: Item Factor under Consideration Marks Page 48 of 183 SECTION III: TENDER DATA SHEET 1. 49 Adherence to Design Manufacturing, Building and 60 Delivery Conditions Adherence to Technical Specifications (50Marks) NB: only tenderers whose products meet at least 90% of this factor (i.e. 45 out of 50 Marks) shall proceed to be evaluated below. Timetable of works (Gantt Chart / Ms Project Presentation showing the delivery period of 18 months or less (5 marks) Details of major components of the Tug Boat as listed with brochures (5 marks) On Site Programme & After Sales Support Plan Testing & Commissioning plan and Timetable of Tug boat (3 marks) Local Agent(s)’ Physical Addresses (2 marks) Adequacy of defects liability plan, 2 year warranty (2 marks) After sale detail support plan after defect liability period (3 marks) Tenderer’s experience List of similar new Tug Boat sales provided details of at least 20 tug boats built and supplied in the past 10 years i.e. serial numbers, dates, , addresses of sales sites, names and addresses of contact persons (10 marks) At least 5 foreign distinct sites / ports outside the Tug Boat builder’s country (5 marks) 2. 3. 4. 10 15 5 Training Detailed local and overseas training activities for the operators and maintenance staff on all the systems (2 marks) Details Operators training on controls and procedures (1 mark) On-site training at Port of Mombasa (1 mark) Time table of training activities (1 mark) 5 Documentation & Tool Box Quality of sample manuals for parts, service and operation provided for the Tug Boat (1 mark) Engine parts and service manual provided (1 mark) CD-ROM presentations (1 mark) Completeness of proposed list of tools for maintenance and troubleshooting to be supplied with the mobile harbour cranes (2 marks) 15 Financial Strength of the Tenderer: Tenderer’s financial position and operational performance from the analysis of Certified Audited Accounts for 2009/10, 2010/11 and 2011/12 specifically annual turnover of > USD 1 Billion (3 Marks) 5. 6. Page 49 of 183 SECTION III: TENDER DATA SHEET 50 availability of credit line of > USD 250 Million (3 Marks) Net Capital of > USD 250 Million (3 Marks) Current ratio shall be > 0.8 for each of the three years (2 Marks) Gearing ratio shall be < 20% for each of the three years (2 Marks) Return on Total Assets ratio shall be > 5% for each of the three years (2 Marks) TOTAL 100 Bidders will be required to score a minimum of 80% to proceed to the next stage of evaluation In determining satisfaction as to whether the bidder(s) whose technical submission(s) has/have been scored above the required pass mark of 80%, the Procuring Entity reserves the right to conduct site visits to the reference sites and manufacturing plant prior to opening of financial submission “Envelope B” so as to establish whether the information provided in the technical submission is accurate. For this Tender, there shall be mandatory site visits by the Committee before opening of envelope B. The Evaluation Criteria shall be based on: Quality of workmanship Reliability of the Tug Boat Availability of spare parts Durability of the Tug Boat Cost of Maintenance The Bidder(s) whose site(s) is/are visited MUST score a minimum of 17 out of 20 points of the site visit criteria so as to be considered for contract award. 30. 30.4 The currency that shall be used for Tender evaluation and comparison purposes to convert all Tender prices expressed in various currencies is Kenya Shillings The source of exchange rate shall be Central Bank of Kenya The date of exchange rate shall be Selling rate on date of tender opening 31. 30.8 Criteria for Tender evaluation – Financial. Lowest evaluated bid 32. 30.9 (a) clause deleted INCOTERMS is CIF Mombasa 33. 30.9 (b) Delivery schedule. Delivery in excess of 18 months shall be declared non-responsive 34. 30.9 (ii) 35. 30.9 (d) (c) Deviation in payment schedule [insert “is” applicable]. Annual interest rate [Central Bank of Kenya lending rate] Cost of spare parts. Refer to the Appendix to the Technical Specifications, for list of applicable spares.] Page 50 of 183 SECTION III: TENDER DATA SHEET 51 Spare parts and after sales service facilities in the Kenya. Refer to the Appendix to the Technical Specifications, for list of applicable spares. Local agents should demonstrate capacity e.g. by similar contract handled 36. 30.9(e) 37. 30.9 38. 30.9 (g) Performance and productivity of equipment. clause deleted 39. 30.9 (h) Details of other factors to be used in the evaluation and their evaluation method: refer to the Technical Specifications. 40. 41. 42. 30.10 31.3 32.1 clause deleted National/other preference not applicable. Post- qualification will “be undertaken where deemed appropriate ” F. Contract Award 43. 35.1 The Authority may change the quantities as deemed fit percentage not applicable. (f) N/a clause deleted Apart from the 1No. Tugboat under this tender for the current financial year (2013/14), the Authority plans to acquire another 1No. Tugboat in the Financial year 2014/15. KPA reserves the right to award the additional Tugboat to the winning tenderer in this tender at the same price and negotiate the delivery terms. 44. 39.1 The Performance Security shall be 10 percent of the Contract Price in the format provided 45. 40.1 The Advance Payment shall be limited to 20% of the Contract Price 46. 40.2 Maximum amount of Advance payment shall be [as 40.1 above ] 47. 41.1 clause deleted refer to conditions of contract G. Review of Procurement Decisions 48. 45.1 49. 44 50. 47.2 The address of PPOA for submitting complaints: Director General, Public Procurement Oversight Authority (PPOA) 11th Floor National Bank Building, Harambee Avenue , P.O. Box 58535-00200 NAIROBI, Kenya. Tel: +254 (0) 20 324 4000 Fax: 2121238 email: info@ppoa.go.ke Fee for administrative review shall be as set out in Part II of the Fourth Schedule of the PPDR 2006. The address for submitting appeals to Administrative Review Board : The Secretary, Page 51 of 183 SECTION III: TENDER DATA SHEET 52 Public Procurement Administrative Review Board , The Public Procurement Oversight Authority, 10th Floor ,National Bank House P.O. Box 58535-00200, NAIROBI, Kenya. Tel: +254 (0) 20 324 4000 Email: info@ppoa.go.ke Website: www.ppoa.go.ke Page 52 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 53 SECTION IV: GENERAL CONDITIONS OF CONTRACT Page 53 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 54 Table of Clauses SECTION IV: GENERAL CONDITIONS OF CONTRACT ............................................................... 53 1. Definitions ............................................................................................................................. 55 2. Application ............................................................................................................................ 56 3. Governing Language ............................................................................................................. 56 4. Applicable Law ..................................................................................................................... 56 5. Country of Origin and Nationality of Supplier ...................................................................... 56 6. Standards ............................................................................................................................... 57 7. Use of Contract Documents and Information; Inspection and Audit by the Government of Kenya ............................................................................................................................................ 57 8. Patent and Copy Rights ......................................................................................................... 57 9. Performance Security ............................................................................................................ 57 10. Inspections and Test .......................................................................................................... 58 11. Packing .............................................................................................................................. 58 12. Delivery and Documents ................................................................................................... 59 13. Incidental Services............................................................................................................. 59 14. Spare Parts ......................................................................................................................... 59 15. Warranty ............................................................................................................................ 60 16. Payment ............................................................................................................................. 60 17. Prices ................................................................................................................................. 61 18. Change Orders ................................................................................................................... 61 19. Contract Amendments ....................................................................................................... 62 20. Assignment ........................................................................................................................ 62 21. Subcontracts ...................................................................................................................... 62 22. Delays in the Supplier’s Performance ............................................................................... 62 23. Liquidated Damages .......................................................................................................... 62 24. Termination for Default ..................................................................................................... 62 25. Termination for Insolvency ............................................................................................... 63 26. Force Majeure .................................................................................................................... 63 27. Disputes ............................................................................................................................. 64 28. Procedure for Disputes ...................................................................................................... 64 29. Replacement of Adjudicator .............................................................................................. 64 30. Limitation of Liability ....................................................................................................... 64 31. Notices ............................................................................................................................... 65 32. Taxes and Duties ............................................................................................................... 65 Page 54 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 55 General Conditions of Contract 1. Definitions 1.1 In this Contract, the following terms shall be interpreted as indicated: a) “CDS” means the Contract data sheet. b) “Completion” means the fulfilment of the related services by the Supplier in accordance with the terms and conditions set forth in the contract c) “Contract” means the agreement entered into between the Procuring Entity and the Supplier, as recorded in the Contract Form signed by the parties, including all attachments and appendices thereto and all documents incorporated by reference therein. d) “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value to influence the action of a public official in the procurement process or in contract execution and includes, inter alia, bribery and extortion or coercion which involves threats of injury to person, property or reputation. e) “Day” means calendar day. f) “Delivery” means the transfer of the goods from the supplier of equipment, machinery, and /or other materials which the Supplier is required to supply to the Procuring Entity under Contract. g) “Effective Date” means the date on which this Contract becomes effective pursuant to GCC Clause h) “Eligible Country" means the countries and territories eligible for participation in procurements financed by the specified institution. i) “End User” means the organization(s) where the goods will be used, as named in the CDS. j) “Force Majeure” means an event or situation beyond the control of the Supplier and not involving the Supplier’s fault or negligence and not foreseeable, is unavoidable, and is not due to negligence or lack of care on the part of the Supplier. Such events may include, but are not restricted to, acts of the Procuring Entity in its sovereign capacity, wars or revolutions, fires, floods, epidemics, quarantine, restrictions, acts of terrorism piracy and freight embargoes. k) “fraudulent practice” means a misrepresentation of facts in order to influence a procurement process or the execution of a contract to the detriment of the Purchaser, and includes collusive practices among Tenderers (prior to or after Tender submission) l) “GCC” means the General Conditions of Contract contained in this section. m) “Origin” means the place where the Goods were mined, grown, or Page 55 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 56 produced or from which the Services are supplied. Goods are produced when, through manufacturing, processing, or substantial and major assembly of components, a commercially recognized new produce results that is substantially different in basic characteristics or in purpose or utility from its components. n) “Procuring Entity” means the entity purchasing the Goods and related service, as named in CDS. o) “Project Site” where applicable, means the place or places named in CDS. p) “Related Services” means those services ancillary to the supply of the Goods, such as transportation and insurance, and any other incidental services, such as installation, commissioning, provision of technical assistance, training, initial maintenance and other such obligations of the Supplier covered under the Contract. q) “Supplier” means the individual, private or public entity or a combination of the above whose Tender to perform the contract has been accepted by the Procuring Entity Procuring Entity and is named as such in the Contract Agreement, and includes the legal successors or permitted assigns of the supplier. r) “The Contract Price” means the price payable to the Supplier as specified under the Contract, subject to such additions and adjustment here to or deduction there from as may be made pursuant to the contract for the full and proper performance of its contractual obligations. 2. Application 2.1 These General Conditions shall apply to the extent that they are not superseded by provisions of other parts of the Contract. 3. Governing Language 3.1 The Contract and all correspondence and documents relating to the contract exchanged by the Supplier and the Procuring Entity shall be written in English, unless another language is specified in CDS. Subject to GCC Clause 3.1, the version of the Contract written in the specified language shall govern its interpretation. 4. Applicable Law 4.1 The contract shall be governed and interpreted in accordance with the laws of Kenya, unless otherwise specified in CDS. 5. Country of Origin and Nationality of Supplier 5.1 The origin of Goods and Services means the place where the goods are mined, grown, cultivated, produced, manufactured, or processed, or through manufacture, process, or assembly, another commercially recognized article results that differs substantially in its basic characteristics from its imported components or the place from which the related services are supplied. The nationality of the firm that produces, assembles, distributes, or sells the goods and services shall not determine their origin. Page 56 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 57 6. Standards 6.1 The Goods supplied under this Contract shall conform to the standards mentioned in the Technical Specifications, and, when no applicable standard is mentioned, to the authoritative standards appropriate to Kenya. Such standards shall be the latest issued by the concerned institution. 7. Use of Contract Documents and Information; Inspection and Audit by the Government of Kenya 7.1 The Supplier shall not, without the Procuring Entity ’s prior written consent, disclose the Contract, or any provision thereof, or any specification, plan, drawing, pattern, sample, or information furnished by or on behalf of the Procuring Entity in connection therewith, to any person other than a person employed by the Supplier in the performance of the Contract. Disclosure to any such employed person shall be made in confidence and shall extend only so far as may be necessary for purposes of such performance. 7.2 The Supplier shall not, without the Procuring Entity ’s prior written consent, make use of any document or information enumerated in GCC Clause 7.1 except for purposes of performing the Contract. 7.3 Any document, other than the Contract itself, enumerated in GCC Clause 7.1 shall remain the property of the Procuring Entity and shall be returned (all copies) to the Procuring Entity on completion of the Supplier’s performance under the Contract if so required by the Procuring Entity . 7.4 The Supplier shall permit the Government of Kenya or / and donor agencies involved in financing the project to inspect the Supplier’s accounts and records relating to the performance of the Supplier and to have them audited by auditors appointed by the Government of Kenya or / and the appropriate donor agencies, if so required by the Government of Kenya or / and the appropriate donor agencies. 8.1 The Supplier shall indemnify the Procuring Entity against all third-party claims of infringement of patent, trademark, or industrial design rights arising from use of the Goods or any part thereof in Kenya. 8.2 The patent right in all drawings, documents, and other materials containing data and information furnished to the Procuring Entity by the Supplier herein shall remain vested in the supplier, or, if they are furnished to the Procuring Entity directly, or through the Supplier by any third party, including suppliers of materials, the patent right in such materials shall remain vested in such third party. 9.1 Within twenty-one (21) days of receipt of the notification of Contract award, the successful Tenderer shall furnish to the Procuring Entity the performance security in the amount specified in CDS. 9.2 The proceeds of the performance security shall be payable to the Procuring Entity as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract. 9.3 The performance security shall be denominated in the currency of the Contract, or in a freely convertible currency acceptable to the Procuring Entity and shall be in one of the following forms: 8. Patent and Copy Rights 9. Performance Security a) b) A bank guarantee, an irrevocable letter of credit, or Page 57 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 10. Inspections and Test 11. Packing 58 c) an insurance bond issued by a reputable insurance company approved by PPOA in the form provided in the Tender documents or another form acceptable to the Procuring Entity ; or d) A banker’s or certified cheque. 9.4 The performance security will be discharged by the Procuring Entity and returned to the Supplier not later than thirty (30) days following the date of completion of the Supplier’s performance obligations under the Contract, including any warranty obligations, unless otherwise specified in CDS. 10.1 The Procuring Entity or its representative shall have the right to inspect and /or to test the Goods to confirm their conformity to the Contract specifications at no extra cost to the Procuring Entity . CDS and the Technical Specifications shall specify what inspections and tests shall be carried out. The Procuring Entity shall notify the Supplier in writing, in a timely manner, of the identity of any representatives retained for these purposes. 10.2 The inspections and tests may be conducted on the premises of the Supplier or its subcontractor(s), at point of delivery, and/or at the Goods’ final destination. If conducted on the premises of the Supplier or its subcontractor(s), all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring Entity . 10.3 Should any inspected or tested Goods fail to conform to the Specifications, the Procuring Entity may reject the Goods, and the Supplier shall replace the rejected Goods to meet specification requirements free of cost to the Procuring Entity . 10.4 The Procuring Entity ’s right to inspect, test and, where necessary, reject Goods after the Goods’ arrival in the Procuring Entity ’s country shall in no way be limited by reason of the Goods having previously been inspected, tested, and passed by the Procuring Entity or its representative prior to the Goods’ shipment from the country of origin. 10.5 Nothing in GCC Clause 10 shall in any way release the supplier from any warranty or other obligations under this Contract. 11.1 The supplier shall provide such packing of the Goods as is required to prevent their damage or deterioration during transit to their final destination, as indicated in the Contract. The packing shall be sufficient to withstand, without limitation, rough handling during transit and exposure to extreme temperatures, salt and precipitation during transit, and open storage. Packing case size and weights shall take into consideration, where appropriate, the remoteness of the Goods final destination and the absence of heavy handling facilities at all points in transit. Page 58 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 12. Delivery and Documents 13. Incidental Services 14. Spare Parts 59 11.2 The packing, marking, and documentation within and outside the packages shall comply strictly with such special requirements as shall be expressly provided for in the Contract, including additional requirements, if any, specified in CDS, and in any subsequent instructions ordered by the Procuring Entity . 12.1 Delivery of the Goods shall be made by the Supplier in accordance with the terms specified in the Schedule of Requirements. The details of insurance and transportation shall be as provided by the INCOTERM DDP or such other INCOTERM and / or other documents to be furnished by the Supplier as are specified in CDS. 12.2 For purposes of the Contract, “DDP", “CIP”, “CIF”, “FCA”, “FOB”, “EXW” and other trade terms used to describe the obligations of the parties shall have the meanings assigned to them by the current edition of INCOTERMS published by the International Chamber of Commerce, Paris. 12.3 Documents to be submitted by the Supplier are specified in CDS. 13.1 The Supplier may be required to provide any or all of the following services, including additional services, if any, specified in CDS: 14.1 a) Performance or supervision of on-site assembly and/or start-up of the supplied Goods; b) Furnishing of tools required for assembly and/or maintenance of the supplied Goods; c) Furnishing of a detailed operations and maintenance manual for each appropriate unit of the supplied Goods; d) Performance or supervision or maintenance and/or repair of the supplied Goods, for a period of time agreed by the parties, provided that this service shall not relieve the Supplier of any warranty obligations under this Contract; and e) Training of the Procuring Entity ’s personnel, at the Supplier’s plant and/or on-site, in assembly, start-up, operation, maintenance, and/or repair of the supplied Goods. Supplier shall carry sufficient inventories to assure ex-stock supply of consumable spares for the Goods. Other spare parts and components shall be supplied as promptly as possible and in any event within the period specified in the CDS. a) Such spare parts as the Procuring Entity may select to purchase from the Supplier, provided that this election shall not relieve the Supplier of any warranty obligations under the Contract; and b) In the event of termination of production of the spare parts: a) Advance notification to the Procuring Entity of the pending termination, in sufficient time to permit the Procuring Entity to procure needed requirements; and Page 59 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 60 b) Following such termination, furnishing at no cost to the Procuring Entity, the blueprints, drawings, and specifications of the spare parts, if requested. 15. Warranty 16. Payment 15.1 The Supplier warrants that the Goods supplied under the Contract are new, unused, of the most recent or current models, and that they incorporate all recent improvements in design and materials unless provided otherwise in the Contract. The Supplier further warrants that all Goods supplied under this Contract shall have no defect, arising from design, materials, or workmanship (except when the design and/or material is required by the Procuring Entity , specifications) or from any act or omission of the Supplier, that may develop under normal use of the supplied Goods in the conditions prevailing in the Republic of Kenya. 15.2 This warranty shall remain valid for a period specified in the CDS after the Goods, or any portion thereof as the case may be, have been delivered to and accepted at the final destination indicated in the Contract, or for a period specified in the CDS after the date of shipment from the port or place of loading in the source country, whichever period concludes earlier, unless specified otherwise in CDS. 15.3 The Procuring Entity shall promptly notify the Supplier in writing of any claims arising under this warranty. 15.4 Upon receipt of such notice, the Supplier shall, within the period specified in CDS and with all reasonable speed, repair or replace the defective Goods or parts thereof, without costs to the Procuring Entity other than, where applicable, the cost of inland delivery of the repaired or replaced Goods or parts from EXW or the port or place of entry to entry to the final destination. 15.5 If the Supplier, having been notified, fails to remedy the defect(s) within the period specified in CDS, the Procuring Entity may proceed to take such remedial action as may be necessary, at the Supplier’s risk and expense and without prejudice to any other rights which the Procuring Entity may have against the Supplier under the Contract. 16.1 The method and conditions of payment to be made to the Supplier under this Contract shall be specified in CDS. 16.2 The Supplier’s request(s) for payment shall be made to the Procuring Entity in writing, accompanied by an invoice describing, as appropriate, the Goods delivered and Services performed, and by documents submitted pursuant to GCC Clause 12, and upon fulfilment of other obligations stipulated in the Contract. 16.3 After delivery and acceptance of the Goods, payments shall be made promptly by the Procuring Entity , within thirty (30) days after submission of a valid invoice or claim by the Supplier, or such other period as specified in the CDS. Page 60 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 17. Prices 18. Change Orders 61 16.4 If the Procuring Entity makes a late payment, the Supplier shall be paid interest on the late payment. Interest shall be calculated from the date by which the payment should have been made up to the date when the late payment is made at the rate as specified in the CDS. 16.5 The currency or currencies in which payment is made to the Supplier under this Contract shall be specified in CDS subject to the following general principle: payment will be made in the currency or currencies in which the payment has been requested in the Supplier’s Tender. 16.6 All payments shall be made in the currency or currencies specified in the CDS pursuant to GCC Clause 18.4 17.1 The contract price shall be as specified in the Contract Agreement subject to any additions and adjustments thereto or deductions therefrom, as may be made pursuant to the Contract. 17.2 Prices charged by the Supplier for Goods delivered and Services performed under the Contract shall not vary from the prices quoted by the Supplier in its Tender, with the exception of any price adjustments authorized in the CDS. 18.1 If the Procuring Entity at any time wishes to make changes within the general scope of the Contract to any one or more of the following, by a written order given to the Supplier pursuant to GCC Clause 21: a) Drawings, designs, or specifications, where Specialized Goods to be furnished under the Contract are to be specifically manufactured for the Procuring Entity ; b) The method of shipment or packing; c) The place of delivery; and/or d) the Services to be provided by the Supplier, he may request the Supplier to provide a quotation on the effect of the change on the time and the cost of the contract. 18.2 Any quotation for additional cost or time by the Supplier for adjustment under this clause must be presented within thirty (30) days from the date of the Supplier’s receipt of the Procuring Entity ’s request for change order. 18.3 Prices to be charged by the supplier for any related services that might be needed but which were not included in the Contract shall be agreed upon in advance by the Parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services. 18.4 If the Procuring Entity accepts the Supplier’s quotation he will issue a formal Change Order in writing. The Supplier will not be eligible to claim reimbursement for any change to the contract unless he is in receipt of such formal written instruction. Page 61 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 62 18.5 All variations must collectively not exceed 10% of the original contract quantity for goods and/or incidental services. Any price variation must be based on the consumer price index or the Central Bank of Kenya inflation rate. 19. Contract Amendments 19.1 Subject to GCC Clause 20, no variation in or modification of the terms of the Contract shall be made except by written amendment signed by the parties. 20. Assignment 20.1 Neither the Procuring Entity nor the Supplier shall assign, in whole or in part, obligations under this Contract, except with the prior written consent of the other party. 21.1 The Supplier shall notify the Procuring Entity in writing of all subcontracts awarded under this contract if not already specified in the Tender. Such notification, in the original Tender or later, shall not relieve the Supplier from any liability or obligation under the contract. 21.2 Subcontracts must comply with the provision of GCC Clause 5. 22.1 Delivery of the Goods and performance of Services shall be made by the Supplier in accordance with the time schedule prescribed by the Procuring Entity in the Schedule of Requirements. 22.2 If at any time during performance of the Contract, the Supplier or its subcontractor(s) should encounter conditions impeding timely delivery of the Goods and performance of Services, the Supplier shall promptly notify the Procuring Entity in writing of the fact of the delay, its likely duration and its cause(s). As soon as practicable after receipt of the Supplier’s notice, the Procuring Entity shall evaluate the situation and may at its discretion extend the Supplier’s time for performance, with or without liquidated damages, in which case the extension shall be ratified by the parties by amendment of Contract. 22.3 Except as provided under GCC Clause 27, a delay by the Supplier in the performance of its delivery obligations shall render the Supplier liable to the imposition of liquidated damages pursuant to GCC Clause 25, unless an extension of time is agreed upon pursuant to GCC Clause 24.2 without the application of liquidated damages. 23. Liquidated Damages 23.1 Subject to GCC Clause 27, if the Supplier fails to deliver any or all of the Goods or to perform the Services within the period(s) specified in the Contract, the Procuring Entity shall, without prejudice to its other remedies under the Contract, deduct from the Contract Price, as liquidated damages, a sum equivalent to the percentage specified in CDS of the delivered price of the delayed Goods or unperformed Services for each week or part thereof of delay until actual delivery or performance, up to a maximum deduction of the percentage specified in CDS. Once the maximum is reached, the Procuring Entity may consider termination of the Contract pursuant to GCC Clause 26. 24. Termination for Default 24.1 The Procuring Entity or the Supplier, without prejudice to any other remedy for breach of Contract, by written notice of default sent to the concerned party may terminate the Contract if the other party causes a fundamental breach of the Contract. 21. Subcontracts 22. Delays in the Supplier’s Performance Page 62 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 24.2 63 Fundamental breaches of Contract shall include, but shall not be limited to the following: a) The Supplier fails to deliver any or all of the Goods within the period(s) specified in the Contract, or within any extension thereof granted by the Procuring Entity pursuant to GCC Clause 24; or b) The Supplier fails to perform any other obligation(s) under the Contract; c) The supplier has abandoned or repudiated the contract. d) The Procuring Entity or the Supplier is made bankrupt or goes into liquidation other than for a reconstruction or amalgamation; e) A payment is not paid by the Procuring Entity to the Supplier within 0 days of the due date for payment; f) The Procuring Entity gives Notice that goods delivered with a defect is a fundamental breach of Contract and the Supplier fails to correct it within a reasonable period of time determined by the Procuring Entity ; and g) The supplier, in the judgment of the Procuring Entity, has engaged in corrupt or fraudulent practices in competing for or in executing the Contract. 24.3 In the event the Procuring Entity terminates the Contract in whole or in part, pursuant to GCC Clause 26.1, the Procuring Entity may procure, upon such terms and in such manner as it deems appropriate, Goods or Services similar to those undelivered, and the Supplier shall be liable to the Procuring Entity for any excess costs for such similar Goods or Services. However, the Supplier shall continue performance of the Contract to the extent not terminated. 24.4 If the Procuring Entity terminates the Contract pursuant to GCC Clause 26.2 (g) above the amount of Liquidated Damages specified in the Contract Data Sheet shall immediately become due from the Supplier to the Procuring Entity . 25. Termination for Insolvency 25.1 The Procuring Entity may at any time terminate the Contract by giving written notice to the Supplier if the Supplier becomes bankrupt or otherwise insolvent. In this event, termination will be without compensation to the Supplier, provided that such termination will not prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to the Procuring Entity . 26. Force Majeure 26.1 Notwithstanding the provisions of GCC Clauses 24, 25, and 26, the Supplier shall not be liable for forfeiture of its performance security, liquidated damages, or termination for default if and to the extent that its delay in performance or other failure to perform its obligations under the Contract is the result of an event of Force Majeure. Page 63 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT 64 26.2 If a Force Majeure situation arises, the Supplier shall promptly notify the Procuring Entity in writing of such condition and the cause thereof. Unless otherwise directed by the Procuring Entity in writing, the Supplier shall continue to perform its obligations under the Contract as far as is reasonably practical, and shall seek all reasonable alternative means for performance not prevented by the Force Majeure event. 27.1 If any dispute or difference of any kind whatsoever shall arise between the Procuring Entity and the Supplier in connection with or arising out of the Contract, the parties shall make every effort to resolve amicably such dispute or difference by mutual consultation. 27.2 If after thirty days, the parties have failed to resolve their dispute or difference by such mutual consultation, then either the Procuring Entity or the Supplier may give notice for adjudication. 27.3 If either party believes that a decision taken by the other was wrongly taken, the decision shall be referred to the Adjudicator within 14 days of the notification of the decision. 28.1 The Adjudicator stated in the CDS shall give a decision in writing within 28 days of receipt of a notification of a dispute. 28.2 The Adjudicator shall be paid by the hour at the rate specified in the CDS, together with reimbursable expenses of the types specified in the CDS, and the cost shall be divided equally between the Procuring Entity and the Supplier, whatever decision is reached by the Adjudicator. Either party may refer a decision of the Adjudicator to an Arbitrator within 28 days of the Adjudicator’s written decision. If neither party refers the dispute to arbitration within the above 28 days, the Adjudicator’s decision will be final and binding. 28.3 The arbitration shall be conducted in accordance with the arbitration procedure published by the institution named and in the place shown in the CDS. 29. Replacement of Adjudicator 29.1 Should the Adjudicator resign or become incapacitated, or should the Procuring Entity and the Supplier agree that the Adjudicator is not functioning in accordance with the provisions of the Contract a new Adjudicator will be jointly appointed by the Procuring Entity and the Supplier. In case of disagreement between the Procuring Entity and the Supplier, within 30 days, the Adjudicator shall be designated by the Appointing Authority designated in the CDS at the request of either party, within 14 days of receipt of such request. 30. Limitation of Liability 30.1 Except in cases of criminal negligence or wilful conduct, and in the case of infringement pursuant to GCC Clause 8, 27. Disputes 28. Procedure for Disputes a) The supplier shall not be liable to the Procuring Entity , whether in contract, tort, or otherwise, for any indirect or consequential loss or damage, loss of use, loss of production, or loss of profits or interest costs, provided that this exclusion shall not apply to any obligation of the Supplier to pay liquidated damages to the Procuring Entity ; and Page 64 of 183 SECTION IV: GENERAL CONDITIONS OF CONTRACT b) 31. Notices 32. Taxes and Duties 65 The aggregate liability of the Supplier to the Procuring Entity , whether under the Contract, in tort or otherwise, shall not exceed the total Contract Price, provided that this limitation shall not apply to the cost of repairing or replacing defective equipment or to any obligation of the Supplier to indemnify the Procuring Entity with respect to patent infringement.. 31.1 Any notice given by one party to the other pursuant to this Contract shall be sent to the other party in writing or by facsimile or e-mail and confirmed in writing or by facsimile or e-mail to the other party’s address specified in CDS. The term “in writing” means communicated in written form with proof of receipt. 31.2 A notice shall be effective when delivered or on the notice’s effective date, whichever is later. 32.1 The Supplier shall be entirely responsible for all taxes, stamp duties, license fees, and other such levies imposed inside and outside the Republic of Kenya. 32.2 If any tax exemptions, reductions, allowances or privileges may be available to the Supplier in the Republic of Kenya, the Procuring Entity shall use its best efforts to enable the Supplier to benefit from any such tax savings to the maximum allowable extent. Page 65 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) SECTION V CONTRACT CONDITIONS OF CONTRACT) DATA SHEET 66 (SPECIFIC Page 66 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 67 Contract Data Sheet The following Contract Data shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the General Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses. CDS Clause Number GCC Clause Number Amendments of, and Supplements to, Clauses in the General Conditions of Contract Definitions (GCC Clause 1) 1. 1.1 The Procuring Entity is: KENYA PORTS AUTHORITY P.O. BOX 95246 -80104 MOMBASA 2. 1.1(j) The Supplier is: [Name and address 3. 1.1(k) The Project is: Supply of 1No. Tug Boat Governing Language (GCC Clause 3) 4. 3.1 The Governing Language if not English shall be: ENGLISH The language in which this Contract shall be construed and interpreted shall be English. All correspondence and communications pertaining to the Contract shall be conducted in English. The Contract shall be deemed to be a Kenyan Contract and shall accordingly be governed by and construed according to the Laws for the time being in force in Kenya and the Kenyan Courts shall have exclusive jurisdiction to hear and determine all actions and proceedings arising out of the Contract and the Tenderer hereby submits to the jurisdiction of the Kenyan Courts for the purpose of any such actions and proceedings. Applicable Law (GCC Clause 4) 5. 4.1 The Applicable Law shall be: Laws of the Republic of Kenya Country of Origin (GCC Clause 5) Country of Origin is ………………………. 6. 5.1 7. Use of contract document and information Unless otherwise stated in the Letter of Acceptance the following 7 documents, listed in order of precedence will form part of the Contract: The Agreement The letter of offer The Letter of Acceptance The Tender Submission Conditions of Contract Technical Specifications Schedules of Prices, Page 67 of 183 5.1 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 68 Names and Addresses of Sureties, Interim Payments, Deviations from Specification Performance guarantee In the case of conflict between documents the terms in the document with higher precedence shall prevail. The Contract Documents (excluding the drawings) shall be prepared by the Procuring Entity and the Tenderer will be supplied with a copy thereof free of charge. The Tenderer will then enter into an Agreement with the Procuring Entity by completing with the Procuring Entity the form annexed to the Contract Documents Performance Security (GCC Clause 9) 8. 9.1 The amount of performance security, as a percentage of the Contract Price, shall be: [ten (10) percent of the Contract Price] in the format of an unconditional guarantee in the format provided It is a requirement of this Contract that Banks issuing any form of Surety required under this Contract shall have operations in Kenya and shall be subject to the approval of the Kenya Ports Authority. Foreign Bank shall advice their guarantees through local banks approved by KPA 8. 9.4 After delivery and acceptance of the Goods, the performance security shall be discharged in [not later than 30 days following the date of completion] Inspections and Tests (GCC Clause 10) 9. 10.1 Inspection and tests prior to shipment of Goods and at final acceptance are as follows: Quality and quantity inspection, if applicable, shall be carried out prior to shipment of Goods by the manufacturer(s) at the supplier’s own expense and responsibility in terms of the items specified in the specifications. The supplier shall submit the inspection certificate issued by himself/herself which should be attached with the certificate(s) of the manufacturer(s) to the Procuring Entity in order to ensure that the goods are manufactured in compliance with the contract. The purchaser reserves the right to make pre-shipment inspection of the Tug Boat. There shall be at least three mile stone visits to the Shipyard during the construction by two representatives from the Authority to ensure the specifications are complied with. This does not preclude the contracted shipyard’s classification society surveyor’s services. The Tenderer shall at his own expense carry out all tests described in the Contract Documents, or which in the opinion of the Procuring Entity, or the Procuring Entity’s Representative, may be necessary in respect of the Tug Boat, prime movers (ME), or the materials and work supplied or performed. Before the Tug Boat is handed over to the Procuring Entity the Tenderer shall make good any defects which may have developed before, during or after testing at Site. Page 68 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 69 All testing of whatever description shall be conducted at the expense and risk of the Tenderer. The Tenderer, except where indicated otherwise in this contract, shall provide all necessary personnel, utilities, fuels and equipment at his own expense for carrying out all the tests required by the Contract Documents or the Procuring Entity until the Tug Boat is accepted by the Procuring Entity. All costs incurred in complying with this Clause shall be included in the Contract Price.” 10 10 The Performance and Endurance testing procedures to be undertaken are as set out in the specification In respect of the specified reliability and endurance testing on Site, the Procuring Entity shall make available free of charge such supplies of water and power. However the Tenderer will be expected to provide all other necessary equipment and labour to successfully complete the tests specified. The Tug Boat and its accompanying ancillary equipment will be issued with a Taking Over Certificate. The testing and commissioning shall be completed before the issue of the Taking Over Certificate is issued in respect of the Tug Boat its accompanying ancillary equipment. In respect of failure to pass the Performance Tests, no reduction in the specified performance criteria will be accepted Packing (GCC Clause 11) 10. 11.2 The Goods shall be packed properly in accordance with standard import packing specified by the Procuring Entity in the Technical Specification. Delivery and Documents (GCC Clause 12) 11. 12.1 The Tenderer shall be deemed to have examined the Site and its surroundings and considered the need to ensure that the work will not interfere with the port operations, except in respect of areas specifically allocated to him nor with the work of other Tenderers or workmen employed by the Procuring Entity on the Site. The Tenderer is deemed to have satisfied himself as to the nature of the existing works and buildings in the vicinity of the Site, the nature of the existing roads and waterways or other means of communication, the access to and egress from the Site, the available accommodation as regards land for temporary purposes (within or without the Site) and buildings that may be required for temporary purposes, and to have made his own enquiries as to work yard sites and such other additional areas that he may require for temporary occupation all for executing and completing the work in accordance with the Contract Documents. The Tenderer shall be deemed to have obtained all necessary information as to the conditions of working at Mombasa Port and elsewhere and to have obtained all necessary information on all matters and things that may in any way influence them in making their Tender and completing Page 69 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 70 the Schedules and to have satisfied themselves as to the risks, obligations and responsibilities to be undertaken in entering into the Contract. The Tenderer is deemed to have inquired into and satisfied himself as to the sources of supply, the sufficiency of and the means of obtaining and transporting all plant, materials, labour, fuel, water, electricity and other things required for or in connection with the work and to have considered all matters as possible contingencies affecting the execution and completion of the work. Notwithstanding certain information as indicated on the drawings and documents issued or made available to the Tenderer for guidance, the Tenderer is deemed to have made local and independent examination and inquiries as to the physical conditions prevailing at the Site and obtained his own information on all matters and things that in any way influence him when completing the Schedules. The Procuring Entity shall assist the Tenderer in obtaining all import permits or licenses required for any part of the Plant or the Works into Kenya, but the Tenderer shall remain responsible for ensuring that all necessary permits and licenses are in place in sufficient time to meet their program for the Works. Any other expenses incurred by the Tenderer other than with respect to clearance of the equipment shall be borne by the Tenderer. The Tenderer shall make his own arrangements entirely in respect of hiring lifting gear and other Tenderer’s Equipment he requires to manufacture, ship, install, test and commission the Works. None of the Procuring Entity’s heavy lift or other equipment operating on the Site will be available to the Tenderer. Supplies of water and electricity will be provided by the Procuring Entity to the Tenderer upon request by the Tenderer, but at the Tenderer’s cost. The Tenderer shall therefore be deemed to have allowed within his Contract Price for the provision of all Site utilities necessary to successfully install and test the Works. In respect of the specified reliability and endurance testing on Site, the Procuring Entity shall make available free of charge such supplies of water and power from the sources stated herein. However the Tenderer will be expected to provide all other necessary equipment and labour to successfully complete the tests specified. The Tenderer shall assume full responsibility for the design, manufacture, construction and testing of the structure, machinery, electrical installation and all other equipment of the Tug Boat to meet in a fully satisfactory manner the requirements for quality, performance, strength and stability as described in the Specification. The Tenderer shall carry out all design and drawing work necessary for the construction and completion of the Tug Boat in all respects and all costs connected with design and drawing work shall be included in the Contract Price. No examination by the Procuring Entity of any document submitted by the Tenderer nor approval expressed by the Procuring Entity or Authorized Representative in regard thereto, either with or Page 70 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 71 without modification, shall absolve the Tenderer from any liability imposed upon him by any provision of the Contract Documents. The program to be submitted shall be in the form of PERT or Linked Bar Charts indicating resources and interrelation of operations in sufficient detail to enable the Procuring Entity to monitor the progress of the release and approval of drawings, calculations, manufacture, erection for shipment, delivery, installation, testing and commissioning The Tenderer shall observe at all times the Procuring Entity’s rules on security at the Site and access into the Port Area. The Tenderer shall submit to the Procuring Entity for his approval two copies of all Tenderer’s Drawings as the Procuring Entity may require, together with any requested Supporting calculations. Any modifications thereto as the Procuring Entity may consider desirable shall be made and executed accordingly without entailing extra payment on account thereof. Two copies of all modified Tenderer’s drawings shall be re-Submitted for approval. One copy of each approved Tenderer’s Drawing shall be signed by the Procuring Entity and returned to the Tenderer where upon the Tenderer shall forward four copies of the approved Tenderer’s Drawing to the Procuring Entity for Distribution. The drawings shall all be referenced with a unique Drawing Numbering System including as appropriate sequentially numbered and dated revision marks. Inspection will not be undertaken by the Procuring Entity or its Authorized Representative unless the Tenderer has submitted to the Procuring Entity the copies of the approved Tenderer’s Drawings and shall have allowed fourteen day’s notice for copies of approved Tenderer’s Drawings, to have been transmitted to the Authorized Representative by the Procuring Entity. The Tenderer shall indicate on the program the dates for submission to the Procuring Entity of the Tenderer’s Drawings. The Procuring Entity shall signify his approval or disapproval thereof. If he fails to do so within 14 days of receipt, they shall be deemed to be approved. Approved Tenderer’s Drawings shall be signed or otherwise identified by the Procuring Entity. The Tenderer shall submit the following for the Procuring Entity’s approval: • All working and fabrication drawings • Design calculations fully referenced to the Tenderer’s Drawings (please note that any computer output presented within the calculations must be fully annotated and referenced so that it is integral with the calculation set.) • orders for materials and components • samples and patterns • such other information as may be required by the Procuring Entity to approve the Tenderer’s proposals. The Defects Liability Period for the Tug Boat shall be a period of twenty Page 71 of 183 SECTION V 11. 12.1 - CONTRACT DATA SHEET (Specific Conditions of Contract) 72 four (24) months starting from the issue of the Taking Over Certificate for Tug Boat commissioned. At the end of this period, the Procuring Entity shall issue a Defects Liability Certificate, provided that all outstanding Defects identified during the Defects Liability Period have been satisfactorily remedied by the Tenderer. This will include removal of items found to be unreliable during the Defects Liability Period (i.e. significantly more replacements/ maintenance than the spares schedule indicates) and their replacement with more robust items. The Tug Boat shall be on full warranty from the date of its Taking Over until the issue of its Defects Liability Certificate. For Goods supplied from abroad: Upon shipment, the Supplier shall notify the Procuring Entity and the Insurance Company by facsimile or e-mail the full details of the shipment, including Contract number, description of Goods, quantity, the vessel, the bill of lading number and date, port of loading, date of shipment, port of discharge, etc. The Supplier shall mail the following documents to the Procuring Entity, with a copy to the Insurance Company: (i.) One original plus four copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount; (ii.) Original and four copies of the negotiable, clean, onboard bill of lading/airway bill/road consignment note marked “freight prepaid” and four copies of nonnegotiable bill of lading or equivalent; (iii.) One original plus four copies of the packing list identifying contents of each package; (iv.) Insurance certificate for comprehensive ; (v.) Manufacturer’s or Supplier’s warranty certificate; (vi.) Inspection certificate, issued by the nominated inspection agency, and the Supplier’s factory inspection report; and (vii.) Certificate of country of origin issued by the chamber of commerce and industry or equivalent authority in the country of origin in duplicate. The above documents shall be received by the Procuring Entity at least one week before arrival of the Goods at the port or place of arrival and, if not received, the Supplier will be responsible for any consequent expenses. 12. 12.3 For Goods from within Kenya: Upon delivery of the Goods to the transporter, the Supplier shall notify the Procuring Entity and mail the following documents to the Procuring Entity: (i.) One original plus four copies of the Supplier’s invoice Page 72 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 73 showing Goods’ description, quantity, unit price, and total amount; (ii.) Delivery note, railway receipt, or truck receipt; (iii.) Manufacturer’s or Supplier’s warranty certificate; (iv.) Inspection certificate issued by the nominated inspection agency, and the Supplier’s factory inspection report; and (v.) Certificate of country of origin issued by the Kenyan Chamber of Commerce, Industry and Agriculture or equivalent authority in the country of origin in duplicate. The above documents shall be received by the Procuring Entity before arrival of the Goods and, if not received, the Supplier will be responsible for any consequent expenses. Incidental Services (GCC Clause 13) 13. 13.1 Incidental services to be provided are: [Selected services covered under GCC Clause 15 and/or other should be specified with the desired features. The price quoted in the Tender price or agreed with the selected Supplier shall be included in the Contract Price.] 14. Spare Parts (GCC Clause 14) Minimum period for supply of spare parts is: ................. 14.1 Warranty (GCC Clause 15) 15. 15.2 GCC 15.2—In partial modification of the provisions, the warranty period shall be _____ hours of operation or _____ months from date of acceptance of the Goods or (_____) months from the date of shipment, whichever occurs earlier. The Supplier shall, in addition, comply with the performance and/or consumption guarantees specified under the Contract. If, for reasons attributable to the Supplier, these guarantees are not attained in whole or in part, the Supplier shall, at its discretion, either: (a) 16. 15.4 & 15.5 Make such changes, modifications, and/or additions to the Goods or any part thereof as may be necessary in order to attain the contractual guarantees specified in the Contract at its own cost and expense and to carry out further performance tests in accordance with CDS 9, The period for correction of defects in the warranty period is: 1 month Payment (GCC Clause 16) 17. 16.1 The procurement entity shall pay for manufacture, delivery and commissioning of the Tug Boat by way of advance of 20% of contract sum Page 73 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 74 backed by an advance payment guarantee and a revolving letter of credit which shall revolve on amounts not exceeding 20% of contract sum for every payment. Payment shall be made on meeting the following conditions/ milestones: 1) On Signing of Contract - 20% of the contract price against an approved advance payment Bank guarantee 2) The balance 80% via irrevocable letter of credit payable as follows: a. Upon delivery of all the main steel plates to the shipyard, Issuance of Purchase Orders of major components certified by Procuring - 20% of contract price b. Upon commencement of ship building activities (availability at the shipyard of the main structures and main mechanical parts certified by Procuring Entity Representatives) - 20% of contract price c. Evidence of shipping receipt of Test Certificates Factory Acceptance Tests, approved by the Procuring Entity Representative. Clean Bill of Lading shall be provided by the Tenderer, evidencing the shipment - 20% of contract price d. Upon issue of Taking Over Certificate by the Procuring Entity upon satisfactory commissioning at the Procuring Entity’s site - 10% of contract price e. Upon issue of Final Acceptance Certificate by the Procuring Entity upon carrying out of the Endurance Test during commissioning at the Procuring Entity’s site - 5% of contract price. f. Retention money on expiry of warranty period - 5% of contract price (The release of the 5% retention money can be replaced with a warranty bond covering the warranty period, issued by a reputable bank with operations in Kenya and approved by the Procuring Entity) 16.2 Applications for payment may be made to the Procuring Entity for interim payments when the project milestones set out are attained and for the amounts stipulated in the Schedule Each Certified payment shall be paid in United States Dollars only. 18. 16.3 Period for payment following a valid invoice: 30 days. Rate to be used for paying the Supplier’s interest on the late payment made by Procuring Entity shall be the Central Bank of Kenya rate. Prices (GCC Clause 17) 19. 17.1 No price adjustment this is a fixed price contract Liquidated Damages (GCC Clause 23) Page 74 of 183 SECTION V 20. 21 23.1 24.4 27 - CONTRACT DATA SHEET (Specific Conditions of Contract) 75 Applicable rate: 0.1 per cent per day of undelivered materials/good’s value. Maximum percentage of Contract Value for payments or deductions shall not exceed 10% (is equal to the performance security). For delay in completion the Percentage of Contract Value to be paid or deducted for each week of delay is 1% Maximum loss recoverable by the Procuring Entity is 25% In the event of corrupt or fraudulent practice or any breach of the Integrity Declaration the Supplier shall be liable to pay to the Procuring Entity [insert number per cent [default 100%] of the Contract Price. The place of arbitration shall be Kenya and shall be conducted in accordance with Kenyan Law. Resolution of disputes shall be through arbitration. Appointment of an Arbitrator shall be in accordance with the provisions of the Arbitration Act Cap 49 of the Laws of Kenya Procedure for Disputes (GCC Clause 28) 22. 28.1 The Adjudicator shall be [insert: Chairman Institute of Arbitrators of Kenya] 23. 28.2 Rate of the Adjudicator fees shall be [RULING RATE] 24. 28.3 Arbitration institution shall be [Institute of Arbitrators of Kenya] Place for carrying out Arbitration [NAIROBI Kenya ] 25. 29.1 Appointing Authority for the Adjudicator [Chairman Institute of Arbitrators of Kenya] Notices (GCC Clause 31) 26. 31.1 Procuring Entity’s address for notice purposes: The Procurement and Supplies Manager Kenya Ports Authority P0 Box 95246 Code 80104 Mombasa, Kenya Tel.: +254 (0) 41 2112999/3600 Fax: +254 (0) 41 2226721 Email:ctcsecretary@kpa.co.ke Supplier’s address for notice purposes: Additional Clauses Bribery Any commission, advantage, gift, gratuity, reward or bribe given, promised or offered by or on behalf of the Tenderer or his agent or servant or any other person on his or their behalf to any officer, servant, representative or agent of the Procuring Entity or of the Procuring Entity or of the Procuring Entity’s Representative or to any person on their behalf or on behalf of any of them in relation to the obtaining or to the execution of this or of any other Contract with the Procuring Entity shall be in addition to any criminal liability which may be thereby incurred subject the Tenderer to the cancellation of this and all other Page 75 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 76 Contracts which he may have entered into with the Procuring Entity and also to the payment to the Procuring Entity of any loss or damage resulting- from such cancellation. The Procuring Entity shall be entitled upon a certificate in writing of the Procuring Entity to deduct the amounts so certified from any monies otherwise due to the Tenderer under this or any other contract or to recover the said amounts as a debt due or partly the one and partly the other as the Procuring Entity shall deem advisable. Personal Liability Units Dimensions of Photographs Work of Copies of Orders Contract Documents Supersede Previous Documents Labour Neither any member or officer, official or employee of the Government or the Procuring Entity nor the Procuring Entity, shall be in any way personally bound or liable for the acts or obligations of the Government or the Procuring Entity under the Contract, or answerable for any default or omission in the observance or performance of any of the acts, matters or things which are herein contained. All dimensions and measurements shall be in Metric Units unless otherwise approved by the Procuring Entity. Progress photographs showing the progress of the Works during manufacture and erection and special photographs showing particular features of the Work, plant or other matters of interest shall be taken at a rate of one set per month. A complete set of photographs of the finished Tug Boat shall be taken. The photographs shall be in colour and not less than A4 size and three prints of every such photograph inscribed with its serial number, date when taken and a short title shall be furnished to the Procuring Entity. All negatives shall be numbered and shall become the property of the Procuring Entity when on completion of the Contract they shall be handed over by the Tenderer. All costs of such photographs shall be included in the Contract Price. The Tenderer shall forward to the Procuring Entity, copies of all orders placed by the Tenderer for supply of materials, articles and items of fabricated or finished work. Sub-Tenderers also shall forward to the Procuring Entity through the Tenderer four copies of all sub orders placed by them in connection with the Contract. All these shall be forwarded without delay. The Contract Documents supersede all documents memoranda, drawings, etc. that may have been issued by the Procuring Entity or the Procuring Entity in all connection with the proposed Work previous to the date hereof. In respect of the Works to be conducted by the Tenderer on Site, or elsewhere in Kenya, he will be expected to observe the procedures set out in the remainder of this Clause. Expatriate and So far as is practicable for his operations on Site the Tenderer shall employ only Kenyan Personnel Kenyan citizens. Only when specially qualified employees are not available in and Labour the Republic of Kenya may the Tenderer employ persons not normally resident in Kenya. The entry and employment of such persons shall be governed by the relevant legislation of the Republic of Kenya. Work and The Tenderer shall comply with the laws and regulations of the Republic of Residence permits Page 76 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 77 Kenya governing work permits and residence requirements. Recruitment Repatriation Accommodation for Employees Sanitation Accident Prevention First Aid Facilities The Tenderer shall not recruit nor attempt to recruit persons in the service of the Procuring Entity or the Procuring Entity. The Tenderer shall be responsible for the return to the place where they were recruited or to their domicile of all persons recruited by him for the purposes of the Contract, including their dependents, and for their maintenance until such return. If the Tenderer shall fail to observe this condition the Procuring Entity may maintain and return the said persons and recover the cost thereof from the Tenderer. The Tenderer shall be deemed to have included in his Tender for all necessary accommodation, transport allowances and services for his employees. All accommodation for personnel operating on Site provided by the Tenderer for his work-people shall conform to local practice and/or the requirements of a Medical Officer of Health appointed by the Procuring Entity Such accommodation shall be maintained in all respects in accordance with the requirements of that officer and of the Procuring Entity. The Tenderer shall comply with the requirements of the appropriate sanitary authorities and shall provide and maintain efficient and sanitary latrine accommodation wherever required on the site. The Tenderer shall at all times take adequate precautions for the safety of employees in the performance of this Contract and shall comply with the Procuring Entity’s instructions and all applicable provisions of the laws and regulations of the Republic of Kenya The Tenderer shall provide and maintain on the Site adequate and easily accessible first aid facilities for treatment of all personnel and work-people in case of accidents during the execution of the Works under the Contract and such equipment as may be required in any relevant Laws and regulations for the time being in force. The places where these items are kept shall be prominently marked. A sufficient number of the Tenderer’s employees shall be fully qualified in first aid so that a person so qualified is immediately available in case of accident at any time and at any place and the persons so designated shall be made known to all employees by the posting of their names and designation in a prominent position on the Site. Any order from the Procuring Entity as to extensions of or alterations to such first aid facilities or services shall be promptly carried out. The Tenderer shall provide, maintain and at all times carry a suitable first aid kit in each of his supervisory transport vehicles. Fire Prevention The Tenderer shall take all necessary precautions to prevent any damage due to and Fire Fighting fire. The precautions shall include but not be limited to the installation and maintenance of fire extinguishers in key positions in or near the buildings. Such arrangements shall be subject to the approval of the appropriate fire service officer. Compensation for The Tenderer shall in accordance with the laws and regulations in force from Injury time to time in the Republic of Kenya pay compensation for loss or damage suffered in consequence of any accident or injury to any workman or other Page 77 of 183 SECTION V - CONTRACT DATA SHEET (Specific Conditions of Contract) 78 person in the employment of the Tenderer of any Sub-Tenderer. Office Accommodation for Engineer’s and Procuring Entity’s Staff Offices, Yards, Stores etc. of Tenderer The Tenderer shall provide office accommodation and services for use by the Procuring Entity’s and Procuring Entity’s staff on Site as specified. The Tenderer shall make his own arrangements subject to the approval of the appropriate authority for all local accommodation which he may require for offices yards stores labour camps etc. all buildings and all services in connection therewith which are required for the efficient execution of the Works. The Tenderer shall pay proper regard to the prevention of obstruction and the avoidance of nuisance to the public and to residents. Rates of Wages (a). The Tenderer shall pay wages (including allowances) and shall observe and Labour hours of work and other conditions of employment not less favourable to his Conditions employees than those established by collective agreement or arbitration award in the trade or industry concerned. Such collective agreement or arbitration award may be nationwide or failing such it may apply only to the district where the Works is carried out. (b). Any difference or dispute arising as to what wages ought to be paid or what hours or other conditions of employment ought to be observed in accordance with the requirements of paragraph (a) of this Sub-Clause shall be dealt with in accordance with procedures in force in the Republic of Kenya for the settlement of labour disputes, including recourse to the Labour Disputes Court. (c). The Tenderer shall furnish the Procuring Entity with a copy of the existing collective agreement or arbitration award applicable to his employees as provided in paragraph (a) of this Sub-Clause. (d). The Tenderer shall keep proper wages books and time sheets showing the wages paid and the time worked by the employees in and about the execution of the Contract, and he shall be bound, whenever required, to produce such wages books and time sheets for the inspection of any person authorized by the Procuring Entity or the Ministry of Labour and Social Insurance. (e). No portion of the Works shall be done at the homes of the employees except in so far as work is so performed by practice or custom. (f). The Tenderer and his Sub-Tenderers shall recognize the freedom of their workpeople to be members of registered Trade Unions. (g). The Tenderer shall also from time to time furnish to the Procuring Entity or to the Ministry of Labour and Social Insurance such further detailed information and evidence as the Procuring Entity or Ministry may deem necessary in order to satisfy them that the conditions of this Clause have been complied with. (h). In the event of default being made in the payment of the wages of any employees employed on the Contract and if a claim therefore is notified to the Procuring Entity the latter may (but shall not be under any obligation) upon proof of such claim, arrange for the payment of the wages due out of the monies at any time payable to the Tenderer under the Contract and the amount so paid shall be deemed to be payment by the Tenderer. Page 78 of 183 SECTION V Notices Posted to be - CONTRACT DATA SHEET (Specific Conditions of Contract) 79 Notices shall be posted in conspicuous places at the establishments and work places concerned to inform the workers of the conditions of work provided by the Tenderer. Regulations and The Tenderer shall obey all police, health and municipal regulations and all other Site Discipline regulations which may from time to time require his observance and he shall instruct his agents, servants and other employees to obey such regulations; the Tenderer shall be responsible for keeping discipline of the Site. Register of Employees The Tenderer shall keep on the Site a detailed register in the form required by the Procuring Entity of all persons employed upon the Works, including SubTenderers and their employees, containing the names, usual and temporary address, trade and rate of pay of each such person. The register shall be available for inspection by the Procuring Entity whenever required. Supply of Water Alcoholic or Drugs The Tenderer shall, so far as is reasonably practicable, having regard to local conditions, provide on the Site, to the satisfaction of the Procuring Entity’s Representative, an adequate supply of drinking and other water for the use of the Tenderer’s staff and work-people. Liquor The Tenderer shall not, otherwise than in accordance with the Statutes, Ordinances and Government Regulations or Orders for the time being in force, import, sell, give, barter or otherwise dispose of any alcoholic liquor, or drugs, or permit or suffer any such importation, sale, gift, barter or disposal by his Subcontractors, agents, or employees. Arms Ammunition and The Tenderer shall not give, barter or otherwise dispose of to any person or persons, any arms or ammunition of any kind or permit or suffer the same as aforesaid. Festivals and The Tenderer shall in all dealings with labour in his employment have due Religious Customs regard to all recognized festivals, days of rest and religious or other customs. Epidemics Disorderly Conduct etc. Observance by Sub-Tenderers Taxation In the event of any outbreak of illness of an epidemic nature, the Tenderer shall comply with and carry out such regulations, orders and requirements as may be made by the Government, or the local medical or sanitary authorities for the purpose of dealing with and overcoming the same. The Tenderer shall at all times take all reasonable precautions to prevent any unlawful riotous or disorderly conduct by or amongst his employees and for the preservation of peace and protection of persons and property in the neighbourhood of the Works against the same and shall not interfere with members of any authorized Police Force who shall have free and undisputed access at all times to any part of the Works in the performance of their duties. The Tenderer shall be responsible for observance by his Sub-Contractors in Kenya of the provisions of this Clause. Except as may be provided otherwise the Tenderer and his staff shall be liable for payment of all taxes, fees, licenses, duties and the like in compliance with local or national laws or orders in Kenya from time to time in force and with amendments thereof that have been or may be enacted from time to time. Page 79 of 183 80 The Tenderer shall perform such duties in regard to the deduction of Income Tax as may be lawfully imposed by the Government of Kenya. In respect of liability for payment of VAT and corporate taxes which the Tenderer may be requested to pay by the Kenyan taxation authorities, in respect of the Plant or Tenderer’s Equipment being imported to site, the Procuring Entity shall seek a waiver on behalf of the Tenderer and if necessary shall pay such of these amounts, as cannot be waived. This waiver will not apply to any Tenderer’s Equipment, Temporary Works or materials purchased in Kenya, nor any liability by the Tenderer for taxation or VAT outside of the Republic of Kenya. Consents, etc. by The Tenderer shall obtain and fill in all notices and forms required by the Authorities Authorities and shall obtain all consents where necessary for the various works being executed and shall a all fees in connection therewith Declaration Against Waiver The condonation by the Procuring Entity of any breach or breaches by the Tenderer or an authorised Sub-Tenderer of any of the stipulations and conditions contained in the Contract shall in no way prejudice, or effect or be construed as a waiver of the Procuring Entity’s rights, powers and remedies under the Contract in respect of any other breach or breaches aforesaid The provisions in the General Conditions shall apply unless modified by Part II, Special Conditions Read and acknowledged (MANDATORY REQUIREMENT) Name:……………………………………………………………… Signed:……………………………………………………………. Duly authorized to sign for and on behalf of (bidder) …………………………………………………………………….. Dated this…………………day of …………………20……… Stamp/Seal Page 80 of 183 SECTION VI: SCHEDULE OF REQUIREMENTS 81 SECTION VI: SCHEDULE OF REQUIREMENTS (See B. Price Schedules for Goods and Related Services – Section VIII) Page 81 of 183 SECTION VII: TECHNICAL SPECIFICATIONS SECTION VII: TECHNICAL 82 SPECIFICATIONS Page 82 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 83 TECHNICAL SPECIFICATIONS & REQUIREMENTS OF THE NEW AZIMUTH STERN DRIVE (ASD) TUG BOAT 7.1 GENERAL 7.1.1 These specifications describe the basic requirements for equipment. Tenderers are requested to submit with their offers the detailed specifications, drawings, catalogues, etc for the products they intend to supply. 7.1.2 Tenderers must indicate on the specifications sheets whether the Equipment offered comply with each specific requirement. 7.1.3 All the dimensions and capacities of the Equipment to be supplied shall not be less than those required in these specifications. Deviations from the basic requirements, if any, shall be explained in detail in writing with the offer, with supporting data such as calculation sheets, etc. The Authority reserves the right to reject the products, if such deviations shall be found critical to the use and operation of the products. 7.1.4 Tenderers are requested to present information along with their offers as follows;(i) Shortest possible delivery period of each product (ii) Information on proper representative and/or workshop for back-up service / repair and maintenance including their names and addresses 7.1.5 The tenderers shall give comprehensive information on every requirement. Technical specifications listed herein are limited guidelines; every item offered MUST be accompanied with a comprehensive description of its dimensions, safety features, functionality, types and/or brand names. Stating “shall provide” shall NOT be considered sufficient without proper detailed description and supporting brochures. 7.1.6 Scheduled Milestone visit by two Owners Representatives for production progress review meeting shall be as follows; a. Kick off meeting at site of construction and laying down of the keel b. After full welding for review c. During/After installation of Major equipment and systems piping d. During Sea Trials, Inclining tests, Bollard test, Equipment tests runs etc 7.2 General description The Berthing Tug boat shall be a modern seagoing highly maneuverable twin Azimuth Stern Drive Tug for harbours and tropical coastal waters with capacity to undertake salvage works. It shall be environmentally and ergonomically designed friendly tug of modern design, built of high quality steel Lloyds Grade A. The Tug shall be optimally laid-out to enhance operations and maintenance. All installed components, shall be of high quality resulting in a “low maintenance” budget for tugboat. The tug boat shall be capable of towing and pushing operations, with on-board Pollution fighting, buoy handling and fire fighting equipment. The propulsion system shall consist of two IMO Tier II compliant WARTSILA Main engines which can be started both by Air starter motors and also electrically started; box cooled, with two steerable rudder propeller units, mounted in the aft ship. Page 83 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 84 7.2.1 Production and Delivery Delivery period to be 9 to 12 months. The vessel shall be delivered at the Port of Mombasa complete with equipment warrant/running spares, special tools, Lap top Computer installed with PM Module software-Preventive Maintenance program and the WARTSILA Diagnostic software/tools as specified in this document. 7.2.2 The Scope Of Works Shall Include: i. To prepare drawings and information including all plans required for Lloyd’s or equivalent Classification Society for Approvals. ii. To Build and Supply One (1No.) New Tug Boat for the Port of Mombasa. iii. To Deliver the New Tug Boat to the Port of Mombasa iv. To carry out Testing, commissioning and handing over the New Tug Boat together with back-up spares for regular maintenance to last one year; v. To supply one lot of the listed special tools and lot of listed spare parts which should include complete overhaul kit of Main Engines and propulsion thrusters. vi. To carry out Factory Acceptance & Test of the prime movers in the presence of two Owner Representatives, vii. To carry out Training of operators and maintenance staff viii. To provide structured specialized training for most of the important equipment and machinery installed onboard the Tug Boat before delivery most preferable with the manufacturers. ix. To provide all necessary manuals and documentation required to operate and maintain the Tug Boat, and replicating the documentation on CD – ROM disks. x. To Provide Computer based Maintenance Programme for the New Tug Boat. xi. To deliver together with the Tug boat, a Lap Top computer that can use KPA Wireless to transmit notifications to Shore based Maintenance office xii. To Provide Tug/ Equipment Warrant for the New Tug Boat xiii. To Provide ALL As Built Drawings as listed in Clause 7.6. 7.3 Functional Requirements 7.3.1 The Tug Boat shall be required to provide safe and reliable ship handling services. 7.3.2 The Tug Boat shall be required to perform ship control functions (steering and braking) in the “indirect” mode at higher approach speeds of at least 7 knots, and should be suitably equipped for this function. 7.3.3 The Tug Boat shall be equipped to perform limited coastal towing and salvage operations as required, and depending upon the aft towing gear fitted. Page 84 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 85 TECHNICAL SPECIFICATIONS & REQUIREMENTS OF THE NEW AZIMUTH STERN DRIVE (ASD) TUG BOAT 7.4 Main particulars 7.4.1 Vessel Features The Vessel should have the following features for operations in exposed waters: (a) To ensure large freeboard and a more raised forecastle deck compared to the current KPA fleet for relatively dry working deck. (b) To ensure large dynamic stability, deep skeg, bilge keels and relatively low wheelhouse position for low accelerations and increased comfort, safety and sea keeping performance. (c) To ensure optimized fendering system for safe operations in offshore conditions. (d) To ensure provision of towing winch with sufficient rendering/recovery capacities. (e) To ensure Vessel is equipped with a towing bitt, towing winch and towing hook and 5T SWL Effer or proven Equivalent lifting crane on the aft deck. 7.4.2 Principal dimensions Length overall Beam overall Depth at side Gross tonnage 32.0 – 33.0 m 12.0 – 13.0m 5.0 - 6.0 m approx. 500 ton 7.4.3 Tank capacities Fuel oil (incl. header tanks) Fresh water not less than Sewage not less than Clean lubrication oil Dirty lubrication oil Sludge Tank Hydraulic oil Tank Bilgewater tank Foam Tank Dispersant Tank : : : : : : : : : : 130.0 m3/109.0 ton (m) 30.0 m3/ 30.0 ton (m) 5.0 m3/ 5.0 ton (m) 7.5 m3/ 6.8 ton (m) 4.0 m3/ 3.6 ton (m) 2.0 m3/ 1.9 ton (m) 2.8 m3/ 2.5 ton (m) 6.0 m3/ 6.0 ton (m) 11.0 m3/ 12.6 ton (m) 5.0 m3/ 4.1 ton (m) 7.4.4 Compliment Crew 7.4.5 Performance (Minimum) Bollard Pull ahead Bollard Pull astern Free running speed, ahead Free Running speed astern : up to 10 persons : : : : 70 tons 65 tons 12.5 Knots 11.0 Knots Page 85 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 86 7.4.6 General Lay-out The Vessel shall feature a compact deckhouse on the main deck and a Wheel House on bridge deck, a spacious fore deck and a large aft deck. The main deck shall be flush with the raised forecastle. The deckhouse and below deck accommodation shall be designed to conform with the Maritime Labour Convention 2006 regulations to accommodate officers and crew for a total of 10 persons. a) b) c) d) e) f) g) h) The hull shall be divided into five watertight compartments and at the sides all fuel tanks shall be separated from the hull. At the bow and the stern corners heavy cylindrical rubber fendering should be provided All round hull sides a rubber D-fender should be fitted in way to minimize rubber tear and damage to the shell plate. Bulwark shall be fitted all round the main/forecastle deck. A double plate skeg shall be fitted to optimize course stability both ahead and astern. A towing bitt shall be located on the aft and fore deck. On the fore deck a rendering/recovery towing winch shall be fitted. Whilst at aft deck, a capstan, towing hook, towing winch and a 5 Ton Lifting Effer Crane or other acceptable equivalent shall be provided. 7.4.7 Classification The Vessel shall be constructed according to Classification Rules and classed by Lloyd Register or equivalent Classification Society which has a local office in Kenya. o Class-HULL · MACH Escort Tug Unrestricted Navigation AUT UMS IWS o Class-HULL · MACH Escort Tug Unrestricted Navigation AUT UMS IWS Fire Fighting 7.4.8 Mandatory Compliance to Regulations The Vessel shall comply with the applicable rules of Class and IMO: (a) International Load line Convention 1966. (b) International Regulation for Prevention of Collisions at Sea, 1972. (c) International Convention for measurement of tonnage of vessels, 1969. (d) The intact stability complies with IMO resolution A749.18 or A469. (e) IMO regulations A 468 (Noise levels) and ILO Recommendation 141 along with class noise level requirements as far as reasonable for this type of vessel. (f) IMO-ISPS code as applicable for the type and size of vessel and Automatic Identification System (AIS). (g) SOLAS 2005 o Chapter IV Radio communication o Chapter V Safety of navigation (h) MARPOL 1973/1978 o Consolidate Edition, with all amendments in force at the time of keel laying o Annex I : Regulations for the Prevention of pollution by oil. Page 86 of 183 SECTION VII: TECHNICAL SPECIFICATIONS o o o 87 Annex IV : Regulations for the Prevention of pollution by sewage from ships. Annex V : Regulations for the Prevention of pollution by garbage from ships. Garbage may be stored on board while at sea and discharges to shore Annex VI : Regulation for air pollution prevention and NOx technical code. (i) Maritime Labour Convention 2006 7.4.9 Language and Units a) b) c) All drawings, documents and equipment manuals MUST be in English language All Equipment and Machinery shall be provided with Nameplates and labels in English Only SI system of units shall be used for all instrumentation, notices and labels, machinery and fittings, identification and data 7.4.10 Trials and Tests; Upon completion and delivery of vessel, the Builders shall provide Owner with two (2) bound copies of a Tests and Trials Report containing an organized record of all tests and trials data. These Tests and Trials shall include; 7.4.11 Dock Trials Builders shall demonstrate the complete workability and correct functioning of the Vessel, its main engines and propulsion units, auxiliaries, generators, systems, Equipment, etc. and notify/issue trials schedule to the Owner. These dock tests shall be conducted in presence of representatives of Class and other Regulatory Authorities where applicable. 7.4.12 Inclining experiment Builders upon completion of the Vessel shall carry out an inclining test under supervision of the Builder, Class or Regulatory Authority and the Owner, to ascertain the light ship weight and the location of the Centre of gravity. The Owner shall be issued with the inclining experiment report showing calculation of metacentric height and other related characteristics as required. Builder shall prepare Stability Booklet with at least five loading conditions, including a light ship condition and maximum loading condition. This Stability Booklet shall be submitted for approval to the Regulatory Authorities and finally delivered together with the Vessel. 7.4.13 Sea trials A complete and detailed technical sea trial will take place before delivery in the presence of Owner. Speed and power runs should be carried out in relatively deep water and at the maximum power. Speed runs should be made at specified conditions. A report including the following trials should be issued to the Owner; Page 87 of 183 SECTION VII: TECHNICAL SPECIFICATIONS a) b) c) d) e) f) g) 88 Maneuvering trials Crash stop tests Main engines starting tests Anchor trials Test of deck and safety equipment Endurance test of propulsion installation Noise and vibration levels measurements are carried out during the sea trials. 7.4.14 Bollard pull test a) At the agreed time between Owner and Shipbuilder, a Bollard Pull trial test shall be conducted during which the bollard pull shall be measured with standard gauge properly calibrated and certified. b) Bollard pull test program should be performed in relatively deep and sheltered waters with sufficient free area at various engine revolutions per minute (r.p.m.), c) The Test should include both ahead and astern, at specified conditions as required by Class and a Bollard pull Certificate to be issued to Owner. 7.4.15 Manuals and documentation 7.4.15 (a) Documents handed over at delivery Upon completion of the Vessel, the Builder will deliver to the Owner three complete sets of the principal construction drawings, arrangement drawings, plans and documents in the English language both in soft and hard copies as follows: o General Arrangement Plan o Docking Plan o Engine Room Arrangement o Diagrams of all systems o Electric Power, Configuration and Distribution Diagrams o Propulsion Arrangement o General Construction Plan o Shell expansion drawing o Deck arrangements, including deck equipment o Safety Plan o Dock and sea trial test reports o Stability booklet o Tank tables for all tanks o Engine room log-book o Paint list and documentation o SOPEP manual o Paint inspection report o Inventory list o Significant roll angle report o As built drawings o Detailed list of all Equipment/components as fitted Page 88 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 89 7.4.15 (b) Charts and Publications The following Charts and publications should be supplied to owner at the time of delivery of the vessel; (i) CHARTS AND PUBLICATIONS 1 BA CHART NUMBER 2694 2 2970 1 EASTERN APPROACHES TO THE GULF OF ADEN 3 100 1 RAAS CASEYR TO SUQUTRA 4 3784 1 RAS AL KALB TO RAS MARBAT 5 2895 1 OUTER APPROACHES TO PORT SALALAH 6 2896 1 PORT SALALAH AND APPROACHES 7 2969 2 CADALE(ITALA) TO RAAS XAAFUUN 8 2968 2 716 1 10 721 1 LAMU TO CADALE(ITALA) SEYCHELLES GROUP TO MADAGASCAR AND AGALEGA ISLAND SOUTHERN APPROACHES TO THE SEYCHELLES GROUP 11 740 1 SEYCHELLES GROUP 12 722 1 671 1 14 3362 2 PORT VICTORIA AND APPROACHES OUTER APPROACHES TO MOQDISHO ANCHORAGE LAMU TO KISMAYO 15 2949 2 MTWAPA TO LAMU 16 3877 1 MOZAMBIQUE, CHANNEL-NOTHERN PART 17 238 2 PORTS IN KENYA, KILIFI AND MALINDI 18 3 1 CHARGOS ARCHIPELAGO 19 563 1 COMORES 20 616 5 APPROACHES TO MOMBASA 21 642 1 PORTS IN MOZAMBIQUE 22 644 1 BAIA DE MAPUTO 23 646 1 PORTO DE MAPUTO 24 647 1 PEMBA(PORTO AMELIA) 25 648 1 MAPUTO TO PORTO DE BARTOLEMEUDIAS 26 649 1 APPROACHES TO NACALA 27 650 1 QUELIMANE 28 661 1 APPROACHES TO KILWA KISIWANI HARBOUR 29 663 2 APPROACHES TO TANGA 30 665 2 APPROACHES TO ZANZIBAR 31 666 10 PORT MOMBASA 32 668 6 LAMU MANDA AND PATE BAYS 9 13 REQD TITLE OF CHART OR PLAN 1 GULF OR ADEN AND APPROACHES AND MARKA Page 89 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 90 33 674 2 APPROACHES TO DAR ES SALAAM 34 677 1 MANANARA TO ILE AUX NATTES 35 678 1 ILE AUX NATTES TO TAMTAVE 36 681 1 LINDI BAY 37 684 1 MTWAPA AND MIKINDANI HARBOURS 38 687 1 KISWERE HARBOUR 39 688 1 TAMATAVE 40 690 1 CABO DELGADO TO MIKINDANI BAY 41 691 1 MTWAPA HARBOUR 42 692 1 RADE DE TULEAR 43 693 2 DAR ES SALAAM 44 701 1 APPROACHES TO BAIE DE BOMBETOKE 45 704 1 NOSI SHABA(NOSI BEROJA) TO MORAMBA BAY 46 706 1 ILES MITSIO TO BAIE D’AMPASINDAVA 47 711 1 MAURITIUS 48 712 1 LA REUNION TO MAURITIUS AND ILE TROMELIN 49 713 1 PORT LOUIS AND GRAND RIVIERENOIRE BAY 50 715 1 RODRIGUEZ ISLAND 51 717 1 SEYCHELLES GROUP TO NAZARETH BANK 52 718 1 ISLANDS NORTH OF MADAGASCAR 53 724 1 ANCHORAGES IN THE SEYCHELLES 54 725 1 PLANS IN THE CHAGOS ARCHIPELAGO 55 726 1 EGMONT ISLANDS TO THREE BROTHERS 56 727 1 PEROS BANHOS TO BLENHEIM REEF 57 742 1 MAHE PRASLIN AND ADJACENT ISLANDS 58 759 1 BAIE D’ANTONGIL TO FARAFANGANA 59 760 1 BAIE D’AMPASILAVA TO MANANJARY 60 865 1 PLANS ON THE TANGANYIKA COAST 61 866 1 PLANS IN TANGANYIKA AND KENYA 62 920 1 DIEGO GARCIA 63 1002 1 DIEGO SUAREZ BAY TO ANDRANOAMBI BAY 64 1003 1 APPROACHES TO PORTO DA BEIRA 65 1032 1 NORTH MAFIA CHANNEL TO KILWA POINT 66 1052 1 APPROACHES TO KISMAYO 67 1064 1 PLANS ON THE NORTH EAST COAST OF MADAGASCAR 68 1116 1 BAIE DE DIEGO-SUAREZ 69 1120 2 VICTORIA NYANZA 70 1310 1 SOUTH WEST COAST OF PEMBA ISLANDS 71 1495 1 POINTE DES CHATEAUX TO PINTE DE LA REVIERE DU MAT 72 1497 1 LA REUNION 73 1810 1 MOZAMBIQUE CHANNEL Page 90 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 91 74 1812 1 WEST COAST OF PEMBA ISLAND 75 1881 1 CARCADOS CARAJOS SHOALS 76 2461 1 PLANS ON THE NORTH AND WEST COASTS OF MADAGASCAR 77 2741 1 ILE DE MAYOTTE 78 2756 1 ILE DE MAYOTTE- NORTHERN PART 79 2757 1 ILE DE MAYOTTE- EASTERN PART 80 2871 1 NOSI BE- SOUTHERN ANCHORAGES 81 2926 1 PORT DE MOZAMBIQUE TO PEMBA 82 2927 1 PEMBA TO MTWAPA 83 2929 1 MTWAPA TO MAFIA ISLANDS 84 2930 1 JESSER POINT TO BOA PAZ 85 2931 1 BAIE DE INHAMBANE TO CABO DE SAO SEBASTIAO 86 2932 1 CABO DE SAO SEBASTIAO TO BEIRA 87 2933 1 ILHA EPIDENDRON TO PORTO DE MOZAMBIQUE 88 2934 1 BEIRA TO RIO ZAMBEZE 89 2935 1 RIO ZAMBEZE TO ILHA EPIDENDRON 90 2939 1 BOA PAZ TO BEIRA DE INHAMBANE 91 2949 1 MTWAPA TO LAMU 92 3048 1 GRAND PORT 93 3211 2 ZANZIBAR HARBOUR 94 3252 2 VICTORIA NYANZA-NORTHERN PORTION 95 3255 2 VICTORIA NYANZA- NAKARANGA POINT TO DAGUSI 96 3256 2 VICTORIA NYANZA- PORT FLORENCE(KISUMU) 97 3300 1 MBASHE POINT TO MAPUTO 98 3310 1 MAFIA ISLAND TO PEMBA ISLAND 99 3361 1 PEMBA ISLAND TO LAMU 100 3665 2 VICTORIA NYANZA- SOUTHERN PORTION 101 3693 1 PLANS IN LAKE VICTORIA NYANZA 102 3855 1 CAP KIMBY TO MOROMBE 103 3868 1 CAP KIMBY TO CAP SAINT ANDRE 104 3871 1 BAIE DE BOMBETOKE TO CAP SAINT ANDRE 105 3872 1 NOSSI BE TO BAIE DE BOMBETOKE 106 3876 1 NOSSI BE TO BAIE DE ANTSIRANANA 107 3877 1 MOZAMBIQUE CHANNEL- NORTHERN PART 108 4172 1 TUGELA RIVER TO PONTA DO OURO 109 4173 1 APPROACHES TO RICHARDS BAY 110 4174 1 RICHARDS BAY HARBOUR 111 4170 1 APPROACHES TO DURBAN 112 4162 1 APPROACHES TO EAST LONDON 113 4158 1 PLANS IN ALGOA BAY 114 4156 1 CAPE ST. FRANCIS TO GREAT FISH POINT Page 91 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 92 115 4159 1 GREAT FISH POINT TO MBASHE POINT 116 3793 1 SHIXIN POINT TO PORT ST. JOHNS 117 4157 1 APPROACHES TO PORT ELIZABETH 118 2095 1 CAPE S. BLAIZE TO PORT S. JOHNS 119 4153 1 CAPE AGULHAS TO CAPE ST. BLAIZE 120 578 1 CAPE COLUMBINE TO CAPE SEAL 121 4154 1 MOSSEL BAY 122 632 1 HOLLANDSBIRD ISLAND TO CAPE COLUMBINE 123 643 1 DURBAN HARBOUR (ii) ROUTEING CHARTS ( INDIAN OCEAN ROUTEING CHARTS- FOLIO 344E) 1 CHART NUMBER 5126 (1) JANUARY RQD 1 2 5126 (2) FEBRUARY 1 3 5126 (3) MARCH 1 4 5126 (4) APRIL 1 5 5126 (5) MAY 1 6 5126 (6) JUNE 1 7 5126 (7) JULY 1 8 5126 (8) AUGUST 1 9 5126 (9) SEPTEMBER 1 10 5126 (10) OCTOBER 1 11 5126 (11) NOVEMBER 1 12 5126 (12) DECEMBER 1 (iii) CHART NO. RQD DESCRIPTION 1 NP 131 1 CATALOGUE OF ADMIRALTY CHARTS & PUBLICATIONS 2 5006 1 THE WORLD – TIME ZONE CHART 3 5307 1 THE WORLD – MAIN OCEAN ROUTE POWER VESSELS 4 5310 1 THE WORLD – GENERAL SURFACE CURRENT DISTRIBUTION 1 THE WORLD – LOADLINE REGULATIONS – ZONES, AREAS AND SEASONAL PERIODS (EDITIONS) 1 METEOROLOGICAL WORKING CHART – INDIAN AND SOUTH WEST PACIFIC 5 D 6083 6 B 6238 7 B 6628 1 SOUTH ATLANTIC OCEAN AND INDIAN OCEAN 8 B 6961 1 INDIAN OCEAN METEOROLOGICAL CHART 9 B 6969 1 SOUTH INDIAN OCEAN METEOROLOGICAL CHART Page 92 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 93 10 B 6984 11 5374 12 5385 13 4070 1 ARABIAN SEA – METEOROLOGICAL CHART MAGNETIC VARIATION 2005 AND ANNUAL RATES OF CHANGE –WORLD MAGNETIC VARIATION 2005 AND ANNUAL RATES OF CHANGE –INDIAN OCEAN INDIAN OCEAN – SOUTHERN PART, OCEAN CHART 14 4071 1 INDIAN OCEAN – NORTHERN PART, OCEAN CHART 15 4072 1 INDIAN OCEAN – WESTERN PART, OCEAN CHART 16 4073 1 INDIAN OCEAN – EASTERN PART, OCEAN CHART 1 1 1 (iv) PUBLICATIONS ADMIRALTY LIST OF RADIO SIGNALS CHART NO. RQD DESCRIPTION 1 2 3 4 5 6 NP 281 (1) NP 282 NP 283 (1) NP 284 NP 285 NP 286 (3) 1 1 1 1 1 1 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 NP 286 (4) NP 1 NP 2 NP 3 NP 38 NP 39 NP 63 NP 64 NP 100 NP 136 NP 203 NP 77 NP 78 NP 83 NP 100 NP 136 NP 735 NP 5011 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 25 NP 247 (1) 1 VOLUME 1 – MARINE RADIO STATION, EUROPE, AFRICA AND ASIA VOLUME 2 – RADIO AIDS TO NAVIGATION VOLUME 3 – PART 1- MARINE SAFETY INFORMATION SERVICES VOLUME 4 – METEOROLOGICAL OBSERVATION STATIONS VOLUME 5 – GLOBAL MARINE DISTRESS AND SAFETY SYSTEM VOLUME 6 – PART 3- PILOT SERVICES, VESSEL TRAFFIC SERVICES AND PORT OPERATIONS, RED SEA AND AFRICA VOLUME 6 – PART 4- PILOT SERVICES, PORT OPERATIONS AFRICA PILOT VOL-1 (ADMIRALTY SAILING DIRECTIONS) AFRICA PILOT VOL.2 (ADMIRALTY SAILING DIRECTIONS) AFRICA PILOT VOL.3 WEST COAST OF INDIA PILOT SOUTH INDIAN OCEAN PILOT PERSIAN GULF PILOT RED SEA AND GULF OF EDEN PILOT THE MARINER’S HAND BOOK OCEAN PASSAGES FOR THE WORLD VOLUME 3 – ADMIRALTY TIDE TABLE – INDIAN OCEAN VOLUME D – LIST OF LIGHTS – WEST OF INDIAN OCEAN, ARABIAN SEA VOLUME E – LIST OF LIGHTS RED SEA VOLUME K – LIST OF LIGHTS – INDIAN AND PACIFIC OCEAN THE MARINERS HAND BOOK – NINTH EDITION 2009 OCEAN PASSAGES FOR THE WORLD – FIFTH EDITION 2004 IALA MARITIME BUOYAGE SYSTEM – EDITION 6 2006 SYSMBOLS AND ABBREVIATIONS USED ON ADMIRALTY CHARTS – EDITION 4 2008 ANNUAL SUMMARY OF ADMIRALTY NOTICES TO MARINERS 26 NP 247 (2) 1 AMMENDMENTS TO SAILING DIRECTIONS 27 NP 350 (2) 1 ADMIRALTY DISTANCE TABLES – INDIAN OCEAN (v) ATT ADMIRALTY TOTAL TIDE FOR AREAS:1 AREA 5 – RED SEA, THE GULF AND INDIAN OCEAN (NORTHERN PART) Page 93 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 1 ADLL 1 1 ADRS6 1 1 94 AREA 10 – SOUTH ATLANTIC AND INDIAN OCEAN (SOUTHERN PART) ADMIRALTY DIGITAL LIST OF LIGHTS:AREA 5 – RED SEA, THE GULF AND INDIAN OCEAN (NORTHERN PART) AREA 10 – SOUTH ATLANTIC AND INDIAN OCEAN (SOUTHERN PART) ADMIRALTY DIGITAL RADIO SIGNALS VOLUME:AREA 5 – RED SEA, THE GULF AND INDIAN OCEAN (NORTHERN PART) AREA 10 – SOUTH ATLANTIC AND INDIAN OCEAN (SOUTHERN PART) (vi) 1 2 3 PUBLICATION IMO- 650E IB 904E I 116E RQD 1 1 1 4 I 910E 1 5 6 7 8 9 IMO-520E CD-802 ID 110E I 155E IA 117E 1 1 1 1 1 10 11 IE 200E IB 267E 1 1 12 PUBLICATION RQD 1288E 1 13 IA 292E 1 14 1298E 1 15 1402E 1 16 1410E 1 DESCRIPTION PROCEDURE FOR PORT STATE CONTROL COLREGS, CONSOLIDATED EDITION 2003 ISPS CODEEDITON 2003 AND SOLAR AMENDMENTS 2002 JOINT IMO/ IHO/ WMO MANUAL ON MARITIME SAFETY INFORMATION MARPOL 73/78 CONSOLIDATED EDITION 2002 MARPOL 73/78 ON CD-ROM (VERSION 2.0) SOLAS(CONSOLIDATED EDITION 2004) FIRE SAFETY SYSTEMS(FSS)CODE(2001EDITION) INTERNATIONAL SAFETY MANAGEMENT CODE(ISM CODE) AND GUIDE LINES ON IMPLEMENTATION OF THE ISM CODE(2010 EDITION) IMDG CODE(2004 EDITION OR LATEST EDITION) RECOMMENDATIONS ON THE SAFE USE OF PESTICIDES IN SHIPS(1996 EDITION) DESCRIPTION CODE OF SAFE PRACTICE FOR THE CARRIAGE OF CARGOES AND PERSONS BY OFFSHORE SUPPLY VESSELS(OSV CODE)(2000 EDITION) CODE OF SAFE PRACTICES FOR CARGO STOWAGE AND SECURING(CSS CODE) 2003 EDITION GUIDELINES FOR THE PREPARATION OF THE CARGO SECURING MANUAL(1997 EDITION) INTERNATIONAL CONVENTION RELATING TO INTERVENTION ON THE HIGH SEAS INCASE OF OIL POLLUTION CASUALITIES(INTERVENTION) 1969(1977 EDITION) INTERNATIONAL CONVENTION ON CIVIL LIABILITY FOR OIL POLLUTION DAMAGE(CLC 1969) Page 94 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 17 1418E 1 18 1450E 1 19 1490M(E/F/S) 1 20 IB 520E 1 21 22 23 24 1680E IB 938E 1968E IB 960E 1 1 1 1 25 26 IC 982E 1987E 1 1 27 1994E 1 95 (1977 EDITION) OFFICIAL RECORDS OF THE INTERNATIONAL LEGAL CONFERENCE ON MARINE POLLUTION DAMAGE 1969(1973 EDITION) INTERNATIONAL CONFERENCE ON SALVAGE 1989(1989 EDITION) BUNKER OIL POLLUTION DAMAGE CONVENTION 2001(2004 EDITION) MARPOL 73/78(CONSOLIDATED EDITION 2002 ANTI FOULING SYSTEM(2001 EDITION) STCW LATEST EDITION GUIDELINES ON FATIGUE(2002 EDITION) (IAMSAR) MANUAL VOL.1,2,3 WITH ALL AMENDMENTS LIFE-SAVING APPLIANCES(2003 EDITION) IMO STANDARD MARINE COMMUNICATIONS PHRASES(SMCP) 2002 EDITION INTERNATIONAL CODE OF SIGNALS(1987 EDITION) 7.4.16 Certificates/statements The following certificates/statements should be supplied to the Owner at the time of delivery of the Vessel: o Builder’s certificate o Classification certificates o International tonnage certificate o Loadline certificate o International oil pollution prevention certificate o International sewage pollution prevention certificate o International air pollution prevention certificate o Anchor and cable certificates o Certificates of navigation lights o GMDSS certificate o Compass deviation chart o Bollard pull certificate o Asbestos free certificate o Deratting certificate o Fresh water certificate o Inventory of hazardous materials certificate o Certificates of ALL major equipment o Piping Certificates 7.4.17 Manuals A set of manuals in English language should be delivered in four copies in both soft and hard copies Page 95 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 96 7.4.18 Displayed documents Diagrams and Safety Plans should be fitted on board of the Vessel as should be as directed by Class. These plans should be copied on a convenient scale and should be plastic sheeted and framed. o Safe Manning Certificate should be displayed o A tank sounding board should be fitted in the engine room. 7.4.19 GMDSS area A1 The navigation and communication equipment should comply with the requirements of GMDSS for area A1 with complete NAVTEX coverage as applicable and shore based maintenance. The required books and manuals shall be stored on board. 7.4.20 GMDSS area A2 The navigation and communication equipment should comply with the requirements of GMDSS for area A2 with complete NAVTEX coverage as applicable and shore based maintenance. The required books and manuals shall be stored on board. 7.4.21 GMDSS area A3 The navigation and communication equipment should comply with the requirements of GMDSS for area A3 with complete NAVTEX coverage as applicable and shore based maintenance. The required books and manuals shall be stored on board. 7.4.22 MED approval All navigation and communication equipment shall be provided with an MED certificate. 7.5 HULL AND SUPERSTRUCTURE 7.5.1 General description The Vessel should have a round bilge hull with a transom stern and a tapered bow. The transom corners should be well rounded. The hull should be made of steel plates (grade A or equivalent), certified by one Lloyd or equivalent Classification Society. The hull structures in the bow sections shall be adequately reinforced for sufficient support when pushing and towing of ships without damaging the tug. 7.5.2 Bulkheads The Vessel should have specified number of bulkheads dividing the hull into five water tight compartments; 7.5.3 Welding Page 96 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 97 All welding will be performed in accordance with classification requirements. Nondestructive tests should be carried out on specific areas as required by Class. 7.5.4 Tank configuration All tanks should be closed by bolted manhole covers and should have spring-loaded bronze drain plugs, sounding pipe with weighted self-closing cock, filling/de-aeration pipes. 7.5.5 Fuel oil tanks Fuel tanks should be separated from the hull but form integral part of hull construction. 7.5.6 Fresh water tanks Two stainless steel fresh water double bottom tanks should form an integral part of the hull construction. 7.5.7 Sewage tank One steel sewage double bottom tank should form an integral part of the hull construction and should be situated athwart ship 7.5.8 Lubrication oil tanks Three steel lubrication oil double bottom tanks should form an integral part of the hull Construction to be situated in the engine room. 7.5.9 Sludge tank One steel sludge tank should form an integral part of the hull construction 7.5.10 Hydraulic oil tank A non-integrated spare hydraulic oil tank for the steering gear should be fitted in the rudder propeller compartment and another non-integrated hydraulic oil tank for the deck equipment should be fitted in the engine room. 7.5.11 Bilge water tank One steel double bottom bilge water tank should form an integral part of the hull construction. 7.5.12 Foam Tank One steel double bottom foam tank to be an integral part of the hull construction. 7.5.13 Dispersant tank One steel double bottom dispersant tank should form an integral part of the hull construction. Page 97 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 98 7.5.14 Chain lockers There should be two chain lockers able to house the full length of chain whose ends shall be fitted with quick release devices operated from deck. 7.5.15 Hull scantlings (mm) -in accordance with Classification requirements but not less than:7.5.15.1 Bottom plating : 12 7.5.15.2 Stern plating : 12 7.5.15.3 Side and bow plating :12 7.5.15.4 Sheer-strake plating :15 7.5.15.5 Forecastle deck plating :8 7.5.15.6 Aft deck plating :8 7.5.15.7 Main deck plating inside superstructure :8 7.5.15.8 Bridge deck plating :6 7.5.15.9 Top deck plating :8 7.5.15.10 Tank top plating :8 7.5.15.11 Watertight bulkhead plating :8 7.5.15.12 Bulwark plating :8 7.5.15.13 Sea chest plating : 12 7.5.15.14 Side longitudinal flat bulb section : 120 x 7 7.5.15.15 Web frames every 3rd frame flat bulb section : 240 x 10 7.5.15.16 Deck longitudinal flat bulb section : 100 x 7 7.5.15.17 Frame spacing : not more than 550mm 7.5.16 Sea chests Two sea chests should be integrated in the hull bottom construction in the engine room to house bronze box coolers for the cooling systems. 7.5.17 Anchor pockets/hawse pipes The anchors should be stowed in pockets, flush with the hull line. The two hawse pipes to be made from steel pipe with the rims of hawse pipes and the upper edge protected with round bar provided with galvanized steel hawse pipe covers, secured with stainless steel chains. Anchor washing arrangement to be incorporated. 7.5.18 Engine Seatings The engine seatings should be sufficiently stiff to minimize hull vibrations exerted by the engines and to consist of longitudinal plate, each with a top plate of flat bar. The Main engines should be secured to the top plates of the seatings. 7.5.19 Bulwark Builders to ensure that along the main deck and forecastle deck a bulwark of height 1.10 M minimum shall be provided with adequate freeing ports. The top of the bulwark should be protected and reinforced with a thick walled steel pipe. Two bulwark doors to be provided for, one at starboard and one at port. Page 98 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 99 7.5.20 Boarding facilities On the inside of the bulwark a platform should be provided, fitted with removable handrails that can be fitted on top of the bulwark together with aluminium foldable gangways on both sides of the boat. 7.5.21 Skeg A double-plate skeg to be fitted with 12 mm side plating and a 20 mm bottom plate. The Skeg should be strong enough for dry-docking and provided with docking plugs. 7.5.22 Bilge keels Bilge keels should be fitted at each side of the vessel to improve the operability of the Vessel in exposed waters. 7.5.23 Mooring ports Mooring ports should be fitted in the bulwark at both sides of the ship. The mooring ports should be made of cast steel. 7.5.24 Tow line guard posts The Vessel should have two tow line guarding posts made from a pipe fitted in two holes in the top of the aft bulwark; and storage for the towing pins should be provided. 7.6 SUPERSTRUCTURE 7.6.1 General description The superstructure should be centrally positioned to protect from operational damages. The deck house should be compact with funnels at the aft and a raised Wheelhouse on top. The lay-out should give an unobstructed view in all directions (360°) 7.6.1.1 The Deck house should have; (a) One steel access door with deadlights at the aft side (b) Four windows at starboard (c) Four windows at port side 7.6.1.2 The wheelhouse should have: (a) Eight sky windows (b) Two steel doors with two fixed windows at each side (c) Three large windows at the front (d) Two large windows at each side (e) Three large windows at the aft 7.6.2 Superstructure scantlings (mm) – minimums a) Side and aft plating : b) Wheelhouse front : c) Top / bridge deck plating : 6 6 6 Page 99 of 183 SECTION VII: TECHNICAL SPECIFICATIONS d) e) f) g) h) Deckhouse front Stiffeners flat bulb section sides Deck beams flat bulb section Web frames deckhouse Web frames wheelhouse : : : : : 100 7 80 x 6/ 100 x 7 80 x 6 200 x 10 160 x 8 7.6.3 Hatches, doors, windows, etc. 7.6.3.1 Hatches All hatch covers should be watertight by means of gaskets with adjustable stainless steel hinges, and provided with grease nipples. All outside hatches and doors should be lockable with a sea water resistant pad lock from outside or inside. The following hatches should be fitted: a) One flush hatch fitted with spring for easy handling on the aft deck for the rudder propeller room/engineers workshop. The hatch cover shall be hinged and be closed by toggles. The hatch should be fitted with a drain gutter draining at the lowest point. b) The Aft deck should be fitted with two flush engine room hatches (for removal of large components from the engine room) whose hatch covers shall be provided with lifting lugs and be lockable by bolts. c) There should be one rudder propeller room/engine room escape hatch on a raised coaming fitted at starboard side on the aft deck whose cover shall be hinged and be lockable by toggles. d) There should be one accommodation escape hatch on a raised coaming fitted at centerline on the fore deck with cover lockable by toggles. e) There should be one store escape hatch on a raised coaming fitted at starboard side on the fore deck closed by toggles. f) There should be one filling and de-aeration locker hatch on a raised coaming fitted at port side on the fore deck closed by toggles. 7.6.3.2 Mounting section AC Room A welded mounting section to be provided in the bulkhead between AC room and engine room and should be easily accessible 7.6.3.3 Air duct covers There should be two air inlet gratings for the ventilation of the engine room which can be closed with steel covers. 7.6.3.4 Control lockers fore/ aft deck There should be fore and aft deck control lockers provided for winch control/ intercom/ emergency control valves with water tight hatches. 7.6.3.5 Manholes The fore peak, the chain lockers and all tanks (except expansion tanks) should be accessible via manholes which should be closed by watertight cover plates secured by stainless bolts. Page 100 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 101 7.6.3.6 Watertight and weather tight doors All watertight w.t. steel doors should be fitted with hinges, grease nipples and bronze toggles, equally spaced along circumference. A stainless steel weather-tight door ought to be installed on each side of the wheelhouse, fitted with hinges, two toggles and lock. 7.6.4 Windows The window glass for all windows shall be double glazed with argon filled cavity and be of low emissivity (low-e), low solar gain and hard coated type, hard glass fitted in stainless steel high polished glass fixing rims. 7.6.4.1 Wheelhouse windows The wheel house should have fixed windows with specified glass thickness appropriate for marine environment 7.6.4.2 Wheelhouse sky windows There should be green tinted sky windows installed slantwise in the wheelhouse top deck, fitted in metal frames whose sizes should provide optimum view upwards. 7.6.4.3 Deckhouse windows The deckhouse windows should be closed type, but in each space one opening window is to be fitted. 7.6.4.4 Window wipers wheelhouse Dual speed, electrical parallel window wipers should be installed on each forward side window, on each front window and on each aft window with independent (individual) electric controls on the main console. 7.6.4.5 Window wash system Window wash Bronze nozzles should be provided for every window with electric solenoids safely secured to prevent damages from washing water or weather. 7.6.4.6 Docking and drain plugs Bronze hexagonal keyhole docking plugs should be fitted to all major tanks. 7.6.5 Stairs, ladders, handrails and platforms Stairs, ladders and climbing steps (Please specify type and areas of location) a) All exterior stairs should be made of steel with non-slip galvanized perforated steps. b) All Interior stairs should be made of steel with non-slip rubber step covers with provisions of easy location for safe landing in case of power failure. c) All ladders should be made of steel with non-slip steps Page 101 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 102 d) All tanks should be provided with climbing steps and handgrips. e) There shall be foldable gangways both sides with safety nets for safe boarding and disembarking 7.6.6 Railings 7.6.6.1 Handrails a) Provide storm rails of optimal standard size steel pipe wherever appropriate. Support storm rails from underside with welded brackets solid round. b) There shall be galvanized steel handrails, wherever appropriate, made of steel pipe welded at a height approximately 1.0 m with stanchions for adequate support to avoid vibrations. c) Polished stainless tubing shall make the storm rails to consoles and counters in wheel house 7.6.6.2 Engine room railings/protection covers Where necessary, protection railing of steel pipe 1¼" should be fitted in the engine room and/or protection covers to be fitted e.g. for rotating parts. 7.6.6.3 Floor plates The Tug boat shall have non-slip floor plates in Engine spaces and the steering space. Floor plates should be fastened to bearers with stainless steel countersunk flat head machine screws. 7.6.7 Fenders 7.6.7.1 Cylindrical fenders bow Two cylindrical fenders Ø 1000 mm should be mounted on the fore ship between specified frames with one fender below forecastle deck level and the other on forecastle deck level. Both cylindrical fenders below and on the forecastle deck level should be extended on each side of the vessel by a cylindrical fender Ø 700 mm to some reasonable length alongside and be secured by hoisting type slings (straps) with tapered ends and the fenders should be fitted in fender channels to accommodate the slings thereby avoiding unnecessary wear and direct contact during operations. 7.6.7.2 Rubber fender at sides Each side of the vessel should be fitted with a continuous D-type fender of size x 300 mm, fitted inside fender channels secured by stainless bolts and nuts. 300 7.6.7.3 Cylindrical fenders transom corners The transom corners shall also be fitted with Cylindrical fenders of outside diameter 600 mm fitted inside fender channels secured by stainless bolts and nuts. Page 102 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 103 7.6.7.4 Tyre fender lugs On the fore ship lugs should be fitted for heavy fender tyres fitting. 7.6.8 Bollards and bitts 7.6.8.1 Bollards Bollards with double legs should be fitted at fore ship, Single bollards at mid ship and double bollards to be fitted on both sides of the deck on the aft ship. The SWL should be welded on all bollards which must be safely fitted and positioned. 7.6.8.2 Towing bitt aft A double pole towing bitt approved by Lloyd or equivalent Classification Society shall be integrated in the aft deck construction. The towing bitt shall be of certified steel fairlead type. 7.6.8.3 Towing bitt fore A triple pole towing bitt approved by Lloyd or equivalent Classification Society should be integrated in the fore deck construction. The towing bitt should be of certified steel fairlead type. 7.6.8.4 Gobeye On the aft deck a flush gobeye should be fitted on aft deck and the gobeye box is to be provided with ample drainage and an appropriate cover plate. 7.6.8.5 Towing beams Local tow wire protection rails should be arranged in way of hatches and other obstructions. The protection rails of substantial steel tube construction should be used. 7.6.9 Mast 7.6.9.1 Fixed Mast. Fixed mast to be fitted with navigational lights and antennae at the aft side of the wheel house top deck, any other attachments to be explained in your bid. 7.6.9.2 Safety system The mast must be provided with safety system for safe access to the mast, and its full technical and safety description to be included in the bid. 7.6.10 Markings hull and superstructure 7.6.10.1 The following should form hull and superstructure markings a) Name of Vessel (full welded steel stencils), Page 103 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 104 b) Port of registry, and c) company emblem 7.6.10.2 Draught marks As required by class, draught marks should be continuously welded to the designated plating on both sides of the bow and the stern, giving a defined spacing of the marks in mm. 7.6.10.3 Loadline marks Both sides of the hull should bare a welded load line mark. Marks of 6 mm steel plate shall be continuously welded to the designated plating. 7.6.10.4 Nameplates All filling, sounding and de-aeration pipes, valves, pumps, doors, ventilation hatches, goosenecks, etc. should be marked by nameplates made of material that is to sea), engine room and also in accommodation spaces. The name plates to be preferably of bronze material. Sounding spring loaded sight-glass incorporated with scales in engine room on header tanks should be made of brass. Tank numbers and tank destination MUST be shown on nameplates which should be provided on or close to all sounding: - filling-, air/vent pipes and valves. o o o o 7.6.10.5 Warning and direction signs on engraved plates should be provided. As a minimum, the following should be provided Engine room fire suppression system is preferable to be Pyrogen or equivalent, aerosol based suppression system. Aerosol release mechanism to be sited in the wheel house. DANGER – UNIT MAY START AUTOMATICALLY” Warning sign on each Genset and Air Compressors Warning signs where electrical panels are served by more than one electrical supply (e.g. transfer switch, shore connection panel etc.) BILGE OVERBOARD VALVE – OPEN IN EMERGENCY ONLY’ Miscellaneous markings Beat welds should mark the following: a) Loaded waterline (paint-line) b) Boundaries of tanks and w.t. bulkheads on hull and deck. c) Manholes, tank no’s and tank destination should be welded on top of and near each Manhole covers. d) Drain plugs, tank no’s and tank destination are welded next to drain plugs. 7.6.11 Corrosion protection and deck covering a) Full description of surface preparation, type of cleaning to be used and primer used, should have no deteriorating effect on subsequent welding work or fade with time and be of reputable high quality marine paint as recommended by Class. Page 104 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 105 b) To provide detailed description of how the painting should be carried out before and after installation of engines, auxiliaries, etc. damaged paint work should be repainted in original colours and quality. c) To provide detailed Paint specifications based on “Marine Paint” indicating the quality, total thickness. The paint and paint application should be verified and certified by an inspector of paint manufacturer. d) To provide detailed specified thickness of each coat of the dry film thickness to be applied in number of layers as required by paint manufacturer and included in the offer. e) A detailed painting manual of the complete tug boat including the maintenance procedures, materials to use and further relevant recommendations and information, together with a basic maintenance package including paint and tools should be delivered by the yard. f) Special attention should be given to the description of Galvanized surfaces painting plan including surface preparation. g) Paint Schedule, listing all areas and compartments in the vessel, indicating the painting coatings, thickness and final color scheme as recommended by the procuring entity should be listed in the tables below 7.6.12 Paint Coat thickness The following specific areas shall have specific painting characteristics including number of primer coats, type of primer, number of paint coats and the ultimate thickness should be indicated under each subheading as in table below; Description /and number of coat(s) of primer/ paint 7.6.12.1 Hull outside, below load waterline Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.2 Thickness (μm) Thickness (μm) Keel cooling channels Thickness(μm) Description /and number of coat(s) of primer/ paint Thickness (μm Page 105 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.6.12.3 Hull outside, above load waterline Thickness (μm) Description /and number of coat(s) of primer/ paint 7.6.12.4 Thickness (μm) Bollards, bitts, outside bulwark, stairs, railings, ladder outside, upper railing pipes, fire fighting platform, MOB platform, deck equipment (except winches),top of funnels Description /and number of coat(s) of primer/ paint 7.6.12.7 Thickness (μm) Superstructure outside Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.6 Thickness (μm) Area behind rubber fenders Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.5 106 Thickness (μm) Inside bulwark and mast Thickness(μm) Description /and number of coat(s) of primer/ paint Thickness (μm) Page 106 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.6.12.8 Winches and capstan (where applicable). Thickness (μm) Description /and number of coat(s) of primer/ paint 7.6.12.9 Thickness (μm Wheelhouse inside incl. wheelhouse door inside Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.15 Thickness (μm Accommodation without paneling Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.14 Thickness (μm Hull and superstructure inside Accommodation and wheelhouse with paneling Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.13 Thickness (μm Under wooden deck Thickness (μm) Description /and number of coat(s) of primer/ paint 7.6.12.11 7.6.12.12 Thickness (μm) Weather decks Thickness (μm) Description /and number of coat(s) of primer/ paint 7.6.12.10 107 Thickness (μm Surfaces below deck level without panelling Thickness(μm) Page 107 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 108 (Engine, Steering spaces) Description /and number of coat(s) of primer/ paint 7.6.12.16 Floors and bottom below floor plates (engine, rudder propeller and steering gear room Description /and number of coat(s) of primer/ paint 7.6.12.17 Thickness (μm Galvanised surfaces outside (handrails, etc.) Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.21 Thickness (μm Inside of funnels Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.20 Thickness (μm Wet spaces (e.g. toilet, shower or bathroom) Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.19 Thickness (μm Deck lockers, CO2 lockers, air intakes engine room Thickness(μm) Description /and number of coat(s) of primer/ paint 7.6.12.18 Thickness (μm Thickness (μm Steps, ladders and stairs inside (except toppipe of stairs) Thickness(μm) Description /and number of coat(s) of primer/ paint Thickness (μm Page 108 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.6.12.22 109 Galvanised handrails inside accommodation incl. toppipe of stairs Thickness(μm) Description /and number of coat(s) of primer/ paint Thickness (μm Tanks inside Thickness(μm) 7.6.12.23 Forepeak, cofferdam accom. void and chain lockers: Description /and number of coat(s) of primer/ paint 7.6.12.24 Sludge tank, bilge water and sewage tank: Description /and number of coat(s) of primer/ paint 7.6.12.25 Thickness (μm Foam tank Thickness (μm) Description /and number of coat(s) of primer/ paint 7.6.12.28 Thickness (μm Lubrication oil, hydraulic oil, fuel oil and all not mentioned tanks: Description /and number of coat(s) of primer/ paint 7.6.12.27 Thickness (μm Fresh water tanks: Description /and number of coat(s) of primer/ paint 7.6.12.26 Thickness (μm Thickness (μm Dispersant tank Description /and number of coat(s) of primer/ paint Thickness (μm Page 109 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.6.12.29 110 Miscellaneous treatment a) b) c) d) Equipment in Machinery spaces The already painted equipment shall be cleaned, where necessary repaired (painting) and shall be painted in the colour system or of the machinery as it were. Anchors and chain cables The chain cables shall be marked each chain length (15 fathoms). Shackle of final cable length should be painted red. Ship's name, draught marks and company emblem The markings should be painted in accordance with the paint system and colour Scheme of Kenya Ports Authority Touch up equipment Paint and painter’s tools to touch up the painting when damaged during working activities should be delivered consisting of: o Approximately 72 litres of each paint, o White spirit approximately 144 litres o Paintbrushes two dozens o Paint rollers two dozens 7.6.13 Cathodic protection The underwater parts of the hull should have cathodic zinc anode protection, sufficient for 5 years in tropical conditions of Mombasa, placed at significant positions. Anodes placed on the ship’s hull should have double plates for welding onto shell plate. Each rudder Kort Nozzle is to be provided with zinc anodes. Any other proven Protection system may be considered if well explained and articulated in the bid. 7.6.14 Anti fouling system (active) o o o 7.7 Inside the box cooler chests an anti-growth system should be fitted of the type Impressed Current Anti-fouling system (ICAF). The system should be sufficient for 5 years in tropical conditions. The copper oxide dosage should be achieved by anodic dissolution, which uses a rectifier installation; with currents flowing between the copper bars (anode) and steel construction (cathode). The ICAF system should be designed to operate at low current and voltage. Machinery, Equipment, and Materials a) The Tenderer shall submit a list of all major equipment and items intended to be installed in the vessel. (Mandatory) b) The Tenderer MUST maintain this equipment list throughout the construction period and submit to Owners Representative as part of production progress report during the milestone progress review meetings as stipulated in Clause 7.1.6 of this tender document. c) For all equipment and machinery the tenderer shall provide technical datasheets describing performances, dimensions, and weight of all major items of equipment d) The tenderer shall provide brochures of all major equipment intended to be installed onboard the tug boat. Page 110 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 111 e) All machinery, valves, manifolds, etc, essential for vessel operations should be arranged in the machinery spaces in orderly and efficient manner f) Safe access to all machinery, equipment, and fittings should be provided g) All machinery and equipment should be provided with lifting arrangements. Thus the tenderer shall provide load rated, lifting arrangements over main machinery as follows; i. Over main engines, drive units, shafts, coupling, pumps, and auxiliary engines as required to safely lift each equipment; ii. Provide six eye (6) additional eye plates at suitable backing structure, and iii. Mark all lifting devices with SWL in (Kgs) h) Guarantee (Mandatory) i. Tenderer to guarantee Tug Boat, its systems, and all components free of defects of material or workmanship for a period of two years (2 yrs.) after delivery and acceptance, subsequent to satisfactory completion of all tests and trials ii. In case of failure of any structure, system or components, the Tenderer will immediately take steps to rectify the fault with utmost dispatch. Response plan to be included in the bid. iii. Tenderer shall ensure that Factory Acceptance Test of the Main Engines are carried out in the presence of two Owners’’ Engineers 7.7.1 Propulsion system a. The design and lay-out of the propulsion installation should be in accordance to the Builder's standards and with the relevant rules of the classification society and should be such that permanent attendance in the engine room is not required. Proposed draft drawings to form part of bid. b. SB and PS propellers configuration and direction of rotation for maximum performance should be included in the proposed propulsion system description. c. All machinery shall be of first class marine type and the installation should be laid out for easy watch-keeping, accessibility for servicing and maintenance. d. Start and stop of main and auxiliary engines should be in the engine room with a provision of starting the Main engines from the bridge included, from the Switchboard air conditioned Control room and local. The Auxiliary sets should have local starting mechanism and also be started from the switchboard (Control) room. 7.7.1.1 Main Engines a. The Tug boat should be propelled by two WARTSILA 6L26 Marine Diesel Engines, each of the latest IMO Tier II compliant, connected by a straight shaft line to a rudder propeller. For the shaft arrangement both torsional and lateral (bending) vibration analysis should be performed to avoid resonances in the working speed range. b. Propulsion Diagram & Engine rating to be provided. c. Engine performance data sheet in relation to its bhp, engine revs, vessel speed, bollard pull ahead and bollard pull astern with draught should be attached herein. Page 111 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 112 d. The Wartsila Main Engines should have two starting systems one being a back-up of the other; (i) Air Starter Motor and (ii) electrical starting system with a rectifier. e. The engines should be water cooled by means of box coolers. f. The engine characteristics and ratings should be included in the description. g. The main engines should be resiliently installed on top plates or engine brackets, which are welded on the longitudinal bottom girders. A flexible coupling should be installed between the engine and intermediate shaft. h. Mandatory spares parts for Wartsila 6L26 listed here-below should be delivered together with the Tug Boat, i. Mandatory Special Tools for Wartsila 6L26 engines listed here below to be delivered together with the Tug Boat j. The engine shall have a mounted device for turning the main engine through an electric driven turning gear with a cable of at least 15 meters and a handheld control unit. k. Turbocharger water cleaning device for turbocharger turbine side should be supplied with the Tug Boat with a dosing unit and a 10 meter hose with quick couplings. l. CBM data acquisition & updating system : A full set of Condition Based Operation and Maintenance (CBM) solution based on regular analyzing of the engine operation data should be supplied together with the Engines to provide live interaction for the Engines by transferring data to Wärtsilä’s CBM centre. The Wärtsilä Engines Manufacturer/Service provider shall enter into contract with the Owner to facilitate issuing of CBM reports and related services. m. The Wärtsilä engines should be supplied with ELDOC2i, electronic documentation on CD. ELDOC2i software should provide an Interactive Electronic Technical Manual (IETM) designed to give rapid access to extensive technical documentation through an interactive and easy-to-use interface. ELDOC2i contains shall be in English an engine specific instruction manual, engine specific spare part catalogue with technical illustrations, drawings and step-by-step instructions supported by digital video and photo sequences (digital media availability depending on engine). n. Mandatory Spare parts to be delivered with the Tug Boat Spare parts for Propulsion machinery (Wärtsilä 6L26) 1. 2. 3. 4. 5. 6. 7. 8. DESCRIPTION OF SPARE UPPER MAIN BEARING SHELL LOWER MAIN BEARING SHELL UPPER "0" MAIN BEARING SHELL LOWER "0" MAIN BEARING SHELL AXIAL BEARING CYLINDERHEAD STUD MAINBEARING STUD MAINBEARING \ CYLINDERHEAD NUT QTY 1 1 1 1 2 2 2 2 PART NO. 1000002 1000003 1000004 1000005 1000006 1000010 1000078 1000011 Page 112 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. CYLINDER LINER KIT OF SEALS ANTI-POLISHING RING O-RING (SIDE STUD) CYLINDER HEAD COMPLETE TOP OVERHAUL KITS FOR 2NO. CYLINDER HEAD NUT FOR CYLINDER HEAD STUD RING CYLINDER GAS (CYL. HEAD LINER) SAFETY VALVE HALF VALVE KEY VALVE ROTATOR SUPPORTING RING EXHAUST VALVE VALVE SPRING CONNECTING ROD COMPLETE BEARING SHELL BEARING SHELL PISTON GUDGEON PIN PISTON RING PISTON RING PISTON RING INNER LOCKING RING RND 120 HIGH PRESSURE FUEL PIPE FUEL FILTER CARTRIDGE CANDLES FOR AUTOMATIC LUB.OIL FILTER SPARE PARTS FO TC (TPS57F) SPARE PARTS FO TC (TPS61F) REPAIR SET FOR TURBINE STARTER ESM10 PDM-20 PDM-10 CAMSHAFT SPEED SENSOR (FOR ESM) LT/HT/CA PRESSURE SENSOR 6 BAR LO PRESSURE SENSOR 10 BAR SA PRESSURE SENSOR 40 BAR PT100 63 MM PT100 113 MM EXHAUST GAS TEMPERATURE SENSOR FO LEAK SWITCH, CAPACITIVE COMPLETE FUEL PUMP COMPLETE FUEL INJECTOR 1 1 1 2 1 2 2 1 2 4 2 2 2 2 1 1 1 1 1 1 1 1 2 2 4 36 1 1 1 1 1 1 1 1 2 2 1 1 2 2 1 2 113 1050001 9105002 1050002 1005009 1200700 1000011 1050004 1250001 1211001 1211003 1211004 1211005 1211002 1110001 1110005 1110006 1130001 1130002 1130004 1130005 1130006 1130003 3510002 4701002 4714010 9218002 516387 5160304 501291 PAAE044025 0051F005313 0051F005314 0051F005316 PAAE005383 PAAE005389 PAAE039156 0050K009505 Page 113 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 114 o. Mandatory Special Tools to be delivered together with the Tug boat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Tools for Propulsion machinery (Wärtsilä 6L26) Description OF TOOL QTY AIR TOOL 3/8” 1 PULLER BAR+BRIDGE SIDE BOLT 2 TROLLY FOR MAIN BEARING 1 JACK COMPL.MAINB.CAP 3 TORQUE WRENCH 150-800 N/M 1 TORQUE WRENCH 20-100 N/M 1 DUMMY COUNTERWEIGHT 1 TORQUE WRENCH 70-350 N/M 1 POLISHING RING 1 POLISHING RING 1 MOUNTING TOOL CYLINDER LINER 1 PULL FRAME CYL. LINER 1 PIPE 2 PISTON RING TOOL 1 PISTON RING PLIERS 1 TAP M8 1 CIRCLIP PLIER 1 SUPPORT OF PISTON 1 (LIFTING) JACK 2 T-BAR WRENCH 8MM 1 LIFTING TOOL CYLINDER HEAD 1 PULLER BAR+BRIDGE CYLINDER HEAD 2 SPLINE TOOL 1 STUD REMOVER MAIN BEARING/CYLINDER HEAD 1 COMPRESS TOOL VALVE SPRINGS 1 FEELER GAUGE 2 FORCE MULTIPL. MAX 1700 NM 1 OPEN END SPANNER 1 SOCKET FOR NOZZLE TIP 1 HOLDER FOR FUEL INJECTOR 1 EXTRACTOR ATOMISER 1 SOCKET SCREW WRENCH 1 CLEANING TOOL CONNECTION ATOMIZER 1 SOCKET SPANNER 1 CONNECTION PIECE 1 GREEN PIN LOCKING 1 HYDRAULIC HOSE 2 HYDRAULIC JACK 1 DUMMY CONTERWEIGHT 1 LOCKING RING 2 PART NO 9612ZT334 9612ZT902 9612ZT906 9612ZT903 9622DT216 9622DT214 9612ZT856 9622DT215 9612ZT950 9612ZT951 9612ZT911 9612ZT912 9612ZT256 9612ZT917 9612ZT185 9612ZT195 9612ZT250 PAAE104247 9612ZT901 9612SW510 9612ZT927 9612ZT904 9612ZT332 9612ZT935 9612ZT919 PAAE104443 9612DT260 9612ZT331 9612DT259 9612ZT978 9612ZT931 9612ZT187 9612ZT962 9612ZT255 PAAE104440 9612ZT108 9612DT381 9612ZT913 9612ZT856 9612ZT925 Page 114 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 41 42 43 44 45 46 47 48 49 50 p. DEPHT GAUGE DISMANTLE TOOL COOLING WATER INLET PIPE FUNCTION GENERATOR CRIMP TOOL, VARIOCRIMP STRIPPER 45-164 STRIPPER 45-165 CONTACT GREASE SGB 2X HYDRAULIC PUMP LOCKING RING TOOLS FOR TURBOCHARGER (TPS57) 115 1 9612ZT941 1 1 1 1 1 1 1 4 1 9612ZT877 0050T002001 0050B085101 PAAE010981 PAAE010982 387010700 PAAE104248 9612ZT924 9612ZT858 Operating & Maintenance manuals Operating & Maintenance manuals covering instructions and descriptions by text and pictures of the main actions and cautions needed when operating should be delivered with the tug boat. The engine Operating & Maintenance manuals should be specifically for the engines to be delivered. q. Spare Parts Catalogues Spare Parts Catalogues containing the needed pictures for identification of spare parts to be ordered, stored or installed should be delivered. The Spare Parts Catalogue furthermore should contain Original Manufacturers (Wartsila) specific Spare Part Numbers and NOT Agent Part Numbers. The Spare Parts Numbers should be connected to Wartsila’s unique Code Resolution system, to enhance the precision of spare parts processing and minimizing the need for updating at KPA’s side. 7.7.1.2 Reduction Gear (i) Slipping Clutch A slipping Clutch coupling to be integrated in the thrusters and should be able to control the maneuverability by controlling the propeller speed. A safety measure should be such that below idle speed, the coupling should modulate and be fully engaged. (ii) Appropriate alarms and instrumentation for the system must be provided. 7.7.1.3 Shaft Propeller a) Straight line Shafting should consist of the following i. One shaft ii. One bow teeth coupling iii. One bulkhead seal iv. Shaft bearings v. Flexible coupling b) Rudder Propellers Page 115 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 116 Azimuth Stern Drive propellers should be fixed pitched propellers made from Bronze, manufactured by Rolls Royce or equivalent. Steering pumps should be mechanically driven with spare V-Belts for Rolls Royce units fitted ready for use. 7.7.1.4 Control System Propulsion o The design and lay-out of the control and alarm system should contain the complete control of the propulsion installation and propeller units from the wheelhouse control panel. o Local hand controls should be provided so that it is possible to operate essential machinery and steering gear with the wheel house control out of order or in failure mode with head set communication. o All Consoles should be made of steel and all instrumentation should be marine type of proven brand, type and make. 7.7.1.5 COMPRESSED AIR SYSTEM (i) Main Air Compressors. No. 2 Generation and distribution of energy by means of pneumatics (compressed air) for main engines starting system with two main air receivers. There shall be two main Air Compressors of make; SPERRE, maximum pressure of 30 bars. The following shall be provided for the Air System; Appropriate Air dryer system, o --------------------------------------------------- Water separator, o --------------------------------------------------- Appropriate air pressure reduction and other components for distribution of air to various use point including the deck. o --------------------------------------------------- There should be provision of supplying compressed air to the water boxes and sea suctions/chests for blow down operation o --------------------------------------------------- The main compressors should be either Air or Water cooled (ii) Emergency Air Compressor: There shall be an emergency air compressor unit installed in the engine room. It should a diesel engine driven Compressor of make SPERRE, with delivery air pressure of 30 bars. Note: All safety features should be installed as per the Classification Society Recommendation 7.7.1.6 Wheelhouse Control Station o Main engine speed and slipping clutch should be electrically operated by remote control from the wheel house desk with one handle for each main engine incorporated in the steering control of Rolls Royce Make, and Combinatory type. Page 116 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 117 o Tenderer should include detailed description of the lay out and list the types of instrumentation and alarms to be provided on the console o There should be two overhead consoles in the wheel house one between the Wheelhouse centre sky window and front window and one to be fitted between the wheel house centre sky window and aft window. o All instrumentation and alarms with their description should be provided for evaluation 7.7.1.7 Controls and alarms in engine room / rudder propeller gear room o The Main engines and all auxiliary engines should have local controls for operation purposes with full instrumentation and alarms fitted for monitoring purposes in the air conditioned control room. o All instrumentation and alarms with their description should be provided for evaluation 7.7.1.8 Alarms Propulsion Installation o All alarms for propulsion installation should be individually presented in the engine room, control room and in the wheel house. The tenderer to provide a list of all appropriate Alarms to be mounted for the system monitoring. o Shut downs should be fitted and the list of these shut downs (stops) should be provided in the bid. Note: Accept push button should be installed to reset the acoustical alarm and to indicate acknowledgement. 7.7.1.9 Steering Gear System 7.7.1.9.1 Steering Gear General o Single hand control units should be fitted in the wheel house. o Rudder propellers should be activated by hydraulic steering gear o This single-hand control should allow combined actuation of steering and engine speed by one hand for each rudder propeller with a follow-up steering system. 7.7.1.9.2 Hydraulic Piping: Seamless steel precision pipes are to be installed between each rudder propeller and steering pump with high pressure hydraulic hoses used where necessary. 7.7.1.9.3 Emergency steering An emergency steering should be provided so that incase the normal steering system fails, the steering can be switched to a non-follow-up system (24V) operated by means of pushbuttons in the wheelhouse dashboards. In addition, the rudder propellers should be operated locally in the rudder propeller room (nonfollow up system). 7.7.1.9.4 Spare Hydraulic Tank Page 117 of 183 SECTION VII: TECHNICAL SPECIFICATIONS A spare hydraulic tank for the steering system should be fitted in the propeller room 118 rudder 7.7.2 Primary Ship Systems a) Pumps Quality, Make of pumps, their suitability and their installation should be according to Class requirements All pumps should be supplied with Overhaul Kits including Impeller, Shaft, Mechanical Seal, Wear-rings and Bearings. Note that this is Mandatory for all pumps b) Piping. The design and layout of piping system, the materials, installation and testing should comply with the relevant rules of Class and other Regulating Authorities and IMO requirements. Pipes, Valves, Fittings, and associated equipment should be critically selected to be suitable for the working pressure to which they may be subjected in service and test to static pressure test 1.5 times working pressure for a minimum of 120 seconds. Unless otherwise stated, Quick Closing Valves (Spring –Loaded Shutoff Valves) should be fitted to all fuel oil and lube oil tanks. c) All pumps and/or equipment be provided with Shut-Off valves on suction and delivery sides to isolate the system during maintenance d) Systems design and layout drawings should be provided e) Ample space should be provided in and around piping for servicing, disassembly, and removal or equipment and components f) Take-down joints should be provided to facilitate removal of equipment and piping for effective and efficient maintenance and repair works. 7.7.3 Bilge, Ballast and Internal Fire Fighting System 7.7.3.1 Bilge System (i) There should be a bilge pumping system capable of pumping out each hull compartment in accordance with Class requirements. Each watertight compartment or bilge wells should have high level bilge alarms. All suction line ends, bronze or stainless steel strainer baskets should be fitted. (ii) The bilge water tank and the dirty oil tank should be able to discharge to shore through central deck connection through a removable discharge hose 20m. (iii) General service pumps suction connections on the sea water inlet and should be provided as the pressure side with Storz Valves in the engine room, at the main deck and at the forecastle deck for firefighting and or deck washing. (iv) The design should be such that the Pump and system can enable the bilge pump to serve as a backup to fire pump. Page 118 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.7.3.2 119 General Service / Fire Fighting / Bilges Pumps There shall be two electrically driven centrifugal general service pumps of selfpriming type installed in the engine room. The pump should be of all bronze and both pumps should be standby for each other. Note: For standardization purposes, Type Sterling AKHA 6101 of not less than 34M³/h is recommended. 7.7.3.3 Bilge Water Separator Bilge water separator should be fitted to separate dirty bilge water from the bilge water tank. Extracted water with an oil content of 5 ppm as per classification rules should be pumped overboard whilst the oil residue should be collected in the dirty oil tank. A p.p.m. monitor with alarm and Auto shut should be fitted. The appropriate filters should be supplied as back up. Note: For standardization purposes, Type Facet of not less than 0.5M³/h is recommended 7.7.3.4 Bilge water discharge The bilge water tank should be discharged to shore through a deck connection for sludge, dirty oil and bilge water by the dirty oil pump. A removable hose pipe of not less than 20m for discharge should be provided. 7.7.3.5 Fire Fighting Pumps Both general service pumps should be connected to the sea water inlet and act as firefighting pump 7.7.3.6 Deck Hydrant Two deck hydrants with 2" Storz hose couplings or equivalent should be connected to the sea water inlet via the general service pump. 7.7.3.7 Fire Hoses on Deck Four fire hoses of 15.0 m length and equipped with three adjustable nozzles and four 2" Storz couplings or equivalent should be stored in a box at the aft deck. 7.7.3.8 Engine Room Hydrant Two engine room hydrants with 2" Storz hose couplings or equivalent should be connected to the sea water inlet via the general service pump. 7.7.3.9 Fire Hose Engine Room Four Hoses of 10M length, equipped with two adjustable nozzles and four 2" Storz couplings or equivalent to be stored on reels in the engine room. 7.7.3.10 Emergency Fire Pump Page 119 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 120 An independent portable diesel driven fire-fighting pump with hose and nozzle, should be installed in the engine room. The air-cooled diesel engine ought to be manually and battery started, complete with built-on fuel tank. Note: Make of pump: Angus of capacity not less than 30 m³/hr is recommended. This pump should be constructed of bronze material both the Impeller and the housing to withstand corrosion on deck and wasting away of the unit. The pump’s impeller should be made of Bronze material. 7.7.4 Fuel Oil System The fuel oil system should be designed for both Main Engines and auxiliary engines. 7.7.4.1 Fuel Oil Piping o The Fuel Oil bunker tanks and fuel oil service tank should be connected via valves to fuel transfer pump o Fuel Oil Purifier should be installed to purify and transfer fuel oil from one of the bunker tanks to the service tank. o Fuel header pumps should be able to supply all fuel from service tanks to the header tanks. o Each header tank should be equipped with Low Level Alarm-Switch, a gauge glass and drain with self-closing valve. o The service tank should be fitted with a low level alarm and a high level alarm. o There should be a provision that the fuel oil tank valves can be remotely quick closed from the main deck (emergency stopping). 7.7.4.2 An Electrical driven fuel Transfer Pump shall be fitted to transfer fuel between bunker tanks. Note: For standardization purposes, Type STERLING AKHA 5101 of capacity not less than 20 m³/hr shall be accepted. 7.7.4.3 Fuel Oil Purifier The fuel oil purifier should be used to transfer the fuel from the bunker tanks to the service tank and in the process to purify the service tank itself (looped use of Purifier). Note: For standardization purposes, Make Westfalia Type OTC 3-02-137 of capacity not less than 1740 ltr / hr. shall be accepted. 7.7.4.4 Fuel Header Pump An Electrically driven header pump should be provided to transfer fuel oil from Service tank to the header tank. Note: For standardization purposes, only Make STERLING TYPE AOHA 3101 of capacity 4.5m³/hr shall be accepted. 7.7.4.5 Water Separator Page 120 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 121 Duplex change-over fuel water separator (Make Separ, type SWK-2000) should be mounted in both PS and SB fuel oil lines between header tank and engines. Separ fuel water separators to be fitted with standard Separ Filter-Element (30 microns) with a low pressure alarm switch at 0.15 bar. An alarm for sensing presence of water should be provided. 7.7.4.6 Duplex Fuel Oil Filters Duplex fuel oil filters should be incorporated in each main engine and generator engine lay-outs. 7.7.5 Cooling water System The cooling water system of main and auxiliary engines should be of the box cooling type. The box type heat exchangers should be fitted in sea chests, situated in the engine room and connected to fresh water cooling systems. The fresh water cooling for each engine should be closed system with cooling water pumps driven by the engines. The main engines should be fitted with separate high and low temperature circuits (HT-LT system). 7.7.5.1 Fresh water cooling circuit The fresh water cooling systems should be of the closed type and pressure gauges installed in the lines. De-aeration plugs and drain valves to be fitted at suitable places in the fresh water cooling systems of each engine. For each diesel engine an expansion tank is installed. 7.7.5.2 Fresh Water Cooling Pumps Fresh water cooling pumps to be incorporated in each engine lay-out. 7.7.5.3 Box Coolers Separate box type heat exchangers should be installed in sea chests in the engine room for cooling the main and auxiliary engines. The chests should be opened for inspection on the Vessel's exterior. The heat exchangers should have adequate capacity for cooling the engines at 100% power rating with a seawater temperature of 35°C and a fouling allowance of 10%. Recommended make is : NRF or equivalent. 7.7.6 Fresh Water System The fresh water tanks should be connected to pressure set which supplies fresh water to the taps in toilets, galley and engine room and to the window spray system. All steel piping should be galvanized. At the taps and/or other fixtures flexible hoses or copper piping should be used while valves should be of bronze. Dead ends of fresh water pipes will not be longer than 5 times the diameter of the considered pipe. 7.7.6.1 Fresh water pressure set Fresh water should be supplied by electrically driven flexible mounted pressure set consisting of a pressure tank of 110 litres with a centrifugal pump. Note: For standardization purposes, only Make : STERLING, Type : HBK 111 / AOHA 3101 shall be acceptable. Page 121 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 122 7.7.7 Sanitary Discharge 7.7.7.1 Sanitary / Flush System The toilets should be flushed with fresh water, which is to be supplied by a fresh water pressure set, through copper pipes. The drainage of washbasins, showers, toilets etc. should be via steel pipes to the sewage tank. This tank is provided with a high-level alarm-switch and a connection for flushing. The sewage from the sewage tank should be discharged overboard by the sewage treatment plant or to shore by the sewage pump through a 20 m hose. 7.7.7.2 Sewage pump One electrically driven sewage pump of capacity not less than 6.6 m3/hr to be fitted with an automatic shut off to be provided by a time switch and a manual override. 7.7.7.3 Sewage treatment plant A sewage treatment plant should be fitted on the lower deck. Note: For standardization purposes, Make Hamann, Type Supermini+ or equivalent for capacity of 12 persons is acceptable. The sewage treatment plant should be able to be flushed with sea water for cleaning purposes. 7.7.8 Filling, Sounding and De-aration System a. All fuel oil tanks should be fitted with a central filling and de-aeration system and fitted with an overflow tank alarm. Each fuel tank (except header tank) should be fitted with a sounding pipe. b. All sounding and filling pipes above deck, with screwed caps, should be of stainless steel and fitted with drip trays. c. The fuel oil and fresh water de-aeration pipes should be equipped with de-aeration caps with a (self) closing device. Fuel oil caps should be fitted with flame traps. d. All filling pipes should have lockable bronze caps, secured by stainless steel chains. e. The fore and aft peak should be provided with sounding and de-aeration pipes. All sounding pipes should have bottom strips and run to the bottom of their respective tanks. f. The filling and de-aeration fitted with flame traps for fuel oil, lubrication oil, dispersant, foam and the g. Discharge for dirty oil, sludge and bilge water should be situated in the central filling and de-aeration station starboard side in the deckhouse. h. The filling and de-aeration for fresh water and the discharge for sewage are i. Situated in the filling and de-aeration locker at port side on the forecastle deck. 7.7.8.1 F.O. tank / Fresh water measurement system In addition to the sounding pipes a tank content, measurement system should be fitted in the fresh water tank and all fuel oil tanks. The measurement should be based on a sensor system connected to the monitoring/alarm system. The tanks contents readings should be in the control room. Page 122 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 123 7.7.9 Lubrication Oil System The clean lubrication oil tanks should be located in the engine room with steel filling and de-aeration pipe to the main deck and a sounding pipe in the engine room. The sumps of main and auxiliary engines should be able to be filled from these tanks. 7.7.9.1 An electrically driven lubrication oil fill pump should be fitted, pumping oil from the clean Oil tank to fill in the main engines sumps. Note: For standardization purposes, only Pump type STERLING R 35/25 of capacity not less than 2.1 m³/hr at 4 bar shall be acceptable. 7.7.9.2 Manual Pump A manual pump with drip tray should be fitted in the engine room and connected to the smallest clean oil tank to fill the Auxiliary engine sumps with a can. 7.7.9.3 Dirty Lubrication Oil Pump There should be a provision for emptying the main engines sumps into the dirty oil tank via an electrically driven pump, recommended is Magator Type L 125VDBP (or equivalent) of capacity not less than 3.0 m³/hr at 2 bar. The Auxiliary engine sumps should be emptied via their own built on manual pumps in to the dirty oil tank. 7.7.9.4 Sludge Pump A dirty lubrication Oil pump should be used to empty the sludge tank, connected to deck for discharge to shore 7.7.9.5 Lubrication Oil Coolers Lubrication Oil should be fresh water cooled, and the coolers be integrated in the engines lay out 7.7.9.6 Pre-Lubrication Oil Pump There should be an integrated electrically driven Pre-lubrication oil pump fitted on each main engine, with an automatic control and a provision of starting in manual mode. 7.7.10 Ventilation, Air-Conditioning and Heating System 7.7.10.1 Natural and Mechanical Ventilation System a. Forced ventilation should be provided for in; Wheelhouse, accommodation, engine room, rudder propeller room and stores with the Air velocity not exceeding 5 m/s at outlets and 3 m/s at inlets. Page 123 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 124 b. Acceptable air velocities for Secondary ducts and main ducts shall be 12m/s and 15m/s respectively. c. Care should be exercised to ensure water does not stagnant in the ducts and the system to be sea water resistant. 7.7.10.2 Forced Ventilation Engine Room Engine room should be supplied with fresh air for ventilation and air suppletion for the engines by two electrically driven double speed ventilators of air capacity 20000 / 40000 m³/h of type SOLAR or equivalent. 7.7.10.3 Forced Ventilation Rudder propeller spaces The rudder propeller spaces should be supplied with fresh air by fitting two fans of capacity not less than 900 m³/hr. each 7.7.10.4 Forced Ventilation Store on Lower Deck The Stores on lower deck space should be supplied with fresh air by fitting one fan of capacity not less than 500 m³/hr. 7.7.10.5 Forced Ventilation Wheelhouse and Accommodation Spaces The Wheelhouse and Accommodation Spaces should be sufficiently supplied with fresh air by fitting by forced ventilation which should supply fresh air through ducts to various compartments, and every fresh air outlet to be controllable locally. 7.7.10.6 Extractor Fans a. There should be an extractor fan fitted in the sanitary spaces below main deck with capacity not less than 200 m3/hr. b. There should be an extractor fan fitted in the sanitary spaces main deck with capacity not less than 100 m3/hr. c. There should be an extractor fan fitted in the dry store space below with capacity not less than 100 m3/hr. d. There should be an extractor fan fitted in the galley spaces with capacity not less than 300 m3/hr. 7.7.10.7 Air Conditioning System for Wheel house and accommodation a. The Wheelhouse and accommodation spaces should be sufficiently and reliably supplied with conditioned air to comfortable working environment with dedicated spaces thermostat. Care should be taken to ensure that; the Cooling Compressor, the Central fan and the Condenser requiring maintenance is easily accessible. b. Separate air conditioning unit should be fitted in the Main Switchboard Room (MSR), consisting of a water cooled self-contained unit fitted in the engine room with air ducts to the MSR c. A closed fresh water cooling system connected to a cooler box should be installed to provide cooling of the condensers of the air conditioning system Page 124 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 125 7.7.11 Exhaust System 7.7.11.1 Exhaust Piping Exhaust should be made from steel pipes insulated with heat resistant material stainless steel compensator fitted between exhaust manifolds and exhaust pipings. 7.7.11.2 Exhaust Silencers with Exhaust silencers for the main engines and auxiliary engines should have a total capacity of not more than 45dBA with the exhaust pipes insulated with minimum 50mm heat resistant material 7.7.11.3 Spark Arresters The exhaust silencers should be provided with spark arrestors of a type suitable for LNG terminals 7.7.12 Electrical Installation General description o The Tug Boat design and lay-out of the electric system, the materials, installation and testing should be in accordance to Class and I.E.C. requirements. o All electric cables and materials should be for marine application and adequately protected against corrosion and in accordance with requirements for safe and efficient operation of the Tug Boat. o All external material and fittings should be weatherproof marine quality. o Clearly marking and labelling should be provided for all cables, sockets, switchgear, distribution boxes, etc. showing voltages, functions, etc. o Megger tests should be carried out on all electric circuits and report prepared to be handed in at delivery of the Tug Boat. All Electric motors onboard should comply with I.E.C. standards and for the supply to the electric consumers and installations the following networks ought to be provided; i. ii. iii. iv. v. vi. vii. 7.7.13 A bipolar battery network, nominal voltage 24 V for ship consumer’s network. A bipolar battery network, nominal voltage 24 V for starting network. A bipolar battery network, nominal voltage 24 V for emergency network. A bipolar battery network, nominal voltage 24 V for radio network. A lighting network, nominal voltage 240 V, 50 Hz, connected between phases and neutral of the power network. A power network, nominal voltage 240/415 V, 50 Hz 3 phases with neutral. Neutral earthed at one point in the main switchboard. Power Generating System Page 125 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 126 7.7.13.1 Transformer / rectifier A transformer / rectifier 415 V A.C. to 24 V D.C. should be fitted, for normal supply to ships consumers network and connected in parallel with the ships consumers battery set, which should be charged by a battery charger. The voltage of the battery charger should be lower than the voltage supplied by the transformer / rectifier. In the event of a blackout in the power network, the ships consumers battery set must automatically supply the ships consumers’ network (back-up supply). Alarm should be indicating the change-over to battery supply. 7.7.13.2 Battery set 24 V - ships consumers’ network There should be Four batteries, 12 V 200 Ah each, combined to one battery bank, 24 V 400 Ah, for back-up supply of the ships consumers network with Low voltage alarm fitted. 7.7.13.3 Battery set 24 V - starting network There should be Four batteries, 12 V 200 Ah each, combined to one battery bank, 24 V 400 Ah, to feed the network for starting the main and auxiliary fitted with a Low voltage alarm. 7.7.13.4 Battery set 24 V - emergency network There should be one battery bank, 24V D.C. for the emergency network fitted with Low voltage alarm. 7.7.13.5 Battery set 24 V - radio network There should be one battery bank, 24V D.C. for the radio network fitted with Low Voltage alarm. 7.7.13.6 Battery change-over facility There should be a battery change-over provision to enable starting of main engines and generators from ship consumers batteries. 7.7.13.7 Battery charging There should be one battery charger for every battery set. 7.7.13.8 Generator sets There should be three generator sets; Two main Generators and a Harbour Generator. Each consisting of a generator with a built in auto voltage regulator driven by Caterpillar CAT marine diesel engine installed in the engine room, with the engines Page 126 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 127 being electrically started and stopped from a control panel mounted on the engine and from the main switchboard room. a) The generator sets should be fitted with: o A cooling water temperature indicator o A lubrication oil pressure indicator o A running indication light o A running hour counter b) There should be Alarm lights for: o Lubrication oil pressure low o Lubrication oil temperature high o Cooling water temperature high o Cooling water level low o HT cooling water pump diff. pressure low o Fuel oil pressure low o Level fuel oil drain tank high c) The generator set should automatically stop at: o Cooling water temperature high (2nd stage) o Lubrication oil pressure low (2nd stage) o Overspeed d) The generator sets should be fitted with auto start system. In case of failure of a set, the stand-by set should automatically start and take over. 7.7.13.9 (i) Two Main generator sets & One Harbor Generator o Engines make Caterpillar (CAT) Marine Diesel Engine. o Generators make recommended is Caterpillar or equivalent. o Capacity 125 kVA o Voltage 240/415 V o Phase(s) 3 o Frequency 50 Hz o Crank case de-aeration integrated o Anti condensation heating built in o Number installed 3 Note: The generator sets should be suitable for parallel operation for take-over purpose. 7.7.13.10 Shore power supply connection There should be a 125 Amp. shore connection being part of the main Switchboard. Socket outlets with male contacts to be arranged in a locker at each side of the deckhouse and delivered with a Shore power supply connection cable of 50 M with a female plug (shipside) and a male plug (shore side). An extra female plug should be delivered for adaptation to the shore system. A provision should be provided to be able to connect through shore power connection from one tug to the other Page 127 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 128 The shore power supply connection should for provision of power for: o Impressed Current Anti-Fouling system o Fresh water pressure set o Fresh water heater o 60% of the lighting o Ventilation / air-conditioning / heating installation o One engine room fan o One general service pump o Rectifiers o Anti condensation heating generator sets o Battery chargers o Galley equipment o Laundry equipment 7.7.13.11 Cables and wiring 7.7.13.12 Cables All Electric cables should be stranded conductor type. Cables for signaling and communication with a voltage less than 100 V have a minimum cross-section of 0.75 mm². Other cables have a minimum cross-section of at least 1.5 mm². Cables for electronic equipment with earth-screen should be used and be adequately separated from the high voltage cables. Fire resistant cable should be used for: o Fixed fire fighting system o Towing hook quick release system o Emergency release towing winch fore o Emergency release towing winch aft 7.7.13.13 24 V network The 24 V installation should be for bi-polar and insulated from earth for the following networks: o One for supplying ships consumers’ network. o One for supplying starting network. o One for supplying emergency network. o One for supplying radio network. 7.7.13.14 240 V network A lighting network, nominal voltage 240 V - 50 Hz 1-phase 7.7.13.15 230/400 V network A power network, nominal voltage 240/415 V - 50 Hz 3-phases Page 128 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 129 7.7.13.16 Switchboards a. All materials and constructions should be shock proof, suitable for tropical conditions, and according to Classification requirements b. Busbars should be of hard drawn high conductivity copper of adequate cross section to support the maximum load. Busbars should be provided along the entire length of the switchboard on convenient location. c. In front of the main switchboard, in the switchboard room as well as in the technical space under the wheelhouse, a rubber matt (carbon free) should be laid. d. All live parts should be covered to prevent contact when switchboard doors with door positioners are opened. Outside the switchboard insulated handrails should be fitted. 7.7.13.17 Starter boxes and switchboards 240/415V a) Switchboards should be closed type, fitted with control lights. b) Motors out of sight of the operator should be provided with an isolating safety switch near the motor. c) Overload protection switches should be of the thermal triple pole type with temperature compensation and hand-reset. d) The maximum voltage of pilot circuits should be 240 Volts. Essential pilot circuits should be protected separately. e) Fuel oil pumps, lubrication oil pumps, hydraulic pumps, engine room ventilators should be connected to the emergency stop near the entrance of the engine room and the control of the fixed fire fighting installation. f) The Ventilation system of the wheelhouse and accommodation should be connected to the emergency stop in the wheelhouse. 7.7.13.18 Measuring instruments Meters in the switchboard should be provided with red marks at nominal limits. Ampere meters should be fitted for motors consuming 10 KW or more. 7.7.13.19 Switchboard 24 V wheelhouse The 24V switchboard should be installed in the technical space below the wheelhouse and provided with: a) Supply connections: o Main supply from switchboard 24 V ship consumers network o Emergency supply from emergency battery set b) There should be combined switches/automatic circuit breakers for the following outgoing circuits: i. Navigation lights (emergency supply from the emergency network): o Sidelights o Masthead light o Sternlight o 2nd Masthead light Page 129 of 183 SECTION VII: TECHNICAL SPECIFICATIONS ii. iii. iv. v. vi. vii. viii. ix. x. xi. xii. xiii. xiv. xv. xvi. xvii. xviii. xix. xx. xxi. xxii. xxiii. xxiv. xxv. xxvi. 130 o 3rd Masthead light Towing light (emergency supply from the emergency network) Anchor light (emergency supply from the emergency network) R.I.M./N.U.C. lights (emergency supply from the emergency network) Window wipers Window wash system General alarm (emergency supply from the emergency network) Emergency lighting accommodation (emergency supply from the emergency network) Emergency lighting wheelhouse (emergency supply from the emergency network) Emergency lighting engine room / rudder propeller room / workshop / store (emergency supply from the emergency network) Emergency lights life rafts (emergency supply from the emergency network) Fixed fire fighting system (emergency supply from the emergency network) Chart table lamp (emergency supply from the emergency network) Dashboard lighting Line pull measurement towing winch forward o Line pull measurement towing winch aft o Remote control fire fighting monitors o Signal lamp Horn (emergency supply from the emergency network) Radar (emergency supply from the emergency network) Speed log Autopilot with interface to magnetic compass GPS (also 230 V supply from switchboard room) (emergency supply from the emergency network or radio network) Echo-sounder Intercom (emergency supply from the emergency network) CCTV (also 230 V supply from switchboard room) VHF (2) (also 230 V supply from switchboard room) (emergency supply from the emergency network or radio network) o SSB (also 230 V supply from switchboard room) (emergency supply from the radio network) o Inmarsat (2) (also 230 V supply from switchboard room) (emergency supply from the emergency network or radio network) AIS 2 Spare switches 7.7.13.20 Switchboards 24V main switchboard room The following 24V switchboards should be found in the Main switchboard room; (a) Switchboard 24V Tug Boat starting network: o Volt meter and ampere meter of the battery set supplying the starting network o Earth fault detection of the starting network battery, transmitted to the alarm system. o All relevant shunts. Page 130 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 131 o All relevant fuses. o Voltage protection relays. o Battery change-over facility. (b) Supply connections: o Main supply from starting battery set o Emergency supply from consumer battery set (c) Circuit breakers for the following outgoing circuits: o Starting motor port side main engine o Starting motor starboard main engine o Starting motor port side generator set o Starting motor starboard generator set o Starting motor fifi set (d) Switchboard 24 V ship consumers network o Volt meter and ampere meter of the battery set supplying the Tug Boat consumers network o Earth fault detection of the Tug Boat consumers network battery, transmitted to the alarm system. o All relevant shunts. o All relevant fuses. o Voltage protection relays. (e) Supply connections: o Main supply from transformer/rectifier o Emergency supply from consumer battery set (f) Circuit breakers for the following outgoing circuits: o Switchboard 24 V wheelhouse o Port side main engine o Starboard main engine o Port side rudder propeller o Starboard rudder propeller o Port side generator set o Starboard generator set o Fifi set o Alarm system o Hydraulic system o 2 Spare switches (g) Switchboard 24 V ship emergency network o Volt meter and ampere meter of the battery set supplying the emergency network o Earth fault detection of the emergency network battery, transmitted to the alarm system. o All relevant shunts. o All relevant fuses. o Voltage protection relays. (h) Supply connections: Page 131 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 132 o Main supply from transformer/rectifier o Emergency supply from emergency battery set (i) Circuit-breakers for the following outgoing circuits: o Switchboard 24 V wheelhouse o Port side main engine o Starboard main engine o Port side rudder propeller o Starboard rudder propeller o Port side generator set o Starboard generator set o Fifi set o Alarm system o Hydraulic system o 2 Spare switches 7.7.13.21 Switchboard 240 V wheelhouse The 240 V switchboard should be fitted in the technical space below the wheelhouse and be provided with the following: (a) Supply connections:- Main supply from switchboard 230/400 V main switchboard room (b) Circuit breakers for the following outgoing circuits: o Re-heaters wheelhouse (duct type) o Emergency network battery charger o Fire detection system o Lighting corridors o Searchlights o Deck lighting o Central aerial system o Wheelhouse lighting / sockets o Floodlights o Battery charger radio network o Battery charger helmsman seat o Charging units hand-held VHF o 2 Spare groups single phase 230 V 7.7.13.22 Switchboard 240/415V main switchboard room The main switchboard should be located in the main switchboard room. A busbar separator Should be installed between two sections of the main switchboard and the power supply of both generators and consumers should be divided over both sections. (a) The switchboard should be provided for every installed generator with: Page 132 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 133 o A four pole motor driven generator circuit breaker with thermal overload, magnetic short circuit protection, no voltage coil and protected against undesired switching. o Selector switch manual / off / stand-by (signal lamp stand-by) o Pushbutton breaker on with signal lamp o Pushbutton breaker off/reset with signal lamp o Signal lamp breaker tripped o Pushbutton start generator with signal lamp o Pushbutton stop generator with signal lamp o A voltmeter with selector switch for measuring between phases and between phases and neutral. o A frequency meter. o Three ampere meters with current transformers. o Kilowatt meter. o All relevant relays. o All relevant fuses. (b) The switchboard is provided for the shore connection with: o A four pole motor driven generator circuit breaker with thermal overload, magnetic short circuit protection, no voltage coil and protected against undesired switching. o Automatic phase change over o Pushbutton breaker on with signal lamp o Pushbutton breaker off/reset with signal lamp o Signal lamp power available o A voltmeter with selector switch for measuring between phases and between phases and neutral o An ampere meter with current transformers and selector switch for measuring each phase. (c) The system should also provide start equipment for individual items including; o A 3-pole circuit-breaker o A contactor o A thermal relay o A start and stop push button or a hand/auto-switch for automatic equipment o A running light with short circuit protection for essential services (d) Control positions: o M = main switchboard room o R = Remote control cabinet o L = Local o I = Integrated in starter box equipment o W = wheelhouse o WS = Work switch (e) The following Consumers should have circuit breakers in the main switchboard 415V: o Bilge/general service pump 1 o Bilge/general service pump 2 o Bilge water separator o Transfer pump for fuel oil o Pump for fuel oil header tanks o Fuel oil purifier I Page 133 of 183 SECTION VII: TECHNICAL SPECIFICATIONS o o o o o o o o o o o o o o o o o o o o o o (f) 134 Freshwater pressure set Freshwater heater Sewage pump Clean lub. oil pump Dirty oil pump Pre-lubricating oil pumps main engines (separate starter box on engine) Engine room fans M/R Ventilation rudder propeller room Ventilation store lower deck Ventilation wheelhouse and accommodation (separate starter/control box in switchboard room) AC compressor with running hours counter (separate starter/control box in switchboard room) Cooling water pump AC system Heating wheelhouse and accommodation (separate starter/control box in switchboard room) Additional heating engine room Transformer/rectifier Capstan Auxiliary hydraulic oil pump Cooling water pump hydraulic system Dispersant pump Deck connection (salvage pump) Cooker 2 Spare groups triple phase 400 V The Following consumers should have circuit breakers in the main switchboard 230V, A circuit breaker should be automatic switch with thermal overload protection and short circuit protection. o Supply 230 V switchboard wheelhouse o Impressed Current Anti-fouling system o Sewage treatment plant o Extractor fan sanitary spaces o Extractor fan galley o Extractor fan dry store o Additional heating accommodation o Anti condense heating generators o Battery charger ship consumers network o Battery charger starting network o Battery charger emergency network o Battery charger radio network o Lighting engine room / rudder propeller room / engineers workshop o Lighting store / laundry lower deck o Lighting accommodation below main deck o Lighting accommodation main deck (3 groups) o Sockets engine room / rudder propeller room / workshop / store o Sockets lower deck o Sockets below main deck o Sockets main deck o Combined refrigerator / freezer o Combined microwave / oven Page 134 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 135 o Freezers , Washing machine, Dryer o 2 Spare groups single phase 230 V 7.7.14 Alarm system An integrated control system should be fitted for central control and display of information. Note: For standardization purposes, Make Praxis Automation of type MegaGuard shall be accepted (a) The alarm system should consist of not less than the following main systems: o Alarm, monitoring and control system o Extension alarm system o Conning screen (b) The following workstations should be fitted: o Main switchboard workstation o Remote control cabinet workstation on main deck o Two workstations in the wheelhouse (c) Each workstation should consist of: o Display (17’’ touchscreen on bridge, normal 17’’ screen elsewhere) o Keypad o Trackball (d) The following panels should be fitted: o Engine room attended/unattended panel near E.R. entrance o CE cabin and mess room panels o Central filling station panel 7.7.14.1 Alarm, monitoring & control system The alarm system should comprise of a number of alarms for the propulsion installation and other Tug Boat functions. The alarms (except for the auxiliary engines) should be individually presented in the main switchboard and in the wheelhouse. The alarms for the auxiliary engines should be presented as group alarms. (a) Main switchboard There should be the intelligent I/O modules in the engine room cabinet. Each I/O channel should be equipped with LED alarm or status indicator and channel identification text window. (b) Central filling station panel There should be a small alarm panel with bunker alarm (fuel oil overflow tank level) in the central filling station (c) Type of Alarms Not less than the following alarms should be included in the alarm, monitoring & control system: o Propulsion alarms of main engines and rudder propeller units (see 214) o Group alarm generator set 1 Page 135 of 183 SECTION VII: TECHNICAL SPECIFICATIONS o o o o o o o o o o o o o o o o o 136 Group alarm generator set 2 Group alarm fire fighting set General bilge alarms High level bilge water tank Low level fuel oil header tank PS Low lever fuel oil header tank SB High water level fuel water separator PS main fuel oil line High water level fuel water separator SB main fuel oil line Low level fuel oil service tank High level fuel oil service tank Water detection fuel oil service tank High level sewage tank High level dirty oil tank High level sludge tank Alarm transformer/rectifier Low voltage alarm for each battery set (from battery chargers) Hydraulic alarms (d) Controls The following controls are included: o Main engines start / stop o Main engine control in engine room or bridge control selection o General service pumps start / stop o Bilge water pump start / stop o Fuel oil header pump start / stop o Fuel oil transfer pump start / stop (control only on main switchboard) o Clean oil pump start / stop (control only on main switchboard) o Cooling water pump hydraulic system start / stop o Sewage pump start / stop (control only on main switchboard) o Ventilators start / stop o Air conditioning system compressor start / stop o Air conditioning system cooling water pump start / stop o Generators start / stop o Generator breakers in / out o Generator stand-by switch o Generator anti-condensation heating on / off o Exterior lighting o Electrically driven hydraulic pumps start / stop 7.7.14.2 Extension alarm system An extension alarm system as per Class requirements for an unmanned machinery space shall be fitted. (a) Bridge: The bridge control station should be integrated in the Alarm, monitoring & control system. A dedicated Extension Alarm System screen should display: o On duty selection o Attended / unattended machinery space selection o Engineer calling o Engine room patrol timer Page 136 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 137 (b) CE cabin and mess-room panels The panel should consist of a 4-line, 40 characters display to indicate all alarms and should be provided with o Menu scroll buttons o Stop horn and acknowledge buttons. o On duty indication light o 8 separate engine room group alarm lamp indicators o Fire alarm indicator o System on o Engine room and bridge call buttons o Dimming function (c) Engine room Near the engine room entrance a panel should be fitted for selection of engine room status (attended/unattended) and a patrol timer reset button. 7.7.14.3 Conning screen The Conning system should be able to selectively convey the following information on screen on the workstations: o Indication pre-lubrication oil pumps main engines running. o Indication auxiliaries running. o Indication open/close of watertight hatches and doors. o Controls and display for direction finding and course keeping equipment. o Digital repeater GPS navigator. o Digital repeater echo sounder. o Display for Wind direction & Speed 7.7.14.4 General alarm Control panel in the wheelhouse should be fitted with buttons to activate a number of alarm signals which can be heard all over the ship, able to give a continuous or intermitted signal. (a) (b) (c) Alarm bells to be installed at: o Accommodation main deck o Passage below main deck o Fore and aft deck A siren and flashing light is installed in the engine room. A siren is installed in the rudder propeller room. 7.7.14.5 Fire detection installation (Recommended Make is Praxis of Type Pro-series) A fire/smoke detection installation should be installed consisting of the following: o Central alarm panel with an acoustical alarm and external pot. free alarm contact output. o Heat detectors and smoke detector(s) in machinery spaces o Heat detector in the galley o Smoke detector(s) in accommodation spaces Page 137 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 138 o Smoke detector(s) in corridors o Heat detector in technical space under the wheelhouse o Call point(s) 7.7.14.6 Bilge alarm There should be an audible and visible alarm provided in wheelhouse and engine room, indicating high bilge-water levels in the engine room, rudder propeller room and cofferdam accommodation. 7.7.14.7 Engine room alarms in accommodation There should be an audible and visible alarm provided in the chief engineer's cabin and mess room. The alarm unit should be provided with a reset button for acceptance. 7.7.14.8 Watertight door open/close indication There should be an open/close door indication integrated in the conning screen for watertight doors in engine room and rudder propeller. 7.7.14.9 Watertight hatches open/close indication There should be an open/close door indication integrated in the conning screen for watertight escape hatches on the main deck. 7.7.14.10 Tank sounding system Tank levels of tanks should be indicated on the Praxis Mega-guard. 7.7.14.11 Bridge Navigational Watch Alarm System (BNWAS) A Bridge Navigational Watch Alarm System should be fitted, according to the IMO and Class requirements. A panel should be fitted in the bridge with an adjustable timer and reset function. If the timer is not reset in the selected interval, a light on the panel should be activated. When the panel has not been reset 15 seconds after the light, a buzzer in the panel should go off. When 15 seconds later the system is still not reset, the General Alarm system should be activated. Recommended Make is Furuno, Model BR500 7.7.14.12 Lighting a. The lighting system for the Tug boat should be divided into a 240 V lighting and a 24 V emergency lighting. b. The interior of the Tug boat should be adequately lighted with marine-type lamps. c. All exterior lamps should be waterproof and sea water resistant marine-type lamps. Page 138 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 139 d. The lighting per compartment should be connected to two different supplies. e. A number of spare bulbs should be provided for the interior, exterior and emergency lighting. 7.7.14.13 Emergency lighting 24V D.C. a. Battery emergency lighting should be installed near essential equipment, along the path to this equipment and near exits. b. Emergency lighting should not be part of the normal lighting and should only light up in case of a black-out of the normal lighting system. c. Emergency lighting should fitted in main compartments; Engine Room, Switchboard room, Rudder Propeller room and in all escape routes and near escape hatches and doors. d. The emergency lights should be integrated in the normal lamp units. 7.7.14.14 Interior lighting 240V A.C. Not less than the following should be fitted: a. Engine room: o 16 fluorescent lamp units 2 x 18 W (one at the entrance), resiliently mounted with switch near the main entrance. o 2 double sockets 240 V/16 A (IP 44). o In each FL unit near main exit(s), a 25 W lamp for emergency lighting is fitted. b. Rudder propeller room / engineers workshop: o 6 fluorescent lamp units 2 x 18 W, resiliently mounted, with switch near entrance o 1 socket 240 V/16 A (IP 44) o 1 socket 415 V/16 A (IP67) o 3 lamps 25 W for emergency lighting (in FL unit) (2x near emergency steering system rudder propeller, 1x near the exit) c. Main switchboard room: o 2 fluorescent lamp units 2 x 18 W with switch near the entrance o 1 double socket 240 V/10 A (IP 44) o 1 lamp 25 W for emergency lighting (in FL unit) d. Dry store / AC room: o 1 fluorescent lamp unit 2 x 18 W with switch near the entrance e. Technical space under the wheelhouse: o 1 bulleye 40 W with a switch near the entrance f. Deck store: Page 139 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 140 o Bulleye 40 W with a watertight switch near the entrance. o One socket 415 V/16 A o One double socket 240 V/16 A g. In each cabin: o 1 fluorescent lamp unit 2 x 18 W with switch near the entrance o 1 bed-reading lamp with switch above each berth o 1 desk lamp o 1 wall lamp (only for captain’s and chief engineer’s cabin) o 2 double sockets 240 V/10 A (IP 44) o 1 double socket for additional heating h. Corridor main deck: o 3 fluorescent lamp unit 2 x 18 W with switch o 3 ceiling lamp 25 W for emergency lighting (in F.L.-unit) i. Corridor below main deck: o 2 fluorescent lamp unit 2 x 18 W with switch o 2 ceiling lamp 25 W for emergency lighting (in F.L.-unit) j. Laundry / sewage treatment room / store lower deck: o 1 fluorescent lamp unit 2 x 18 W with switch o 1 ceiling lamp 25 W for emergency lighting (in F.L.-unit) near main exit k. In each sanitary space: o 1 ceiling lamp 60 W with watertight switch near the entrance o 1 combined 15 W fluorescent lamp and shaving socket with isolating transformer above wash basin l. Galley: o 2 fluorescent lamp units 2 x 18 W with a switch near the entrance o 1 lamp in extractor unit above working range o 2 double sockets 240 V/16 A (IP 44) m. Messroom: o 2 fluorescent lamp units 2 x 18 W with a switch near the entrance o 2 double sockets 240 V/10 A (IP 44) o 2 wall lamps n. Wheelhouse: o 2 fluorescent lamp units 2 x 18 W with a switch on the switchboard. o 1 ceiling lamp 40 W, coloured type, near stairway with dimmer and Page 140 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 141 two-way switch on top and on bottom of stairway. o 1 ceiling lamp 25 W for emergency lighting (in FL unit) with separate switch. o 1 chart table lamp 40 W with dimmer. o 1 desk lamp 15 W for emergency light near the radio equipment. o 2 double sockets. 240 V/10 A (IP 44) o 1 double socket for signal lamp 24 V 7.7.14.15 Exterior lighting 240 V D.C. Not less than the following lights should be fitted in the designated spaces listed below; (a) On aft deck o 2 Halogen floodlights 500 W with switch in the wheelhouse. o 1 Fluorescent lamp unit 2 x 18W with switch against deckhouse. o 1 Bronze bulleye 40 W with watertight switch against deckhouse. (b) On fore deck o 2 Halogen wheelhouse front centerline floodlights 500 W with dimmer switch in the wheelhouse. o 2 Halogen wheelhouse front side floodlights 500 W with dimmer switch in the wheelhouse. o 1 Bronze bulleye 40 W with switch in the wheelhouse. (c) Deckhouse sides o 2 Bronze bulleyes 40 W on each side. (d) Bridge deck o 2 Bulleyes 40 W near wheelhouse doors. o 2 Emergency floodlights 150 W (24 V) near life rafts on bridge deck at starboard and port connected to a switch on the bridge deck. 7.8 DECK EQUIPMENT 7.8.1 Anchor equipment a. The anchor equipment and installation should be in accordance with the Classification society’s regulations. b. Two High Holding Power Anchors, type Pool or equivalent should be to be provided c. Anchors should be stowed in anchor pockets flush with the hull. d. Each anchor to be provided with a chain cable e. Cable lifters integral with hawser winch should be provided f. Each chain runs via the winch to a separate chain locker below the fore deck. The anchor and chain cable should be of hot dip galvanized material. g. The end of each chain should be connected to the Tug Boat by means of a quick release device. h. For securing the anchors at sea, a turn buckle for tightening each chain with anchor should be provided. 7.8.1.1 Anchor with chain (Class Unrestricted Service) Page 141 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 142 The following should be the specifications of the Anchor and chain; o Approximate weight: 495 kg o Chain length: 165 m o Chain diameter : 22 mm (stud-link) o Quality : U2 / Q2 (Class) o Number onboard : 2 o Each connection to anchors should be a four link adapter piece and consists of: Kenter joining shackle-swivel-Kenter joining shackle and D-end shackle. 7.8.1.2 Anchor/towing winch a. A Heavy duty double drum hydraulic anchor/towing winch should be fitted on the forecastle deck. b. One drum should be for regular towing duties. c. The other drum should be fitted with an identical line for be stand-by in case of emergencies. d. The winch should be driven by a two speed Staffa hydraulic motor (Tenderer to give detailed description of the Winch to be offered; brake holding force, pull speed 1 and pull speed 2, shield diameter etc and describe the functionability of the said Winch). e. The wire should run from the top of the winch. f. Hauling speed anchor : Not less than 10 m/min 7.8.1.3 Line pull and line length measurement system anchor/towing winch (i) The following sensors should be provided: (a) A pulse counter to determine actual length of outstanding wire and actual working layer should be fitted on each drum of the fore winch. (b) A load pen should be fitted to determine the actual force in the towing wire when the brake is engaged and the clutch is disengaged. (c) A winch control panel should be fitted in the wheelhouse with the following settings/indications: o Indication of the actual length of the outstanding wire o Indication of the actual force in the outstanding wire o Setting of the maximum force in the outstanding wire (ii) Line Measurement system o The pre-set value for the maximum force in the outstanding wire should automatically be the maximum force of the band brake. o The setting for the maximum force in the outstanding wire should be changed continuously during operation. o If the actual force in the outstanding wire is below the set maximum force the band brake should hold the drum and the wire length should be kept automatically. o If the actual force in the outstanding wire is above the set maximum force the drum should slip in the band brake and wire should be prayed out. o When the actual force in the wire is low enough the wire should be able to be pulled in. o When the actual length of the outstanding wire is too long an alarm should be activated in the wheelhouse by a lamp and a buzzer. o The band brake should automatically engage at the end of the 2nd layer to prevent loss of the towing wire. Page 142 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.8.1.4 143 Control system anchor/towing winch The bridge front station situated in the wheelhouse desk should be the designate the main station for controlling the towing winch. Additionally foot pedals should be fitted for the forward towing winch control. The winch should also be locally controlled with a wireless control panel. The selection buttons for remote control and local control should be in the main station. 7.8.2 MOORING SYSTEM 7.8.2.1 Mooring lines A set of Four (4) Polypropylene mooring lines of length 55 m each and diameter 40 mm of minimum breaking strength of 19.tons should be delivered together with the Tug Boat. 7.8.2.2 Capstan 5 T On the aft deck an electric (240/415 V) capstan with two rotation directions should be installed of minimum speed: 15 m/min and capacity of 5 ton. 7.8.2.3 Guiding pin A towline guiding pin fitted in a hole at the top of the bulwark in line with the warping head of the fore winch should be provided 7.8.3 Hoisting equipment 7.8.3.1 Deck Crane Deck crane preferable an Effer Marine Crane or equivalent should be installed 7.8.3.2 Winch on crane An Effer Marine hydraulic hoisting winch or Palfinger should be installed on the deck crane with SWL of 5T 7.8.4 Towing equipment 7.8.4.1 Towing winch fore On the forecastle deck a heavy duty double drum hydraulic anchor/towing winch should be installed where one drum should be for regular towing duties. 7.8.4.2 Towing winch aft On the aft deck, between the towing bitt and the deckhouse, a heavy duty hydraulic towing winch driven by a two speed Staffa hydraulic motor should be installed with the following minimum characteristics; Page 143 of 183 SECTION VII: TECHNICAL SPECIFICATIONS Minimum Speed 1 Speed 2 Brake holding force Drum length Wire drum diameter Shield diameter Wire capacity 144 : 38.0 ton up to 12.0 m /min on second layer : reduced pull up to 38.0 m /min on second layer : 200 ton on 2nd layer : 1275 mm : 900 mm. : 2050 mm, sufficient for storing a stretcher. : 750 m - for steel wire up to diameter 54 mm The following should be provided o The wire runs from the bottom side of the winch. o Al the grease nipples should be the standard flat head type. o Grease lines should fitted with improved accessibility of the grease nipples. o All bolts should be galvanized and all hinges and turning points fitted with stainless steel pins. o A spooling device should be installed. o The guide rollers should be hardened with one guide roller being foldable for removing wire from spooling device. o During towing the spooling device should be disengaged. o Towing bridle and shackles to be provided 7.8.4.3 Control system towing winch aft The bridge front station situated in the wheelhouse desk should be the designate the main station for controlling the towing winch. Additionally foot pedals should be fitted for the forward towing winch control. The winch should also be locally controlled with a wireless control panel. The selection buttons for remote control and local control should be in the main station. 7.8.4.4 Towing hook aft - SWL 1000 Kn/100.0 ton A Class approved towing hook, preferable a disc type or equivalent with a hydraulic quick release device, which can be operated from inside the wheelhouse and from the main deck near the hook should be mounted on the aft deck with safe working load: 1000 kN/100.0 ton. 7.8.4.5 Tow line fore (in combination with the anchor-towing winch) The fore winch should be fitted with the following rope system: o One full friction layer directly on the drum made of 30 mm diameter rope, Euroflex (or equal). o 130 meter tow rope, Euroflex of 96 mm diameter. o An additional spare tow rope as above to be provided o 20 meter forerunner, consisting of 96 mm diameter rope, Euroflex (or equal), with braided protective cover. The interconnections of the different ropes should be made by means of “cowhitch” connecting of the spliced eyes of breaking strength: approx. 220 ton 7.8.4.6 Tow line aft Page 144 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 145 A tow line of 750 m steel wire diameter 54 mm (6x36 ws + st) should be fitted on the aft towing winch with a breaking strength of : approx. 200 ton 7.8.5 Life saving and fire protection Life saving appliances and fire control equipment should be in accordance with the regulations of Class and national authorities for a vessel of this class. The equipment should be of approved type. The required equipment should be properly fitted on convenient locations on board the tug boat, including the required plans (to be plastic sealed) like Safety Plan, etc. The safety plans for outside should be fitted in storage tubes. 7.8.6 Portable CO2 fire extinguishers A portable CO2 fire extinguisher (5 kg) should be fitted in the wheelhouse, the galley, the engine room, the main switchboard room and on the lower deck. 7.8.7 Portable dry powder extinguishers Portable dry powder extinguishers (6 kg) should be fitted in the engine room (two), the passage deckhouse (one), and the passage accommodation below deck (one). 7.8.8 Spare fillings Spare fillings for the portable fire extinguishers should be provided. 7.8.9 Fireman’s outfit Two fireman’s outfits should be supplied and stowed onboard each of which consisting of: o One complete fireman’s outfit o One self-contained breathing apparatus o One compressed air cylinder, completed with spare bottle o One fire axe o One safety lamp 7.8.10 Firemen’s outfit (Lloyd’s Register Fi-Fi 1 notation) Four additional firemen’s outfits complete with breathing apparatus should be supplied and a breathing air compressor of adequate capacity should also be provided. 7.8.11 Fire blanket One fire blanket should be stored in the galley. 7.8.12 Lifebuoys Page 145 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 146 Ten lifebuoys, two with smoke/lights and two with floating lines, should be stored in frames at appropriate places. 7.8.13 Life jackets Twelve plus eight extra life jackets with lights should be provided. 7.8.14 Life rafts Two inflatable life rafts on ejector racks are provided at easy accessible and protected places. Instruction for use of life raft should also be provided. The rafts should be fitted with a hydrostatic release of; o Make : RFD or equivalent & Capacity of 12 persons each. 7.8.15 First-aid equipment A first-aid kit (according to Classification Society should be provided). 7.8.16 Workboat One four-meter inflatable workboat should be fitted with 25 hp outboard engine being able to be handled with a davit. 7.8.17 Rescue Boat One four-meter inflatable rescue boat should be fitted with 50 hp outboard engine. An engine flusher should be provided to help keep salt, grime, silt and sludge off the internal parts of the outboard engine. 7.8.18 Life net A Markus life net should be stored on board. 7.8.19 Immersion suits Twelve immersion suits with buoyancy and light should be provided. 7.8.20 Fire signals Twelve emergency fire-signals, parachute type and waterproof packed should be provided. 7.8.21 Line throwing appliance Four single shot line throwing appliances shall be supplied and stored, make Comet or equal. 7.8.22 Miscellaneous safety items The Tug Boat should be fitted out with the following items: o Emergency stops for E.R. fans, fuel pumps and engines o Remotely operated valves for fuel tanks o Fire dampers, where required Page 146 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 147 o Remote start/stop for general service pump o International shore connection for the internal Fi-Fi system 7.9.0 AUXILIARY SYSTEMS 7.9.1 Hydraulics One hydraulic system should be installed for power supply of the deck equipment consisting of: i. Independent electrically driven hydraulic pumps to power the towing winch (es) ii. One electrically driven hydraulic pump to power towing winch brakes and clutches and the towing hook quick release non-simultaneously. iii. Hydraulic oil circulation tank with the required fittings and piping and hydraulic filters incorporated in each system. a) Hydraulic piping i. Seamless steel precision pipes to be fitted between the hydraulic equipment and pumps. ii. High-pressure hydraulic hoses to be used where necessary. iii. Pipes above deck up to and including a diameter of 25 mm should be made of stainless steel and should be fitted with screwed galvanized steel couplings. iv. Larger pipes above deck should be made of steel and be fitted with screwed galvanized steel couplings or forged steel welded flanges. v. Outside couplings and flanges should be wrapped with Denso-tape. vi. Piping should be sized to avoid high pressure peaks with manageable lengths between the joints for maintenance purposes. b) Main hydraulic pumps There should be two independent electrically driven hydraulic pumps to power the towing winch (es) for non-simultaneous powering of the winches and each pump should have the following characteristics i. Appropriate Design pressure drop ii. Sensing pump with variable displacement. iii. Load sensing pump with variable displacement. iv. Each main pump should have minimum capacity for 50% of the total required power for the largest consumer at increased idle speed of the main engine. v. In the pressure line of each pump a non-return valve and an adjustable safety valve should be fitted whilst the discharge line runs to the circulation tank. c) Electrically driven hydraulic pumps There should be one electrically driven hydraulic pump installed on top of the hydraulic oil circulation tank for powering of the towing winch brakes and clutches and the towing hook quick release non-simultaneously with the following characteristics: i. ii. Appropriate Design pressure drop. Constant pressure pumps with fixed displacement. Page 147 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 148 iii. The pump has sufficient capacity to deliver the total required power for the largest consumer. iv. In the pressure line of each pump a non-return valve and an adjustable safety valve should be fitted and the discharge line to run to the circulation tank. d) Hydraulic oil circulation tank The hydraulic oil circulation tank should be designed for a maximum temperature of 65°C. An oil cooler should be installed to control the temperature of the hydraulic oil in the system. The tank shall be fitted with provision for hand hole for inspection, cleaning, filling with 10 micron filter and level indicators and alarms. e) Hydraulic oil cooling system Each hydraulic system should be provided with a separate low temperature cooling system which shall double up in cooling the hydraulic oil. An electrical pump should be provided, recommended of Make Sterling, Type ZLKD, with minimum capacity approx.10 m3/hr, which will start/stop automatically. f) Commissioning hydraulic systems After finishing the fitting of the system, the complete system (including the filters) Should be prepared, tested, pressure tested and commissioned to general accepted standards. g) Alarms hydraulic systems The alarms for the hydraulic installation should be individually presented in the Main Switchboard room and in the wheelhouse. 7.9.2 Oil pollution control There should be a pollution control unit mounted on the Tug boat with the following; 7.9.2.1 Dispersant pump and booms A removable dispersant spray boom at least 6m be fitted at each side of the Vessel, installed with an electrically driven twin pump for sea water and dispersant mixing of minimum capacity;9 liters and up to 82 litres seawater /min The spray gear should include and not limited to the following; o Pump unit o Sets of Suction and delivery hoses o Galvanized steel dispersant spray booms o Sets of Spray nozzles and adapters o Stainless steel wire and stainless steel shackles Page 148 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.10.0 EXTERNAL FIRE-FIGHTING, EMERGENCY FIREFIGHTING PUMP AND SALVAGE SYSTEM 149 PORTABLE 7.10.1 External fire fighting system 1200 m3/hr In the Engine room, there shall be a fire fighting set consisting of a fire fighting pump driven by an independent Caterpillar (CAT) Marine diesel engine which should be electrically started and stopped from a control panel mounted on the engine combined with a foam mixer. o Diesel engine : CAT Marine Diesel Engine o Pump : All Bronze (impeller & housing) o Capacity : 1200m³/hr o Working pressure : 10.5 bar 7.10.1.1 Monitors There should be Two monitors make Albach type APF7, fitted forward of the wheelhouse, together covering a large horizontal arc. The monitors are to be fed by the fire fighting pump situated in the engine room. The monitors should be equipped with a jet/spray nozzle suitable for water and for water/foam and be remote controlled from wheelhouse. Monitor of Capacity water : 1200 m³/hr each at 120 meter jet length Capacity foam : 300 m³/hr each 7.10.1.2 Foam equipment A foam mixing system should be fitted with two in-line type foam inductors. The protein type foam should be able to mix to a maximum percentage of 6%. 7.10.1.3 Flushing lines There should be a provision to flush through with fresh water, the fire fighting piping & monitors can be flushed after use. 7.10.1.4 Fire fighting connections One International shore connection. On each side of the fore deck 4 fire fighting connections are to be fitted. 7.10.1.5 Fixed Internal Fire Fighting System Engine room fire suppression system is preferable to be Pyrogen or equivalent, aerosol based suppression system. Aerosol release mechanism to be sited in the wheel house 7.10.1.6 Emergency Portable Firefighting. As per classification society recommendation to be supplied with dedicated suction and delivery hoses. The suction hose to be filled with a robust throt valve Page 149 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 150 7.10.1.7 Salvage pump (portable) There should be a Single phase electrical driven submersible salvage pump on board with minimum capacity of 36m³/hr at 12M head. The Submersible pump set should be delivered complete with a minimum 20 meter pressure hose and 20 meter electrical cable. The electrical connection (plugging) should be compatible with an external power supply and the current organizational tugs power supply . 7.11.0 JOINERY & ARRANGEMENT OF SERVICE/LIVING SPACES The Vessel should comfortably accommodate 10 persons. The lay-out to conform with the Maritime Labour Convention 2006 regulations and subsequent annexes; and to be shown on the relevant General Arrangement Plan. a. Table tops are made of hard plastic covered waterproof marine plywood. b. Berths are to be provided with a 20 cm box spring mattress. c. Berths are to be 2200 x 900 mm. d. Aluminium handrails to be fitted where necessary. e. The locks should be of the master key type and the vessel to be delivered with three master keys. f. There should be a central digital aerial system for radio and TV installed with an aerial socket outlet in the mess and in each cabin. g. There are to be a minimum of two power supply sockets in all cabins to allow for appliances connection h. For every outside door a doormat should be provided. i. The Standing height in accommodation should be approx. 2.20 M j. The Door height in accommodation should be approx. 2.10 M 7.11.1 Acoustical insulation Vessel design shall ensure that satisfactory measures are taken to maintain low noise levels onboard. Special emphasis should be given to the following areas and their designed maximum allowable noise levels according to the Shipyard (Tenderer) prognosis to be availed in the tender bid in the table format below; NO. 01 02 03 04 05 06 07 08 09 AREA OF CONSIDERATION The Wheelhouse The Captain’s cabin The Chief Engineer’s cabin The Galley The Mess Room Cabins below main deck PS/SB forward Cabins below main deck PS/SB aft Main switchboard room Engine room DESIGN NOISE LEVELS Page 150 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 151 Accuracy of the calculations allowable tolerance should be +/- 3 dB(A) based on free sailing condition at full throttle 7.11.2 Joinery 7.11.2.1 7.11.2.2 7.11.2.3 7.11.2.4 7.11.2.5 7.11.2.6 7.11.2.7 All joinery work should be in accordance with normal Builders' standards as approved by class. For lining, non steel partition bulkheads, ceilings hard plastic coated (on both sides) marine plywood panels should be fastened with screws and finished with Omega wall joints and Aluminium profiles. Furniture should be of hard plastic coated in the colour light grey. Non-Combustible and/or fire retardant materials only should be used where required. Appropriate thickness of lining and of ceilings should be be given and the wheelhouse should be fitted with an acoustic ceiling of Dampa type or equivalent. Partition bulkheads between cabins should be double panelled for sound insulation. Interior doors should be of the B-15 type with all Door frames made of steel. All Door-locks, -handles, -hooks, clamps, should be made of chromeplated brass or stainless steel. 7.11.3 Floors 7.11.3.1 Floors engine room and rudder propeller room o Chequered Aluminium floor plates should be fitted in the engine and rudder propeller rooms fastened to frames by stainless steel screws. o The plates are to be mounted on angle section frames in such a way that all equipment can be reached for operation and maintenance. o In the rope store and on the engine room tank top anti-slip deck paint should be applied. 7.11.3.2 Floors wheelhouse and accommodation o The floors in the switchboard room, alleyways, messroom and wheelhouse should be of the composite synthetic type OR equivalent of colour red brown. o The basic floors in the accommodation should be of the floating type, and no direct contact is to be made between the floors and the steel structure. o The cabins should have linoleum laid over the Bolidt or equivalent floor, colour red brown. 7.11.3.3 Floor galley and sanitary spaces o In the galley and sanitary spaces a non-floating Bolidt or equivalent type floor is to be fitted; colour light grey. o The floor should extend 10 cm up to the side walls. Page 151 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.11.4 152 Walls 7.11.4.1 Walls wheelhouse o The wheelhouse walls (up to the windows) should be insulated with mineral wool. The walls are to be panelled up to the windows, anthracite coloured. o The dashboard casings should be made of steel, dashboard tops to be coloured black. o The steel structure around the windows should be painted grey (Satin). Handrails to be fitted as appropriate for safety. 7.11.4.2 Walls accommodation o The accommodation sides and partition bulkheads are to be completely panelled with hard plastic coated marine plywood panels; coloured frosted or light grey. o Walls and decks exposed to the sun should have thermal insulation of mineral wool between the plating and lining or ceiling. 7.11.4.3 Walls sanitary spaces o The sanitary spaces should have panelled ceiling and painted steel sides 7.11.4.4 Ceiling wheelhouse o Ceiling should be Dampa type or equivalent system, anthracite coloured and to be insulated with mineral wool. 7.11.4.5 Ceiling accommodation o The accommodation ceilings should be made of hard plastic coated marine plywood panels coloured white with sound absorbing ceilings. 7.11.5 Insulation Reduction of noise levels onboard the Tug should be prioritized, hence appropriate insulation fittings should be provided for the following spaces; (a)Engine room deckhead and bulkheads (b) Exposed shell accommodation sides (c)Deckhouse sides behind linings. (d) Floating floor in accommodation 7.11.6 Furniture o Seats should be made of hard plastic coated marine plywood panels of minimum thickness 20 mm and upholstered with black coloured heavy duty leather with storage facilities underneath the Seats. o Chairs should be fitted with armrests and be provided with securing facilities for sailing in sea conditions. o Chairs should be marine type with chromium plated steel frames and with heavy duty black leather. Page 152 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 153 7.11.7 Arrangement wheelhouse 7.11.7.1 Control consoles The control consoles should be made of steel 7.11.7.2 Helmsman seat There should be one helmsman seat, ergonomically designed cabin controlled adjustable to meet Operators body profile of the Dynamic 07, Brieda Seat type in accordance with the European standards: EN 1005-3/4/5. 7.11.7.3 Seats One person each seats, covered in blue leather shall be installed in the Starboard and portside in the wheelhouse. 7.11.7.4 Chart table A chart table with dimmable lamp should be installed in the wheelhouse at starboard side. 7.11.7.5 Time clock A quartz marine clock Ø 4" chrome plated with silence periods should be fitted. 7.11.7.6 Binoculars A set of two pairs of prismatic binoculars (7x50), of recommended Make, Steiner Skipper should be provided in a binocular box. 7.11.7.7 Dustbin There should be a dustbin with a shutting top in the wheelhouse 7.11.7.8 Roller curtains o All sky windows should be fitted with roller type curtains. Roller curtains should be operated from bottom to top for maximum coverage. o All wheelhouse windows should be fitted with roller type curtains. Roller curtains should be operated from bottom to top for maximum coverage. 7.11.7.9 Inclinometer In the wheelhouse, Inclinometers for trim and heel should be mounted. 7.11.7.10 Arrangement living quarters A complete inventory including bed sheets, pillows and covers, blankets and towels should be provided for 12 persons. Page 153 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 154 7.11.7.11 Arrangement cabins above main deck a. One captain's cabin to be provided with: o One bunk with one drawer with lock o One writing table with locker and with chair. o Two clothing lockers with keylocks, one with dressing rod and top shelve, one with shelves only o Wash basin with taps (hot and cold water, one handle control) o One seat o One bookshelf o One double clothes hook o One dustbin o One safe o Curtains for windows o Notice board o One quartz marine clock Ø 4" chrome plated, make; Schatz. b. One chief engineer's cabin to be provided with: o One bunk with one drawer with lock o One writing table with locker and with chair. o Two clothing lockers with keylocks, one with dressing rod and top shelve, one o with shelves only o Wash basin with taps (hot and cold water, one handle control) o One seat o One bookshelf o One double clothes hook o One dustbin o Curtains for windows o Notice board o One quartz marine clock Ø 4" chrome plated, make; Schatz. 7.11.7.12 Arrangement cabins below main deck a. o o o o o o o o Four double crew cabins each to be provided with: One bunk for each person, lower bunk with two drawers with locks One writing table with chair One clothing locker with keylock for each person Wash basin with taps (hot and cold water, one handle control) One bookshelf One double clothes hook One dustbin Curtains for bunks 7.11.7.13 Arrangement galley and mess rooms There should be a Mess/Day-room supplied with anti-slip placemats with two Page 154 of 183 SECTION VII: TECHNICAL SPECIFICATIONS o o o o o o o o o 155 dining tables with corner seats and chairs for 12 persons. A complete mess/galley inventory including dishes, cups, pans, etc. should be provided for the crew; andshould be fitted with; Glass locker Book shelf Notice board ER alarm VHF remote handset with loudspeaker TV 24 Inches LED Radio/DVD player, car type, with two loudspeakers flush mounted in the ceiling One dustbin, make Wesco, capacity 40 ltrs, colour grey One quartz marine clock Ø 4" chrome plated. (a) Galley o One stainless steel worktop, with cupboards underneath and small wall type o lockers. The worktop has a stainless steel sink with water tap hot and cold and o One stainless steel combined refrigerator/freezer of the compressor type of o 224/89 net ltrs., with key locks o One marine type electric cooker with 4 hotplates and pan fittings o One combined microwave / oven o Stainless steel sheeting around cooker o One spice rack o One dustbin, make Wesco, capacity 40 litres, colour grey o One set of mugs + mugs rack The floor of the galley should be provided with a drain with siphon. The galley door should have an electro-magnetic open position lock with local control. Lock should also be connected to fire detection installation. 7.11.7.14 Laundry room There should be a laundry room on lower deck provided with a washing machine and dryer with its own store equipped with whitewood shelves and a wash basin with taps (hot and cold water, one handle control). 7.11.7.15 Crew sanitary spaces a. All sanitary units (toilets, showers, etc.) should have a drain to the sewage treatment plant and each sanitary space should be equipped with: o Toilet with sea water flush o Shower with thermostatic controlled taps o Coat hooks o Drains with siphons in the floor b. There should also be one sanitary space below main deck which should be provided with a wash basin with taps. (hot and cold water, one handle control). And above each wash basin a mirror locker should be fitted and near each washbasin a soap dispenser and drinking glass with bracket are to be fitted. c. Each shower space is to be fitted with hand-grip and wire model soap dish. d. On the right side of each toilet on board, a hand held bidet shower with a flexible hose should be fitted Page 155 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.11.8 156 Arrangement store and boatswain equipment 7.11.8.1 Dry store 7.11.8.2 The dry store below main deck should be equipped with racks at the side walls and two freezers. Store The store on the lower deck should be equipped with three compartments as follows: o A rope store for spare ropes that can be transferred from lower deck to main deck through the escape hatch. o General store with wooden shelves at the side walls o Garbage store with several containers to separate the garbage 7.11.8.3 Boatswain equipment o 1 Rubber bucket with line o 1 Broom deck brush o 1 Wash-leather o 1 Sponge o 1 Boat hook 4 meter o 4 Safety harnesses o 2 boatswain knifes with harness 7.11.8.4 Basic cleaning set Basic cleaning set should consist of; o 2 pc Adhesive tape, Marine air tape, W=50 mm, L=50 m (duct tape) o 2 pc Insulation foam, PU, B3, can 700 ml, with hose, CFK-free o 1 pc Copper/brass polish, Tube 150 gr. also for St.St. o 2 x 20 m. deck wash hose complete with hoses, D=1/2", with crosslink synthetic wire o 1 roll Anti-skid mat, Slipstop 3.66 x 0.30 m² o 2 pc Carpet sweeper, W=24.5 cm, fibre medium, with stick L=1.7 m. o 2 pc Floor mop o 1 pc Metal cleaner, Muscle Steelfix o 1 pc Plastic cleaner, Valma Plasticolor o 2 pc Wood cleaner, Pledge cleaning foam o 10 L. Rust remover, HC-Roka o 12 pc Brush 1", round tip o 12 pc Brush 1 ½ ", round tip o 10 pc Foam paint roller, Spare roll for painting o 25 ltrs. wash & shine o 2 ltrs. Antical/lime scale remover o Vacuum cleaner o Portable Electrical High pressure washer machine. 7.11.9 Engine room workshop and tools a. Standard tools and inventory Page 156 of 183 SECTION VII: TECHNICAL SPECIFICATIONS o o o o o o o o o o o o 157 Standard tool set as supplied by the engine manufacturer(s) 2 Grease gun with a set of required heads 1 Grease gun for towing hook Key for flush hatch Key for docking plugs Key for shore connections 3 Sounding tapes, one for fresh water and one for other liquids Cleaning brush for condenser 1 Battery water filling bottle 2 Spare Padlock Test set for ELC cooling fluid 1 Set of spare bulbs (interior lighting) b. Engine Room Tool Box to include o Basic Wartsila tool kit o 1 Bulkhead mounted tool cabinet, S1400GM Gedore o 1 Ringspanner set 9 pcs 6/32 o 1 Open end spanner set 12 pcs 6/30&32 o 1 Socket set 24 pcs 10/32 o 1 Socket driver set 6pcs 5.5/10 o 1 Wrench set allenhead 8 pcs 3-14 mm o 1 Adjustable wrench 25*205, Bahco o 1 Adjustable wrench 53*455, Gedore o 1 Wrench adjustable for pipes, 227-4 Gedore o 1 Crow bar (wrecking) 18*50 mm, 611 Muller o 1 Gedore grip wrench - 137/10” o 1 Combination pliers o 1 Screwdriver set 7 pcs o 1 Chisel and punch set 6 pcs o 1 Key file set 6 pcs o 1 Feeler gauge set 0.05-1 mm, 720-20M Gedore o 1 File half-round 8” coarse 200 mm, 210 Sandvik o 1 File half-round 8” smooth 200 mm, 210 Sandvik o 1 File set 3 pcs o 2 Handles for file L=140 mm o 2 Hammers, 1*0.5kg and 1* 1 kg, 4E Habero o 2 Screwdrivers isolated, 1*3 mm and 1*4 mm, Gedore o 1 Multimeter handheld with LCD display, Y 122 F 32 o 1 Hammer, with removable plastic heads, 224E-32 Habero o 1 Gasket remover up to 8 mm L=160 mm o 1 Wire brush, 3 rows, 30 mm, 803 o 1 Hack saw with one spare blade o 1 Universal hand saw o 1 Scraper triangular L=150 o 2 Pliers flat long nose, 144-7” & 145-10” o 1 Pliers diagonal cutting, Gedore 8530 R9 o 1 Adjustable wrench, 175-3 Gedore o 1 Wrench set allenhead AF 10pcs - 1/16” - 1/2” o 1 Feeler gauge set AF, 702-13A Gedore o 1 Socket driver set AF 25 pcs, 5/16”-1.1/4”, D 19 TAU-10 Gedore o 1 Spanner set AF 14 pcs, 5/16”-1.1/4”, 1B-014A Gedore Page 157 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 158 c. Hoisting gear o Three hand-operated chain blocks of 5, 3 and 1 tons capacity should be provided. o Above each main engine and the Auxiliaries, steel hoisting rods should be fitted. d. Deck tools o 1 Crow bar 50 cm. o 1 Hand hammer, 1000 gr. o 4 Screwdrivers: 4, 5.5, 6.5 and 8 mm. o 2 Shackles, Greenpin D-type 1.5 ton. o Pneumatic hammer with spare set of gun and needles. Deck air connection to be provided. o Electrical portable grinder equipped with a replaceable rotary cup wire brush. e. Engineers workshop / store o The engineer’s workshop / store should be provided with: o A workbench with 6" engineers vice, One grinding combined with wire brush machine ; Creussen, and Storage racks f. Others Watertight Bisonyl covers should be provided for: o Compass o Searchlight o Horn o Fresh water de-aerators o FiFi monitors 7.12.0 NAUTICAL, NAVIGATION & COMMUNICATION EQUIPMENT 7.12.1 Navigation lights The navigation lights should be switched and signalled in the wheelhouse on a control panel. When an indication light is defective the circuit to the navigation light should not be interrupted and a buzzer should be fitted to indicate broken circuit. Normal supply of these lights from the 24 V ships consumer’s network. In the event of a blackout in the normal supply, the emergency network should be able to automatically supply the navigation lights (emergency supply). Lights on the wheelhouse control desk should indicate normal/emergency supply. There should be; o 2 Side lights (red and green) fitted at the sides of the railing on the bridge deck. o A sternlight (white) is to be fitted in the mast o 3 Masthead lights (white) are to be fitted in the mast o A towing light (yellow) is to be fitted in the mast Page 158 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 159 o An anchor light (white) is to be fitted in the mast o 3 R.I.M. (restricted in manoeuvring) lights (red, white, red) are fitted in the mast, lights can also be used as N.U.C. (not under command) lights (red, red). It is recommended that the Navigation Lights be double type 7.12.2 Optical signaling equipment and searchlight 7.12.2.1 Searchlight Two LED type searchlights to be mounted on the wheelhouse top deck, one fore and aft. The searchlights should be electrically remote controlled from the wheelhouse with the following characteristics o Output : equivalent of 1000 W o Power supply : 240 V o Make : Seematz searchlights or equivalent 7.12.2.2 Floodlights (Lloyd’s Register Fi-Fi 1 notation) Two LED Floodlights to be mounted on the wheelhouse top deck, one fore and aft. The Floodlights should be electrically remote controlled from the wheelhouse with the following characteristics o Output : equivalent of 500 W Xenon o Power supply : 240 V o Make : Seematz flood lights or equivalent 7.12.3 Signals and flags 7.12.3.1 Signal flags A set of signal flags should be stored in a bag in the wheelhouse provided with a signal flag code chart 7.12.3.2 Signal lamp A signal lamp should be stored in the wheelhouse. 7.12.3.3 Day signals Three black balls and one diamond should be provided. 7.12.3.4 Horn A magnet type horn (whistle above 130 dB) should be fitted on the wheelhouse top deck of a proven Make and type. A push button should be installed in the wheelhouse dashboard. 7.12.3.5 Ship’s bell A ship’s bell (12” diameter) should be fitted. 7.12.3.6 National and Ship Builders flags Page 159 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 160 Two national flags and Two Shipbuilders’ flags should be provided. 7.12.3.7 Nautical and bridge systems A radar system should be installed with a colour display unit with 19” LCD Screen and its Key Board Control unit to be integrated in the dashboard. Recommended Make should be; o FURUNO CHART RADAR; Type : FCR-21X9 The GPS navigator and the echosounder should be connected to the radar for on screen display. 7.12.3.8 GPS navigator GPS navigator to be installed should be of Make : Furuno and Type : GP-150 7.12.3.9 Sextant A sextant should be stored in the wheelhouse. 7.12.3.10 Magnetic compass - Kotter type A magnetic compass should be installed and located on a stainless steel foundation on the wheelhouse top. Recommended Make should be : Cassens & Plath, Type : Kotter and a Netcam digital repeater to be fitted in the wheelhouse 7.12.3.11 Autopilot An autopilot should be installed, recommended Make is : Robertson, Type : AP50 or equivalent. The autopilot should be connected to the magnetic compass and able to steer one or both of the azimuth thrusters. 7.12.3.12 Echo sounder An echo sounder of LCD type fed by the 24 V board installation should be fitted onboard, and the Make should be : Furuno, Type FE-700. The transducer should be installed at an appropriate place in the hull. 7.12.3.13 Speed log A Doppler speed log should be fitted, according new Solas section V. The Make should be Furuno and the Type be : DS-80 7.13.0 COMMUNICATION 7.13.1 Internal Communication (a) Intercom Page 160 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 161 An intercom system should be installed onboard that has a “call all” button which provides public address function. The Working stations to be established should include: o Master station in wheelhouse o Engine room/rudder propeller room with headset and rotating lamp o Crew accommodation below forecastle deck o Fore deck with call possibility to master station o Aft deck with call possibility to master station o Galley o Mess/day-room o Chief engineer's cabin o Captain's cabin o Main switchboard room o Stations on fore and aft deck are closed watertight stations. Recommended Type Phontech BTS 4000 (b) CCTV There should be a closed circuit television system (CCTV) provided with a 10” monitor in both the wheelhouse and the Main Switch Board room. The system should cover the engine room area (1camera), rudder room, and Aft deck. Recommended type IRIS model IM-DCS-35 7.13.2 External communication 7.13.2.1 VHF radiotelephones o Two VHF radiotelephones make S.P. Radio – type “Sailor” Compact 6222, 25 W, o with all international channels should be fitted onboard. o VHF 1, to be provided with one VHF antenna and one DSC antenna in the mast. The DSC antenna should provide DSC and DSC watch receiver (Ch. 70) functionality. o VHF 2, to be provided with one VHF antenna in the mast (only VHF functionality), with loudspeaker with tele-microphone in the mess room and connected to the intercom system. o A repeater should be fitted in the captain’s and engineer’s cabin. o Both VHF’s are to be provided with one man control, consisting of control switch/gooseneck microphone. 7.13.2.2 VHF hand-held transceivers Two VHF hand-held transceivers should be provided of Make: Jotron and Type : TRON TR-20 7.13.2.3 SSB radio telephone Note: required for area A2 o An SSB/AM radio telephone with a maximum output power of 150 W and 200 selectable channels should be installed onboard. The Make should be Furuno Type : FS-1575 o In receiving mode the frequencies should be such that they can be scanned. The antenna should be mounted on the wheelhouse top deck or in the mast. The Page 161 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 162 SSB radio telephone should be equipped with a watch receiver (2187.5 KHz) and integrated DSC unit (GMDSS). o SSB antenna should be fitted on the base plate of the mast and to be 6M length. 7.13.2.4 Inmarsat system Note: required for area A2 without Navtex coverage and area A3 o One Inmarsat C system according GMDSS requirements should be fitted in the wheelhouse. The Make should be Furuno, Type : Felcom 18. o The Inmarsat C system should be fitted with LCD type display and separate keyboard and a printer fitted in the wheelhouse. o Long Range Identification and Tracking (LRIT) system is to be integrated onboard. 7.13.2.5 Spare Inmarsat system Note: required for area A3 o One spare Inmarsat C system, according GMDSS requirements should be fitted. The Make should be Furuno, Type : Felcom 18 o The Inmarsat C system should be fitted with LCD type display and separate keyboard fitted in the Captain’s cabin. 7.13.2.6 NAVTEX One Navtex receiver should be installed with capacity to store up to 64 message identifications, selection of stations, etc. Make should be Furuno, Type NX700A/B Dual channel receiver. 7.13.2.7 AIS Chart Plotter system An automatic identification system should be fitted, connected to GPS and VHF. Within VHF-range the position, course, speed, navigational status etc. of surrounding vessels being displayable on the AIS. Make should be Furuno Maxsea Solution, Type FA-100 AIS Transponder, and Maxsea (software) Chart PC with Chart Plotter. Hardware to include; Intel Pentium 4pc, 15” Color TFT flat screen, Key Board and Mouse, Windows XP, Maxsea Shell for easy operation of the chart plotter software. C 7.13.2.8 EPIRB A single EPIRB, make Jotron, type TRON-60s, operating on 121,5 and 406 MHz, complete with lithium battery, antenna unit, test facilities and manual, a Float free bracket FB-4 with hydrostatic release should be installed. 7.13.2.9 SART One complete "search and rescue radar transponder" make Jotron, type TRONSART20, operating on 9 GHz, is to be fitted. Page 162 of 183 SECTION VII: TECHNICAL SPECIFICATIONS 7.13.3 Infotainment system 7.13.3.1 Internet system 163 An internet/television antenna system should be fitted. Sockets to be provided in the wheelhouse, mess room and all cabins. 7.13.3.2 Computer network a. Computer network is to be installed based on Ethernet technology with RJ45 plugs in the following spaces: o Wheelhouse o Switchboard room o Mess room o Captain’s cabin o Chief Engineer’s cabin o Crew cabins b. High quality Ethernet cables should be used and a triple band wireless voice data gateway to be provided. c. An external antenna type GSM HSDPA should be installed in the navigation mast, of make Comrod, type AC15-P or equivalent. d. The system should be able to be activated using the local service providers in Kenya. e. A combined TV aerials system for analogue and digital TV sets should be provided in the mess room. 7.13.4 Meteorological equipment There should be an aneroid barometer Ø 4" onboard mounted in the wheelhouse. The Anemometer to be of Make Windsonic OMC 115 for ultra-sonic wind speed and wind direction measurement, or equivalent to be installed, with a sensor fitted on top deck. Page 163 of 183 SECTION VIII: TENDER FORMS 164 SECTION VIII: TENDER FORMS Page 164 of 183 A. Form of Tender Tender No: Date: To: Sir/Madam: Having examined the Tender documents including Addenda Nos. [insert addenda numbers], the receipt of which is hereby duly acknowledged, we, the undersigned, offer to supply, deliver and commission 1No. Tug Boat in conformity with the said Tender documents for the sum of ______________________________________________[total Tender amount in words and figures] or such other sums as may be ascertained in accordance with the Schedule of Prices attached herewith and made part of this Tender. We undertake, if our Tender is accepted, to deliver the Goods in accordance with the delivery schedule specified in the Schedule of Requirements. If our Tender is accepted, we undertake to provide a performance security in the form, in the amounts, and within the times specified in the Tender documents. We agree to abide by this Tender for the Tender validity period specified in Clause 18.1 of the Tender Data Sheet, and it shall remain binding upon us and may be accepted at any time before the expiration of that period. We are not participating, as Tenderers, in more than one Tender in this Tendering process. Our firm, its affiliates or subsidiaries – including any subcontractors or suppliers for any part of the contract – has not been declared ineligible by the Government of Kenya under Kenyan laws. Until a formal Contract is prepared and executed, this Tender, together with your written acceptance thereof and your notification of award, shall constitute a binding Contract between us. We understand that you are not bound to accept the lowest or any Tender you may receive. We certify/confirm that we comply with the eligibility requirements as per ITT Clause 3 of the Tender documents Dated this ________________ day of ________________ 20______. (Name) _________________ __________________________ [signature] [in the capacity of] Duly authorized to sign Tender for and on behalf of ______________________________ SECTION VIII: TENDER FORMS 166 B. Price Schedules for Goods and Related Services Name of Tenderer ………………………. 1 Item Description 1. 2. 3. 4. 5. 6. 7. 8. 9. IFB Number ……………. Page ……… of …………… 2 3 4 Unit Unit price CIF Mombasa New Tug Boat 1 Preventive maintenance spares to be used for one year after Lot warranty Back Up Spares listed in the tender document Lot Local Training of 5 Technicians & 5 Operators Overseas Training of 5 Technicians & 5 Operators Special Training for engines/generators for 5 technicians Special Tools as listed in the technical specifications (statutory requirements) Clause 7.2.1.10 AMOS & Diagnostic Software installed in Computer lap top as detailed in the Technical Specification At least three milestone visits to the Shipyard by two Representatives to be housed by Shipyard AU AU AU Lot 1 AU Name ……………………………………………………………….. in the capacity of ……………………………………… Signature of Tenderer……………………………………………………………………………………………………………… Duly authorized to sign the Tender for and on behalf of …………………………………………………………………………… Dated on ……………………………………. day of …………………………………. 20 ……………………………………. Note: In case of discrepancy between unit price and total, the unit price shall prevail. 166 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT 7 Total Price CIF Mombasa SECTION VIII: TENDER FORMS 167 C. Confidential Business Questionnaire 1.1 1. Individual Tenderers or Individual Members of Joint Ventures Legal status of Tenderer: documents] [attach copies of statutory registration Place of registration: [insert] Principal place of business: [insert Detailed Physical address, Building, street town country Telephone , fax, email and website] Power of attorney of signatory of Tender: [attach] Other official contact person(s) – indicate telephone and email addresses Project name and country 1.2 Total annual volume of Services performed in (three-3) years, in the internationally traded currency specified in the Tender Data Sheet: [USD] 1.3 Services performed as prime Supplier on the provision of Services of a similar nature and volume over the last (Five) years. The values should be indicated in the same currency used for Item 1.2 above. Also list details of work under way or committed, including expected completion date. Name of Procuring Entity and contact person Type of Services provided and year of completion Value of Contract (a) (b) 1.5 Qualifications and experience of key personnel proposed for administration and execution of the Contract. Attach biographical data. Refer also to Clause 14.4(d) of the Instructions to Tenderers. Position Name Years of experience (general) (a) (b) 167 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT Years of experience in proposed position SECTION VIII: TENDER FORMS 1.6 168 Proposed subcontracts and firms involved. Refer to Clause 23 of General Conditions of Contract. Sections of the Services Value of Subcontract Subcontractor (name and address) Experience in providing similar Services (a) (b) 1.7 Financial reports for the last (3) years: balance sheets, profit and loss statements, auditors’ reports, etc. List below and attach copies. 1.8 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List below and attach copies of support documents. We certify/confirm that we comply with eligibility requirements as per ITT Clause 3 of the Tender documents. 1.9 Name, address, and telephone, telex, and facsimile numbers of banks that may provide references if contacted by the Procuring Entity. 1.10 Information regarding any litigation, current or within the last 10) years, in which the Tenderer is or has been involved. Other party(ies) Cause of dispute Details of litigation Amount award involved (a) (b) 168 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT SECTION VIII: TENDER FORMS 169 1.11 Information regarding Occupation Health and Safety Policy and Safety Records of the Tenderer. 1.12 Statement of compliance with the requirements of Clause 3.4 of the Instructions to Tenderers. 1.13 Proposed Program (service work method and schedule). Descriptions, drawings, and charts, as necessary, to comply with the requirements of the Tender documents. We, the undersigned declare that (a) The information contained in and attached to this form is true and accurate as of the date of Tender submission Authorized Signature: ______ Name and Title of Signatory: ______ Name of Tenderer: Address: Company Stamp/ seal _____________________________________________ 169 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT SECTION VIII: TENDER FORMS 170 DECLARATION FORM (MANDATORY REQUIREMENT) Date To The tenderer i.e. (name and address) declare the following: a) Has not been debarred from participating in public procurement. b) Has not been involved in and will not be involved in corrupt and fraudulent practices regarding public procurement. Title Signature (To be signed by authorized representative and officially stamped) 170 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT Date SECTION VIII: TENDER FORMS 171 D. Integrity Declaration UNDERTAKING BY TENDERER ON ANTI – BRIBERY POLICY / CODE OF CONDUCT AND COMPLIANCE PROGRAMME 1. Each Tenderer must submit a statement, as part of the Tender documents, in the given format which must be signed personally by the Chief Executive Officer or other appropriate senior corporate officer of the Tendering company and, where relevant, of its subsidiary in the Kenya. If a Tender is submitted by a subsidiary, a statement to this effect will also be required of the parent company, signed by its Chief Executive Officer or other appropriate senior corporate officer. 2. Tenderers will also be required to submit similar No-bribery commitments from their subcontractors and consortium partners; the Tenderer may cover the subcontractors and consortium partners in its own statement, provided the Tenderer assumes full responsibility. 3. a) Payment to agents and other third parties shall be limited to appropriate compensation for legitimate services. b) Each Tenderer will make full disclosure in the Tender documentation of the beneficiaries and amounts of all payments made, or intended to be made, to agents or other third parties (including political parties or electoral candidates) relating to the Tender and, if successful, the implementation of the contract. c) The successful Tenderer will also make full disclosure [quarterly or semi- annually] of all payments to agents and other third parties during the execution of the contract. d) Upon completion of the performance of the contract, the successful Tenderer will formally certify that no bribes or other illicit commissions have been paid. The final accounting shall include brief details of the goods and services provided that they are sufficient to establish the legitimacy of the payments made. e) Statements required according to subparagraphs (b) and (d) of this paragraph will have to be certified by the company's Chief Executive Officer, or other appropriate senior corporate officer. 4. Tenders which do not conform to these requirements shall not be considered. 5. If the successful Tenderer fails to comply with its No-bribery commitment, significant sanctions will apply. The sanctions may include all or any of the following: a) Cancellation of the contract; b) Liability for damages to the procuring entity and/or the unsuccessful competitors in the tendering process. 6. Tenderers shall make available, as part of their Tender, copies of their anti-Bribery Policy/Code of Conduct, if any, and of their general or project-specific Compliance Program. 7. The Government of Kenya has made special arrangements for adequate oversight of the procurement process and the execution of the contract, and has invited civil society and other competent Government Departments to participate in the oversight. Those charged with the oversight responsibility will have full access to all documentation submitted by Tenderers for this contract, and to which in turn all Tenderers and other parties involved or affected by the project shall have full access (provided, however, that no proprietary information concerning a Tenderer may be disclosed to another Tenderer or to the public). 171 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT SECTION VIII: TENDER FORMS 172 ANTI-CORRUPTION DECLARATION COMMITMENT/ PLEDGE (Sections39, 40,41,42,43 & of the PPD Act, 2005) I/We/Messrs……………………………………………………………………………. of Street, Building, P O Box…………………………………………………………… ………………………………………………………………………………………….. Contact/Phone/E mail………………………………………………………………….. declare that Public Procurement is based on a free and fair competitive Tendering process which should not be open to abuse. I/We ..………………………………………………………………………………….. declare that I/We will not offer or facilitate, directly or indirectly, any inducement or reward to any public officer, their relations or business associates, in connection with Tender name…………………………………………………………….. Tender No ………………………..………………………………………………. for or in the subsequent performance of the contract if I/We am/are successful. Authorized Signature................................................................................................ Name and Title of Signatory…………………………………………………………… 172 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT SECTION VIII: TENDER FORMS 173 E. Letter of notification to Unsuccessful Bidders Dear Sir This is to inform you in accordance with Section 67 of the Public Procurement and Disposal Act 2005 that your offer in relation to [tender name and number] has been determined to be unsuccessful upon evaluation. We intend to make a contract with [name of successful tenderer] for [amount]. Your tender security / tender security declaration will be discharged. Thank you for your participation in the tendering process. 173 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT SECTION VIII: TENDER FORMS 174 F. Letter of Acceptance [Letterhead paper of the Procuring Entity ] [Date] Letter of Acceptance To: [name and address of the Service provider] This is to notify you that your Tender dated [date] for execution of the [name of the Contract and identification number, as given in the Contract data sheet] for the Contract Price of the equivalent of [amount in numbers and words] [name of currency], as corrected and modified in accordance with the Instructions to Tenderers is hereby accepted by us and it is our intention to proceed to make a written contract in accordance with the terms of section 68 of the Public Procurement and Disposal Act 2005 after the 14 day period of notification has expired. The contract/contracts shall be signed by the parties within 30 days of the date of this letter but not earlier than 14 days from the date of the letter. Note: Insert one of the 3 options for the second paragraph. The first option should be used if the Bidder has not objected the name proposed for Adjudicator. The second option if the Bidder has objected the proposed Adjudicator and proposed a name for a substitute, who was accepted by the Procuring Entity. And the third option if the Bidder has objected the proposed Adjudicator and proposed a name for a substitute, who was not accepted by the Procuring Entity. We confirm that [insert name proposed by Procuring Entity in the Tender Data Sheet], or We accept that [name proposed by Tenderer] be appointed as the Adjudicator or We do not accept that [name proposed by Tenderer] be appointed as adjudicator, and by sending a copy of this letter of acceptance to [insert the name of the Appointing Authority], we are hereby requesting [name], the Appointing Authority, to appoint the Adjudicator in accordance with Clause 44.1 of the Instructions to Tenderers. You may proceed with the said Contract in accordance with the Contract documents once the written contract has been signed. Please return the attached Contract duly signed Authorized Signature:_______________________________________________ Name and Title of Signatory:_________________________________________ Name of Agency:__________________________________________________ Attachment: Contract: 174 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT SECTION VIII: TENDER FORMS 175 G. Form of Contract THIS AGREEMENT made the _____ day of __________ 20_____ between [name and address of PE] of Kenya (hereinafter called “the Purchaser”) of the one part and [name of Tenderer] of [city and country of Tenderer] (hereinafter called “the Supplier”) of the other part: WHEREAS the Purchaser invited Tenders for certain goods and ancillary services, viz., [brief description of goods and services] and has accepted a Tender by the Supplier for the supply of those goods and services in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”). NOW THIS AGREEMENT WITNESSETH AS FOLLOWS: 1. In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to. 2. The following documents shall be deemed to form and be read and construed as part of this Agreement, viz.: (a) (b) (c) (d) (e) (f) The Tender Form and the Price Schedule submitted by the Tenderer; The Schedule of Requirements; The Technical Specifications; The General Conditions of Contract; The Contract Data Sheet; and The Purchaser’s Notification of Award. 3. In consideration of the payments to be made by the Purchaser to the Supplier as hereinafter mentioned, the Supplier hereby covenants with the Purchaser to provide the goods and services and to remedy defects therein in conformity in all respects with the provisions of the Contract 4. The Purchaser hereby covenants to pay the Supplier in consideration of the provision of the goods and services and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract. IN WITNESS whereof the parties hereto have caused this Agreement to be executed in accordance with the Laws of Kenya the day and year first above written. Signed, sealed, delivered by __________________the ________________ (for the Purchaser) Witness to the signatures of the Purchaser:___________________________ Signed, sealed, delivered by __________________the ________________ (for the Supplier) Witness to the signatures of the supplier: _________________________________ 175 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT SECTION IX: FORMS OF SECURITY SECTION IX: FORMS OF SECURITY 176 TENDER NO. KPA/057/2013-14/MO - SUPPLY OF 1NO. TUG BOAT 176 A. Tender Security (MANDATORY REQUIREMENT) Bank letterhead Whereas ………………………………………. [name of the tenderer] (hereinafter called “the tenderer”) has submitted its tender dated …………. [date of submission of tender] for the supply, installation and commissioning of ……………………[name and/or description of the equipment] (hereinafter called “the Tender”) ……………………………………….. KNOW ALL PEOPLE by these presents that WE ……………………… of ………………………. having our registered office at ………………… (hereinafter called “the Bank/Insurance Company”), are bound unto …………….. [name of Procuring entity} (hereinafter called “the Procuring Entity”) in the sum of …………………….. for which payment well and truly to be made to the said Procuring Entity, the Bank/Insurance Company binds itself, its successors, and assigns by these presents. Sealed with the Common Seal of the said Bank/Insurance Company this 20 . day of THE CONDITIONS of this obligation are:1. If the tenderer withdraws its Tender during the period of tender validity specified by the tenderer on the Tender Form; or 2. If the tenderer, having been notified of the acceptance of its Tender by the Procuring entity during the period of tender validity: fails or refuses to execute the Contract Form, if required; or fails or refuses to furnish the performance security in accordance with the Instructions to tenderers; We undertake to pay to the Procuring entity up to the above amount upon receipt of its first written demand, without the Procuring entity having to substantiate its demand, provided that in its demand the Procuring entity will note that the amount claimed by it is due to it, owing to the occurrence of one or both of the two conditions, specifying the occurred condition or conditions. This tender guarantee will remain in force up to and including thirty (30) days after the period of tender validity, and any demand in respect thereof should reach the Bank not later than the above date. [signature of the Bank/Insurance Company]____________________________ [seal] 177 178 B. Performance Bank Guarantee [Unconditional] To …………………………………………. [name of Procuring entity] WHEREAS …………………………………… [name of tenderer] (hereinafter called “the tenderer”) has undertaken , in pursuance of Contract No. [reference number of the contract] dated 20 to supply ……………………………………………… [description of goods] (hereinafter called “the Contract”). AND WHEREAS it has been stipulated by you in the said Contract that the tenderer shall furnish you with a Bank guarantee by a reputable Bank for the sum specified therein as security for compliance with the Tenderer’s performance obligations in accordance with the Contract. AND WHEREAS we have agreed to give the tenderer a guarantee: THEREFORE WE hereby affirm that we are Guarantors and responsible to you, on behalf of the tenderer, up to a total of ………………………. [amount of the guarantee in words and figure] and we undertake to pay you, upon your first written demand declaring the tenderer to be in default under the Contract and without cavil or argument, any sum or sums within the limits of …………………….. [amount of guarantee] as aforesaid, without you needing to prove or to show grounds or reasons for your demand or the sum specified therein. This guarantee is valid until the day of Signed and seal of the Guarantors [name of Bank ] [address] [date] 178 20 179 C. Bank Guarantee for Advance Payment To ……………………………… [name of Procuring entity] [name of tender] ………………….. Gentlemen and/or Ladies: In accordance with the payment provision included in the Contract Data Sheet, which amends the General Conditions of Contract to provide for advance payment, …………………………………………………. [name and address of tenderer](hereinafter called “the tenderer”) shall deposit with the Procuring entity a Bank guarantee to guarantee its proper and faithful performance under the said Clause of the Contract in an amount of …… …………………. [amount of guarantee in figures and words]. We, the ……………………………. [Bank ], as instructed by the tenderer, agree unconditionally and irrevocably to guarantee as primary obligator and not as surety merely, the payment to the Procuring entity on its first demand without whatsoever right of objection on our part and without its first claim to the tenderer, in the amount not exceeding …………………… [amount of guarantee in figures and words] We further agree that no change or addition to or other modification of the terms of the Contract to be performed there-under or of any of the Contract documents which may be made between the Procuring entity and the tenderer, shall in any way release us from any liability under this guarantee, and we hereby waive notice of any such change, addition, or modification. This guarantee shall remain valid in full effect from the date of the advance payment received by the tenderer under the Contract until ………… [date]. Yours truly, Signature and seal of the Guarantors [name of Bank] [address] [date] 179 180 D. Manufacturer’s Authorization Form (Not Applicable) To: [name of the Purchaser] WHEREAS [name of the Manufacturer] who are established and reputable manufacturers of, and have the rights to manufacture, [name and/or description of the goods] having factories at [address of factory] do hereby authorize [name and address of Agent] to submit a Tender, and subsequently negotiate and sign the Contract with you against IFB No. [reference of the Invitation to Tender] for the above goods manufactured by us. We hereby extend our full guarantee and warranty as per Clause 17 of the General Conditions of Contract for the goods offered for supply by the above firm against this Invitation for Tenders. ______________________________________________________________________ [signature for and on behalf of Manufacturer] Note: This letter of authority should be on the letterhead of the Manufacturer and should be signed by a person competent and having the power of attorney to bind the Manufacturer. It should be included by the Tenderer in its Tender. 180 181 Local Dealer Nomination Form The particulars of tendering company’s nominated local agent are: Name of Company: ______ Company profile: Telephone Number: Physical Address (Road & Building): ______ Website/email address: ______ Statutory documents to be attached: KRA PIN and VAT Certificate, current Tax Compliance Certificate, Certificate of incorporation, Trade License and copies of audited accounts for the years 2010 and 2011 certified as true copies by their external auditors. Full Name of Contact Person: ______ Title of Contact Person in the Company: ______ Phone Number of Contact Person: ______ Email address of contact person: ______ We, the undersigned declare that The information contained in and attached to this form is true and accurate as of the date of Tender submission Authorized Signature: ______ Name and Title of Signatory: ______ Name of Tenderer: Address: Company Stamp/ seal 181 _______________ SECTION X: APPLICATION TO PUBLIC PROCUREMENT REVIEW BOARD 182 FORM RB 1 REPUBLIC OF KENYA PUBLIC PROCUREMENT ADMINISTRATIVE REVIEW BOARD APPLICATION NO…………….OF……….….20……... BETWEEN ……………………………………………………….APPLICANT AND …………………………………RESPONDENT (Procuring Entity) Request for review of the decision of the…………… (Name of the Procuring Entity) of ……………dated the…day of ………….20……….in the matter of Tender No………..…of …………..20… REQUEST FOR REVIEW I/We……………………………,the above named Applicant(s), of address: Physical address…………….Fax No……Tel. No……..Email ……………, hereby request the Public Procurement Administrative Review Board to review the whole/part of the above mentioned decision on the following grounds , namely:1. 2. etc. By this memorandum, the Applicant requests the Board for an order/orders that: 1. 2. etc SIGNED ………………. (Applicant) Dated on…………….day of ……………/…20… FOR OFFICIAL USE ONLY Lodged with the Secretary Public Procurement Administrative Review Board on ………… day of ………....20….……… SIGNED Board Secretary 183