Raven Rock Narrative (1)

advertisement
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 1 of 15
Submission Information
Submission Name:
Rosemont-Raven Rock Road Bridge Rehabilitation
Location/Address of Entry:
Lockatong Creek, Delaware Township, Hunterdon County
Nominated by:
Todd Batchelor, Project Engineer
Organization:
TranSystems Corporation
Address:
1037 Raymond Boulevard, Suite 400, Newark, New Jersey 07102
Day Telephone:
201.334.1461
E-Mail Address:
tsbatchelor@transystems.com
FAX: 973.741.2414
Application Information Checklist
B
Category – Please select A, B, C, or D
X
Nomination Form
X
Narrative, comprised of 10 pages
X
Project Cost
X
List of Project Team Members with mailing addresses included
X
Time required to complete the project
X
Photographs included. Number of photos 34 (See Appendix A)
X
CD-Rom included. Number of images 34 (Two (2) CD-Roms of images included –
pdf of full application submission included on CD 2)
X
Maps included and number of maps 1
X
Architectural drawings/renderings folded to 8.5” x 11”. Number of documents 19
(See Appendix C)
X
Letters of support included and number of letters 3
(See Appendix B)
(See Appendix D)
Other attachments are listed on a separate sheet of paper
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 2 of 15
Narrative
Introduction
The Rosemont-Raven Rock Road Bridge, also known as Bridge D-300, is a single span, wrought
and cast iron, pin-connected Pratt through truss bridge that is owned and operated by
Hunterdon County. The structure carries Rosemont-Raven Rock Road over the Lockatong Creek
in Delaware Township, New Jersey (refer to Project Location Map in Appendix B).
According to recent research performed by Marfy Goodspeed to commemorate the bridge's
rehabilitation project, the stone masonry abutments date to a previous crossing of the
Lockatong Creek destroyed during an early October 1877 flood. Her research also uncovered
Hunterdon Republican newspaper records indicating that a request for proposals for a new all
wrought iron bridge crossing of the Lockatong Creek was placed in early November 1877 and
received a week later. The project was awarded to the Lambertville Iron Works of Lambertville,
New Jersey in late November 1877 for a bid of $2,850. The bridge tension members,
compression fitting castings, and decorative work were fabricated by the Lambertville Iron
Works and compression member Phoenix columns were fabricated by the Phoenix Iron
Company of Phoenixville, Pennsylvania. The bridge was erected by the Lambertville Iron Works
and was opened to traffic in 1878.
The Lambertville Iron Works has a rich history in Hunterdon County and is recognized as one of
the county's foremost second-half of the 19th century foundries. Beginning operation in 1857
as Laver & Cowin, the works was known for its owner William Cowin and his three (3) cast iron
and wrought iron spans designed by Trenton engineer Francis C. Lowthorp and built in Clinton,
Glen Gardner, and Hampton between 1868 and 1870. By the time of Cowin's death in 1874
William Johnson was general manager of the works. Prior to holding the general manager
position Johnson was a master machinist with the works and the holder of several bridge, boiler,
and machine related patents. It was Johnson who proposed on the Rosemont-Raven Rock Road
Bridge in 1877.
The Phoenix column, consisting of wrought iron segmental channels riveted together to form a
circular tube of great compressive strength, was developed in 1862 by Samuel Reeves of the
Phoenix Iron Company. The patented section was used by both the Phoenix Iron Company and
other companies, such as the Lambertville Iron Works, in the erection of bridges as well as
buildings, viaducts, and elevated lines. By joining the compressive members through fittings at
cast iron nodes, the Phoenix column “was a great factor causing the substitution of wrought
iron for cast iron in compression members of pin-connected bridges“, according to noted
engineer and author J.A.L. Waddell.
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 3 of 15
The Rosemont-Raven Rock Road Bridge is 127’-6” long, center to center of end bearings, and
17’-0” wide, center to center of trusses. The bridge roadway carries a single lane of opposing
two-way traffic. The span is comprised of two (2) nine panel wrought and cast iron, pinconnected Pratt through trusses supporting floorbeams, stringers, and asphalt-filled galvanized
corrugated steel bridge flooring. The trusses are approximately 17’’-3” deep. The interior
verticals, upper chords, and inclined end posts are all patented Phoenix column compression
members comprised of four (4) channel sections. These members are joined at each panel
point with distinctive cast iron compression fittings fabricated locally by the Lambertville Iron
Works. The connecting pins for the eyebar and counter rod members pass through these
castings. Tension diagonals, end verticals, and lower chord members are made up of unique
square cross-section eyebars as opposed to the more common rectangular cross-section.
Diagonal counters consist of rods with loop forged eyes and adjustable sleeve nuts. The upper
chord bracing system consists of transverse I section struts and lateral bracing rods connected at
the upper panel point castings. The lower bracing system is a unique system of rods that join at
a center ring. Outstanding decorative features include cast iron ball and spire finials at each
upper chord panel point, cast iron filigree portal bracings, and bridge plaques mounted on the
portal struts. The lattice railings consist of riveted plate and angle members with decorative
cast iron end posts that are connected to the truss shoes. The lattice railings are connected to
the vertical truss members with decorative cast iron spacers and tie washers. The truss
expansion bearings are nested rollers. The bridge is supported on ashlar abutments with flared
wingwalls. Both approaches are signed for a 5 ton gross weight limit and a 12 foot vertical
clearance.
Prior to this rehabilitation project the bridge had been subjected to several modifications over
its lifetime including the following work:










Replacement of the deck and stringers with modern materials,
Installation of welded cover plates at the floorbeams,
Installation of welded plates between the floorbeams and their u-bolt hangers,
Installation of random welded attachments to the trusses, remnants of which remained,
Installation of localized welded repair plates on the Phoenix column members,
Installation of welded angles on the upper chord Phoenix members,
Installation of welded supplementary struts and connection plates at the inclined end
posts,
Installation of welded supplementary members and connection plates at the end vertical
hangers,
Installation of welded knee braces between the interior vertical truss members and
upper chord lateral struts,
Installation of welded modern turnbuckles in several counter members,
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 4 of 15




Removal of portions of the cast iron portal bracing filigree to accommodate the welded
repairs to the end vertical hangers,
Installation of welded repairs and replacement sections of the lattice railings,
Insensitive repairs to the finials, and
Insensitive repointing of the abutments and wingwalls.
The bridge had also experienced age-related physical material deterioration despite regular
maintenance, localized vehicular impacts, and structural capacity issues. Its location on a lightly
traveled rural road had helped to preserve the bridge by limiting exposure to traffic.
Despite the alterations listed above, the bridge was a well preserved example of its type and
technologically distinguished as one of the earliest and most complete bridges built with
Phoenix columns in the state. It is also the work of the Lambertville Iron Works, successor to
the firm that fabricated the most important 19th century bridges in the region.
The Rosemont-Raven Rock Road Bridge has been determined eligible for the National Register
of Historic Places.
Description of Project Activities
Preparations for this first comprehensive rehabilitation of the bridge began in 2002 with an indepth physical inspection, a load testing program, a structural analysis, and a concept study that
established the project scope of work, all performed and coordinated by TranSystems (formerly
Lichtenstein Consulting Engineers). In conjunction with the final design development by
TranSystems, a public involvement program was conducted in 2008 to help gauge public
reaction to the project. Consultation with the public was continuous throughout the project’s
final design and construction phases due to their strong attachment to the bridge and desire to
see it preserved. The rehabilitation work was completed during an uninterrupted shutdown of
the bridge from spring 2013 to late summer 2014. TranSystems was tasked with providing
construction support services to the county during the construction phase to ensure that the
bridge rehabilitation work proceeded in accordance with the Secretary of the Interior’s
Standards for Rehabilitation.
The Rosemont-Raven Rock Road Bridge was nearing the end of its useful life. Rehabilitation of
the bridge was necessary to maintain the transportation corridor and to protect public safety.
The bridge had experienced widespread physical deterioration, had insufficient structural
capacity, and had inadequate safety features. Over time the bridge’s physical condition had
suffered due to significant deterioration and the introduction of visually incompatible features
to this historic structure. Long-term moisture exposure, vehicular impact damage to truss
members, and the demands of modern day traffic usage were accelerating its deterioration. As
a direct result of the physical deterioration the capacity of the floor system members were well
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 5 of 15
below the project’s H15 truck design loading. Several Phoenix column members also had
insufficient structural capacity. Although numerous repair projects had been performed to the
bridge in the past, there are no records of a comprehensive rehabilitation of the bridge having
taken place. Aesthetic details, particularly the portal bracing and lattice railings, had been
altered with unsuitable modifications over time. Welded supplementary members and
components were aesthetically and technologically inappropriate for the bridge (refer to
Photographs 1 and 3 in Appendix A).
Through intensive study and alternatives analysis, it was determined by the conclusion of
scoping that the then 130-year old bridge could be rehabilitated and continue to serve the
traveling public’s needs. From the outset of the scoping project the goal of retaining as much
historic fabric as possible guided the work performed to the bridge. The work undertaken at
the Rosemont-Raven Rock Road Bridge consisted of the following rehabilitation activities (refer
to selected drawings in Appendix C for further details):






Bridge relocation and complete bridge disassembly at the east approach roadway,
transportation of truss members and decorative elements to a specialty fabrication shop
for repair, and on site reassembly and placement in its original location. Disassembly
was deemed to be the prudent option for truss rehabilitation due to the need for truss
member replacements and repairs and the need for pin replacements. Furthermore,
member repairs made in a shop environment are superior to those performed on site. A
comprehensive member match marking plan was developed by the engineer and
contractor to ensure that all bridge elements would be returned to their original
locations and orientations upon reassembly (refer to Photographs 5 and 6),
Removal of deteriorated and structurally inadequate stringers and floorbeams and
replacement with new galvanized and painted high strength steel elements matching the
overall shape of the original members (refer to Photographs 7 and 8),
Removal of existing asphalt-filled galvanized corrugated steel bridge flooring and
replacement with new corrugated steel flooring and compression seal deck joints (refer
to Photographs 3, 4, 7, and 8),
Removal of newer concrete bearing seats, replacement of underlying deteriorated
bearing seat stones with locally quarried material, and construction of new cast-in-place
reinforced concrete backwalls (refer to Photographs 7 and 8),
Complete cleaning and repointing of the stone masonry abutments and wingwalls using
accepted practices and compatible materials (refer to Photographs 7 and 8),
Installation of a new custom designed bridge railing system, designed to AASHTO
specifications using square tube elements. Although a new element on the bridge,
these railings effectively protect the truss lines from vehicle impacts. They are attached
to the new floor system rather than the trusses and could be removed in the future
without physically impacting the trusses. The railing system lends itself to historic truss
bridges due to its simple, clean shape and open appearance (refer to Photograph 4),
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 6 of 15









Rehabilitation of existing lattice railings including repair of damaged decorative
hardware and end posts, heat straightening of impact damaged rail elements, and
refabrication of elements damaged beyond repair. Rivets matching the existing were
used in the repairs and in newly fabricated work (refer to Photographs 9, 10, and 11),
Removal of non-original welded knee braces between the interior vertical truss
members and upper chord lateral strut members (refer to Photographs 12 and 13),
Removal of non-original welded supplementary strut members and connection plates at
the inclined end post members (refer to Photographs 14 and 15),
Removal of under capacity end vertical hangers, welded supplementary members, and
welded connection plates and replacement with high strength members matching the
original dimensions (refer to Photographs 14 and 15),
Removal of random welded attachments to the truss members to restore the members
to their original appearance,
Removal of modern welded turnbuckles installed in several counter members with
frozen/inoperable sleeve nuts and replacement with rod material and coupler nuts.
Restoration of tension adjustment function to all original sleeve nuts at the counter
members (refer to Photographs 16 and 17),
Repair of impact damaged truss members (including tension members, counters, and
lateral bracing rods) using heat straightening and shortening methods. Heat
straightening and shortening is not a commonly applied method of bridge repair and can
be described as more of an art than a science that requires years of experience to
master. In order to ensure successful application of the methods, careful inspection of
the members was necessary and detailed contract documents were prepared to limit the
work to qualified contractors and the repair procedures to accepted practices. The use
of this repair method resulted in the retention of original members that might have
otherwise required replacement (refer to Photographs 18 and 19),
Repair of material losses at the eyebar heads with pad welding. Pad welding is a method
of building up weld filler material to restore members to their original dimensions.
Material testing was performed using the original end vertical hanger members that
were proposed for replacement. Testing results indicated that the cast iron eyebar
material was weldable. The use of this repair method resulted in the retention of
original members that might have otherwise required replacement (refer to
Photographs 20 and 21),
Removal of the welded supplementary angles that were previously installed at the upper
chord members. Upon removal of the angles it was determined that the material losses
to the original Phoenix column member surfaces due to long-term trapped moisture
were beyond repair and that the originally proposed scheme of strengthening these
members with internal tubes was no longer a viable option. Instead, after consultation
with the SHPO, the upper channels of the members were replaced with new material
that dimensionally matched the original members. The new channels were fabricated
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 7 of 15







using stock high strength structural tube sections that were cut and then welded to plate
flanges. The new channels were riveted to the existing members matching the original
construction. Upon completion and painting of these new channels it is difficult to
distinguish between new and old. In conjunction with the member disassembly, the
interior surfaces of the upper chords and inclined end posts were completely primed to
ensure long-term durability (refer to Photographs 22, 23, and 24),
Installation of bolted repairs at lower ends of the Phoenix column vertical members to
offset holed through areas and material losses noted at the interior surfaces (refer to
Photographs 25 and 26),
Shop replacement of deteriorated rivets at the Phoenix column members,
Replacement of all truss pins and pin nuts with high strength, non-galling, stainless steel
material (refer to Photographs 12 and 13),
Complete rehabilitation of the frozen/inoperable truss expansion bearings including
replacement of rollers and plate components with high strength, non-galling, stainless
steel material. The truss shoes and masonry plates were also faced with stainless steel
plates. Damaged areas at the cast iron truss shoes and masonry plates were repaired to
restore the external appearance of the truss bearings (refer to Photographs 27, 28, 29,
and 30),
Rehabilitation of the upper chord finial balls. Several of the cast iron finial balls had
previously cracked and the damaged areas were sealed with silicone. These damaged
areas were repaired with weld material by the fabricator to provide a permanent repair
(refer to Photographs 31 and 32),
Rehabilitation of the truss portal bracings. These decorative castings were previously
broken at the end upper chord panel point locations to accommodate connection plates
for the supplementary welded end vertical hangers. The fabricator duplicated the
original decorative pattern and recreated the broken areas, making the repairs difficult
to distinguish from the original material (refer to Photographs 33 and 34), and
Shop blast cleaning and painting of the disassembled truss members (refer to
Photographs 2 and 4).
Approach roadway work includes milling and repaving of the roadways and installation of an
approach guide rail system attached to the new bridge rails.
Project Goals, Objectives, Impacts, and Benefits
The primary project goals were to improve the poor physical condition (both visually and
structurally), increase the low structural capacity, and upgrade the safety features of this
historically significant bridge by means of sensitive rehabilitation measures. Precedence was
given to retaining original material when possible. Replacement of structural members and
other bridge elements was performed when damage was determined to be beyond repair
and/or strengthening was not practical.
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 8 of 15
Replacement of structural members deteriorated beyond repair and interfacing of new
materials to the existing details presented significant challenges. The same can be said for
upgrading the load bearing capacity of the bridge in order to provide the desired H15 truck
capacity. It is often found that owners/clients and design engineers do not think that
rehabilitation and continued use of historic bridges is a viable option due to their lack of
understanding of the resiliency and adaptability that these structures possess. After several
studies were performed including an in-depth physical inspection, load testing program, a
structural analysis, and a concept study that established the project’s scope of work, it was
determined that rehabilitation of this 19th century bridge could be performed to meet the
project goals and that the structure could continue to serve the traveling public. The work
performed to the Rosemont-Raven Rock Road Bridge is an excellent example of bridge
rehabilitation proving to be just as successful as bridge replacement in regard to meeting the
client’s and community’s needs.
Community praise for the project was tremendous after completion of construction. Since
Hunterdon County was well aware that a prolonged closure of this bridge was going to be a high
profile project, the team was dedicated to addressing any community concerns or needs that
arose during construction. After the completion of construction numerous positive comments
were made by the public, preservation organizations, and the local media regarding the quality
of construction and fine appearance of the bridge. Many positive comments came from
individuals attending the bridge re-dedication ceremony who were able to see the results of the
work up close.
Beyond the local community, the rehabilitation project was recognized for its excellence by The
Bridgehunter's Chronicles, an online forum of bridge historians and enthusiasts, as the 2014
Amman Award recipient for “Best Example of a Restored Historic Bridge”. The bridge was one of
ten (10) structures located across the nation that was nominated to the category. Exposure of
this project on the internet will promote the benefits of historic bridge rehabilitation and its
intrinsic sustainability to a worldwide audience.
Rehabilitation projects are inherently “green” because of retaining existing materials.
Precedence was given to retaining original materials when possible, for instance by utilizing
heat straightening/shortening methods and pad welding to repair damaged truss members.
New materials used on this project are of high quality and were chosen for long-term durability.
Longer-lasting and better-functioning products require replacement less frequently, reducing
the impacts of producing replacements. Durable materials employed include high strength
galvanized steel members, stainless steel pins and truss bearing components, stainless
steel/teflon sliding plate stringer bearings, and high performance metal coating systems. The
traditional bridge building materials utilized on this project, such as steel, can be recycled in the
future for use in other applications just as the existing floor system steel and iron was removed
and salvaged.
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 9 of 15
Along with the visible aesthetic improvements to the bridge and the application of green design,
the traveling public will directly benefit daily from the safety improvements made as part of the
bridge rehabilitation. These important safety improvements include the construction of new
vehicular railings, the replacement and structural upgrading of deteriorated floor system and
truss members, the repair of impact damaged truss members through heat
straightening/shortening, and the repair of deteriorated truss members by pad welding. To
further public safety and to protect the historic bridge Hunterdon County conservatively chose
to retain the existing load posting due to the age of the structure. At the same time the
increased structural capacity of the bridge now permits the occasional passage of emergency
vehicles and enhances the community welfare.
The Rosemont-Raven Rock Road Bridge is not simply a transportation structure. The
rehabilitation of this bridge provides more for the community in which it is located than just a
safer and more efficient means of crossing the Lockatong Creek. The bridge has been a
landmark in the community for nearly 140 years and this rehabilitation project will ensure that
it will remain in service for years to come. This bridge provides the community with a renewed
sense of place and a connection to its rich history.
The Standards
The Secretary of the Interior’s Standards for Rehabilitation assume that some degree of repair
and/or alteration will be required, based upon condition and current use, to ensure “efficient
contemporary use” of a historic structure. However, the Standards also clearly define the
appropriate means of accomplishing this goal, as follows:










Use for the historic purpose or provide a new use requiring minimal change,
Retain and preserve historic character,
Do not make changes that create a false sense of historical development,
Retain and preserve those past changes that have acquired their own significance,
Preserve distinctive features, finishes, and construction techniques,
Repair rather than replace deteriorated features; new features, where required, must
match the old; replacement, where required, must be substantiated,
Do not use treatments that will damage historic materials,
Protect and preserve significant archaeological features,
Differentiate new work from old; do not destroy historic materials for the construction
of new additions or alterations, and
Ensure that historic features would be unimpaired if new work were removed.
In order to accomplish the primary goals of the Rosemont-Raven Rock Road Bridge
Rehabilitation project, the Standards were at the center of all decision-making relative to the
appropriate approaches for both design and construction. The historic elements of the bridge
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 10 of 15
were retained, and distinctive features were preserved and protected during execution of the
work. Treatments were selected to ensure that existing materials were not damaged. Original
historic fabric was retained and cleaned, repaired (e.g., heat straightening and heat shortening
of truss members and pad welding), or refinished wherever possible. New materials, where
required, were selected to match original materials in terms of not only color and appearance,
but also finish texture and physical compatibility (e.g., the new abutment seat stones and the
mortar for stone masonry repointing).
Where strengthening/replacement of structural elements was needed (e.g., the floor system,
end vertical hangers, and Phoenix column member repairs) modern structural materials were
fabricated to ensure an appearance that was evocative of the original elements.
Modern elements introduced to the bridge (e.g., the vehicular railings) were designed to be
sympathetic and appropriate to the overall goal of the rehabilitation project. The railings are
attached to the new floor system, do not impact the historic trusses, and could be removed in
the future if the bridge were to be relocated for a new use and the railings were no longer
needed.
TranSystems was tasked with providing construction support services to the county during the
construction phase to ensure that the bridge rehabilitation work proceeded in accordance with
the Secretary of the Interior’s Standards for Rehabilitation.
The bridge has always served as a vehicular transportation structure, and will continue to do so
in the future. The rehabilitation of the bridge provides a more pleasing experience for the
traveling public, whether they are motorists or pedestrians, crossing the historic structure.
Project Quality and Success
The rehabilitation of the Rosemont-Raven Rock Road Bridge has restored the historically
significant structure to its former functionality and aesthetic splendor. Through the retention of
visually and technologically significant features and historic fabric, the application of specialized
repair methods to retain and restore original truss members, the use of historically appropriate
materials and treatments for repair and replacement work, and the introduction of sensitively
designed and visually compatible modern elements the bridge is once again a reliable, wellpreserved, and attractive historic structure.
The bridge rehabilitation enhances the experience of motorists and pedestrians crossing the
creek or visiting the site in the following ways:

The bridge is once more a visually striking structure over the Lockatong Creek with an
aesthetically appealing color scheme that complements and accentuates the trusses,
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 11 of 15




The trusses, with their uncommon wrought iron construction, rarely seen Phoenix
members, panel point castings, and decorative elements, are an impressive engineering
structure that can be better appreciated with the impact damaged members repaired,
the non-original supplementary welded members removed, and the decorative
elements repaired,
The new vehicular railings meet present safety standards, while their simple, open
appearance is unobtrusive, attractive, and visually appropriate to the historic bridge,
The bridge feels more substantial under both traffic and pedestrian loads due to the
rehabilitated floor system framing and roadway decking, and
The newly restored truss portal details and plaques, calling renewed attention to the
bridge’s link to the Lambertville Iron Works, connect motorists and pedestrians to the
long and important history of the structure.
At the local level, both the outreach efforts undertaken prior to construction and the results of
the rehabilitation project have generated enthusiastic responses from area residents and
community organizations. The physical and visual improvements to the structure have brought
renewed focus on, and interest in, the historically important bridge. The work has also gained
recognition at the national level for its excellence in bridge rehabilitation engineering that
reinforces the value of retaining and reusing significant engineering resources such as this 19th
century structure.
The Rosemont-Raven Rock Road Bridge Rehabilitation project ensures the continued and
prolonged life of this important transportation resource as a functioning crossing serving the
needs of the rural area. The historic structure continues to be a source and focus of local pride.
Its retention and rehabilitation offer a renewed sense of place and history for local residents
and provides a link to the past for area visitors.
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 12 of 15
Project Cost
Local Scoping Project
$254,000
Final Design and Construction Project
Design
Construction
Total Cost
$208,000
$2,218,000
$2,680,000
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 13 of 15
Project Team
The following is a list of primary organizations that played a significant role in the
accomplishment of this project:
1. Client/Owner
County of Hunterdon
Hunterdon County Division of Roads, Bridges and Engineering
Route 12 County Complex, Building #1
P.O. Box 2900
Flemington, New Jersey 08822-2900
Mr. James G. Martin, P.E.
Hunterdon County Engineer
Telephone: 908-788-1227
Email: jmartin@co.hunterdon.nj.us
Web: http://co.hunterdon.nj.us/depts/roads/enginr.htm/
2. Design Engineer
TranSystems Corporation
1037 Raymond Boulevard, Suite 400
Newark, New Jersey 07102
Mr. Todd Batchelor
Project Engineer
Telephone: 201-334-1461
Email: tsbatchelor@transystems.com
Web: http://www.transystems.com/
3. Fabricator
Susan R. Bauer, Inc.
427 Margaret King Avenue
Ringwood, New Jersey 07456
Mr. Richard Bauer, Jr.
Project Manager
Telephone: 973-657-1590
Email: srbauerinc@aol.com
Web: http://www.susanrbauerinc.com/
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 14 of 15
4. Contractor
Rencor, Inc.
24 Tannery Road, Suite 1-B
Somerville, New Jersey 08876
Mr. Juan Carlos Alfonso
Project Manager
Telephone: 908-534-2131
Email: juanalfonso@rencorinc.net
Web: No web site available
5. Subcontractor
Archer Steel Construction Co., Inc. (Bridge Erection)
151 State Route 33
Manalapan, New Jersey 07726
Mr. Fred Archer, Jr.
President
Telephone: 732-625-1300
Email: archer83@optonline.net
Web: No web site available
2015 New Jersey Historic Preservation Awards Program Application
Rosemont-Raven Rock Road Bridge Rehabilitation
Page 15 of 15
Time Required
Local Scoping Project
Activity / Milestone
Start or Completion Date
Project Start
Project Complete
November 2002
September 2008
Final Design and Construction Project
Activity / Milestone
Final Design
Project Start
Project Complete
Construction
Project Start
Project Complete
Total Time to Complete Project:
Start or Completion Date
January 2010
August 2012
February 2013
September 2014
Ten Years (active time)
Download