Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.4.5.2.1 Final To-Be Process Models Final Version 2.0 January 12, 2012 Submitted to: Florida’s Office of Early Learning Prepared by: HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table of Contents Amendment History .................................................................................................................... 1 1. Introduction............................................................................................................................. 2 1.1 Purpose ............................................................................................................................ 2 1.2 Background ..................................................................................................................... 2 1.3 Overview .......................................................................................................................... 3 1.4 Audience .......................................................................................................................... 3 1.5 References ....................................................................................................................... 3 1.6 Glossary ........................................................................................................................... 4 2. Development of the Future-State Business Model .............................................................. 5 2.1 Overview .......................................................................................................................... 5 2.2 Business Process Reengineering Methodology .......................................................... 6 2.2.1 Validating To-Be Processes ........................................................................................ 7 2.2.1.1 Final To- Be Business Process Models Inventory .............................................. 7 2.2.1.2 Joint Application Development (JAD) Validation Sessions................................. 9 2.3 Final To-Be Business Process Models ....................................................................... 10 2.3.1 Methodology .............................................................................................................. 10 2.3.1.1 Process Flow Diagram ..................................................................................... 11 2.3.1.2 Detailed Workflows ........................................................................................... 11 3. To-Be Business Process Models ........................................................................................ 16 3.1 BP-01 Child Care Resource and Referral .................................................................... 16 3.1.1 Process Overview ..................................................................................................... 16 3.1.1.1 Actors ............................................................................................................... 16 3.1.2 CCR&R Process Flow Diagram ................................................................................ 17 3.1.3 CCR&R Detailed Process Narrative .......................................................................... 18 3.1.4 CCR&R Detailed Workflows ...................................................................................... 24 3.1.5 Business Rules.......................................................................................................... 28 3.1.6 Traceability ................................................................................................................ 29 3.1.6.1 Use Cases ........................................................................................................ 29 3.1.6.2 Requirements ................................................................................................... 29 3.2 BP-02 Enrollment .......................................................................................................... 30 3.2.1 Process Overview ..................................................................................................... 30 3.2.1.1 Actors ............................................................................................................... 30 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page i HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.2.2 Enrollment Process Flow Diagram ............................................................................ 31 3.2.3 Enrollment Detailed Process Narrative ..................................................................... 32 3.2.4 Enrollment Detailed Workflows ................................................................................. 37 3.2.5 Business Rules.......................................................................................................... 44 3.2.6 Traceability ................................................................................................................ 45 3.2.6.1 Use Cases ........................................................................................................ 45 3.2.6.2 Requirements ................................................................................................... 46 3.3 BP-03 Wait List Management ....................................................................................... 47 3.3.1 Process Overview ..................................................................................................... 47 3.3.1.1 Actors ............................................................................................................... 47 3.3.2 Wait List Process Flow Diagram ............................................................................... 48 3.3.3 Wait List Detailed Process Narrative ......................................................................... 49 3.3.4 Wait List Detailed Workflows ..................................................................................... 51 3.3.5 Business Rules.......................................................................................................... 54 3.3.6 Traceability ................................................................................................................ 54 3.3.6.1 Use Cases ........................................................................................................ 54 3.3.6.2 Requirements ................................................................................................... 55 3.4 BP-4 Child Screening .................................................................................................... 56 3.4.1 Process Overview ..................................................................................................... 56 3.4.1.1 Actors ............................................................................................................... 56 3.4.2 Child Screening Process Flow Diagram .................................................................... 57 3.4.3 Child Screening Detailed Process Narrative ............................................................. 58 3.4.4 Child Screening Detailed Workflows ......................................................................... 61 3.4.5 Business Rules.......................................................................................................... 64 3.4.6 Traceability ................................................................................................................ 64 3.4.6.1 Use Cases ........................................................................................................ 64 3.4.6.2 Requirements ................................................................................................... 65 3.5 BP-05 School Readiness Eligibility Redetermination ................................................ 66 3.5.1 Process Overview ..................................................................................................... 66 3.5.1.1 Actors ............................................................................................................... 66 3.5.2 School Readiness Eligibility Redetermination Process Flow Diagram ...................... 67 3.5.3 School Readiness Eligibility Redetermination Detailed Process Narrative ............... 68 3.5.4 School Readiness Eligibility Redetermination Detailed Workflows ........................... 71 3.5.5 Business Rules.......................................................................................................... 74 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page ii HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.5.6 Traceability ................................................................................................................ 74 3.5.6.1 Use Cases ........................................................................................................ 74 3.5.6.2 Requirements ................................................................................................... 75 3.6 BP-06 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer .................................................................................................................................. 76 3.6.1 Process Overview ..................................................................................................... 76 3.6.1.1 Actors ............................................................................................................... 76 3.6.2 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Process Flow Diagram ......................................................................................................... 77 3.6.3 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Detailed Process Narrative .................................................................................................. 78 3.6.4 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Detailed Workflows .............................................................................................................. 81 3.6.5 Business Rules.......................................................................................................... 85 3.6.6 Traceability ................................................................................................................ 86 3.6.6.1 Use Cases ........................................................................................................ 86 3.6.6.2 Requirements ................................................................................................... 86 3.7 BP-07 Guardianship Transfer ...................................................................................... 87 3.7.1 Process Overview ..................................................................................................... 87 3.7.1.1 Actors ............................................................................................................... 87 3.7.2 Guardianship Transfer Process Flow Diagram ......................................................... 88 3.7.3 Guardianship Transfer Detailed Process Narrative ................................................... 89 3.7.4 Guardianship Transfer Detailed Workflows ............................................................... 91 3.7.5 Business Rules.......................................................................................................... 94 3.7.6 Traceability ................................................................................................................ 94 3.7.6.1 Use Cases ........................................................................................................ 94 3.7.6.2 Requirements ................................................................................................... 95 3.8 BP-08 Provider On-boarding and Management.......................................................... 96 3.8.1 Process Overview ..................................................................................................... 96 3.8.1.1 Actors ............................................................................................................... 96 3.8.2 Provider On-boarding and Management Process Flow Diagram .............................. 97 3.8.3 Provider On-boarding and Management Detailed Process Narrative ....................... 98 3.8.4 Provider On-boarding and Management Detailed Workflows ................................. 101 3.8.5 Business Rules........................................................................................................ 103 3.8.6 Traceability .............................................................................................................. 105 3.8.6.1 Use Cases ...................................................................................................... 105 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page iii HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.8.6.2 Requirements ................................................................................................. 105 3.9 BP-09 Provider Quality Monitoring and Improvement ............................................. 106 3.9.1 Process Overview ................................................................................................... 106 3.9.1.1 Actors ............................................................................................................. 106 3.9.2 Provider Quality Monitoring and Improvement Process Flow Diagram ................... 107 3.9.3 Provider Quality Monitoring and Improvement Detailed Process Narrative ............ 108 3.9.4 Provider Quality Monitoring and Improvement Detailed Workflows ........................ 110 3.9.5 Business Rules........................................................................................................ 112 3.9.6 Traceability .............................................................................................................. 113 3.9.6.1 Use Cases ...................................................................................................... 113 3.9.6.2 Requirements ................................................................................................. 113 3.10 BP-10 Attendance Roster Processing ....................................................................... 114 3.10.1 Process Overview ................................................................................................... 114 3.10.1.1 Actors ............................................................................................................. 114 3.10.2 Attendance Roster Processing Process Flow Diagram ........................................... 115 3.10.3 Attendance Roster Processing Detailed Process Narrative .................................... 116 3.10.4 Attendance Roster Processing Detailed Workflows ................................................ 119 3.10.5 Business Rules........................................................................................................ 122 3.10.6 Traceability .............................................................................................................. 122 3.10.6.1 Use Cases ...................................................................................................... 122 3.10.6.2 Requirements ................................................................................................. 123 3.11 BP-11 Prior Period Attendance Adjustments ........................................................... 124 3.11.1 Process Overview ................................................................................................... 124 3.11.1.1 Actors ............................................................................................................. 124 3.11.2 Prior Period Attendance Adjustments Process Flow Diagram ................................ 125 3.11.3 Prior Period Attendance Adjustments Detailed Process Narrative .......................... 126 3.11.4 Prior Period Attendance Adjustments Detailed Workflows ...................................... 128 3.11.5 Business Rules........................................................................................................ 130 3.11.6 Traceability .............................................................................................................. 130 3.11.6.1 Use Cases ...................................................................................................... 130 3.11.6.2 Requirements ................................................................................................. 130 3.12 BP-12 Closeout ............................................................................................................ 131 3.12.1 Process Overview ................................................................................................... 131 3.12.1.1 Actors ............................................................................................................. 131 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page iv HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.12.2 Closeout Process Flow Diagram ............................................................................. 132 3.12.3 Closeout Detailed Process Narrative ...................................................................... 133 3.12.4 Closeout Detailed Workflows .................................................................................. 137 3.12.5 Business Rules........................................................................................................ 142 3.12.6 Traceability .............................................................................................................. 144 3.12.6.1 Use Cases ...................................................................................................... 144 3.12.6.2 Requirements ................................................................................................. 145 3.13 BP-13 Collections ........................................................................................................ 146 3.13.1 Process Overview ................................................................................................... 146 3.13.1.1 Actors ............................................................................................................. 146 3.13.2 Collections Process Flow Diagram.......................................................................... 147 3.13.3 Collections Detailed Process Narrative ................................................................... 148 3.13.4 Collections Detailed Workflows ............................................................................... 153 3.13.5 Business Rules........................................................................................................ 156 3.13.6 Traceability .............................................................................................................. 157 3.13.6.1 Use Cases ...................................................................................................... 157 3.13.6.2 Requirements ................................................................................................. 157 3.14 BP-14 Slot Management ............................................................................................. 158 3.14.1 Process Overview ................................................................................................... 158 3.14.1.1 Actors ............................................................................................................. 158 3.14.2 Slot Management Process Flow Diagram ............................................................... 159 3.14.3 Slot Management Detailed Process Narrative ........................................................ 160 3.14.4 Slot Management Detailed Workflows .................................................................... 162 3.14.5 Business Rules........................................................................................................ 163 3.14.6 Traceability .............................................................................................................. 164 3.14.6.1 Use Cases ...................................................................................................... 164 3.14.6.2 Requirements ................................................................................................. 164 3.15 BP-15 Develop Policy and Manage Programs .......................................................... 165 3.15.1 Process Overview ................................................................................................... 165 3.15.1.1 Actors ............................................................................................................. 165 3.15.2 Develop Policy and Manage Programs Process Flow Diagram .............................. 166 3.15.3 Develop Policy and Manage Programs Detailed Process Narrative ....................... 167 3.15.4 Develop Policy and Manage Programs Detailed Workflows ................................... 170 3.15.5 Business Rules........................................................................................................ 171 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page v HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.15.6 Traceability .............................................................................................................. 172 3.15.6.1 Use Cases ...................................................................................................... 172 3.15.6.2 Requirements ................................................................................................. 172 3.16 BP-16 Process ELC Invoice ....................................................................................... 173 3.16.1 Process Overview ................................................................................................... 173 3.16.1.1 Actors ............................................................................................................. 173 3.16.2 Process ELC Invoice Process Flow Diagram .......................................................... 174 3.16.3 Process ELC Invoice Detailed Process Narrative ................................................... 175 3.16.4 Process ELC Invoice Detailed Workflows ............................................................... 178 3.16.5 Business Rules........................................................................................................ 182 3.16.6 Traceability .............................................................................................................. 182 3.16.6.1 Use cases ....................................................................................................... 182 3.16.6.2 Requirements ................................................................................................. 183 3.17 BP-17 Monitor and Reconcile ELC Grant Utilization................................................ 184 3.17.1 Process Overview ................................................................................................... 184 3.17.1.1 Actors ............................................................................................................. 184 3.17.2 Monitor and Reconcile ELC Grant Utilization Process Flow Diagram ..................... 185 3.17.3 Monitor and Reconcile ELC Grant Utilization Detailed Process Narrative .............. 186 3.17.4 Monitor and Reconcile ELC Grant Utilization Detailed Process Workflows ............ 191 3.17.5 Business Rules........................................................................................................ 196 3.17.6 Traceability .............................................................................................................. 197 3.17.6.1 Use Cases ...................................................................................................... 197 3.17.6.2 Requirements ................................................................................................. 197 3.18 BP-18 Monitor Program and Instructor Eligibility .................................................... 198 3.18.1 Process Overview ................................................................................................... 198 3.18.1.1 Actors ............................................................................................................. 198 3.18.2 Monitor Program Eligibility and Instructor Qualifications Process Flow Diagram .... 199 3.18.3 Monitor Program Eligibility and Instructor Qualifications Detailed Process Narrative 200 3.18.4 Monitor Program Eligibility and Instructor Qualifications Detailed Workflows ......... 204 3.18.5 Business Rules........................................................................................................ 208 3.18.6 Traceability .............................................................................................................. 209 3.18.6.1 Use Cases ...................................................................................................... 209 3.18.6.2 Requirements ................................................................................................. 209 3.19 Maintain Data Quality and Provide Service Support................................................ 210 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page vi HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.19.1 BP 19 Maintain Data Quality and Provide Service Support .................................... 210 3.19.1.1 Actors ............................................................................................................. 210 3.19.2 Maintain Data Quality and Provide Service Support Process Flow Diagram .......... 211 3.19.3 Maintain Data Quality and Provide Service Support Detailed Process Narrative.... 212 3.19.4 Maintain Data Quality and Provide Service Support Detailed Workflows ............... 215 3.19.5 Business Rules........................................................................................................ 219 3.19.6 Traceability .............................................................................................................. 219 3.19.6.1 Use Cases ...................................................................................................... 219 3.19.6.2 Requirements ................................................................................................. 219 3.20 Process Cash Receipts .............................................................................................. 220 3.20.1 BP-20 Process Cash Receipts ................................................................................ 220 3.20.1.1 Actors ............................................................................................................. 220 3.20.2 Process Cash Receipts Process Flow Diagram ...................................................... 221 3.20.3 Process Cash Receipts Detailed Process Narrative ............................................... 222 3.20.4 Process Cash Receipts Detailed Workflows ........................................................... 225 3.20.5 Business Rules........................................................................................................ 227 3.20.6 Traceability .............................................................................................................. 227 3.20.6.1 Use Cases ...................................................................................................... 227 3.20.6.2 Requirements ................................................................................................. 228 3.21 Manage Statewide Contracts ..................................................................................... 229 3.21.1 BP-21 Manage Statewide Contracts ....................................................................... 229 3.21.1.1 Actors ............................................................................................................. 229 3.21.2 Manage Statewide Contracts Process Flow Diagram ............................................. 230 3.21.3 Manage Statewide Contracts Detailed Process Narrative ...................................... 231 3.21.4 Manage Statewide Contracts Detailed Workflows .................................................. 233 3.21.5 Business Rules........................................................................................................ 236 3.21.6 Traceability .............................................................................................................. 236 3.21.6.1 Use Cases ...................................................................................................... 236 3.21.6.2 Related Requirements .................................................................................... 237 4. ELIS Differences-Impact to Business ............................................................................... 238 4.1 Overview ...................................................................................................................... 238 5. Implementing the Redesigned Business Processes ...................................................... 243 5.1 Implementing the Redesigned Business Processes ............................................... 243 5.2 Business Process Rollout Plan ................................................................................. 245 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page vii HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Figures Figure 1. Business Process Reengineering Methodology ............................................................ 7 Figure 2. Final To-Be Business Process Models ........................................................................ 10 Figure 3. Process Flow Diagram Key ......................................................................................... 11 Figure 4. Child Care Resource and Referral Process Flow Diagram ......................................... 17 Figure 5. Determine Nature of Contact Process (A1) ................................................................ 24 Figure 6. Determine Needs, Create Provider Profile, Offer Community Services, and Provide Consumer Education/Consultation Process Flow Diagram (B1, B3, B4, and B5) ...................... 25 Figure 7. Determine Preliminary Eligibility (B2) ......................................................................... 26 Figure 8. Handle Other Contacts and Supply Provider Information Process Flow Diagram (C1/D1) ....................................................................................................................................... 27 Figure 9. Enrollment Process Flow Diagram .............................................................................. 31 Figure 10. Review Applicant Information and Follow Up (A1) .................................................... 37 Figure 11. Alternative Point of Entry - VPK Pilot Program (A1-ALT) .......................................... 38 Figure 12. Conduct Intake Interview (A2) ................................................................................... 39 Figure 13. Certify School Readiness Eligibility (A3) .................................................................... 40 Figure 14. Certify Voluntary Pre-Kindergarten Eligibility (A4) ..................................................... 41 Figure 15. Process School Readiness/Local Enrollment (A5) ................................................... 42 Figure 16. Process Voluntary Pre-Kindergarten Enrollment (A6) ............................................... 43 Figure 17. Wait List Process Flow Diagram ................................................................................ 48 Figure 18. Wait List Validation (A1) ............................................................................................ 51 Figure 19. Wait List Selection (A2) ............................................................................................. 52 Figure 20. Update Wait List (A3) ................................................................................................. 53 Figure 21. Child Screening Process Flow Diagram .................................................................... 57 Figure 22. Conduct Developmental Screening (A1) ................................................................... 61 Figure 23. Conduct Additional Follow-up Developmental Screening (A2) ................................. 62 Figure 24. Complete Child Screening (A3) ................................................................................. 63 Figure 25. Eligibility Redetermination Process Flow Diagram .................................................... 67 Figure 26. Notice of Eligibility Redetermination (A1) .................................................................. 71 Figure 27. Re-determine School Readiness Eligibility (A2) ....................................................... 72 Figure 28. Suspected Potential Fraud Referral (A-3) .................................................................. 73 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page viii HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Figure 29. Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Process Flow .............................................................................................................................. 77 Figure 30. Assess Transfer Request: VPK Re-enrollment (A1) ................................................. 81 Figure 31. Execute and Confirm Transfer: VPK Re-enrollment (A-2) ......................................... 82 Figure 32. Access Transfer Request: SR Provider Transfer (A1) .............................................. 83 Figure 33. Confirm and Execute Transfer: SR Provider Transfer (A2) ...................................... 84 Figure 34. Guardianship Transfer Process Flow Diagram ......................................................... 88 Figure 35. Review Request for Guardianship Transfer (A1 – Part 1) ......................................... 91 Figure 36. Review Request for Guardianship Transfer (A1 – Part 2) ......................................... 92 Figure 37. Process Guardianship Transfer (A2) ........................................................................ 93 Figure 38. Provider On-boarding and Management Process Flow Diagram .............................. 97 Figure 39. Prospective Provider Contact and Conduct Provider Orientation (A1/A2) ............... 101 Figure 40. Review and Verify Documentation and Maintain Provider Profile (A3/A4) .............. 102 Figure 41. Provider Quality Monitoring and Improvement Process Flow Diagram ................... 107 Figure 42. Prepare/Conduct Monitoring and Develop Program Improvement Plan (A1/A2/A3)110 Figure 43. Conduct Follow Up Process Flow Diagram (A4) ..................................................... 111 Figure 44. Attendance Roster Processing Process Flow Diagram ........................................... 115 Figure 45. Develop Schedule/Release Attendance Roster (A0/A1) ......................................... 119 Figure 46. Populate Attendance Roster (A2) ............................................................................ 120 Figure 47. Approve Attendance Roster/Revise Child Attendance Information (A3/A4) ............ 121 Figure 48. Prior Period Attendance Adjustments Process Flow ............................................... 125 Figure 49. Generate Prior Period Attendance Adjustment (A1) ................................................ 128 Figure 50. Approve Prior Period Attendance Adjustment, Revise Child Information (A2, A3) .. 129 Figure 51. Closeout Process Flow Diagram ............................................................................. 132 Figure 52. Develop Schedule for Closeout (A0) ....................................................................... 137 Figure 53. Review Closeout for Period (A1) ............................................................................. 138 Figure 54. Approve Closeout (A2) ............................................................................................ 139 Figure 55. Issue SR/VPK Provider Payments (A3) ................................................................... 140 Figure 56. Submit Reimbursement Request; Receive Reimbursement (A4, A5) ..................... 141 Figure 57. Collections Process Flow Diagram .......................................................................... 147 Figure 58. Questioned Cost, Initiate Recovery (A1, A2) ........................................................... 153 Figure 59. Request Repayment of Delinquent Account/ Resolved Recovery (A3, A4)............. 154 Figure 60. Suspected Fraud Referral (A5) ................................................................................ 155 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page ix HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Figure 61. Slot Management Process Flow Diagram ............................................................... 159 Figure 62. Analyze Slot Usage, Develop and Implement Slot Strategy (A1/A2) ....................... 162 Figure 63. Develop Policy and Manage Programs Process Flow Diagram .............................. 166 Figure 64. Develop Program Policies and Best Practices/Manage Programs/Collect and Analyze Programmatic Data and Customer Feedback Process (A1/A2/A3) .......................................... 170 Figure 65. Process ELC Invoice Process Flow Diagram .......................................................... 174 Figure 66. Develop Schedule for Closeout (A0) ....................................................................... 178 Figure 67. Receive and Review ELC Invoice (A1, A2) ............................................................. 179 Figure 68. Approve ELC Invoice (A3) ....................................................................................... 180 Figure 69. Initiate Payment (A4) ............................................................................................... 181 Figure 70. Monitor and Reconcile ELC Grant Utilization Process Flow .................................... 185 Figure 71. Create ELC Annual Spending Plan (A0) .................................................................. 191 Figure 72. Review Expenditures (A1 Page 1) ........................................................................... 192 Figure 73. Review Expenditures (A1 Page 2) ........................................................................... 193 Figure 74. Communicate and Resolve Utilization and Other Issues (A2/A3 Part 1) ................. 194 Figure 75. Resolve Utilization and Other Issues (A3 Part 2) .................................................... 195 Figure 76. Monitor Program Eligibility and Instructor Qualifications Process Flow Diagram .... 199 Figure 77. Schedule ELC Monitoring/Review ELC Data Flow Diagram (A1/A2) ...................... 204 Figure 78. Review of Representative Cases (A3) ..................................................................... 205 Figure 79. Develop Accountability Review Reports (A4) .......................................................... 206 Figure 80. Initiate Questioned Cost Determination (A5) ........................................................... 207 Figure 81. Maintain Data Quality and Provide Service Support Process Flow Diagram........... 211 Figure 82. Receive and Review Services Requests (A0) ......................................................... 215 Figure 83. Analyze and Improve Data Quality Flow Diagram/ Monitor Data Quality (A1/A2) ... 216 Figure 84. Provide System Support Process Monitor Data Quality (A3/A2) ............................. 217 Figure 85. Complete Service Request (A4) .............................................................................. 218 Figure 86. Process Cash Receipts Process Flow Diagram ...................................................... 221 Figure 87. Receive Payment, Receipt of Payment, Return Payment (A1/A2/A3) ..................... 225 Figure 88. Determine Payment/Create Accounting Entries/Reconcile Payment (A4/A5/A6) .... 226 Figure 89. Manage Statewide Contracts Process Flow Diagram ............................................. 230 Figure 90. Review Contractor Compliance and Resolve Issues (A1) ....................................... 233 Figure 91. Receive and Validate Contractor Invoice (A2/A3) ................................................... 234 Figure 92. Initiate Contractor Payment (A4) ............................................................................. 235 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page x HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Tables Table 1. Business Process Inventory ........................................................................................... 8 Table 2. Core BPMN Elements ................................................................................................... 12 Table 3. CCR&R – Determine Nature of Contact ....................................................................... 18 Table 4. CCR&R – Determine Needs ......................................................................................... 20 Table 5. CCR&R – Determine Preliminary Eligibility ................................................................... 21 Table 6. CCR&R – Create Provider Referral .............................................................................. 22 Table 7. CCR&R – Community Resources Requested .............................................................. 22 Table 8. CCR&R – Provide Consumer Education/Consultation ................................................. 22 Table 9. CCR&R – Supply Provider Information ......................................................................... 23 Table 10. CCR&R – Handle Other Contacts ............................................................................... 23 Table 11. CCR&R Business Rules ............................................................................................. 28 Table 12. Enrollment – Review Application and Follow up ......................................................... 32 Table 13. Enrollment – Alternative Child Registration ................................................................ 33 Table 14. Enrollment – Conduct Intake Interview ....................................................................... 33 Table 15. Enrollment – Certify School Readiness Eligibility ....................................................... 34 Table 16. Enrollment – Certify VPK Eligibility ............................................................................. 35 Table 17. Enrollment – Process School Readiness Enrollment .................................................. 35 Table 18. Enrollment – Process VPK Enrollment ....................................................................... 36 Table 19. Enrollment Business Rules ......................................................................................... 44 Table 20. Wait List Management – Wait List Validation .............................................................. 49 Table 21. Wait List Management – Wait List Selection ............................................................... 50 Table 22. Wait List Management – Update Wait List .................................................................. 50 Table 23. Wait List Business Rules ............................................................................................ 54 Table 24. Child Screening – Conduct Developmental Screening ............................................... 58 Table 25. Child Screening – Conduct Additional Follow-up Developmental Screening .............. 59 Table 26. Child Screening – Complete Developmental Screening ............................................. 60 Table 27. Child Screening Business Rules ................................................................................. 64 Table 28. Redetermination – Notice of Eligibility Redetermination ............................................ 68 Table 29. Redetermination – Re-determine School Readiness Eligibility ................................... 69 Table 31. School Readiness (SR) Eligibility Redetermination Business Rules........................... 74 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page xi HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 32. VPK Re-enrollment – Assess Transfer Request ......................................................... 78 Table 33. VPK Re-enrollment – Execute and Confirm Transfer ................................................. 79 Table 34. School Readiness (SR) Provider Transfer – Assess Transfer Request...................... 79 Table 35. School Readiness (SR) Provider Transfer-Confirm and Execute Transfer ................. 80 Table 36. VPK Re-enrollment/SR Provider Transfer Business Rules ......................................... 85 Table 37. Guardianship Transfer – Review Request for Guardianship Transfer ........................ 89 Table 38. Guardianship Transfer – Process Guardianship Transfer .......................................... 90 Table 39. Guardianship Transfer Business Rules ...................................................................... 94 Table 40. Provider On-boarding and Management – Prospective/New Provider Contact .......... 98 Table 41. Provider On-boarding and Management – Conduct Provider Contact ....................... 99 Table 42. Provider On-boarding and Management – Review and Verify Documentation ........ 100 Table 43. Provider On-boarding and Management – Maintain Provider Profile ....................... 100 Table 44. Provider On-boarding and Management Business Rules ......................................... 103 Table 46. Provider Quality Monitoring and Improvement – Prepare for Monitoring .................. 108 Table 47. Provider Quality Monitoring and Improvement – Conduct Monitoring ...................... 108 Table 48. Provider Quality Monitoring and Improvement – Develop Program Improvement Plan .................................................................................................................................................. 109 Table 49. Provider Quality Monitoring and Improvement – Conduct Follow Up ....................... 109 Table 50. Provider Quality Monitoring and Improvement Business Rules ................................ 112 Table 51. Required Attendance Submission ............................................................................. 116 Table 52. Developed Attendance Roster Schedule .................................................................. 116 Table 53. Generation of a Blank Attendance Roster ................................................................ 117 Table 54. Submitted Attendance Roster ................................................................................... 117 Table 55. Approved Attendance Roster .................................................................................... 118 Table 56. Attendance Roster Processing Business Rules ........................................................ 122 Table 57. Generate Prior Period Attendance Adjustment ......................................................... 126 Table 58. Approve Prior Period Adjustment .............................................................................. 127 Table 59. Revise Child Information ........................................................................................... 127 Table 60. Prior Period Attendance Adjustments Business Rules ............................................. 130 Table 61. Closeout – Develop Schedule for Closeout .............................................................. 133 Table 62. Closeout – Review Closeout for Period .................................................................... 133 Table 63. Closeout – Approve Closeout ................................................................................... 134 Table 64. Closeout – Issue School Readiness/Voluntary Prekindergarten Provider Payments134 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page xii HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 65. Closeout – Submit Reimbursement Request to OEL ................................................ 135 Table 66. Closeout – Receive Reimbursement ........................................................................ 136 Table 67. Closeout Business Rules .......................................................................................... 142 Table 68. Collections – Questioned Cost Determination .......................................................... 148 Table 69. Collections – Initiate Recovery .................................................................................. 149 Table 70. Collections- Request Repayment of Delinquent Account ......................................... 150 Table 71. Collections- Resolved Recovery ............................................................................... 151 Table 72. Collections- Suspected Fraud Referral ..................................................................... 152 Table 73. Collection Business Rules ........................................................................................ 156 Table 74. Slot Management – Analyze Slot Usage and Develop Slot Strategy ........................ 160 Table 75. Slot Management – Implement Slot Strategy ........................................................... 161 Table 76. Slot Management Business Rules ............................................................................ 163 Table 77. Develop Policy and Manage Programs – Develop Program Policies and Best Practices ................................................................................................................................... 167 Table 78. Develop Policy and Manage Programs – Manage Programs ................................... 168 Table 79. Develop Policy and Manage Programs – Collect and Analyze Programmatic Data and Customer Feedback.................................................................................................................. 169 Table 80. Develop Policy and Manage Programs Business Rules ........................................... 171 Table 81. Process ELC Invoice – Develop Schedule for Closeout ........................................... 175 Table 82. Process ELC Invoice – Receive ELC Invoice ........................................................... 175 Table 83. Process ELC Invoice – Review ELC Invoice ............................................................ 176 Table 84. Process ELC Invoice – Approve ELC Invoice ........................................................... 177 Table 85. Process ELC Invoice – Initiate ELC Payment ........................................................... 177 Table 86. Process ELC Invoice Business Rules ....................................................................... 182 Table 87. Create ELC Annual Spending Plan ........................................................................... 186 Table 88. Monitor and Reconcile – Review Expenditures ....................................................... 187 Table 89. Monitor and Reconcile – Review Expenditures ........................................................ 188 Table 90. Monitor and Reconcile – Communicate Utilization and Other Issues ....................... 188 Table 91. Monitor and Reconcile – Resolve Utilization and Other Issues (Part 1) ................... 189 Table 92. Monitor and Reconcile – Resolve Utilization and Other Issues (Part 2) ................... 190 Table 93. Resolve Utilization and Other Issues ........................................................................ 196 Table 94. Monitor Program Eligibility and Instructor Qualifications – Schedule ELC Accountability Review ............................................................................................................... 200 Table 95. Monitor Program Eligibility and Instructor Qualifications – Review ELC Data .......... 201 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page xiii HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 96. Monitor Program Eligibility and Instructor Qualifications – Review of Representative Cases ........................................................................................................................................ 202 Table 97. Monitor Program Eligibility and Instructor Qualifications – Develop Accountability Review Reports ......................................................................................................................... 202 Table 98. Monitor Program Eligibility and Instructor Qualifications- Initiate Questioned Cost Determination ............................................................................................................................ 203 Table 99. Monitor Program Eligibility Business Rules .............................................................. 208 Table 100. Maintain Data Quality and Provide Service Support – Receive and Review Service Requests ................................................................................................................................... 212 Table 101. Maintain Data Quality and Provide Service Support – Analyze and Improve Data Quality ....................................................................................................................................... 212 Table 102. Maintain Data Quality and Provide Service Support – Monitor Data Quality .......... 213 Table 103. Maintain Data Quality and Provide Service Support – Provide System Support .... 214 Table 104. Maintain Data Quality and Provide Service Support – Complete and Close Service Request..................................................................................................................................... 214 Table 105. Maintain Data Quality and Provide Service Support Business Rules ..................... 219 Table 106. Process Cash Receipts – Receive Payment .......................................................... 222 Table 107. Process Cash Receipts – Deposit Payment ........................................................... 222 Table 108. Process Cash Receipts – Return Payment ............................................................. 223 Table 109. Process Cash Receipts – Determine Payment ....................................................... 223 Table 110. Process Cash Receipts – Create Accounting Entries ............................................. 223 Table 111. Process Cash Receipts – Reconcile Receivables .................................................. 224 Table 112. Process Cash Receipts Business Rules ................................................................. 227 Table 113. Manage Statewide Contracts – Review Contractor Compliance and Resolve Issues .................................................................................................................................................. 231 Table 114. Manage Statewide Contracts – Receive Contractor Invoice ................................... 231 Table 115. Manage Statewide Contracts – Validate Contractor Invoice ................................... 232 Table 116. Manage Statewide Contracts – Initiate Contractor Payment .................................. 232 Table 117. Manage Statewide Contracts Business Rules ........................................................ 236 Table 118. Examples of Differences ......................................................................................... 238 Table 119. BPR Rollout Activities ............................................................................................. 245 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page xiv HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) A ME NDME NT HIS T OR Y Summary of Changes CR# Document Version # Date Modified By Section, Page(s) and Text Revised 0.1 02/02/2011 KLV Initial Creation 0.2 02/09/2011 KLV Incorporated Feedback from HP Review 0.3 02/11/2011 LMB Prepared for Agency Review 0.4 02/15/2011 KLV Incorporate Additional Feedback from HP Review 0.5 2/27/2011 KLV/JCV/LMB Incorporated Agency Feedback and prepared for Agency review 0.6 3/09/2011 KLV/JCV Incorporated Agency Clarifications and Additional Feedback. 1.0 3/2011 LMB Finalized upon approval 1.1 12/13/2011 JCV Updated per Corrective Action Plan 1.2 12/19/2011 LMB Prepared for formal review 2.0 01/12/12 KAA Prepared for formal submission 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 1 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 1. INT R ODUC T ION With the exception of references to publications or external interfaces created by or associated with the Agency of Workforce Innovation, any reference in this document to “the Agency for Workforce Innovation,” “the Agency,” or “AWI” implies Florida’s Office of Early Learning. 1.1 Purpose The purpose of this document is to describe and document the future-state, To-Be Business Process Models for the HP Florida Early Learning Information System (ELIS). This includes the approach for creating the final to-be process models and rolling out the reengineered Business Processes that will enable stakeholders to effectively use ELIS and realize the benefits of system implementation. Any reference to AWI throughout this document implies Florida’s Office of Early Learning. 1.2 Background ELIS will replace the eighteen-year-old Enhanced Field System (EFS) that was implemented to manage child care subsidies. One centrally located server database does not exist; rather there are 34 client server databases located around the state supporting 31 Early Learning Coalitions (ELCs) and Redlands Christian Migrant Association (RCMA). Because of the current information system limitations, there are inconsistent business rules and operating procedures across the state. This includes variances in data entry and tracking and results in unreliable data and performance reporting for ELCs and the state. The ELIS project has been conceived as the best means of eliminating the limitations of the current system and architecture while, at the same time, establishing and sustaining new and improved processes that are better able to accomplish the Agency‘s mission and advance the achievement of the Office of Early Learning’s strategic objectives. During an earlier stage of the ELIS Project, an experienced team staffed with knowledgeable practitioners in project management, business process analysis and requirements definition worked with the Agency for Workforce Innovation (the Agency), Office of Early Learning (OEL), Early Learning Coalition, and Redlands Christian Migrant Association subject matter experts (SMEs) to develop reengineered Business Processes and Requirements for ELIS. The Agency documented these potential future-state Business Processes and Requirements in the ELIS OEL Project To-Be Documentation and the ELIS ELC To-Be Process Documentation, involving a wide cross-section of stakeholders in March 2008. Facilitated sessions were conducted with the Agency staff to prioritize Business Processes to be initially enabled by ELIS. When the final requirements were determined, 7 of the 13 OEL Business Process Models and 17 of the 21 ELC Business Process Models were targeted for implementation. These Business Process Models are addressed in this document. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 2 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) The following Business Process Models identified in the OEL To-Be Process Documentation are not currently in the scope of the ELIS solution: • BP2 – Develop CCDF State Plan • BP3 – Develop Grant Agreements • BP5 – Reporting of Grant Match Sources • BP7 – Process Annual ELC Inventory • BP9 – Monitor ELC Program Performance • BP10 – Monitor Fiscal Practices The following Business Process Models identified in the ELC To-Be Process Documentation are not currently in the scope of the ELIS solution: 1.3 • BP2 – Complaints and Appeals Processing • BP6 – Child Assessment • BP16 – ELC Planning and Performance Monitoring • BP18 – Service Provider Contract Compliance Monitoring Process Annual ELC Inventory Overview This document depicts the future state of ELIS and includes: 1.4 • The Future OEL and ELC Business Process Models • Workflow diagrams developed by using the Business Process Modeling Notation (BPMN) standard method • Roll-out of the final to‐be Business Process Models to the Agency, RCMA, and the ELCs Audience The audience for this document is the ELIS project team, ELCs, the Agency and the OEL. 1.5 References The following documents are referenced, or have been used in the preparation of this document: • ELIS Project ELC As-Is Process Documentation • ELIS Project OEL As-Is Process Documentation • ELIS Project ELC To-Be Process Documentation • ELIS Project OEL To-Be Process Documentation • ELIS Project Use Case Specification 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 3 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) • ELIS Project Business Process Improvement Opportunities • ELIS Project Schedule IV-B Feasibility Study FY2009-10 • FL ELIS Change Management Plan • HP FL ELIS Project Deliverable Expectations • HP FL ELIS Documentation Management Plan • HP FL ELIS Project Management Plan • HP FL ELIS Communications Management Plan • HP FL ELIS Knowledge Transfer Plan • HP FL ELIS Business Process Reengineering Guide • HP FL ELIS Joint Application Design (JAD) Packets • HP FL ELIS Software Requirements Specifications These documents can be found on the Agency ELIS Project SharePoint site. 1.6 Glossary Refer to the HP FL ELIS Project Glossary posted on the Agency ELIS Project SharePoint site for other terms and definitions related to this project. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 4 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 2. DE V E L OP ME NT OF T HE F UT UR E -S T A T E B US INE S S MODE L 2.1 Overview Planning for a project that includes Business Process Reengineering (BPR) is critical to its success. The Agency has invested a considerable amount of time and resources in planning and preparing for the design, build, implementation, and maintenance of ELIS. This activity began with developing a consensus on the goals and importance of BPR to achieve those goals, setting a strategic direction of the project, and defining the scope, including the identification of Business Processes to be reengineered. This strategic direction provides a future state of what the Agency wants to achieve when it has completed the reengineering project. It will also sustain the Agency’s focus and resiliency through the stress of the reengineering process. If necessary, this can be a pillar to rally the organization around should morale suffer. It will also be a cornerstone for change management and communications, while providing a yard stick for measuring progress. ELIS itself cannot make process changes; only people can make these changes. However, a systems project presents an occasion and a structure for improving the way work is done. ELIS is expected to enhance the implementation of early learning programs by: • Improving access to the Early Learning Program and customer service to parents, providers, and other stakeholders • Creating a single point of entry for eligibility data for the School Readiness (SR) and Voluntary Prekindergarten (VPK) Education Program • Optimizing the use of funds and services provided to Florida’s children by facilitating fiscal management and providing timely data for utilization forecasting • Establishing a centralized and consolidated information system that provides consistent, uniform information across the entire state that each ELC will use to manage its programs • Automating cumbersome manual or paper processes to ensure that critical information needed to effectively manage the programs is readily accessible to state and local administrators and policymakers Agency approval of the Final To-Be Business Processes is through review and acceptance of this deliverable. A structured Agency deliverable review process is applied. This process is outlined in the HP FL ELIS Project Deliverable Expectations and HP FL ELIS Documentation Management Plan within the HP ELIS Project Management Plan. The Design Phase Gate Review serves as a second and final review and acceptance of the final to-be process models and is outlined in the HP FL Phase Gate Review Criteria. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 5 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 2.2 Business Process Reengineering Methodology For the Florida ELIS Project, HP used a BPR methodology that is broken down into five phases: planning, analyzing, redesigning, implementing, and rolling out Business Processes. This Methodology is detailed in a previous deliverable, the HP FL ELIS Business Process Reengineering Guide. This allowed HP to build upon the previous work completed by the Agency and to focus the reengineering efforts on the value added phases. The HP team worked directly with the Agency to define requirements and validate the previously created ELIS to-be Business Process models. HP will continue to validate that the technical design, development, and implementation plans support the Agency’s business needs throughout the project life cycle. If there are changes during the course of the project, HP will work with the Agency to identify the impact of each change and utilize the BPR methodology. The reengineered Business Processes were documented and delivered during the Design Phase of the project. HP worked with the stakeholders to validate and reengineer the current Agency and ELC Business Processes as needed, through: • Validating the preliminary to‐be Business Processes; promoting stakeholder buy‐in and commitment • Validating process alignment with business rules and organizational objectives; and current project scope, making revisions based on feedback as appropriate to create final to-be Business Process Models The detailed methodology contained in the HP FL ELIS Business Process Reengineering Guide is summarized here. This process is shown in Figure 1. As previously discussed, the initial phases of reengineering work were completed in an earlier phase of ELIS. Reengineering work in the scope of this document is shown in bold type. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 6 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Analyze Business Processes Understand Project •Strategic Purpose •Identify Objectives •Refine Scope •AnalyzeCurrent Processes •Define As-Is Processes •Identify problems, needs, and business process improvements Redesign Business Processes •Identify Business Process Improvements •Define To-Be Process •Validate To -Be Processes •Identify gaps between business processes •Final To-Be Process Models Implement Redesigned Processes Roll out Redesigned Processes • Software •Manage Development transition and • User Acceptance Change Test •Manage ongoing • Development of Infrastructure and process •Continual materials to support new Improvement processes • Training Development • Knowledge Transfer • Test in Pilot Figure 1. Business Process Reengineering Methodology 2.2.1 Validating To-Be Processes In an earlier phase of ELIS, the Agency used the As-Is Business Process documentation, problems and needs identified in conjunction with the OEL and ELCs/RCMA, and the Business Process improvement recommendations to draft the preliminary To-Be Business Process Models. Facilitated sessions were conducted with Agency staff to prioritize the initial Business Processes to be enabled by ELIS. The next step was to validate and update these Business Process Models to align with current statutes, laws, and policy. 2.2.1.1 F INA L T O - B E B US INE S S P R OC E S S M ODE L S I NV E NT OR Y HP began by reengineering the preliminary To-Be Business Process Models remaining in the scope of ELIS. The Business Processes have been renumbered in order to reflect the current situation. Table 1 shows the Joint Application Development (JAD) session in which the Business Process Model was addressed and provides traceability back to the ELIS ELC To-Be Project Documentation and the ELIS OEL To-Be Project Documentation Developed by the Agency in 2008. Note that the To-Be process for Child Developmental Screening was reviewed and validated in a special Agency-run JAD session beginning on September 2, 2010, not during the Case Management JAD session. On September 30, 2010 the Agency met with HP to present the findings of the special workgroup. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 7 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 1. Business Process Inventory J A D S es s ion G rouping B us ines s P roc es s Name R eferenc e to 2008 E L IS P rojec t T o-B e P roc es s Doc umentation B P1 Resource and Referral CCR&R BP1 B P2 Intake Enrollment BP3 B P3 Intake Wait List Management BP4 B P4 Special Session: Developmental Screening Child Screening BP5 B P5 Case Management SR Eligibility Redetermination BP7 B P6 Case Management VPK Re-enrollment/SR Provider Transfer BP8 B P7 Case Management Guardianship Transfer BP9 B P8 Service Management Provider On-boarding and Management BP10 B P9 Service Management Provider Quality Monitoring and Improvement BP11 B P 10 Attendance Management Attendance Roster Processing BP12 B P 11 Attendance Management Prior Period Attendance Adjustments BP13 B P 12 Grants and Financial Management Closeout BP14 B P 13 Grants and Financial Management Collections BP15 B P 14 Service Management Slot Management BP17 B P 15 Policy Planning and Program Management Develop Policy and Manage Programs BP1 B P 16 Grants and Financial Management Process ELC Invoice BP4 B P 17 Grants and Financial Management Monitor and Reconcile ELC Grant Utilization BP6 B P 18 Policy Planning and Program Management Monitor Program and Instructor Eligibility BP8 B P 19 Policy Planning and Program Management Maintain Data Quality and Provide Service Support BP11 F inal B P Numbering 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 8 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) J A D S es s ion G rouping B us ines s P roc es s Name R eferenc e to 2008 E L IS P rojec t T o-B e P roc es s Doc umentation B P 20 Policy Planning and Program Management Process Cash Receipts BP12 B P 21 Policy Planning and Program Management Manage Statewide Contracts BP13 F inal B P Numbering 2.2.1.2 J OINT A P P L IC A T ION D E V E L OP ME NT (J A D) V A L IDA T ION S E S S IONS The preliminary To-Be Business Process Models were reviewed during the JAD sessions. The JAD sessions were working sessions held in Tallahassee in August and September of 2010. Representatives from the OEL and each of the ELCs and RCMA were invited to attend. This process was completed in 15 multi-day sessions. The 15 JAD sessions were held in the Collins Building located at 107 West Gaines Street, Tallahassee, Florida. To encourage participation, the sessions were available through a conference call number and an HP Virtual Room (similar to the WebEx used by the Agency). An additional Agency-led JAD session was held on September 2, 2010 for review and validation of the Child Screening To-Be Business Process. One week in advance of the session, participants received a review packet that included the high-level overview of the To-Be Business Process Models, a detailed narrative from the ELIS Project ELC To-Be Process Documentation and or ELIS Project OEL To-Be Process Documentation and a detailed, narrative, step-by-step description of the workflow being discussed. During these JAD sessions, the BPR team reviewed the preliminary To-Be Business Process Models with the participants and validated or captured changes to the Business Process Model due to: • Applicable Changes in State or Federal Statute • Changes in Agency Policy, Rules, or Regulations • Changes in Grant Requirements • Additional Detail Provided 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 9 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) ELIS Preliminary (2008) To-Be Process models Meetings with Stakeholders to Validate To-Be Models (JAD Sessions) Additional Application of Changes in Scope, Statute, Regulation, and Agency Policy Agency Review Final To-Be Process Models Figure 2. Final To-Be Business Process Models Additional research and analysis was done to align the to-be models with changes in scope, statute, regulation, and Agency policy. 2.3 2.3.1 Final To-Be Business Process Models Methodology The BPR team used Microsoft Visio to update each preliminary to-be process model based on the feedback from stakeholders. Visio has an advanced diagramming tool that includes Business Process Modeling Notation (BPMN) and validation, which is consistent with the method used in the ELIS Project ELC To-Be Process Documentation and ELIS Project OEL To-Be Process Documentation. This allowed HP to build upon the preliminary To-Be Business Process Models, while updating and validating them to the final To-Be Business Process Models based on JAD sessions. Each final to-be process model includes: • A narrative overview of the Business Process, including a high-level Process Flow Diagram • A detailed narrative explaining each step • A detailed business workflows model • Identification of Business Process updates 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 10 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 2.3.1.1 P R OC E S S F L OW D IA G R A M The Process Flow Diagram is a high-level overview process map that includes the name of the process, inputs, outputs, policies, and any information systems being used. An example of the process flow diagram is included in Figure 3. This is the title and reference number of the process being taken. Florida Statute, Administrative Code, Policies and Guidance These represent controls and tools that guide the task. This is the result of the process. Process to be Completed Outputs Inputs A-1 This is the trigger that starts the process. Information Systems This references any IT systems being used to execute the process. Figure 3. Process Flow Diagram Key 2.3.1.2 D E T A IL E D W OR K F L OW S Business processes can be modeled through a number of methods. The BPMN used in the preliminary To-Be Business Process documentation is a Business Process modeling technique that can be used for drawing Business Processes in a workflow. For consistency and comparison, HP used the same modeling method for the final To-Be Business Process Models. 2.3.1.2.1 Business Process Modeling Notation (BPMN) BPMN is considered a best practice and industry standard for Business Process modeling, whether for simple documentation, analysis, or executable implementation. BPMN was developed by Business Process Management Initiative (BPMI) in 2004 and is currently maintained by the Object Management Group, Inc. (OMG). The BPMN technique provides a standard graphical notation for specifying Business Processes in a workflow. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 11 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) The primary goal of BPMN is to provide a notation that is readily understandable by all business users, from the business analysts that create the initial drafts of the processes, to the technical developers responsible for implementing the technology that will perform those processes, and finally, to the business people who will manage and monitor those processes. Thus, BPMN creates a standardized bridge for the gap between the Business Process design and process implementation. A key element of BPMN is the choice of shapes and icons used for the graphical elements identified in this specification. The intent is to create a standard visual language that everyone will recognize and understand. Ultimately, BPMN provides the ability to understand internal Business Processes in a graphical notation and to communicate these procedures in a standard manner. 2.3.1.2.2 Core BPMN Elements The following symbols are the BPMN elements that were used to develop workflow diagrams in the Business Process Model. Table 2. Core BPMN Elements Pool Pools and Lanes represent responsibilities for activities in a process. A pool or a lane can be an organization, a role, or a system. Lane Lanes sub-divide pools or other lanes hierarchically. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Lane A small Looping indicator will be displayed at the bottom-center of the activity if it will happen more than once in a process. Lane Activity Looping Pool An Activity is a generic term for work that an agency performs Pool Activity Page 12 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) A Gateway is used to control the divergence and convergence of sequence flow. A gateway will determine branching, forking, merging, and joining of paths. Internal markers will indicate the type of behavior control. Variations on the gateway include: • Exclusive decision and merging • Event based can start a new instance of a process • Parallel forking and joining Gateway Sequence Flow Sequence Flow defines the execution order of activities in a process. Conditional Flow A Conditional Flow is a sequence flow with a condition expression (mini diamond) that is evaluated at runtime to determine whether or not the sequence flow will be used. If the conditional flow is outgoing from a gateway, then the line will not have a mini-diamond Message Message: A Message is a contact or communication transmitted through a message flow. It is represented as an independent message or an activity with a sending or receiving message. This can represent a face-to-face communication, a letter, an e-mail, as well as a system generated communication. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Send Receive Page 13 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Message Flow A Message Flow is used to show the flow of messages between two organizational boundaries that are prepared to send and receive. Message flow can be attached to pools, activities, or message events. Association An Association is used to associate text or other annotations to activities or arrows on a diagram. Text Annotation Text Annotations provide additional text information for the reader of a BPMN diagram Text An Event is something that happens during the course of the process. Events can trigger the start of a process, can send and receive messages, disrupt a process, and link to another process or end a process. There are three main types of events they are as follows: Event Start Events simply indicate where a process begins or starts. Intermediate Events occur between a start and end event. End Event indicates where a process ends or terminates. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Start Intermediate End Page 14 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Additional Events include: Message Events: Indicate when a message is being received or sent. Additional Events Catch Throw Linking Events: Links processes and can be used to connect two sections of a long process. Catch Throw Multiple Events: Indicates multiple triggers can start the event. Catch Throw Timer Events: Indicates a specific time date or cycle for an activity. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Catch Page 15 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3. T O-B E B US INE S S P R OC E S S MODE L S 3.1 BP-01 Child Care Resource and Referral 3.1.1 Process Overview The Child Care Resource and Referral (CCR&R) Process is part of the CCR&R functional group. CCR&R is the initial entry point for all customers seeking information about early learning programs. The customers using this service vary greatly as does the information and referrals provided by the CCR&R staff using ELIS. CCR&R staff will conduct CCR&R Interviews and generate child care referrals, determine preliminary eligibility for early learning services, schedule intake appointments, or place applicants on the wait list. CCR&R staff will also provide referrals to other community resources and provide consumer education/consultation. The following assumption has been made for the To-Be CCR&R process: 1. RCMA does not provide referrals/consumer education and consultation. 3.1.1.1 A C T OR S • ELC Intake/Eligibility Specialist • ELC CCR&R Specialist • Other ELC Departments • Parents/Guardians • Providers • Customers, can include: • Parents/Guardians • Vendors • Providers • Trainers • Volunteers • Employers • Funders • Other Agencies • School Districts • Teachers • Chamber of Commerce • Consultants • General Public 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 16 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.1.2 CCR&R Process Flow Diagram The following high-level diagram depicts the CCR&R process. To-Be Child Care Resource and Referral Need for Additional Program Information Parents/ Guardians Determine Needs Intake Appointments B2 ELIS CCR&R Program Requirements: 60 BB 9.300 Determine Nature of Contact Determine Preliminary Eligibility B1 ELIS Information Services Need/ Customer Feedback OEL Rules & Policies, Statutes ELC Policies and Procedures FAC 60 BB-4.300/60 BB-8 Need Provider Referral OEL Rules & Policies, Statutes ELC Annual Plan Create Provider Referral Type of Contact B3 ELIS A1 OEL Rules & Policies, Statutes ELC Annual Plan Service Provider Contract Service Provider Protocols ELIS Providers Supply Provider Information C1 ELIS Other Contacts Handle Other Contacts D1 ELIS Answered Questions CCR&R provider entered into ELIS Need for Additional Community Services Offers Referral to Community Services B4 New or Prospective Provider Literature Technical Assistance Referral ELC Policies and Procedures ELC Annual Plan FAC 60 BB- 9.300 Applicant on Wait List Provider Referral Listing Consumer Education Informational Materials & Community Resources Early Learning and Child Welfare Information Community Resources Referral Informational Materials ELIS Need for Additional Information ELC Policies and Procedures ELC Annual Plan FAC 60 BB- 9.300 Provides Consumer Education/ Consultation Consumer Education Consultation B5 Informational Materials Customer Feedback ELIS Child Care Resource and Referral Services Figure 4. Child Care Resource and Referral Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 17 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.1.3 CCR&R Detailed Process Narrative Table 3. CCR&R – Determine Nature of Contact P roc es s Child Care Resource Referral T riggers Customer Contacts ELC with Need or Feedback P roc es s S tep A1 – Determine Nature of Contact A c tivities 1. Customers (see Note 1) contact the Child Care Resource and Referral unit to request information and/or services or provide feedback. 2. A CCR&R Specialist determines the nature of the contact (see Note 3). Notes Note 1: Customers include: - Parents/Guardians - Vendors - Providers: - New - Current - Prospective - Other Agencies - School Districts - Teachers - Chamber of Commerce - Consultants - General Public - Trainers - Volunteers - Employers - Funders Note 2: Where a customer chooses to contact the CCR&R directly (rather than through a Portal). The CCR&R Specialist enters their initial information into ELIS. Note 3: Contact types include: • Parent / Guardian – VPK program – Financially assisted child care programs – Customer Feedback – Request for Other Information – Community Resources – Child Care Programs – Other Need 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 18 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Outputs • Child Care Providers – Technical Assistance – Customer Feedback – Update Information – Other Need • Other – Customer Feedback – Other Need 1. Identified Needs 2. Preliminary Data Entered into ELIS 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 19 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 4. CCR&R – Determine Needs P roc es s Child Care Resource Referral T riggers Contact is Parent Request for Information P roc es s S tep B1 - Determine Needs A c tivities Parents/Guardians 1. The applicant (CCR&R Specialist or the parent) enters basic information (Note 1) into ELIS with the option to generate a provider referral, ascertain preliminary eligibility for programs, and receive consumer education and/or referral to community resources. 2. The CCR&R Specialist is notified when an application has been completed so that they can review and validate the information presented by the parent. 3. The CCR&R Specialist reviews the information entered, if requested or necessary, and confers (either in person, over the phone, email, or fax) with the parent regarding their needs and provides them information on child care and early learning. Notes Note 1: Basic information includes but is not limited to: Outputs • Provider referral data: – Demographic data – Reason for care – Child care issues • Eligibility data for VPK: – Child’s date of birth – Residency • Eligibility data for financially assisted child care: – Family income – Family size – Child’s age and legal name – Parent working, attending school, or disabled 1. An initial Determination of Family Needs 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 20 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 5. CCR&R – Determine Preliminary Eligibility P roc es s Child Care Resource Referral T riggers Additional Program Assistance is Requested P roc es s S tep B2 – Determine Preliminary Eligibility A c tivities 1. Based on the information provided and the type of additional assistance requested, the CCR&R Specialist determines the program(s) and billing group(s) for which the child/family might be eligible (See Note 1). 2. If the child might be eligible and enrollment is currently open for the billing group: A. The CCR&R Specialist schedules an appointment for the parent with an Intake Specialist. B. The CCR&R Specialist gives the parent and information packet and an appointment reminder to the parent. This packet includes the required documentation that the parent must bring to the Intake appointment. C. The Intake Specialist is notified about the appointment. Notes 3. If enrollment is not currently open for the billing group: (See Note 2): A. The CCR&R Specialist adds the child to the School Readiness wait list in ELIS and may also determine the child’s priority based on the ELC’s enrollment rules. B. The CCR&R Specialist informs the parent of the re-validation date and their responsibility to provide current information at that time so that revalidation can be conducted. C. The CCR&R Specialist offers CCR&R referrals, consumer education and community resources, as appropriate. 4. If they appear to be ineligible (See Note 3): A. The CCR&R Specialist informs them they are ineligible and offers CCR&R referrals, consumer education and community resources, as appropriate. Note 1: SR Eligibility: • Is the applicant working, attending school or disabled? • Is the applicant income <= 150% Federal poverty level? • TANF/Protective Services Referral VPK Eligibility: • Is the child a Florida Resident? • Is the child 4 years old as of September 1 of the VPK school year? Note 2: Enrollment may not be open for a variety of reasons: funding, provider capacity, provider choice/capacity, and so forth. Note 3: A customer determined ineligible has the right to submit an appeal. Outputs 1. 2. 3. 4. Appointment with an Intake Specialist School Readiness Wait List Placement Other Child Care and/or Early Learning Information Community Resources 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 21 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 6. CCR&R – Create Provider Referral P roc es s Child Care Resource Referral T riggers Provider Referral Requested P roc es s S tep B3 – Create Provider Referral A c tivities 1. Based on the requested search area and criteria of the customer, a listing of provider profiles is produced. 2. The CCR&R Specialist provides the listing along with educational brochures and information related to early learning, consumer education and community resources, as needed. Notes None Outputs 1. 2. 3. 4. Provider Referral listing, Early Learning and Child Welfare Information Consumer Education Informational Materials and Community Resources (if needed) Table 7. CCR&R – Community Resources Requested P roc es s Child Care Resource Referral T riggers Community Resources Requested P roc es s S tep B4 – Community Resources Requested A c tivities 1. The CCR&R Specialist reviews the information entered and confers (either in-person, over the phone, email, or fax) with the parent regarding their needs and provides them information on community resources. Notes None Outputs 1. Community Resources Referral 2. Informational Materials Table 8. CCR&R – Provide Consumer Education/Consultation P roc es s Child Care Resource Referral T riggers Consumer Education/Consultation Requested P roc es s S tep B5 – Provide Consumer Education/Consultation A c tivities 1. The CCR&R Specialist reviews the information entered and confers (either in-person, over the phone, email, or fax) with the parent regarding their needs and provides them with consumer education/consultation. Notes None Outputs 1. Consumer Education Consultation 2. Informational Materials 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 22 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 9. CCR&R – Supply Provider Information P roc es s Child Care Resource Referral T riggers Contact is a Provider Request for Information P roc es s S tep C1 – Supply Provider Information A c tivities Interes t in P roviding E arly L earning S ervic es 1. The CCR&R Specialist determines what type of business the contact is interested in (home or center, private or public funding, VPK, School Readiness provider) and provides the pertinent information, or refers the contact to another agency. 2. The CCR&R Specialist gives (directly, mail, e-mail) the provider relevant educational/informational materials. 3. The CCR&R Specialist enters CCR&R providers into ELIS and verifies they are legally operating providers. 4. The CCR&R Specialist gives (directly, mail, e-mail) the provider Quality Initiatives. E arly L earning P roviders 1. The CCR&R Specialist records relevant information regarding the inquiry. 2. The CCR&R Specialist provides the pertinent information and inclusion Warm-Line support services to the provider. Notes None Outputs 1. Answered Questions 2. Provider Literature 3. CCR&R Provider Entered into ELIS Table 10. CCR&R – Handle Other Contacts P roc es s Child Care Resource Referral T riggers Contact is Another Type of Request or a Complaint P roc es s S tep D1 – Handle Other Contacts A c tivities 1. The CCR&R Specialist handles other requests for information and referrals on a case-by-case basis and refers to the appropriate departments. 2. The CCR&R Specialist refers providers seeking technical assistance to the appropriate departments. 3. The CCR&R Specialist receives and processes customer feedback. Customer feedback may be recorded in ELIS case notes. Notes None Outputs 1. Referrals to Technical Assistance 2. Customer Feedback 3. Complaints or Appeal of Decision 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 23 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.1.4 CCR&R Detailed Workflows Enters Request into Portal (Alternatively may contact CCR&R) Enters Request into Portal (Alternatively may contact CCR&R) Enter Request Information or Feedback End Enter Request Information or Feedback End Enter Request Information or Feedback Enters Request into Portal (Alternatively may contact CCR&R) ELC CCR&R Specialist Parents/ Guardians Providers Customers The following process workflows describe the work activities for each process step in the process flow diagram above. End Handle Other Contacts D-1 Determines Nature of Contact Receives Information from Portal Or Customer contacts ;CCR&R; Specialist enters Information into ELIS Supply Provider Information C-1 Determine Needs B-1 Figure 5. Determine Nature of Contact Process (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 24 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Confirms Requested Information Provide Application Received Confirmation Request Parents/Guardians Parent Request For Information End Received Provider Referral List Received Community Resource Information Received Request Confirmation of Information Create Provider Referral List End CCR&R Specialist ELC Yes Enters Basic Information Application Reviewed Link from Determine Nature of Contact or Determine Preliminary Eligibility Validate Applicant Information End Confirm Applicant Information Confirmation Necessary ? Provide Community Resources End No Provide Consumer Education/ Consultation End Link to Determine Preliminary Eligibility B-2 Figure 6. Determine Needs, Create Provider Profile, Offer Community Services, and Provide Consumer Education/Consultation Process Flow Diagram (B1, B3, B4, and B5) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 25 HP Enterprise Services ELC Intake/ Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Other Information CCR&R Specialist ELC Parents/ Guardians Appointment Information Link from Determine Needs and Create Provider Referral Determine Preliminary Eligibility Preliminarily Eligible No Appointment Information End End End Revalidation End information and Literature Provide Other Information End Yes Enrollment Open No Yes Schedule Appointment with Intake Specialist Provide Appointment Information Create Wait List Entry End Provide Re-Validation Information and Literature End Figure 7. Determine Preliminary Eligibility (B2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 26 HP Enterprise Services Customers Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Provides Additional Information Providers Request for Additional Information Received Provides Additional Information End Request to Be a CCR&R Provider Relevant Materials Received End Other Departme nts Request for Additional Information Received Relevant Materials Received End No Enters and verifies CCR&R Provider Provide Relevant Materials CCR&R Specialist ELC End Assistance Referral To Other ELC Department Yes Refer to Others End Request Link from Determine Nature of Contact Request Additional Information Reviews Request or Feedback Determines Request or Feedback Feedback Determines if Complaint/ Appeal Yes No Process Feedback End Process Complaint or Appeal End Figure 8. Handle Other Contacts and Supply Provider Information Process Flow Diagram (C1/D1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 27 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.1.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. ID Rule Table 11. CCR&R Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Part 98 Child Care Development Fund N/A 2002 Florida State Statute Section 411.0101 Child care and early childhood resource and referral Provides Statutory authority regarding establishment of statewide CCR&R responsibilities and services March 26,2010 F.A.C. 60 BB 9.300 Child Care Resource and Referral Establishes the statewide responsibilities and CCRR Services which include: August 10, 2009 • Early learning referrals, • Consumer education resources, • Information regarding community resources Child Care Resource and Referral Program Requirements Same Provides Agency’s CCR&R program requirements from 60BB9.300 Child Care Resource and Referral Rule, the Agency’s Grant Agreement and the 2009 CCDF Plan August 20, 2010 ELC Policies and Procedures N/A N/A N/A F.A.C. 60BB-4.300 Waiting List Procedures Establishes waiting list procedures for the Agency and the ELCs April 21, 2003 F.A.C. 60BB-8.200 Documenting Child Eligibility for the VPK Program Establishes the required requirements and documentation for VPK eligibility May 24, 2007 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 28 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.1.6 Traceability 3.1.6.1 U S E C A S E S The following Use Cases are associated with the CCR&R To-be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-01: Determine Preliminary Eligibility • UC-COM-02: Request Child Care Resource and Referral • UC-COM-14: Provide Technical Assistance • UC-ELC-16: Process SR/VPK Provider Application • UC-ELC-17: Maintain SR/VPK Provider Information • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-10: Manage User Profile • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.1.6.2 R E QUIR E ME NT S The requirements associated with the CCR&R To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V1.0. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 29 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.2 BP-02 Enrollment 3.2.1 Process Overview The Enrollment Process is part of the Intake functional group. Enrollment includes the Early Learning Coalition (ELC) Business Processes performed to determine and certify eligibility for School Readiness (SR)/Local and Voluntary Pre-Kindergarten (VPK) education programs, assisting parents with selecting appropriate SR/Local and VPK providers, enrolling eligible children with selected SR and VPK providers, and ongoing wait list management. The following assumptions have been made for the To-Be Enrollment process: 1. Initial applicant contact with the ELC and preliminary screening for eligibility and wait list placement will occur in Child Care Resource & Referral (BP-01). 2. The Enrollment process will be integrated and streamlined allowing both SR/Local eligibility certification and VPK eligibility determination to be performed by a standardized process and ELC Intake/Eligibility Specialist role(s). 3. Delayed enrollment allows a child to start the VPK program as a delayed enrollment if at least 10 percent of the instructional hours remain in the VPK prekindergarten class. At any point in the process Parents/Guardians can be referred to CCR&R for additional consumer education, technical assistance, referrals to community services or early learning services. 4. 3.2.1.1 A C T OR S • ELC Intake/Eligibility Specialist • Parents/Guardians • Referring Agency • Providers 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 30 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.2.2 Enrollment Process Flow Diagram The following high-level diagram depicts the Enrollment process. Figure 9. Enrollment Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 31 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.2.3 Enrollment Detailed Process Narrative The following process narrative describes the work activities for each process step in the process flow diagram above. Table 12. Enrollment – Review Application and Follow up P roc es s Enrollment T rigger • • Applicant and Preliminary Eligibility Information Entered into Elis Notification of Wait List Selection Received P roc es s S tep A1 – Review Applicant Information and Follow-up A c tivities 1. The Intake/Eligibility Specialist is notified of applicant selection from the Wait List or by CCR&R of completion of initial documentation of applicant information, information/ service needs and preliminary screening. 2. The Intake/Eligibility Specialist reviews applicant information, including referrals from external agencies to determine the need for additional information (from applicants or external agencies) and to follow up as required for information or interview scheduling. Notes Note 1: Initial applicant contact with the ELC to apply for desired services (School Readiness or VPK) may be with CCR&R Specialist (office walk-in or telephone call), by referrals, at VPK events/group sessions or by parent completing an online application for services. Note 2: If the applicant is a walk-in and the CCR&R Specialist documents initial applicant information, service need and preliminary eligibility, the intake interview could occur during the applicant walk-in visit. Note 3: School Readiness (SR)/Local referral types include: Relative Caregiver- at risk; at risk of abuse/neglect; Temporary Cash Assistance (TCA); Transitional Child Care (TCC); Child Care Executive Partnership (CCEP); Teenage Pregnancy Program (TAPP): Local Education Agencies(LEAs) and local funders. Outc omes 1. Review of Applicant Information Complete 2. Follow-up Performed (needed information and/or scheduled interview) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 32 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 13. Enrollment – Alternative Child Registration P roc es s Enrollment T rigger Parent Chooses to Enroll Child at the Provider P roc es s S tep A1 (Alternative) – VPK pilot project - 60BB-8.2015 (VPK Child Registration Pilot Project) A c tivities 1. VPK pilot project - 60BB-8.2015 (VPK Child Registration Pilot Project) 2. The customer submits the VPK 01P form and documentation to the provider. 3. The provider forwards the form and documentation to the ELC. 4. The ELC Specialist verifies the documentation, approves it, and enrolls the child with the provider. Notes None Outc omes Child Enrolled in VPK Table 14. Enrollment – Conduct Intake Interview P roc es s Enrollment T rigger Intake Interview Scheduled P roc es s S tep A2 – Conduct Intake Interview A c tivities 1. The Intake/Eligibility Specialist reviews and validates the required documentation provided by the applicant during the interview, including accessing and validating any pre-applications submitted online, if the interview occurs. 2. The Intake/Eligibility Specialist determines if the applicant is interested in wraparound SR services when applying for VPK. 3. The Intake/Eligibility Specialist enters detailed information into ELIS during the intake interview including, as required based on services needed (SR/Local, VPK), the complete family information, required eligibility documentation, income worksheet (SR/Local), Informed Parental Consent for Delayed Enrollment VPK04 if necessary, tasks completed, and case notes. 4. The Intake/Eligibility Specialist determines if the applicant is eligible and refers the applicant to CCR&R if the are ineligible for SR/Local or VPK services. 5. The Intake/Eligibility Specialist confirms with the applicant if a provider has been chosen and queries ELIS to ensure that the chosen provider is active, provides the type of care needed during the desired period (VPK fall or summer term), has space available, and meets the delayed enrollment policy. 6. If VPK services are desired, the Intake/Eligibility Specialist generates a VPK Provider Profile list from ELIS and provides the Provider Profile list to the parent. If SR/Local services are desired, the Intake/Eligibility Specialist may generate a Provider Referral list from ELIS and provide the Provider Referral list to the parent. If a provider is not in the system or if there is not a current provider 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 33 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) agreement, go to Provider On-boarding. 7. The Intake/Eligibility Specialist maintains copies of required documentation for the applicant’s case file and returns the originals to applicant. Notes Note 1: The Intake/Eligibility Specialist uses an eligibility checklist to guide the interview and eligibility certification process including documenting and tracking of all required tasks and documentation. Note 2: Required SR/Local eligibility documentation includes: proof of employment and income, proof of parent school attendance, child date of birth documentation, valid parental identification and relationship to each child, proof of disability, child’s citizenship, household size, referral, and proof of county residency. Note 3: Required VPK eligibility documentation includes: child date of birth documentation and proof of Florida residency, proof of immunization (school-based programs), and proof of county residency. Note 4: For initial SR/Local eligibility, the total family income must be at or below 150% of the Federal Poverty Level (unless other funds are available). Other applicants may be served if local or other funds, such as Child Care Executive Partnership (CCEP), TANF Transitional Child Care (TCC), Teenage Pregnancy Program (TAPP), or local funders. Note 5: The delayed enrollment policy is OEL-PI-0031-05 Outc omes 1. Intake Interview Completed with Eligibility Information Documented in ELIS 2. Provider Profile/List Generated and Provided to Parent Table 15. Enrollment – Certify School Readiness Eligibility P roc es s Enrollment T rigger SR Intake Interview Scheduled P roc es s S tep A3 – Certify SR Eligibility A c tivities 1. The Intake/Eligibility Specialist reviews and validates the SR/Local eligibility group and fund source for which the parent or child is eligible and the parent copayments that have been calculated based on data entered into ELIS. 2. The Intake/Eligibility Specialist reviews the SR/Local child care application, the income worksheet, terms and conditions and parent co-payments (including county differentials) with the applicant to ensure understanding of the amount, how calculated, responsibility for co-payment to provider selected, accuracy and completeness of data. 3. The applicant agrees to and signs, as required, the application, terms and conditions, and income worksheet. 4. The Intake/Eligibility Specialist notifies the applicant and referring agency of eligibility decision, and of the right to submit grievances or appeals. 5. The Intake/Eligibility Specialist requests that the applicant complete a Customer Feedback Survey. Outc omes 1. School Readiness Eligibility Certified and Co-payments Determined 2. Information Documented in ELIS 3. Grievance/Appeal 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 34 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 4. Customer Feedback Table 16. Enrollment – Certify VPK Eligibility P roc es s Enrollment T rigger Voluntary Pre Kindergarten Intake Interview Scheduled P roc es s S tep A4 – Certify VPK Eligibility A c tivities 1. The Intake/Eligibility Specialist reviews a copy of the completed VPK 01 or VPK 01P application form for parent validation and agreement. 2. The Intake/Eligibility Specialist notifies the applicant of eligibility decision, and of the right to submit grievances or appeals. 3. The Intake/Eligibility Specialist reviews ELC services, AWI-VPK 06 (Voluntary Pre-Kindergarten Parent Handbook), and other information with the parent. 4. The parent signs the verification of receipt of the AWI-VPK 06 and other provided information. 5. The Intake/Eligibility Specialist enters documentation of the intake interview and parent receipt of required documentation in ELIS. 6. The Intake/Eligibility Specialist may request that the applicant provide customer feedback. Note 1: If the applicant does not provide the required eligibility documentation, the applicant is requested to provide the missing documentation prior to continuing the VPK eligibility determination process. Outc omes 1. Applicant’s VPK Eligibility Established 2. Completed VPK 01 (Parent Application) or VPK 01P (Pilot Program Application) 3. Information Documented in ELIS 4. Grievance/Appeal 5. Customer Feedback Table 17. Enrollment – Process School Readiness Enrollment P roc es s Enrollment T rigger • • Applicant SR Eligibility Documented in ELIS School Readiness Provider Selected P roc es s S tep A5 – Process School Readiness/Local Enrollment A c tivities 1. The Intake/Eligibility Specialist enters child enrollment data into ELIS for the School Readiness(SR) provider selected, including care start date, schedule (calendar, if applicable) and match source code (BG-8 and Child Care Executive Partnership) as required. 2. The Intake/Eligibility Specialist provides copies of the required documents to the applicant, the SR provider and the referring agency (as required). 3. The Intake/Eligibility Specialist maintains documentation of required documentation at the ELC. Notes Note 1: The Intake/Eligibility Specialist removes applicants who have been selected from the Wait List upon enrollment per the Wait List Management process. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 35 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Outc omes 1. 2. Completed Child Care Application, Income Worksheet, and Terms and Conditions Enrollment Data Entered in ELIS Table 18. Enrollment – Process VPK Enrollment P roc es s Enrollment T rigger • • Applicant VPK Eligibility Documented in ELIS VPK Provider Selected P roc es s S tep A6 - Process VPK Enrollment A c tivities 1. 2. 3. 4. 5. The Intake/Eligibility Specialist completes the top section of the Certificate of Eligibility (VPK 02) and provides the completed certificate to the parent. The parent signs the VPK 02 - Certificate of Eligibility and provides the form to the VPK provider they have selected. Upon receipt of the completed VPK Certificate of Eligibility, the VPK provider completes the Provider section of the VPK certificate and obtains a confirmation number associated with the certificate. The Intake/Eligibility Specialist finalizes the enrollment of the child by validating and entering the child’s start date and classroom assignment into ELIS for the VPK provider selected. If the provider fails to submit or contact the Intake/Eligibility Specialist regarding the completed Certificate, the Intake/Eligibility Specialist contacts the VPK provider to complete the enrollment. Notes Note 1: The VPK provider may either contact the ELC to provide the child start date and classroom assignment, or submit the completed certificate to the Intake/Eligibility Specialist to obtain a confirmation number associated with the VPK Certificate. Note 2: Per 60BB-8, to complete a child’s enrollment, the VPK provider must submit the child’s name and the VPK certificate number and associate the child with the provider’s VPK class. Outc omes 1. 2. Completed and signed VPK 02 - Certificate of Eligibility VPK Enrollment Completed in ELIS 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 36 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Intake/Eligibility Specialist Enrollment Detailed Workflows Reviews Application Information Wait List Additional Information Required? Schedule Interview No Review Completed Receive Initial Application CCR&R Yes Request Additional Information Document Information Receive Additional Information External Agency Parents/ Guardians ELC 3.2.4 Provide Additional Information End Referring Agency Request for Information Received Provide Additional Information Request for Information Received End Figure 10. Review Applicant Information and Follow Up (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 37 HP Enterprise Services Parent enrolls child at the Provider Verifies Documentation Approves Documentation Enrolls Child with the Provider Child Enrolled in VPK VPK 01P Submits the VPK O1P form and supporting documents to the Provider Providers Parents/ Guardians ELC Intake/ Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) VPK O1P form End Provider Forwards the Form and Documentation to the Coalition End Figure 11. Alternative Point of Entry - VPK Pilot Program (A1-ALT) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 38 HP Enterprise Services Parents/ Guardians ELC Intake/Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Link to CCR&R BP 1 No Intake Interview Scheduled Conducts Intake Interview, validates documentation Determines Services Requested Reviews, Validates and Records Documentation If Provider Chosen? No Yes Verify in ELIS that Provider is active and a match Maintains Copies of Required Documentation Returns Documentation to the Applicant Certify VPK Eligibility Yes Provides a Provider Profile or Provider Referral List Eligible Provides Information Provider Chosen Intake Interview Scheduled No Certify SR/Local Eligibility Receive Provider Profile or Provider Referral List Returned Documentation End Yes Figure 12. Conduct Intake Interview (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 39 HP Enterprise Services Intake interview scheduled Reviews and Validates the SR Eligibility Group and Fund Source Reviews the Income Worksheet, Terms and Conditions, CoPayment ad accuracy Reviews the Income Worksheet, Terms and Conditions, and Co-Payment Referring Agency Parents/Guardians ELC Intake/Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Receives the Application, Terms, and Conditions, and Income Worksheet Signs and Returns the Application, Terms, and Conditions, and Income Worksheet Notifies Applicant and referring agency of Eligibility Decision and or right to grievance or appeal Request Customer Feedback Notice of Eligibility and/ or Right to Appeal or Grieve Record Customer Feedback Notice of Eligibility certified and documented Provide Customer Feedback End Notice of Eligibility Figure 13. Certify School Readiness Eligibility (A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 40 HP Enterprise Services Parents/Guardians ELC Intake/Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) VPK Interview Scheduled Reviews Eligibility and VPK01 Parent Application and Supporting Documents Start Notify Applicant and Referring Source of Eligibility and Right to Appeal Receives Notice of Eligibility and Right to Appeal Reviews Information with the Parent Parent Handbook Receive Verification Receipt Signs and Returns Verification of Receipt Request to Applicant to Provide Documentation Documents Interview information and Parent Receipt of Documentation Requests Customer Feedback and Documents in ELIS Eligibility Established and Documented Returns Verification of Receipt Verification of Receipt End Figure 14. Certify Voluntary Pre-Kindergarten Eligibility (A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 41 HP Enterprise Services SR/Local Eligibility Documented in ELIS Provider Selected Enter Child Enrollment Data into ELIS for Provider Selected Parents/ Guardians ELC Intake/Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Provide Enrollment Documents Child Care Application Completed Enrollment Documents Referring Agency Maintains Documentation End Providers Enrollment Documents Enrollment Documents Figure 15. Process School Readiness/Local Enrollment (A5) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 42 HP Enterprise Services SR/Local Eligibility Documented in ELIS Provider Selected Completes the top section of the Certificate of Eligibility (VPK-02) Provider has submitted or contacted VPK-02 Certificate of Eligibility VPK-02 Validates and enters child’s start date and classroom into ELIS VPK Enrollment completed in ELIS Contacts the VPK Provider to complete Enrollment No Parent Signs Certificate of Eligibility (VPK-02) Yes End Providers Referring Agency Parents/ Guardians ELC Intake/Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Certificate of Eligibility VPK-02 Completes the Provider section and obtains confirmation number End Figure 16. Process Voluntary Pre-Kindergarten Enrollment (A6) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 43 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.2.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 19. Enrollment Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR Subtitle A, Part 98.20(b) Child Care Development Fund: A Child’s Eligibility for Services Application Process: 2002 State CCDF Plan • • 60BB-4.100, 4-201207 45 CFR Subtitle A, Part 98.20(b) State CCDF Plan Child Care Development Fund: A Child’s Eligibility for SR Services • 60BB-4.100, 4-201, 202, 203, and 4.206 A Child’s Eligibility for SR Services State CCDF Plan April 21, 2003 2002 Must have a documented, complete valid referral for each child (FFY 2010-2011) Must include an allowable authorization period April 21, 2003 Must deliver services for priority groups within ten days Early Learning Grant Agreement 45 CFR Subtitle A, Part 98.20(b) (FFY 2010-2011) Must include a payment certificate signed by the parent/guardian and the provider Referrals: • State CCDF Plan Must include an application signed and dated by the parent/guardian (FFY 2010-2011) (July 1, 2010) Eligibility Period and Redetermination Hours of care authorized must relate to hours of activity (including travel, study, sleep time) (FFY 2010-2011) Eligibility rules for children at risk for: 2002 March 4, 2007 60BB-4 45 CFR Subtitle A, Part 98.20(b) • State CCDF Plan • Welfare Dependency Eligibility rules for: 60BB-4.100, 4-201, 202, 203, and 4.206 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Child Abuse and Neglect • Children in Working Families Whose Income Does Not Exceed 150 Percent of the Federal Poverty Level • The Migrant Preschool Program (FFY 2010-2011) April 21, 2003 Page 44 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) R ule T itle Des c ription E ffec tive Date ELC Policies and Procedures N/A N/A N/A AWI/OEL Policies and Guidelines N/A N/A varies Florida Statutes Sections 1002.511002.79 Voluntary Prekindergarten Act Establishes authority and requirements for the Voluntary Prekindergarten Education Program March 26, 2010 3.2.6 Traceability 3.2.6.1 U S E C A S E S The following Use Cases are associated with the Enrollment To-be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-01: • UC-COM-02: • UC-ELC-01: Review Preliminary Application Information • UC-ELC-02: Enter Eligibility Information • UC-ELC-03: Validate School Readiness/Local Eligibility • UC-ELC-04: Validate Voluntary Pre-Kindergarten Eligibility • UC-ELC-05: Complete School Readiness/Local Enrollment • UC-ELC-06: Complete Voluntary Pre-Kindergarten Eligibility • UC-ELC-07: Manage Wait List • UC-ELC-08: Validate Wait List • UC-ELC-09: Submit Provider Transfer Request • UC-ELC-10: Manage Provider Transfer Request • UC-ELC-11: Submit Request for Guardianship Transfer • UC-ELC-12: Manage Request for Guardianship Transfer • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-10: Manage User Profile • UC-GEN-11: Maintain Notes 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 45 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.2.6.2 R E QUIR E ME NT S The requirements associated with the Enrollment To-be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 46 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.3 3.3.1 BP-03 Wait List Management Process Overview The Wait List Management process is part of the Intake functional group. Wait List Management includes the ELC Business Processes performed to manage the ELIS waiting list over time, including the periodic validation of continued preliminary eligibility, selection of applicants from the wait list as funding or capacity becomes available, and updating of the wait list as required to keep information current and to terminate applicants who are no longer eligible or in need of services. The Wait List Management process only applies to School Readiness and local funding. The following assumptions have been made for the To-Be Wait List Management process: • The processes related to initial applicant contact, screening to determine preliminary eligibility, and placement on the ELIS wait list are performed by CCR&R staff. • For families with children who already receive SR services, but who also have other children on the wait list, updating of the family’s information as part of the SR Eligibility Redetermination process will also serve as validation for and update to information for wait list status. • Statewide standard wait list criteria, methods for prioritization of applicants, processing, and codes will be established and integrated with ELIS to allow meaningful analysis and reporting of wait list statistics and service needs across ELCs. There is a need to have a statewide wait list to eliminate duplicates and provide a statewide view of applicants and unmet needs, which can also be managed at the ELC level by ELCs to accommodate local needs, services, priorities and funding. 3.3.1.1 A C T OR S • ELC Intake/Eligibility Specialist • Applicant 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 47 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.3.2 Wait List Process Flow Diagram The following high-level diagram depicts the Wait List Management process. To-Be Wait List Management ELC Policy FL Administrative Rule Chapter 60BB4.300 Applicant Records Entered in Wait List Applicant Information Validation notices Update Wait List Wait List Validation Notification A1 Updated Applicant Information ELIS ELC Policy Updated Applicant Information A3 Termination Notices ELIS Selected Applicants Wait List Selection A2 ELIS Intake Process Figure 17. Wait List Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 48 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.3.3 Wait List Detailed Process Narrative The following process narrative describes the work activities and other associated process notes for each process step in the process flow diagram above. Table 20. Wait List Management – Wait List Validation P roc es s T rigger Wait List Management • Applicant records Entered into Wait List • Notification to Validate P roc es s S tep A1 – Wait List Validation A c tivities 1. The Intake/Eligibility Specialist receives notification prior to the end of the six month preliminary eligibility period for applicants on the wait list in ELIS. 2. The Intake/Eligibility Specialist generates and reviews a Wait List Eligibility Validation report listing applicants by eligibility validation date. 3. The Intake/Eligibility Specialist generates eligibility notifications from ELIS and provides notice to the applicants. 4. The Intake/Eligibility Specialist terminates non-responsive applicants from the wait list in ELIS (See Process Step A3). 5. The Intake/Eligibility Specialist reviews the information provided by responsive applicants and validates the continued preliminary eligibility to remain on the wait list. 6. The Intake/Eligibility Specialist enters the updated information received from the applicant into ELIS and resets the eligibility re-validation date from the date of eligibility validation. Notes Note 1: The timing of eligibility validation is determined by the ELC. Note 2: Information required to validate continued eligibility for wait list includes: statement of family income, household composition, validation of continued need for and type of services requested. Note 3: The Intake/Eligibility Specialist may contact applicants who do not respond to the notification within the given timeframe. Note 4: The eligibility for all applicable billing groups and eligibility categories is calculated and updated based on the applicant information entered and the approved ELC method for prioritizing applicants on the wait list. Outc omes 1. Validation Notifications 2. Updated Applicant Information 3. ELIS Wait List Records Updated Including New Eligibility Validation Date 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 49 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 21. Wait List Management – Wait List Selection P roc es s T rigger P roc es s S tep A c tivities Notes Outc omes Wait List Management Funds Available/Slot Available (provider capacity) A2 – Wait List Selection 1. The Intake/Eligibility Specialist receives notification to review and process applicants on the wait list when funds and/or capacity become available. 2. The Intake/Eligibility Specialist selects applicants from the wait list based on their priority in ELIS and type of funding or capacity available. 3. The Intake/Eligibility Specialist notifies the selected applicants of their status change and schedules an appointment to complete the Intake process. 4. The Intake/Eligibility Specialists completes the Intake process with responsive applicants (Refer to the Enrollment Process A-2/A-3). 5. The Intake/Eligibility Specialist terminates applicants who cannot be contacted or non-responsive or found ineligible applicants from the wait list in ELIS (See Process Step A3- Update Wait List). Note 1: ELIS wait list priority is based on the approved Early Learning Coalition method for prioritizing applicants on the wait list. Prioritizing will be by ELC. 1. Selected Applicants Table 22. Wait List Management – Update Wait List P roc es s T rigger P roc es s S tep A c tivities Notes Outc omes Wait List Management Updated Applicant Information is Received A3 – Update Wait List 1. The Intake/Eligibility Specialist receives notice of applicants who may need to be terminated from the wait list. 2. The Intake/Eligibility Specialist accesses and reviews the applicable records in ELIS and, as required, will terminate the applicant from the wait list. 3. The Intake/Eligibility Specialist sends notice of termination (including reason, date and CCR&R information) to applicants who have been terminated from the wait list. Note 1: Updates to the ELIS wait list upon completion of the required six month validation of eligibility are made as noted in Process Step A-1 (Validation). Note 2: Reasons for termination from the wait list include: children who are aging out, applicants who have transferred to another county, applicants who have not contacted the ELC within the allotted time, applicants who are not reachable by the ELC by the re-validation date, or clients who are now receiving services (no longer in need of care). Note 3 The Intake/Eligibility Specialist will be able to perform terminations of groups of applicants based on selected criteria. Note 4: The eligibility for all applicable billing groups and eligibility categories is calculated and updated based on the applicant information entered and the approved ELC method for prioritizing applicants on the wait list. 1. ELIS records updated including new eligibility re-validation date 2. Wait List records terminated in ELIS 3. Termination notices sent 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 50 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.3.4 Wait List Detailed Workflows Receives Notification Generates and Reviews a Wait List Eligibility Validation Report Parents/Guardians ELC Intake/Eligibility Specialist The following workflow diagrams show the details of the Wait List Management process including actors and activities. Generates Eligibility Notifications from ELIS Applicant Responds? Terminates Applicant from WaitList No Process Step A-3 Update Wait List No Longer Eligible Reviews the Information Provided Yes Responds to Notification Yes Validated Continued Preliminary Eligibility Yes Enters Updated Information and Resets the Eligibility Revalidation date Waitlist record updated with new validation date Provides Information End Receives Notification No Process Step A-3 Update Wait List Figure 18. Wait List Validation (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 51 HP Enterprise Services Selects Applicants from Wait List Notification to Process Applicants on Wait List Parents/Guardians ELC Intake/Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Notify Selected Applicants/Schedule Appointment Applicant Responds Completes the Intake Process Yes No Applicants Selected; Go to Enrollment Process (BP-02) Ineligible Terminates Applicant from WaitList Applicant Responds Eligible Yes Notice of Status change Process Step Update Wait List A-3 Completes the Intake Process To Intake Process No Process Step Update Wait List A-3 Figure 19. Wait List Selection (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 52 HP Enterprise Services Accesses and Reviews Record Applicant Termination? Receives Notice of Applicants to be terminated Yes Terminates Applicant From the Waiting List Send Notice of Termination Terminated From Wait List/ Notice Sent No ELIS record updated/ New Re-determination date Parents/Guardians ELC Intake/Eligibility Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Start Notice of Termination Date Reason CCR&R information End Figure 20. Update Wait List (A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 53 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.3.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 23. Wait List Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Part 98 Child Care Development Fund N/A 2002 F.A.C. 60BB-4.300 Waiting List Procedures Establishes waiting list procedures for the Agency and the ELCs. April 21, 2003 3.3.6 Traceability 3.3.6.1 U S E C A S E S The following Use Cases are associated with the Wait List Management To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • • • • • • • • • • • • • • • • • • UC-COM-01: Determine Preliminary Eligibility UC-COM-05: Manage Slot Availability UC-ELC-03: Validate School Readiness/Local Eligibility UC-ELC-04: Validate Voluntary Prekindergarten Eligibility UC-ELC-05: Complete School Readiness/Local Enrollment UC-ELC-06: Complete Voluntary Prekindergarten Eligibility UC-ELC-07: Manage Waitlist UC-ELC-08: Validate Waitlist UC-GEN-01: Executive Advanced Search UC-GEN-02: Manage Documentation UC-GEN-03: Manage Workflow UC-GEN-04: Generate Notification UC-GEN-07: Execute Reports UC-GEN-08: Schedule Events UC-GEN-09: Execute User Login UC-GEN-11: Maintain Notes UC-GEN-12: Maintain Records UC-GEN-13: Configure System 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 54 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.3.6.2 R E QUIR E ME NT S The requirements associated with the Wait List Management To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 55 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.4 3.4.1 BP-4 Child Screening Process Overview Child Screening is the Business Process for administering, monitoring and tracking age appropriate developmental screening. ELCs are required by s. 411.01(5) (c) 2.c., F.S., to administer developmental screenings to all children, age birth to five, receiving School Readiness (SR) services. Various tools and methodologies are used to indicate that a child’s development is on target, determine if a follow up screening should be performed, create an individual learning plan, refer the family for rescreening, or refer the family to an Inclusion Specialist to coordinate additional community services. The following assumptions have been made for the To-Be Child Screening process: 1. Screenings are conducted within 45 days of enrollment and at a minimum annually, within 30 days of the child’s birth date, for as long as the child receives SR services. 2. ELCs use the Terms and Conditions form to obtain parental consent during the SR Eligibility and SR Eligibility Redetermination processes. ELCs send out and obtain consent for annual and additional screenings using a consent letter. 3. Ages and Stages is proprietary software currently secured for use by all ELCs. The Ages and Stages screening tool collects scores and manages follow-up for learning plans, materials for provider’s lesson plans, and letters to parents for activities at home. 4. ELIS shall interface with Ages and Stages and export child data (basic demographic data, provider enrollment) from ELIS to Ages and Stages will be completed during Phase 2 (Maintenance) of the ELIS Project. 5. ELIS shall receive scores for all children, identify children with identified delays, and identify children with an individual learning plan (a plan exists, not the actual plan) from Ages and Stages. 3.4.1.1 A C T OR S • ELC Screening and Assessment Specialist • ELC Inclusion Specialist • Parents/Guardians • SR Providers • Screener 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 56 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.4.2 Child Screening Process Flow Diagram The following high-level diagram depicts the Child Screening process: Figure 21. Child Screening Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 57 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.4.3 Child Screening Detailed Process Narrative The following process narrative describes the work activities and other associated process notes for each process step in the process flow diagram above. Table 24. Child Screening – Conduct Developmental Screening P roc es s Child Screening T riggers Enrollment, Annual Cycle and/or Follow-up Screening P roc es s S tep A1 – Conduct Developmental Screening A c tivities 1. The ELC Screening and Assessment Specialist, Inclusion Specialist, or designated staff person coordinates age appropriate developmental screening for all SR children ages birth to five years, consistent with the parameters set forth in the OEL rule. 2. The Screening and Assessment Specialist obtains a list of children for screening from ELIS and sends a consent letter to the parents/guardians of the children to be screened. Parental consent is tracked in ELIS. Parental consent is required prior to all developmental screening. The Terms and Conditions form signed during SR Enrollment includes parental consent for screening and may be used in lieu of the consent letter. 3. The Screening and Assessment Specialist coordinates with the Screener and may provide technical assistance. For those ELCs that conduct an annual developmental screening or follow-up screenings, the specialist sends the Screener a list of children for screening. 4. The Screener administers and scores the Baseline Developmental Screening. Results are sent to the provider/teacher and parent. Screening activities, including date completed, location, tool used, person administering the tool, results, follow up recommended, and referral information (to whom and date) are documented in ELIS. 5. The Screening and Assessment Specialist, Inclusion Specialist, or designated staff person reviews the results and determines if a referral for additional/re-screening is necessary. Generally, screening results are used to: • Indicate that the child’s development is on target • Indicate that concerns were identified and a follow-up screening should be performed • Create an individual learning plan, if needed • Refer families for re-screening • Refer families, and the child’s early learning program staff, to the Inclusion Specialist to coordinate additional community services where appropriate Notes Note 1: The timing, performance, and tools used for developmental screenings vary by ELC. Note 2: ELC staff, providers, or contracted entities may administer and score the screening. Outputs 1. Consent Letters (optional) 2. Completed Baseline Development Screening 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 58 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 25. Child Screening – Conduct Additional Follow-up Developmental Screening P roc es s Child Screening T riggers Completed Baseline Screening or Additional/Follow-up Screening Referral P roc es s S tep A2 – Conduct Additional/Follow-up Developmental Screening A c tivities 1. 2. 3. 4. 5. The Screening and Assessment Specialist, Inclusion Specialist, or designated staff person coordinates and schedules the additional/follow-up activities in ELIS. The ELC or service provider obtains parental consent to conduct the additional/follow-up screening activities. The screening activities and schedule are then given to the parent. The Screener administers and scores the additional and/or follow-up developmental screenings. Results are sent to the provider/teacher, parent, and the Inclusion Specialist where appropriate. If the results of the additional and/or follow-up screenings are within the typical range, the child resumes a regular screening cycle based on ELC policy. Go to A3 – Complete Developmental Screening. If the results of the additional and/or follow-up remain outside of the typical range, the Screening and Assessment Specialist and/or the Inclusion Specialist may refer the child for additional services with external community agencies. Notes Note 1: ELC staff, providers, or contracted entities may administer and score the screening. Outputs 1. 2. 3. Consent Letters (optional) Completed Additional/Re-screening Community Agency Referral 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 59 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 26. Child Screening – Complete Developmental Screening P roc es s Child Screening T riggers Completed Baseline Screening and Community Referrals P roc es s S tep A3 – Complete Child Screening A c tivities 1. The Screening and Assessment Specialist records the results of the screening(s) in ELIS. 2. Parents/guardians and providers receive all results information. 3. The Screening and Assessment Specialist and/or an Inclusion Specialist works with the parent/guardian to monitor coordinate and schedule any additional follow-up activities throughout the course of the year. As appropriate and based on the results of the screening(s), an individualized learning plan may be created and /or updated by the teacher with assistance, as needed, from the Screening and Assessment and/or Inclusion Services staff. This plan is implemented during the year and includes both classroom and home related strategies. 4. The aggregate results data is maintained by the ELC or service provider, sorted, and used in various management reports. Notes None Outputs 1. 2. 3. Completed Developmental Screening(s) Individualized Child Plan Reports by Child, Age Group, and Provider 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 60 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.4.4 Child Screening Detailed Workflows Screening and Assessment Specialist Start Identify School Readiness Children for Screening Documents and Tracks Consent Response Obtain Parental Consent for Screening Send List of Children to Screener Reviews Screening Results Referral or Rescreening? Yes Link to Conduct Additional/ Follow-up Developmental Screening A-2 No Link to Complete Child Screening A-3 Parental consent letter Parent/ Guardian Provides Consent No Yes Parent/ Guardian Provides Consent Screening Rresults End Screening Results Screener End Parent/ Guardian Does Not Consent School Readiness Provider Parents/Guardians ELC The following workflow diagrams show the details of the Child Screening process including actors and activities. End Conduct and Score Screening End Figure 22. Conduct Developmental Screening (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 61 HP Enterprise Services Screening and Assessment Specialist/Inclusion Specialist No Link from Conduct Developmental Screening A-1 Referral for Additional or Re-screening Obtain Parental Consent for Screening Document and Track Consent Send List of Children to Screener Reviews Screening Results Refer Child for Additional Services Results in Typical Range? Yes Link to Complete Child Screening A-3 Regular Cycle for Screening End Parents/ Guardians ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Parent/ Guardian Provides Consent School Readiness Provider End Screener Screening Results End Conduct and Score Screening End Figure 23. Conduct Additional Follow-up Developmental Screening (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 62 HP Enterprise Services Screening and Assessment Specialist/ Inclusion Specialist Sends All Results and Individualized Learning Plan Individualized Learning Plan Updated Parents/ Guardians Link from Conduct Additional/ Follow-up Developmental Screening A-2 Records Results and Notes of Screening Parent/ Guardian Reviews All Results School Readiness Provider ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Provider Reviews All Results Coordinates with Parent/Guardian on Additional Follow Up Activities Coordinates with Specialist on Additional Follow Up Activities Updates Individualized Learning Plan Updates Individualized Learning Plan End End End Figure 24. Complete Child Screening (A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 63 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.4.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process: Table 27. Child Screening Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Part 98 Child Care Development Fund N/A 2002 Florida Statutes Section 411.01 School Readiness Act Establish a unified approach to the state’s efforts toward enhancement of school readiness, including child screening March 26,2010 F.A.C 60BB-4 Office of Early Learning Provides regulations governing the School Readiness Program. March 4, 2007 ELCs Policies and Procedures N/A 3.4.6 N/A Traceability 3.4.6.1 U S E C A S E S The following Use Cases are associated with the Child Screening To-be Business Process Model based on the Requirements Traceability Matrix (RTM): • • • • • • • • • • • • • • UC-ELC-13: Initiate Child Developmental Assessment UC-ELC-14: Complete Child Developmental Assessment UC-GEN-01: Executive Advanced Search UC-GEN-02: Manage Documentation UC-GEN-03: Manage Workflow UC GEN-04: Generate Notification UC-GEN-05: Export Data UC-GEN-06: Import Data UC-GEN-07: Execute Reports UC-GEN-08: Schedule Events UC-GEN-09: Execute User Login UC-GEN-11: Maintain Notes UC-GEN-12: Maintain Records UC-GEN-13: Configure System 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 64 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.4.6.2 R E QUIR E ME NT S The requirements associated with the Child Screening To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 65 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.5 3.5.1 BP-05 School Readiness Eligibility Redetermination Process Overview The School Readiness (SR) Eligibility Redetermination process is part of the Case Management functional group. SR Eligibility Redetermination is the process for re-determining eligibility for the School Readiness program. The process includes generating listings of redeterminations due and redetermination notices that are sent to clients, providers, and referring agencies. A full determination of continued eligibility is completed for responsive clients. ELIS is used to document updated information and generate updated forms including the authorization for the selected provider to continue to provide SR services. If clients are non-responsive or are no longer eligible, services are terminated. The following assumptions have been made for the To-Be SR Eligibility Redetermination process: 1. ELIS is used to document and generate SR Eligibility Redetermination forms 2. In general, parents and providers have access to technology and the Internet 3. If at any time it is discovered that there is the potential that fraud has occurred, a fraud referral is made to DFS. If that fraud investigation impacts a client’s continued eligibility, a notice is sent to the client informing them that eligibility will be terminated until the investigation is completed. 3.5.1.1 A C T OR S • ELC Family Support Specialist • Parents/Guardians • Referring Agency • School Readiness Providers 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 66 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.5.2 School Readiness Eligibility Redetermination Process Flow Diagram The following high-level diagram depicts the SR Eligibility Redetermination process. Figure 25. Eligibility Redetermination Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 67 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.5.3 School Readiness Eligibility Redetermination Detailed Process Narrative The following process narrative describes the work activities and other associated process notes for each process step in the process flow diagram above. Table 28. Redetermination – Notice of Eligibility Redetermination P roc es s To-Be SR Eligibility Redetermination T rigger Eligibility Expired or Change in Client Information Impacting Continued Eligibility P roc es s S tep A1 – Notice of Eligibility Redetermination A c tivities 1. Using ELIS, the Family Support Specialist generates eligibility redetermination/expiration reports, which contain records for parents whose eligibility will expire during the coming months. 2. The Family Support Specialist sends the notices to the parent/guardian, SR provider and referral source, if applicable, in advance of eligibility expiration. The redetermination notice includes a list of required documentation that will be needed for the redetermination to be completed (updated proof of income, disability information, and so forth.) A. A mail-in redetermination process may be used. In these cases, the redetermination notice includes a statement specifying the last date of child care services if eligibility is not renewed and a mail-in redetermination package with required forms for the parent to complete, sign, and return. B. For maintaining eligibility for child care referrals from external agencies, a Redetermination Notice is sent to the parent with instructions to contact the referring agency for renewal of the Child Care Authorization/Referral. The Redetermination Notice is also sent to the referring agency. 3. The Redetermination Notice may be sent to the SR/Local provider. 4. In addition, if at any time it is discovered by the Family Support Specialist that there have been changes that could impact a client’s continued eligibility, a notice is sent to the client informing them that they have a period of time to provide the needed updated information, or eligibility will be terminated. (This excludes child protective services referrals, information will be requested for protective services but funding will not be terminated for economic reasons.) 5. In addition, if at any time it is discovered by the Family Support Specialist that there is potential that fraud has occurred a fraud referral is made. If that fraud investigation impacts a client’s continued eligibility, a notice is sent to the client informing them that eligibility will be terminated (see A3 – Suspected Potential Fraud Referral). 6. If the client does not respond, the eligibility is terminated in ELIS effective on the day following the “last date of care” date provided in the Redetermination Notice. Notes Note 1: In some ELCs, follow up notices and/or telephone calls may be made to the parent or the SR provider to follow up on status. If the client disagrees with the eligibility termination decision, they have the right to submit an appeal in writing. Note 2: The Redetermination Notice sent to the provider will only indicate: – Child has a redetermination date coming up – Eligibility period may be ending 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 68 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) No details about income or household size are included in the notice. Outc omes 1. 2. 3. 4. Redetermination Notice (with request for needed information) Mail-In Redetermination Package (optional procedure) Notice of Need for Changed and/or Updated Eligibility Information Determination Appeal Table 29. Redetermination – Re-determine School Readiness Eligibility P roc es s To-Be SR Eligibility Redetermination T rigger Receipt of Updated Eligibility Documentation P roc es s S tep A2 – Re-determine School Readiness Eligibility A c tivities 1. The Family Support Specialist receives redetermination documentation from the parent and/or referring agency. Documentation may be received in a variety of manners, including electronically, a face-to-face interview, or through the mail-in redetermination package. 2. The Family Support Specialist documents the parent’s eligibility information in ELIS. 3. An Eligibility Redetermination is made and documented in ELIS based on the Family Support Specialist’s review of the parent information. A. If the parent is found ineligible, a termination notice is given to the parent and services are terminated based on the date provided in the Redetermination Notice. The events of the Redetermination process are recorded in ELIS. – If the mail-in redetermination package is incomplete when returned by the parent to the ELC, a notice of incomplete documentation is sent to the parent and to the SR provider. If the parent fails to return the required paperwork as noted, services are terminated. – A parent who has been determined ineligible has the right to submit grievances or appeals. Appeals can be filed, in person, by telephone, electronic, or in writing. Appeals are documented by the ELC. B. If the parent is found eligible, the Family Support Specialist accesses the parent and child records within ELIS and edits the eligibility information to set a new date and updates other information as required. 4. Once all updated eligibility information has been entered into ELIS, parent fees are reassessed and updated as needed. 5. Family Support Specialist extends the eligibility date in ELIS. The parent receives the funding notice. The provider receives a copy of the new Child Care Eligibility and Enrollment Certificate. Notes Note 1: There may be more than one funding notice if the family has multiple funding. The details of the funding notice are captured ELIS requirements. Note 2: When a parent is found ineligible, a keyboard entered closure date or an automated redetermination date of the day after 10 day notice, whichever is sooner unless unreported change is discovered while processing which could result in immediate closure. Note 3: Documentation collected includes signatures on application, parent fee and terms & conditions. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 69 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Outc omes 1. 2. 3. 4. Updated Child Care Authorization/Referral Confirmation of Continued Eligibility or Termination Notice Updated ELIS Parent and Child Records, including History Notes Signed Child Care Application, Income Worksheet and Other Required Forms (certificate or related form) 5. Appeal Table 30. Suspected Potential Fraud Referrals (A-3) P roc es s To-Be SR Eligibility Redetermination T riggers Suspected Potential Fraud P roc es s S tep A3 – Suspected Potential Fraud Referral A c tivities 1. Determine the amount of lost program benefits. 2. In cases of suspected fraud, the ELC Family Support Specialist will enter the referral to the referral database. 3. Suspected fraud referral data is sent to DFS in the form of the Suspected Fraud Referral document. 4. DFS conducts investigation or rejects referral. 5. DFS will send updated data on the status of suspected fraud referrals from initial referral to resolution and closure or collections. Notes Note 1: DFS as of January 1, 2011, OEL and AWI Inspector General’s Office will receive notification a suspected fraud case has been initiated by the ELC. Note 2: if at any time it is discovered by the Family Support Specialist that there is potential that fraud has occurred a fraud referral is made. If that fraud investigation impacts a client’s continued eligibility, a notice is sent to the client informing them that eligibility will be terminated until the investigation is completed (A1 -5). Note 3: The suspected fraud referrals are sent via an interface. This interface will also receive the State Attorney’s action and related data, if available from DFS. Outputs 1. Fraud Referral to Referral Database 2. Updated Status of Suspected Fraud Referrals 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 70 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.5.4 School Readiness Eligibility Redetermination Detailed Workflows Generate Eligibility Expiration Reports Send Eligibility Expiration Notices STart Requested Documentation Parents/Guardians ELC Family Support Specialist The following workflow diagrams show the details of the SR Eligibility Redetermination process including actors and activities. Yes Responds? Re-determination Returns Requested Documentation? End Notice of Expiring Eligibility No Referring Agency Services End Responds? Start Yes Returns Requested Documentation? End Notice of Expiring Eligibility No SR Providers Services End STart Notice of Expiring Eligibility End Figure 26. Notice of Eligibility Redetermination (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 71 HP Enterprise Services ELC Family Support Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Receives Redetermination Documentation Documents Parent Eligibility Redetermination information in ELIS Makes and Documents Eligibility Redetermination Documentation Complete? Yes Parent Eligible? Yes Parent Copayments are reassessed Extends Eligibility Date End No No Notice of incomplete Documentation to Parent Documentation Returned? No Services End Yes Parents/ Guardians Returns Required Paperwork? Yes No Services ended SR Providers Re-determine SR Eligibility Start End Figure 27. Re-determine School Readiness Eligibility (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 72 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Discovery of Fraudulent Reporting or Document Enters Suspected Fraud into Suspected Fraud Referral Database Receives Updates on Suspected Fraud Referrals Suspected Fraud Referral is sent to DFS Open Suspected Fraud? No Link to (A-1/A-2) Yes DFS ELC Family Support Specialist Determine Lost Program Benefits Referral Received Conducts Investigation or Rejects Referral Sends Periodic Updates to Suspected Fraud Referral End Figure 28. Suspected Potential Fraud Referral (A-3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 73 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.5.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 31. School Readiness (SR) Eligibility Redetermination Business Rules R ule T itle Des c ription E ffec tive Date 60BB-4.209 F.A.C Redetermination: Authorization Periods • April 21, 2003 • 45 CFR Subtitle A, Part 98.20(b) Eligibility Period and Redetermination State CCDF Plan Eligibility should be redetermined annually Must consider all factors required for initial redetermination Hours of Care authorized must relate to hours of activity (including travel, study, sleep time) 2002 (FFY 2010-2011) March 4, 2007 60BB-4 3.5.6 Traceability 3.5.6.1 U S E C A S E S The following Use Cases are associated with the SR Eligibility Redetermination To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-ELC-02: Enter Eligibility Information • UC-ELC-03: Validate School Readiness/Local Eligibility • UC-ELC-05: Complete School Readiness/Local Enrollment • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 74 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.5.6.2 R E QUIR E ME NT S The requirements associated with the School Readiness Redetermination To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 75 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.6 3.6.1 BP-06 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Process Overview The Voluntary Prekindergarten (VPK) Re-enrollment/School Readiness (SR) Provider Transfer process is part of the Case Management functional group. VPK Re-enrollment/SR Provider Transfer is the Business Process and activities that facilitate the request and transfer of a child’s enrollment in the early learning services from one provider to another. The process steps include a request for transfer made by a parent or guardian to transfer their child from one early learning service provider to another. The request for transfer requires an analysis of the nature of the request to include a reconciliation and determination of the remaining VPK Full Time Equivalent (FTE) hours transferable and, for SR, a reconciliation and validation from the provider that the parent is current on their responsibility for co-payment. This will allow for the ability to report on uncollected parent co-payments, but an outstanding balance does not prevent the transfer to a new provider. Once the ELC, parent, and provider have reconciled and confirmed the transfer request, the new provider information is entered into ELIS for the parent and child and the appropriate enrollment documentation is filled out and signed by all parties. A certificate is issued for the parent and provider to finalize the child’s enrollment in the early learning services of the new provider. The following assumptions have been made for the To-Be VPK Re-enrollment/SR Provider Transfer process: • The VPK Re-Enrollment Form and the VPK Child Eligibility Enrollment Certificate are integrated with ELIS. • The SR Child Care Application and Authorization and the Child Care Eligibility and Enrollment forms are integrated in ELIS. • Validating the parent co-pay balance with the SR provider and collecting zerobalance documentation is optional for the ELCs. It is only for the purpose of documentation. The existence of a balance does not impact the process. • Parents and providers have access to the Parent and Provider portals respectively. 3.6.1.1 A C T OR S • Family Support Specialist • Parent/Guardian • VPK Provider • SR Provider 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 76 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.6.2 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Process Flow Diagram The VPK Re-enrollment and SR Provider Transfer process is depicted in the figure below. Figure 29. Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Process Flow 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 77 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.6.3 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 32. VPK Re-enrollment – Assess Transfer Request P roc es s To-Be VPK Re-Enrollment/SR Provider Transfer T rigger Parent Requests Transfer To Another VPK/SR Provider, Licensing Issues, Out of Business, External Agency, Disaster P roc es s S tep A1 – Assess Transfer Request: VPK Provider Re-enrollment A c tivities 1. A request for VPK re-enrollment is received by the Family Support Specialist from the child’s parent or guardian. A notification of VPK re-enrollment is received by the Family Support Specialist (see Note 3 below). The request may be received using a variety of communication channels. 2. The Family Support Specialist reviews the re-enrollment request to assess the reason for re-enrollment and files any required supporting documentation. 3. The Family Support Specialist validates the last date of service with the previous provider. 4. The Family Support Specialist reconciles the balance of the remaining VPK hours using the last date of service from the previous provider and the balance of remaining VPK hours reported for the child in ELIS. 5. The Family Support Specialist and parent complete the re-enrollment application (AWI-VPK-05 Form). The parent gets a copy of the form, completing the VPK Reenrollment process. Notes Note 1: If the reason for request is for good cause: As defined in s.s.1002.71 (4) (a) and 60BB-8.210 Parent approval is required and written documentation is not required (as defined in s.s.1002.71 (4) (a) and 60BB-8.210). Some ELCs may require supporting documentation for good cause If the reason for request is for extreme hardship: Supporting documentation is required along with parent approval (as defined in s.s.1002.71 (4) (b), and 60BB-8.210). Note 2: If the transfer is between one ELC and another ELC, the parent must go through the VPK Eligibility and Enrollment process. Note 3: A. If the transfer is from one class to another class with the same provider and will not result in the student being reported for more than one FTE student, the provider is required to notify the ELC with an effective date of transfer. Parental approval is not required unless the transfer results in a different schedule. A class transfer is not considers a re-enrollment and is not subject to the same rules. B. There is a Rule effective 12/21/2010, 60BB-8-210, regarding requirements for provider transfer. C. ELIS checks the enrollment per the requirements against the business rules before the child is enrolled or transferred to a new provider. Outc omes 1. Signed VPK Re-Enrollment Application (AWI-VPK 05) 2. Completed VPK Class Transfer (Note 3.A.) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 78 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 33. VPK Re-enrollment – Execute and Confirm Transfer P roc es s To-Be VPK Re-Enrollment/SR Provider Transfer T rigger Completed Transfer Assessment and Re-Enrollment Application P roc es s S tep A2 – Execute and Confirm Transfer: VPK Provider Re-enrollment A c tivities 1. The Family Support Specialist associates the child with the new VPK provider in ELIS. 2. The Family Support Specialist associates the completed VPK Certificate (AWIVPK-02 form) with the new VPK provider in ELIS. 3. The new VPK provider associates the VPK Certificate (AWI-VPK-02 form) with the child in ELIS validating that the child is enrolled in their class. The Family Support Specialist receives notification when this is done, completing the VPK Reenrollment process. 4. The Family Support Specialist documents details of the transfer in ELIS. Notes None Outc omes 1. 2. 3. 4. Updated Record in ELIS Completed Child Eligibility and Enrollment Certificate(AWI-VPK-02 Form) Completed VPK Re-enrollment with New VPK Provider Denial of Application Table 34. School Readiness (SR) Provider Transfer – Assess Transfer Request P roc es s To-Be VPK Re-Enrollment/SR Provider Transfer T rigger Parent Requests Transfer To Another VPK/SR Provider, Licensing Issues, Out of Business, External Agency, Disaster P roc es s S tep A1 – Assess Transfer Request: School Readiness Provider Transfer A c tivities 1. A request for provider transfer is received and processed by the Family Support Specialist. The request may be received using a variety of communication channels. 2. The Family Support Specialist works with the parent/guardian to assess the reason for transfer and files any supporting documentation. Note 1: If the purpose of transfer is determined to be: An incident(s) of abuse – the incident is first reported to the Florida Department of Children and Families (DCF) Abuse Hotline and then followed up with the appropriate transfer of the child. – A licensing issue – the issue is first reported to the appropriate authorities and then followed up with the appropriate transfer of the child. Note 2: If the child needs to be removed from the provider’s facility immediately and does not have a selected provider, the Family Support Specialist works with the parent/guardian to select a SR provider. 3. The Family Support Specialist contacts the previous provider to validate the status of the parent co-pay and establishes the last date of care with the previous – 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 79 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) SR/Local provider Note 3: If the balance of the parent co-pay is up to date, the request for transfer is approved by the Family Support Specialist. Note 4: If the balance of the parent co-pay is not current, the Family Support Specialist will assess the parent’s ability to pay based on a qualifying event or if the child is at-risk. As defined by 60BB-4.400, the Family Support Specialist will either waive the fee or assess a minimum fee by approving the transfer. Note 5: .If the balance of the co-pay is not current, the Family Support Specialist will document the remaining balance in ELIS Note 6: If the ELC does not require documentation of the balance of the parent co-pay fee for transfer go to Step A2 – Confirm and Execute SR Provider Transfer. 4. The Family Support Specialist may receive documentation of a zero balance from the parent/provider prior to approval of the transfer. Notes Note: Unpaid balances do not prevent a BG1 or BG3R RCG from transferring. Outc omes 1. Approved SR Provider Transfer Table 35. School Readiness (SR) Provider Transfer-Confirm and Execute Transfer P roc es s To-Be VPK Re-Enrollment/SR Provider Transfer T rigger Approved SR Provider Transfer P roc es s S tep A2 – Confirm and Execute Transfer: School Readiness Provider Transfer A c tivities 1. The Family Support Specialist obtains parent signature on the Child Care Application and Authorization Form in ELIS per ELC option. 2. The Family Support Specialist obtains parent signature on the Child Care Eligibility and Enrollment Certificate per ELC option. 3. The Parent receives a copy of both forms and the new SR provider receives a copy of the Child Care Eligibility and Enrollment Certificate completing the transfer process. 4. The Family Support Specialist updates ELIS (terminates the previous provider and enrolls the child with the new provider). 5. The Family Support Specialist documents details of the transfer in ELIS. Notes None Outc omes 1. Updated Record in ELIS 2. Signed Child Care Application and Authorization Form 3. Signed Child Care Eligibility and Enrollment Certificate 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 80 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.6.4 Voluntary Prekindergarten Re-enrollment/School Readiness Provider Transfer Detailed Workflows VPK Provider Parent/ Guardian Family Support Specialist The following workflow diagrams show the details of the VPK Re-enrollment /SR Provider Transfer process including actors and activities. Reviews the Transfer Request Request for VPK Re-enrollment received Requests additional documentation as needed Obtain and Record Supporting Documentation Validate Last Date of Service with Previous Provider Completes VPK Enrollment Form Completes VPK Enrollment Form with the Family Support Specialist Provide Supporting Documentatation Request for VPK Re-enrollment Reconcile Balance of VPK Hours Request for Supporting Documentation Update Records/ Complete Reenrollment in ELIS Link to A-2 VPK Re-enrollment end Provide Supporting Documentatation Notification of VPK Re-enrollment Request for Supporting Documentation End Figure 30. Assess Transfer Request: VPK Re-enrollment (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 81 HP Enterprise Services Link from Assess Transfer Requestor VPK Provider Re-enrollment A-1 Associates Child with new VPK Provider Associates the Completed VPK Certificate with the New VPK Provider Documents Details of the Transfer Notification of Associated VPK Re-enrollment Forms End VPK Provider Parent/ Guardian Family Support Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Notification of Associated VPK Re-enrollment Forms Associates the Completed VPK Certificate with the Child End Figure 31. Execute and Confirm Transfer: VPK Re-enrollment (A-2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 82 HP Enterprise Services SR Provider Parent/ Guardian Family Support Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Processes SR Provider Transfer Request Request for SR Provider Transfer Works with Parent/ Guardian to Assess Reason Obtain and Record Supporting Documentation Abuse/ Licensing Issue? No Contacts SR Provider to obtain Parent Co-Pay and Last date of care Update Records Link to A-2 SR Provider Transfer Yes Referral to DCF Child Abuse Hotline or Referral to Licensing Agency Works with Family Support Specialist to Assess Reason Request for SR Provider Transfer Notification of SR Provider Transfer Optional Documentation of zero balance Provide Supporting Documentatation Request for Parent Co-Pay and Last Date of Care Provide Last Date of care and Parent Co-Pay Figure 32. Access Transfer Request: SR Provider Transfer (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 83 HP Enterprise Services Requests Signature for Child Care Application and Link from A-1 Authorization Form SR Provider Transfer Request for Signature Obtain and Record Signed Documentation Requests Signature for Child Care Eligibility and Enrollment Certificate Provides Signed Child Care Application and Authorization Form New SR Provider Parent/ Guardian Family Support Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Request for Signature Obtain and Record Signed Documentation Provides the Parent and New Provider with Appropriate Forms Terminates previous SR Provider and Enrolls the Child at the New SR provider Updates the details of the SR Transfer Provides Child Care Eligibility and Enrollment Certificate Notification of SR Provider Transfer Figure 33. Confirm and Execute Transfer: SR Provider Transfer (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 84 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.6.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 36. VPK Re-enrollment/SR Provider Transfer Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Part 98 Child Care Development Fund N/A 2002 60BB- 4.400 (Required Parent Copayment) Rules regarding the required parent copayment for SR February 2, 2005 60BB- 4.401 (Co-payment Collection) Rules regarding the required parent Copayment collection for SR February 2, 2005 Florida State Statute Section 1002.53 (VPK Eligibility and Enrollment) Rules addressing VPK eligibility and enrollment March 26, 2010 60BB – 8.202(b) Child Eligibility Determination and Enrollment Procedures ELC procedures for child registration, eligibility determination and enrollment May 24, 2007 60BB-8.210 Reenrollment for Good Cause and Extreme Hardship in the Voluntary Prekindergarten Education Program Re-enrollment in the VPK program after withdrawal or dismissal from the program December 21, 2010 Florida State Statute Section 1002.71 Funding; financial and attendance reporting Enrollment and Eligibility for VPK program July 1, 2009 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 85 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.6.6 Traceability 3.6.6.1 U S E C A S E S The following Use Cases are associated with the VPK Re-enrollment/SR Provider Transfer To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-ELC-09: Submit Provider Transfer Request • UC-ELC-10: Manage Provider Transfer Request • UC-ELC-11: Submit Request for Guardianship Transfer • UC-ELC-12: Manage Request for Guardianship Transfer • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.6.6.2 R E QUIR E ME NT S The requirements associated with the VPK Re-enrollment/SR Provider Transfer To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 86 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.7 3.7.1 BP-07 Guardianship Transfer Process Overview Guardianship Transfer is the Business Process and activities that facilitate the legal transfer of a child from one parent/guardian to another. The Family Support Specialist ensures that all legal documentation supporting the transfer of the child is in place. The Family Support Specialist updates the family records for the child for both the previous parent/guardian and the new parent/guardian and determines eligibility for the new parent/guardian. If a VPK/SR Provider Transfer is necessary due to the transfer of guardianship, the Family Support Specialist ensures that all documentation for VPK and/or child care services with a child care provider are in place for the child to either continue receiving services with their current provider(s) or successfully complete the transfer of services from one provider to another. The Family Support Specialist records and updates all records in ELIS throughout the Guardianship Transfer process. The following assumptions have been made for the Guardianship Transfer process: 1. Assumes a centralized database with statewide access to ELC Data. 2. Status update is something that impacts the parent’s eligibility and/or fees, but does not require a full redetermination. Only pertinent documentation is required. Status update examples include: • Guardianship change • Income changes (employment or other income) • Family size changes (for example, birth, death, marital status) • Education/training changes • Work schedule change 3.7.1.1 A C T OR S • ELC Family Support Specialist • SR/VPK Provider • Parent • External Agency 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 87 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.7.2 Guardianship Transfer Process Flow Diagram The Guardianship Transfer process is depicted in the figure below. To-Be Guardianship Transfer Applicant Information Legal Documents Guardianship Transfer Request Review Request for Guardianship Transfer A1 ELIS Provider Transfer Process Eligibility Process Validated Guardianship Transfer Eligible Applicant Process Guardianship Transfer A2 Guardianship Transfer Completed Documents/ Records Updated ELIS Figure 34. Guardianship Transfer Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 88 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.7.3 Guardianship Transfer Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 37. Guardianship Transfer – Review Request for Guardianship Transfer P roc es s Guardianship Transfer T riggers Guardianship Transfer Requested P roc es s S tep A1 – Review Request for Guardianship Transfer A c tivities 1. The Family Support Specialist receives a request for change of guardianship of a child. Requests may come in the form of a parent or relative request, or an Agency notice or referral. 2. The requestor provides appropriate documentation relevant to the guardianship change (court order, foster care authorization, agency referral, letters, and so forth). 3. The Family Support Specialist reviews the documentation provided to determine validity and to make decisions regarding needed activities for proceeding with the guardianship transfer. The Family Support Specialist may contact the current guardian to confirm the change in guardianship. 4. Once the guardianship transfer documentation is validated, the Family Support Specialist certifies eligibility for the child’s early learning services. A. If the transfer request is the result of an agency referral (court order, child care authorization), eligibility for early learning services does not need to be determined. Proceed to A2 of this process. B. If the transfer request is the result of a parent or relative request; the Family Support Specialist checks ELIS to determine if the new guardian has an existing ELIS record: i) The current parent/guardian will have a status update ii) If the new parent/guardian is already active in ELIS, they will have a status update iii) If the new parent/guardian is not active in ELIS, refer to the Intake process Notes None Outputs 1. Validated Guardianship Transfer 2. New Guardian Eligibility Determination 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 89 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 38. Guardianship Transfer – Process Guardianship Transfer P roc es s Guardianship Transfer T riggers Guardianship Transfer Validity Established Applicant is Eligible P roc es s S tep A2 – Process Guardianship Transfer A c tivities 1. For the new parent/guardian, where the provider selection for the child remains the same: A. The Family Support Specialist terminates services for parent/current guardian and child in ELIS. B. The Family Support Specialist completes the Application and Authorization Form and Child Care Eligibility and Enrollment Certificate for the new parent/guardian with the new signature, if eligible. C. The Family Support Specialist informs the provider of the termination of services for parent/current guardian. The new parent/guardian will receive the application and certificate, while the current provider will receive a copy of the child care certificate. 2. For a new guardian, where the provider selection for the child is changed: A. The Family Support Specialist terminates services of parent/current guardian and child in ELIS. B. The Family Support Specialist sends a termination notice to the parent/current guardian and the provider to confirm guardianship is no longer with parent/current guardian and to close out the case. C. The Family Support Specialist starts the Provider Transfer process for the child. (See Provider Transfer Process) Notes None Outputs 1. 2. 3. 4. Guardianship Transfer Completed Updated Enrollment Documents Completed Provider Transfer Process Updated Records in ELIS 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 90 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.7.4 Guardianship Transfer Detailed Workflows External Agency Parent/Guardian Family Support Specialist ELC The following workflow diagrams show the details of the Guardianship Transfer process including actors and activities. Start Review Guardianship Transfer Request and Documentation Request for Guardianship Transfer Documentation Valid? Yes No Link To Review Request For Guardianship Transfer A-1 Part 2 Request Follow Up Information Guardianship Transfer Request Start End Guardianship End Transfer Request Request for Additional Information Request for Additional Information Provide Additional Information for Guardianship Transfer Provide Additional Information for Guardianship Transfer End End Figure 35. Review Request for Guardianship Transfer (A1 – Part 1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 91 HP Enterprise Services Family Support Specialist Link from Review Request For Guardianship Transfer A Current Parent/Guardian ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Review New Guardians Eligibilty Contact Current Guardian? No Validate Guardian Transfer Existing Parent/ Guardian Record Certifies Eligibility Early Learning Services. Referral External Agency Yes Update Current and New Parent/ Guardian Records New Guardian Record Link to Process Guardianship Transfer A-2 End Guardianship Transfer process Contact Current Guardian End Request is Validated? Yes Link to Process Guardianship Transfer A-2 Link to Eligibility Determination Enrollment (Business Process BP-2) Validate Request End Current Guardian Contact No Invalidate Request End Figure 36. Review Request for Guardianship Transfer (A1 – Part 2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 92 HP Enterprise Services Family Support Specialist Link from Final Review Request for Guardianship Transfer A-1 Part 2 Workflow Provider Selection for Child(ren) Complete Forms and Authorizations for new Parent/ Guardian Terminate Current Parent/Guardian Same SR/VPK Provider Provides New Parent/ Guardian and Provider with Application and Certificate Inform Current Parent/Guardian and Provider of terminated services End New Inform Current Parent/Guardian and Provider of terminated services Terminate Current Parent/Guardian Link to SR Provider Transfer or VPK Re-enrollment Business Process BP-6 Start Start Termination Notice Termination Notice End End New Parent/ Guardian Current Parent/ Guardian ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Start Application and Certificate Start Start Termination Notice End Child Care Certificate End End Figure 37. Process Guardianship Transfer (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 93 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.7.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 39. Guardianship Transfer Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Part 98 Child Care Development Fund N/A 2002 Florida Statutes Section 411.01 School Readiness Act Establishes the School Readiness program and services March 26, 2010 Florida Statutes Section 411.011 Records of Children in School Readiness Programs Identifying which records from School Readiness Programs are exempt from Chapter 119 of the Florida State Statute March 26, 2010 Florida State Statute Section 1002.72 Records of Children in the Voluntary PreKindergarten Education Program Identifying which records from the Voluntary Prekindergarten Program are exempt from Chapter 119 of the Florida State Statute March 26, 2010 ELC Policies and Procedures N/A N/A N/A 3.7.6 Traceability 3.7.6.1 U S E C A S E S The following Use Cases are associated with the Guardianship Transfer To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-ELC-11: Submit Request for Guardianship Transfer • UC-ELC-12: Manage Request for Guardianship Transfer • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 94 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.7.6.2 R E QUIR E ME NT S The requirements associated with the Guardianship Transfer To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 95 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.8 3.8.1 BP-08 Provider On-boarding and Management Process Overview The Early Learning Coalitions (ELCs) recruit, enroll, and manage providers. Recruitment activities vary, depending on local need. All legally operating providers must be entered into ELIS as an active CCR&R provider. School Readiness and Voluntary Prekindergarten providers must complete an orientation to learn of their roles and responsibilities. Orientation may be a regularly scheduled group meeting or conducted on a one-to-one, as needed basis. CCR&R provider records are created once the new provider's legal status is verified. The provider profile details are entered into ELIS once the provider completes the CCR&R Provider Update survey and information is updated as provider circumstances change. The following assumptions have been made for the Provider On-boarding and Management process: 1. A Prospective Provider is defined as a CCR&R Provider (legally operating) already in ELIS. 2. A new provider is defined as in ELIS, but may be pursuing becoming a new SR or VPK provider. 3. Providers are initially entered as an active CCR&R provider in their service area. 4. An interface will be established with the Department of Children and Families to provide ELIS child care provider licensure and registration information. 3.8.1.1 A C T OR S • SR/VPK Provider • Prospective Provider • ELC Provider Specialist • ELC Executive Director • SR/VPK Provider Director/Owner 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 96 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.8.2 Provider On-boarding and Management Process Flow Diagram The Provider On-boarding and Management process is depicted in the figure below. Figure 38. Provider On-boarding and Management Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 97 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.8.3 Provider On-boarding and Management Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 40. Provider On-boarding and Management – Prospective/New Provider Contact P roc es s Provider On-boarding and Management T riggers Provider Seeks Information P roc es s S tep A1 – Prospective/New Provider Contact 1. The prospective or new provider contacts the ELC for information about providing early learning services (CCR&R, School Readiness or VPK). 2. The Provider Specialist gives the prospective or new provider a packet of helpful information. Materials provided are dependent on the type of services provision the prospective provider is interested in. Packets may include: A c tivities • Provider/Site Contact Form • EFT – No Hassles, Faster Payments Letter • Electronic Funds Transfer Authorization • Notification of Change Agreement • Rilya Wilson Act Absence Reporting Letter • Rilya Wilson Act Signature Page • Provider Agreement Letter and Provider Agreement • Child Care Provider Self Assessment Form • Reflective Checklists for: Environment, Daily Program, Activities and Experiences, Supportive Interactions, and Partnerships with Families • W-9 Request for Taxpayer ID Number and Certification • Federal Food Program Information (Family Home Child Care Only) • New Licensed/Exempt Provider Information Checklist • School Readiness Scholarship Provider Curriculum Orientation Verification Form • School Readiness Scholarship Provider Orientation Training Verification Form • Provider Rate Request • Provider Approved Rates Procedures • Provider Paid Holiday Request Form • Owner Information Form • Reimbursement Process Information • Early Learning and/or CCR&R information • CCR&R Provider Update Survey Notes None Outputs 1. Prospective/New Provider Information Packet 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 98 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 41. Provider On-boarding and Management – Conduct Provider Contact P roc es s Provider On-boarding and Management T riggers Information Packet Provided and Continued SR/VPK Provider Interest P roc es s S tep A2 – Conduct SR/VPK Provider Orientation A c tivities 1. The Provider Specialist arranges for the prospective provider to receive orientation. SR/VPK orientation may be conducted in a number of ways: • Regularly scheduled meeting • One-on-one at the provider site • Scheduled appointments at the ELC 2. The Provider Specialist conducts the SR/VPK Provider Orientation. Required paperwork, policies and procedures, and a variety of other topics are reviewed with the prospective provider. Topics include but are not limited to: Notes • CCR&R • Eligibility • Reimbursement • Curriculum • Monitoring • Contracts • Background Screening • Health and Safety • Quality of Services and Compliance • Professional Development Note 1: Scheduling and orientation is conducted by various departments within the ELC or RCMA and may include other local partners such as DCF for health and safety-related issues. Note 2: Orientation is not required for CCR&R Providers. Outputs 1. Complete SR/VPK Orientation 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 99 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 42. Provider On-boarding and Management – Review and Verify Documentation P roc es s Provider On-boarding and Management T riggers Completed SR/VPK Orientation and Documentation Received P roc es s S tep A3 – Review and Verify Documentation A c tivities 1. The prospective provider completes the required documentation and submits it to the Provider Specialist for review. 2. The Provider Specialist reviews the documentation and verifies that all licensing, background, and other requirements are completed. 3. The Provider Specialist creates the provider record/profile. 4. The Owner/Director and ELC Executive Director execute the SR/VPK Provider Agreement. Notes None Outputs 1. Executed SR/VPK Provider Agreement 2. Provider Record/Profile Table 43. Provider On-boarding and Management – Maintain Provider Profile P roc es s Provider On-boarding and Management T riggers Approved Provider and Provider Information Change P roc es s S tep A4 – Maintain Provider Profile A c tivities 1. The Provider Specialist or Provider updates provider records at least annually, and as provider information changes. Notes None Outputs 1. Updated Provider Record/Profile 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 100 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.8.4 Provider On-boarding and Management Detailed Workflows Provider Specialist Provides Prospective Provider Information Packet Schedules SR/VPK Provider Orientation Provides SR/VPK Provider Orientation Link to Review and Verify Documentation Prospective Provider Executive Director ELC The following workflow diagrams show the details of the Provider On-boarding and Management process including actors and activities. Request Information on Becoming a Provider Start Attends SR/VPK Provider Orientation Prospective Provider Packet Scheduled Orientation End Figure 39. Prospective Provider Contact and Conduct Provider Orientation (A1/A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 101 HP Enterprise Services Provider Specialist Reviews required Documentation Link from Prospective Provider Contact and Conduct SR/VPK Orientation Provider Documentation Complete? Yes Create Provider Record/Profile Creates Provider Agreement Updates Provider Information No Request Additional Information Executive Director ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Prospective Provider Executes the Provider Agreement Completes Required Provider Documentation Request for additional information Completes Provider Agreement Provides Updated Information Provider Agreement Figure 40. Review and Verify Documentation and Maintain Provider Profile (A3/A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 102 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.8.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 44. Provider On-boarding and Management Business Rules R ule T itle Des c ription E ffec tive Date Florida Statutes Section 411.01 School Readiness Act Establishes the SR program and services March 26, 2010 Florida State Statute Section 1002.55 School-year Prekindergarten Program Delivered by Private Prekindergarten Providers Establishes the requirements to become a VPK provider March 26, 2010 Florida State Statute Section 1002.61 Summer Prekindergarten delivered by public school and private prekindergarten providers N/A March 26, 2010 Florida State Statute Section 1002.63 School year prekindergarten program delivered by public schools. N/A March 26, 2010 ELCs Policies and Procedures N/A N/A N/A Early Learning Coalition Plan N/A Establishes the onboarding process and management for the ELCs Reviewed BiAnnually 2010 Grant Agreement N/A Contract between OEL and the ELCs for delivery of early learning services July 1, 2010 2010 Early Learning Coalition Provider Agreement VPK Statewide Provider Agreement School Readiness Agreement (which is in the process of being standardized statewide) Contract between ELCs and SR or VPK providers for delivery of early learning services Varied 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 103 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) R ule T itle Des c ription E ffec tive Date Child Care Resource and Referral Program Requirements F.A.C 60 BB 9.300 Child Care Resource and Referral A new provider who does not request a SR or VPK agreement just needs to have their legal status verified and needs to provide information about their program in order to be entered into ELIS by an ELC Provider Specialist August 20, 2010 Table 45. Provider On-boarding Forms CCR &R SR VPK Provider Update form License/Registration Certificate Gold Seal/Accreditation (if applicable) Provider Rates form Holiday Form Hours of operation/schedule Additional services provided Enhanced Services Meal Options Transportation (if applicable) Subsidy Child Care Service option Contact information Staff qualifications Ages of children served Facility policies Annual Service Agreement/Contract Current License, Registration or Exempt Status Curriculum Declaration or Waiver Curriculum Training Certificate Protective Service Annual Service Agreement (if applicable) Holiday Form Provider Rate Form W-9 Copy of Tax ID document for W9 General Liability Insurance Bank Information & copy of voided check for EFT Business Integrity StatementLicensed Exempt programs only Health & Safety Checklist (registered/informal only) Gold Seal Agreement Addendum (if applicable) Copy of Gold Seal Certificate/Accreditation (if applicable) COOP Plan Delegation of Authority statement of No-Fraud Health and safety check (registered/informal only) COOP Plan Provider Contract VPK 10 form Licensed or Exempt (Exempt only if accredited) Coalition Approval Letter Gold Seal/Accreditation Certificate Directors Credential VPK Directors Endorsement DCF clearance (within 5 yrs) FDLE clearance (within 5 yrs) Local clearance (within 5 yrs) Copy of Tax ID document for W9 Provider Profile - website VPK 11 form Affidavit of Good Moral character 5 hr Literacy Training Certificate/emergent literacy Certificate for VPK Standards training Written Attendance/Absence Policy List of Holidays for Classroom Calendar for VPK classroom days with holidays marked W-9 Lead instructor educational qualifications 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 104 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.8.6 Traceability 3.8.6.1 U S E C A S E S The following Use Cases are associated with the Provider On-boarding and Management To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-02: Request CCR&R • UC-COM-14: Provide Technical Assistance • UC-ELC-16: Process SR/VPK Provider Application • UC-ELC-17: Maintain SR/VPK Provider Information • UC-ELC-18: Maintain SR/VPK Instructor Information • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-09: Execute User Login • UC-GEN-10: Manage User Profile • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.8.6.2 R E QUIR E ME NT S The requirements associated with the Provider On-boarding Management To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 105 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.9 3.9.1 BP-09 Provider Quality Monitoring and Improvement Process Overview ELCs monitor provider activities and attendance records, and provide technical assistance and training to help providers improve the quality of their services. ELIS helps track monitoring activities and results. Improvement plans may be created for noncompliant providers or to structure quality improvement efforts. Chronic problems may result in provider termination from the program. This process includes Low Performing Providers (LPP) for the Voluntary Pre-Kindergarten Education Program (VPK). The following assumptions have been made for the To-Be Provider Quality Monitoring and Improvement process: 1. The LPP list is received from the Department of Education (DOE) on an annual basis and will be uploaded into ELIS. 2. Quality Program Strategies and Tools include: a. Technical Assistance b. Quality Rating Program c. Coaching and Mentoring d. Training e. Provider Agreements 3.9.1.1 A C T OR S • SR/VPK Provider • ELC Quality Manager • ELC Quality Specialist • Parents/Guardians 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 106 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.9.2 Provider Quality Monitoring and Improvement Process Flow Diagram The Provider Quality Monitoring and Improvement process is depicted in the figure below. Figure 41. Provider Quality Monitoring and Improvement Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 107 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.9.3 Provider Quality Monitoring and Improvement Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 46. Provider Quality Monitoring and Improvement – Prepare for Monitoring P roc es s Provider Quality Monitoring and Improvement T riggers Annual Cycle, Poor Performance, Customer Complaints P roc es s S tep A1 – Prepare for Monitoring A c tivities 1. The Quality Manager selects providers for monitoring per Agency-OEL guidelines and ELC policies: • Provider records and complaint files are continuously monitored and the ELC Quality Manager is alerted when certain criteria are met to warrant non-routine monitoring. • A pre-defined percentage (up to 100% of providers) is randomly selected for routine monitoring. 2. The Quality Specialist reviews selected provider records, along with any supporting documentation such as prior monitoring and self-assessments. Notes Note 1: Throughout the provider quality monitoring process, the process status and results are recorded in ELIS for management and reporting purposes. Note 2: One-hundred percent of LLPs are reviewed. Outputs 1. List of Selected Providers to be Monitored 2. Monitoring Files Table 47. Provider Quality Monitoring and Improvement – Conduct Monitoring P roc es s Provider Quality Monitoring and Improvement T riggers Providers Selected for Monitoring P roc es s S tep A2 – Conduct Monitoring A c tivities 1. The Quality Specialist conducts the monitoring per Florida State Statute, Administrative Code, Agency/OEL and ELC policies and procedures, and provider agreements and documents the results. Notes Note 1: Provider monitoring is conducted by ELC staff, service provider staff, or a contracted third party. Note 2: Technical assistance is provided throughout the process. Note 3: The staff conducting the monitoring may not be the same staff that provides technical assistance and required training. Outputs 1. Completed Monitoring 2. Reporting (individual and collective provider results) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 108 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 48. Provider Quality Monitoring and Improvement – Develop Program Improvement Plan P roc es s Provider Quality Monitoring and Improvement T riggers Monitoring Completed and Results Known P roc es s S tep A3 – Develop Program Improvement Plan A c tivities The Quality Specialist develops the program improvement/corrective action plan, per Agency-OEL and ELC guidelines, to address areas needing improvement. Technical assistance, training, mentoring, coaching and a variety of other strategies are included in program improvement plans. Notes None Outputs 1. Individual Provider Program Improvement Plan 2. Adjustment to Reimbursement Table 49. Provider Quality Monitoring and Improvement – Conduct Follow Up P roc es s Provider Quality Monitoring and Improvement T riggers Program Improvement Plan P roc es s S tep A4 – Conduct Follow Up A c tivities 1. The Quality Specialist conducts site visit(s) and/or other means to determine compliance with the improvement plan and assess progress made. 2. The Quality Specialist sends corrective action letters to non-compliant providers. 3. The Quality Manager initiates the provider agreement termination process for chronic unresolved issues previously documented in the improvement plan. Notes Note 1: In some cases, funds may be suspended for poor performance without terminating the provider contract or agreement. However, if the provider license is revoked, contracts are terminated. Note 2: The Executive Director, and/or the Board, is typically required to approve termination actions. Note 3: Parental notification of pending provider termination is given at or about the time the provider termination notice is delivered. Note 4: LPP/VPK provider agreement termination occurs when provider has been LPP for 4 consecutive years. Outputs 1. 2. 3. 4. 5. Other compliance results Corrective Action Letters Parental Notification (of provider termination) Notice of Termination Notice of Suspension of Funding 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 109 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.9.4 Provider Quality Monitoring and Improvement Detailed Workflows Selects Providers for Monitoring Periodic Quality Monitoring Quality Specialist ELC Quality Manager The following workflow diagrams show the details of the Provider Quality Monitoring and Improvement process including actors and activities. Conduct SR / VPK Provider Monitoring SR/VPK Provider Review Selected SR / VPK Provider Records Develop Program Improvement / Corrective Action Plan Program Improvement / Corrective Action Plan Conducts Followup Site Monitoring Makes Improvements/ Corrections Link to Conduct Follow Up Participates in Site Monitoring End Figure 42. Prepare/Conduct Monitoring and Develop Program Improvement Plan (A1/A2/A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 110 HP Enterprise Services Quality Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Notice of Termination or proposed Termination of SR/ VPK Provider Terminate or propose Termination of SR/ VPK Provider End SR/VPK Provider is Compliant? Link from Prepare/ Conduct Monitoring, and Develop Program Improvement Plan No Conducts Followup Monitoring Develop Corrective Action Letters Continued NonCompliance No End Yes End SR/VPK Provider Quality Specialist ELC Yes Provides Follow up Information for Monitoring End Parents/ Guardians Makes Improvements/ Corrections Start End Figure 43. Conduct Follow Up Process Flow Diagram (A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 111 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.9.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 50. Provider Quality Monitoring and Improvement Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Parts 74, 92, 98 and 99 Child Care Development Fund N/A 2002 Florida State Statute Section 411 Handicap or highrisk condition prevention and early childhood assistance. N/A March 26,2010 Florida Statutes Chapter 1002, Part V VPK Act Establishes authority and requirements for the Voluntary Prekindergarten Education Program March 26, 2010 F.A.C. 60BB-4 Office of Early Learning Regulations for administering the SR Program March 4, 2007 F.A.C. 60BB-8 Voluntary Prekindergarten December 21, 2010 CCDF Plan Child Care Development Fund Plan School Readiness Standard Eligibility Review Guide Same Regulations for administering the VPK Education Program State Plan for use of Federal CCDF dollars, and meeting federal requirements. Guide to assist in the review process and criteria for monitoring ELCs. VPK Standard Eligibility Review Program Guide Same Guide to assist in the review process and criteria for monitoring ELCs. August, 2010 ELC Policies and Procedures N/A N/A N/A Early Learning Coalition Plan N/A Establishes the onboarding process and management for the ELCs Reviewed BiAnnually 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Every Two Years January 14, 2011 Page 112 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) R ule T itle Des c ription E ffec tive Date 2010 Grant Agreement N/A Contract Between OEL and the ELCs for delivery of early learning services July 1, 2010 2010 Early Learning Coalition Provider Agreement N/A Contract Between ELCs and providers for delivery of early learning services N/A 3.9.6 Traceability 3.9.6.1 U S E C A S E S The following Use Cases are associated with the Provider Quality Monitoring and Improvement To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-ELC-13: Initiate Child Developmental Assessment • UC-ELC-14: Complete Child developmental Assessment • UC-ELC-15: Monitor SR/VPK Provider Quality • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.9.6.2 R E QUIR E ME NT S The requirements associated with the Provider Quality Monitoring and Improvement ToBe Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 113 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.10 BP-10 Attendance Roster Processing 3.10.1 Process Overview Attendance Roster Processing is the process of gathering attendance and service data from SR/Local and VPK providers. This process consists of generating a periodic attendance roster, allowing the SR/Local or VPK provider to modify the attendance roster based on the service information for the child, submitting the SR/Local or VPK provider attendance roster, and approving the attendance roster at the ELC. The data from the attendance roster is entered into ELIS. Once approved, the children’s service records are revised accordingly. The processing of the attendance roster also drives period close-out processes and payments to SR/Local and VPK providers. The following assumptions have been made for the Attendance Roster Processing process: 1. OEL, the ELCs, and the SR and VPK providers agree on a monthly for roster submission. 2. Supporting documentation (SR sign-in/sign-out sheets, monthly VPK absence forms, absence documentation, and so forth) is NOT required to be submitted through the Attendance Roster Processing process. Local policies may still require the submission of certain documentation to the ELC, as well as continue to require the SR or VPK provider to store the supporting documentation locally. 3. Original attendance rosters are not required for submission. 4. Attendance rosters are not required to be physically signed (electronic signature allowed). 5. Locally funded children are included in Attendance Roster Processing. 3.10.1.1 ACTORS • AWI/OEL • Early Learning Coalition • ELC Reimbursement Specialist • ELC Reimbursement Manager • SR/VPK Provider 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 114 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.10.2 Attendance Roster Processing Process Flow Diagram The Attendance Roster Processing process is depicted in the figure below. Figure 44. Attendance Roster Processing Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 115 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.10.3 Attendance Roster Processing Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 51. Required Attendance Submission P roc es s To-Be Attendance Roster Processing T riggers Required Attendance Submission P roc es s S tep A0 – Develop Schedule for Attendance Submission A c tivities 1. Agency staff develops the monthly schedule for attendance submission based on the Agency Attendance Submission policy. 2. Agency staff provides the attendance schedule to the ELC. 3. The ELC Reimbursement Specialist provides the attendance schedule to the SR/VPK providers. Notes Note 1: The attendance submission schedule contains information pertinent to roster scheduling, such as roster generation date and roster due date. Note 2: Based on the attendance submission schedule, the attendance rosters are generated accordingly (at the ELCs/RCMA). Note 3: This step is performed by Agency staff to periodically setup the schedule for attendance submission. Outputs 1. Developed Roster Schedule Table 52. Developed Attendance Roster Schedule P roc es s To-Be Attendance Roster Processing T riggers Developed Attendance Roster Schedule P roc es s S tep A1 – Generate Attendance Roster A c tivities 1. The ELC Reimbursement Specialist generates the attendance roster for each SR and VPK provider. 2. The ELC Reimbursement Specialist releases the attendance roster to the each SR and VPK provider. 3. By request, the ELC Reimbursement Specialist may provide additional attendance rosters to the SR/VPK provider. Notes Note 1: The data on the attendance roster will be based on the SR/VPK provider information, child information, and teacher/classroom information maintained in ELIS as well as the data required to be reported through policy. Note 2: Throughout the month, as enrollments, re-certifications, and terminations occur, the data on the attendance roster will change. Note 3: ELCs can set up local funding that will work under the same rules and flexibility as SR. Outputs 1. Incomplete Attendance Roster 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 116 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 53. Generation of a Blank Attendance Roster P roc es s To-Be Attendance Roster Processing T riggers Generation of Blank Attendance Roster P roc es s S tep A2 – Populate Attendance Roster A c tivities 1. The SR or VPK provider completes the attendance roster (marking the days/hours the child was absence for service as well as other required information). 2. The SR or VPK provider submits the completed attendance roster to the ELC Reimbursement Specialist by the submission date on the schedule. SR/local provider submits additional documentation of excessive absences when absences exceed 3 per month (SR/local only) or for emergency closure. 3. The ELC Reimbursement Specialist enters and verifies (hardcopy) or verifies (electronic) the attendance data in ELIS. 4. The ELC Reimbursement Specialist rejects the submitted attendance roster for corrections or the specialist approves the reimbursement once discrepancies are resolved and enters the roster data into ELIS, the provider of SR, Local or VPK services may be contacted for clarification. 5. The ELC Reimbursement Specialist scans or stores the attendance roster at the ELC (if paper-based). Notes None Outputs 1. Submitted Attendance Roster Table 54. Submitted Attendance Roster P roc es s To-Be Attendance Roster Processing T riggers Submitted Attendance Roster P roc es s S tep A3 – Approve Attendance Roster A c tivities 1. The ELC Reimbursement Specialist sends the submitted attendance roster for review 2. The ELC Reimbursement Manager reviews the summary information from the roster data once the roster has been submitted. 3. The ELC Reimbursement Manager approves and processes the attendance roster once the review of the attendance roster is complete. Should discrepancies exist during the review, the SR/VPK provider or ELC Reimbursement Specialist may be contacted to resolve the discrepancy. Notes Note 1: The approval of the attendance roster initiates the revision (or update) to the child’s attendance records. Outputs 1. Approved Attendance Roster 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 117 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 55. Approved Attendance Roster P roc es s To-Be Attendance Roster Processing T riggers Approved Attendance Roster P roc es s S tep A4 – Revise Child Attendance Information A c tivities 1. Once the attendance roster is approved the child’s attendance information (based on the approved attendance roster) is revised. Notes None Outputs 1. Revised Child Attendance Information 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 118 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.10.4 Attendance Roster Processing Detailed Workflows Develop Schedule Provide Attendance Schedule to ELC End Required Attendance Submission Receives Attendance Schedule SR/VPK Provider ELC Reimbursement Specialist AWI/OEL The following workflow diagrams show the details of the Attendance Roster Processing process including actors and activities. Provides Attendance Schedule to Providers Generates Attendance Roster Receives Attendance Schedule Releases Attendance Roster End Receives Attendance Roster Link to Populate Attendance Roster (A-2) Figure 45. Develop Schedule/Release Attendance Roster (A0/A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 119 HP Enterprise Services SR/VPK Provider ELC Reimbursement Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Start Verifies the Attendance Data in ELIS Discrepancies Exist? Scans or Stores Paper Based Attendance Rosters No Yes Link to Approve Attendance Roster/ Revise Child Attendance Information (A-3/A-4) Contacts SR/VPK Provider for Clarification Completes Attendance Roster Submits Completed Attendance Roster Provides Clarification End Link from Develop Schedule And Release Attendance Roster Figure 46. Populate Attendance Roster (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 120 HP Enterprise Services Reimbursement Manager Reviews Summary Information from the Roster Data Discrepancies Exist? Approves and Process Attendance Roster No No Yes Contacts SR/VPK Provider or Reimbursement Specialist for Clarification Submits Attendance Roster for Review Receives Clarification(s) Child’s Attendance Information is Revised Yes Discrepancies Resolved? End Receives Request for Information Link from Populate Attendance Roster A-2 Sends Requested Information SR/VPK Provider Reimbursement Specialist ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Provides Clarification Request for Clarification End Figure 47. Approve Attendance Roster/Revise Child Attendance Information (A3/A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 121 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.10.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 56. Attendance Roster Processing Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Part 98 State CCDF Plan Child Care Development Fund N/A 2002 FFY 2010-2011 Florida State Statute Section 1002.71 Funding; financial and attendance reporting N/A March 26, 2010 F.A.C. 60BB – 4.500 General Reimbursement Provisions N/A February 2, 2005 F.A.C. 60BB - 4.501 Emergency Closures N/A February 2, 2005 F.A.C. 60BB – 4.502 Records to be Maintained N/A February 2, 2005 F.A.C. 60BB – 4.503 Fraud N/A February 2, 2005 F.A.C. 60BB – 8.204 Attendance Policy N/A September 14, 2009 F.A.C. 60BB – 8.205 Advance Payment and Reconciliation for the Voluntary Prekindergarten Education Program Recording and Certifying Child Attendance in the VPK Program. N/A September 14, 2009 N/A May 24, 2007 F.A.C. 60BB- 8.305 3.10.6 3.10.6.1 Traceability US E C AS E S The following Use Cases are associated with the Attendance Roster Processing To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-05: Manage Slot Availability • UC-ELC-09: Submit Provider Transfer Request • UC-ELC-10: Manage Provider Transfer Request • UC-ELC-19: Execute SR / VPK Attendance Processing • UC-ELC-20: Execute ELC Attendance Processing • UC-ELC-22: Execute Closeout • UC-GEN-01: Execute Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 122 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.10.6.2 • UC-GEN-04: Generate Notification • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System R E QUIR E ME NT S The requirements associated with the Attendance Roster Processing To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 123 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.11 BP-11 Prior Period Attendance Adjustments 3.11.1 Process Overview The discovery of attendance or payment discrepancies may result in adjustments to existing attendance records. By adjusting the attendance records, the ELC Reimbursement Specialist corrects the attendance records for the child and corrects the funds that should have been paid to the SR/VPK provider. Prior period attendance adjustments processed in the current period are reflected in the current period’s payment to the SR/VPK provider. The following assumptions have been made for the Prior Period Attendance Adjustments process: 1. Supporting documentation (SR sign-in/sign-out sheets, monthly VPK absence forms, absence documentation, and so forth) is NOT required to be submitted through the Attendance Roster Processing process. Local policies may still require the submission of certain documentation to the ELC, as well as continue to require the SR/VPK provider to store the supporting documentation locally. 2. Locally funded children are included in SR attendance and prior period adjustments. 3.11.1.1 A C T OR S • ELC Reimbursement Specialist • ELC Reimbursement Manager • SR/VPK Provider 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 124 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.11.2 Prior Period Attendance Adjustments Process Flow Diagram The Prior Period Attendance Adjustments process is depicted in the figure below. To-Be Prior Period Attendance Adjustments Figure 48. Prior Period Attendance Adjustments Process Flow 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 125 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.11.3 Prior Period Attendance Adjustments Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 57. Generate Prior Period Attendance Adjustment P roc es s To-Be Prior Period Attendance Adjustments T riggers Discovery of Attendance Discrepancy P roc es s S tep A1 – Generate Prior Period Attendance Adjustment A c tivities 1. The ELC Reimbursement Specialist initiates the investigation of the attendance issue. 2. If supporting documentation is needed to review the attendance issue, the ELC Reimbursement Specialist requests the supporting documentation from the SR/VPK provider. This may include original attendance rosters, original SR sign-in/sign-out forms VPK Certification of Attendance Long or Short Form (AWI-VPK Form 03L or 03S) for SR inquires, and/or documentation submitted to support absence or emergency closure and original SR/Local monthly absence reason forms. 3. If a prior period attendance adjustment is determined to be needed, the ELC Reimbursement Specialist generates a prior period attendance adjustment and documents the reason for the prior period attendance adjustment. 4. Reimbursement Specialist submits attendance adjustment for review Notes Note 1: The prior period attendance adjustment may be based on: • SR or VPK Attendance Audit finding a need for an attendance adjustment • Reimbursement Specialist identifies an error during the attendance entry (actual attendance issue, incorrect child age, etc.) • Potential fraud • Request from another ELC department • SR/VPK provider call or notice • Client call • Other processing Note 2: If fraud is suspected, the fraud case will be investigated as described by the ELC’s fraud policy. Outputs 1. Pending Prior Period Attendance Adjustment 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 126 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 58. Approve Prior Period Adjustment P roc es s To-Be Prior Period Attendance Adjustments T riggers Pending Prior Attendance Adjustment P roc es s S tep A2 – Approve Prior Period Attendance Adjustment A c tivities 1. The Reimbursement Manager reviews the original entry, the adjustment entry, reason for adjustment, and supporting documentation related to the adjustment. • If the prior period attendance adjustment is needed, the ELC Reimbursement Manager approves and processes the prior period attendance adjustment. • If the prior period attendance adjustment is not needed or requires additional information, the ELC Reimbursement Manager rejects the prior period attendance adjustment and sends it back to the ELC Reimbursement Specialist (go to A-1). Notes Note 1: Approved prior period attendance adjustments are reflected in the period’s closeout and period’s payment to the SR/VPK provider (refer to Closeout Process). Note 2: The approval of the prior period attendance adjustment initiates the revision (or update) to the child’s attendance records. Outputs 1. Approved Prior Period Attendance Adjustment 2. Rejected Prior Period Attendance Adjustment Table 59. Revise Child Information P roc es s To-Be Prior Period Attendance Adjustments T riggers Approved Prior Attendance Adjustment P roc es s S tep A3 – Revise Child Information A c tivities 1. Once a prior period attendance adjustment is approved, the ELC Reimbursement Manager revises the child’s attendance information (based on the approved prior period attendance adjustment). Notes Note 1: ELIS revises the attendance information. Note 2: Revising attendance may also revise payment. Outputs 1. Revised Child Attendance Information 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 127 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.11.4 Prior Period Attendance Adjustments Detailed Workflows Reimbursement Specialist Initiates the Investigation of the Attendance Issue SP/VPK Provider Early Learning Coalition The following workflow diagrams show the details of the Prior Period Attendance Adjustments process including actors and activities. Supporting Documentation Requested No Attendance Adjustment Needed No End Yes Yes Request Supporting Documentation Supporting Documentation Received Generate a Prior Period Adjustment Documents Reason for Prior Period Adjustment Submits Pending Prior Period Adjustment Link to Approve Prior Period Adjustment (A-2/A-3) Provides Supporting Documentation Request for Supporting Documentation End Figure 49. Generate Prior Period Attendance Adjustment (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 128 HP Enterprise Services ELC Reimbursement Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Approves Prior Period Adjustment? Link from Prior Period Attendance Adjustment (A-1) Yes Processes Prior Period Adjustment Revises Child Attendance Information End No Rejects Prior Period Adjustment Go to back to A-1 To generate corrected prior period adjustment Figure 50. Approve Prior Period Attendance Adjustment, Revise Child Information (A2, A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 129 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.11.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 60. Prior Period Attendance Adjustments Business Rules R ule T itle Des c ription E ffec tive Date ELC Fraud Policy N/A N/A N/A FAC 60BB-8.305 Recording and Certifying Child Attendance in the VPK Program Records to be Maintained and Monitoring for Reimbursements. N/A May 24, 2007 N/A February 2, 2005 FAC 60BB-4.502 3.11.6 Traceability 3.11.6.1 U S E C A S E S The following Use Cases are associated with the Prior Period Attendance Adjustments To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-05: Manage Slot Availability • UC-ELC-21: Execute Prior Period Attendance Adjustment • UC-ELC-22: Execute Closeout • UC-GEN-01: Execute Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-07: Execute Reports • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.11.6.2 R E QUIR E ME NT S The requirements associated with the Prior Period Attendance Adjustments To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 130 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.12 BP-12 Closeout 3.12.1 Process Overview On a periodic basis, the ELC performs a reconciliation, review and "closeout" of the direct service expenditures (including VPK provider advance payment), non-direct expenditures, administrative expenditures, quality expenditures, and match data. Once the closeout has occurred for the period, the ELC submits the request for reimbursement of funds to the Office of Early Learning (OEL), and issues payment, for the direct service expenditures, to the SR/VPK providers based on ELC preference and is subject to change without OEL involvement. The reimbursement data is entered into ELIS through the FLAIR interface or manually if the interface is not available. The following assumptions have been made for the Closeout process: 1. The OEL, ELCs, and SR/VPK providers agree on a monthly schedule for the period. 2. Authorized ELC staff does not need to sign the reimbursement request to OEL. Electronic Signature or approval replaces the need for a physical signature. The reimbursement request is submitted through ELIS. 3. ELC Staff are trained on the ELC accounting software. 4. There will be closeout of ELIS (direct services) and a close out of Local Accounting System (all other data) 3.12.1.1 A C T OR S • Agency Staff • ELC Finance Director • ELC Fiscal Manager • ELC Fiscal Specialist • ELC Reimbursement Manager • Provider 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 131 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.12.2 Closeout Process Flow Diagram The Closeout process is depicted in the figure below. To-Be Closeout Closeout Policy Required Periodic Closeout Develop Schedule for Closeout Funds Developed Closeout Schedule Reviewed Closeout Approved Closeout Review Closeout for Period Approve Closeout for Period A1 A2 A0 Issue SR /Local/ VPK Provider Payment SR/VPK Provider Payment A3 Issue Resolution ELIS Accounting Software Accounting Software ELIS Submit Reimbursement Request to OEL ELIS Reimbursement of Funds Reimbursement Request A4 Accounting Software Accounting Software ELIS Receive Reimbursement A5 Accounting Software Figure 51. Closeout Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 132 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.12.3 Closeout Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 61. Closeout – Develop Schedule for Closeout P roc es s To-Be Closeout T riggers Required Periodic Closeout P roc es s S tep A0 – Develop Schedule for Closeout A c tivities 1. Agency staff develops the schedule for closeout based on the Agency Closeout Submission policy. The schedule is user-defined and will be set to monthly. 2. Agency staff provides the closeout schedule to the ELC. Notes Note 1: The schedule contains information pertinent to the closeout – such as Period date, Agency submission date, etc. Note 2: This is a periodic step in the process. This step is performed by Agency staff to setup the closeout schedule. Outputs 1. Develop Closeout Schedule Table 62. Closeout – Review Closeout for Period P roc es s To-Be Closeout T riggers Develop Closeout Schedule P roc es s S tep A1 – Review Closeout for Period A c tivities 1. Based on the Closeout Schedule, the ELC Reimbursement Manager reviews the following data (by Grant): • Direct Service Expenditures (including VPK provider advance payment) • Match Data (Direct Services) 2. The ELC Fiscal Manager reviews the data from the ELC accounting software. • Non-Direct Service Expenditures • Administrative Expenditures • Quality Expenditures • Match Data (Excluding Direct Services) 3. The ELC Reimbursement Manager resolves discrepancies in ELIS and reanalyzes the figures. 4. Once the ELIS figures are accurate, the ELC Reimbursement Manager routes the ELIS closeout information to the ELC Finance Director for approval. 5. Once the ELC accounting software is verified, the ELC Fiscal Manager routes the ELC accounting software closeout information to the ELC Finance Director for approval. Notes None Outputs 1. Reviewed ELIS Closeout Data 2. Reviewed ELC Accounting Software Closeout Data 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 133 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 63. Closeout – Approve Closeout P roc es s To-Be Closeout T riggers Reviewed Closeout P roc es s S tep A2 – Approve Closeout A c tivities 1. The ELC Finance Director reviews the period’s closeout figures (both ELIS and ELC accounting software). 2. If the ELC Finance Director agrees with the closeout figures, the following occurs: A. Direct service data is entered into the ELC’s accounting software. B. Budget spending data is defined. C. The period’s closeout is approved. 3. If the ELC Finance Director does not agree with the closeout figures, the ELC Finance Director determines the discrepancy and requests that the ELC Reimbursement Manager or ELC Fiscal Manager corrects the issue. Notes None Outputs 1. Approved Closeout 2. Unapproved Closeout Table 64. Closeout – Issue School Readiness/Voluntary Prekindergarten Provider Payments P roc es s To-Be Closeout T riggers Approved Closeout P roc es s S tep A3 – Issue SR/VPK Provider Payments A c tivities 1. Once the period’s closeout has been approved, the ELC Finance Director creates the payments to the SR/VPK providers. 2. The ELC Finance Director prints the physical checks and/or initiates the electronic payment. 3. The ELC Finance Specialist provides a “Payment Package” to the SR/VPK provider: 4. The ELC Finance Specialist stores backup copies of the Payment Package at the ELC. Notes Note 1: The Payment Package consists of: Outputs • If the SR/VPK provider receives a paper check: – Actual paper check – A copy of the direct service expenditures included in payment • If the SR/VPK provider receives a direct deposit payment: – Direct deposit stub – A copy of the direct service expenditures included in payment 1. SR/VPK Provider Payment 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 134 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 65. Closeout – Submit Reimbursement Request to OEL P roc es s To-Be Closeout T riggers Approved Closeout P roc es s S tep A4 – Submit Reimbursement Request to OEL A c tivities 1. Once the period’s closeout has been approved, the ELC Finance Director submits the closeout data to OEL Financial Administration and Budget Services (BP 16 Process ELC Invoice). The reimbursement data/invoice includes (categorized by each grant): • • • • • • Notes Outputs Direct service expenditures Administrative expenditures Quality expenditures Non-direct and other allowable expenditures Prior Period Adjustments Coalition Advance/VPK Provider Advance requests Note 1: School Readiness: See cash management guidance, 240.01 • SR: The ELC may request and receive an initial cash advance of SR funds on the projected need to cover the ELC’s immediate cash requirements not to exceed the anticipated expenses of a 30 day period. An initial cash advance may not exceed the ELC’s highest invoice month from the previous fiscal year unless an exception is granted with justification granted by OEL. The ELC must complete a monthly reconciliation, including projections for future cash needs. • VPK Coalition Advance: The ELC may request and receive a VPK coalition advance payment calculated in accordance with the formula in Rule 60BB-8.205, F.A.C. The ELC must reconcile the advance payment to the ELC’s immediate cash needs. • VPK Provider Advance: Each ELC shall calculate and reconcile advance payments to private providers and public schools in the VPK program in accordance with Rule 60BB-8.205, F.A.C. The ELC shall address provider advance overpayments in accordance with Rule 60BB-8.205, Florida Administrative Code. If an ELC is owed money by a provider at the end of the fiscal year due to unrecovered provider overpayments, the ELC may invoice the Agency on the final (13th) invoice for the delinquent amount. (See 240.03 Collection of delinquent accounts (VPK, SR, all other contractors receiving state funds) 1. Reimbursement Request 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 135 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 66. Closeout – Receive Reimbursement P roc es s To-Be Closeout T riggers Reimbursement Request P roc es s S tep A5 – Receive Reimbursement A c tivities 1. The reimbursement of funds is sent to the ELC from the Department of Financial Services (from BP 16 Process ELC Invoice- See Note 1). 2. The Financial Specialist enters the reimbursement data into the ELC accounting system or is imported through the local accounting system interface. Notes Note 1. See BP 16- Process ELC invoice for details of approvals and process steps that occur between the request for reimbursement of funds and the actual reimbursement. Outputs 1. Reimbursement of Funds 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 136 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.12.4 Closeout Detailed Workflows Periodic Monthly Schedule Develops the schedule for closeout ELC AWI Staff The following workflow diagrams show the details of the Closeout process including actors and activities. Provides schedule to the ELC Review Closeout for Period (A-1) Closeout Schedule Review Closeout Figure 52. Develop Schedule for Closeout (A0) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 137 HP Enterprise Services Fiscal Manager Reviews Grant Data Periodic Monthly Closeout Schedule Monthly Closeout Resolves Discrepancies/ Reanalyzes Figures Sends for Approval End Sends ELC Accounting Software Closeout for Approval Reviews And Verifies Data from Accounting Software Finance Director ELC Reimbursement Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Monthly Closeout Monthly Closeout Link to Approve Closeout (A-2) Figure 53. Review Closeout for Period (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 138 HP Enterprise Services Reimbursement Manager/ Fiscal Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Finance Director ELC Resolves Discrepancies Review Closeout Figures (ELIS and Accounting Software) Agrees with Closeout Figures? No Link from Review Closeout for Period (A-1) Yes Send for Approval Determines Discrepancies and Returns for corrections Approves Period Closeout Link to Issue SR/VPK Provider Payments (A-3) Figure 54. Approve Closeout (A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 139 HP Enterprise Services Finance Director Creates payments to providers Link from Closeout Approved (A-2) Prints Checks/ Initiates Electronic Payment Finance Specialist ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Provider Provides a Payment Package to the SR/ VPK provider Start Payment Package Stores Copy of Payment Package Provider Payment Completed End Figure 55. Issue SR/VPK Provider Payments (A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 140 HP Enterprise Services ELC Finance Director ELC Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Submits Closeout Data Link from Closeout Approved (A-2) Link from Link to BP 16 Reimbursement BP 16 Process ELC Invoice A-1 Received Process ELC Invoice Enters Reimbursement Data into ELC Accounting Systems Reimbursement Complete Figure 56. Submit Reimbursement Request; Receive Reimbursement (A4, A5) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 141 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.12.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 67. Closeout Business Rules R ule T itle Des c ription E ffec tive Date The ELC's contract with the SR /VPK provider outlines the payment schedule and method of payment N/A N/A Various Reimbursement invoices are required to be submitted to OEL by the 25th of the month. N/A Per the ELC Grant Agreement Annual Match data is required to be submitted to OEL by the 20th of the month. N/A Per the ELC Grant Agreement Annual VPK provider/ELC advance payments are sometimes submitted separately. It is permissible to submit direct service invoices separately (this is done on an exception basis by some and routinely by other ELCs. N/A N/A N/A For the Teenage Parent Program (TAPP), a report must accompany the school readiness invoice. N/A N/A N/A Advances are subject to adjustment at any time due to cash flow and enrollment changes. N/A N/A N/A AWI Fiscal Guidance 240.01 OEL-FG-0042-07: Cash Management Guidance • The ELC may request and receive an initial cash advance of SR funds on the projected need to cover the ELC’s immediate cash requirements not to exceed the anticipated expenses of a 30-day period. • An initial cash advance may not exceed the ELC’s highest invoice month from the previous 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 September 22, 2008 Page 142 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) R ule F.A.C 60BB-8.205: AWI Fiscal Guidance 240.03 OEL-FG-0042-07 T itle Advance Payment and Reconciliation for the Voluntary Prekindergarten Education Program Collection of a Delinquent Account 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Des c ription fiscal year. E ffec tive Date • The ELC must complete a monthly reconciliation, including projections for future cash needs. • The ELC may request and receive a VPK ELC advance payment calculated in accordance with the formula in Rule 60BB8.205, F.A.C. • The ELC must reconcile the advance payment to the ELC’s immediate cash needs. • VPK Provider Advance: Each ELC shall calculate and reconcile advance payments to private providers and public schools in the VPK program in accordance with Rule 60BB-8.205, F.A.C. • The ELC shall address provider overpayments in accordance with Rule 60BB-8.205, Florida Administrative Code. • If an ELC is owed money by a provider at the end of the fiscal year due to unrecovered provider overpayments, the ELC may invoice the Agency on the final (13th) invoice for the delinquent amount. • An ELC may request that the Agency report a delinquent account to the Department of Financial Services (DFS) for collection after the ELC has exercised due diligence September 14, 2009 April 18, 2007 Page 143 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) R ule T itle 3.12.6 3.12.6.1 Des c ription and is yet unsuccessful in collecting on the account. E ffec tive Date • The ELCs’ collection efforts should include approving a repayment schedule, offsetting a debt with state or federal funds due to the debtor, and issuing letters demanding repayment • If the Agency denies the ELC request, the Agency may deduct the amount the debtor owes from state or federal funds due to the ELC. Traceability US E C AS E S The following Use Cases are associated with the Closeout To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-05: Manage Slot Availability • UC-COM-06: Manage Reimbursements • UC-COM-07: Initiate Payment • UC-COM-09: Manage Receivable • UC-ELC-22: Execute Closeout • UC-GEN-01: Execute Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 144 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.12.6.2 • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System R E QUIR E ME NT S The requirements associated with the Closeout To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 145 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.13 BP-13 Collections 3.13.1 Process Overview When a questioned cost is discovered, it may be determined to be a recoverable item. Based on the type of recoverable item, the ELC may use one of a variety of methods to attempt to collect the recoverable cost. Should fraud be suspected, the ELC refers the case to the Department of Financial Services (DFS) who performs the investigation. All other action is stopped until the fraud referral is resolved. The following assumptions have been made for the Collections process: 1. The collection policy is standard across ELCs. 2. Unrecoverable, non-fraud costs may be referred to the Department of Financial Services (DFS) collections. 3. In the case of collections of funding, the collection may be escalated to the state attorney of jurisdiction based on where the fraud occurred. 3.13.1.1 A C T OR S • ELC Finance Specialist • Debtor • Department of Financial Services • Agency 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 146 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.13.2 Collections Process Flow Diagram The Collections process is depicted in the figure below. To-Be Collections AWI Delinquent Account Policy Demand Letters Not Suspected Fraud Costs Initiate Recovery Delinquent Recovery Details Payment Request Request Repayment of Delinquent Account A2 Questioned Cost ELIS Questioned Cost Determination Resolved Recovery Recovery Resolution A3 A4 ELIS ELIS A1 Non-Delinquent Recovery Details ELIS Suspected Fraud Referral Suspected Fraud Costs Referral to DFS A5 Fraud Referral Database Figure 57. Collections Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 147 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.13.3 Collections Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 68. Collections – Questioned Cost Determination P roc es s To-Be Collections T riggers Discovery of Questioned Cost P roc es s S tep A1 – Questioned Cost Determination A c tivities 1. The ELC Finance Specialist becomes aware certain costs by the VPK/SR provider, parents or guardian that require further investigation. 2. The ELC Finance Specialist stores the details regarding the questioned cost and the action taken, referencing the guardian or SR/VPK provider. Notes Note 1: Questioned costs may occur, or be discovered, for a number of reasons: – Disallowed payment (attendance adjustments) – Improper payment occurred – Improper benefit received – Overpayment – Reconciliation of VPK advance payment (results in deficiency at the end of the fiscal year) – Unexpected funds remaining at the end of the fiscal year – Suspected fraud – Attorney General audit – OEL audit – County differentials Note 2: In the event a VPK provider ceases doing business, the ELC will attempt to recover provider advance payments the provider received. Outputs 1. Recoverable Item 2. Suspected Fraud 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 148 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 69. Collections – Initiate Recovery P roc es s To-Be Collections T riggers Instruction to Recover Questioned Cost P roc es s S tep A2 – Initiate Recovery A c tivities 1. The ELC’s Finance Specialist initiates the recovery of the cost when the questioned cost is determined to be a recoverable item (not including cases of fraud), and determines the method of recovery. 2. The ELC’s Finance Specialist records the details about the recoverable item for tracking purposes. Notes Note 1: The ELC may perform one or more of the following methods for recovery: Outputs • Request Repayment in Full – The ELC’s Finance Director will request a full repayment of funds immediately, providing the cost and reason for requesting the repayment. • Establishing a Repayment Schedule – The ELC’s Finance Director will work with the debtor to establish a repayment schedule, paying the debt in partial payments over a period of time. • Create an Offsetting Payment (SR/VPK provider only) – The ELC’s Finance Director will create an offsetting payment from funds from other programs paid to the SR/VPK provider, or may offset the funds provided to the SR/VPK provider for the next payment year. • Create an Offsetting Payment Vendors/Sub-recipients – The ELC’s Finance Director will create an offsetting payment from funds from other programs paid to the vendors/sub-recipients, or may offset the funds provided to the vendors/sub-recipients for the next payment year. • Attendance Adjustment (SR/VPK provider only) – The ELC’s Reimbursement Manager determines an attendance adjustment will recover the cost (see Attendance Adjustment process). 1. Recovery Details and Action 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 149 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 70. Collections- Request Repayment of Delinquent Account P roc es s To-Be Collections T riggers Receive Recovery Details P roc es s S tep A3 – Request Repayment of Delinquent Account A c tivities 1. The ELC Finance Specialist generates the first Demand Letter and sends the letter through certified mail. 2. If the account remains delinquent, the ELC Finance Specialist generates a second (and final) Demand Letter and sends the letter through certified mail. Notes Note 1: The text of the Demand Letters is standard from the Agency/OEL, but the ELC customizes portions of the text. Note 2: The first Demand Letter informs the debtor for repayment. The letter must be issued within 10 calendar days after the account has become delinquent. This demand letter includes: – Amount of debt owed – Reason for delinquency – Demand for repayment of full amount within 30 calendar days after issuance of the letter – Debtor’s rights to dispute (which must be received in writing within 30 calendar days after issuance of the letter) – Description of the ELC’s collection efforts used if the account remains delinquent Note 3: The second Demand Letter informs the debtor repayment is required within 10 days. This demand letter includes: – Amount of debt owed – Reason for delinquency – Demand for repayment of full amount within 10 calendar days after issuance of the second letter – Debtor’s rights to dispute (which must be received in writing within 10 calendar days after issuance of the letter) – Description of the ELC’s collection efforts used if the account remains delinquent – Notice the debtor may not receive further state or federal funds until the delinquent account is paid in full – Notice Agency may initiate collection of the funds through DFS. Outputs 1. Payment Request 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 150 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 71. Collections- Resolved Recovery P roc es s To-Be Collections T riggers Recovered Cost, Other Resolution P roc es s S tep A4 – Recovery Resolution A c tivities 1. If payment is made, the ELC Finance Specialist updates the account based on the funds received. The account moves back into “good standing” once the debt is being paid successfully or has been paid in full. 2. At the time payment is received by the ELC, the ELC Finance Specialist deposits the funds into the appropriate account. 3. If the debt is from a SR/VPK provider, and remains delinquent after attempts have been made by the ELC to collect the repayment, the ELC Specialist may refer the delinquent account to the Agency. A. Agency staff will review the delinquent account information and may refer the account to DFS for collection. Note: The Agency may also deny the ELC’s request to have DFS recover the delinquent account. B. If the request to the Agency is denied, the ELC Finance Specialist makes the appropriate entries into their financial records to account for and clarify the discrepancy. 4. The ELC Finance Specialist stores the documentation used in the collections process for reference. Notes Note 1: If a payment schedule is set up, the debtor must repay the funds according to the terms of the payment schedule. The partial payments follow the same process outlined in A2 (above). Recovery is not resolved until all payments are received Note 2: Could go to DFS collections if unable to collect (non fraud) Outputs 1. Resolved Recovery 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 151 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 72. Collections- Suspected Fraud Referral P roc es s To-Be Collections T riggers Reason is Suspected Fraud P roc es s S tep A5 – Suspected Fraud Referral A c tivities 1. In cases of suspected fraud of a questioned cost, the ELC Finance Specialist will enter the referral to the referral database. 2. Suspected fraud referral data is sent to DFS in the form of the Suspected Fraud Referral document. 3. DFS will send updated data on the status of suspected fraud referrals from initial referral to resolution and closure or collections. Notes Note 1: DFS as of January 1, 2011, OEL and AWI Inspector General’s Office will receive notification a suspected fraud case has been initiated by the ELC. Note 2: No other action is taken until the fraud referral is resolved. Note 3: Could go to DFS collections if unable to collect (non fraud). Note 4: The suspected fraud referrals are sent via an interface. This interface will also receive the State Attorney’s action and related data, if available from DFS. Outputs 1. Fraud Referral to Referral Database 2. Updated Status of Suspected Fraud Referrals 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 152 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.13.4 Collections Detailed Workflows The following workflow diagrams show the details of the Collections process including actors and activities. ELC Finance Specialist Link from Suspected Fraud Referral (A-5) Questioned Cost Records the Details Regarding the Question Cost and Action Taken Fraud Suspected? Yes No Initiates Recovery of Cost and Method of Recovery Records the Details of Recovery Item Request Repayment of Delinquent Account/Resolved Recovery (A-3/A-4) Link to Suspected Fraud Process (A-5) Figure 58. Questioned Cost, Initiate Recovery (A1, A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 153 HP Enterprise Services Debtor ELC Finance Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Generates Demand Letter Link from Questioned Cost/ Initiate Recovery (A-1/A-2) Account Remains Delinquent? Payment Received Yes Receive Demand Letter Updates Account and Deposits Funds No Recovery Resolved Makes Referral to AWI to Recover Delinquent Account Generate Second Demand Letter Account Remains Delinquent? Stores Documentation for Reference Yes Receive Demand Letter No End Payment Made End AWI Reviews Referral for Delinquent Account Start Approves referral? Yes Makes Referral to DFS to recover Delinquent Account End DFS No Start End Figure 59. Request Repayment of Delinquent Account/ Resolved Recovery (A3, A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 154 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Discovery of Questioned Cost (A-1) Receives Updates on Suspected Fraud Referrals Suspected Fraud Referral is sent to DFS Open Suspected Fraud? No Link to (A-1/A-2) Yes Initiates Fraud Referral Process DFS ELC Finance Specialist Enters Suspected Fraud into ELIS Sends Periodic Updates to Suspected Fraud Referral End Figure 60. Suspected Fraud Referral (A5) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 155 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.13.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 73. Collection Business Rules R ule T itle S ummary E ffec tive Date AWI Fiscal Guidance 240.03 OEL-FG-0042-07 Collection of a Delinquent Account • An ELC may request that the Agency report a delinquent account to the Department of Financial Services (DFS) for collection after the ELC has exercised due diligence and is yet unsuccessful in collecting on the account. April 18, 2007 • The ELCs collection efforts should include approving a repayment schedule, offsetting a debt with state or federal funds due to the debtor, and issuing letters demanding repayment. • If the Agency denies the ELC request, the Agency may deduct the amount the debtor owes from state or federal funds due to the ELC. AWI Fiscal Guidance 240.01 OEL-FG-0042-07 (45 CFR§74.22) Cash Management Procedures Advises ELCs and other sub recipients that receive early learning funding from the Agency on procedures governing changes to: • Electronic funds transfers • Advanced payments September 22, 2008 • Final and supplemental invoices Interest earned on payments through ELC grant agreements and statewide contracts 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 • Audit disallowances • Current and prior year refunds Page 156 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) R ule T itle S ummary FAC-69I-21.003 Procedure for Processing Delinquent A/R Regulated referral to DFS for collection on a delinquent account within 6 months for collections. ELC Annual Plans 3.13.6 3.13.6.1 Collection policies of the ELCs are contained within the Annual Plans E ffec tive Date July 1, 2010 Traceability US E C AS E S The following Use Cases are associated with the Collections To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): 3.13.6.2 • UC-COM-07: Initiate Payment • UC-COM-08: Process Payment • UC-COM-09: Manage Receivable • UC-GEN-01: Execute Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System R E QUIR E ME NT S The requirements associated with the Collections To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 157 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.14 BP-14 Slot Management 3.14.1 Process Overview Slot Management is the Business Process of the ELC managing the expenditure of dollars to maximize children served. This process is executed on an on-going basis and may result in the development and execution of a number of slot management strategies aimed at maximizing slot utilization. Overall slot management strategy is set by the ELC’s Board of Directors and is documented in the ELC’s plan. The following assumptions have been made for the Slot Management process: 1. The ELC slot management strategies and enrollment strategies, driven by service priorities, are included in the ELC plan submitted to OEL. 3.14.1.1 A C T OR S • ELC Finance Director • ELC Executive Director • ELC Board of Directors 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 158 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.14.2 Slot Management Process Flow Diagram The To-Be Slot Management process is depicted in the figure below. Figure 61. Slot Management Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 159 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.14.3 Slot Management Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 74. Slot Management – Analyze Slot Usage and Develop Slot Strategy P roc es s Slot Management T riggers Periodic Review of Slot Usage P roc es s S tep A1 – Analyze Slot Usage and Develop Slot Strategy A c tivities 1. The ELC Finance Director periodically (daily, weekly, monthly, and so forth) reviews funding reports (expenditures, current budget, utilization and seasonal variance), enrollment data (see Enrollment Process), eligibility, wait list and termination data. 2. The ELC Finance Director and ELC Executive Director review the analysis and develop slot management strategies and recommendations which could include: • Increased/decreased enrollments • Replacement enrollments • Stop placements • Limited enrollment strategies • Movement of children among billing groups • Parent fee increases/decreases • Provider rate reductions/increases • Accelerated redeterminations • Disenrollment Notes None Outputs 1. Slot Management Strategy 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 160 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 75. Slot Management – Implement Slot Strategy P roc es s Slot Management T riggers Developed Slot Management Strategy P roc es s S tep A2 – Implement Slot Strategy A c tivities 1. The ELC Executive Director informs the ELC Board of the strategy options to be implemented. 2. In the event the analysis supports a strategy which may be viewed as negative (for example, increasing parent fees, disenrollment, and so forth); the ELC Board may take action to attempt to mitigate the slot usage issues. 3. Any change in enrollment priorities, parent fees, provider rates, or disenrollment is submitted to the OEL as a plan amendment. 4. The ELC Executive Director implements the selected strategy. Notes Note 1: In the case of disenrollment, additional reviews may be conducted by the ELC Board and/or OEL. The ELC Board may seek additional funding from the community prior to disenrollment. Note 2: The strategy implemented may result in updating the Wait List. Note 3. VPK is an entitlement program. If any forecasts reflect a deficit in a coalition’s VPK budget, the coalition should continue enrolling children into VPK as the state will assure the coalition (and providers) are paid for these services. If a VPK deficit happens a coalition should request a re-obligation or de-obligation of funds from OEL. Outputs 1. Revised Enrollment Practices 2. Analysis Report 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 161 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.14.4 Slot Management Detailed Workflows The following workflow diagrams show the details of the Slot Management process including actors and activities. Review Plan Admendment AWI/OEL Provide Feedback? No Provides Letter of Amended Plan End Yes Provide Feedback on Plan Amendment Approve Selected Strategy? No Provide Mitigation Strategies Yes Provides ELC Plan Amendment Yes Executive Director Finance Director ELC Board of Directors Reviews Selected Strategy Review the Analysis of Data Develop Slot Management Strategies and Recommendations Selects and Presents Strategy to be Implemented Amendment Required? No Implements Selected Strategy End Start Reviews Funding, Enrollment, and Termination Data Review the Analysis of Data Develop Slot Management Strategies and Recommendations End Figure 62. Analyze Slot Usage, Develop and Implement Slot Strategy (A1/A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 162 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.14.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 76. Slot Management Business Rules R ule T itle Des c ription E ffec tive Date Florida Statutes Section 411.01 (5)(d)(4)(d) and (6) School Readiness Act The establishment of priorities for the ELC’s county or multicounty region in accordance with the program eligibility priorities. March 26, 2010 Florida Statutes Section 1002.53 VPK education program eligibility and enrollment N/A March 26, 2010 F.A.C. 60BB-4 Office of Early Learning Regulations for administering the SR Program March 4, 2007 F.A.C. 60BB-8 Voluntary Prekindergarten Regulations for administering the VPK Education Program December 21, 2010 Early Learning Coalition Plan N/A The plan submitted by an ELC to the OEL describing: Reviewed Bi-Annually • ELC Policies and Procedures • Service Priority Policies • Enrollment Policies • ELC Governance • Program Elements N/A 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Community Plan N/A Page 163 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.14.6 3.14.6.1 Traceability US E C AS E S The following Use Cases are associated with the Slot Management To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): 3.14.6.2 • UC-COM-05: Manage Slot Availability • UC-ELC-05: Complete SR Enrollment • UC-ELC-06: Complete VPK Enrollment • UC-ELC-07: Manage Waitlist • UC-ELC-11: Submit Request for Guardianship Transfer • UC-ELC-12: Manage Request for Guardianship Transfer • UC-ELC-18: Manage SR/VPK Instructor Information • UC-ELC-19: Manage SR/VPK Attendance Processing • UC-ELC-22: Execute Closeout • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-09: Execute User Login • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System R E QUIR E ME NT S The requirements associated with the Slot Management To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 164 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.15 BP-15 Develop Policy and Manage Programs 3.15.1 Process Overview The Agency/OEL develops or updates policies and procedures when statutes change, customer needs change, or when program performance results or outcomes indicate a need for changes. Program performance results and outcomes and customer feedback are monitored on an ongoing basis to help gauge the need for policy or procedure development or change. Changes are communicated to customers and training and technical assistance are provided as needed. The following assumptions have been made about the Develop Policy and Manage Programs Business process: 1. Generic rolls are used in place of specific organizational names or titles. 2. Customers may provide a feedback/survey at anytime, outside of this Business Process. 3.15.1.1 A C T OR S • OEL Programs and Policy Specialist • OEL Programs and Policy Manager • Director of the OEL • Customers include, but are not limited to: • Agency/OEL Staff • ELC Staff • Parents/Guardians • Providers • Teachers • Other State Agencies • Community Agencies • Community Business Partners 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 165 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.15.2 Develop Policy and Manage Programs Process Flow Diagram The Develop Policy and Manage Programs process is depicted in the figure below. Develop Policy and Manage Programs OEL Administrative Rules Statutes Federal Regulations Early Learning Best Practices CCR&R Program Requirements (2009) Customer Needs Statutes Develop/Update Program Policies and Best Practices Program Performance A1 Policies, Procedures Forms Best Practices ELIS OEL Administrative Rules Statutes Federal Regulations Early Learning Best Practices CCR&R Program Requirements (2009) Customer Feedback Surveys Complaint Records Technical Assistance A2 Collect and Analyze Programmatic Data and Customer Feedback A3 ELIS Email Website CCR&R Call Center Email Website CCR&R Call Center Manage Programs Training Updated Programs and Policies Reports Figure 63. Develop Policy and Manage Programs Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 166 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.15.3 Develop Policy and Manage Programs Detailed Process Narrative The following process narrative describes the work activities and other associated process notes for each process step in the process flow diagram above. Table 77. Develop Policy and Manage Programs – Develop Program Policies and Best Practices P roc es s Develop Policy and Manage Programs T riggers Statutory Change; Program/Performance Improvement Needs, Customer Needs P roc es s S tep A1 – Develop Program Policies and Best Practices A c tivities 1. The Programs and Policy Manager analyzes the need for policy or procedural changes based on statutory changes, program/performance improvement needs and feedback from customers. In addition, the need for policy guidance memos or responses to policy questions may be included. 2. The Programs and Policy Manager drafts the proposed policy, procedure, guidance, or best practice and routes it to the Director of the OEL for approval. 3. The Director of the OEL reviews and approves, denies, or returns the proposed policy, procedure, forms, guidance, or best practice for revision. Notes Note 1: The governance process involves stakeholders in the development and implementation of policies and procedures. Guidance and input may be solicited from the Director of the OEL, other Agency/OEL leadership, the Policy/Data Quality Unit, the CCR&R Network Unit, ELC staff and leadership, the Child Care Executive Partnership (CCEP) Board of Directors, and other appropriate stakeholders. Note 2: Customers include, but are not limited to: – Agency/OEL staff – ELC staff – Parents/guardians – Providers – Teachers – Other State agencies – Community agencies – Community business partners Note 3: As appropriate, the CCEP Board of Directors review and approve draft policies, procedures, and best practices. Note 4: Input is also received from but not limited to OEL Questions, the VPK Inquiry box, and regularly occurring monitoring findings. Outputs Policies, Procedures, Forms, Guidance or Best Practices 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 167 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 78. Develop Policy and Manage Programs – Manage Programs P roc es s Develop Policy and Manage Programs T riggers New Policies, procedures, and best practices P roc es s S tep A2 – Manage Programs A c tivities 1. The Programs and Policy Specialist disseminates policy, procedure, and other early learning programmatic information to internal and external customers via the website, conference calls, web meetings, the telephone, mail, and email, making referrals to other agencies and resources as appropriate. 2. The Programs and Policy Specialist provides programmatic guidance, training, and technical assistance to customers as needed. Notes Note 1: CCR&R Call Center staff is also referred to as Program and Policy Specialists. Note 2: Information provided by Programs and Policy Specialists may include, but is not limited to: – Provider referral information – ELC information, governance, business and fiscal practices – Community resource information – Programmatic information (e.g., VPK, SR, Inclusion, CCR&R, and CCEP) – Other quality childcare and early learning information (for example, Head Start, Early Start, Kid Care) Note 3: Programs managed include: CCR&R, Inclusion, SR, VPK, and CCEP. Outputs 1. 2. 3. 4. Information Packets for Parents, Providers, and Others Telephone Logs of Incoming Calls and Information/Referrals Completed Referrals to Other Agencies or to ELCs Training or Technical Assistance Pertaining to Policies, Procedures, and Best Practices 5. CCEP Marketing Materials to Prospective Business Partners 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 168 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 79. Develop Policy and Manage Programs – Collect and Analyze Programmatic Data and Customer Feedback P roc es s Develop Policy and Manage Programs T riggers Information, Training, or Technical Assistance Provided P roc es s S tep A3 – Collect and Analyze Programmatic Data and Customer Feedback A c tivities 1. Customers complete feedback surveys or file a complaint with the Programs and Policy Office. 2. The Programs and Policy Specialist records customer feedback and complaint information. 3. The Programs and Policy Specialist reviews customer survey and complaint records and refers actionable issues to the appropriate parties for resolution. 4. The Programs and Policy Manager reviews cumulative customer feedback, complaint information, and programmatic performance data and uses this to inform policy, procedure, and programmatic changes. Notes None Outputs 1. Customer Feedback Results (individual and aggregate) 2. Updated Policies and Procedures 3. Programmatic Changes 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 169 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.15.4 Develop Policy and Manage Programs Detailed Workflows Review need for Policy or Proceedure Director of OEL Identified need for Policy or Procedure Customers Programs & Policy Specialist AWI/OEL Programs and Policy Manager The following workflow diagram shows the details of the Develop Policy and Manage Programs process including actors and activities Draft Proposed Policy of Procedure Draft Policy Reviews Cumulative Feedback and Data Revisions needed Approve? End No End Yes Disseminate Policy or Proceedure Provide Technical Assistance and/or Training Actionable Item? Record and Review Feedback Yes Refer Actionable Item End No End Policy Recieved Receive Technical Assistance and/or Training Actionable item is referred to external or internal parties for resolution Provide Customer Feedback/Survey End Figure 64. Develop Program Policies and Best Practices/Manage Programs/Collect and Analyze Programmatic Data and Customer Feedback Process (A1/A2/A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 170 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.15.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 80. Develop Policy and Manage Programs Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Parts 74, 92, 98 and 99 Child Care Development Fund N/A 2002 Florida State Statute Section 411.0101 Child Care and Early Childhood Resource and Referral Provides Statutory authority regarding establishment of statewide CCR&R responsibilities and services March 26,2010 Florida Statutes Section 215.97 Florida Single Audit Act Establish uniform state audit requirements for state financial assistance provided by state agencies to nonstate entities to carry out state projects. Florida Administrative Code Chapter 60 BB 9.300 Child Care Resource and Referral Establishes the statewide responsibilities and CCRR Services, which include: • Early learning referrals • Consumer education resources • Information regarding community resources August 10, 2009 Office of Management and Budget (OMB) Circulars A-87, A-110, A-122, A-133 N/A N/A N/A Temporary Assistance for Needy Families, 42 USC § 601 et seq. N/A N/A N/A 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 171 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.15.6 3.15.6.1 Traceability US E C AS E S The following Use Cases are associated with the Develop Policy and Program Management To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): 3.15.6.2 • UC-COM-14: Provide Technical Assistance • UC-OEL-01: Manage Policy Development • UC-OEL-02: Manage CCDF Plan • UC-ELC-13: Initiate Child Developmental Assessment • UC-ELC-14: Complete Child Developmental Assessment • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System R E QUIR E ME NT S The requirements associated with the Development Policy and Manage Programs To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 172 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.16 BP-16 Process ELC Invoice 3.16.1 Process Overview On a periodic basis, the ELCs request a reimbursement, or advance, of funds through a request to the OEL. The request may contain direct service expenditures (including VPK provider advance payments), non-direct service expenditures, administrative costs, and advance or provider advance payment requests. The invoice is reviewed at the OEL and the Agency. Once approved, the payment request is submitted by the Agency to the Department of Financial Services (DFS) for payment to the ELC. The following assumptions have been made for the Process ELC Invoice process: 1. OEL, the ELCs, and the SR and VPK providers agree on a schedule for period closeout. 2. Authorized ELC staff does not need to physically sign the invoice to OEL. 3. This to-be process is related to the ELC To-Be Closeout process. 3.16.1.1 A C T OR S • ELC Finance Director • ELC Staff • Agency Reimbursement Specialist • Agency Reimbursement Manager • Agency Finance and Accounting Disbursement Unit • Agency Finance and Accounting Revenue Unit • Agency Grants Manager • DFS • Provider 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 173 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.16.2 Process ELC Invoice Process Flow Diagram The To-Be Process ELC Invoice process is depicted in the figure below. To-Be Process ELC Invoice Figure 65. Process ELC Invoice Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 174 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.16.3 Process ELC Invoice Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 81. Process ELC Invoice – Develop Schedule for Closeout P roc es s To-Be Process ELC Invoice T riggers Required Periodic Closeout P roc es s S tep A0 – Develop Schedule for Closeout A c tivities 1. Agency staff works with the ELC to develop the schedule for closeout based on the Agency Closeout Submission policy. The schedule is user-defined – to be set to a monthly closeout schedule. 2. Agency staff provides the closeout schedule to the ELC. Notes Note 1: This is the same step as the A0 step in the ELC To-Be Closeout Process. Note 2: Prior year refund must be sent separately with a check Note 3: Match must be done by the 20th of the month (per current grant agreement) Note 4: Currently, (per current grant agreement) the invoice is due no later than the 25th Outputs 1. Developed Closeout Schedule Table 82. Process ELC Invoice – Receive ELC Invoice Process To-Be Process ELC Invoice Triggers Developed Closeout Schedule Process Step A1 – Receive ELC Invoice Activities 1. Using Agency guidelines and instructions, the ELC Finance Director creates and submits the ELC invoice to the Agency. 2. The Agency Reimbursement Specialist receives the ELC invoice. Notes Note 1: The ELC Invoice shall contain: • Direct service expenditures • Administrative expenditures • Quality expenditures • Non-direct and other allowable expenditures • Prior Period Adjustments • Coalition Advance/VPK Provider Advance requests Note 2: The ELC Invoice contains expenditures) for VPK, SR, and Outreach Awareness and Monitoring (OAM). Note 3: The following can be submitted separately: • Direct and non-direct costs • Match 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 175 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) • Outputs Advance – VPK Provider Advance – Coalition Advance 1. Submitted ELC Invoice Table 83. Process ELC Invoice – Review ELC Invoice P roc es s To-Be Process ELC Invoice T riggers Submitted ELC Invoice P roc es s S tep A2 – Review ELC Invoice A c tivities 1. Agency Reimbursement Specialist reviews the ELC invoice and identifies any discrepancies A. If discrepancies exist, the Agency Reimbursement Specialist communicates the issues with the ELC to determine the appropriate resolution. 2. Once correct the Agency Reimbursement Specialist routes the ELC invoice to the Agency Reimbursement Manager for approval. Notes Note 1: The ELC Invoice Review process involves comparing direct service expenditures reported on the invoice to supporting documentation, comparing year to date expenditures of the ELC by Other Cost Accumulators (OCA) with the OCA budget allocation, verifying the administrative service expenditures and non-direct service expenditures are accounted accurately, and review of the restricted revenues allocation (at that point in the year) to mitigate overspending or under spending. Note 2: If the ELC is out of OCA alignment, the ELC invoice cannot be processed until it has been reconciled. Note 3: If a county is out of OCA alignment, in a multi-county ELC, the ELC invoice may be processed, but the ELC must be contacted for resolution. Note 4: This process is iterative until the ELC Invoice has been reconciled. Outputs 1. Reviewed ELC Invoice 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 176 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 84. Process ELC Invoice – Approve ELC Invoice P roc es s To-Be Process ELC Invoice T riggers Reviewed ELC Invoice P roc es s S tep A3 – Approve ELC Invoice A c tivities 1. Financial Administration and Budget verifies the reviewed ELC invoice (sent by the Agency Reimbursement Manager). 2. If Financial Administration and Budget agrees with the figures from the reviewed ELC invoice, the following occurs: A. Approves the ELC invoice for payment. B. Routes the ELC invoice to a Finance and Accounting Disbursement Unit for further payment processing. 3. If Financial Administration and Budget does not agree with the figures from the reviewed ELC invoice or determines another correction is needed (for example, ELC change of address, missing organization code, etc.); the ELC invoice is routed, through the OEL, to the ELC Reimbursement Specialist for corrections. Notes Note 1: Following the approval of the ELC Invoice, the information contained on the ELC invoice is available to the other Agency/OEL business units. Outputs 1. Approved ELC Invoice Table 85. Process ELC Invoice – Initiate ELC Payment P roc es s To-Be Process ELC Invoice T riggers Approved ELC Invoice P roc es s S tep A4 – Initiate ELC Payment A c tivities 1. The Finance and Accounting Disbursement Unit initiates the entry of the ELC invoice information into Florida Accounting and Information Resource (FLAIR) to the appropriate grant and OCA. 2. The Finance and Accounting Revenue Unit initiates the federal payment drawdown (as necessary). This process is outside of ELIS 3 Based on the payment information in FLAIR, the Department of Financial Services (DFS) authorizes the payment (electronic payment or paper warrant) to the ELC. 4. The Grants Manager monitors payment (via the FLAIR interface with ELIS) and initiates the update of the payment information (based on confirmation the payment has been transmitted or mailed). Notes Note 1: See Process Cash Receipts to review how payments received are processed by the Agency (for example, fraud restitution payments, negative adjustments, etc.). Note 2: If the ELC does not receive payment (for example, a lost warrant), payment is reissued per DFS policy. Note 3: The Finance Specialist who enters information into FLAIR cannot be the same person who initiates the federal drawdown. Outputs 1. Initiated ELC Payment 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 177 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.16.4 Process ELC Invoice Detailed Workflows Develops the schedule for closeout Provides schedule to the ELC Periodic Monthly Schedule ELC AWI Staff The following workflow diagrams show the details of the Process ELC Invoice process including actors and activities. Schedule Developed Closeout Schedule Review Closeout Figure 66. Develop Schedule for Closeout (A0) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 178 HP Enterprise Services Creates ELC Invoice Responds with resolutions to any Discrepancies Submits ELC Invoice Reimbursement Specialist Start Reviews ELC Invoice ELC Invoice Discrepancies Identified Yes Communicates Discrepancies to ELC for Resolution Receives End Sends Updated ELC Invoice for Approval End No Reimbursement Manager AWI ELC Finance Director Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Receives ELC Invoice Link to Approve ELC Invoice A-3 Figure 67. Receive and Review ELC Invoice (A1, A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 179 HP Enterprise Services Link from Review ELC Invoice A-2 Sends Reviewed Invoice to the Grants Manager Grants Manager AWI Reimbursement Specialist Reimbursement Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Makes Updates or Corrections Verifies Reviewed ELC Invoice Agrees with Figures in ELC Invoice? No ELC Invoice is Routed for Corrections ELC or Reimbursement Specialist? Yes ELC Approves ELC Invoice for Payment Sent to ELC OEL Reimb Spec Routes corrected ELC Invoice to Grants Manager Routed to Reimbursement Specialist Link to Initiate ELC Payment Makes Updates or Corrections ELC Finance and Accounting Disbursement Unit End ELC Invoice to be Corrected End Figure 68. Approve ELC Invoice (A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 180 HP Enterprise Services Receives ELC Invoice Receives Paper Warrant or EFT receipt Entry of the ELC Invoice into FLAIR Link from Approve ELC Invoice (A-3) Initiates the Federal Draw Down (as necessary) Mails paper warrant or EFT receipt to ELCs DFS End End Grants Manager Finance and Accounting Revenue Unit AWI Finance and Accounting Disbursement Unit Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Confirmation of Payment Based on Information in FLAIR Authorizes Payment Issues EFT to ELCc or Paper Warrant to OEL Monitors FLAIR and Updates Payment information End Confirms Payment has been Made End ELC EFT Start ELC Payment Electronic or Paper End Figure 69. Initiate Payment (A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 181 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.16.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 86. Process ELC Invoice Business Rules R ule T itle Des c ription E ffec tive Date The ELC is required to submit invoices per the terms and conditions of the grant agreement N/A N/A July 1, 2010 ELC monthly reimbursement invoices are due at OEL by the 25th of each month (at the time of this writing) N/A N/A July1, 2010 60BB- 8.205 Advance Payment and Reconciliation for the Voluntary Prekindergarten Education Program N/A September 14, 2009 3.16.6 3.16.6.1 Traceability US E CAS E S The following Use Cases are associated with the Process ELC Invoice To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-06: Manage Reimbursements • UC-COM-07: Initiate Payment • UC-COM-08: Process Payment • UC-COM-09: Manage Receivable • UC-GEN-01: Execute Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 182 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.16.6.2 • UC-GEN-11: Maintain Notes • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System R E QUIR E ME NT S The requirements associated with the Prior Process ELC Invoice To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 183 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.17 BP-17 Monitor and Reconcile ELC Grant Utilization 3.17.1 Process Overview The OEL periodically and routinely reviews ELC spending to monitor the utilization of their allocated grant funds. Direct service expenditures, captured in ELIS and reported to OEL through the ELC Invoice Reimbursement process, are reconciled with the Florida Accounting and Information Resource (FLAIR) record of the ELC’s expenditures to ensure the accuracy of the expenditure data and the appropriate use of allocated funds. Audits of non-direct and quality expenditures are periodically conducted to ensure the accurate and appropriate use of administrative and other non-direct funds. The OEL works with the ELCs and other stakeholders to make recommendations on current and future utilization of grant funds, resolve discrepancies, and follow up to provide assistance and ensure grant utilization is compliant and sustainable through the end of the current fiscal year. The following assumptions have been made for the Monitor and Reconcile ELC Grant Utilization process: 1. OEL, the ELCs, and the SR and VPK providers agree on a schedule for period closeout (See BP-12 Closeout). 2. ELCs have the authority to transfer funds across their OCA allocations within the terms and conditions of their grant agreement and notice of grant award as long as the net transfers do not exceed the total amount of the grant award. 3.17.1.1 A C T OR S • OEL Financial Administration and Budget Services Unit • OEL Financial Administration Analyst(within Financial Administration and Budget) • ELC/RCMA • Department of Financial Services (DFS) Budget Services 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 184 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.17.2 Monitor and Reconcile ELC Grant Utilization Process Flow Diagram The process is depicted in the figure below. To-Be Monitor and Reconcile ELC Grant Utilization Figure 70. Monitor and Reconcile ELC Grant Utilization Process Flow 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 185 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.17.3 Monitor and Reconcile ELC Grant Utilization Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 87. Create ELC Annual Spending Plan P roc es s To-Be Monitor and Reconcile ELC Grant Utilization T riggers Annual Budgeting Cycle – Notice of Grant Award P roc es s S tep A0 – Create ELC Annual Spending Plan A c tivities 1. The Finance and Accounting Analyst receives notification that the ELC has created their annual ELC Spending Plan in ELIS. 2. The Finance and Accounting Analyst reviews the ELC Spending Plan and based on utilization trend reports and the terms and conditions of the Grant Agreement and the Notice of Grant Award, reviews the ELC Spending Plan. The Finance and Accounting Analyst may follow up with the ELC to discuss any concerns with the Spending Plan. 3. If concerns remain unresolved, the Finance and Accounting Analyst may involve the Finance and Accounting Manager. The Finance and Accounting Manager may follow-up with the ELC to assist in the resolution of the concern. Notes None Outputs 1. ELC Annual Spending Plan 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 186 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 88. Monitor and Reconcile – Review Expenditures P roc es s To-Be Monitor and Reconcile ELC Grant Utilization T riggers Notification of Updates to an ELC Spending Plan, Periodic Review of ELC Grant Utilization, ELC Requests for Grant Reallocation, or Revised ELC Notice of Grant Award. P roc es s S tep A1 – Review Expenditures – Page 1 A c tivities 1. The Finance Administration and Budget unit reconciles the direct and nondirect services expenditures with the ELC payments in FLAIR. A. Refer any discrepancies to: i. Budget Services (OEL) if the issue is with FLAIR. ii. If an OCA realignment or an invoice is needed to correct the discrepancy, then it is coordinated with the OEL Financial Administration Analyst who escalates it back to the ELC for resolution. iii. The period closeout data is posted in ELIS and made available to the Agency/OEL and the ELCs. 2. The OEL Financial Administration Analyst reviews ELC expenditures periodically and on an ongoing basis, and in addition receives notifications that review and reconciliation of an ELC budget is necessary. Note: Notifications may be any of the following, but are not limited to: • A request for approval of an ELC grant reallocation or notification of an updated spend plan due to an OCA realignment. • Notification of an updated Notice of Grant Award. • Submission of an ELC invoice as part of the monthly Reimburse ELC Invoice process. • Notification of a periodic review based on the terms and conditions of the grant agreement. • Payment adjustment request against submitted and/or posted expenditures. 3. The OEL Financial Administration Analyst reviews the ELC grant utilization in ELIS to ensure that ELC spending is in accordance with the ELC’s approved budget and the terms and conditions of the ELC Notice of Grant Award. 4. The OEL Financial Administration Analyst reviews the year-to-date balance of ELC expenditures against each Other Cost Accumulator (OCA) budget allocation to: A. Ensure that ELCs will not over spend or under spend, as appropriate within each of their OCA budget allocations. B. Monitor the utilization of targeted funds or the “burn” rate of ELC spending to ensure that ELCs are spending their OCA allocations as defined in the ELC Notice of Grant Award. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 187 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 89. Monitor and Reconcile – Review Expenditures P roc es s To-Be Monitor and Reconcile ELC Grant Utilization T riggers ELC Incurring Expenditures, ELC Reimbursement, Periodic Review of ELC Grant Utilization, ELC requests for Grant Reallocation, or Revised ELC Notice of Grant Award. P roc es s S tep A1 – Review Expenditures – Page 2 A c tivities 5. The OEL Financial Administration Analyst conducts desk reviews of the ELC expenditures periodically. A. The Finance and Accounting Analyst contacts the ELC and requests copies of the ELC General Ledger or other accounting documentation as needed. B. The OEL Financial Administration Analyst pulls a random sample of submitted ELC expenditures. C. The OEL Financial Administration Analyst requests supporting documentation for the selected ELC expenditures. D. The OEL Financial Administration Analyst reconciles the ELC invoice sample and supporting documentation with the ELC General Ledger. If discrepancies exist then it is escalated to the ELC for resolution. 6. The OEL Financial Administration Analyst identifies those ELCs that have utilization issues with either their current month’s balance or their year-todate utilization. Notes None Outputs 1. Completed ELC Utilization Review 2. Management Reports on Utilization 3. Completed Desk Review of Non-Direct Service Expenditures Table 90. Monitor and Reconcile – Communicate Utilization and Other Issues P roc es s To-Be Monitor and Reconcile ELC Grant Utilization T riggers Completed Review of ELC Grant Utilization Documentation P roc es s S tep A2 – Communicate Utilization and Other Issues A c tivities 1. The Finance and Accounting Analyst contacts their ELC point of contact to make them aware of utilization issues, question a cost, request supporting documentation to approve, make changes or adjustments to expenditures, and/or request a waiver and corrective action plan and/or supporting documentation when utilization appears or may be out of compliance with the terms and conditions of the ELC grant agreement. This response may be in the form of an email, telephone call, or letter to the ELC. Notes Note 1: For CCEP, the Finance and Accounting Analyst submits a quarterly report to the CCEP Board for review. Outputs 1. Notification of Utilization and Other Issues 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 188 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 91. Monitor and Reconcile – Resolve Utilization and Other Issues (Part 1) P roc es s To-Be Monitor and Reconcile ELC Grant Utilization T riggers Notice of Findings P roc es s S tep A3 – Resolve Utilization and Other Issues – Page 1 A c tivities 1. The OEL Financial Administration Analyst reviews all information, requests, and supporting documentation submitted by the ELCs. 2. Based on the findings of the grants utilization and reconciliation review, the Finance and Accounting Analyst may take the following actions: • The OEL Financial Administration Analyst will contact the ELC if the targeted percentage of the ELC administrative cost utilization is out of proportion to the percentage of direct services utilization, to understand the additional administrative costs, and confirm the ELC is aware of the risk to the annualized budget and has a plan for managing the remaining funds. • The OEL Finance and Administration Unit (Budget Services), at end of year closeout, will adjust final invoice(s), if necessary, to ensure ELCs adhere to targeted funds and restrictions in the Notice of the Grant Award. • The OEL Finance and Administration Unit may recommend an adjustment if either the direct or non-direct service costs from ELIS do not match either the ELC supporting documentation and/or the FLAIR financial reports. The request for adjustment is routed to the Financial Manager for approval and then to the Financial Specialist for processing. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 189 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 92. Monitor and Reconcile – Resolve Utilization and Other Issues (Part 2) P roc es s To-Be Monitor and Reconcile ELC Grant Utilization T riggers Notice of Findings P roc es s S tep A3 – Resolve Utilization and Other Issues – Page 2 A c tivities (continued from previous page) 3. If the utilization of funds requires a grant re-obligation or de-obligation to cover expenditures and sustain funding for the remainder of the fiscal year, the ELC Board Chair must submit a request to OEL Director (Fiscal Policy 240.04), who routes to Financial Administration and Business Unit for analysis. A. The Financial Administration and Budget Services Manager reviews and routes the ELC requests for grant reallocation back to the OEL Director for approval. B. The OEL Director then routes the approved Re-obligation or Deobligation Plan to the Financial Administration and Budget Unit. Note: The CCEP Board reviews and approves recommendations for CCEP funds before changes in allocations can be made. C. The Financial Administration and Budget Unit de-obligates and reobligates grant funds based on the approved ELC reallocation requests and updates the impacted ELC Notice of Grant Awards. D. The Amended Notice of Grant Awards are posted and sent to the ELCs. E. The ELC point of contact ensures the ELC Spending Plan is updated, realigns the additional or remaining funds across the appropriate OCAs, and submits to the OEL Financial Administration Analyst. F. The Financial Administration and Budget Unit receives notification that the ELC Spending Plan has been updated in ELIS. 4. If, after desk review, the OEL Financial Administration and Budget Unit cannot resolve a utilization/expenditure issue, the issue may be referred to the Inspector General’s Office for final decision on any outstanding issue(s). Notes Outputs 1. AWI Grants Management performs reconciliation of the payments in FLAIR. 2. OEL Budget Services Concurrently reconciles information payment information at the OCA detail level. 1. 2. 3. 4. Resolved Utilization/Expenditure Issues Updated ELC Spending Plan Updated Notice of Grant Award Notification to Inspector General of Questioned Cost 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 190 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.17.4 Monitor and Reconcile ELC Grant Utilization Detailed Process Workflows Finance and Accounting Specialist Reviews the ELC Spending Plan Requires follow up with ELC? No Spending Plan Created End Yes Contact ELC Yes Resolved? No Early Learning Coalitions (ELC) End Refer to Finance and Accounting Manager Finance and Accounting Manager AWI The following workflow diagrams show the details of the Monitor and Reconcile ELC Grant Utilization process including actors and activities. Contacts ELCs Resolution End Provide Information End Provide Information End Start ELC creates their Annual Spending Plan End Figure 71. Create ELC Annual Spending Plan (A0) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 191 HP Enterprise Services Financial Administration Analyst Finance and Accounting Management Unit Notice to Review Reviews ELC Expenditures Reviews the ELC grant utilization in ELIS Reviews the Year-toDate Balance Against OCA Allocation Conduct Desk Review of ELC Expenditures Periodically Periodic Review Monthly Reconciliation Identifies ELCs with Utilization Issues Resolution Update Or Referral to Inspector General Early Learning Coalitions Office of Early Learning Agency for Workforce Innovation Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Figure 72. Review Expenditures (A1 Page 1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 192 HP Enterprise Services Early Learning Coalition (ELC) Financial Administration Analyst Office of Early Learning Agency for Workforce Innovation Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Pulls Random Sample of Submitted Expenditures Contacts ELC Periodic Desk Review Due Reviews the Invoice Sample and supporting Documentation Request Supporting Documentation Discrepancies Exist? No End Yes Escalate to ELC for Resolution Request for Accounting Documentation Provide General Ledger Accounting Documentation End Provide Supporting Documentation Request for Supporting Documentation End End Figure 73. Review Expenditures (A1 Page 2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 193 HP Enterprise Services Financial Administration Unit Financial Administration Analyst Early Learning Coalition (ELCs) Office of Early Learning Agency for Workforce Innovation Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Reviews Findings Determines and Executes Resolution Resolved? Yes No Disallow payment of the reimbursement request; Notify Inspector General’s Office Communicate Utilization and other Issues Utilization and other issues Reviews all ELC submitted information Submits additional information as requested End Send findings to Financial Administration Unit Utilization issue Requires Reobligation/Deobligation Yes ELC Submits Request End No Figure 74. Communicate and Resolve Utilization and Other Issues (A2/A3 Part 1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 194 HP Enterprise Services Reconciles expenditures with ELC payments in FLAIR Discrepancies? No Expenditures Reviewed Yes Is Issue with Flair? Refer to OEL Financial Administration Analyst No Post Close out data in ELIS End Yes OEL/AWI AWI Grants Management OEL Budget Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Refer to F&A Financial Administration Analyst End Escalate to ELC for Resolution AWI Finance and Admnistration Issue with Expenditure End Early Learning Coalition(ELC) Redlands Christian Migrant Association (RCMA) FLAIR Issue Monitor and Reconcile Expenditures Resolve Issue Issue with Expenditure End Figure 75. Resolve Utilization and Other Issues (A3 Part 2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 195 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.17.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 93. Resolve Utilization and Other Issues R ule T itle Des c ription E ffec tive Date Early Learning Coalition Grant Agreement N/A • The ELC is required to spend a minimum percentage of their allocated grant funds as defined in the terms and conditions of the grant agreement and Notice of Grant Award. July 1, 2010 • Recommendations for changes to CCEP grant funds must be approved by the CCEP Board. • Recommendations for changes to ELC Grant • Not all costs can be adjusted at the end of year. • Allocations must be approved by the OEL, under spending in quality is not allowed OEL Fiscal Policy 240.04 Notice of Award and OAMS Terms and Conditions CCDF Plan School Readiness Funds Management Notice of Award and OAMS Terms and Conditions Child Care Development Fund Plan 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Provides guidance for tracking of SR funds July 30, 2010 Provides allocations and terms for Agency-granted funding to the ELCs Annual (July 1) and amended when necessary during the year State Plan for use of Federal CCDF dollars, and meeting federal requirements. Every Two Years Page 196 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.17.6 Traceability 3.17.6.1 U S E C A S E S The following Use Cases are associated with the Monitor and Reconcile ELC Grant Utilization To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-GEN-01: Execute Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.17.6.2 R E QUIR E ME NT S The requirements associated with the Monitor and Reconcile ELC Grant Utilization ToBe Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 197 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.18 BP-18 Monitor Program and Instructor Eligibility 3.18.1 Process Overview OEL conducts an eligibility determination review for each ELC and Redlands Christian Migrant Association (RCMA) annually. The purpose of the review is to verify that ELC and RCMA have correctly determined child eligibility for SR, VPK, and Home Instructional Program for Preschool Youth (HIPPY) programs and for VPK instructor qualifications. An OEL/ELC team reviews ELIS data and may conduct an onsite review at the ELC and/or subcontractor. The findings of the review are included in a formal report and submitted to the ELC. If the ELC provides clarification of the findings listed in the report, the report is updated accordingly. The following Assumptions have been made for the Monitor Program and Instructor Quality process: 1. ELIS will track monitoring activities and findings. 2. Generic roles are used in place of specific organization names or job titles. 3. The Accountability Review staff has access to ELIS to obtain needed samples and case information. 4. The ELC can also use this process monitor sub-contractor performance. 3.18.1.1 A C T OR S • OEL Accountability Review Specialist • OEL Accountability Review Manager • ELC 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 198 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.18.2 Monitor Program Eligibility and Instructor Qualifications Process Flow Diagram The Monitor Program Eligibility and Instructor Qualifications process is depicted in the figure below. Figure 76. Monitor Program Eligibility and Instructor Qualifications Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 199 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.18.3 Monitor Program Eligibility and Instructor Qualifications Detailed Process Narrative The following process narrative describes the work activities and other associated process notes for each process step in the process flow diagram above. Table 94. Monitor Program Eligibility and Instructor Qualifications – Schedule ELC Accountability Review P roc es s Monitor Program Eligibility and Instructor Qualifications T riggers Annual ELC Accountability Review Due P roc es s S tep A1 – Schedule ELC Accountability Review A c tivities 1. The Accountability Review Manager develops annual monitoring plan and schedule for ELC Accountability Review and enters monitoring plan data in ELIS. 2. The Accountability Review manager assigns the Monitoring team (Note 1). 3. The Accountability Review Specialist contacts the ELC to schedule the annual ELC Accountability Review. 4. The Accountability Review Specialist confirms the dates and purpose of the ELC Accountability Review. The Accountability Review Specialist enters the confirmed date of the ELC Accountability Review in ELIS Notes Note 1: The Monitoring team consists of Accountability Review Specialist(s). Outputs 1. Scheduled Annual ELC Accountability Review. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 200 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 95. Monitor Program Eligibility and Instructor Qualifications – Review ELC Data P roc es s Monitor Program Eligibility and Instructor Qualifications T riggers Scheduled Annual ELC Accountability Review P roc es s S tep A2 – Review ELC Data A c tivities 1. The Accountability Review Specialist obtains random sample of data from ELIS for the specific ELC being reviewed, including: • SR child cases (at billing group level) • SR providers(Including Gold Seal) • VPK child cases • VPK provider qualifications • VPK instructor eligibility • Validate payment on child cases (SR/VPK) • Program monitoring – Governance, CCR&R, Contracts, and Educational Service District 2. Based on the random sample of data, the Accountability Review Specialist selects specific cases to review and accesses the information for the selected cases in ELIS. 3. The Accountability Review Specialist also reviews (but is not limited to): • ELC fee scale • ELC SR and VPK policies and procedures • ELC monitoring documentation • VPK provider lists • SR and VPK provider payments • Case notes • Data entry accuracy and completeness • Forms, notices and terms and conditions • Compliance with Florida State Statute and Rule • VPK contract dates • SR Contract Dates • ELC monitoring reports and findings • ELC policy and procedures • Coalition plans • Corrective action plans 4. Using the Federal Regulations, SR & VPK Standard Eligibility Review Program Guide, Florida Statutes, Florida Administrative Code, and OEL Policies, a representative sample of cases are reviewed by the Accountability Review Specialist using ELIS. Notes None Outputs 1. Sample of Cases 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 201 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 96. Monitor Program Eligibility and Instructor Qualifications – Review of Representative Cases P roc es s Monitor Program Eligibility and Instructor Qualifications T riggers Completion of Initial ELC Documentation Review P roc es s S tep A3 – Review of Representative Cases A c tivities 1. The Accountability Review Specialist(s) provides an overview and purpose of the review for the ELC. 2. The Accountability Review Specialist records the results found for each case in ELIS 3. The Accountability Review Specialist(s) provides their preliminary findings (Note 1) and observations including the need for and date of follow-up required by the ELC at the conclusion of the review. If a cost is questioned during the Accountability Review, it is noted in the preliminary findings for further inquiry and review. Notes Note 1: The findings can be accessed by the ELC in ELIS. Outputs 1. 2. OEL Eligibility Determination Findings Questioned Cost (if one is discovered) Table 97. Monitor Program Eligibility and Instructor Qualifications – Develop Accountability Review Reports P roc es s Monitor Program Eligibility and Instructor Qualifications T riggers Completion of Annual ELC Accountability Review P roc es s S tep A4 – Develop Accountability Review Reports A c tivities 1. The ELC provides feedback to the Accountability Review Specialist to clarify discrepancies found. 2. The Accountability Review Specialist develops the Annual ELC Eligibility Review Report and notifies the ELC of its availability (Note 1). 3. The ELC reviews and clarifies or refutes the contents of the report. As required, a Corrective Action Plan (CAP) may be developed. 4. Once an acceptable response is received from the ELC, the Accountability Review Specialist creates an Accountability Review Closeout report and notifies the ELC of its availability. 5. The Accountability Review Specialist validates implementation of the CAP at subsequent annual Accountability Review. Notes Note 1: Notifications are also sent to other internal and external stakeholders. Outputs 1. Published Annual ELC Eligibility Review Report 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 202 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 98. Monitor Program Eligibility and Instructor Qualifications- Initiate Questioned Cost Determination P roc es s Monitor Program Eligibility and Instructor Qualifications T riggers Questioned Cost Discovered P roc es s S tep A5 – Initiate Questioned Cost Determination A c tivities 1. The ELC determines the appropriate course of action with assistance from the Accountability Review Specialist(s) if instances of questioned cost are discovered during the review. • If the questioned cost is determined to be an instance of suspected fraud, the Annual ELC Eligibility Review Report is updated, and the ELC refers the incident to the Department of Financial Services (DFS) and notifies the AWI – Inspector General. • If the questioned cost is determined to be an acceptable cost, the Annual ELC Eligibility Review Report is updated to reflect the cost determination. • If the questioned cost is determined to be a disallowed cost, the Annual ELC Eligibility Review Report is updated to reflect the cost determination and the cost recovery process is initiated. 2. If, after reviewing, researching and working with the ELC regarding a questioned cost, the Finance and Accounting Analyst cannot resolve a utilization/expenditure issue, the Finance and Accounting Analyst notifies the Inspector General’s Office and follows the Agency’s process to disallow payment of the reimbursement request Notes None Outputs 1. Questioned Cost Determination 2. Suspected Fraud Referral (If Indicated) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 203 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.18.4 Monitor Program Eligibility and Instructor Qualifications Detailed Workflows Develop Annual Monitoring Plan Assign Monitoring Team Accountability Review Specialist Start End Schedules Review with ELC Select Random Sample of Cases Select Specific Cases for Review Review ELC other Information Review Selected Cases Review of Representative Cases A-3 ELC AWI/OEL Accountability Review Manager The following workflow diagrams show the details of the Monitor Program Eligibility and Instructor Qualifications process including actors and activities. End Figure 77. Schedule ELC Monitoring/Review ELC Data Flow Diagram (A1/A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 204 HP Enterprise Services Accountability Review Specialist Link from Schedule ELC Monitoring/Review ELC Data A1/A2 Provide an Overview and purpose of the review for the ELC Records the results for each case Provide Findings and Observations Questioned Cost? No End Yes Questioned Costs are noted for Additional Review Link to Initiate Questioned Cost Determination A-4 ELC AWI/OEL Accountability Review Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Start Overview and Purpose for Review Findings and Observations Develop Eligibility Monitoring reports Figure 78. Review of Representative Cases (A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 205 HP Enterprise Services Accountability Review Specialist AWI/OEL Accountability Review Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Feedback on Discrepancies Develop Annual ELC Accountability Review Report Acceptable Response? Notify ELC of Report Availability Response to the Annual ELC Accountability Review Report (CAP if necessary) Yes Develops Accountability Review Closeout Report End No Provide Feedback to the Response for the ELC Accountability Review Report End ELC Develops Corrective Action Plan Yes Review of Representative Cases Provide Feedback to clarify discrepancies found Notification of ELC Eligibility Review Report Review, Clarify, or Refutes Contents of the Report Action Plan Required No Send Response to the Annual ELC Accountability Review Report Notification of Accountability Monitoring Closeout Report End Figure 79. Develop Accountability Review Reports (A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 206 HP Enterprise Services Accountability Review Specialist AWI/OEL Accountability Review Manager Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Yes Initiate Questioned Cost Determination Review of Representative Cases Receives ELC Recommended Course of Action Provides Assistance to ELC Resolved Questioned Cost? End Notifies AWI Inspector General & Begins Process to Disallow Payment Notifies AWI Inspector General concerning Questioned Cost Annual ELC Eligibility Review Updated with Cost Determination End Collections To Be Process BP-13 ELC Disallowed Cost Questioned Costs From ELC Eligibility Review ELC Determines Potential Course of Action ELC Determines Course of Appropriate Course of Action Course of Action? Acceptable Cost Annual ELC Accountability Review Updated with Cost Determination End Fraud Annual ELC Accountability Review Updated with Cost Determination Refers Suspected Fraud to DFS and notifies AWI Inspector General End Figure 80. Initiate Questioned Cost Determination (A5) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 207 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.18.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 99. Monitor Program Eligibility Business Rules R ule T itle Des c ription E ffec tive Date 45 CFR, Subtitle A, Part 45 CFR parts 74, 92, 98 and 99 Child Care Development Fund N/A 2002 42 USC § 601 et seq. Temporary Assistance for Needy Families N/A 42 USC § 9858 et seq. Child Care Development Fund (CCDF) Block Grant N/A Florida Statutes Section 411.01 School Readiness Act Establishes a unified approach to the State’s efforts toward enhancement of school readiness, including child screening March 26, 2010 Florida Statutes Chapter 1002, Part V VPK Act Establishes authority and requirements for the Voluntary Prekindergarten Education Program March 26, 2010 Florida Statutes Section 215.97 Florida Single Audit Act Establishes uniform state audit requirements for State financial assistance provided by State agencies to non-state entities to carry out State projects. Florida Statutes Section 251.97 State Single Audit Act F.A.C. 60BB-4 F.A.C. 60BB-8 F.A.C. 60BB-9.300 School Readiness Voluntary Prekindergarten Child Care Resource and Referral 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Regulations for administering the School and Voluntary Prekindergarten Education Program Establishes the statewide responsibilities and CCRR Services, which include: • Early learning referrals • Consumer education resources • Information regarding community resources March 4, 2007 Dec. 21, 2010 August 10, 2009 Page 208 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) R ule T itle Des c ription E ffec tive Date School Readiness Standard Eligibility Review Guide N/A This Guide is a resource for performing School Readiness eligibility reviews August 2010 Voluntary Prekindergarten Standard Eligibility Review Guide N/A This Guide is a resource for performing Voluntary Prekindergarten Education Program provider and child eligibility reviews August 2010 3.18.6 3.18.6.1 Traceability US E C AS E S The following Use Cases are associated with the Monitor Program Eligibility and Instructor Qualifications To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): 3.18.6.2 • UC-COM-12: Initiate Monitoring • UC-COM-13: Complete Monitoring • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System R E QUIR E ME NT S The requirements associated with the Monitor Program Eligibility and Instructor Qualifications To-be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix ARTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 209 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.19 Maintain Data Quality and Provide Service Support 3.19.1 BP 19 Maintain Data Quality and Provide Service Support The Maintain Data Quality and Provide Service Support process ensures that ELIS meets the business requirements for system performance, business intelligence, and business operations. The process activities include the management, delivery, and support of IT service requests, problems, and incidents. End users of ELIS call into a single point of contact where their issues and needs are recorded as a service request. The service request is then routed to the appropriate technical staff for analysis and resolution. The service request is tracked and monitored until resolution. The process includes requests for enhancements and changes to ELIS to accommodate changes in legislation, policy and procedures, data analysis to ensure data integrity, as well as provide business information for executive and management decision-making, requests for instruction and training on the use of ELIS and requests for technical assistance to ensure end user access to, and the availability and reliability of the system. This process also includes service level management, whereby performance metrics are tracked and monitored to ensure ELIS supports the business needs of the organization. The following assumptions have been made for the Maintain Data Quality and Provide Service Support process: 1. Generic roles are used in place of specific organization names or job titles. 3.19.1.1 A C T OR S • OEL Data Quality Specialist • OEL Data Quality Manager • OEL System Support Specialist • OEL System Support Manager • OEL Customer Service Specialist 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 210 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.19.2 Maintain Data Quality and Provide Service Support Process Flow Diagram The Maintain Data Quality and Provide Service Support process is depicted in the figure below. Figure 81. Maintain Data Quality and Provide Service Support Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 211 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.19.3 Maintain Data Quality and Provide Service Support Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 100. Maintain Data Quality and Provide Service Support – Receive and Review Service Requests P roc es s Maintain Data Quality and Provide Service Support T riggers Agency/OEL/ELC Staff IT/ Data Needs and Issues P roc es s S tep A0 – Receive and Review Service Requests A c tivities 1. The Customer Service Specialist receives a request from the Agency/OEL, an ELC staff member, external stakeholders, the general public or recommendations from the Change Control Board (CCB). 2. The Customer Service Specialist reviews the request and if possible, resolves the issue or need and closes the request. 3. The Customer Service Specialist sends the request to the appropriate specialist and/or manager for further analysis, resolution and/or service delivery if they cannot resolve the service request themselves and need further technical assistance. Notes Note 1: Service Requests are received by the ticketing system for technical issues. All other requests are received by email, phone, or fax. Outputs 1. Service Assignment Table 101. Maintain Data Quality and Provide Service Support – Analyze and Improve Data Quality P roc es s Maintain Data Quality and Provide Service Support T riggers Service Assignment P roc es s S tep A1 – Analyze and Improve Data Quality A c tivities 1. The Data Quality Specialist reviews the service assignment and prioritizes the work to be done based on the nature and severity of the service assignment. 2. The Data Quality Specialist performs the following activities to resolve end user issues, meet end user needs, and improve data quality: • The Data Quality Specialist monitors and reviews internal processes and documentation and develops data quality instructions and accompanying documentation that identifies changes to processes, procedures, and data definitions based on best practices. • The Data Quality Specialist works with end users and the CCB to develop functional requirements for changes and enhancements to ELIS based on program policy and/or procedural changes. • The Data Quality Specialist conducts research and analysis based on program needs and provides reports based on the findings to assist in executive and management decision making and to improve end user 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 212 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) understanding and management of ELIS data. • The Data Quality Specialist provides technical assistance to program staff on how to use ELIS to ensure data integrity and accuracy. • The Data Quality Specialist develops training curricula and end user instructions on how to use ELIS to meet program needs. • The Data Quality Specialist staff defines criteria and method for obtaining data sets (edit report). • As required, the Data Quality Specialist conducts follow-ups to ensure implementation of required corrections/changes. 3. The Data Quality Specialist completes and closes the Service Assignment. Notes Note 1: This process is currently handled in the Data Quality Unit. Outputs 1. 2. 3. 4. Data Quality Instructions/Documentation End User Technical Assistance End User Instructions End User Trainings Table 102. Maintain Data Quality and Provide Service Support – Monitor Data Quality P roc es s Monitor Program Eligibility and Instructor Qualifications T riggers Service Assignment P roc es s S tep A2 – Monitor Data Quality A c tivities 1. The Data Quality Specialist or System Support Specialist performs the following activities to resolve end user issues, meet End user needs, and monitor data quality: • The System Support Specialist develops plans and coordinates User Acceptance Testing (UAT) of enhancements and changes to ELIS. • The System Support Specialist ensures on a routine and periodic basis, that the data files for state and federal reports are successfully run, posted and/or distributed. • The Data Quality Specialist assists end users, develops parameters for data needed, scripts for extracting data and routines for monitoring data integrity. • The Data Quality Specialist points out and corrects reported process problems. • The Data Quality Specialist provides completed reports, including ad hoc reports, federal reports, state reports as required, and/or prepared data as scheduled to appropriate receiver. 2. The Data Quality Specialist or System Support Specialist completes and closes the service assignment. Notes Note 1: This process is handled by a combination of the Data Quality and OEL Application Development Units. Outputs 1. Reports or Data Files Prepared 2. Completed Changes to ELIS 3. Supporting Documentation 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 213 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 103. Maintain Data Quality and Provide Service Support – Provide System Support P roc es s Maintain Data Quality and Provide Service Support T riggers Service Assignment P roc es s S tep A3 – Provide System Support A c tivities 1. The System Support Specialist reviews the service assignment and prioritizes the work to be done based on the nature and severity of the service assignment. 2. The System Support Specialist performs the following activities to resolve end user issues, meet end user needs, and ensure system performance based on the contracted service level agreement: • Detects and corrects work stoppage or errors by conducting tests, monitoring output, and entering code changes • Optimizes system efficiency by analyzing performance indicators. • Periodically and on an ongoing basis, provides statistical data on the system • Ensures ELIS is running smoothly and efficiently • Ensures information is kept confidential by monitoring and controlling access to system • Supports end user hardware needs as related to database functionality • Installs system software by loading software onto the server • Develops and maintains standard operating procedures for all processes in utilization of ELIS 3. The System Support Specialist completes and closes the Service Assignment. Notes Note 1: This process is currently handled in the OEL Application Development Unit. Outputs 1. Performance and Utilization Reports 2. Resolved Work Stoppage or System Performance Issues 3. Optimized System Performance Table 104. Maintain Data Quality and Provide Service Support – Complete and Close Service Request P roc es s Maintain Data Quality and Provide Service Support T riggers Service Assignment Completed P roc es s S tep A4 – Complete and Close Service Request A c tivities 1. The Customer Service Support Specialist receives notification that a Service Assignment has been completed and closed. Notes None Outputs 1. Completed Service Request 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 214 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.19.4 Maintain Data Quality and Provide Service Support Detailed Workflows Customer Service Specialist Reviews the Request Resolves the Request? Yes Closes the Request Receives Request Data Quality No Send Request to Appropriate Specialist or Manager Type of Technical Assistance? System Support System Data Support Quality Specialist Specialist or or Manager Manager AWI/OEL The following workflow diagrams show the details of the Maintain Data Quality and Provide Service Support process including actors and activities. Send Request to Appropriate Specialist or Manager End End Link to Analyze and Improve Date Quality/Monitor Data Quality A1/A2 Link to Provide System Support/Monitor Data Quality A3/A2 Figure 82. Receive and Review Services Requests (A0) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 215 HP Enterprise Services Data Quality Specialist or Manager AWI/OEL Customer Service Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Receives a Notification Service Request has been closed Start Reviews the Request Receive and Review Service Requests Performs Activities to resolve issues, meet End User needs and improve data quality Resolves the Request? Yes Monitor Data Quality? No Yes Performs Activities to resolve issues, meet End User needs and improve data quality No End Closes Service Assignment Yes Resolves the Request? System Support Specialist No Figure 83. Analyze and Improve Data Quality Flow Diagram/ Monitor Data Quality (A1/A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 216 HP Enterprise Services Customer Service Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Receives a Notification Service Request has been closed End System Support Specialist or Manager AWI/OEL Data Quality Specialist Start Reviews the Request Receive and Review Service Requests Performs Activities to resolve issues, meet End User needs system performance Resolves the Request? Yes Monitor Data Quality? No Yes No Performs Activities to resolve issues, meet End User needs and improve data quality Closes Service Assignment Yes Resolves the Request? No Figure 84. Provide System Support Process Monitor Data Quality (A3/A2) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 217 HP Enterprise Services Receives a Notification Service Request has been closed End Data Quality Specialist or Manager Start System Specialist or Manager AWI/OEL Customer Service Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Figure 85. Complete Service Request (A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 218 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.19.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 105. Maintain Data Quality and Provide Service Support Business Rules R ule N/A 3.19.6 T itle Des c ription E ffec tive Date N/A N/A N/A Traceability 3.19.6.1 U S E C A S E S The following Use Cases are associated with the Maintain Data Quality and Provide Service Support To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-09: Execute User Login • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.19.6.2 R E QUIR E ME NT S The requirements associated with the Maintain Data Quality and Provide Service Support To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix ARTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 219 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.20 Process Cash Receipts 3.20.1 BP-20 Process Cash Receipts When a payment is received at the Agency, the funds are deposited into the bank and the appropriate accounting transactions are created in FLAIR by the Agency. The supporting documentation, accompanying the payment, is forwarded to the appropriate business unit and is used to reconcile the outstanding receivables. The following assumptions have been made for the Process Cash Receipts process: 1. All early learning payments (fraud restitution, interest payments, adjustment payments, and so on) are received by the Agency – Finance and Accounting. 3.20.1.1 A C T OR S • Agency/OEL Finance Specialist • Agency/OEL Business Unit • Payee 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 220 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.20.2 Process Cash Receipts Process Flow Diagram The Process Cash Receipts process is depicted in the figure below. To-Be Process Cash Receipts Payment in Error Returned Payment Return Payment Payment in Error A3 Payment Receive Payment A1 Received Payment Deposit Payment A2 ELIS Deposited Payment ELIS Payment Documentation Processed Accounting Entries Payment Information Determine Payment Create Accounting Entries Reconcile Receivables A4 A5 A6 FLAIR Issue Resolution ELIS Reconciled Receivables ELIS FLAIR ELIS Figure 86. Process Cash Receipts Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 221 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.20.3 Process Cash Receipts Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 106. Process Cash Receipts – Receive Payment P roc es s Process Cash Receipts T riggers Payment Issued P roc es s S tep A1 – Receive Payment A c tivities 1. The Finance Specialist receives the payment. 2. The Finance Specialist records the payment information Notes Note 1: Payments to the Agency consist of: • Restitutions • Overpayments • Disallowed Payments Reimbursements • Interest Note 2: The authority for Cash Receipt Instruction is Section 116.01(1) of Florida Statutes. Note 3: Payments may be received in error – see A3. Note 4: Reference AWI/OEL Fiscal Guidance 240.01 for additional information on receipt of payments. Outputs 1. Received Payment Table 107. Process Cash Receipts – Deposit Payment P roc es s Process Cash Receipts T riggers Receipt of Payment P roc es s S tep A2 – Deposit Payment A c tivities 1. The Finance Specialist deposits the payment to the bank (using appropriate deposit documentations). The deposit of the payment is made regardless if the payment has supporting documentation accompanying it. Notes Note 1: Deposit of the funds does not reconcile (Process Step A5) the outstanding receivable. Note 2: Payments may be deposited in error – see A3. Outputs 1. Deposited Funds 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 222 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 108. Process Cash Receipts – Return Payment P roc es s Process Cash Receipts T riggers Receipt of Payment in Error P roc es s S tep A3 – Return Payment A c tivities 1. If a payment has been made in error, and has not been deposited, the Finance Specialist returns the payment to the issuer. 2. If a payment has been made in error and has been deposited, the Finance Specialist issues a payment to the sender (in the amount of the original payment). Notes None Outputs 1. Payment Returned to Sender 2. Payment Issued to Sender (in cases where the payment was in error) Table 109. Process Cash Receipts – Determine Payment P roc es s Process Cash Receipts T riggers Receipt of Payment P roc es s S tep A4 – Determine Payment A c tivities 1. The Finance Specialist determines the purpose of the payment based on the supporting payment documentation. If supporting payment documentation was not submitted for the payment, the Finance Specialist researches the payment to determine where to apply the payment. 2. The Finance Specialist indicates how the payment should be applied to the receivable. Notes Note 1: This process may be iterative until the determination of how to apply the payment. Outputs 1. Reason for Payment Determined Table 110. Process Cash Receipts – Create Accounting Entries P roc es s Process Cash Receipts T riggers Payment Reason Determined and Deposited Funds P roc es s S tep A5 – Create Accounting Entries A c tivities 1. The Finance Specialist enters the appropriate accounting transactions into FLAIR (to account for the payment). Notes None Outputs 1. Created Accounting Entries 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 223 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 111. Process Cash Receipts – Reconcile Receivables P roc es s Process Cash Receipts T riggers Payment Reason Determined and Deposited Funds P roc es s S tep A6 – Reconcile Payment A c tivities 1. The Finance Specialist notifies the appropriate business unit of payment and purpose of payment for receivable resolution. 2. The appropriate Agency/OEL business unit reconciles the payment to the outstanding receivable and communicates the resolution to the party making the payment. Notes None Outputs 1. Reconciled Receivables/Payments 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 224 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.20.4 Process Cash Receipts Detailed Workflows Finance Specialist The following workflow diagrams show the details of the Process Cash Receipts process including actors and activities. Records Payment Information Payment Payment Received in Error? No Deposits Payment Payment Received in Error? Yes Yes Return Payment Issue Payment No Link to Determine Payment/ Create Accounting Entries/ Reconcile Payment (A-4, A-5,A-6) End Payee End Returned Payment End Issued Payment End Issues Payment End Figure 87. Receive Payment, Receipt of Payment, Return Payment (A1/A2/A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 225 HP Enterprise Services Link from Receive, Deposit, and Return Payment (A-1, A-2, A-3) Determines Reason for Payment? Yes Indicates how payment should be applied to the receivable Enters Accounting Transactions into FLAIR Notifies Appropriate Business Unit End No Researches Reason/ Documentation for Payment? OEL Business Unit AWI Finance Specialist Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Payee Notification of Determination Reconciles Payment, Communicates Resolution Communicates Resolution Reconciled Billing Start End Figure 88. Determine Payment/Create Accounting Entries/Reconcile Payment (A4/A5/A6) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 226 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.20.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 112. Process Cash Receipts Business Rules R ule T itle Des c ription E ffec tive Date FS, Section 116.01(01) Payment of Public Funds into Treasury • July 1, 2010 N/A N/A The deposit of funds must be made within 7 business days of the receipt of the funds. 3.20.6 • Authority for Cash Receipt Deposit of funds must be made within 7 days of the receipt of funds N/A Traceability 3.20.6.1 US E C AS E S The following Use Cases are associated with the Process Cash Receipts To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-07: Initiate Payment • UC-COM-08: Process Payment • UC-COM-09: Manage Receivable • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-06: Import Data • UC-GEN-07: Execute Reports • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 227 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.20.6.2 R E QUIR E ME NT S The requirements associated with the Process Cash Receipts To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 228 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.21 Manage Statewide Contracts 3.21.1 BP-21 Manage Statewide Contracts On a periodic basis, assigned Agency contractors are monitored to ensure compliance with the terms and conditions of their contracts. As outlined in the contract, the contractor submits invoices to the Agency for payment. The invoice is issued for services provided and deliverables completed during the month. The invoice is reviewed at the Agency against the service provider contract. Once approved, the payment request is submitted by the Agency to Department of Financial Services (DFS) for payment to the service provider. 3.21.1.1 A C T OR S • Agency/OEL Contract Manager • Agency/OEL Finance Specialist • Contractor 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 229 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.21.2 Manage Statewide Contracts Process Flow Diagram The Manage Statewide Contracts process is depicted in the figure below. Figure 89. Manage Statewide Contracts Process Flow Diagram 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 230 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.21.3 Manage Statewide Contracts Detailed Process Narrative The following process narrative describes the work activities and other associated process roles for each process step in the process flow diagram above. Table 113. Manage Statewide Contracts – Review Contractor Compliance and Resolve Issues P roc es s Manage Statewide Contracts T riggers Contract Established with the Agency P roc es s S tep A1 – Review Contractor Compliance and Resolve Issues A c tivities 1. On a periodic basis, the Contract Management Manager reviews the compliance of the contractor. 2. Following the review, the Contract Management Manager creates a draft report of the findings and sends the draft report to the Contractor. 3. Contractor reviews draft reports, provides input, and sends it back to the Contract Management Manager. 3. The Contract Management Manager notifies the contractor of the findings. A. If issues exist in the findings, the Contract Management Manager works with the contractor to resolve the issues, and, if necessary implement a Corrective Action Plan (referenced in subsequent compliance reviews). Notes Note 1: Agency policy and the terms and conditions of the contract indicate when the compliance review will occur. Note 2: Reviewing compliance includes: – Comparing the deliverables/services to the terms and conditions of the contract – Performing site visits (as indicated in the contract) Outputs 1. Compliance Findings Table 114. Manage Statewide Contracts – Receive Contractor Invoice P roc es s Manage Statewide Contracts T riggers Contractor Performs Services P roc es s S tep A2 – Receive Contractor Invoice A c tivities 1. The Contract Management Manager receives the contractor invoice and supporting documentation. 2. The Contract Management Manager may receive requests for advance payment from the contractor. If an advance payment is authorized and approved, that payment may be recovered as part of the monthly contractor invoice process, and must be recovered in full prior to any subsequent year advances being provided. Notes Note 1: The contractor invoice is issued for services (and deliverables) to the Agency delivered during the invoiced period of time. Note 2: The contractor invoice is due by the date specified within the terms and conditions of the contract. Outputs 1. Submitted Invoices 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 231 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Table 115. Manage Statewide Contracts – Validate Contractor Invoice P roc es s Manage Statewide Contracts T riggers Received Invoice P roc es s S tep A3 – Validate Contractor Invoice A c tivities 1. The Contract Management Manager verifies the invoice against the contractor’s deliverable (for the period of time being invoiced) and the contractor’s contract. • If the invoice is accurate, the Contract Management Manager approves the invoice. • If the invoice contains discrepancies, the Contract Management Manager may contact the contactor to resolve the discrepancies, or return the invoice to the contractor. 2. If needed, the Contract Management Manager may also include guidance on allowable, allocable, reasonable, and necessary costs from the OEL Program and Policy unit. 3. The Contract Management Manager records data about the invoice. 4. Once approved, the Contract Management Manager routes the invoice to the Finance Specialist. Notes Note 1: This process is iterative until the contractor invoice has been reconciled. Note 2: As defined in the terms and conditions of the contract, the contractor may be required to submit periodic reports to the Agency. Once the contract is completed, the contractor is required to submit a final report to the Agency. Outputs 1. Validated Invoice Table 116. Manage Statewide Contracts – Initiate Contractor Payment P roc es s Manage Statewide Contracts T riggers Validated Invoice P roc es s S tep A4 – Initiate Contractor Payment A c tivities 1. The Finance Specialist verifies funds are available and enters the information into FLAIR. 2. The Finance Specialist initiates the drawdown (as necessary). 3. Based on the invoice payment information in FLAIR, DFS authorizes the payment and issues payment to the contractor. 4. The Finance Specialist monitors FLAIR and initiates the update of the payment information based on confirmation the payment has cleared. Notes Note 1: Payments may be in the form of EFT, warrant, or journal transfer. Outputs 1. Invoice Payment 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 232 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.21.4 Manage Statewide Contracts Detailed Workflows Contract Manager Reviews Compliance Periodic Review of Existing Contract Creates Draft Repot of Findings Receives feedback and creates Report of Findings Notifies Contractor of Report/Findings Sends Draft Report of Findings Findings Needing Resolution? Yes Works with contractor to Resolve Findings Corrective Action Plan Needed? No Yes Review Closed Notification for Corrective Action Plan No Review Closed End Contractor Financial Specialist AWI/OEL The following workflow diagrams show the details of the Manage Statewide Contracts process including actors and activities. Receives Notice of Draft Findings Sends Draft Report of Findings Findings Needing Resolution? Receives Notice of Findings Yes Works with Contract Manager to Resolve Findings Develops Corrective Action Plan Review Closed No End Figure 90. Review Contractor Compliance and Resolve Issues (A1) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 233 HP Enterprise Services Contract Manager Verifies Invoice Discrepancies Exist? Receives Invoice/ Advanced Payment Request No May provide guidance on allowable, allocable, reasonable, and necessary costs Record Invoice Data Yes Approve Invoice Link to Initiate Contractor Payment(A-4) Resolve Discrepancy Contractor Financial Specialist AWI/OEL Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Submits Invoice Start End Figure 91. Receive and Validate Contractor Invoice (A2/A3) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 234 HP Enterprise Services Contract Manager Route Invoice to Financial Specialist Link from Receive and Validate Contractor Invoice Verifies Funds are Available Enters it into FLAIR Contractor Financial Specialist AWI/OEL Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Initiate Federal Drawdown Initiate Payment Start Payment Monitors Flair and Updates Payment Information Paid Invoice Paid Invoice Figure 92. Initiate Contractor Payment (A4) 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 235 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.21.5 Business Rules The following table contains statute, administrative rule, and other critical business rules to this Business Process. Table 117. Manage Statewide Contracts Business Rules R ule T itle Des c ription E ffec tive Date Contractors are required to submit invoices per the terms and conditions of the vendor contract. N/A Contractors are required to submit invoices per the terms and conditions of the vendor contract. Contract Date Agency Service Provider invoices are due at the Agency by the date specified within the terms and conditions of the contract. N/A Agency Service Provider invoices are due at the Agency by the date specified within the terms and conditions of the contract. Contract Date Contractors are monitored per the terms and conditions of the vendor contract. N/A Contractors are monitored per the terms and conditions of the vendor contract. Contract Date 3.21.6 3.21.6.1 Traceability US E C AS E S The following Use Cases are associated with the Manage Statewide Contracts To-Be Business Process Model based on the Requirements Traceability Matrix (RTM): • UC-COM-07: Initiate Payment • UC-COM-10: Manage Contracts • UC-COM-12: Initiate Monitoring • UC-COM-13: Complete Monitoring • UC-GEN-01: Executive Advanced Search • UC-GEN-02: Manage Documentation • UC-GEN-03: Manage Workflow • UC-GEN-04: Generate Notification • UC-GEN-05: Export Data • UC-GEN-08: Schedule Events • UC-GEN-09: Execute User Login • UC-GEN-12: Maintain Records • UC-GEN-13: Configure System 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 236 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 3.21.6.2 R E L A T E D R E QUIR E ME NT S The requirements associated with the Manage Statewide Contracts To-Be Business Process Model can be found in the Business Process to Requirements Traceability Matrix (RTM) attached as HP FL ELIS 3.4.5.2.1 Appendix A-RTM with Business Processes V.04. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 237 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 4. E L IS DIF F E R E NC E S -IMP A C T T O B US INE S S 4.1 Overview ELIS is expected to enhance the implementation of early learning programs through automation, the centralization and consolidation of information, improved data quality, and many other benefits. The To-Be Business Process Models provided in Section 3 of this document provide a picture of the future state of business after the ELIS project is completed and implemented. The differences will impact the business by enhancing early learning programs in Florida. The following table provides highlights of the differences from the current business situation to the post-ELIS business situation by Business Process. Table 118. Examples of Differences NE W- HP F inal T o-B e Numbering B us ines s P roc es s Name Differenc es as a res ult of E L IS Implementation • • • BP1 CCR&R • • • • • • • • BP2 Enrollment • • • Initial contact may be by phone, Customer Portal, Provider Portal, or walk-in. Reduction in duplicative work, entry directly into ELIS directly or through the Portals. Wait List Placement has been incorporated into the CCR&R Process. The Parent/Guardian can determine preliminary eligibility via the Customer Portal, but will still have the option of applying face-to-face. Providers will be able to view and update their CCR&R information via the Provider Portal. Centralized CCR&R reporting. ELIS will replace the Single Point of Entry (SPE) system. Initial applicant contact with the ELC will take place in CCR&R. Preliminary screening will take place in CCR&R. The Intake Specialist receives the application through the CCR&R or waiting list. The enrollment process will be integrated allowing both SR and VPK eligibility to be performed by a standardized Intake Specialist role. Interfaces to receive data regarding immunizations, income and employment information. Customers can schedule appointments through the customer portal. Standardized business rules around eligibility determinations to reduce errors and incomplete information. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 238 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) NE W- HP F inal T o-B e Numbering B us ines s P roc es s Name Differenc es as a res ult of E L IS Implementation • • BP3 Wait List Management • • • • BP4 Child Screening • • • • BP5 SR Eligibility Redetermination • • • • BP6 VPK Reenrollment/SR Provider Transfer • • • The processes related to initial applicant contact, screening to determine preliminary eligibility, and placement on waiting lists are performed by CCR&R staff. Will provide access to statewide waiting list, while allowing for local management and reporting. Will provide a vehicle to analysis statewide waiting list statistics and service needs. For School Readiness, updating of the family’s information during the Eligibility Redetermination process will serve as validation for and update waiting list information. Parents can update the necessary documentation and information through the Parent Portal for the waiting list revalidation process. Interface with Ages and Stages™ and export Child data from ELIS to Ages and Stages (basic demographic data, provider enrollment). Business rules and notifications are employed to support timelines for completion of initial and follow up child screenings. Non-responsive customers will be automatically removed from the waiting list based on business rules. Redeterminations are integrated and update the waiting list management process. Updating parent eligibility information can be done through the Parent Portal. Standardized business rules around eligibility redeterminations to reduce errors and incomplete information. Interfaces to receive data regarding immunizations, income, and employment information. Customers can schedule appointments through the Customer Portal. Parents or guardians can request a provider transfer through the Parent or Partner Portal. ELIS will calculate and determine the remaining VPK hours for transfer. Eligibility certificates and applications are integrated into ELIS. Updating parent eligibility information can be done through the Parent Portal. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 239 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) NE W- HP F inal T o-B e Numbering B us ines s P roc es s Name Differenc es as a res ult of E L IS Implementation • • BP7 Guardianship Transfer • • • • • BP8 Provider Onboarding and Management • • • • BP9 Provider Quality Monitoring and Improvement • • • • BP10 Attendance Roster Processing • • BP11 Prior Period Attendance Adjustments • • Parents or guardians can request a provider transfer through the Parent or Partner Portal. Standardized business rules around eligibility determinations for new guardians, decreasing errors or incomplete information. Eligibility certificates and applications are integrated into ELIS. Family Specialists have access to a statewide database to facilitate guardianship transfers. Partners and parents can check the status of a guardianship transfer request through the portal. Providers can update their provider profile and information through the provider portal, allowing for increased self service options. Referrals can be sent or received electronically for technical assistance. Applications and provider and selected packet information is available in ELIS. Providers’ progress through the on-boarding process can be tracked in ELIS. An electronic interface with the Department of Children and Families for licensed providers, background checks, credentials, and other information. Eliminates separate database and spreadsheet tracking of provider Quality Monitoring and Improvement. ELIS will generate a random sample of providers to be selected for monitoring. Results from assessment tools are entered into ELIS for monitoring. Providers will enter or revise attendance information directly via the Provider Portal. This replaces paper submission and entry into EFS. Standardized business rules will provide edit checks to guide providers in completing the electronic attendance rosters improving accuracy and reducing errors. Providers can check the status of the attendance roster through the process. Interface with school systems and selected providers to receive attendance records into ELIS. Standardized business rules for making prior period adjustments are integrated into ELIS. Payment adjustments are stored in ELIS reducing the need to retain a hard copy paper format. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 240 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) NE W- HP F inal T o-B e Numbering B us ines s P roc es s Name Differenc es as a res ult of E L IS Implementation • BP12 Closeout • • BP13 Collections • • • • BP14 Slot Management BP15 Develop Policy and Manage Programs BP16 Process ELC Invoice • BP17 BP18 • ELIS will have a bidirectional interface with Local Accounting Systems. Information for the invoice will be transmitted via interface or entered directly into ELIS. Electronic signatures will be used for electronic submission of the invoices. ELIS will replace the invoice workbook. ELIS will have a bidirectional interface with the FLAIR system. • • • • Monitor Program and Instructor Eligibility Maintain Data Quality and Provide Service Support Service priorities and slot management strategies are integrated into ELIS. Forecasting or modeling tools are integrated into ELIS to support the development of strategies. Changes in enrollment priorities, parent fees, provider rates, or disenrollment must be submitted to the OEL as a plan amendment and approved before implementation. The OEL Director reviews and approves all policy, procedure, guidance, and best practices. ELIS will have a bidirectional interface with FLAIR. ELIS will have the capacity to reconcile the ELC invoice with FLAIR payments. OCAs will be integrated into ELIS to reconcile grant utilization. None • BP19 Standardize all collection efforts across ELCs through standardized business rules around questioned costs. All fraud investigations have been transitioned from FDLE to DFS effective January1, 2011. Suspected fraud referrals are referred to DFS and the AWI Inspector General, while all other action ceases. • • • Monitor and Reconcile ELC Grant Utilization ELIS will have a bidirectional interface with Local Accounting Systems (LASs). Information for closeout data or can be entered directly into ELIS. Submission of the reimbursement data to the OEL is integrated into ELIS, streamlining the process. • • ELIS is a single, statewide database, eliminating the data pull from 34 separate ELCs databases. Improved quality, timeliness and accuracy of federal and state reports. Indicates a ticketing process or system for tracking and monitoring technical and data quality requests. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 241 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) NE W- HP F inal T o-B e Numbering B us ines s P roc es s Name Differenc es as a res ult of E L IS Implementation BP20 Process Cash Receipts • ELIS will allow for entering data regarding payments and replace the use of excel spreadsheets. BP21 Manage Statewide Contracts • Contracts will be entered, stored and searchable in ELIS. • The quality and effectiveness of auditing and monitoring processes and findings may be improved due to more consistent and improved data quality. Improved confidence in ELC and OEL data and reports. Parents, providers, and partners can access, view, upload documents and enter information through the use of web portals. Electronic notifications in ELIS allow for a reduction in the use of paper and increased communication. Documents can be stored, attached to records, accessed and searched on in ELIS, reducing paper use and storage. Documents can be automatically selected by standard records retention business rules for destruction. • • All General • • • • Electronic signatures are accepted through the web portals. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 242 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 5. IMP L E ME NT ING T HE R E DE S IG NE D B US INE S S P R OC E S S E S 5.1 Implementing the Redesigned Business Processes Once The HP FL ELIS Final To-Be Business Process Models have been approved, a management process will support each of the final to-be Business Processes. BPR Business Process updates that may require updates or changes to training, policy, or other supports for ELIS stakeholders to use ELIS successfully were identified. These potential updates are identified in the Final To-Be Business Process Model Update Action Log and will also be recorded on the HP Florida ELIS Project Team SharePoint site. The final Business Processes will be rolled out and verified through a multitude of activities and communication channels as identified in Table 117 of this document. HP will collaborate with the Agency and its Organizational Change Management (OCM) team to support the ELCs and RCMA in adopting the new Business Processes so that the full benefits of an ELIS implementation are realized. As stakeholder groups require additional support and education about the new organizational structures, processes, policies, and system functionality, HP will work with the Agency and its OCM team in adopting the changes. 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 243 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) Figure 93. BPR Schedule 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Page 244 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) 5.2 Business Process Rollout Plan The following table describes a plan for rollout activities and communications based on the targeted audience and the channel for delivery. Table 119. BPR Rollout Activities B P R R ollout E vent/Materials J oint A pplic ation Development S es s ions P urpos e A udienc e C hannel To validate the requirements and to-be Business Processes and elicit more detailed requirements with subject matter experts • Agency/OEL ELC Executive Directors ELC Ambassadors ELC Subject Matter Experts (SMEs) ELIS Project Business Stakeholder’s Committee • Agency/OEL ELC Executive Directors ELC Ambassadors ELC SMEs ELIS Project Business Stakeholder’s Committee • Agency/OEL ELC Executive Directors ELC Ambassadors ELC SMEs ELIS Project Business Stakeholder’s Committee Document • • • • F unc tional S ys tem Des ign W alk T hrough The BPR team will participate in design sessions to ensure design aligns with future Business Processes • • • • • F inal T o-B e B us ines s P roc es s Deliverable Documents the final to-be processes • • • • • 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 • • • Walk-through To-Be Business Processes Multiple Meetings ELIS Newsletter Updates Briefing ELIS Newsletter Updates Page 245 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) B P R R ollout E vent/Materials Us er A c c eptanc e T es ting P urpos e A udienc e C hannel • End Users • • T raining Have stakeholders responsible for core Business Processes, review system functionality, and perform UAT Collect any BPR implications from UAT to pass on to the HP technical personnel BPR will inform training on: • New organizational structures • Business processes • New policies and procedures • New skills as appropriate • • • • • • • • • P re-P ilot • • P ilot • • • • Reinforce new Business Processes Use new ELIS processes, rules, security, and information in this final test before statewide implementation • Identify knowledge gained in Pilot Testing the implementation of Business Processes Use new ELIS processes, rules, security, and information in this final test before statewide implementation Lessons learned • 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 • • • • • • Technical Staff Agency Staff ELC Staff ELC Subcontractor Staff Referral Agencies Staff Providers Customers • Agency Management ELC Executive Directors ELIS Users • Agency Management Business Stakeholders Committee ELC Executive Directors ELIS Ambassadors ELIS Pilot Users • • • • • • • • Briefing ELIS Newsletter Updates Testing and Incorporating Feedback ELIS Newsletter Updates Hands-on Classroom e- Learning Mentoring Support Briefing ELIS Newsletter Updates Training Briefings ELIS Newsletter Updates/Lesson s Learned Training Page 246 HP Enterprise Services Florida’s Office of Early Learning Contract V1013 Early Learning Information System (ELIS) B P R R ollout E vent/Materials P urpos e A udienc e C hannel P re- Implementation • • Agency Management ELC Executive Directors ELIS Users Briefing Agency Management ELC Executive Directors ELIS Users Briefing • • Implementation Incorporate Implementation readiness and effectiveness evaluations into communications Full implementation reminder Who to contact and where to go for more information To share successes and resolve any issues • • • • • K nowledge T rans fer Meetings The BPR team will participate in meetings, as appropriate, of both a technical nature as well as Business Process nature, to enable the Agency to support ELIS after implementation 3.4.5.2.1 Final To-Be Process Models, Final Version 2.0 Submitted: January 12, 2012 Agency/OEL Meeting Page 247 HP Enterprise Services