Civil Engineering and Development Building, 101 Princess Margaret Road, Kowloon, Hong Kong 土 木 工 程 拓 展 署 Civil Engineering and Development Department File Ref.: CEDD T 4/36/1 1 April 2009 Civil Engineering and Development Department (CEDD) Technical Circular No. 03/2009 CEDD Standard Drawings Introduction This technical circular (TC) promulgates guidelines on the use and the responsibilities for reviewing and updating of CEDD Standard Drawings. Effective Date 2. This TC takes immediate effect. Effect on Existing Circular 3. This TC supersedes CEDD TC No. 25/2004 which is hereby cancelled. Background 4. The first set of CED Standard Drawings was published in October 1991 as a collection of Standard Drawings issued by the then Civil Engineering Department, together with some general drawings applicable to most Government projects. 5. The document was originally issued in loose jacket form and was later bound in book form for sale to the public since August 1996. 6. The CED Standard Drawings were renamed as CEDD Standard Drawings upon the merger of the former Civil Engineering Department and Territory Development Department in July 2004. CEDD TC No. 03/2009 卓越工程 建設香港 Page 1 of 3 We Engineer Hong Kong’s Development Guidelines on Application of Standard Drawings 7. The Standard Drawings are intended to give guidance on suitable design details and solutions for commonly-encountered situations. They are not mandatory and should be reviewed by project engineers to ensure suitability for use in each individual case. 8. Direct application of the Standard Drawings to works should be done only with great caution, as some of the Standard Drawings are not sufficiently precise for use as contract drawings, and hence could give rise to disputes or claims for additional payment. Updating of CEDD Standard Drawings 9. The responsibilities for reviewing, updating and approval of the CEDD Standard Drawings are as follows: Section 1 (General) 2 (Geotechnical) 3 (Port Works) Reviewing and Updating Approving Officer SE/Quality Management & Standards AD(T) CGE/LPM2 Head, GEO CE/Port Works Head, CEO 10. The SE/Quality Management & Standards (SE/QM&S) shall be responsible for preparation of the updated drawing list and promulgation of the CEDD Standard Drawings by posting the soft copies on the CEDD Bulletin Board and the Internet. Hard copies may also be distributed to officers for document control purpose if necessary. 11. For updating an existing drawing or production of a new drawing in Section 1 (General), the SE/QM&S shall carry out all necessary preparation, consultation and circulation of the drawing and arrange for endorsement by the Assistant Director (Technical) (AD(T)). 12. For updating an existing drawing or production of a new drawing in Section 2 (Geotechnical), the CGE/LPM2 shall carry out all necessary preparation, consultation and circulation of the drawing and arrange for endorsement by the Head, GEO. A finalized version of the drawing ready for promulgation shall then be sent to the SE/QM&S through the Head, GEO for necessary actions. 13. Similarly, the CE/Port Works shall deal with drawings in Section 3 (Port Works) through the Head, CEO. CEDD TC No. 03/2009 Page 2 of 3 Annual Review 14. At the beginning of each calendar year, the SE/QM&S shall initiate an annual review of all the current CEDD Standard Drawings in collaboration with the CGE/LPM2 and the CE/Port Works. Any necessary updating work identified shall be processed accordingly. Enquiries 15. Enquiries on this TC should be addressed to the Senior Engineer/Quality Management & Standards, CEDD Headquarters. (John S V CHAI ) Director of Civil Engineering and Development CEDD TC No. 03/2009 Page 3 of 3