CAMPUS MASTER PLAN AMENDMENTS CAMPUS MASTER PLAN, 2005-2015 AMENDMENTS JANUARY 2013 FACILITIES PLANNING & CONSTRUCTION DIVISION AMENDMENTS UNIVERSITY OF FLORIDA COMPREHENSIVE MASTER PLAN JANUARY 2013 Contents 1. Acreage Chart of Land Use Changes 2. Relationship of Amendments to Public Facilities in Context Area 3. Land Use Amendment FLU-13-1 Heavener Hall Warrington College of Business, Figure 2-1 FLU-13-2 Eastside Campus, Figure 2-1.d 4. Capital Improvements Amendments Table 13-1 Ten Year Capital Projects List, 2005-2015 Figure 13-1 Future Building Sites Figure 13-1.d Future Building Sites – Eastside Campus 5. Replacement Maps Figure 2-1 Future Land Use Figure 2-2 Future Building Site by Future Land Use Figure 13-1 Future Building Sites Campus Master Plan Amendments – January 2013 Page 2 of 10 Section 1 ACREAGE CHART OF LAND USE CHANGES UF Main Campus Land Use Classification Academic Academic - Outdoor Active Recreation Active Recreation Outdoor Buffer - Green Space Urban Park Conservation Cultural Housing Parking Road Support Utility As Adopted March 2006 274.87 325.20 72.04 Total Acres As Amended March 2008 276.37 325.20 72.04 198.26 22.73 68.42 447.27 19.51 158.69 93.45 83.68 167.12 24.48 197.76 22.73 67.92 447.27 19.51 158.69 91.88 83.68 169.28 23.39 FLU-13-1.a Heavener Hall .14 -.14 Total Acres As Amended March 2013 276.51 325.20 72.04 197.76 22.59 67.92 447.27 19.51 158.69 91.88 83.68 169.28 23.39 UF Alachua County Satellite Properties Eastside CampusLand Use Classification Academic/Research Buffer Parking Road (not a land use) Support Utility Total Acres As Adopted March 2006 2.57 2.87 3.76 1.92 2.8 0.33 Total Acres As Amended December 2010 2.32 3.15 3.75 1.29 3.41 0.33 FLU-13-2.d -0.04 0.00 -0.52 -0.22 0.78 0.00 Total Acres as Amended January 2013 2.28 3.15 3.23 1.07 4.19 0.33 Campus Master Plan Amendments – January 2013 Page 3 of 10 SECTION 2 RELATIONSHIP OF AMENDMENTS TO PUBLIC FACILITIES IN CAMPUS MASTER PLAN CONTEXT AREA Campus Master Plan Amendments – January 2013 Page 4 of 10 Section 3 MAP AMENDMENT FLU-13-1 Undergraduate Studies Building UF-380 (Heavener Hall) - This proposed land use change is being initiated in conjunction with the design of UF-380 Graduate Studies Building (Heavener Hall) on the site. This building was projected to be located for its current site in the Master Plan, however during site analysis it was determined that the building would need to extend to the east, which placed a portion of the proposed building in the Green Space Buffer land use category. Heavener Hall will include classrooms, seminar and meeting rooms, and study/lounge space for undergraduate students, along with staff offices and support spaces capable of hosting special events. It is to be located at the de facto “Entrance Gateway” to the University, immediately south of University Avenue and west of SW 13th Street immediately adjacent to the 5 buildings used by the College of Business Administration. The buildings massing and materials must, therefore, be compatible with nearby facilities on the National Register of Historic Places, while also being “of its time” and presenting an appropriate aesthetic from all angles. Figure 2-1 13-1 Title Future Land Use Future Building Locations EXISTING LAND USE Green Space Buffer PROPOSED LAND USE Academic/Research ACRES .13 PUBLIC FACILITIES IMPACT There are no public facilities impacts with this amendment. The project is consistent with the Campus Development Agreement. LANDUSE COMPATIBILITY The proposed building location is designated as Academic/Green Space Buffer in the 2005 Campus Master Plan. This proposed change lies in the Historic District and is immediately adjacent to the academic buildings Bryant, Matherly and Gerson Halls. Since the building is to be used for additional lecture and interaction space for the adjacent business colleges the site is well chosen for its immediate proximity to the college’s other buildings. CONSISTENCY WITH GOP’S A review of the goals, objectives and policies (GOP’s) of the Campus Master Plan indicates that the proposed parking garage is consistent with the Master Plan and supports the following objectives and policies: Campus Master Plan Amendments – January 2013 Page 6 of 10 Future Land Use Objective 1.1: Make available future building sites that provide a range of future land use activities to support the academic mission of the University meeting the needs of the present and allowing for rational, sustainable growth that does not compromise the potential for future development and protection of valuable natural and cultural resources. Policy 1.1.4: The Future Land Use map and Future Building Sites map shall be used to identify available land and redevelopment sites suitable for development on the main campus to accommodate future growth, define future infill opportunities and conserve existing resources. Future Land Use maps shall identify available land for development on university satellite properties consistent with the list of projects in Table 13-1 and the Capital Improvements Element. This inventory of available sites shall be updated on a periodic basis, no less than once every five years, to reflect changes in status. Policy 1.1.5: The selection of building sites, refinement of future building site footprints and design of associated site improvements within designated future land use areas shall: Conform to the Future Land Use definition in Policy 1.1, Future Land Use Element; Preserve or satisfactorily realign pedestrian connections and future shared use path alignments that appear on the Urban Design Connections Map in the Urban Design Element; Create functional compatibility between adjacent facilities within the contiguous future land use area and along the boundaries between different future land use classifications, particularly when a new structure is adjacent to a Conservation land use as addressed in the Conservation Element, Policy 1.3; Create building groupings that frame functional open space when encouraged by the Future Land Use definition; Provide compatibility of size, scale, orientation and materials with existing structures in the Registered Historic District and its impact area as presented on the Historic District Area of Impact Map in the Urban Design Element; Group similar or associated programs in close proximity to one another in order to facilitate interaction between the facility occupants, particularly in support of interdisciplinary or multidisciplinary teaching and research; Concentrate buildings in centers of development to accommodate convenient pedestrian access between buildings, provide a critical mass that facilitates associated support activities (parking, transit, food service, etc.) and retain open spaces; and Avoid locations of undesirable soils or topography by conducting appropriate soil and geotechnical evaluations during site selection and design. Academic Facilities Element Objective 1.2: To increase academic and research facilities to eliminate deficiencies and support the university’s Academic Strategic Plan. Campus Master Plan Amendments – January 2013 Page 7 of 10 MAP AMENDMENT FLU-13-2 Eastside Campus – A Data Center is being built on the Eastside Campus on Waldo Road in Gainesville. The building will serve as an off-campus back-up location for academic and administrative support functions from various departments across the main campus University. This building serves an important back-up function of the University. The placement of the building was projected at another location, but due to site constraints the current site was selected. In addition, the Powell Hall Structures Lab is being added to provide additional academic /research space to the existing structure. These two projects programs required the minor reworking of Land Use classifications as shown on the figures and East Campus Land Use table. Figure 2-1.d 13-1.a Title Future Land Use Future Buildings EXISTING LAND USE Academic/Research- Parking PROPOSED LAND USE Support ACRES Academic/Research: (-) 0.04 Parking: (-) 0.52 Road: (-) 0.22 Support: (+) 0.78 PUBLIC FACILITIES IMPACT There are no public facilities impacts with this amendment. The project is consistent with the Campus Development Agreement. LANDUSE COMPATIBILITY The Eastside Campus has been conceived as a mixture of academic and support functions since it was brought into the Campus Master Plan in 2004. The Data Center Building will serve an important support function as a back-up, off main campus, data warehouse. The addition to the Structures Lab CONSISTENCY WITH GOP’S A review of the goals, objectives and policies (GOP’s) of the Campus Master Plan indicates that the proposed office building is consistent with the Master Plan and supports the following objectives and policies: Support / Clinical Facilities Element Campus Master Plan Amendments – January 2013 Page 8 of 10 Objective 1.0: Provide support facilities consistent with the academic support needs of the University and in accordance with applicable space standards and customer expectations. Policy 1.1.4: Support facilities that attract the general public and/or have minimal interaction with students should locate on the campus perimeter adjacent to parking and transit facilities, or in offcampus locations, or at the Eastside Campus on Waldo Road to maximize accessibility. Urban Design Element Objective 1.3.: Utilize building construction, renovation and rehabilitation to enhance the campus environment. Policy 1.3.10: New buildings, building additions or building renovations on the Eastside Campus shall be consistent with the overall site layout depicted in Figure 1-12, and shall incorporate landscaping, pedestrian circulation, transit and bicycle access, and functional open space. New structures shall be two to five stories in height except where unique building programs dictate lower heights and approval is obtained from the Land Use and Facilities Planning Committee. Building skin materials shall include Gainesville-range brick and project the image of a satellite campus comparable to the main campus. Intergovernmental Coordination Element Objective 1.4: Implement procedures and programs for effective community coordination on issues of economic development, emergency services, transportation and other community goals consistent with the University’s Mission and the programs of the City of Gainesville and Alachua County. Policy 1.4.1: The University shall consider potential for locating non-academic services and other programs within appropriate areas of the community, including East Gainesville, that could enhance on-going and/or proposed economic development activities identified in the objectives and policies prepared by Alachua County and the City of Gainesville in their comprehensive plans. Campus Master Plan Amendments – January 2013 Page 9 of 10 SECTION 4 CAPITAL IMPROVEMENTS AMENDMENTS Table 13-1 “Ten Year Capital Projects List, 2005-2015” tracks the ten-year building program anticipated by the University. The December 2010 amendments to this table reflect current project status including revised completion dates, changes to project descriptions, additions and deletions of projects. According to the University of Florida Internal Operating Memorandum and Delegation adopted on March 28, 2003, “corrections, updates or modifications to the Capital Improvements Element concerning costs, revenue sources, acceptance of facilities or facility construction dates consistent with the adopted plan, and corrections, updates, or modifications of current costs in other plan elements shall not be considered to be plan amendments and are not subject to these provisions”. However, all updates to Table 13-1 are included herein as a project status report. Projects on this List that are funded by state revenue sources including Public Education Capital Outlay (PECO) and Facility Enhancement Challenge Grant (FECG/Courtelis Match Program) are updated annually and approved by the University of Florida Board of Trustees. The following tables and figures are modified with this Campus Master Plan amendment. Figure Table 13-1 Figure 2-1 Figure 2-2 Figure 13-1 Title Ten-year Capital Projects Future Land Use Future Buildings w/Landuse Future Building Sites Campus Master Plan Amendments – January 2013 Page 10 of 10 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 CAPITAL IMPROVEMENTS ELEMENT Table 13-1: Ten-Year Capital Projects List, 2005-2015 (BOLD and yellow hightlighted text indicates changes in the April 2012 minor amendment. This list does not represent all revisions that may be shown in the forthcoming Campus Master Plan Update for 2010-2020.) Project Name (UF Project #) Estimated Net New GSF Estimated Renovated / Relocated GSF Project Description PROJECTS - ACADEMIC / RESEARCH Funded or Partially Funded (chronological order at time of CMP adoption) This project is to remodel the ground through 6th Floor Levels of the Pharmacy Wing and update space currently utilized by the Departments of Pharmacy Practice, Pharmaceutics and the Center for Drug Discovery to house their research and administrative functions, including offices for the faculty, and to create additional generic research laboratory space to meet any unmet needs of the Departments of Medicinal Pharmacy Wing Chemistry, Pharmacodynamics and Pharmacy Practice. Remodeling, Phase II (UF-196) 4,500 Completed April 2005. The project will partially demolish, and then infill and renovate, the first two floors of Holland Hall to increase the size of the Legal Information Center by 75%. The quality and quantity of instructional space will be enhanced with new classrooms on the renovated 3rd floor of Holland Hall and in (2) new connectors between Holland and Bruton-Geer Halls. The final product will triple the current inventory of classroom space, and will provide a classroom seat for nearly the entire student body. The site west of both buildings will be redeveloped as a plaza area, with a new staff parking lot south of the existing lot along Village Drive. Early site construction and demolition began in July of 2003 as the building design was finalized. The new classroom Legal Information towers were completed for use in the Fall of 2004. The Center Addition expanded Legal Information Center was completed and Law School 57,500 Phase II (UF-150) 47,000 48,000 June 2005. Major full scale historical renovation of the Old Women's Gym building. Project to provide office, classroom and seminar space for Center for Womens Studies and Kathryn Chicone Gender Research in the College of Liberal Arts and Ustler Hall (UF208) 13,840 Sciences. Completed August 2006. Library West The project will construct 60,000 GSF on the north side Addition and of the existing library and remodel the existing 117,000 Remodeling (UFGSF including repairs to the exterior. Completed July 144) 60,000 117,000 2006. This project is for construction of a new research laboratory facility for the Interdisciplinary Center for Biotechnology Research at the University of Florida. The new building will include research laboratories, teaching labs, and administrative office space in support of university-wide research programs. The proposed Biotechnology Laboratory Pavilion is programmed to be a 24,500 GSf facility, providing 16,500 net assignable square feet to house the research, training and administrative operations of the ICBR. This facility will allow the ICBR to consolidate their operations which are ICBR currently located in six different Health Science Center Biotechnology and Institute of Food and Agricultural Sciences facilities, Laboratory as well as a small one story administrative building. Pavilion (UF-134) Design and construction will be concurrent with that of – combined with UF-136, the Genetics and Cancer Research Center. Cancer/Genetics Research Center 24,500 Completed June 2006. Project Map Location G-509 B-512 C-506 C523 and C-1 G-320 PAGE 13-2 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Estimated Net New GSF Estimated Renovated / Relocated GSF 255,500 286,700 - 11,900 2,778 - 11,087 18,082 3,360 NIMET Nanoscale Research Facility (a.k.a. Multidisciplinary Nanosystems Research Facility, UF-202) 80,000 57,867 - Biomedical Sciences Research (UF269) 214,750 - - 2,600 40,000 48,617 - Project Name (UF Project #) Cancer/Genetics Research Center (UF-136) Veterinary Medicine Food Animal Research Facility / Deriso Hall (UF-195) Steinbrenner Band Practice Facility / Music Building Addition, Phase I (UF-207) Perry Construction Yard at M. E. Rinker Hall (UF277) Pugh Hall (UF288) CAPITAL IMPROVEMENTS ELEMENT Project Description This project is for construction of a multi-disciplinary biomedical research facility at the University of Florida for the UF Genetics Institute and the Cancer Research Center. The new facility will include research laboratories, animal research facilities, faculty and administrative offices, and a rooftop research greenhouse. The proposed Genetics and Cancer Research Center is programmed to be a 255,500 gross square foot facility, providing 148,500 net assignable square feet to house the research, training and administrative operations of the Genetics Institute and Cancer Research Center and a Central Energy Plant. This facility will provide the two entities with the necessary space to increase the level of funded grant research, and will provide efficiencies in operation through the consolidation of the core research support facilities. Design and construction will be concurrent with project UF-134, the ICBR Research laboratory Pavilion. Completed June 2006. A new 11,900 square foot facility for the Department of Large Animal Clinical Sciences on the site of the old IFAS Meats Lab Building Bldg. No. 65. The space program focuses on the needs of Food Animal faculty and staff and the Food Animal Services program and their vehicles. The Food Animal Services program is an outreach program providing veterinary medicine services to area farms and ranches. Completed April 2006 with 9,998 GSF replacing a demolished 7,220 GSF existing building. This project includes a rehearsal hall sufficient to hold 300 performers of the University of Florida Pride of the Sunshine Fightin Gator Marching Band offices, instrument storage, band library, and instrument issue room. Completed August 2008. This project will construct a new multi-disciplinary facility to house clean rooms, laboratories, office and support space for multi-disciplinary research in the nanosciences. As a user facility, the NRF will house few permanent research faculty and staff. The mission of the NRF is to foster collaborative research by users from the college of Engineering, College of Medicine and College of Liberal Arts and Sciences (primarily Physics and Chemistry Departments). Completed January 2008. The project is for a new interdisciplinary research building to combine life sciences, engineering and medicine with space for research labs, office and animal care facilities. Program components include the Institute for Bioimaging and Bioengineering (IBB) that partners a new Biological Imaging Center, the Department of Biomedical Engineering, the Office of Technology Licensing, the General Clinical Research Center and Industry within the same building. Proximity to related programs housed in the McKnight Brain Institute is a key consideration of site location. Completed August 2009. This project will cover and partially enclose an existing 2,585 GSF outdoor classroom and demonstration yard for the construction trades. The area will not be climate controlled. Consistent with Rinker Hall’s LEED Gold Certification, the project is conceived to include a green roof design. Completed April 2007. This project proposed to construct a new building to house the Graham Center for Public Services and related program support within the College of Liberal Project Map Location G-320 G-246 C-2 F-38 G-36 or G-35 C-321 C-323 PAGE 13-3 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Project Name (UF Project #) Estimated Net New GSF Estimated Renovated / Relocated GSF CAPITAL IMPROVEMENTS ELEMENT Project Description Arts and Sciences. Completed December 2007. Project Map Location Funded or Partially Funded Since CMP Adoption Extension IFAS Professional Development Center (UF-361) Frazier Rogers Hall Addition: Center of Excellence Biofuels Lab 10,000 - 2,693 252 - 2,200 Levin College of Law Advocacy Center (UF-155) 20,000 - Master of Business Administration Building / Hough Hall (UF-206) 45,000 54,000 - Pathogen Research Building (UF-275) 144,010 90,000 - UF Innovation Center 160,000 - Irrigation Research and Education Park (IREP) Relocation The Extension Professional Development Center will enhance UF IFAS extension, research, teaching and outreach programs and foster collaborative opportunities by all interested public and private community organizations. This facility will provide for academic support, office, and support space. Completed December 2011. This project provides laboratory and support space for the Center of Excellence Biofuels Laboratory. Completed February 2008. This project is necessary to vacate the existing location on Hull Road to make way for student recreation athletic facilities. The new location will be southeast of the orchard in the vicinity of the vacated Poultry Unit. The Irrigation Research Park is an outdoor teaching facility with minimal support structures. The project is in design with a current plan to split the teaching and research functions of the IREP. The teaching element will be located at the vacant poultry complex and will renovate building #152. The research element is being proposed near Ritchey Road. Completed 2008. This project provides a new courtroom, support, meeting, and shelled office space. The building will be constructed south of Bruton-Geer Hall. Completed August 2009. The project will include departmental office spaces, classrooms, and career services spaces, and could potentially house some existing centers such as the Public Utility Research Center, BEBR, Retailing, Entrepreneurship and the Center for International Business among others. Completed April 2010. The project is for a new multi-disciplinary research building to be jointly used by the Health Science Center, CLAS and IFAS. The building will consist of research labs, teaching labs, offices and support services. Program components include the Environmental and Human Toxicology Center that must be relocated from its current location near the Genetics Cancer Research Center where future research buildings are planned. Completed October 2009. This project will be constructed in phases by a publicprivate partnership with Alexandria Equities, Inc. to provide life science and technology related laboratory and office space. The proposed building(s) will include Alexandria’s unique range of state-of-the-art facilities and proprietary products and services designed to foster the development of the broad and diverse life science and technology sectors. The Innovation Center will also include highly flexible and adaptable space for more established entities and key university-related functions. Project Deleted. K-413 F-6 I-316 B-101 C-5 or C6 G-54 , G36 or G33 G-55&56 PAGE 13-4 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 CAPITAL IMPROVEMENTS ELEMENT Estimated Net New GSF Estimated Renovated / Relocated GSF Veterinary Education and Clinical Research Center (UF-313) 67,175 95,310 49,233 0 Veterinary Medicine CT Scan Facility (UF-287) - 900 Project Description This project is for construction of an addition to College of Veterinary Medicine Small Animal Hospital at the University of Florida, and renovation of existing hospital space. The proposed Small Animal Hospital Expansion is programmed to include 67,175 gross square foot of new facility, along with 49,233 gross square foot of renovated hospital space. This facility will allow the Small Animal Hospital to relieve space deficiencies, which are currently causing less efficient hospital function and customer service. The project was formerly named Vet Med Small Animal Hospital. Completed October 2010. Installation of a CT Scan facility in the College of Veterinary Medicine Clinical Teaching Hospital (UF Bldg. #215). The College will collaborate with the IAMS pet food company for the installation of an MRI in the VH-146 area of the Clinical Teaching Hospital for animal patient diagnosis, both large and small animal. Completed April 2007. - This project will construct a new modular building adjacent to Building #625 to temporarily house research programs that will eventually move into the Emerging Pathogens and/or Environmental Toxicology building projects. Completed March 2009. Project Name (UF Project #) Aquatic Pathobiology Phase I (LM-4611) 3,499 Addition to the Aquatic Pathobiology Building - Phase II (LM-4722) 3,470 - College of Engineering Renovations (UF363) - 38,500 Veterinary Medicine Auditorium (UF313-U) 5,800 - Weimer Hall Vertical Addition – Phase I (UF-342) 7,580 5,570 Chemical Engineering Additi on Student Center 44,147 8,691 11,788 - Phase II will provide space for research of aquatic mammals to compliment the fish/toxicology research being conducted in the Phase I area. Completed March 2010. The project will renovate four buildings (Benton Hall/Bldg. #0721, Nuclear Science/Bldg. #0634, Weil Hall/Bldg. #0024, and Larson Hall/Bldg #0722) within the College of Engineering. These projects are estimated at 35,000 - 40,000 total square feet. The purpose of these renovations is to create more lab space, reduce energy consumption, upgrade space to latest code, and allow for more technologically advanced lab space. The scope may also include the renovation of temporary space as laboratories are renovated. Weil Hall is on the National Register of Historic Places and will be modified accordingly. Completed June 2011. This project will construct a new 165-seat auditorium north of the Veterinary Medicine Academic Building. Completed August 2011. This project was split into two phases, the first of which includes an interior renovation and two floors of expansion infill that does not extend onto the 2001 addition. The project creates a “convergence newsroom” and support space within the radio and television studio area of the building. Completed July 2012. This addition to the existing Chemical Engineering Building will house new departmental offices and student lounges on the first floor; and state-of-art research and teaching laboratories wet laboratories on the second floor. The second floor wet lab will be shelled during Phase I construction, and completed as Phase II. The building will include a new shared public Project Map Location G-65 G-530 G-59 G-59 C-505 G-427 C-528 F-244 PAGE 13-5 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 CAPITAL IMPROVEMENTS ELEMENT Estimated Net New GSF Estimated Renovated / Relocated GSF Plant Science Diagnostics Facilities (IFAS 11085) 20,595 6,000 - Institute on Aging / Clinical Translational Research Building (UF-357) 110,307 - IFAS Communications Building 3,428 - College of Business Administration Undergraduate Studies Building/ Heavener Hall (UF-380) 45,000 - 15,000 42,900 29,850 30,382 103,400 167,500 95,000 - Project Description lobby/atrium that connects to the addition via a corridor and serves as a backdrop to the existing plaza west of the New Engineering Building. Completed August 2012 This building will house all plant and soils diagnostic testing labs associated IFAS on the UF main campus. The project will be coordinated with and complement the planned IFAS Plant, Soil and Water Sciences building project. Alternately, this building program may be satisfied in the Pathogen Research Facility or IFAS Plant Soil and Water Sciences building. Completed December 2012. This project will construct a new building up to 7 stories that will house clinical and support programs of the College of Medicine, Institute on Aging. These programs will move out of the Butler Building #210 and will demolish this 9,693 GSF temporary building. The new building is anticipated to construct 120,000 GSF, for a net increase of 110,307 GSF. Under Construction; Scheduled Completion in March 2013. This project will demolish existing UF Bldgs #0449 (890 GSF) & 0661 (1,682 GSF) to replace them with a new 6,000 GSF building for communications offices. Scheduled completion October 2013. The proposed new building will be home to the School of Business undergraduate programs, consolidating functions currently housed in Matherly, Stuzin, and Bryan Halls. The new building will provide a variety of classrooms, study and breakout rooms, academic advising space, and staff offices, but faculty offices will remain in existing buildings. The project will also be responsible for enhancing the surrounding site, including the gateway/entry at the corner of SW 13th Street and University Avenue. Construction anticipated early 2013 through Spring 2014. This project will rehabilitate and convert into a Student Learning Commons to provide a variety of research & study spaces for individual and group activity. Scheduled Completion January 2015. The Departments of Agronomy and Soil & Water Sciences currently occupy Newell Hall and its Annex. The IFAS Plant/Soil Water Sciences building will relocate those occupants so that the building can be renovated for occupants to be determined. as a teaching facility for the College of Liberal Arts and Sciences. An auditorium and additional classroom space is also needed in this part of campus. These needs are anticipated to be addressed, in part, by an addition and/or new Annex building at Newell Hall. Newell Hall is on the National Register of Historic Places and will be modified accordingly. This project will provide for expansion of the Medical School with additional classrooms and modern teaching laboratories including simulation facilities. The project is not yet fully funded for construction, but completion is targeted for February 2015. In Design. - The project will construct an addition to the south side of the Nuclear Science Building (UF Bldg. #0634). Only design is funded at this time. Project Name (UF Project #) Newell Hall Renovation Rem odeling, Restoration and Addition UF-212 Health Science Center Harrell Medical Education / Simulation Building UF-286 Nuclear Science Building Addition 48,000 Project Map Location I-217 or E-78 G-416 E-421 C-428 C-518 & C-323 G-33 or G-35 C-113 & C-114 Unfunded (alphabetical order) PAGE 13-6 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Estimated Net New GSF Estimated Renovated / Relocated GSF Animal Research Lab #1 Replacement / Relocation - 12,370 Architecture Building Addition and Renovation 30,000 83,800 Astronomy Building and Teaching Observatory Relocation 76,140 - Chemistry / Chemical Biology Building 111,800 - CLAS Life Sciences 112,530 - Constans Theatre Addition, Phase II 11,500 - Dental Building Expansion 160,000 - Project Name (UF Project #) CAPITAL IMPROVEMENTS ELEMENT Project Description This project will relocate the animal laboratories of the Racing Lab to complete the relocation of all animal research west of SW 34th Street. The existing laboratory facilities include 9,370 GSF in the main lab plus 3,000 GSF in an annex. The existing building was constructed with state funds under a 20-year service contract signed in 1999. Non-state funding will need to be identified to fund the relocation. This project was reprioritized due to accommodations for the animal research program within the Biomedical Sciences Building project. This project will demolish the north elevated one-story portion of the existing Architecture building (built in 1979) and infill with a multi-story addition of classroom, studio and office space for faculty and/or graduate students. The existing open plaza is proposed to be renovated as a covered atrium that could be used for lectures, studios, exhibits, receptions and other public events. The remaining existing building will be renovated as needed to accommodate modern studios and classroom facilities. This project is for construction of a new facility located adjacent to the Physics Building to house the Astronomy Department. The new facility will be connected with an enclosed circulation element to the Physics Building. The program will include research, offices and classroom spaces. The high bay research spaces will be designed for collaborative research and fabrication of the state of art telescope components. The project includes a roof top observatory and nanotechnology fabrication labs. The project will include demolition of the existing observatory (520 GSF) and vacating space in the Bryant Space Science Research Building, which can then be reassigned. The Chemistry/Chemical Biology Building will catalyze growth in critical areas that build on chemical insights into biological problems. The building will house researchers in biochemistry, chemical applications of genetics, biophysical chemistry, drug discovery, and nanochemistry as applied to the analysis and detection of pathogens and disease. The facility will centralize core chemical biology research and teaching infrastructure to be the centerpiece of recruitment for the next generation of world class chemical biology faculty and students. The new building will provide a set of specialized facilities for the life sciences that are not currently available, or are inadequate in the present Bartram/Carr complex and will house the Zoology and Botany Departments. This project proposes an addition to the north elevation of the existing Constans Theatre to include a Script Library classrooms and graduate student spaces. The addition will open out to the Union North Lawn creating a new lobby/entry focal point accessible from the lawn. The floor slab will be connected to the existing second floor level at north and south ends of the Constans Theatre. This project is for a 240,000 GSF addition to the DSB that will provide expansion for the College of Dentistry research functions and office space with potentially new or renovated space for dental clinics. Project Map Location G-61 C-3 & C511 F-41 C-7 C-37 or G-59 C-301 G-48 PAGE 13-7 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Estimated Net New GSF Estimated Renovated / Relocated GSF Entomology/Nema tology Support Facilities 15,000 - Equine Sports Complex 30,000 - Project Name (UF Project #) HDC/BSB (HSC) Remodeling / Renovation - 120,000 20,000 - IFAS Fisheries and Natural Resources Water, Soil Land and Plant Sciences Re sources Bldg 122,490 - Law School Library and Classroom Phase IV - 4,000 Livestock Pavilion / Animal Support Facility 36,050 23,950 - 61,600 113,332 - 27,250 33,430 83,460 89,462 McCarty Hall Renovation Mechanical Engineering Lab Replacement Norman Hall Remodeling / Addition for the International CAPITAL IMPROVEMENTS ELEMENT Project Description The Entomology and Nematology Departments need additional greenhouses, support and storage facilities to serve these departments near the Department building on Surge Area Drive. This project will construct a new Equine Sports Complex, consisting of classrooms, teaching labs and research labs with access to horse pastures. The project program will focus on equine sports medicine. This project addresses the need for modernization and upgrades to various aging Health Science Center facilities to serve the academic and research programs conducted by the Colleges of Dentistry, Medicine, Nursing, Pharmacy and Health Professions, with first priority to those facilities housed in the Basic Sciences and Human Development buildings. This project will construct a new facility to serve the Fisheries Aquatic Sciences program along with some functions of the School of Natural Resources and the Water Institute. It will include classrooms, teaching labs, research labs, offices and support. The project is for a new 120,000 GSF research building for the College of Agriculture. The building will include space for research labs, teaching labs and related support. This project seeks to augment the funded project, Legal Information Center Addition & Phase II Law Building, by providing for additional renovations not funded in the Phase II-III project. Also, this phase will provide for much needed upgrades to the existing mechanical, fire protection, and telecommunications systems installed as part of the earlier phases of the Law School projects. The project primarily consists of renovations to Brutonrd Geer Hall and 3 Floor offices in Holland Hall. This project proposes to construct a 60,000 GSF teaching facility at the Sandhill Farms Beef Teaching Unit near Williston Road. It is necessary to vacate the existing structure (23,950 GSF) on Archer Road to make way for future parking and academic buildings. The structure will include expanded classrooms to complement the covered teaching arena and improve functionality over the existing structure. This project consists of the renovation of approximately 61,600 GSF of McCarty A, B & D to upgrade spaces, correct deficiencies and improve the functionality of the building and its systems. This 140,000 GSF project proposes to replace the existing Mechanical Engineering building. The new facility will house the combined Mechanical Engineering and Aeronautical Engineering programs. The project scope will include the demolition of existing 26,668 GSF building and the machine shop attached to the west side of the Rhines Hall. The project will take advantage of elevation change in the north/south direction to include a below grade floor starting at higher elevation opening out to a common service yard shared between new facility and Rhines Hall. The project will provide high-end research labs, high bay machine shops, offices and classrooms, state-of-the-art auditorium, wind tunnel and shared public lobby with amenities to unify the two engineering programs. The Norman Hall Remodeling/International Media Union includes renovations to the ground floor Norman Library and new construction infill for the International Media Union. This project will also renovate historical Norman Project Map Location I-119 & 120 G-310 G-503, 510, 533 & 532 E-247 E-79, E74 or G59 B-512 l-117 C-508, 520 & 524 C-18 C-10, C504 and C-507 PAGE 13-8 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Estimated Net New GSF Estimated Renovated / Relocated GSF Norman Hall Remodeling - 45,000 P. E. T. Scan Facility 30,000 - - 50,000 110,000 68,946 - 151,220 16,000 2,104,856 2,435,755 2,398,831 2,429,236 2,372,840 2,400 Project Name (UF Project #) Media Union Plant Science Growth Facilities Psychology Building Remodeling and Addition Weil Hall Remodeling, Phase II Weimer Hall Vertical Addition – Phase II SUBTOTAL CAPITAL IMPROVEMENTS ELEMENT Project Description Hall. The building is need of major cosmetic and utilities infrastructure upgrades. Norman Hall is on the National Register of Historic Places and will be modified accordingly. The proposed site of the addition (C-10) is moved from the space between Norman Hall and Norman Annex to the parking lot on the northeast corner of Norman Hall. This project is for building renovation of the historical Norman Hall. The building is need of major cosmetic and utilities infrastructure upgrades. Norman Hall is on the National Register of Historic Places and will be renovated and modified accordingly. This project is deleted and combined with the International Media Union. This project will construct a Positron Emission Tomography Facility that provides a much needed research function at the Health Science Center. The project will provide laboratory space and laboratory support for investigators involved in research to advance knowledge about computerized tomography scanning and its applications for the treatment of diseases. By providing laboratory space in conjunction with nearby treatment facilities, investigators will have the unique opportunity to utilize the Positron Emission Tomography system as part of their research activities. This project will construct new greenhouses and supporting headhouse to replace the older greenhouses on campus. This project will be implemented incrementally with an estimated five new replacement greenhouses per year on average. This project proposes to construct an addition and renovate space in the existing Psychology Building including classrooms, research laboratories, offices, vivarium/laboratories, auditorium and support space. The project will likely be phased, or alternately its program may be incorporated in whole or in part within the CLAS Life Sciences building. Complete restoration and remodeling of Weil Hall. The west half has been remodeled but the east half has major deficiencies. This Phase II addition project proposes to construct two additional floors on the 2001-addition portion of Weimer Hall and renovate the existing auditorium to improve acoustics and technology. The addition will provide space to house expanding programs in Science Health Communication, Interactive Electronic Media and the Documentary Institute. Project Map Location C-504 & 507 F-32 I-190 & E224 F-115 C-505 C-528 975,629 887,372 925,872 931,974 PROJECTS - SUPPORT / CLINICAL Funded or Partially Funded (chronological order) This project will demolish the existing Building #521, which was built in 1958, and construct a new building with modern classrooms, art and science laboratories, storage and ADA-compliant restroom facilities. The existing building consists of 5,500 GSF that will be replaced with a building of 10,740 GSF for a net gain of 5,240 GSF. This building replacement is necessary due P.K.Y. Arts and to the age and condition of the structure, as well as Sciences Building Replacement 5,240 5,500 classroom space and resource deficiencies. The H-108 PAGE 13-9 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Project Name (UF Project #) Hub (UF-237) Estimated Net New GSF Estimated Renovated / Relocated GSF - 66,900 UAA Football Offices (UAA-18) 32,000 18,380 Infirmary Addition Student Health Care Counseling and Wellness Center – Phase I (UF-256) 34,000 20,000 22,549 23,974 6,000 CAPITAL IMPROVEMENTS ELEMENT Project Description project is funded from a PKY School PECO allocation and is justified by a supplemental educational plant survey. Completed November 2005. The project scope involves renovations to the existing Hub Building. The Technology Union, as part of Academic Technology is envisioned as a facility that allows student access to multiple information technologies in support of learning and extracurricular activities. Completed in February 2007 to house Academic Technology and the International Center. This project proposes to construct an addition and renovate a portion of the UAA Football and other administrative offices. Completed July 2008. This project will provide a 34,000 GSF expansion and minor renovation to the existing Infirmary Building. The expansion will include an outpatient health clinic located in close proximity to the existing infirmary building. While this is not a comprehensive health care facility, all clinical functions will be located in one facility while most of the business, administrative and mental health functions will reside in the current infirmary. This project will be funded from the Capital Improvement Trust Fund. The Infirmary is on the National Register of Historic Places and will be renovated and modified accordingly. This project will construct a new Student Health Care Center to house programs to be relocated from the Infirmary and Peabody Hall facilities for Women’s Clinical Services, Mental Health Clinic, Health Promotions and a Pharmacy. The project will also develop program and design for a Phase II addition. Completed February 2010. Project Map Location C-514 C-17 C-12 D-12 Funded or Partially Funded Since CMP Adoption Transportation and Parking Services Offices (UF-290) 2,000 1,430 7,570 Laundry Services Building Renovation - 20,070 Gator Band Shell Replacement (UF345) 2,860 3,140 Sun Terrace Expansion (UF354) 5,500 - This project will relocate and replace the existing administrative and customer service office of the Transportation and Parking Services Division. The project proposes to construct these facilities as a liner building to a future parking garage. The existing 7,570 GSF temporary building offices will be demolished and replaced with 9,000 GSF of new construction. Completed September 2009. The University intends to begin outsourcing laundry services so that this facility will no longer be needed. The building will be reassigned. Renovations are complete for use as the Physical Plant Annex. Completed June 2009. The project scope includes demolition of the existing university bandshell/restroom facilities and replacement with a new bandshell, restrooms, and support facilities (UF Buildings # 255 & 256 totaling 3,140 GSF). The existing facilities will be replaced with a structure of 6,000 GSF to provide enhanced accommodation for concerts, graduation convocations, and other mass outdoor events. Completed July 2009. This project will construct a 1,500 GSF addition to the existing Sun Terrace food service and a new structure of 4,000 GSF for expanded food service. The project will also provide enhanced outdoor seating, an enhanced entrance to the Health Center Library from the Sun Terrace, and possibly a covered walkway leading to the library. Completed August 2011. - This project will construct a new food service facility consisting of approximately 3,500 GSF on the west side Turlington Hall Addition (LM- 3,000 G-45 D-501 B-313 G-423 C-263 PAGE 13-10 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Estimated Net New GSF Estimated Renovated / Relocated GSF Columbarium - - Rawlings Hall Addition 4,100 - 10,000 17,317 20,000 56,209 2, 500 - Project Name (UF Project #) 4737) P.K.Y. Developmental Research School Replacement Facilities Addition to “Gator Locker” the Official Store of Florida Athletics (UAA-28) Fresh Food Court (LM-5005) 3,800 Wilmot Gardens Greenhouse (LM5040) 3,653 - Reitz Union Annex Expansion and Renovation 100,000 90,000 65,000 CAPITAL IMPROVEMENTS ELEMENT Project Description of Turlington Hall. The project will also incorporate a relocation of the Student Information Booth (Bldg #447) and associated site improvements. Completed July 2010. This project will construct a columbarium within an Urban Park Future Land Use area. The project will include landscaping, lighting and other site improvements as needed. In Design. Anticipated completion in September 2012. This project will construct an addition to the west façade of Rawlings Residence Hall. It will create a new entry that features food services, restrooms, seating areas and support space. Space will include 2,100 GSF of interior space plus approximately 2,000 GSF of outdoor covered walkway and seating area. Anticipated completion in February 2013. This project proposes to replace classroom and support spaces on the P.K. Yonge school campus based upon updated Educational Plant Study and space standards. The P.K.Y campus was built in 1958, with only a limited number of buildings constructed in more recent years. As such, the campus physical plant is in need of upgrades including technology, security, deferred maintenance, ADA and other building codes. New buildings will be designed as minimum two-story structures when feasible to make more efficient use of the small campus. The project includes demolition of 105,657 GSF of existing buildings to be replaced with 179,183 GSF of new buildings plus reconstructed parking lots, athletic fields and support. Phase 1 demolishes an existing 9,237 GSF building #0514 and constructs a 37,000 GSF building for elementary classrooms. Completed May 2012. Phase 2 is beginning design for the Middle/High School Building that proposes to construct 75,000 GSF while demolishing 13,925 GSF (Bldgs #513 & 517). The retail store located at the north end zone of Ben Hill Griffin Stadium is proposed to be expanded. This project will expand the existing Fresh Food Court at Broward Dining on Inner Road to add 340 seats and needed support space. Scheduled Completion May 2013. The greenhouse will be constructed along the south border of Wilmot Gardens to support the healing garden and research functions of the rehabilitated gardens. Completion scheduled fall 2013. The Reitz Union continues to experience space shortages for various student services, student organizations, meeting rooms, conference space, Student Government offices and a multi-cultural center. This project proposes to construct an addition annex facility south of Museum Road potentially connected by skywalk to the existing Reitz Union. The project will nd demolish the existing colonnade including the 2 floor 10,000 GSF meeting space, renovate 65,000 GSF in the existing Union and construct a 100,000 GSF addition. With a proposed location on an existing surface parking lot, the structure would be designed to incorporate parking and potentially interconnect to an adjacent site considered for future library expansion. Project schedule anticipates construction to start in summer 2013 and be complete by April 2015. Project Map Location E-420 H–333 – H-341 C-430 C-429 G-435 F-40 PAGE 13-11 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Project Name (UF Project #) Estimated Net New GSF Estimated Renovated / Relocated GSF CAPITAL IMPROVEMENTS ELEMENT Project Description Project Map Location Unfunded (alphabetical order) Animal Research Support Relocation/Replac ement Facilities Phase II 7,882 32,118 Baby Gator Replacement Facility 36,079 - Criser Hall Addition & Renovation with Peabody Renovations 12,000 8,555 FMNH Digester Replacement Facility 1,000 - FMNH Exhibit Loading, Storage and Staging Facility 12,550 - 120,000 - The project is for replacement/relocation of the animal research facilities currently located west of SW 34th Street (32,118 GSF). A new complex of approximately 40,000 GSF is being developed south of Archer Road in closer proximity to the HSC and other users of these research animal support facilities. Currently, one building has been relocated and the remaining buildings will be relocated within the ten-year horizon. The project proposes to construct a replacement facility to house the growing enrollment demand at the existing Baby Gator facility, and to better accommodate associated teaching and research support facilities. The program includes classrooms, offices, outdoor playground and support spaces for College of Education programs. The existing Baby Gator buildings will be available for reassignment, or eventually for demolition to create a future building site. This project proposes to enclose the existing patio space west of Criser Hall to construct a three-to-four story structure for expanded student support services. The project will also renovate the student financial aid area currently located in Criser Hall. These facilities were designed to accommodate large crowds prior to technology advances that allow students to conduct business over the computer. However, student enrollment has grown and student support programs have expanded, which are in need of additional space. Some student services located in Peabody Hall, such as the Student Counseling Center, are in need of additional space that can be provided by relocating other Student Affairs units into the Criser Hall addition. The reassignment of Peabody Hall space will likely create the need for minor revisions that will be done consistent with its status as a registered historic building. This project will provide the facilities necessary to accommodate updated student services programming. This project will construct a 1,000 GSF facility in the Surge Area to replace the existing digester located on Radio Road. This relocation is necessary to make the Radio Road site available for future housing. This project will construct an enhanced loading dock area for the FMNH that will facilitate staging and limited storage of exhibits. The east façade may incorporate a covered picnic pavilion area facing the Center for Performing Arts. As part of this project or a stand-alone project, alcohol storage will be provided for specimens. This project proposes to construct a medical clinics building west of SW 34th Street near the Orthopaedic Surgery & Sports Medicine Building. The building could house multiple College of Medicine clinics that would be relocated from HSC facilities near Archer Road and other satellite facilities. - This project proposes to add 72 hotel rooms and approximately 3,500 GSF of conference space to the existing hotel and conference center. Health Science Center Clinical Building at SW 34th Street Hilton Guest Room and Conference Center Expansion 45,000 J-230, J231, 232, 233, 234, 236 & 237 D-87 C-158 & C531 I-249 I-274 D-259 I-82 & I168 PAGE 13-12 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Estimated Net New GSF Estimated Renovated / Relocated GSF P.K.Y. FamilySchool Collaboration Early Childhood and Family Outreach Center 5,000 7,289 - Public Safety Building 40,395 44,155 4,790 State University System Press 9,256 - Project Name (UF Project #) Student Health Care Center – Phase II Student Information Booth (Bldg. 447) Relocation West Student Dining Facility SUBTOTAL 37,000 - - - 17,000 492,262 528,058 540,532 544,632 540,932 544,585 - CAPITAL IMPROVEMENTS ELEMENT Project Description The Family-School Collaboration Center proposes a facility to provide adult education, community involvement and community access to university resources in a "non-university" atmosphere. The facility could house some existing centers in the College of Education such as the University Center of Excellence in Development Disabilities, Florida Collaborative for Community Inclusion and similar related programs. This project will provide for a new University Police Department facility. The project will also renovate the current police facilities in Building #27 & #132 to provide compliance with Americans with Disabilities Act (ADA) and Fire Safety Regulations as well as meeting current security and functional requirements of the department. Building #27 is on the National Register of Historic Places and will be renovated accordingly. The State University System Press has outgrown its current space. A new facility is recommended either as a reconstruction in the same location or as a liner building to a future parking garage at the Cultural Plaza complex. This project will expand the new Student Health Care Center to relocate remaining functions currently located in the Infirmary and Yon Hall. The existing information booth (692 GSF) was constructed in 1986. This project proposes to relocate the structure closer to the Computer Science Building or elsewhere on the site to facilitate pedestrian flow and transit access. This project should be accomplished in conjunction with overall site enhancements. This project proposes to construct a new student dining facility in the western side of campus convenient to student housing and the Southwest Recreation Center. The project may be constructed as a liner building to a future parking garage. Project Map Location H-107 F-24 C-112 or I-269 D-90 C-263 D-90 or I267 193,023 223,232 288,232 PROJECTS - CULTURAL Funded or Partially Funded (chronological order) Mary Ann Harn This project provides 14,304 GSF of exhibition gallery, Cofrin Pavilion 19,240 support, cafe and curatorial spaces. Completed (UF-115) 14,304 September 2005. I-324 Funded or Partially Funded Since CMP Adoption Phillips Center for the Performing Arts Lobby Expansion Phase I (UF-297) 12,000 4,555 4,400 Harn Museum Addition – Asian Art Wing (UF-273) 38,686 18,000 25,800 - The Phillips Center for the Performing Arts hosts a variety of performances in its 1,800-seat facility. The existing lobby is too small to accommodate full-house audiences during intermission. This project proposes to extend the existing lobby by creating a new front facade and enclosing two existing side terraces. The terrace enclosures were completed January 2008. This project will construct 16,000-18,000 25,800 GSF of new exhibit, curatorial and support space to house the Asian Art collection. The project also includes an exterior Asian Garden and other site improvements scheduled for completion in July 2010 Completed March 2012. I-272 & 273 I-275 PAGE 13-13 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Estimated Project Name Net New (UF Project #) GSF Unfunded (alphabetical order) Estimated Renovated / Relocated GSF Cultural Plaza Auditorium 10,000 - Harn Museum Addition 38,686 20,686 - Phillips Center for the Performing Arts Lobby Expansion Phase II 12,000 7,445 4,400 Phillips Center for the Performing Arts Support Space Expansion 4,800 - 205,730 290,456 285,520 293,320 - Powell Hall Addition SUBTOTAL CAPITAL IMPROVEMENTS ELEMENT Project Description The three entities present in the Cultural Plaza complex (Florida Museum of Natural History, Harn Museum of Art and Phillips Center for the Performing Arts) have need of a shared 400-seat auditorium. The project is proposed as a liner building on a future parking garage to be located in the existing surface parking lot of the Cultural Plaza complex. This project proposes to expand and partially renovate the Harn Museum of Art to support expanded education outreach, enlarged gift shop, expanded curatorial support spaces and a new exhibit wing. The project will include master planning for an outdoor sculpture garden. The Asian Art Wing project will partially construct this project. The remainder is Phase II. The Phillips Center for the Performing Arts hosts a variety of performances in its 1,800-seat facility. The existing lobby is too small to accommodate full-house audiences during intermission. This project proposes to extend the existing lobby by creating a new front facade and enclosing two existing side terraces. The terrace enclosures were completed January 2008. The lobby expansion and front façade remains unfunded. The Phillips Center for the Performing Arts hosts a variety of performances in its 1,800-seat facility. This project proposes to provide a Green Room for performers and a catering kitchen by constructing a vertical addition on the rear office portion of the building. This project proposes an expansion of Powell Hall to house the administrative, research and collections curatorial components of the Florida Museum of Natural History currently located in Dickinson Hall. The FLMNH has expanded its unique position as a research museum and has outgrow Dickinson Hall, which is landlocked and is not suitable for expansion or renovation as a state of the art research building. The expansion and relocation will allow the entire museum operations to be combined in a single facility, providing greater interaction between research, curatorial and exhibits aspects of the museum. Project Map Location I-268 I-110 I-271 I-527 I-81 4,400 PROJECTS - HOUSING Funded or Partially Funded (chronological order) Scope includes removal of asbestos-containing floor tile and mastic, removal and replacement of existing windows, installation of new central air conditioning and heating hot water systems and associated steam and piping systems, installation of new electrical breakers, Murphree Hall conduit and wiring, and upgrade of restrooms and Renovation (UF236) 97,450 miscellaneous interior finishes. Completed July 2005. The Sorority will demolish its existing house (16,020 GSF) on Sorority Row and build a new structure of Delta Delta Delta 23,122 in the same location to better serve the needs of Sorority House the members in an updated facility. Completed August Replacement 7,102 2007. This project will conduct a facilities assessment to determine the best approach for a net gain of 200 graduate/family housing units. University village communities have an average occupancy of 1.7 Corry Village Reconstruction 150,000 155,430 persons/dwelling unit, therefore, this project would C-522 H-322 B-145 PAGE 13-14 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Project Name (UF Project #) Estimated Net New GSF Estimated Renovated / Relocated GSF CAPITAL IMPROVEMENTS ELEMENT Project Description house approximately 340 new residents for a total of approximately 556 persons in Corry Village. Phase I (UF-365) – Corry Village Commons Building Replacement demolishes the existing 1,020 GSF building and replaces it with a new 9,000 GSF building. Completed April 2012. Funded or Partially Funded Since CMP Adoption Alpha Epsilon Pi This project will demolish the existing fraternity house (AEPi) Fraternity on Stadium Road. The existing house of 10,980 GSF House will be replaced with a new house of 14,027 GSF. Replacement 3,047 Completed. Alpha Epsilon Phi Sorority House This project will construct a 630 GSF addition to the th Addition 630 existing house on SW 9 Avenue. Completed. This project will provide new or renovated space for the house parent suite, chapter room, dining room, and kitchen. It will also renovate dorm rooms and provide an additional 9 beds. The project will also provide Beta Theta Pi various life/safety and code compliance upgrades. The Fraternity House original house was constructed in 1955, and all 5,000 10,000 Addition and renovation/addition work will respect and enhance the Renovation (UF historic architectural character. The project has 4 Bldg. #430) phases planned over 3-4 years depending upon fundraising, with the first phase anticipated to begin in 2009. Phase two is expected to follow shortly and be completed in summer 2010. Phi Mu Sorority This project will construct an addition of 1,800 GSF to Addition and 1,800 the existing house on Sorority Row for use as a Chapter Renovation Room. Completed August 2012. This project will demolish the existing house of 14,478 Theta Chi GSF on Fraternity Row, and replace it with a building of 6,522 Fraternity 21,000 GSF and increase the number of beds from 50 to 60. Scheduled completion summer 2013. This new residence hall is to increase the number of beds available to undergraduate students with a Single Student design mix of Single Occupancy Suites, Double Housing 2015 60,000 Occupancy Suites, Single and Double Occupancy (UF-400) ADA Enhanced Suites and several "Super Suite" style rooms. The building is anticipated to be five stories and provide 250 beds. Unfunded (alphabetical order) Fraternity or Sorority House 7,400 2015 Graduate / Family Housing Complex SUBTOTAL 120,000 284,502 288,179 293,179 301,501 361,501 - - One lot is available on West Fraternity Drive for construction of a Greek house. This project will construct additional graduate/family housing as demand warrants, and is anticipated to provide occupancy for approximately 600 students in a Village Community setting. Project Map Location B-331 H-342 B-422 H-432 B-431 C-160 B-150 E-253 through 257 252,880 PROJECTS - RECREATION SPORTS Funded or Partially Funded (chronological order) Phase I of this project constructed thee new basketball Broward Courts courts, volleyball courts, skateboard and skate hockey Outdoor facilities as well as upgrades to the tennis courts and Recreation walkways. Phase II will construct a restroom and 1,0 Complex, Phase II equipment storage building plus a staff monitor building 00 (UF-164) 1,666 and landscape enhancements. Completed September C-311 & C-312 PAGE 13-15 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Project Name (UF Project #) Estimated Net New GSF CAPITAL IMPROVEMENTS ELEMENT Estimated Renovated / Relocated GSF Project Description 2005. Project Map Location Funded or Partially Funded Since CMP Adoption Southwest Recreation Center Expansion, Phase III (UF-331) 75,0 00 37,000 27, 000 6,600 Construct additional student recreation facilities to potentially include a track, wellness center, activity rooms, increased strength and cardiovascular space, climbing wall, cycling room and juice bar with related office and support space. Completed July 2010. D-166 Unfunded (alphabetical order) Northeast Recreation Center 189,000 - Recreation Courts at Bledsoe Drive - - Recreation Courts at Corry Village Reconstruction - - Southwest Recreation Field Expansion at Hull Road 5,000 - Southwest Recreation Pool 35,000 - SUBTOTAL 304,0 00 300,666 262,666 Construct a new student recreation to serve students living on the east and northeast sides of campus. Facilities potential to include strength and cardiovascular space, multipurpose rooms, gymnasium, activity rooms, locker rooms, juice bar with related office and support space. The student parking lot on Bledsoe Drive is proposed to redevelop into recreation courts once additional student parking is provided in a new garage at the Cultural Plaza complex. Areas have been identified for future recreation courts south of Corry Village. These areas are proposed to be developed in coordination with the Corry Village reconstruction project. An area south of Hull Road has been identified for future student recreation fields and/or courts with support structures such as equipment storage. Development of this area will require relocation of the existing Irrigation Park. Project Deleted. UAA Lacrosse Field located on this site. Recreation Sports met this program requirement by reassigning the existing UAA soccer practice field to Recreation Sports. This project proposes to construct a swimming pool in conjunction with the expansion of the Southwest Recreation Center. C-243 D-86 B-140 I-215 and I-330 D-167 27, 000 6,600 PROJECTS - RECREATION: UNIVERSITY ATHLETIC ASSOCIATION Funded or Partially Funded (chronological order) The Spring Sports Master Plan calls for the initial construction of a new baseball/football building, and renovation of the existing Lemerand Center at Perry Field. The project will include restrooms and equipment storage serving the football practice field, and indoor UAA Baseball batting cages. The Lemerand Center renovation will Locker Room relieve overcrowding where five team sports share Construction and space, and will improve the appearance of Perry Field Lemerand Center and the adjacent practice fields. Completed October Renovation (UAA20,760 10,090 17) 45,459 24,000 2006. B-105, 106, 515, 516 and 517 Funded or Partially Funded Since CMP Adoption UAA New Women's Field Sport Facility Lacrosse Field & This project proposes to develop athletic fields with Locker Room support structures such as equipment storage, locker (UAA-20) 6,000 rooms and spectator facilities. Completed July 2009. D-83 & 84 I-215 and I-330 PAGE 13-16 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 CAPITAL IMPROVEMENTS ELEMENT Estimated Net New GSF Estimated Renovated / Relocated GSF Golf Course Clubhouse Renovation and Expansion (UAA19) 5,320 4,480 O’Connell Center st 1 Floor Renovation (UAA24) - 33,700 Ben Hill Griffin Stadium West Concourse Renovation (UAA25) - 47,083 Project Description This project proposes to renovate the existing Golf Course Clubhouse to provide new entryway, offices, and locker rooms. The addition will enclose an existing patio to provide new space for cart storage and repair with a second story for event gatherings, concessions and restrooms. Completed August 2008. The project consists of approx. 18,800 GSF of renovation and approx. 14,900 GSF of refinished space to the lower level of the O’Connell Center. The renovation and improvements of the facilities are necessary to 1) replace and update the currently out dated, deteriorated, and damaged finished; 2) provide more efficient use of space for this level’s operational changes; and 3) provide a better image and atmosphere for users of the facilities on the lower level of the O’Connell Center. Completed December 2011. This project will renovate the west concourse of the football stadium on the main and upper levels plus adjacent Restrooms and Concessions. The design is aimed at improving the Stadium functionality and image for both game day and non-game day use. Completed July 2012. 13,994 This project will renovate and expand the gymnastics studio to meet current needs. The project will modify space on the concourse, lower level and mezzanine mechanical area. Completed December 2012. Project Name (UF Project #) O’Connell Center Gymnastics Studio (UAA-27) 10,936 Tennis Practice Facility (UAA-23) - 22,509 Softball Batting Complex Renovation (UAA26) 11,936 3,496 - 200 Renovations to the O’Connell Center will include the arena bowl, seating, concessions and restroom areas in addition to mechanical system upgrades and an expanded east entry area. This project will renovate the existing Linder Tennis Stadium (Bldg #125) to meet current NCAA standards, and improve the visitor and athlete experience. The extent of the renovation is being determined but may include a complete demolition and rebuild. Scheduled completion January 2013. This project will upgrade the Women’s Softball Complex at the Katie Seashole Pressly Stadium. The project will replace the existing practice batting facility with a new structure for five batting lanes, and add additional seating to the east and west sides of the field. The interior renovation includes remodeling the existing storage area for umpire locker rooms, install power infrastructure for a new video system in the team meeting room, and finish the walls and ceiling. UAA’s electronic media department, GatorVision, seeks to equip a high definition-quality video control room in space already allocated in Weimer Hall for this purpose. The project would include fiber connections, as well as the necessary equipment to produce all video board productions and live web casts for football, men’s and women’s basketball, volleyball and gymnastics. The project may also renovate baseball/softball scoreboards. - As part of the Spring Sports Master Plan, a new Track & Field Locker and Team building is proposed for the northwest corner of the existing track stadium. The facility will house men's and women's locker rooms, AV room, team lounges, visitors' locker room, a main concourse and stadium ticketing. Enhancements to the O’Connell Center Renovation (UF392) Scoreboard Control Room & Baseball/Softball Scoreboards Renovation 150,000 Project Map Location A-153 B-436 Unfunded (alphabetical order) UAA Track and Field Building and Percy Beard Stadium Renovations 12,000 B-307 & B-529 PAGE 13-17 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Project Name (UF Project #) SUBTOTAL Estimated Net New GSF Estimated Renovated / Relocated GSF 38,760 68,779 91,651 10,090 28,480 299,462 CAPITAL IMPROVEMENTS ELEMENT Project Description Percy Beard Stadium include facade improvements, landscaping and pedestrian walkways. PROJECTS - SUPPORT/CLINICAL: UF&SHANDS Funded or Partially Funded (chronological order) This project proposes to construct an outpatient ambulatory surgery center for use by various UF&Shands clinical practices. The facility will contain 8 surgery suites and employ approximately 30 people Ambulatory including some staff who are already employed at the Surgery Florida adjacent Orthopaedic Surgery & Sports Medicine Surgical Center 25,000 Phase I 26,619 Center. Completed September 2007. This project adds a new third and fourth floor to the Shands Medical existing clinical building. Phase I completed July 2005. Plaza B Addition 46,350 Phase II completed March 2006. The project will demolish the remaining Schucht Village building (23,050 GSF) to construct administrative offices (12,000 GSF) and an emergency power generating plant (10,000 GSF) for Shands Facilities Shands Hospital. Scheduled completion in May Administration -1,050 2013. Unfunded (alphabetical order) Ambulatory Surgery Florida Surgical Center Phase II 15,000 - Archer Road Administration Building - SUBTOTAL 180,000 220,000 267,969 266,919 This project proposes to expand the outpatient ambulatory surgery center to add four additional surgery suites. The administration for Shands Hospital and associated clinics needs a centralized facility to more efficiently manage operations. It is proposed to construct a facility with approximately 180,000 GSF of space for this purpose. The building will be similar in nature and use to the J. Hillis Miller Health Center administration building located south of the Health Science complex at the intersection of SW 16th Street and SW 16th Avenue. Project Map Location D-262 G-525 D-327 G-163 - PROJECTS - UTILITY Funded or Partially Funded (chronological order) The purpose of this project is due to the increasing demand for research equipment to be connected to power that is available in the event of an emergency, to upgrade the Health Science Center facilities to meet current code demands, and to isolate the current emergency power supply from its current Shands Hospital source. The power source will be constructed as mechanical space within a HSC building. This project was implemented in conjunction with the Health Science Biomedical Sciences Building. Completed August Center Emergency Power 2008. NA PAGE 13-18 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 CAPITAL IMPROVEMENTS ELEMENT Estimated Renovated Estimated / Relocated Project Name Net New (UF Project #) GSF GSF Project Description Funded or Partially Funded Since CMP Adoption Building expansions in the Southwest Research Circle Chiller Plant #10 will require the construction of a new chiller plant to be at Southwest located west of the Cancer/Genetics Research Center. Research 5,840 Completed August 2009. The project will construct a 1.5 million gallon storage tank for reclaimed water with 400 GSF of associated support space. The tank will increase the University’s reclaimed water irrigation capacity and minimize the discharge of reclaimed water into the injection well Reclaimed Water Storage Tank 11,310 except during rainy seasons. Completed May 2008. Project Map Location G-343 F-332 Unfunded (alphabetical order) Animal Research Support Utility Facilities 1,300 - Center Drive North Chiller Plant 12,000 - 6,200 - 19,500 36,650 9,187 3,754,336 4,211,576 4,154,126 4,181,098 4,223,925 4,167,529 1,472,209 1,432,551 1,471,051 1,791,833 1,636,633 1,792,735 Chilled Water Plant #9 Expansion Sanitary Sewer Treatment Upgrades Membrane Bioreactor SUBTOTAL MAIN CAMPUS TOTAL Utility infrastructure is needed to supply the facilities of the Animal Research Support site, and potentially to serve as a service hub for eventual extension of some services to Energy Park. This project was re-prioritized due to accommodations for the animal research program within the Biomedical Sciences Building project. Building expansions in the vicinity of Center Drive and Museum Road will require the construction of a new chiller plant on the university's central system. This project was re-prioritized in order to construct the Southwest Research chiller plant first to meet critical needs. Building expansions in the HSC area will require expansion of an existing chiller plant on the university's central system. This project was re-prioritized in order to construct the Southwest Research chiller plant first to meet critical needs. Building expansions and enrollment growth require the upgrading of the sanitary sewer treatment facility. This project is an upgrade within the footprint of existing infrastructure. Additional storage capacity for reclaimed water is also sought. J-238 F-305 G-43 F-245 9,187 PROJECTS - TRANSPORTATION AND PARKING Funded or Partially Funded Since CMP Adoption Garage 13 (UF290) Veterinary Medicine West - - - - This project proposes to construct a new parking structure on an existing surface parking lot and temporary building site at the northeast corner of Gale Lemerand Dr. and Mowry Rd. The structure will include a liner building to house the Transportation and Parking Services offices. The identified site is subject to additional traffic impact analysis during the project design phase. The project will construct 956 parking spaces on an existing 325 space surface lot, for a net increase of approximately 631 parking spaces. Completed in September 2009. This project will demolish the Livestock Pavilion and construct a parking lot, that together with the lot G-46 G-62 PAGE 13-19 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Project Name (UF Project #) Parking Lot (UF313-N) Hull Road West Park & Ride Lot Expansion Estimated Net New GSF Estimated Renovated / Relocated GSF - - CAPITAL IMPROVEMENTS ELEMENT Project Description reconfigured for the Veterinary Education and Clinical Research Center (UF-313), will provide 608 parking spaces for the project. Considered with the existing parking lot that the building consumed, this will result in a net increase of 31 parking spaces. A private entity will be extending Hull Road westward and modifying existing parking in the Park & Ride 2 parking lot. A new parking lot will be constructed south of the new road alignment, which is expected to provide a net gain of 100-150 parking spaces. Project Map Location D-437 Unfunded (alphabetical order) Garage 14 - - Garage 15 - - This project proposes to construct a new parking structure on a portion of the existing surface parking lot at the O'Connell Center as need and funding demonstrate feasibility. The identified site is subject to additional traffic impact analysis during the project design phase. This project proposes to construct a new parking structure on a portion of the existing surface parking lot at either the Cultural Plaza or Orthopaedic Surgery building as need and funding demonstrate feasibility. In either location, the structure is anticipated to include liner buildings to house various support functions. The identified site is subject to additional traffic impact analysis during the project design phase. B-329 I-276 or D121 PROJECTS - ALACHUA COUNTY SATELLITE PROPERTIES Austin Cary Conference Center Replacement 2,000 - Eastside Campus - Powell Structures and Materials Laboratory (UF201) 8,565 - Eastside Campus - Building 1603 Renovations - 26,277 Eastside Campus - Building 1604 Renovation - 16,120 The 5,800 GSF conference center at Austin Cary was destroyed by fire in 2011. A replacement building of 7,800 GSF will be constructed on the site of the former building. This new building is planned to be a one story enclosed building with approximately 8,565 GSF to house a concrete testing area, several offices, an instrumentation area, necessary support spaces and a storage area. The concrete testing area requires a 4feet thick concrete floor foundation for the main testing area and strong walls. The interior is to have two 25 ton cranes for moving concrete test forms and have a clear height of 36 feet to the crane. The building has been sited to easily receive deliveries of approximately 40' long beams that will be brought by tractor-trailer. Completed December 2005. This project will renovate the existing building for occupancy by the Bridges administrative unit with space for offices, training, conference/seminars, mechanical and storage. Completed September 2005. This project will renovate the existing building for occupancy by the administrative units and College of Engineering researchers with space for offices, training, mechanical and storage. Completed September 2012. PAGE 13-20 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 CAPITAL IMPROVEMENTS ELEMENT This project will construct various consolidated utility infrastructure to service redevelopment of the site. Telecommunications fiber hut (264 GSF) completed October 2005. Eastside Campus – Telecom. Infrastructure Eastside Campus - Utility Compound and Telecom. Infrastructure 264 - 14,000 13,736 - Eastside Campus - Office Building (UF-310) 80,000 84,021 - Eastside Campus Data Center (UF310A) 14,546 - Eastside Campus Powell Structures Lab Addition (UF310B) -10,122 - 55,000 2,851 12,973 13,152 - 4,200 - 21,876 46,000 5,000 - This project will construct structures for equipment storage and use in field operations. 12,000 - This project will construct structures for equipment storage and use in field operations. 5,000 - This project will construct structures for equipment storage and use in field operations. 5,000 - This project will construct structures for greenhouses, equipment storage and use in field operations. 3,000 2,684 - Eastside Campus - Academic, Research and Support buildings Eastside Campus - Research Flume Building Libraries Remote Services – Joint Use Library Storage Facility Beef Research Unit - Field Support Building Dairy Research Unit - Filed Support Building Santa Fe Beef Ranch - Field Support Building Millhopper Horticulture Unit Field Support Building Millhopper Horticulture Unit Office Building Millhopper Horticulture Unit – FL Fish & Wildlife Building #1397 Millhopper Horticulture Unit – USGS Auditorium Addition This project will construct various consolidated utility infrastructure to service redevelopment of the site. This project will construct a 3- or 4-story office building to house various academic and administrative support functions. Associated parking, utilities and site upgrades are also included in the project scope. Completed April 2010. This project will demolish exiting buildings #1621 (7,748 GSF) and #1622 (3,096 GSF) then construct a 25,390 GSF data center for consolidated back-up of main campus computing systems. Scheduled Completion January 2013. This project will construct an 11,000 GSF addition to the existing Powell Structures Laboratory. Through this and related projects, several buildings will be demolished including #1620 (2,643 GSF), #1616 (5,465 GSF), #1601 (2,661 GSF), #1602 (4,450 GSF), and #1605 (5,903 GSF). Completed October 2012. This project will construct new or replacement facilities for academic, research and support activities to occupy the Eastside Campus. As the site develops, the University also intends to construct formalized parking, up to a total of 476 spaces. This project will construct a new facility for FDOTrelated research. To meet the state-wide demand for storage, the State University Libraries (SUL) is jointly seeking to build a new six-aisle high-density shared storage facility adjacent to the current UF Libraries Remote Services / Auxiliary Library Facility (ALF). The estimated capacity of the new facility would be three million volumes. This includes on-site processing and shelving of the 1.5 million volumes already in storage at UF, Florida State University (FSU) and other SUL. The project is currently funded for design only. 3,850 This project will construct space for ten faculty and staff offices. Completed 2007. This project will construct office, lab and support space for the Florida Fish & Wildlife Conservation including some offices to be occupied by related University support. Completed July 2007. 1,800 The project will construct a small auditorium addition on an existing concrete block research building subleased by USGS. - PAGE 13-21 MARCH 2006 – AMENDED JANUARY 2013 UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, 2005-2015 Austin Carey Forest - Field Support Building 5,000 - Wall Farm/HTU Field Support Building 5,000 - Lake Wauburg, South - Lodge 13,200 - Lake Wauburg Picnic Pavilions - - Lake Wauburg, South - Residence 2,000 - Lake Wauburg, South - Support Facilities 6,000 - Lake Wauburg, North – Support Facilities 2,050 3,724 CAPITAL IMPROVEMENTS ELEMENT This project will construct structures for equipment storage and use in field operations. This project will construct structures for equipment storage, reproduction barn expansion and other field operations support. In 2007, two support/storage facilities were constructed totaling 1,312 GSF. This project will construct a lodge facility similar to that which exists at the North Park. Demand for use of the North Park Lodge is greater than can currently be accommodated. This project will construct approximately two picnic pavilions at the South Park and three small picnic pavilions at the North Park. This project proposes to construct a single-family residence for the on-site park manager. This project proposes to construct various support infrastructure including a maintenance building and yard, new check-in booth, new entrance road, dock, boat house, expanded ropes course, parking and associated utility upgrades. Parking is anticipated to include 150 parking spaces on a combination of asphalt, gravel and overflow grass areas. The existing Cypress Lodge at Lake Wauburg North Park will be renovated and expanded eastward to better serve groups that hold events at the recreation area. PROJECTS - CAMPUS MASTER PLAN SATELLITE PROPERTIES OUTSIDE ALACHUA COUNTY Fort Lauderdale This project will construct a residence for graduate REC - Graduate student(s) working at the site. Completed September Housing 2,485 2005. Fort Lauderdale REC - Support This project will construct structures for greenhouses, Facilities 10,000 equipment storage and use in field operations. The project is relocating existing facilities from the portion of the property that has been leased to FAU. A total of 49,316 GSF will be demolished and 44,050 GSF will be constructed. The new construction will include replacement support, lab, and office space along with two new graduate student houses. A Phase II project is Fort Lauderdale anticipated that will demolish and reconstruct REC – Facilities approximately 19,600 GSF of support buildings. Relocation Phase I (UF-315) -5,266 Completed June 2009. Mid-Florida REC Pharmacy This project will construct a building for classrooms, Building 25,000 laboratories and offices for the College of Pharmacy. Mid-Florida REC Termite Training 4,000 This project will construct a building for classrooms, Facility 6,000 laboratories and offices. Completed 2007. Mid-Florida REC Support Facilities 15,000 - This project will construct structures for greenhouses, equipment storage and use in field operations. Note: Projects completed, under construction or in design after December 2004 are included in this 20052015 Capital Projects List. PAGE 13-22 MARCH 2006 – AMENDED JANUARY 2013