City & County of San Francisco Office of Contract Administration Purchasing Division ITSF 16000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer I. II. General Requirements A. This bid is for furnishing and delivering materials and equipment: instrument isolator ring, pressure sensor and pressure indicator assemblies (Assemblies), which include but are not limited to instrument isolator annular rings, pressure sensing elements including but not limited to pressure gauges and pressure switches, with interconnecting fittings, assembly, fill fluids, calibration, testing, packaging, delivery, operations and maintenance data, and warranty as specified in this document and attachments for use at the Southeast Water Pollution Control Plant (SEP) at 1700 Jerrold Ave. San Francisco, C A 94124 and the Oceanside Water Pollution Control Plant (OSP) at 3500 Great Highway, San Francisco, C A 94132. B. A l l materials and equipment shall be delivered complete, with all Assemblies configured for service, and with testing and calibration documentation traceable to each instrument. A l l Units shall be securely packaged for shipment and outdoor storage. C. Bidders shall refer to the Bid Sheets, General Bid Conditions and Requirements (Attachment A), and these technical specifications (Attachment B) for additional requirements. Any additions, deletions, or variations from the following specifications must be noted in writing at the time of bid as exceptions. D. A l l bid prices must be submitted on the City and County of San Francisco Office of Contract Administration Purchasing Division bid document form. A l l required bid forms must be completed and submitted with the bid package. Any incomplete documents submitted in the bid package may result in the rejection of the bid. Bid prices should be inclusive of all cost to the City. (FOB) destination to the Southeast Water Pollution Control Plant-Building 940-Warehouse at 1700 Jerrold St. San Francisco, C A 94124. Bid prices should be exclusive of all local, state, and federal tax. Submittals A. Bidders shall submit the following required items with their bid. 1. 10/26/15 A i l bid documents completed and signed. Page 1 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSF 16000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer 2. B. Four (4) complete sets of original manufacturer's specifications sheets, catalog illustrative literature, dimensioned drawings demonstrating layout and installation, and installation and testing procedures for ail material and equipment specified herein. A l l exceptions to the Specifications shall be clearly noted. Bidders shall submit the following required items with delivery. 1. Furnish four (4) complete sets of Operations and Maintenance (O&M) manuals. 1) Each manual shall include: a. Cover sheet shall include Successful Bidder's name, local distributor and equipment manufacturer contact information with equipment model and serial/part numbers. b. Data sheets identifying material and equipment part numbers, serial numbers, sizes, capacities, range, and set points. c. System descriptions, operating instructions, installation instructions, maintenance instructions, drawings defining assembly and parts, list of suggested spare parts. d. Completed test forms and calibration sheets. e. Manufacturer's certificate of warranty two (2)-year period for all material and equipment to be provided under the bid. The two (2)~ year period shall commence when the equipment has been inspected and accepted by personnel of the City and County of San Francisco. 2) Each of the four (4) O & M manuals shall include electronic copies of all the documents listed on items 2 and 3. A l l electronic copies shall be saved on a compact disk (CD). Acceptable formats shall be limited to: dwg., pdf, tif, and jpeg. 10/26/15 Page 2 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSFl 6000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer III. Quality Assurance A. A l l assemblies shall be clearly marked to identify the size, class, rating, range, and set point. A l l materials shall be inspected to verify that it is free of deformations, indentations or punctures. A l l material shall be new and free of defects. B. The manufacturer shall maintain a quality program, which will assure adequate control of quality throughout the performance of this purchase, including fabrication and procurement of awarded items. C. Inspection of the equipment may also be made by the City Representative after delivery. The equipment shall be subject to rejection at any time on account of failure to meet any of the Specification requirements, even though submittal data may have been accepted previously. Equipment rejected after delivery shall be marked for identification and shall be removed from the Southeast Water Pollution Control Plant (SEWPCP) at once. D. Standards 1. In case of conflict between codes, reference standards, and Shop Drawings, the most stringent requirements shall apply. 2. A l l applicable standards of the organizations as specified herein these specifications shall appiy to this specification. AA ACI AFBMA AGMA AISI ANSI ASME ASTM AWWA AWS ISA NESC NFPA SAE SSPC UL 10/26/15 Aluminum Association American Concrete Institute Anti-Friction Bearing Manufacturers' Association American Gear Manufacturers' Association American Iron and Steel Institute American National Standards Institute American Society of Mechanical Engineers American Society for Testing and Materials American Water Works Association American Welding Society Instrument Society of America National Electrical Safety Code National Fire Protection Association Society of Automotive Engineers Steel Structures Painting Council Underwriters Laboratories Page 3 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSF16000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer E. A l l assemblies of the same type shall be provided by the same manufacturer in order to achieve standardization of operation, maintenance, spare parts, manufacturer's service and warranty. F. Bidder and Manufacturer Minimum Qualification Requirements G. H. 10/26/15 1. The Successful Bidder shall have a minimum of five (5) years of experience, be reputable, qualified and regularly engage in the manufacture/distribution of wastewater plant process instrumentation including pressure switches, pressure gauges, process flanged wafer pressure isolators, snubbers, and piping flange connections. Bidder must be available to answer questions and offer any assistance required by SFPUC personnel during day business hours Monday thru Friday, 8:00 a.m.-5:00 p.m. 2. Manufacturers of equipment furnished under this specification shall have a minimum of five (5) years verifiable experience in the manufacture of such equipment. Bidder Responsibilities 1. The Successful Bidder must assume complete responsibility for all component parts of the isolator ring assemblies. Responsibility shall include component furnishing, unit assembly, inspection, function, calibration, operations/maintenance documentation and warranty. 2. The Successful Bidder shall also be responsible for assuring that the assembly and components meet the specified criteria as included in this specification. Products 1. The use of a manufacturer's name and/or model or catalog number is for the purpose of establishing the standard of quality and general configuration desired. 2. A l l items shall be of the size specified in Article VI.F. Unit Assembly Descriptions and Quantities of these specifications. Page 4 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSF 160001 i 8/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer 10/26/15 3. A l l assemblies of the same type shall be identical and the end-product of one (l)-manufacturer. 4. Assemblies shall be furnished as complete assemblies with all special adaptors as required to ensure compatibility between valves, fittings, sensors, switches, appurtenances and adjacent pipe. 5. Every isolator ring shall be given a hydrostatic leak test at 1.5 times the rated pressure with test results being certified when required by the specification. 6. Nameplates: A l l items shall have the name of the maker, the model number, the serial number, the nominal size, and the conditions for which they are rated or designed permanently marked upon some appropriate part of the body. 7. Paint: Unless otherwise noted all metal exterior exposed surfaces except for those on stainless steel and zinc plated steel hardware, shall be cleaned, sandblasted to near-white metal per SSPC-SP10 and sprayed with one (1)primer base coat and two (2)-coats of an enamel coating appropriate for corrosion resistant use in wastewater treatment plant environments. Minimum lining and coating thickness shall be 16 mils. The coating shall be applied in strict accordance with the manufacturer's directions. The coating shall be free of pinholes or holidays. Appropriate "returns" shall be incorporated at all juncture lines of coated and uncoated surfaces such as isolator ring bore and isolator ring flange to prevent lifting the coating. Seating surfaces such as flange faces shall not be painted but coated instead with rust inhibitor. 8. The manufacturer's standard stock of spare parts, including seats, seals, bushings, and packing shall be furnished to the City upon acceptance of the equipment. Speciai tools, if required for normal operation and maintenance shall be supplied with the equipment. Page 5 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSFl 6000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer IV. Instrument Isolator Rings (Flanged Wafer Pressure Isolators) A. Isolator rings shall be designed to permit pressure measurement of wastewater processes (slurries) and other wastewater process fluids without compromising instrument gauge function. Isolation ring shall consist of a metal ring with an internal pulsation dampener and elastomer inner tube filled with silicone instrument oil. The center section and end plates shall be Type 316 stainless steel and elastomeric sleeve shall be Viton. B. Sensors shall be full, flat face, flange style with through bolt holes meeting ANSI Class 125. Face to face length of the sensor shall conform to specification MSSSP67. Sensor shall be flow through design with flexible rubber sleeve around full circumference. The center section shall have a cavity behind the rubber sleeve filled with silicone fluid to transfer pressure to the gauge. C. A l l pressure instruments attached to the sensor shall be rigidly supported by a post at least 0.875-inches diameter welded to the isolator ring body. Threaded nipple risers are not allowed. A l l connections shall be V^-inch National Pipe Thread (NPT) as a minimum. !4-inch NPT fittings are not acceptable. The riser shall have an integral isolation valve to assist with instrument changes. The sensor ring shall not have a fill plug that can be inadvertently removed with the resultant loss of fill fluid. D. The sensor shall be vacuum filled and permanently sealed at the factory with a modular seal consisting of a rubber membrane and needle fitting to allow removal and replacement of pressure instruments without compromising the vacuum fill. The needle fitting shall have both 14-inch NPT (Female thread) and V2-inch NPT (Male threads). The pressure isolator shall be capable of operating under pressure with all instruments removed with no loss of fill fluid. Pressure instruments shall be attached to the isolator with a hand tightened lock ring. It shall be possible to remove, rotate or attach pressure instruments to the isolator without requiring the use of any tools. The pressure sensor shall be permanently filled with high viscosity silicone instrument oil to damp out surges or pressure spikes without a separate snubber. Instruments can be attached to an Isolator Ring installed in the pipe line while the system is pressurized. E. Maximum operating pressure without leakage shall be 1,000 psig minimum. F. Isolator rings shall be capable of installation in any attitude, with flow in either direction. 10/26/15 Page 6 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSFl 6000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer V. G. Isolator rings shall be capable of installation without pressure instruments attached in order to minimize damage to gauges and sensitive pressure instruments during pipe fitting and construction. H. The isolator ring assembly shall be configured with features enabling pressure instrument removal/calibration while the Isolator Ring assembly remains connected to the process pipe. An integral ball valve shall be part of the riser to allow for instrument "hot swap" without the loss of silicon oil. The ball valve shall allow for isolation of the instruments under full pipeline pressure. I. Isolator Ring assemblies required to be removed from process piping in order to complete calibration/pressure sensor servicing/maintenance are NOT ACCEPTABLE. J. Acceptable Instrument Isolator Ring (Flanged Wafer Pressure Isolators) Manufacturer/Model shall be: 1. Onyx Valve Company / Model PSR (with associated Ashcroft / United Electric Control pressure measuring elements) or approved equal. 2. If bidding an alternate assembly, the Bidder shall submit with bid complete documentation demonstrating the proposed wastewater instrument isolator ring, pressure sensor and pressure indicator assemblies meets the technical specifications stated herein. Incomplete and/or insufficient data demonstrating equivalency of equipment is grounds for rejection of Bidder's bid. The City Representative shall make final determination of suitability of the submitted alternate equipment prior to award. PRESSURE MEASURING ELEMENTS 10/26/15 A. For instrument configurations, including but not limited quantities, assembly description, and ranges, shall be as Specified under Article VI.F. B. Refer to Isolator Ring, Pressure Sensor & Pressure Indicator - Unit Assemblies Article below which references Article VI.F. Unit Assembly Descriptions and Quantities for materials and equipment requirements furnished under this Specification. Page 7 of 14 ITSF 16000118/CD RQWP16000051 Attachment B City & County of San Francisco Office of Contract Administration Purchasing Division General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer C. Ashcroft Pressure Sensor Switch Model GPSN4GB25 1. Pressure switch shall make or break on discrete pressure adjustable set point signaled electronically and be suitable for application in municipal wastewater service application, with U L and CSA ratings. a. b. c. d. e. f. g. D. Pressure control, single set point, fixed dead-band N E M A 4 X IP65 watertight and corrosion resistant enclosure With General purpose switch elements. With B U N A N actuator seal. With 4-inch National Pipe Thread (NPT) Female pressure port. With Type 316 stainless steel construction Switch shall be G-Series manufactured by Ashcroft, or approved equal. ! Electric Control Pressure Sensor Switch Models 4W3A01P14,4W3A01P15, and 2WLP41P12 1. Pressure switch shall make or break on discrete pressure adjustable set point signaled electronically and be suitable for application in municipal wastewater service applications, with U L and CSA ratings. a. With large digital gauge for status, process indication and diagnostic reporting. 100% programmable set point and deadband for easy adjustment. Solid-state design for high-vibration applications. b. Ordering: 1. ) For2WLP41-: 2-Wire loop powered or 24V external powered, 4-20 mA output, 0-140 V A C / V D C , 0.6 A SSE switching. 2. ) For4W3A01-: Supply voltage - 90-130 V A C , 24-280 V A C , 10 A SSR switching. c. Switches shall have non-inductive electrical rating and Class I, Div 2 Group A, B, C, & D ratings. d. Switch shall be manufactured by Electric Control, or approved equal. 10/26/15 Page 8 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSFl 6000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer E. Ashcroft Pressure Indicator Gauge Model Duragauge 45 1279 02L X L L 1. Pressure gauge shall feature solid front case design, field convertible to hermetically sealed or liquid filled style, with 400 series stainless steel movement, with Teflon coated pinion, with patented Duratube with as-welded tube construction controlling stresses for longer life, with Plus Perfonnance option of liquid-filled performance in a dry gauge addressing vibration and pulsation dampening without liquid filling issues. 2. Pressure gauge shall be 4- 1/2-inch diameter dial. 3. 1/4-inch National Pipe Thread (NPT) male process connection size. 4. With lower connection location. 5. Pressure gauge shall be Model Duragauge 45 1279 02L X L L manufactured by Ashcroft, or approved equal. VI. ISOLATOR RING, PRESSURE SENSOR & PRESSURE INDICATOR - UNIT ASSEMBLIES A. Materials and equipment furnished under this Specification are grouped into unit assemblies. Each unit assembly is an item listed in Article V L F that includes the isolator ring, associated pressure sensor and pressure indicator description and quantities. Each unit assembly under Article VI.F. shall include the materials and equipment listed under the unit assembly item description and be furnished with the quantities listed. B. Pressure measuring elements integrated into a unit assembly shall be configured in a pre-assernbled sub-assembly with interconnecting pipe fittings, stinger fittings, stinger needles, and appurtenances. Each sub-assembly shall utilize a stinger fitting to attach the isolator ring with a hand tightened lock ring. C. The pressure measuring element sub-assembly shall be vacuum filled with high viscosity silicone instrument oil to dampen out potential surges or pressure spikes without a separate snubber assembly and shall be permanently sealed at the factory with a modular seal consisting of a rubber membrane and stainless steel stinger fitting to allow removal and replacement of pressure instruments without compromising the vacuum fill of the sub-assembly or the isolator ring. The needle fitting shall have both 1/4-inch National Pipe Thread female thread and V2inch National Pipe Thread male thread connections. 10/26/15 Page 9 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSFl6000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer D. The isolator rings and pressure instrument assemblies shall be packaged as assembled units in the arrangements specified in Article VI.F. unit assembly descriptions and quantities. Isolator rings and pressure instruments shall be vacuum filled at the factory. E. Each unit assembly shall be provided assembled as a working unit. F. Unit Assembly Descriptions and Quantities, O N Y X PSR with Ashcroft, United Electric Control or Approved Equal. Item No. 1 3 10/26/15 Description 6" dia O N Y X Series PSR, Flanged Pressure Isolation Ring, 316-SST Body, 316-SST end plates, VTTON elastomer, Module Seal w/ Internal Pulsaton Dampener, Silicone Filled, SST Stingers & Fittings "C" Configuration on the Dual instruments ** Instruments Included / Assembled / Filled: 1. ) Ashcroft switch GPSN4GB25 30Hg/15psi-l per unit, or approved equals. 2. ) Ashcroft gauge 45 1279 02L X L L 30Hg/15psi~ 1 per unit, or approved equals. 6" dia O N Y X Series PSR, Flanged Pressure Isolation Ring, 316-SST Body, 316-SST end plates, VITON elastomer, Module Seal w/ Internal Pulsaton Dampener, Silicone Filled, SST Stingers & Fittings "C" Configuration on the Dual instruments ** Instruments Included / Assembled / Filled: 1. ) Ashcroft switch GPSN4GB25 lOOpsi 1 per unit or approved equals. 2. ) Ashcroft gauge 45 1279 02L X L L lOOpsi - 1 per unit or approved equals. Page 10 of 14 Quantity 29 Unit EA 14 EA City & County of San Francisco Office of Contract Administration Purchasing Division ITSF 16000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer 4 6" dia O N Y X Series PSR, Flanged Pressure Isolation Ring, 316-SST Body, 316-SST end plates, VITON elastomer, Module Seal w/ Internal Pulsaton Dampener, Silicone Filled, SST Stingers & Fittings "C" Configuration on the Dual instruments** Instruments Included / Assembled / Filled: 1. ) Ashcroft switch GPSN4GB25 160psi- I per unit or approved equals 2. ) Ashcroft gauge 45 1279 02L X L L 160psi - 1 per unit, or approved equals. 3 EA 5 6" dia O N Y X Series PSR, Flanged Pressure Isolation Ring, 316-SST Body, 316-SST end plates, VITON elastomer, Module Seal w/ Internal Pulsaton Dampener, Silicone Filled, SST Stingers & Fittings "C" Configuration on the Dual instruments ** Instruments Included / Assembled / Filled: 1.) Ashcroft gauge 45 1279 02L X L L 60psi - 1 per unit, or approved equals. 8" dia O N Y X Series PSR, Flanged Pressure Isolation Ring, 316-SST Body, 316-SST end plates, VITON elastomer, Module Seal w/ Internal Pulsaton Dampener, Silicone Filled, SST Stingers & Fittings "C" Configuration on the Dual instruments ** Instruments Included / Assembled / Filled: 1. ) Ashcroft switch GPSN4GB25 lOOpsi -1 per unit, or approved equals. 2. ) Ashcroft gauge 45 1279 02L X L L lOOpsi-1 per unit, or approved equals. 12 EA 4 EA 6 10/26/15 Page 11 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSF 16000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer 7 8" O N Y X Series PSR, Flanged Pressure Isolation Ring, 316-SST Body, 316-SST end plates, VITON elastomer, Module Seal w/ Internal Pulsaton Dampener, Silicone Filled, SST Stingers & Fittings "C" Configuration on the Dual instruments** Instruments Included / Assembled / Filled: 1.) Ashcroft gauge 45 1279 02L X L L 60psi: 1 per unit, or approved equals. 17 EA 8 8" dia O N Y X Series PSR, Flanged Pressure Isolation Ring, 316-SST Body, 316-SST end plates, VITON elastomer, Module Seal w/ Internal Pulsaton Dampener, Silicone Filled, SST Stingers & Fittings "C" Configuration on the Dual instruments ** Instruments Included / Assembled / Filled: 1. ) Ashcroft switch GPSN4GB25 30Hg/15psi: 1 per unit or approved equals. 2. ) Ashcroft gauge 45 1279 02L X L L 30Hg/I5psi: 1 per unit or approved equals. 6" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control switch 4W3A01P14 and Ashcroft dura gauge and SST instrument or approved equals. 6" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control switch 4W3A01P15 and Ashcroft dura gauge and SST instrument or approved equals. 6" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control switch 4W3A01P14/2WLP41P12 and 90 degree elbow, No gauge or approved equals. 8 EA 15 EA 6 EA 8 EA 9 10 11 10/26/15 Page 12 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSF 16000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer 12 13 14 15 16 18 VII. 10/26/15 6" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, Ashcroft dura gauge only and 90 degree elbow, no switch or transmitter, 0-60 psi or approved equals. 4" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control switch 4W3A01P14 and Ashcroft dura gauge and SST instrument or approved equals. 10" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control Switch 4W3A01P14 and Ashcroft dura gauge and SST instrumentor approved equals. 8" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control switch 4W3A01P14 and Ashcroft dura gauge and SST instrument or approved equals. 6" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control switch 4W3A01P15 and Ashcroft dura gauge and SST instrument, 90 deg elbow or approved equals. 4" dia Model PSR annular full face ring, 316 SST body, Viton elastomer, United Electric Control switch 4W3A01P14 and Ashcroft dura gauge and SST instrument, 90 deg elbow or approved equals. 8 EA 2 EA 2 EA 2 EA 2 2 EA EA CALIBRATION AND SHOP TESTING A. Prior to shipment, all equipment specified shall be subjected to operational, functional, hydrostatic, leakage and performance testing. Testing documentation shall be furnished as specified under Article SUBMITTALS. B. Verification of test will not preclude possible warranty claims after installation. Page 13 of 14 City & County of San Francisco Office of Contract Administration Purchasing Division ITSF 16000118/CD RQWP16000051 Attachment B General Requirements and Specifications for Wastewater Instrument Isolator Ring, Pressure Sensor and Pressure Indicator Assemblies San Francisco Water Power Sewer C. Calibration documentation shall be supplied as specified under Article SUBMITTALS and shall index each instrument furnished under this Specification with a unique identifier. VIII. PACKAGING, SHIPPING & DELIVERY A. The City's and Successful Bidder shall conduct a physical inspection of all equipment upon delivery at Southeast Water Pollution Control Plant, 750 Phelps St. San Francisco, C A 94124. B. Equipment may also be inspected or tested by the City Representative for compliance with these Specifications. Any equipment found not to comply will not be accepted until deficiencies are corrected by the Manufacturer, or Manufacturer's representative, at no cost to the City. Failure by the Engineer to inspect or witness tests at the manufacturer's plant shall not be construed as waiving inspection upon delivery or testing. IX. WARRANTY A. A l l equipment shail be supplied with their standard manufacturer's warranty which guarantee that all equipment furnished under this bid will meet all contract requirements and are free of defects in equipment, material, or workmanship, and are fit for the intended purpose. B. During the warranty period, if any parts of components fail or are defective, vendor shall repair or replace defective or unsatisfactory parts and equipment. Defective parts are to be replaced free of charge with surface transportation allowed. END OF SPECIFICATION 10/26/15 Page 14 of 14