Strategies for High-Quality Bus/BRT by Juan Carlos Muñoz Pontificia Universidad Católica de Chile Nigel Wilson MIT Across Latitudes and Cultures- Bus Rapid Transit Centre of Excellence www.brt.cl What can we say about bus service? Bus is critical to providing a good door-to-door transit alternative for many journeys: • • • Much higher network density and coverage than rail Greater flexibility in network structure Low marginal cost for service expansion BUT Bus as traditionally operated also has serious limitations: • • • • • Low-speed Subject to traffic congestion Unreliable Harder to convey network to the public Negative public image Transit Leaders Roundtable MIT, June 2011 This feeds this vicious cycle Income and Population grows More cars in the city More congestion And delays Bus Demand drops Car becomes more attractive Bus fare increases Bus frequency drops Buses cover fewer miles per day Operation cost grows Buses And we areneed not expected to make buses to be sexy attractive as Richard to car mentioned drivers… However, this doesn’t affect Metro as much Transit Leaders Roundtable MIT, June 2011 • Fast • Low wait time • Comfortable Can we provide Metro-like service with buses? • Reliable • Good information • Branding Transit Leaders Roundtable MIT, June 2011 Can we provide Metro-like service with buses? • • • • • • Fast Low wait time Comfortable Reliable Good information Branding Transit Leaders Roundtable MIT, June 2011 Operational benefits •Shorter cycle time •Reliable operations •Higher productivity Increase Bus speed, Frequency, Capacity and Reliability IMPROVED EFFICIENCY Reduced bus costs •Less buses required •Lower cost per km Improved bus productivity •More pax/bus-day IMPROVED SERVICE QUALITY •Reduced travel time •Reduced waiting time •Higher comfort •Reliability Attracts more passegers Reduced private car use & traffic congestion Improves revenue IMPROVED FINANCIAL VIABILITY Better buses Source: Frits Olyslagers, May 2011 Passenger benefits More investment into new buses & cleaner technology Lower Subsidies Improved energy efficiency Reduced emissions Can we provide Metro-like service with buses? OF COURSE WE CAN! (several pieces are already there in cities worldwide) The good news are: COURAGE WILL BE REWARDED Metro Attributes Fast Low waits Comfort Reliable Main drivers Increase Speed Increase Frequency Increase Capacity Regular Headways Actions •Segregated ways/lanes Metro Attributes Fast Low waits Comfort Reliable Main drivers Increase Speed Increase Frequency Increase Capacity Regular Headways Actions •Segregated ways/lanes •Reduce dwell times •Fare payment off-bus •Buses with multiple doors Metro Attributes Fast Low waits Comfort Reliable Main drivers Increase Speed Increase Frequency Increase Capacity Regular Headways Actions •Segregated ways/lanes •Reduce dwell times •Fare payment off-bus •Buses with multiple doors •Increase distance between stations Metro Attributes Fast Low waits Comfort Reliable Main drivers Increase Speed Increase Frequency Increase Capacity Regular Headways Actions •Segregated ways/lanes •Reduce dwell times •Fare payment off-bus •Buses with multiple doors •Increase distance between stations •Express services Metro Attributes Fast Low waits Comfort Reliable Main drivers Increase Speed Increase Frequency Increase Capacity Regular Headways Actions •Segregated ways/lanes •Reduce dwell times •Fare payment off-bus •Buses with multiple doors •Increase distance between stations •Express services •Traffic signal priority Metro Attributes Fast Low waits Comfort Reliable Main drivers Increase Speed Increase Frequency Increase Capacity Regular Headways Actions •Segregated ways/lanes •Reduce dwell times •Fare payment off-bus •Buses with multiple doors •Increase distance between stations •Express services •Traffic signal priority •Improved headway control BRT should achieve these features Some examples… Transit Leaders Roundtable MIT, June 2011 Cities with BRT/Bus Corridors 25 125 Guanghzhou, Hefei, Yancheng, Zaozhuang -China Jaipur - India; Pelembang, Gorontalo, Surakata - Indonesia Bangkok - Thailand; East London Transit - UK João Pessoa - Brazil; Barranquilla, Bucaramanga - Colombia Estado México - México; Lima - Perú; Brampton - Canada 20 100 17 16 15 75 13 Bogotá TransMilenio Los Angeles Metrorapid 10 8 Curitiba 5 5 1 1 0 1970 1975 2 1 0 1980 11 1 2 1 1 2 11 5 11 7 50 888 4 25 2 0 1985 1990 1995 2000 2005 2010 Source: EMBARQ BRT/Bus Corridors Database, January, 2011 Rapid growth of BRT Systems and Bus Corridors in 2010, specially in developing cities 16 cities started operations in 2010 (13% growth) • • China (4), Indonesia (3), Colombia (2), India, Thailand, Brazil, México, Perú, UK, Canada • 21 corridors; 396 km; 464 stations; 2,047 buses • 1.4 million passengers per weekday (5% growth) • 7 cities expanded corridors in 2010, 125 km • 49 new cities with corridors under construction • 16 cities expanding their corridors • 31 new cities in planning stages Transmilenio, Bogotá Transit Leaders Roundtable MIT, June 2011 Ricardo Giesen © Nigel Wilson Transit Leaders Roundtable MIT, June 2011 20 Fuentes: Encuesta Anual “Bogotá ¿Cómo Vamos?” www.eltiempo.com; Main mode of transport 1998-2009 Total Public Transport Other Public Transport TransMilenio BRTS Private (Car, motorbike) Walking + Bicycle Fatalities in Bogotá Over Time 1400 1299 1200 1165 1171 1000 1106 1014 923 800 788 698 665 600 564 400 1995 1997 1999 2001 2003 551 511 2005 2007 Source: Anuario Estadístico, Ministerio de Transporte, Colombia 2009 Guangzhou BRT, China • Trunk and feeder logic relaxed 22.5 km dedicated busway • 26 stations (prepayment, level boarding – some buses, passing lane, up to six platforms) • Peak supply: 340 buses/hr/direction • 40 routes (in and out the system, no transfers) • Peak demand: 26,900 passengers/hr/direction • Daily demand: 800,000 pax/per weekday • Photo by Benjamin In Bucaramanga, Colombia Bus only lane through downtown • Photo: http://www.metrolinea.gov.co/ Regarding Service Design • The user must perceive a system • Integration does not end in fare collection • With integration transfers blossom… • Make them fast, safe, informed, less painful • Reduce them when possible • Bring express services (10 % social costs reduction) • Lower operational cost per mile • Less time spent by passengers • Increase capacity Transit Leaders Roundtable MIT, June 2011 Strategies for High-Quality Bus/BRT by Juan Carlos Muñoz Pontificia Universidad Católica de Chile Nigel Wilson MIT Across Latitudes and Cultures- Bus Rapid Transit Centre of Excellence www.brt.cl