Case Study AC-C-022 Engineering Design & Consultancy The Challenge To remove an offshore carousel from its barge following significant in situ modifications which increased the mass, diameter and height of the originally installed structure. The Solution Key Facts: Contract No: AC-C-022 Client: Technip Offshore Wind Ltd Duration: 4 Months Completion: Dec 2012 Location: North East England Scale: 16m Diameter, 280 Tonne Lift Design Codes: Noble Denton and DNV Understand the revised geometry and level of load share between the existing lift points and access the feasibility of reusing one or more of these in combination with additional lift points. The Work Scope • • • • • Equipment Survey Feasibility Studies Structural Analysis Detail Design & Draughting Manufacturing Support Implementation Following structural analysis and verification of the proposed lifting arrangement a new lifting point was designed into the existing carousel structure, allowing a cost effective three point lift. Vessel: UR101 The Outcome How can we assist you? The successful, safe and cost effective removal of a 280 tonne carousel. Have you any requirements for analysis of existing structures? We can support with equipment surveys and 3D modelling of in-situ equipment followed by analysis and design modifications to incorporate new project requirements or facilitate decommissioning. Contact our team for further details. Ardmore Craig Ltd Office F32, Evans Business Incubation Centre Durham Way South, Aycliffe Business Park Newton Aycliffe, DL5 6XP Tel: 01325 329880 Email: enquiries@ardmorecraig.com Website: www.ardmorecraig.com