Work Instructions for Training Materials Development 1. Prepare the Training Materials in accordance with: Controlling Document OPNAVINST 1500.76, Navy Training System Requirements, Acquisition and Management MIL-HDBK-29612-2, DoD Instructional Systems Development – Systems Approach to Training and Education MIL-HDBK-29612-4A, Glossary for Training NAVEDTRA 130A, Task Based Curriculum Development Manual Location https://acc.dau.mil/CommunityBrowser.aspx?id=361895 http://www.au.af.mil/au/awc/awcgate/edref/hbk2.pdf http://www.au.af.mil/au/awc/awcgate/edref/hbk4.pdf http://spider.adlnet.gov/index.cfm?RID=POL_OT_1000162 2. Conduct reviews, verifications, and validations in accordance with the following schedule: Short Description of Review Kick off meeting Schedule Project Start Purpose Preliminary Desktop Review 15 Days after start (depending on scope and complexity of training design) Review training requirements including controlling docs and schedule Identify/gather available source material Identify SMEs Verify proposed training format design (ICW, WBT or ILT) and content Verify Course Master Schedule Identify deficiencies and corrective actions Method Verification 90 Days Prior to Validation (depending on scope and complexity of development efforts) Verify corrective actions Verify format SSI-W-OPS-20V4 Schedule meeting with cognizant technical customer Review SOW requirements and finalize Project Plan Schedule meeting with cognizant technical personnel including SMEs Review document against controlling document(s) Review contents against source data Prepare minutes including deficiencies and corrective actions Schedule internal review meeting Review document against controlling document(s) Review contents against source data Prepare minutes including deficiencies and corrective actions DRAFT Work Instructions for Training Materials Development Short Description of Review Validation Schedule 10 Days prior to final Government Review Purpose Final Government Review 30 Days prior to delivery Method Verify corrective actions Verify accuracy of all content Evaluate implementation plan Obtain government acceptance Schedule meeting with SMEs and technical customer Review contents against source data Prepare minutes including deficiencies and corrective actions Distribute validated copy of document for review and acceptance by technical customer 3. Deliver after all government comments have been incorporated. SSI-W-OPS-20V4 DRAFT