ESH&Q Manual 3210-T3 Task Hazard Analysis Worksheet Task Hazard Analysis Worksheet A-08-016-T Complete all information. Use as many sheets as necessary. Task location Hall A Task title Critical crane lifts Division Physics Prepared by Folts Department Hall A Reviewed by Supervisor deJager Approved by Folts Standard Requirements: (PPE, TOSPs, SOPs, etc.) Task Potential Hazards Risk Code before mitigation Critical crane lifts with multiple attach points, uneven loads or multiple lifting devices Crush, bump, pinch Drop load 4 Safe Procedures/Practices/Controls Equipment training Proper PPE, Crane training Lift plan Risk Code after mitigation 1 Use warning beacons and guards Requires master rigger training May require lift plan May require OSP 3210T3THA—11/9/01 rev: November 16, 2001 3210-T3 Page 1 of 2 ESH&Q Manual 3210-T3 Task Hazard Analysis Worksheet When a completed analysis indicates that the estimated risk code for any of the steps of this task is “medium” or higher (RC≥3), then develop a formal written procedure for the task and have it reviewed and approved prior to beginning the work. 3210T3THA—11/9/01 rev: November 16, 2001 3210-T3 Page 2 of 2