Berwick Fire Hall – Kitchen Addition
Information to Proponents
Section:00100
December 2015
Berwick Fire Hall – Kitchen Addition
Owner:
1.
Fire Commission for the District of Berwick & Town of Berwick
Proposal Submission
.1
Submit completed Section 00330 – Tender Form
February 11 2016, by 2:00pm on for above project in sealed
envelope marked as follows:
DESIGN-BUILD PROPOSAL
Berwick Fire Hall–Kitchen Addition
and addressed to:
Fire Commission for the District of Berwick & Town of Berwick
236 Commercial Street
PO Box 130
Berwick, Nova Scotia B0P 1E0
2.
Proposal Opening
.1
Proposals will be opened immediately after closing, at the
Offices’ of the Town of Berwick. Opening will be public. Pricing
will not be disclosed at opening.
3.
Contacts
.1
.2
Steve McMahon, mcmahon@lbelec.com 902-680-6115
Ken Redden, klredden@hotmail.com 902-599-3261
4.
Accuracy of
Referencing
.1
Indexing and cross-referencing are for convenience only.
5.
Conditions of
Proposal Submission
.1
Take full cognizance of content of all Contract Documents in
preparation of Proposal. Refer to Section 00330 – Tender Form
for a complete list of Contract Documents.
6.
Proponents to
Investigate
.1
Proponents will be deemed to have familiarized
themselves with existing site and working conditions
which may affect performance of the Contract. No
plea of ignorance of such conditions as a result of failure
to make all necessary examinations will be accepted as a
basis for any claims for extra compensation or an
extension of time.
1
Berwick Fire Hall – Kitchen Addition
Information to Proponents
7.
Clarification
and Addenda
Section:00100
December 2015
.1
Notify the Owner not less than 7 working days before
proposal Closing of omissions, errors or ambiguities
found in Contract Documents. If the Owner considers
that correction, explanation or interpretation is
necessary, a written addendum will be issued. All
addenda will form part of Contract Documents.
.2
Confirm that all addenda have been received.
8.
Preparation of
Proposal
.1
Complete Tender Form provided with Project Documents
in ink or by typewriter. Complete all items and fill in all
blanks. Have corrections initialed by person signing
Proposal.
9.
Taxes
.1
Include all taxes except Harmonized Sales Tax in tender
unit prices.
10. Proposal Security
.1
Provide Proposal Security in amount of 10% of the
Estimated Contract Price with Proposal, in the form of
A Certified Cheque or Money Order payable to the Owner
or a Bid Bond on CCDC Form 220.
11. Contract Security
.1
The successful Proponent (Design-Build Contractor) shall
submit to the Owner a performance guarantee in the form
of a Performance Bond and for fifty percent (50%) of the
contract amount.
12.
.1
Refer to General Conditions for insurance requirements.
Insurance
2
Berwick Fire Hall – Kitchen Addition
Information to Proponents
Section:00100
December 2015
13. Agreement and
General Conditions
.1
CCA Document 14-2000 Design-Build Stipulated Price
Contract forms the basis of Agreement and General
Conditions between the Owner and Proponent.
14.
Return of
Proposal Security
.1
Proposal Security will be returned to:
15.
Amendment or
Withdrawal of Proposal
.1
all except the three lowest Acceptable Proponents
within 7 days of Proposal Opening.
.2
two remaining unsuccessful Proponents within 7
days of Date of the executed Agreement.
.3
successful Proponent following receipt by Owner of
Executed Agreement, specified Contract Security,
and Insurance documents.
.1
Proposals may be amended or Withdrawn by post or
Facsimile.
.2
Amendment of individual unit prices is the only acceptable
price amendment. Amendments shall not disclose either
original or revised total price.
.3
Head amendment or withdrawal as follows:
“(Amendment)/(Withdrawal) of Proposal for Berwick Fire
Hall – Kitchen Addition”. Sign and seal as required for
Proposal, and submit at Address given for receipt of
Proposal prior to time of Proposal Closing.
16.
Informal or
Unbalanced Proposal
.1
Proposal which in the opinion of the Owner are considered
to be informal or unbalanced may be rejected.
17.
Right to Accept
or Reject any Proposal
.1
Owner reserves right to accept or reject any or all
3
Berwick Fire Hall – Kitchen Addition
Information to Proponents
Section:00100
December 2015
proposal including without limitation the lowest price
proposal, and to award the award the Contract to
whomever OWNER in its sole and absolute discretion
deems appropriate notwithstanding any custom of the
trade nor anything contained in the Contract Documents
or herein. OWNER shall not, under any circumstances, be
responsible for any costs incurred by the Proponent in
preparing of its Proposal.
Without limiting the Generality of the foregoing,
the OWNER reserves the right, in its sole and absolute
discretion, to accept or reject any Proposal which in
the view of the OWNER is incomplete, obscure, or
irregular, which has erasures or corrections in the
documents, which contains exceptions and variations,
which omits one or more prices, which contains prices
the OWNER consider unbalanced or which is accompanied
by a Bid Bond or Consent or Surety issued by a surety not
acceptable to the OWNER.
Criteria which may be used by the OWNER in evaluating
proposals and awarding the Contract are in the OWNER’s
sole and absolute discretion and, without limiting the
generality of the foregoing, may include one or more of:
experience of design team, price, total cost to OWNER;
the amount of Nova Scotia and local content; the amount
of Canadian content; reputation; claims history of
Proponent qualifications and experience of the Proponent,
the design team and its personnel; quality of services and
personnel proposed by the Proponent; ability of the
Proponent to ensure Continuous availability of qualified
and experienced personnel; the Construction Schedule
and Plan; the proposed Labour and Equipment; the quality
of the submission; and the proposed Supervisory Staff.
An early completion will be weighed strongly in the
evaluation of Proposals.
Should the OWNER not receive any proposal satisfactory
to the OWNER in its sole and absolute discretion, the
OWNER reserves the right to re-issue the Request
for Proposals for the Project, or negotiate a contract for
4
Berwick Fire Hall – Kitchen Addition
Information to Proponents
Section:00100
December 2015
the whole or any part of the Project with anyone or more
persons whatsoever, including one or more of the
Proponent.
18. Safety
Certification
19. Security Clearance
.1
Submit with Proposal, a copy Proponent’s current and
valid Letter of Good Standing issued jointly by the Nova
Scotia Construction Safety Association and the Province
of Nova Scotia Department of Labour.
.2
Out of province companies shall submit, with their
Proponent, a current and valid Letter of Good Standing
from their province of origin or from a recognized Safety
Association which utilizes an External audit element.
.3
Out of province companies may obtain a Letter of Good
Standing from the Nova Scotia Construction Safety
Association upon submission of documentation verifying
training and compliance with the Nova Scotia OH&S Act
and Regulations.
.4
In any event, out of province Proponent will have to
satisfy the Nova Scotia Construction Safety
Association in respect to their safety status prior to
being awarded a contract.
.5
Subcontractors are not required to have Nova Scotia
Construction Safety Association certification.
.1
The successful Proponent must Submit proof of security
back-ground clearances for all staff proposing to work on
the project.
.2
The Owner reserves the right not to award the contract
Based on the results of the security background clearance.
5
Berwick Fire Hall – Kitchen Addition
Information to Proponents
20. Workers
Compensation Board
.1
Section:00100
December 2015
The Contractor shall provide to the Owner’s
Representative a clearance certificate from the Workers’
Compensation Board at the following project milestones:
.1 Prior award of the contract
.2 Every three months during the progress of the project.
.3 Prior to release of Holdback.
21. Permits
.1
The Proponent shall be responsible for obtaining and
Paying for all permits, licenses and fees from the
appropriate authorities including the cost of any building
permits required.
22. Professional Seals
.1
This Performance Specifications and drawings are
provided as a guideline for minimum requirements
for the development of detailed design by the Design
Team members of the Design-Build Proponent.
.2
The responsibility for the design, construction,
commissioning and warranty of the project will
reside with the Design-Build proponent.
****** End of Section 00100 ******
6
Berwick Fire Hall – Kitchen Addition
Proposal Submission Requirements
Section:00200
December 2015
Design Build Proposal Submission Requirements
1. General
.1
The intent of this design build proposal is to obtain a complete price for the design,
construction, commissioning, and handover of a kitchen addition to the Berwick and
District Volunteer Fire Department. The contractor shall use the specifications within
this document and the attached drawings as a guide for the requirements of this space.
The approximate size of the addition will be 22’ wide by 20’ deep. It will be up to the
contractor to finalize the exact size to line up the interior walls with the existing kitchen
in width, and match the exterior end wall to line up with the exterior wall of the
apparatus floor section of the fire hall.
2. Architectural Design
.1
Provide a floor plan in adequate detail to show footprint, location size and swing of
doors, structural components including bracing.
.2
Provide building cross sections to indicate eave height, flashing, and insulation details.
.3
Provide elevations of the exterior view of the addition.
.4
Provide detailed description of exterior wall systems including type of construction,
insulation rating and type, flashings, air and vapour barriers, thermal breaks, interior
and exterior finishes.
.5
Provide a detailed description of roofing system including type of construction,
thickness, slopes, drainage, insulation rating and type, air and vapour barriers, snow
loads and wind resistance design.
.6
Provide a schedule of interior finishes, door and framing types.
.7
Existing kitchen ceiling height is approximately 10’-00”. Identify if addition ceiling height
can be maintained or if it is necessary to have a lower ceiling height in the addition.
3. Minimizing Disruption and Security
.1
The existing kitchen must remain operational during the construction period. Provide
for a dust barrier between existing kitchen and addition during construction.
.2
The building must remain secure during the period of construction.
.3
Any lawn, landscaping, or parking lot damage incurred during construction shall be
repaired and returned to original condition.
1
Berwick Fire Hall – Kitchen Addition
Proposal Submission Requirements
Section:00200
December 2015
4. Exterior
.1
Steel siding, trim, facia, and brick work to match existing building. Existing siding and
brickwork that is removed from existing exterior wall may be reused in the new
addition.
.2
Windows from existing kitchen shall be reused in the addition.
.3
Roof shingles on the addition are to match existing and be of equal quality.
.4
Gutters and downspouts to match existing with concrete splash pads under
downspouts.
.5
36” Exterior man door and frame to be equivalent in quality to existing exterior doors.
Door to have a thermopane window approximately 24” x 24”.
.6
Exterior door hardware to match existing fire hall door hardware. Lock to be keyed to
match existing fire hall keys.
5. Foundation and concrete floor
.1
Foundation and frost wall to suit site conditions. Existing building utilizes a 4’-0” frost
wall on a strip footing.
.2
The connection of the addition’s frost wall and floor to the existing building shall be
done using industry best practices to prevent movement. Proponent shall describe
intended method in their proposal.
.3
Floor shall be minimum of 4” of 4000 PSI concrete with wire mesh reinforcement.
6. Exterior walkways
.1
Install a 4’-0” wide x approximately 20’-0” long concrete pad with brushed finish along
the South wall. Pad shall be minimum 4” thick of minimum 5000 PSI concrete with wire
mesh reinforcement. Pad to be sloped ¼” over the 4-00” wide away from the building.
Joint between pad and addition frost wall shall be caulked with an appropriate flexible
caulking product.
2
Berwick Fire Hall – Kitchen Addition
Proposal Submission Requirements
.2
Section:00200
December 2015
Install a 3’-0” wide concrete walkway between the south side pad and the existing
asphalt walkway to clubroom door. Walkway shall be minimum 4” thick of minimum
5000 PSI concrete with wire mesh reinforcement.
7. Insulation Levels
.1
Ceiling minimum R60. Existing building uses cellulous blown in insulation.
.2
Walls minimum R40. Existing building uses 2x8 stud walls with 8” of fiberglass batt type
insulation and 2” of extruded Styrofoam insulation on the inside face of the wall.
.3
Floors Minimum R20. Existing building uses 2 layers of 2” extruded Styrofoam layered
with staggered joints under the concrete floor.
.4
Thermal breaks to be provided where concrete floor meets the foundation wall.
8. Interior
.1
Floor tile and baseboard to match existing.
.2
Ceiling tile to match existing.
.3
Walls to be ½” GWB Taped and filled to industry standard.
.4
The ceramic tile backsplash adjacent the openings between the existing kitchen and
addition shall be extended to cover the edges of the new opening to the height of the
bottom of the upper cabinets.
9. Paint Finishes
.1
Paints shall be either Pitt Teck or Benjamin Moore Ultraspec 500 latex.
.2
All surfaces shall receive a minimum of one coat of primer topped with a minimum two
coats of finish. Tinted primer will not count as a coat of finish.
.3
Colours are to be as follows:
Interior walls – White Swan Semi Gloss
Door Frames – Natural Wool Satin
Interior of Man Door – Indian Corn
Exterior of Man Door – White Satin
3
Berwick Fire Hall – Kitchen Addition
Proposal Submission Requirements
Section:00200
December 2015
10. Cabinets and Countertops
.1
New cabinets and countertops to match existing cabinets and countertops.
.2
Supply and install two cabinets 48”wide outside x 24” deep inside by 84” high outside.
Cabinets to have one center fixed shelf and two adjustable shelves above and two
adjustable shelves below the fixed shelf.
.3
Supply and install one cabinet 24” wide outside x 24” deep inside x 84” high outside.
Cabinet to have one fixed shelf 60” from bottom of cabinet and one adjustable shelf
above the fixed shelf.
.4
Supply and install a shelf 48” long with closet rod of same construction style as found in
existing coat room in the auditorium.
.5
Reuse four 24 x 24” lower cabinets that are removed from existing kitchen to construct
a new fixed island approximately 48” wide x 96” long. Reused cabinets to be located
back to back at each end with 2 adjustable shelves approximately 48” x 48” between
them and doors installed to match existing cabinet doors.
.6
New island countertop to be approximately 50”wide x 96” long to match existing
countertops.
.7
Supply and install two new countertops to match existing countertops where cabinets
are modified to make openings between existing kitchen and addition.
.8
Install 2x8 blocking in walls behind new cabinets approximately 48” AFF.
11. Mechanical
.1
Supply and install ducting as required to a 2’ x 2’ ceiling mount supply grill in the
addition using appropriately sized ducting.
.2
If any duct work is located in unconditioned space install appropriate insulation.
.3
Balance the air handling system.
.4
Extend / relocate existing range hood ducting to allow for new roofline if required.
4
Berwick Fire Hall – Kitchen Addition
Proposal Submission Requirements
Section:00200
December 2015
12. Plumbing
.1
Relocate existing exterior hose bib to addition exterior wall.
13. Electrical
.1
Supply and install a 18 circuit Siemens type BL 3 phase 4 wire bolt on breaker panel with
door kit to be fed from Panel K located in the existing kitchen. Contractor to supply and
install a 60A 3P type BL breaker in panel to power the new 18 circuit panel.
.2
Supply and install six new recessed fluorescent light fixtures c/w lamps matching the
fixtures in the existing kitchen. The new lights are to be connected onto the existing
kitchen lighting circuit. A new 4 way switch with stainless steel cover is to be installed at
the new outside entrance and wiring adjusted so that all lights in the existing kitchen
and addition can be turned on from either of the two existing switch locations and
inside of the new outside entrance. Fixtures shall be Lithonia 2GT8 332 A12125 MVOLT
1/3 GEB10IS CSA c/w F32T8 3500K lamps. Fixture designation F1
.3
Supply and install six new recessed lights c/w LED lamps in facia to match existing facia
pot lights. Fixtures shall be Lithonia L6WCSA c/w LED screw base lamps 11Watt A19
2700K. Control with a photocell mounted under the soffit on the south side of the
addition. Fixture designation R1
.4
Supply and install 20A duplex receptacles for fridge, freezer, and island plugs as
indicated on the drawings. Each of these receptacles to be fed from their own 20A
breaker. Receptacles shall be Hubbel CR15I or equivalent with stainless steel wall plates.
Receptacle mounting height to be 12” AFF except the 2 Island mounted receptacles.
.5
Supply and install commercial grade general service 15A duplex receptacles in locations
indicated on the drawings. Receptacles shall be Hubbel CR20I or equivalent with
stainless steel wall plates. Receptacle mounting height to be 12”AFF except the one
receptacle on the south inside wall at 7’-0” AFF for the insect trap.
.6
Supply and install exterior GFCI receptacles as indicated on the drawings c/w
weatherproof covers.
.7
Supply and install two 1250 watt 208V electric base board heaters fed from a line
voltage double pole thermostat. Locations as indicated on the drawings below windows.
Baseboard heater designation BB1
.8
Install a run of 18/2 LVT cable and a run of Cat5 cable for door lock system from the
door frame of the exterior man door to the control cabinet in the radio room.
Installation of the door strike reader and termination of wiring will be others.
5
Berwick Fire Hall – Kitchen Addition
Proposal Submission Requirements
.9
Section:00200
December 2015
Supply and install a door bell button outside of the man door and connect to existing
door bell system in kitchen.
*******End of Section 00200******
6
Berwick Fire Hall – Kitchen Addition
Tender Form
1.
Section:00330
December 2015
SALUTATION:
.1
To:
Fire Commission for the District of Berwick
and Town of Berwick
c/o Town of Berwick
236 Commercial Street, PO Box 130
Berwick, Nova Scotia B0P 1E0
.2
For:
Berwick Fire Hall – Kitchen Addition
.3
From: _________________________________________
______________________________________________
______________________________________________
2.
3.
PROPONENT DECLARES:
.1
That this proposal was made without collusion or fraud
.2
That the proposed work was carefully examined.
.3
That the Proponent was familiar with local conditions.
.4
That Contract Documents and Addenda No.____ to ____ Inclusive were carefully
examined.
.5
That all above were taken into consideration in preparation of this Proposal.
PROPONENT AGREES:
.1
To enter into a contact to supply all design services, Labour, materials and equipment
and to do all the work necessary to design and construct the Work as described and
specified herein for the prices stated in the Breakdown of Prices.
.2
That this Proposal is valid for acceptance for 90 days from the time of Proposal Closing.
.3
To provide evidence of ability and experience within 7 days of request, including:
experience in similar work, work currently under contract, senior supervisory staff
available for the project, equipment available for use on project, and financial
resources.
1
Berwick Fire Hall – Kitchen Addition
Tender Form
Section:00330
December 2015
.4
To execute in triplicate the Agreement and forward same together with the specified
Contract security and insurance documents to the Owner with 14 days of
written notice of award.
.5
That failure to enter into a formal contract and give specified insurance documents and
Contract security within time required will constitute grounds for forfeiture of certified
cheque or enforcement of bid bond.
.6
That if certified cheque is forfeited, Owner will retain difference in money between
of Proposal and amount for which Owner legally contracts with another party to
perform the Work and will refund balance, if any, to Proponent.
.7
That the Contract Documents include:
.1
Standard Specifications for Municipal Services listed in Table of Contents Page.
.2
CCDC 2 – 1994 Stipulated Price Contract listed in Table of Contents Page.
.3
Project Documents
.1
Section 00100
Information to Proponents
.2
Section 00200
Proposal Submission Requirements
.3
Section 00330
Tender Form
.4
Section 00400
Supplementary Proposal Information
.5
Room Data Sheet
Room 1
.6
Drawings
A-1
E-1
E-E
E-S
E-S
P-1
.7
Architectural Layout – Proposed Kitchen Addition Floor Plan
Electrical Layout – Power Distribution and lighting Partial Plan 1
Elevation East
Elevation South
Elevation West
BDVFD Kitchen Addition 2015 Photos
Addenda as issued and as confirmed in Subsection 2.4 of this section.
2
Berwick Fire Hall – Kitchen Addition
Tender Form
Section:00330
December 2015
4. BREAKDOWN OF PRICES
4.1 April 2016 Construction Start
1. Site work and building construction
$____________
2. Mechanical, HVAC
$____________
3. Electrical
$____________
TOTAL (Excluding HST)
$____________
Proponent’s HST Registration No.___________________
5. COMPLETION TIME
5.1 April 2016 Construction Start
.1
Proponent agrees to complete the work within ____ weeks of the date of the
Executed Agreement.
3
Berwick Fire Hall – Kitchen Addition
Tender Form
Section:00330
December 2015
6. SIGNATURE*
DATED THIS ______ DAY OF ___________2016.
______________________________
Name of Firm Submitting
________________________________________________________________
Witness
Signature of Signing Officer
________________________________
Name and Title (printed)
_________________________________________________________________
Witness
Signature of Signing Officer
________________________________
Name and Title (printed)
__________________________________________________________________
Company Address
________________________________
Telephone No.
________________________________
Fax No.
*NOTE: Proposals submitted by or on behalf of any Corporation must be signed and sealed in the name
of such Corporation by a duly authorized officer or agent.
******End of Section 00330******
4
Berwick Fire Hall – Kitchen Addition
Tender Form
Section:00330
December 2015
5
Berwick Fire Hall – Kitchen Addition
Supplementary Proposal Information
Section:00400
December 2015
1.
This Section is required to be completed at the time of proposal submission with all
Information requested completed in full.
2.
Submit with Proposal the following:
.1
Name and address of the chartered Canadian bank or reputable financial institution
to vouch for proponent’s financial status.
.2
Name and address of the company who has agreed to underwrite the bonds for
Performance and for Labour and Material Payment.
.3
Name and address of the company who will underwrite the contract insurance
required.
.4
Particulars of recent contracts successfully completed or progressing towards
completion, including design-build experience, and experience with solar heating,
and air heating pumps, Commercial Building Incentive Program (BDIP).
.
.5
3.
A list of equipment to be used.
.6
A list of project personnel.
.7
A list of subcontractors.
.8
A program of the work.
Submittals
.1
Confirmation of Proponent’s financial status.
Name _____________________________________________________________
__________________________________________________________________
Address ___________________________________________________________
__________________________________________________________________
Contact Person ___________________________Telephone _________________
.2
Name and address of company who has agreed to underwrite the bonds for
Performance and for Labour and Material Payment. These bonds shall be issued by
1
Berwick Fire Hall – Kitchen Addition
Supplementary Proposal Information
Section:00400
December 2015
a duly licensed surety company authorized to transact the business of suretyship in
the Province of Nova Scotia.
Name _______________________________________________________________
____________________________________________________________________
Address _____________________________________________________________
____________________________________________________________________
Contact Person __________________________Telephone ____________________
.3
Name and address of company who has agreed to underwrite insurance, the type and
amount. This insurance shall be issued by a company having insurance adjusting
representation in the Berwick area.
Name _______________________________________________________________
_____________________________________________________________________
Address ______________________________________________________________
_____________________________________________________________________
Contact Person _____________________________ Telephone _________________
Type of Insurance
Amount
________________________________
______________________
________________________________
______________________
________________________________
______________________
________________________________
______________________
________________________________
_______________________
________________________________
_______________________
________________________________
_______________________
2
Berwick Fire Hall – Kitchen Addition
Supplementary Proposal Information
.4
Section:00400
December 2015
List of project personnel.
Include below the names, qualifications and previous experience of those employees
who will be directly involved with the project. Include project engineer or manager,
superintendent, foreman, and other senior staff.
.5
Name
_______________________
Position
Architect ___________
Related Experience
___________________
_______________________
Structural Engineer
___________________
_______________________
_______________
___________________
_______________________
___________________
___________________
_______________________
_____________________
___________________
_______________________
_____________________
___________________
_______________________
_____________________
___________________
_______________________
_____________________
___________________
_______________________
_____________________
___________________
_______________________
_____________________
___________________
List of Subcontractors
Enter the name and address of each Subcontractor used in making up this Proposal.
Only name one Subcontractor for each part of the Work to be sublet.
Upon acceptance of a Proposal by the Owner, the Contractor shall not substitute
another Subcontractor in place of the one named without the written approval from
the Owner’s Representative.
3
Berwick Fire Hall – Kitchen Addition
Supplementary Proposal Information
Subtrade
.6
Section:00400
December 2015
Value of Work
________________
Subcontractor
Extent of Work
Name and Address
__________________ ________________
_________________
__________________ ________________
______________
_________________
__________________ ________________
______________
_________________
__________________ ________________
______________
_________________
__________________ ________________
______________
_________________
__________________ ________________
______________
_________________
__________________ ________________
______________
______________
Program of the Works
Insert a brief description of the proposed method of operation and phasing to ensure
Completion in the period set forth in Section – 00330 – Tender Form, Subsection 5 –
COMPLETION TIME.
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
******End of Section 00400******
4
Berwick Fire Hall - Kitchen Addition
Photographs of existing building.
Hose bib to be relocated
Approximate width of addition
Berwick Fire Hall - Kitchen Addition
Photographs of existing building.
Addition East wall to line up with back apparatus floor wall
Windows to be reused
Fan may require duct extension
Berwick Fire Hall - Kitchen Addition
Photographs of existing building.
Existing island to be rotated 90 degrees
Edges of openings to addition to have ceramic tile
matching existing to height of lower cabinets
Berwick Fire Hall - Kitchen Addition
Photographs of existing building.
South existing lower cabinets to be reused in new island
South countertop to be replaced
Berwick Fire Hall - Kitchen Addition
Photographs of existing building.
Existing Panel K
North existing lower cabinets to be reused in new island
North countertop to be replaced
Download